S02 Att01 Unit Pricing 2025.08.28 578-26-008 TO-E Abmt Bldgs 1_200.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Z1DA--578-26-004: IDIQ ACM Abatement Base
Solicitation number
36C25226B0020
Issued by

About this file

This is a unit pricing schedule for an Indefinite Delivery/Indefinite Quantity (IDIQ) contract for asbestos-containing material (ACM) abatement services under solicitation 36C25226B0020. The pricing document is associated with the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12 and references a base contract Z1DA--578-26-004. The spreadsheet presents a line item pricing structure for Item #1, which covers fire stopping services, specifically addressing pipe, conduit, wall, and floor penetration applications. The document establishes unit prices and quantities for calculating subtotal costs related to fire stopping work, which represents a critical component of the abatement project scope.

The file appears to be a pricing template or attachment extracted from a larger solicitation package. As a unit pricing schedule for an IDIQ vehicle, this document would establish the basis for pricing multiple task orders issued over the contract period. The specific focus on fire stopping as the first priced item suggests this is foundational work requiring sealing of penetrations through building envelopes, a standard requirement in ACM abatement projects to prevent fiber release and ensure worker and occupant safety during remediation activities at VA facilities.

View the file

Other files

File Type Posted
S06 Att1_S02 Insert B.2 IDIQ Abatement Services PRICE SCHEDULE-Rev1.docx DOCX document
36C25226B0020 0004.docx DOCX document
S06 Att12.rev DB Wages_COOK CTY_rev2 IL20260009 2026.05.18 current_2026.06.17.pdf PDF
36C25226B0020 0003.docx DOCX document
S06 0002 Att1.pdf PDF
36C25226B0020 0002.docx DOCX document
S06 001.Att4a S02_Att17a DWGS_Healthcare Bldgs 113_128_200_217_221_228.pdf PDF
S06 001.Att6 Site Visit Sign In Sheets 2026.04.13_04.20.pdf PDF
S06 001.Att5 S02_Att18 Reference_2022 Facility Condition Assessment Report_rev.pdf PDF
S06 001.Att0.0 S02_Att00 SOW.R1 2026.04.23 578-26-004 Base IDIQ Abatement Services.pdf PDF
36C25226B0020 0001.docx DOCX document
S06 001.Att1 S02_Att14 VHA Directive 7714_D_2017-04-06 Asbestos Mangement Plan.pdf PDF
S06 001.Att0.1 S02_Att7.0 Seed SOW.Rev1 Project 578-26-008 TO-E Abatement Bldgs 1_200 2026.04.22 (1).pdf PDF
S06 001.Att4b S02_Att17b DWGS_Outer Bldgs_01_12, and 13.pdf PDF
S06 001.Att3 S02_Att16 Hines VA Preservation Plan with Inventory_updated 2013.pdf PDF
Copy of S06 001.Att2 S02_Att15 Asbestos Survey for EHVAH.xlsx XLSX spreadsheet
S02 Att07.2 Seed 578-26-008 SPECS.pdf PDF
S02 Att07.5 Seed 578-26-008 ILSM.pdf PDF
S02 Att07.3 Seed 578-26-008 VHA PCRA-1-1.pdf PDF
36C25226B0020_4.docx DOCX document
S02 Att03 Emergency Contact List - Template.pdf PDF
S02 Att12 DB Wage Rates_COOK CTY_rev1 IL20260009 2026.01.09 current as of 2026.04.07.pdf PDF
S02 Att07.6 Seed 578-26-008 Hines Abatement TO-E Locations.pdf PDF
S02 Att04 Contractor Badging - Fingerprint Request Form 2025.pdf PDF
S02 Att09 Contractor Surety Limitations 578-26-004_B0020.pdf PDF
S02 Att08 Financial Disclosure Questionnaire IDIQ Abatement B0020.pdf PDF
S02 Att13 SOL 0020 VAAR 852.219-75 Certification 578-26-004.docx DOCX document
S02 Att07.1 Seed SOW 578-26-008 Hines Documents for Construction with TOC.pdf PDF
S02 Att00 SOW 578-26-004 IDIQ Abatement Services.pdf PDF
S02 Att11 Contractor General Information 578-26-004_B0020.pdf PDF
S02 Att07.0 Seed SOW 578-26-008 Abatement TO-E Bldgs 1_200 2025.08.28.pdf PDF
S02 Att10 Contractor Safety and EMR 578-26-004_B0020.pdf PDF
S02 Att02 HINES VA SITE PLAN 5-1-2025.pdf PDF
S02 Att07.4 Seed 578-26-008 VHA ICRA-1-3.pdf PDF
S02 Att05 VHA PCRA-1.1_May 21 2024.pdf PDF
S02 Att06 VHA ICRA-1.3_Dec 9 2024.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

