S02 Att01 Unit Pricing 2025.08.28 578-26-008 TO-E Abmt Bldgs 1_200.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Z1DA--578-26-004: IDIQ ACM Abatement Base
- Solicitation number
- 36C25226B0020
About this file
This is a unit pricing schedule for an Indefinite Delivery/Indefinite Quantity (IDIQ) contract for asbestos-containing material (ACM) abatement services under solicitation 36C25226B0020. The pricing document is associated with the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12 and references a base contract Z1DA--578-26-004. The spreadsheet presents a line item pricing structure for Item #1, which covers fire stopping services, specifically addressing pipe, conduit, wall, and floor penetration applications. The document establishes unit prices and quantities for calculating subtotal costs related to fire stopping work, which represents a critical component of the abatement project scope.
The file appears to be a pricing template or attachment extracted from a larger solicitation package. As a unit pricing schedule for an IDIQ vehicle, this document would establish the basis for pricing multiple task orders issued over the contract period. The specific focus on fire stopping as the first priced item suggests this is foundational work requiring sealing of penetrations through building envelopes, a standard requirement in ACM abatement projects to prevent fiber release and ensure worker and occupant safety during remediation activities at VA facilities.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| IDIQ Base Price Schedule | |||||
| ITEM #1 - FIRE STOPPING | Unit Price | Unit | Quantity | Subtotal | |
| a. Pipe/conduit wall and floor penetration <2" dia. | EACH | $ - 0 | |||
| b. Pipe/conduit wall and floor penetration >2" to <4" dia. | EACH | $ - 0 | |||
| c. Pipe/conduit wall and floor penetration >4" to <8" dia. | EACH | $ - 0 | |||
| d. Pipe/conduit wall and floor penetration >8" to <12" dia. | EACH | $ - 0 | |||
| e. Pipe/conduit wall and floor penetration >12" to <16" dia. | EACH | $ - 0 | |||
| f. Pipe/conduit wall and floor penetration >16" dia. | EACH | $ - 0 | |||
| g. Ductwork and/or b\boiler breeching | LF | $ - 0 | |||
| h. Beams and/or columns | LF | $ - 0 | |||
| i. Firestopping top and/or edge of wall | LF | $ - 0 | |||
| j. Masonry wall - cavity enclosure | LF | $ - 0 | |||
| k. Drywall - cavity enclosure | LF | $ - 0 | |||
| Item 1 Subtotal: | $ - 0 |
| ITEM #2 - ASBESTOS ABATEMENT, GLOVE BAG REMOVAL | Unit Price | Unit | Quantity | Subtotal | |
| a. Insulation from pipe up to 6" dia. | LF | $ - 0 | |||
| b. Insulation from fitting up to 6" dia. | EACH | $ - 0 | |||
| c. Insulation from pipe 7" to 12" dia. | LF | $ - 0 | |||
| d. Insulation from fitting 7" to 12" dia. | EACH | $ - 0 | |||
| Item 2 Subtotal: | $ - 0 |
| ITEM #3 - ASBESTOS ABATEMENT, FULL-CONTAINMENT REMOVAL | Unit Price | Unit | Quantity | Subtotal | |
| a. Insulation from pipe up to 6" dia. | LF | $ - 0 | |||
| b. Insulation from fitting up to 6" dia. | EACH | $ - 0 | |||
| c. Insulation from pipe 7" to 12" dia. | LF | $ - 0 | |||
| d. Insulation from fitting 7" to 12" dia. | EACH | $ - 0 | |||
| e. Insulation from tank, boiler, breaching | LF | $ - 0 | |||
| f. Insulation from ductwork | LF | $ - 0 | |||
| g. Contaminated suspended ceiling from grid | SF | $ - 0 | |||
| h. Contaminated drywall/plaster ceiling, walls, etc. | SF | $ - 0 | |||
| I. Contaminated debris from floor, ceiling, etc. | SF | $ - 0 | |||
| j. Contaminated transite material/panels | SF | $ - 0 | |||
| k. Contaminated spray-on insulation | SF | $ - 0 | |||
| l. Contaminated floor tile/mastic | SF | $ - 0 | |||
| m. Carpet with contaminated floor tile/mastic | SF | $ - 0 | |||
| n. Contaminated soil 3" deep & encapsulation/lock-down | CF | $ - 0 | |||
| Item 3 Subtotal: | $ - 0 | ||||
| ITEM #4 - OPERATION AND MAINTENANCE | Unit Price | Unit | Quantity | Subtotal | |
| a. Pipe insulation - patch and repair | LF | $ - 0 | |||
| b. Fitting insulation - patch and repair | EACH | $ - 0 | |||
| c. Boiler/tank insulation - patch and repair | LF | $ - 0 | |||
| d. Ductwork insulation - patch and repair | LF | $ - 0 | |||
| e. Clean-up, hepa vac and encapsulate/lock down | LF | $ - 0 | |||
| Item 4 Subtotal: | $ - 0 | ||||
| ITEM #5 – REINSULATION | Unit Price | Unit | Quantity | Subtotal | |
| a. Reinsulation from pipe up to 6" dia. | LF | $ - 0 | |||
| b. Reinsulation from fitting up to 6" dia. | EACH | $ - 0 | |||
| c. Reinsulation from pipe 7" to 12" dia. | LF | $ - 0 | |||
| d. Reinsulation from fitting 7" to 12" dia. | EACH | $ - 0 | |||
| e. Reinsulation from tank, boiler, breaching | LF | $ - 0 | |||
| f. Reinsulation from ductwork | LF | $ - 0 | |||
| Item 5 - Subtotal | $ - 0 | ||||
| NET TOTAL (Item 1 + 2 + 3 + 4 + 5) | $ - 0 | ||||
| Note: All line-item pricing shall factor in the following costs: | |||||
| a. Temporary environmental controls and safety, |
b. Office administration,
c. Project management, h. Testing, inspection, reports and manifests & material disposal
i. Decontamination.
| d. Preconstruction risk assessments (PCRA) | j. Temporary signage, |
| e. Infection control risk assessment (ICRA) | k. Daily clean-up, final cleaning, warranty, |
| f. Interim, life safety measures, | l. As-builts, |
| g. Submittals, | m. Overhead |
| n. Profit |