This document is an attachment to a Task Order (TO-E) under the 36C25226B0020 IDIQ Abatement contract for the Hines Abatement project covering Buildings 1 and 200. The attachment details six abatement tasks with specific scope, timelines, and location information.

Tasks 1 and 2 involve abatement work in Building 1, Floor 3 (Rooms D333, D335, and D335A) with 8 calendar days, 6 abatement days, and 8 monitoring days allocated. The scope includes abating all lead paint excluding windows (with contractor assumption that all paint is lead-based), abating all asbestos-containing materials (ACM) floor tile, ceiling tile, glue dots, mastic, and pipe insulation/fittings/elbows, and re-insulating all abated piping. Tasks 3, 4, and 5 cover Building 1, Floor 4 (Rooms D405, D407, D407A, D409, and D409A) with identical abatement requirements but requiring 10 calendar days, 8 abatement days, and 10 monitoring days. Task 6 addresses Building 200's stone space with 34 calendar days, 32 abatement days, and 34 monitoring days, focusing solely on ACM pipe insulation, fittings, and elbows abatement with re-insulation. All work is scheduled for Monday-Friday day shift hours, and the document includes floor plan drawings identifying the specific rooms and areas requiring abatement treatment.

View the file

Other files

File Type Posted
S06 Att1_S02 Insert B.2 IDIQ Abatement Services PRICE SCHEDULE-Rev1.docx DOCX document
36C25226B0020 0004.docx DOCX document
S06 Att12.rev DB Wages_COOK CTY_rev2 IL20260009 2026.05.18 current_2026.06.17.pdf PDF
36C25226B0020 0003.docx DOCX document
S06 0002 Att1.pdf PDF
36C25226B0020 0002.docx DOCX document
S06 001.Att4a S02_Att17a DWGS_Healthcare Bldgs 113_128_200_217_221_228.pdf PDF
S06 001.Att6 Site Visit Sign In Sheets 2026.04.13_04.20.pdf PDF
S06 001.Att5 S02_Att18 Reference_2022 Facility Condition Assessment Report_rev.pdf PDF
S06 001.Att0.0 S02_Att00 SOW.R1 2026.04.23 578-26-004 Base IDIQ Abatement Services.pdf PDF
36C25226B0020 0001.docx DOCX document
S06 001.Att1 S02_Att14 VHA Directive 7714_D_2017-04-06 Asbestos Mangement Plan.pdf PDF
S06 001.Att0.1 S02_Att7.0 Seed SOW.Rev1 Project 578-26-008 TO-E Abatement Bldgs 1_200 2026.04.22 (1).pdf PDF
S06 001.Att4b S02_Att17b DWGS_Outer Bldgs_01_12, and 13.pdf PDF
S06 001.Att3 S02_Att16 Hines VA Preservation Plan with Inventory_updated 2013.pdf PDF
Copy of S06 001.Att2 S02_Att15 Asbestos Survey for EHVAH.xlsx XLSX spreadsheet
S02 Att07.2 Seed 578-26-008 SPECS.pdf PDF
S02 Att07.5 Seed 578-26-008 ILSM.pdf PDF
S02 Att07.3 Seed 578-26-008 VHA PCRA-1-1.pdf PDF
36C25226B0020_4.docx DOCX document
S02 Att03 Emergency Contact List - Template.pdf PDF
S02 Att12 DB Wage Rates_COOK CTY_rev1 IL20260009 2026.01.09 current as of 2026.04.07.pdf PDF
S02 Att04 Contractor Badging - Fingerprint Request Form 2025.pdf PDF
S02 Att09 Contractor Surety Limitations 578-26-004_B0020.pdf PDF
S02 Att08 Financial Disclosure Questionnaire IDIQ Abatement B0020.pdf PDF
S02 Att13 SOL 0020 VAAR 852.219-75 Certification 578-26-004.docx DOCX document
S02 Att07.1 Seed SOW 578-26-008 Hines Documents for Construction with TOC.pdf PDF
S02 Att00 SOW 578-26-004 IDIQ Abatement Services.pdf PDF
S02 Att11 Contractor General Information 578-26-004_B0020.pdf PDF
S02 Att01 Unit Pricing 2025.08.28 578-26-008 TO-E Abmt Bldgs 1_200.xlsx XLSX spreadsheet
S02 Att07.0 Seed SOW 578-26-008 Abatement TO-E Bldgs 1_200 2025.08.28.pdf PDF
S02 Att10 Contractor Safety and EMR 578-26-004_B0020.pdf PDF
S02 Att02 HINES VA SITE PLAN 5-1-2025.pdf PDF
S02 Att07.4 Seed 578-26-008 VHA ICRA-1-3.pdf PDF
S02 Att05 VHA PCRA-1.1_May 21 2024.pdf PDF
S02 Att06 VHA ICRA-1.3_Dec 9 2024.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tasks 1 and 2 Bldg 1 – Floor 3, Room D333, D335, and D335A

Calendar Days = 8 Abatement Days = 6 Monitoring Days = 8

• Abate all lead paint – excluding all windows – contractor shall assume all paint is lead based paint.

• Abate all ACM floor tile, ceiling tile, glue dots, mastic, pipe insulation, pipe fittings, and pipe elbows

• Re-insulate all abated piping, pipe fittings, and pipe elbows.

• This work can be completed during Monday-Friday day shift hours

36C25226B0020 IDIQ Abatement

ATTACHMENT 7.6

578-26-008 Hines Abatement TO-E Bldgs 1 and 200

Tasks 3, 4, and 5 Bldg 1 – Floor 4, Room D405, D407, D407A, D409 and D409A

• Abate all lead paint – excluding all windows – contractor shall assume all paint is lead based paint.

• Abate all ACM floor tile, ceiling tile, glue dots, mastic, pipe insulation, pipe fittings, and pipe elbows

• Re-insulate all abated piping, pipe fittings, and pipe elbows.

• This work can be completed during Monday-Friday day shift hours

Calendar Days = 10 Abatement Days = 8 Monitoring Days = 10

36C25226B0020 IDIQ Abatement

ATTACHMENT 7.6

578-26-008 Hines Abatement TO-E

Tasks 6 Bldg. 200 Stone space – Example of an existing condition

Calendar Days = 34 Abatement Days = 32 Monitoring Days = 34

• Abate all ACM pipe insulation, pipe fittings, and pipe elbows

• Re-insulate all abated piping, pipe fittings, and pipe elbows.

• This work can be completed during Monday-Friday day shift hours

36C25226B0020 IDIQ Abatement

ATTACHMENT 7.6

578-26-008 Hines Abatement TO-E

Slide Number 1
Slide Number 2
Slide Number 3

File details come from the government source that posted it. Updated .