S02 Att03 556-20-013 Drawings Volume 1 of 4_2021.12.23.pdf
PDF 11 MB Posted
- Attached to
- Z1DA--Project 556-20-013 Renovate Bldg 134 CLC 3A/C at the Captain James A. Lovell FHCC in North Chicago, IL
- Solicitation number
- 36C25222B0022
About this file
This file provides details for a federal contract solicitation to renovate Building 134 at the Captain James A. Lovell Federal Health Care Center in North Chicago, Illinois. The solicitation number is 36C25222B0022 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12. The opportunity type is listed as a solicitation for Project 556-20-013, which involves renovating three areas, 3A through 3C, of Building 134 to include associated construction drawings in four volumes. No pricing terms, response dates, or other contract specifics are included in this file.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT OFFICER REPRESENTATIVE DATE
CHIEF OF ENGINEERING DATE
INTERIOR DESIGNER DATE
DEPARTMENT HEAD DATE
CONTRACT SPECIALIST DATE LEAD USER SIGNATURE DATE
PROJECT SITE,
BUILDING 134
AREA MAP
VICINITY MAP
G R
E E
N B
A Y
R D
BUCKLEY RD
N
N
A WING B WING
C WING
N
KEY PLAN
SHADED AREA
INDICATES NOT IN
SCOPE
PROJECT LOCATION:
3RD FLOOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
15% SCHEMATIC DESIGN 06/10/2021
30% SCHEMATIC DESIGN 08/04/2021
50% DESIGN DEVELOPMENT 09/12/2021
75% DESIGN DEVELOPMENT 11/09/2021
95% CONSTRUCTION DOCUMENTS 12/09/2021
100% BID DOCUMENTS 12/23/2021
C U s e rs
\d c h ri s te n s e n
\D o c u m e n ts \1
.1
.0
N C h ic a g o C
L C
V d c h ri s te n s e n
M N
F X
.r v t
/2 /2
:4
:3
P M
GI000
COVER SHEET
GUIDON DESIGN
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
CMTA
10411 MEETING STREET
Prospect, KY 40059
RENOVATE B134-3AC CLC
3001 GREEN BAY ROAD, NORTH
CHICAGO, IL 60061
556-20-013
12/23/2021 JF DMC
556-20-013
RENOVATE B134-3AC CLC
CAPTAIN JAMES A. LOVELL FHCC
3001 GREEN BAY ROAD, NORTH CHICAGO, IL 60061
100% BID DOCUMENTS
100% BID DOCUMENTS
FULLY SPRINKLERED
317.695.4837
SHEET INDEX
SHEET
NUMBER SHEET NAME
FIRE SUPPRESSION
FP101 THIRD FLOOR PLAN - FIRE PROTECTION - C WING
FP102 THIRD FLOOR PLAN - FIRE PROTECTION - A WING
PLUMBING
P001 PLUMBING LEGEND AND GENERAL NOTES
P120.A SECOND FLOOR PLUMBING DEMO - A WING
P120.C SECOND FLOOR PLUMBING DEMO - C WING
P130.A PLUMBING THIRD FLOOR DEMO - A WING
P130.C PLUMBING THIRD FLOOR DEMO - C WING
P220.A SECOND FLOOR PLUMBING - A WING
P220.C SECOND FLOOR PLUMBING - C WING
P230.A PLUMBING THIRD FLOOR - A WING
P230.C PLUMBING THIRD FLOOR - C WING
P400 PLUMBING RISER DIAGRAMS
PL600 PLUMBING DETAILS
MECHANICAL
M001 MECHANICAL LEGEND AND GENERAL NOTES
M001.A THIRD FLOOR ZONING PLAN - A WING
M001.C THIRD FLOOR ZONING PLAN - C WING
M002.A AIR PRESSURE RELATIONSHIP DIAGRAM - A WING
M002.C AIR PRESSURE RELATIONSHIP DIAGRAM - C WING
M100.A THIRD FLOOR AIR DISTRIBUTION DEMO - A WING
M100.C THIRD FLOOR AIR DISTRIBUTION DEMO - C WING
M101.A THIRD FLOOR HYDRONICS DEMO - A WING
M200.A THIRD FLOOR AIR DISTRIBUTION - A WING
M200.C THIRD FLOOR AIR DISTRIBUTION - C WING
M201.A THIRD FLOOR HYDRONICS - A WING
M201.C THIRD FLOOR HYDRONICS - C WING
M300 ROOF PLAN MECHANICAL DEMO
M301 ROOF PLAN MECHANICAL
M302 ROOF ENLARGED MECHANICAL PLAN
M303 PENTHOUSE DEMO AND NEW PLANS
M400 FLOW DIAGRAMS
M500 HVAC SCHEDULES
M600 HVAC DETAILS
M601 HVAC DETAILS
M602 HVAC DETAILS
M603 HVAC DETAILS
MI100 CONTROL DIAGRAMS
MI101 CONTROL DIAGRAMS
MG200 BASEMENT MEDICAL GAS PLAN - C WING
MG230.A THIRD FLOOR MEDICAL GAS - A WING
MG230.C THIRD FLOOR MEDICAL GAS - C WING
MG300 MEDICAL GAS DETAILS
ELECTRICAL
E001 ELECTRICAL SYMBOLS AND ABBREVIATIONS
E101.A THIRD FLOOR LIGHTING DEMOLITION - A WING
E101.C THIRD FLOOR LIGHTING DEMOLITION - C WING
E102.A THIRD FLOOR POWER AND SYSTEMS DEMOLITION - A WING
E102.C THIRD FLOOR POWER AND SYSTEMS DEMOLITION - C WING
E104 PENTHOUSE DEMOLITION
E105 RISER DIAGRAM DEMOLITION
E201.A THIRD FLOOR LIGHTING PLAN - A WING
E201.C THIRD FLOOR LIGHTING PLAN - C WING
E202.A THIRD FLOOR LIGHTING CALC - A WING
E202.C THIRD FLOOR LIGHTING CALC - C WING
E203 THIRD FLOOR LIGHTING ZONE PLAN
E300 BASEMENT POWER PLAN
E301.A THIRD FLOOR POWER PLAN - A WING
E301.C THIRD FLOOR POWER PLAN - C WING
E302 ROOF PLAN POWER
E401.A THIRD FLOOR FIRE ALARM PLAN - A WING
E401.C THIRD FLOOR FIRE ALARM PLAN - C WING
E402.A THIRD FLOOR SYSTEMS PLAN - A WING
E402.C THIRD FLOOR SYSTEMS PLAN - C WING
E501 ENLARGED PLANS
E601 ELEVATIONS
E701 RISER DIAGRAM
E702 DIAGRAMS
E801 SCHEDULES
E802 SCHEDULES
E803 SCHEDULES
E901 DETAILS
E902 DETAILS
SHEET INDEX
SHEET
NUMBER SHEET NAME
GENERAL
GI000 COVER SHEET
GI101 LIFE SAFETY PLAN
GC101 INFECTION CONTROL/PHASING PLAN
GC102 BID ALTERNATES
HA101 HAZARDOUS MATERIAL REMOVAL PLAN
STRUCTURAL
SF101 THIRD FLOOR FRAMING PLAN & GENERAL NOTES
SF102 MECHANICAL EQUIPMENT SUPPORT PLAN & DETAILS
ARCHITECTURAL
AE001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS
AE002 WALL TYPES
AD101 THIRD FLOOR DEMOLITION PLAN - OVERALL
AD102 THIRD FLOOR DEMOLITION PLAN - A WING
AD103 THIRD FLOOR DEMOLITION PLAN - C WING
AE100 SECOND FLOOR ARCHITECTURAL PLAN
AE101 THIRD FLOOR ARCHITECTURAL PLAN - OVERALL
AE102 THIRD FLOOR ARCHITECTURAL PLAN - A WING
AE103 THIRD FLOOR ARCHITECTURAL PLAN - C WING
AE104 PENTHOUSE AND ROOF PLAN
AE111 THIRD FLOOR REFLECTED CEILING PLAN - OVERALL
AE112 THIRD FOOR REFLECTED CEILING PLAN - A WING
AE113 THIRD FLOOR REFLECTED CEILING PLAN - C WING
AE321 STAIR PLAN, SECTION, AND DETAILS
AE400 ENLARGED ARCHITECTURAL AND REFLECTED CEILING PLANS
AE401 ENLARGED ARCHITECTURAL AND REFLECTED CEILING PLANS
AE402 ENLARGED ARCHITECTURAL AND REFLECTED CEILING PLANS
AE501 BUILDING DETAILS
AE601 DOOR SCHEDULE
AE900 PERSPECTIVE RENDERINGS
AE901 PERSPECTIVE RENDERINGS
AI101 THIRD FLOOR FINISH WALL TREATMENT PLAN - OVERALL
AI102 THIRD FLOOR FINISH WALL TREATMENT PLAN - A WING
AI103 THIRD FLOOR FINISHES WALL TREATMENT PLAN - C WING
AI121 THIRD FLOOR FINISH FLOOR TREATMENT PLAN - OVERALL
AI122 THIRD FLOOR FINISH FLOOR TREATMENT PLAN - A WING
AI123 THIRD FLOOR FINISHES FLOOR TREATMENT PLAN - C WING
AI200 INTERIOR ELEVATIONS AND PLANS
AI201 INTERIOR ELEVATIONS AND PLANS
AI202 INTERIOR ELEVATIONS AND PLANS
AI203 INTERIOR ELEVATIONS AND PLANS
AI502 CASEWORK DETAILS
AI601 FINISHES SCHEDULE
AI902 THIRD FLOOR SIGNAGE PLAN - A WING
AI903 THRID FLOOR SIGNAGE PLAN - C WING
AI911 SIGNAGE TYPE
QH101 THIRD FLOOR EQUIPMENT PLAN - OVERALL
QH102 THIRD FLOOR EQUIPMENT PLAN - A WING
QH103 THIRD FLOOR EQUIPMENT PLAN - C WING
Contact: Contact:
Captain James A. Lovell FHCC
Bryan Briggs
Contracting Officer's Representative
3001 GREEN BAY ROAD
NORTH CHICAGO, IL 60061
p: 224.558.8788 e: bryan.briggs@va.gov
OWNER
GUIDON DESIGN INC.