IDIQ Base Price Schedule
ITEM #1 - FIRE STOPPINGUnit PriceUnitQuantitySubtotal
a. Pipe/conduit wall and floor penetration <2" dia.EACH$ - 0
b. Pipe/conduit wall and floor penetration >2" to <4" dia.EACH$ - 0
c. Pipe/conduit wall and floor penetration >4" to <8" dia.EACH$ - 0
d. Pipe/conduit wall and floor penetration >8" to <12" dia.EACH$ - 0
e. Pipe/conduit wall and floor penetration >12" to <16" dia.EACH$ - 0
f. Pipe/conduit wall and floor penetration >16" dia.EACH$ - 0
g. Ductwork and/or b\boiler breechingLF$ - 0
h. Beams and/or columnsLF$ - 0
i. Firestopping top and/or edge of wallLF$ - 0
j. Masonry wall - cavity enclosureLF$ - 0
k. Drywall - cavity enclosureLF$ - 0
Item 1 Subtotal:$ - 0
ITEM #2 - ASBESTOS ABATEMENT, GLOVE BAG REMOVALUnit PriceUnitQuantitySubtotal
a. Insulation from pipe up to 6" dia.LF$ - 0
b. Insulation from fitting up to 6" dia.EACH$ - 0
c. Insulation from pipe 7" to 12" dia.LF$ - 0
d. Insulation from fitting 7" to 12" dia.EACH$ - 0
Item 2 Subtotal:$ - 0
ITEM #3 - ASBESTOS ABATEMENT, FULL-CONTAINMENT REMOVALUnit PriceUnitQuantitySubtotal
a. Insulation from pipe up to 6" dia.LF$ - 0
b. Insulation from fitting up to 6" dia.EACH$ - 0
c. Insulation from pipe 7" to 12" dia.LF$ - 0
d. Insulation from fitting 7" to 12" dia.EACH$ - 0
e. Insulation from tank, boiler, breachingLF$ - 0
f. Insulation from ductworkLF$ - 0
g. Contaminated suspended ceiling from gridSF$ - 0
h. Contaminated drywall/plaster ceiling, walls, etc.SF$ - 0
I. Contaminated debris from floor, ceiling, etc.SF$ - 0
j. Contaminated transite material/panelsSF$ - 0
k. Contaminated spray-on insulationSF$ - 0
l. Contaminated floor tile/masticSF$ - 0
m. Carpet with contaminated floor tile/masticSF$ - 0
n. Contaminated soil 3" deep & encapsulation/lock-downCF$ - 0
Item 3 Subtotal:$ - 0
ITEM #4 - OPERATION AND MAINTENANCEUnit PriceUnitQuantitySubtotal
a. Pipe insulation - patch and repairLF$ - 0
b. Fitting insulation - patch and repairEACH$ - 0
c. Boiler/tank insulation - patch and repairLF$ - 0
d. Ductwork insulation - patch and repairLF$ - 0
e. Clean-up, hepa vac and encapsulate/lock downLF$ - 0
Item 4 Subtotal:$ - 0
ITEM #5 – REINSULATIONUnit PriceUnitQuantitySubtotal
a. Reinsulation from pipe up to 6" dia.LF$ - 0
b. Reinsulation from fitting up to 6" dia.EACH$ - 0
c. Reinsulation from pipe 7" to 12" dia.LF$ - 0
d. Reinsulation from fitting 7" to 12" dia.EACH$ - 0
e. Reinsulation from tank, boiler, breachingLF$ - 0
f. Reinsulation from ductworkLF$ - 0
Item 5 - Subtotal$ - 0
NET TOTAL (Item 1 + 2 + 3 + 4 + 5)$ - 0
Note: All line-item pricing shall factor in the following costs:
a. Temporary environmental controls and safety,

b. Office administration,

c. Project management, h. Testing, inspection, reports and manifests & material disposal

i. Decontamination.

d. Preconstruction risk assessments (PCRA)j. Temporary signage,
e. Infection control risk assessment (ICRA)k. Daily clean-up, final cleaning, warranty,
f. Interim, life safety measures,l. As-builts,
g. Submittals,m. Overhead
n. Profit