Mark Jones, Senior Project Manager
1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 x 153 e: mjones@guidondesign.com
ARCHITECT
Contact:
CMTA Engineers
Doug Fick
Project Manager
MECHANICAL,
ELECTRICAL &
PLUMBING
10411 Meeting Street Prospect, KY 40059 p: 317.695.4837 e: dfick@cmta.com
Revisions: Date:
TOTAL OCCUPANCY
FEC
EXIT
OCCUPANCY LOAD FACTOR
EXITS REQUIRED
SQUARE FOOTAGE
OCCUPANCY TYPE
EGRESS EXIT SIGNAGE
FIRE EXTINGUISHER CABINET
DIAGONAL DISTANCE
EXIT SEPARATION DISTANCE
EGRESS PATH
2 HR - FIRE SEPARATION
1 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
B
1500 SF
CODE ANALYSIS LEGEND
A B C D E
F
F G H J
K L
MFx Hx Hy Hz Jx Jy Kx Ky Lx Ly
J.4
8800 SF
24037
I-2
10895 SF
24046
I-2
168 SF
B332
LAUNDRY
LAUN1
267 SF
A306
BATHING SUITE
TUB01
323 SF
A305
STAFF LOUNGE
SL001
89 SF
A305A
STAFF LOCKERS
LR004
48 SF
A305B
STAFF TOILET
TLTU1
63 SF
A304
HAC
JANC1
189 SF
STAIR
183 SF
A302
SEMI-PRIVATE
OFFICE
OFA07
171 SF
A301
BIOHAZARD
STORAGE
SRS01
171 SF
A300
BUILDING
CONNECTION
105 SF
P-2
ELEVATOR
114 SF
P-1
ELEVATOR
106 SF
S-1
ELEVATOR
932 SF
A304
ELEVATOR LOBBY
673 SF
A313
MULTIPURPOSE
ROOM
DAYR1
54 SF
A312
PUBLIC TOILET
TLTU1
227 SF
A311
FAMILY LOUNGE
DAYR1
283 SF
A310
EQUIPMENT
STORAGE
SRSE1
136 SF
A307
SPD STORAGE
SRS01
167 SF
C2
CORRIDOR
CORRIDOR
136 SF
A315
SERVICE ELEVATOR
LOBBY
231 SF
A316
SEMI-PRIVATE
OFFICE
OFA07
100 SF
A318
EQUIPMENT
STORAGE
SRS01
85 SF
A320A
STAFF LOCKERS
LR001
54 SF
A320B
STAFF TOILET
TLTU1
372 SF
A320
STAFF LOUNGE
SL001
275 SF
C3
CORRIDOR
285 SF
A319
BATHING SUITE
TUB01
121 SF
C302
LAUNDRY
LAUN1
138 SF
C301
SOILED UTILITY
USCL1
162 SF
C303
CLEAN SUPPLY
USCL1
133 SF
C305
NURSE MANAGER
OFFICE
OFA09
72 SF
C306
STAFF TOILET
TLTU1
42 SF
C304
CLEAN LINEN
UCCL1
284 SF
C307
TEAM CONFERENCE
ROOM
DAYR1
431 SF
C312
LIVING ROOM
DAYR1
291 SF
C4
CORRIDOR
86 SF
C309
UNIT SECURITY
COM03
110 SF
C310
MEDS ROOM
MED1
112 SF
C311
STORAGE
SRS01
83 SF
C324B
RES. BATH
TLTS2
205 SF
C324
PRIVATE RESIDENT
ROOM
BRNP1
223 SF
C326
PRIVATE RESIDENT
ROOM - BARIATRIC
BRNP1
90 SF
C326B
RES. BATH
TLTS2
1205 SF
C6
CORRIDOR
322 SF
C314C
KITCHEN
IPK01
103 SF
C315
PANTRY
SRS01
59 SF
C316
ELEC
42 SF
C323
SECONDARY CARTS
STORAGE
59 SF
C313
PUBLIC TOILET
TLTU1
80 SF
C328B
RES. BATH
TLTS2
232 SF
C328
PRIVATE RESIDENT
ROOM
BRNP1
282 SF
S-4
STAIR
229 SF
C329
PRIVATE RESIDENT
ROOM
BRNP1
79 SF
C329B
RES. BATH
TLTS2
89 SF
C327B
RES. BATH
TLTS2
220 SF
C327
PRIVATE RESIDENT
ROOM - BARIATRIC
BRNP1
205 SF
C325
PRIVATE RESIDENT
ROOM
BRNP1
90 SF
C325B
RES. BATH
TLTS2
143 SF
C317
HAC / SOILED
TRASH
JANC1
215 SF
C319
PRIVATE RESIDENT
ROOM - BARIATRIC
BRNP1
210 SF
C318
BARIATRIC
RESIDENT ROOM
BRNP1
102 SF
C318B
RES. BATH
TLTS2
102 SF
C319B
RES. BATH
TLTS2
205 SF
C321
PRIVATE RESIDENT
ROOM
BRNP1
209 SF
C320
PRIVATE RESIDENT
ROOM
BRNP1
539 SF
C5
CORRIDOR
82 SF
C321B
RES. BATH
TLTS2
82 SF
C323B
RES. BATH
TLTS2
82 SF
C322B
RES. BATH
TLTS2
82 SF
C320B
RES. BATH
TLTS2
238 SF
C322
PRIVATE RESIDENT
ROOM
BRNP1
235 SF
C323
PRIVATE RESIDENT
ROOM
BRNP1
283 SF
STAIR
E X
IT
EXIT
E X
IT
E X
IT S
E P A R
A
TIO
N D
IS
TA
N C
E = 192' -
0"
EXIT
S
EPAR
ATIO
N D
IS
TAN
C E=
3'
0"
T R
A V
E L
D
IS
T A
N C
E
TRAVEL DISTANCE= 172' - 0"
D
IA
G O
N A
L D
IS
T
A N
C E
D
IAG
O N
AL D
ISTAN
C E= 145' - 0"
J.2
F.2
F.2
591 SF
C314B
DINING
FSCD1
674 SF
C314A
DEN
DAYR1
12 SF
A309
OXY CLEAN
12 SF
A308
OXY DIRTY
FEC
F E
C
F E
C
FEC
80 SF
A317
COMM
88 SF
A315A
ELECTRICAL
72 SF
A315B
IT
66 SF
A313B
CLOSET
SRSE1
A W
IN
G
B W
IN
G
MATCHLINE
C WING
A WING
A WING B WING
C WING
N
KEY PLAN
SHADED AREA
INDICATES NOT IN
SCOPE
PROJECT LOCATION:
3RD FLOOR
2 HR FIRE RATED
1 HR FIRE RATED
1 HR SMOKE BARRIER
2 HR SMOKE BARRIER
WALL RATING LEGEND
EXISTING 1HR FIRE RATED
EXISTING 2HR FIRE RATED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
15% SCHEMATIC DESIGN 06/10/2021
30% SCHEMATIC DESIGN 08/04/2021
50% DESIGN DEVELOPMENT 09/12/2021
75% DESIGN DEVELOPMENT 11/09/2021
95% CONSTRUCTION DOCUMENTS 12/09/2021
100% BID DOCUMENTS 12/23/2021
C U s e rs
\d c h ri s te n s e n
\D o c u m e n ts \1
.1
.0
N C h ic a g o C
L C
V d c h ri s te n s e n
M N
F X
.r v t
/2 /2
:4
:4
P M
GI101
LIFE SAFETY PLAN
GUIDON DESIGN
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
CMTA
10411 MEETING STREET
Prospect, KY 40059
RENOVATE B134-3AC CLC
3001 GREEN BAY ROAD, NORTH
CHICAGO, IL 60061
556-20-013
12/23/2021 JF STW
100% BID DOCUMENTS
FULLY SPRINKLERED
317.695.4837
LIFE SAFETY OCCUPANCY COUNT
LEVEL AREA NAME AREA DESIGNATION SF OCC OCC FACTOR # OF OCC
THIRD FLOOR
THIRD FLOOR A-WING (RENO+ETR) SMOKE COMPARTMENT 1 8800 SF I-2 240 37
THIRD FLOOR C-WING (RENO) SMOKE COMPARTMENT 3 10895 SF I-2 240 46
THIRD FLOOR B-WING (ETR) SMOKE COMPARTMENT 2 11046 SF I-2 240 46
30742 SF 129
30742 SF 129
SCALE: 1/16" = 1'-0"GI101
1 THIRD FLOOR LIFE SAFETY PLAN
N
DN
DN
DN
T
C s
M
M
M
DN
T
CONSTRUCTION ACTIVITY - FIRE RISK: C
PATIENT RISK GROUP: HIGH
CLASS OF PRECAUTION MATRIX: III
1. PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL
CONSTRUCTION PER NFPA 241. REFER TO DETAIL 5/GI101.
2. PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH
CARD READER ACCESS. REFER TO ELEVATION 6/GI101.
A. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED
BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.
B. REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE
FOR ADDITIONAL INFORMATION.
C. PROJECT SHALL BE COMPLETED IN A 2 MAIN PHASES.
D. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND
FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE
CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
E. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER
WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR
AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY
IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE
APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND
PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA
PROTOCOLS AND PLAN IS APPROVED.
F. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR
AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE
PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR
PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW
THE FLOOR PLATE OF THE PROJECT BOUNDARY.
G. ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM
AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE
CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED
IN A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED
AND BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.
H. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF
OPERATION.
I. WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN
THE HOURS OF 8:00 AM AND 5:00 PM. EVERY EFFORT SHALL BE MADE TO
KEEP NOISE AND VIBRATION TO A MINIMUM.
J. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36"
STICKY WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR
LOCATION. MAT SHALL BE REPLACED OR CLEANED AS NECESSARY
K. PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION.
L. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,
MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 30 GALLONS.
M. ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED
WITH 4 MIL. POLY SHEET.
N. ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED
WITH A LID.
O. ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
P. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE
PROJECT BOUNDARY.
A. PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT
CONSTRUCTION.
B. PROJECT SHALL BE COMPLETED DURING NORMAL HOURS, 7:00 AM TO 5:00
PM. COORDINATE WITH COR. ALL WORK TO BE COMPLETED AND OPEN FOR
PUBLIC USE AT THE END OF EACH NIGHT'S WORK.
C. REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION
FOR EACH PHASE AND AREA OF WORK.
PHASING GENERAL NOTES
INFECTION CONTROL PLAN NOTES
INFECTION CONTROL GENERAL NOTES
INFECTION CONTROL PROJECT INFORMATION
TEMPORARY WALLS. SEE PLAN AND PLAN NOTES
TEMPORARY CONSTRUCTION ACCESS DOORS
REFERENCE AREA FOR ABOVE CEILING
WORK ON FLOOR BELOW.
RE: ENGINEERING DRAWINGS FOR FULL
SCOPE OF WORK
BEYOND PROJECT BOUNDARY
PROJECT BOUNDARY
IC / PHASING LEGEND
CONTINUOUS FIRESAFE SEALANT
TOP AND BOTTOM, & BOTH SIDES
3 1/2" SOUND ATTENUATION BATT.
5/8" TYPE X GYPSUM BOARD, BOTH SIDES
3 5/8" METAL STUD @ 16" O.C. WITH
RUNNER CHANNELS ALONG TOP
AND BOTTOM
CONSTRUCTION
SIDE
PUBLIC
SIDE
6 MIL. FIRE RETARDANT VISQUEEN
MEMBRANE. CONTINUOUSLY ADHERE
TO THE STRUCTURAL DECK ABOVE AND
TO THE FLOOR BELOW WITH TAPE.
UNDERSIDE OF STRUCTURAL DECK
UL LISTING: U465
COORDINATE WITH EXISTING CEILING
PUBLIC
SIDE
1 HOUR FIRE RATED METAL DOOR ASSEMBLY
AND FRAME WITH SEALS, CARD READER,
HARDWARE AND CLOSER
TRIATEK MONITOR
HAND SANITIZER
SEAL ALL EDGES WITH TAPE
SEAL ALL EDGES WITH TAPE
REFER TO TEMPORARY BARRIER TYPE FOR
REQUIRED CONDITION TO STRUCTURE ABOVE
VA / OSHA TEMPORARY SIGNAGE
283 SF
STAIR
235 SF
C323
PRIVATE RESIDENT
ROOM
238 SF
C322
PRIVATE RESIDENT
ROOM
209 SF
C320
PRIVATE RESIDENT
ROOM
210 SF
C318
BARIATRIC
RESIDENT ROOM
59 SF
C316
ELEC
42 SF
C323
SECONDARY CARTS
STORAGE
59 SF
C313
PUBLIC TOILET
112 SF
C311
STORAGE
205 SF
C324
PRIVATE RESIDENT
ROOM
89 SF
C327B
RES. BATH
229 SF
C329
PRIVATE RESIDENT
ROOM
282 SF
S-4
STAIR
86 SF
C309
UNIT SECURITY
110 SF
C310
MEDS ROOM
431 SF
C312
LIVING ROOM
284 SF
C307
TEAM CONFERENCE
ROOM
162 SF
C303
CLEAN SUPPLY
39 SF
C0
CORRIDOR
42 SF
C304
CLEAN LINEN
72 SF
C306
STAFF TOILET
121 SF
C302
LAUNDRY
285 SF
A319
BATHING SUITE
275 SF
C3
CORRIDOR 372 SF
A320
STAFF LOUNGE
100 SF
A318
EQUIPMENT
STORAGE
85 SF
A320A
STAFF LOCKERS
54 SF
A320B
STAFF TOILET
231 SF
A316
SEMI-PRIVATE
OFFICE
88 SF
A315A
ELECTRICAL
136 SF
A315
SERVICE ELEVATOR
LOBBY
673 SF
A313
MULTIPURPOSE
ROOM
17 SF
A314
LAUNDRY CHUTE
VESTIBULE
106 SF
S-1
ELEVATOR
114 SF
P-1
ELEVATOR
105 SF
P-2
ELEVATOR
66 SF
A313B
CLOSET
932 SF
A304
ELEVATOR LOBBY
171 SF
A300
BUILDING
CONNECTION
171 SF
A301
BIOHAZARD
STORAGE
183 SF
A302
SEMI-PRIVATE
OFFICE
189 SF
STAIR
63 SF
A304
HAC
48 SF
A305B
STAFF TOILET
89 SF
A305A
STAFF LOCKERS
323 SF
A305
STAFF LOUNGE
54 SF
A312
PUBLIC TOILET
227 SF
A311
FAMILY LOUNGE
283 SF
A310
EQUIPMENT
STORAGE
136 SF
A307
SPD STORAGE
12 SF
A308
OXY DIRTY
12 SF
A309
OXY CLEAN
267 SF
A306
BATHING SUITE
167 SF
C2
CORRIDOR
4 SF
A303
ELECTRICAL
168 SF
B332
LAUNDRY
291 SF
C4
CORRIDOR
138 SF
C301
SOILED UTILITY
4 SF
C308
CLOSET
PHASE 1
674 SF
C314A
DEN
591 SF
C314B
DINING
322 SF
C314C
KITCHEN
103 SF
C315
PANTRY
1205 SF
C6
CORRIDOR
223 SF
C326
PRIVATE RESIDENT
ROOM - BARIATRIC
90 SF
C326B
RES. BATH
80 SF
C328B
RES. BATH
232 SF
C328
PRIVATE RESIDENT
ROOM
220 SF
C327
PRIVATE RESIDENT
ROOM - BARIATRIC
205 SF
C325
PRIVATE RESIDENT
ROOM
143 SF
C317
HAC / SOILED
TRASH
215 SF
C319
PRIVATE RESIDENT
ROOM - BARIATRIC
102 SF
C319B
RES. BATH
205 SF
C321
PRIVATE RESIDENT
ROOM
82 SF
C321B
RES. BATH
82 SF
C323B
RES. BATH
102 SF
C318B
RES. BATH
82 SF
C320B
RES. BATH
82 SF
C322B
RES. BATH
PHASE 2
72 SF
A315B
IT
80 SF
A317
COMM
M A
T C
H L
IN
E
A W
IN
G
B W
IN
G
MATCHLINE
C WING
A WING
SERVICE ELEVATOR S-1 TO BE
USED BY CONTRACTOR DURING
CONSTRUCTION
PHASE 2 AFTERHOURS
C
LE
A R
5'
79 SF
C329B
RES. BATH
83 SF
C324B
RES. BATH
90 SF
C325B
RES. BATH
133 SF
C305
NURSE MANAGER
OFFICE
A WING B WING
C WING
N
KEY PLAN
SHADED AREA
INDICATES NOT IN
SCOPE
PROJECT LOCATION:
3RD FLOOR
PHASE 1:
CONTRACTOR TO RENOVATE THE FULL
SCOPE OF C WING INCLUDING THE RATED
CHASE ON THE SECOND FLOOR AND
ROOFTOP/PENTHOUSE EQUIPMENT. MED
GASES TO BE ROUTED FROM BASEMENT
LEVEL TO PROJECT FLOOR.
PHASING DESCRIPTIONS
PHASE 2:
CONTRACTOR TO RENOVATE THE FULL
SCOPE OF A WING. THE ELEVATOR LOBBY
AND CORRIDORS TO BE RENOVATED DURING
AFTER HOURS AND OPEN DURING NORMAL
HOURS.
PHASE 2 - AFTERHOURS:
CORRIDOR RENOVATION.
M A
T C
H L
IN
E
A W
IN
G
B W
IN
G
MATCHLINE
C WING
A WING
PHASE 1
PHASE 1
MATCHLINE
C WING
A WING
PHASE 1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
15% SCHEMATIC DESIGN 06/10/2021
30% SCHEMATIC DESIGN 08/04/2021
50% DESIGN DEVELOPMENT 09/12/2021
75% DESIGN DEVELOPMENT 11/09/2021
95% CONSTRUCTION DOCUMENTS 12/09/2021
100% BID DOCUMENTS 12/23/2021
C U s e rs
\d c h ri s te n s e n
\D o c u m e n ts \1
.1
.0
N C h ic a g o C
L C
V d c h ri s te n s e n
M N
F X
.r v t
/2 /2
:4
:0
P M
GC101
INFECTION CONTROL/PHASING
PLANGUIDON DESIGN
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
CMTA
10411 MEETING STREET
Prospect, KY 40059
RENOVATE B134-3AC CLC
3001 GREEN BAY ROAD, NORTH
CHICAGO, IL 60061
556-20-013
12/23/2021 JF DMC
100% BID DOCUMENTS
FULLY SPRINKLERED
317.695.4837
SCALE: 1 1/2" = 1'-0"GC101
TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL
CONSTRUCTION NFPA 241
SCALE: 1/4" = 1'-0"GC101
6 TEMPORARY WALL CONSTRUCTION ELEVATION
SCALE: 1/16" = 1'-0"GC101
1 PHASING THIRD FLOOR
N
SCALE: 1/16" = 1'-0"GC101
3 PARTIAL BASEMENT PLAN - PHASING
SCALE: 1/16" = 1'-0"GC101
4 PARTIAL SECOND FLOOR PLAN - PHASING
SCALE: 1/16" = 1'-0"GC101
2 ROOF PLAN
N
NN
STATEMENT OF BID ITEMS
1. ALTERNATE 1 - ELIMINATE WORK IN A WING
NO WORK TO TAKE PLACE IN A WING INDICATED BY
HATCHED AREA.
BID ITEM #1: BASE BID- ALL WORK BASEMENT AND 3RD FLOOR WINGS A & C.
BID ITEM #2: ALL WORK AS DESCRIBED FOR BID ITEM #1 ABOVE MINUS THAT
PORTION OF WORK SHOWN AS ALTERNATE 1.
A B C D E
F G H J
K L
Fx Hx Hy Hz Jx Jy Kx Ky Lx Ly
J.4
J.2F.2
189 SF
STAIR
267 SF
A306
BATHING SUITE
TUB01
168 SF
B332
LAUNDRY
LAUN1
323 SF
A305
STAFF LOUNGE
SL001
89 SF
A305A
STAFF LOCKERS
LR004
63 SF
A304
HAC
JANC1
48 SF
A305B
STAFF TOILET
TLTU1
183 SF
A302
SEMI-PRIVATE
OFFICE
OFA07171 SF
A300
BUILDING
CONNECTION
171 SF
A301
BIOHAZARD
STORAGE
SRS01
105 SF
P-2
ELEVATOR
114 SF
P-1
ELEVATOR
106 SF
S-1
ELEVATOR
932 SF
A304
ELEVATOR LOBBY
136 SF
A307
SPD STORAGE
SRS01
283 SF
A310
EQUIPMENT
STORAGE
SRSE1227 SF
A311
FAMILY LOUNGE
DAYR1
54 SF
A312
PUBLIC TOILET
TLTU1
673 SF
A313
MULTIPURPOSE
ROOM
DAYR1
12 SF
A309
OXY CLEAN
12 SF
A308
OXY DIRTY
66 SF
A313B
CLOSET
SRSE1
136 SF
A315
SERVICE ELEVATOR
LOBBY
88 SF
A315A
ELECTRICAL
17 SF
A314
LAUNDRY CHUTE
VESTIBULE
100 SF
A318
EQUIPMENT
STORAGE
SRS01
231 SF
A316
SEMI-PRIVATE
OFFICE
OFA07
85 SF
A320A
STAFF LOCKERS
LR001
54 SF
A320B
STAFF TOILET
TLTU1
372 SF
A320
STAFF LOUNGE
SL001
285 SF
A319
BATHING SUITE
TUB01
275 SF
C3
CORRIDOR
121 SF
C302
LAUNDRY
LAUN1
42 SF
C304
CLEAN LINEN
UCCL1
72 SF
C306
STAFF TOILET
TLTU1
162 SF
C303
CLEAN SUPPLY
USCL1
138 SF
C301
SOILED UTILITY
USCL1
133 SF
C305
NURSE MANAGER
OFFICE
OFA09
284 SF
C307
TEAM CONFERENCE
ROOM
DAYR1
291 SF
C4
CORRIDOR
431 SF
C312
LIVING ROOM
DAYR1
86 SF
C309
UNIT SECURITY
COM03
110 SF
C310
MEDS ROOM
MED1
112 SF
C311
STORAGE
SRS01 59 SF
C313
PUBLIC TOILET
TLTU1
322 SF
C314C
KITCHEN
IPK01
103 SF
C315
PANTRY
SRS01
1205 SF
C6
CORRIDOR
83 SF
C324B
RES. BATH
TLTS2
205 SF
C324
PRIVATE RESIDENT
ROOM
BRNP1
223 SF
C326
PRIVATE RESIDENT
ROOM - BARIATRIC
BRNP1
90 SF
C326B
RES. BATH
TLTS2
80 SF
C328B
RES. BATH
TLTS2
232 SF
C328
PRIVATE RESIDENT
ROOM
BRNP1
282 SF
S-4
STAIR
229 SF
C329
PRIVATE RESIDENT
ROOM
BRNP1
79 SF
C329B
RES. BATH
TLTS2
89 SF
C327B
RES. BATH
TLTS2
220 SF
C327
PRIVATE RESIDENT
ROOM - BARIATRIC
BRNP1
205 SF
C325
PRIVATE RESIDENT
ROOM
BRNP1
90 SF
C325B
RES. BATH
TLTS2
42 SF
C323
SECONDARY CARTS
STORAGE
59 SF
C316
ELEC
143 SF
C317
HAC / SOILED
TRASH
JANC1
215 SF
C319
PRIVATE RESIDENT
ROOM - BARIATRIC
BRNP1
102 SF
C319B
RES. BATH
TLTS2
210 SF
C318
BARIATRIC
RESIDENT ROOM
BRNP1
102 SF
C318B
RES. BATH
TLTS2
209 SF
C320
PRIVATE RESIDENT
ROOM
BRNP1
205 SF
C321
PRIVATE RESIDENT
ROOM
BRNP1
82 SF
C321B
RES. BATH
TLTS2
82 SF
C323B
RES. BATH
TLTS2
82 SF
C320B
RES. BATH
TLTS2
539 SF
C5
CORRIDOR
82 SF
C322B
RES. BATH
TLTS2
238 SF
C322
PRIVATE RESIDENT
ROOM
BRNP1
235 SF
C323
PRIVATE RESIDENT
ROOM
BRNP1
283 SF
STAIR
674 SF
C314A
DEN
DAYR1
591 SF
C314B
DINING
FSCD1
72 SF
A315B
IT
80 SF
A317
COMM
M A
T C
H L
IN
E
A W
IN
G
B W
IN
G
MATCHLINE
C WING
A WING
A WING B WING
C WING
N
KEY PLAN
SHADED AREA
INDICATES NOT IN
SCOPE
PROJECT LOCATION:
3RD FLOOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
15% SCHEMATIC DESIGN 06/10/2021
30% SCHEMATIC DESIGN 08/04/2021
50% DESIGN DEVELOPMENT 09/12/2021
75% DESIGN DEVELOPMENT 11/09/2021
95% CONSTRUCTION DOCUMENTS 12/09/2021
100% BID DOCUMENTS 12/23/2021
C U s e rs
\d c h ri s te n s e n
\D o c u m e n ts \1
.1
.0
N C h ic a g o C
L C
V d c h ri s te n s e n
M N
F X
.r v t
/2 /2
:4
:1
P M
GC102
BID ALTERNATES
GUIDON DESIGN
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
CMTA
10411 MEETING STREET
Prospect, KY 40059
RENOVATE B134-3AC CLC
3001 GREEN BAY ROAD, NORTH
CHICAGO, IL 60061
556-20-013
12/23/2021 JF DMC
100% BID DOCUMENTS
FULLY SPRINKLERED
317.695.4837
SCALE: 1/16" = 1'-0"GC102
1 THIRD FLOOR DEDUCT PLAN
A. HAZMAT REMOVAL NOTES APPLY TO ENTIRE ROOMS. CONTRACTOR SHALL
IDENTIFY ALL MATERIALS DESCRIBED BY NOTE IN EACH ROOM AND
REMOVE ACCORDING TO SAFETY STANDARDS. REFERENCE SPECIFICATION
02 82 11.
B. ALL HAZARDOUS MATERIALS SHALL BE REMOVED IN COMPLIANCE WITH
APPLICABLE CODES AND LAWS.
C. THE CONTRACTOR IS RESPONSIBLE TO VERIFY THE HAZARD(S) AND LEVEL
OF PROTECTION REQUIRED FOR ALL EMPLOYEES OR SUBCONTRACTORS
TO COMPLETE THE CONSTRUCTION WORK.
D. PROVIDE COST FOR REMOVAL OF COUNTED AND UNFORESEEN MUD
FITTINGS ON FIBERGLASS INSULATED DOMESTIC WATER LINES FOR 36
FITTINGS.
E. PROVIDE COST FOR REMOVAL OF FLUORESCENT LIGHT TUBES AND CFL
BULBS, ASSUME 120 EACH.
F. REFER TO SPECIFICATION AND ATTACHMENTS FOR ADDITIONAL
INFORMATION.
G. REFER TO ENVIRONMENTAL SURVEY REPORT IN THE SPECIFICATIONS
APPENDIX FOR ADDITIONAL INFORMATION.
1. REMOVE ASBESTOS - CONTAINING PIPE INSULATION - APPROX. 120 LF.
2. REMOVE ASBESTOS - CONTAINING PIPE INSULATION ON MUD FITTINGS -
APPROX. 36 FITTINGS.
3. REMOVE ASBESTOS - CONTAINING TRANSITE CEMENT SHEETS BEHIND
RECESSED RADIATORS - APPROX. 15 ( 120 LF).
HAZARDOUS MATERIAL REMOVAL GENERAL NOTES
HAZARDOUS MATERIAL REMOVAL PLAN NOTES
F G H
Fx Hx Hy Hz Jx Jy Kx Ky Lx Ly
J.4J.2F.2
MATCHLINE MATCHLINE
STORAGE
B333
FAMILY
A314
LOUNGE
A316
OFFICE
A301
LOBBY
BIOHAZARD
A302
DINING
A313
JANITOR
A312
BATH
A311
BATH
A310
FAMILYROOM
A309
LINEN
A308
LINEN
A309
DINING
A307
A306A
CONFERENCE
A306
IT
A305
SERVICE
A304
BATH
A303
189 SF
STAIR
333333
A WING B WING
C WING
N
KEY PLAN
SHADED AREA
INDICATES NOT IN
SCOPE
PROJECT LOCATION:
3RD FLOOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
15% SCHEMATIC DESIGN 06/10/2021
30% SCHEMATIC DESIGN 08/04/2021
50% DESIGN DEVELOPMENT 09/12/2021
75% DESIGN DEVELOPMENT 11/09/2021
95% CONSTRUCTION DOCUMENTS 12/09/2021
100% BID DOCUMENTS 12/23/2021
C U s e rs
\d c h ri s te n s e n
\D o c u m e n ts \1
.1
.0
N C h ic a g o C
L C
V d c h ri s te n s e n
M N
F X
.r v t
/2 /2
:4
:4
P M
HA101
HAZARDOUS MATERIAL REMOVAL
PLANGUIDON DESIGN
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
CMTA
10411 MEETING STREET
Prospect, KY 40059
RENOVATE B134-3AC CLC
3001 GREEN BAY ROAD, NORTH
CHICAGO, IL 60061
556-20-013
12/23/2021 JF DMC
100% BID DOCUMENTS
FULLY SPRINKLERED
317.695.4837
SCALE: 1/8" = 1'-0"HA101
1 THIRD FLOOR HAZMAT PLAN
A B C D E
F G H
J
K L
J.2
F.2
MATCHLINE
C WING
A WING
C O
N C
. S
LA
B T
O R
E M
A
IN
P O
R T
IO
N
O F
E X
. R
IB
B E
D
E X
C
O N
C
B E
A M
T O
R E
M A
IN
S
LA
B T
O R
E M
A
IN
E X
. R
IB
B E
D C
O N
C
E X
C
O N
C
B E
A M
T O
R E
M A
IN
E X
C
O N
C
B E
A M
T O
R E
M A
IN
E X
C
O N
C
B E
A M
T O
R E
M A
IN
EX. CONC. HEADERS
TO REMAIN
T O
B E
R E
M O
V E
D
P O
R T
IO
N
O F
E X
R
IB
B
E D
C O
N C
. S
LA
B
S
LA
B T
O R
E M
A
IN
E X
. R
IB
B E
D C
O N
C
(F V
/2
(F
V
15' - 1" (FV) 10' - 0" (FV) 15' - 2" (FV)
1/ 2"
F
V
/2
(F V
N E
W W
8x
4"
EX. 12x12 CONC. COL.
(FV) TO REM
AIN
EX. 12x12 CONC. COL.
(FV) TO REM
AIN
NEW W10x22
NOTE: ATTACH NEW BEAMS TO EX. CONC.
W/ L4X4X1/4 X 6" W/ (2) 3/8" DIA. X 3 3/8"
LONG HILTI HIT-Z ANCHOR W/ HIT-HY 200
EPOXY (OR APPROVED EQUIV.) U.N.O.
4"
ATTACH NEW BEAM TO EX. CONC.
COLUMN W/ L6X4X1/4 X 6" W/ (2)
3/8" DIA. X 3 3/8" LONG HILTI HIT-Z
ANCHOR (OR APPROVED EQUIV.)
R k
A WING B WING
C WING
N
KEY PLAN
PHASE 1
LIGHT SHADE INDICATES
AREA NOT IN PHASE
DARK SHADE INDICATES
AREA NOT IN SCOPE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
15% SCHEMATIC DESIGN 06/10/2021
30% SCHEMATIC DESIGN 08/04/2021
50% DESIGN DEVELOPMENT 09/12/2021
75% DESIGN DEVELOPMENT 11/09/2021
95% CONSTRUCTION DOCUMENTS 12/09/2021
100% BID DOCUMENTS 12/23/2021
C U s e rs
\d c h ri s te n s e n
\D o c u m e n ts \1
.1
.0
N C h ic a g o C
L C
V d c h ri s te n s e n
M N
F X
.r v t
/2 /2
:4
:1
P M
SF101
THIRD FLOOR FRAMING PLAN &
GENERAL NOTESGUIDON DESIGN
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
CMTA
10411 MEETING STREET
Prospect, KY 40059
RENOVATE B134-3AC CLC
3001 GREEN BAY ROAD, NORTH
CHICAGO, IL 60061
556-20-013
12/23/2021 MAV LKB
100% BID DOCUMENTS
FULLY SPRINKLERED
317.695.4837
SCALE: 1/8" = 1'-0"SF101
1 THIRD FLOOR FRAMING PLAN
NOTES:
1. REFERENCE GENERAL NOTES THIS SHEET.
2. REFERENCE FINISH FLOOR ELEVATION = 100' - 0" (USGS = PER CIVIL)
3. TOP OF NEW STEEL BEAMS TO MATCH BOTTOM OF EXISTING SLAB. EXISTING SLAB = 2 ½" THICK (FIELD VERIFY).
4. REFERENCE MECHANICAL DRAWINGS & CONTRACTOR FOR FINAL EQUIPMENT SIZES & LOCATIONS.
5. EXISTING STRUCTURE SIZES, ELEVATIONS, AND LOCATIONS MUST BE FIELD VERIFIED.
6. CORNERS OF NEW OPENINGS IN EXISTING CONCRETE SLAB MUST BE CORE DRILLED.
N
GENERAL
THE STRUCTURE HAS BEEN DESIGNED FOR THE IN-SERVICE LOADS ONLY. THE METHODS, MEANS, PROCEDURES, AND SEQUENCES OF CONSTRUCTION ARE THE RESPONSIBILITY OF THE CONTRACTOR. THE STRUCTURE IS DESIGNED TO BE SELF-SUPPORTING AND STABLE AFTER THE BUILDING IS COMPLETE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE ERECTION PROCEDURES AND SEQUENCE TO INSURE SAFETY OF THE BUILDING AND ITS COMPONENTS DURING ERECTION. THIS INCLUDES THE ADDITION OF NECESSARY
SHORING, SHEETING, TEMPORARY BRACING, GUYS, TIEDOWNS, ETC.
THE STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH CIVIL, ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING
DRAWINGS AND SPECIFICATIONS.
THE GENERAL NOTES ON THE DRAWINGS ARE TO BE USED IN CONJUNCTION WITH THE FULL WRITTEN MATERIAL SPECIFICATIONS (IF ANY) FOR THE PROJECT. IF A DISCREPANCY OCCURS BETWEEN THE NOTES AND THE FULL SPECIFICATIONS, THE MORE STRINGENT
REQUIREMENT SHALL APPLY.
NO PENETRATIONS THROUGH STRUCTURAL ELEMENTS, OTHER THAN THOSE SHOWN ON THE DRAWINGS, SHALL BE MADE WITHOUT THE
APPROVAL OF THE STRUCTURAL ENGINEER.
CONTRACTOR TO COORDINATE ALL EQUIPMENT, ROOF DRAINS, CHASES, AND OTHER ITEMS CONNECTED TO THE STRUCTURE BEFORE
FABRICATION BEGINS.
SHOP DRAWING SUBMITTALS
THE CONTRACTOR SHALL PREPARE DETAILED SHOP DRAWINGS TO ENABLE HIM TO FABRICATE, ERECT AND CONSTRUCT ALL PARTS OF THE WORK IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS. THESE SHOP DRAWINGS WILL BE REVIEWED FOR GENERAL COMPLIANCE WITH THE DESIGN INTENT ONLY. THE CONTRACTOR IS RESPONSIBLE FOR ALL DIMENSIONS, ACCURACY AND FIT OF WORK.
ALL SHOP DRAWINGS SHALL BE REVIEWED BY THE CONTRACTOR PRIOR TO SUBMITTAL TO THE STRUCTURAL ENGINEER. DRAWINGS
SUBMITTED WITHOUT CONTRACTOR'S REVIEW WILL BE RETURNED UNCHECKED.
SUBMIT ELECTRONIC VERSIONS OF SHOP DRAWINGS. SUBMIT SHOP DRAWINGS IN PDF FORMAT.
SUBMIT SHOP DRAWINGS FOR EACH OF THE FOLLOWING ITEMS:
1. STRUCTURAL STEEL (INCLUDING DESIGN CALCULATIONS SEALED BY A PROFESSIONAL ENGINEER REGISTERED IN THE STATE WHERE THE PROJECT IS CONSTRUCTED FOR ALL CONNECTIONS NOT SPECIFICALLY DETAILED ON THE DRAWINGS)
STRUCTURAL STEEL
STRUCTURAL STEEL DETAILING, FABRICATION AND ERECTION SHALL CONFORM TO THE ANSI/AISC 360 SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS, LATEST EDITION WITH AMENDMENTS, AND THE AISC 303 CODE OF STANDARD PRACTICE FOR
STEEL BUILDINGS AND BRIDGES, LATEST EDITION WITH AMENDMENTS.
STRUCTURAL STEEL WIDE FLANGE SHAPES SHALL CONFORM TO ASTM A992, 50 KSI.
STRUCTURAL STEEL PLATES AND ROLLED SHAPES OTHER THAN WIDE-FLANGE SHAPES SHALL CONFORM TO ASTM A36, UNLESS NOTED
OTHERWISE.
ANCHOR RODS SHALL CONFORM TO ASTM F1554, GRADE 36, UNLESS NOTED OTHERWISE.
BOLTED CONNECTIONS SHALL CONFORM TO THE SPECIFICATION FOR STRUCTURAL JOINTS USING ASTM A325 OR A490 BOLTS, APPROVED BY THE RESEARCH COUNCIL ON STRUCTURAL CONNECTIONS OF THE ENGINEERING FOUNDATION. BOLTED CONNECTIONS FOR STRUCTURAL STEEL MEMBERS SHALL BE MADE WITH 3/4" DIAMETER A325 BOLTS, UNLESS NOTED OTHERWISE.
BOLTED CONNECTIONS SHALL BE TIGHTENED TO THE SNUG TIGHT CONDITION, EXCEPT BOLTED CONNECTIONS IN BRACE ELEMENTS
ARE TO BE FULLY PRETENSIONED WITH CLASS A FAYING SURFACES.
WELDING PROCEDURES SHALL CONFORM TO THE LATEST EDITION OF THE AMERICAN WELDING SOCIETY'S STRUCTURAL WELDING
CODE FOR STEEL ANSI/AWS D1.1.
WELDED CONNECTIONS USING ASTM A992 STEEL AS A BASE METAL SHALL BE MADE WITH E70XX LOW HYDROGEN ELECTRODES.
UNLESS OTHERWISE SHOWN OR NOTED ON THE DRAWINGS, OTHER WELDED CONNECTIONS MAY BE MADE WITH STANDARD E70XX
ELECTRODES.
STRUCTURAL STEEL NOTED TO BE GALVANIZED SHALL BE HOT-DIP GALVANIZED IN CONFORMANCE WITH ASTM A123.
DO NOT PAINT OR GALVANIZE SURFACES TO BE WELDED.
ALL ABRASIONS TO GALVANIZED SURFACES OR SURFACES TO RECEIVE AN ARCHITECTURAL FINISH COAT SHALL BE TOUCHED-UP AFTER ERECTION IS COMPLETE. FOR PAINTED STEEL, USE A PRIMER EQUIVALENT TO THE SHOP PAINT. FOR GALVANIZED STEEL, USE
A ZINC-RICH COLD-GALVANIZING PAINT.
DESIGN CONNECTIONS NOT SHOWN IN ACCORDANCE WITH THE ASD SPECIFICATION AND MANUAL OF STEEL CONSTRUCTION. UNLESS NOTED OTHERWISE ON THE DRAWINGS, DESIGN BEAM CONNECTIONS NOT SHOWN, TO SUPPORT A MINIMUM OF A 10 KIP SHEAR REACTION. PROVIDE NO LESS THAN 2 BOLTS IN ANY SINGLE LINE OF BOLTS, UNLESS SPECIFICALLY INDICATED ON THE DRAWINGS.
PROVIDE L4X4X1/4 FRAMED OPENINGS FOR ALL ROOF PENETRATIONS 12 INCHES OR LARGER ALONG ANY SIDE, UNLESS LARGER FRAMING IS INDICATED. REFER TO MECHANICAL AND PLUMBING DRAWINGS FOR PENETRATIONS. COORDINATE FRAMED OPENING SIZES
AND LOCATIONS WITH THE MECHANICAL AND PLUMBING CONTRACTORS.
GALVANIZE ALL EXPOSED STEEL.
DESIGN DATA
THE BUILDING STRUCTURE HAS BEEN DESIGNED IN ACCORDANCE WITH THE 2021 INTERNATIONAL BUILDING CODE.
SEE LOAD MAPS FOR FLOOR LOADING CRITERIA.
RISK CATEGORY = III
SNOW LOAD DESIGN DATA
1. GROUND SNOW LOAD (Pg) = 30 PSF
2. FLAT ROOF SNOW LOAD (Pf) = 27.7 PSF
3. MINIMUM LOW-SLOPE SNOW LOAD (Pm) = 22 PSF
4. SNOW EXPOSURE FACTOR (Ce) = 1.0
5. THERMAL FACTOR (Ct) = 1.2
6. SNOW LOAD IMPORTANCE FACTOR (Is) = 1.10
7. DRIFT LOADS WILL APPLY BASED ON STRUCTURE AND EQUIPMENT GEOMETRY AND ELEVATION.
WIND LOAD DESIGN DATA
1. BASIC WIND SPEED (3-SECOND GUST) = 114 MPH
2. WIND EXPOSURE = B
3. INTERNAL PRESSURE COEFFICIENT, GCpi = 0.00 (OPEN)
4. WIND DESIGN PRESSURE (P) = VARIES WITH HEIGHT AND LOCATION
EARTHQUAKE LOAD DESIGN DATA
1. SHORT PERIOD SPECTRAL RESPONSE (Ss) = 0.102
2. 1-SECOND SPECTRAL RESPONSE (S1) = 0.057
3. SHORT PERIOD SPECTRAL RESPONSE COEFFICIENT (SDS) = 0.088
4. 1-SECOND SPECTRAL RESPONSE COEFFICIENT (SD1) = 0.057
5. SEISMIC IMPORTANCE FACTOR (Ie) = 1.25
6. SITE CLASS = C
7. SEISMIC DESIGN CATEGORY = A
8. BASIC STRUCTURAL SYSTEM / SEISMIC RESISTING SYSTEM: H - STEEL SYSTEMS NOT SPECIFICALLY DETAILED FOR SEISMIC
RESISTANCE, EXCLUDING CANTILEVER COLUMN SYSTEMS
9. ANALYSIS PROCEDURE UTILIZED = EQUIVALENT LATERAL FORCE PROCEDURE
10. RESPONSE MODIFICATION COEFFICIENT (R) = 3
11. SEISMIC RESPONSE COEFFICIENT (Cs) = 0.037
RENOVATION (EXISTING CONDITIONS)
INFORMATION SHOWN FOR THE EXISTING STRUCTURE ON THESE DRAWINGS WAS TAKEN FROM DRAWINGS THAT WERE PREPARED FOR THE WAR DEPARTMENT, ENTITLED VETERANS ADMINISTRATION HOSPITAL, DATED 11-12-1949, AND SPS BASEMENT ADDITION DATED 08-15-2014.
WORK SHOWN ON THESE PLANS ASSUMES THAT THE ORIGINAL CONSTRUCTION WAS PERFORMED IN ACCORDANCE WITH THE ABOVE INDICATED ORIGINAL DRAWINGS INCLUDING (BUT NOT LIMITED TO) DIMENSIONS, ELEVATIONS, MEMBER SIZES, MATERIALS, DETAILS, ETC. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE CONDITIONS RELATING TO THE EXISTING STRUCTURE AND TO
NOTIFY THE STRUCTURAL ENGINEER IMMEDIATELY OF ANY DISCREPANCIES OR CONFLICTS.
WHERE NEW WORK IS TO BE FITTED TO OLD WORK, THE CONTRACTOR SHALL CHECK ALL DIMENSIONS AND CONDITIONS IN THE FIELD, AND REPORT ANY ERRORS OR DISCREPANCIES TO THE STRUCTURAL ENGINEER PRIOR TO THE FABRICATION AND ERECTION OF ANY
NEW MEMBERS.
EXISTING MATERIALS TO BE REMOVED AND REINSTALLED AS PART OF THE PROJECT, THAT BECOME DAMAGED, SHALL BE REPLACED
WITH NEW MATERIAL OF EQUAL QUALITY AND APPEARANCE, AT THE CONTRACTORS EXPENSE.
ALL WORK SHALL BE PREFORMED WITHOUT DAMAGE TO ADJACENT RETAINED WORK. ADJACENT EXISTING CONSTRUCTION SHALL BE
PROTECTED FROM DUST, DIRT, AND DEBRIS ACCUMULATION AT ALL TIMES.
A B C D E
F G H
J
K L
J.2
F.2
MATCHLINE
C WING
A WING
N E
W W x3
(F V
/2
(F
V
15' - 1" (FV) 10' - 0" (FV) 15' - 2" (FV)
EX. 1
2x
C
ONC. C
OL.
(F V) T
O R
EM
AIN
EX. 12x12 CONC. COL.
(FV) TO REM
AIN
EX. 1
2x
C
ONC. C
OL.
(F V) T
O R
EM
AIN
EX. 12x12 CONC. COL.
(FV) TO REM
AIN
SF102
C R
O S
S H
A T
C H
D
E N
O T
E S
N
E W
R T
U
P E
R M
E C
H
D W
G S
DIAGONAL HATCH DENOTES:
EX. CONC. ROOF & FRAMING
TO REMAIN
EX. 12x12 CONC. COL.
(FV) TO REM
AIN
EX. 12x12 CONC. COL.
(FV) TO REM
AIN
SF102
NEW W10x33
NEW W10x33
NEW W10x33
N E
W W x3
N
E W
W x3
2' - 8 1/2" (FV)
NEW W10x33
NEW W10x33
2' - 8 1/2" (FV)
1/ 2"
F
V
/2
(F V
6'
1/ 8"
(F V
6'
1/
8" (F
V
NOTE: REPAIR EXISTING CONCRETE
COLUMNS AS REQUIRED WITH
SIKAQUICK VOH (OR APPROVED EQUIV.).
N E
W W x3
2' - 7 1/2" (FV)
2' - 7 1/2" (FV)
SF102
A WING B WING
C WING
N
KEY PLAN
PHASE 1
LIGHT SHADE INDICATES
AREA NOT IN PHASE
DARK SHADE INDICATES
AREA NOT IN SCOPE
GH
NEW MECHANICAL EQUIP. -
FINAL SIZE & LOCATION PER
MECH. DWGS. & CONTRACTOR
EX. CONC. ROOF
TO REMAIN, TYP.
5" 2' - 8 1/2" (FV)
EX. CONC. COLUMN
W/ STEEL TOP PLATE
PER PLAN TO REMAIN
1/4 11
1/4 11
B/BEAM = 116' - 9" (FV)
NEW STEEL BEAM PER PLAN -
GROUT AS REQUIRED ABOVE
EXISTING COLUMN TO LEVEL
BEAMS & INCREASE WELD
THROAT TO COMPENSATE.
NEW STEEL BEAM PER PLAN -
GROUT AS REQUIRED ABOVE
EXISTING COLUMN TO LEVEL
BEAMS & INCREASE WELD
THROAT TO COMPENSATE.
5"2' - 7 1/2" (FV)
EX. CONC. ROOF
TO REMAIN, TYP.
5" 6' - 10 1/8" (FV)
EX. CONC. COLUMN
W/ STEEL TOP PLATE
PER PLAN TO REMAIN
NEW STEEL BEAM PER PLAN -
GROUT AS REQUIRED ABOVE
EXISTING COLUMN TO LEVEL
BEAMS & INCREASE WELD
THROAT TO COMPENSATE
1/4 11
NEW MECHANICAL EQUIP. -
FINAL SIZE & LOCATION PER
MECH. DWGS. & CONTRACTOR
EX. CONC. JOIST
L4X4X1/4 FRAME
T/FRAME=T/JOIST
DECK
OPENING
NOTES:
1. COORDINATE OPENING SIZE WITH MECHANICAL CONTRACTOR.
2. CONCRETE SLAB NOT SHOWN FOR CLARITY
3. CONTRACTOR TO SAWCUT SLAB FLUSH WITH THE INSIDE FACE OF THE
ANGLE FRAME. PROVIDE 2" CORE DRILL RADIUS AT NEW SLAB CORNERS.
EX. CONC. JOIST
DRILL & EPOXY (2) 3/8" DIA.
X 3 3/8" LONG HILTI HIT-Z
ANCHORS WITH HIT-HY 200
EPOXY (OR APPROVED EQUIV.).
M
IN3"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
15% SCHEMATIC DESIGN 06/10/2021
30% SCHEMATIC DESIGN 08/04/2021
50% DESIGN DEVELOPMENT 09/12/2021
75% DESIGN DEVELOPMENT 11/09/2021
95% CONSTRUCTION DOCUMENTS 12/09/2021
100% BID DOCUMENTS 12/23/2021
C U s e rs
\d c h ri s te n s e n
\D o c u m e n ts \1
.1
.0
N C h ic a g o C
L C
V d c h ri s te n s e n
M N
F X
.r v t
/2 /2
:4
:1
P M
SF102
MECHANICAL EQUIPMENT
SUPPORT PLAN & DETAILSGUIDON DESIGN
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
CMTA
10411 MEETING STREET
Prospect, KY 40059
RENOVATE B134-3AC CLC
3001 GREEN BAY ROAD, NORTH
CHICAGO, IL 60061
556-20-013
12/23/2021 MAV LKB
100% BID DOCUMENTS
FULLY SPRINKLERED
317.695.4837
SCALE: 1/8" = 1'-0"SF102
1 MECHANICAL EQUIPMENT SUPPORT PLAN
N
SCALE: 3/4" = 1'-0"SF102
2 SECTION
NOTES:
1. REFERENCE GENERAL NOTES ON SHEET SF101.
2. REFERENCE FINISH FLOOR ELEVATION = 100' - 0" (USGS = PER CIVIL)
3. REFERENCE MECHANICAL DRAWINGS & CONTRACTOR FOR FINAL EQUIPMENT & OPENING SIZES & LOCATIONS.
4. EXISTING STRUCTURE SIZES, ELEVATIONS, AND LOCATIONS MUST BE FIELD VERIFIED.
5. CORNERS OF NEW OPENINGS IN EXISTING CONCRETE SLAB MUST BE CORE DRILLED.
6. ALL NEW STEEL THIS SHEET MUST BE HOT-DIP GALVANIZED.
SCALE: 3/4" = 1'-0"SF102
3 SECTION
Revisions: Date:
SCALE: 3/4" = 1'-0"SF102
4 NEW OPENINIG IN EXISTING SLAB
SECTION REFERENCE
DRAWING NUMBER
SHEET LOCATION
DRAWING NUMBER
SHEET
LOCATION
DETAIL REFERENCE
OBJECT
REFERENCED
OBJECT
REFERENCED
X
XXXX
X
XXXX
SCALE: ??
VIEW TITLE
N
NORTH ARROW
LED WALL MOUNTED LIGHT FIXTURE
LED SURFACE MOUNTED LIGHT FIXTURE
LED SURFACE MOUNTED LIGHT FIXTURE
LED RECESSED LIGHT FIXTURE
HVAC RETURN AIR GRILLE
HVAC SUPPLY DIFFUSER
PENDANT LIGHT
ACCESS PANEL
EXIT LIGHTING
S
D
SPEAKER
SMOKE DETECTOR
LED RECESSED LIGHT FIXTURE
A 9'-0"
CEILING TAG CEILING TYPE
FINISHED CEILING HEIGHT
REFER TO CEILING LEGEND FOR MORE
INFORMATION
EXTENT OF REVISION
REVISION SET
MECH/ELEC ITEMS: REFER TO MEP SHEETS AS APPLICABLE
PROJECT BOUNDARY
BEYOND PROJECT BOUNDARY, NIC
DETAIL/DRAWING SCALE
TITLE OF DETAIL/DRAWING
DETAIL/DRAWING NUMBER
SHEET NUMBER
A/C AIR CONDITION
A/E ARCHITECT/ENGINEER
AB ANCHOR BOLT
ABC AGGREGATE BASE COURSE
AC ASBESTOS CEMENT OR ASPHALTIC CONCRETE
ACS DR ACCESS DOOR
ACS FLR ACCESS FLOOR
ACS PNL ACCESS PANEL
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADC AUTOMATIC DOOR CLOSER
ADDL ADDITIONAL
ADDN ADDITION
ADH ADHESIVE
ADJ ADJACENT, ADJOINING, OR ADJUSTABLE
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGGR AGGREGATE
AHJ AUTHORITY HAVING JURISDICTION
AHR ANCHOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF ARCHITECTS
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINUM
AMP AMPERE
AMT AMOUNT
ANOD ANODIZE
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
ANT ANTENNA
APPD APPROVED
APPROX APPROXIMATE
AR AS REQUIRED
ARCH ARCHITECT
ASB ASBESTOS
ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTION
ASKLR AUTOMATIC SPRINKLER
ASPH ASPHALT
ASSN ASSOCIATION
ATCH ATTACHMENT
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
AVG AVERAGE
AW ACID WASTE
AWI ARCHITECTURAL WOODWORKING INSTITUTE
AWS AMERICAN WELDING SOCIETY
AWT ACOUSTICAL WALL TREATMENT
B PL BASE PLATE
BALC BALCONY
BAT BATTEN
BB BULLETIN BOARD
BD BOARD
BEV BEVEL
BI FLD DR BIFOLDING DOORS
BITUM BITUMINOUS
BKG BACKING
BLD BUILD
BLDG BUILDING
BLKG BLOCKING
BLKT BLANKET
BM BEAM OR BENCHMARK
BOT BOTTOM
BRCG BRACING
BRDG BRIDGING
BRG BEARING
BRKT BRACKET
BRZ BRONZE
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT-UP ROOFING
C CELSIUS CHANNEL OR CHANNEL CELSIUS
C CONC CAST CONCRETE
C TO C CENTER TO CENTER
CAB CABINET
CB CORNER BEAD
CBB CEMENTITIOUS (BACKER) BOARD
CC CUBIC CENTIMETER
CCTV CLOSED CIRCUIT TELEVISION
CCW COUNTERCLOCKWISE
CEM CEMENT
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CGSFU CERAMIC GLAZED STRUCTURAL FACING UNITS
CH BD CHALKBOARD
CHEM CHEMICAL
CHFR CHAMFER
CI CAST IRON
CIP CAST-IN-PLACE
CIR CIRCLE
CIRC CIRCULAR
CJ CONSTRUCTION JOINT OR CONTROL JOINT
CL CENTER LINE
CLDG CLADDING
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNR CORNER
CNTR COUNTER
CO CARBON MONOXIDE, CLEANOUT
CO₂ CARBON DIOXIDE
COL COLUMN
COM COMMON
COMB COMBINATION, COMBINED
COMM COMMUNICATION
COMP COMPONENT
CONC CONCRETE
COND CONDENSER OR CONDITION
CONF CONFERENCE
CONN CONNECT
CONSTR CONSTRUCTION
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
CORR CORRIDOR
CPM CRITICAL PATH METHOD
CPRS COMPRESSIBLE
CPT CARPET
CRS COLD ROLLED STEEL
CS CAST CONCRETE STONE
CSB CONCRETE SPLASH BLOCK
CSG CASING
CSK COUNTER SUNK
CSMT CASEMENT
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTG COATING
CTR CENTER
CTRL CONTROL
CTV CABLE TELEVISION
CU COPPER C
CU FT CUBIC FEET
CU IN CUBIC INCH
CU YD CUBIC YARD
CURT CURTAIN
CYL CYLINDER
CYL L CYLINDER LOCK
N NORTH
NA NOT APPLICABLE
NAT NATURAL
NATL NATIONAL
NC NOISE CRITERIA
NCOMBL NONCOMBUSTIBLE
NEG NEGATIVE
NEUT NEUTRAL
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NR NOISE REDUCTION
NRC NOISE REDUCTION COEFFICIENT
NRP NONREMOVABLE
NS NARROW STILE
NUM NUMERAL
O/O OUT TO OUT
O OXYGEN
OA OUTSIDE AIR OR OVERALL
OC ON CENTER
OCC OCCUPY
OCT OCTAGON
OD OUTSIDE DIAMETER OR OUTSIDE DIMENSION
OF/CI OWNER FURNISHED/CONTRACTOR INSTALLED
OFD OVERFLOW DRAIN
OFF OFFICE
OF/OI OWNER FURNISHED/OWNER INSTALLED
OH OVERHANG
OH DR OVERHEAD (COILING) DOOR
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
OPT OPTIONAL
OR OPERATING ROOM OR OUTSIDE RADIUS
ORD ORDNANCE OR OVERFLOW ROOF DRAIN
ORG ORGANIC
ORIG ORIGINAL
ORN ORNAMENTAL
OUT OUTLET
OZ OUNCE
PAR PARALLEL OR PARAPET
PART PARTIAL
PAT PATTERN
PB PUSHBUTTON
PBD PARTICLEBOARD
PC PIECE, POLYCARBONATE OR PORTLAND CEMENT
PCC PRECAST CONCRETE
PCCP CONCRETE PAVEMENT
PCD PAPER CUP DISPENSER
PCF POUNDS PER CUBIC FOOT
PCP PORTLAND CEMENT PLASTER
PED PEDESTAL
PEN PENETRATE
PEND PENDANT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PGBD PEGBOARD
PHS PHILLIPS HEAD SCREW
PKG PACKAGE
PL PLATE, PROPERTY LINE
PLAM PLASTIC LAMINATE
PLAS PLASTER OR PLASTIC
PLBG PLUMBING
PLYWD PLYWOOD
PMTL PAINTED METAL
PNEU PNEUMATIC
PNL PANEL
POLY POLYETHYLENE (PLASTIC)
PR PAIR
PRCST PRECAST
PREFAB PREFABRICATE
PREFIN PREFINISH
PRELIM PRELIMINARY
PREP PREPARATION
PRESS PRESSURE
PREV PREVIOUS
PRKG PARKING
PRMLD PREMOLDED
PROJ PROJECT
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT, PNEUMATIC TUBE, OR PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PVC POLYVINYL CHLORIDE (PLASTIC)
PVG PAVING
PWR POWER
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QRY QUARRY
QT QUARRY TILE
QTB QUARRY TILE BASE
QTF QUARRY TILE FLOOR
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
QUAL QUALITY
R RADIUS OR RISER
RA RETURN AIR
RAD RADIATOR
RB RESILIENT BASE OR RUBBER BASE
RB HK ROBE HOOK
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RCP REFLECTED CEILING PLAN
RCVR RECEIVER
RD ROAD OR ROOF DRAIN
REC RECESSED
RECD RECEIVED
RECPT RECEPTACLE
RECT RECTANGLE
REF REFERENCE OR REFRIGERATOR
REFR REFRACTORY REFRIGERATION OR REFRIGERATION
REFRACTORY
REG REGISTER
REINF REINFORCE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
RET RETURN
REV REVISION
RF RADIO FREQUENCY
RFG ROOFING
RFI REQUEST FOR INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RHMS ROUND HEAD MACHINE SCREW
RHR RIGHT HAND REVERSE
RHWS ROUND HEAD WOOD SCREW
RL ROOF LEADER
RLG RAILING
RM ROOM
RND ROUND
RO ROUGH OPENING
ROW RIGHT OF WAY
RPM REVOLUTIONS PER MINUTE
RS ROUGH SAWN
RT RIGHT
RV ROOF VENT
RVS REVERSE
RWD REDWOOD
RWL RAIN WATER LEADER
W/ WITH
W/O WITHOUT
WARR WARRANTY
WBL WOOD BLOCKING
WC WALL COVERING OR WATER CLOSET
WC WL HNG WATER CLOSET, WALL HUNG
WCHR WATER CHILLER
WCL WL MTD WATER COOLER, WALL HUNG
WD WOOD
WDW WINDOW
WF WIDE FLANGE
WFAB WALL FABRIC
WFR WOOD FRAME
WFS WOOD FURRING STRIPS
WH WATER HEATER
WHSE WAREHOUSE
WLD WELDED
WM WIRE MESH
WP WATERPROOFING
WPD WATER PRESSURE DROP
WPM WATERPROOF MEMBRANE
WR WEATHER RESISTANT
WS WEATHERSTRIP
WSCT WAINSCOT
WT WEIGHT
WWF WELDED WIRE FABRIC
X BRACE CROSS BRACE
XPS EXTRUDED POLYSTYRENE BOARD (INSULATION)
YD YARD
YR YEAR
1. THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING REVIT®
SOFTWARE IN A MICROSOFT WINDOWS ENVIRONMENT. A BUILDING INFORMATION
MODEL (BIM) HAS BEEN DEVELOPED FOR DESIGN COMMUNICATION. THE MODEL
DOES NOT CONTAIN COMPLETE INFORMATION FOR USE IN COST ESTIMATING,
SYSTEMS PERFORMANCE, COORDINATION, SCHEDULING, OR FACILITIES
MANAGEMENT.
2. THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING THE
CONSTRUCTION SPECIFICATIONS INSTITUTE'S UNIFORM DRAWING SYSTEM AND THE
NATIONAL CAD STANDARD AS GUIDES.
3. DISCREPANCIES IN THE CONTRACT DOCUMENTS SHALL BE IMMEDIATELY BROUGHT
TO THE ATTENTION OF THE ARCHITECT AND OWNER’S REPRESENTATIVE/COR.
CONTRACTOR SHALL PROVIDE THE HIGHER GRADE OF QUALITY AND/OR GREATER
QUANTITY OF WORK WHEN BIDDING IF A CLARIFICATION CAN NOT BE OBTAINED BY
THE BID DUE DATE.
4. CONTRACTOR IS RESPONSIBLE FOR COORDINATING SCOPE OF WORK WITH
OWNER’S REPRESENTATIVE/COR AND VARIOUS FACILITY PERSONNEL INVOLVED
WITH UTILITY SHUT DOWN, INFECTION CONTROLS, OCCUPANT/EMPLOYEE SAFETY,
ACCESS CONTROL, ETC.
5. ANY INDICATION OF PROJECT LIMITS OR BOUNDARY OF DEMARCATION ARE SHOWN
FOR THE CONVENIENCE OF THE CONTRACTOR, THE FULL SCOPE OF THE PROJECT
LIMIT OF BOUNDARY REQUIRES COORDINATION WITH THE DESIGN SCOPE OF WORK
AND ACCESS TO EXISTING UTILITIES FOR TIE IN.
6. DRAWINGS ARE PREPARED FROM FIELD VERIFICATION, EXISTING FACILITY DRAWING
BASE FILES, AND USING DIMENSIONS, CONFIGURATIONS AND DETAILS OF SPECIFIC
MANUFACTURERS AS A BASIS OF DESIGN. CONTRACTOR IS RESPONSIBLE FOR
VERIFICATION OF ACTUAL DIMENSIONS, THE COORDINATION OF THE DETAILS WITH
THE PRODUCTS WHICH ARE PROVIDED PER THE SCOPE OF THE SPECIFICATIONS
AND THE SURROUNDING CONSTRUCTION. CONTRACTOR SHALL VERIFY DIMENSIONS,
ROUGH-IN DIMENSIONS, CONNECTIONS, AND OVERALL INSTALLATION
REQUIREMENTS.
7. CONTRACTOR IS RESPONSIBLE FOR THE COMPLETION OF THE ENTIRE SCOPE OF
WORK OUTLINED IN THE CONTRACT DOCUMENTS. CONTRACTOR IS RESPONSIBLE
FOR THE COORDINATION OF ALL SUB-CONTRACTORS AND THE SCOPE OF WORK
THEY PROVIDE. SUB-CONTRACTORS ARE RESPONSIBLE FOR THEIR FULL SCOPE OF
WORK WITHIN THE CONTRACT DOCUMENTS, TRADES ARE NOT SEGMENTED TO ONLY
CERTAIN SHEETS AND SPECIFICATIONS, CROSS COORDINATION IS REQUIRED.
8. CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR
UNDERSTANDING INFORMATION OUTLINED IN THE SPECIFICATIONS, KEY NOTES,
GENERAL NOTES, LEGEND, CODES, ETC., PROVIDED IN THE CONTRACT DOCUMENTS.
9. CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR PROVIDING
AND MAINTAINING SMOKE/FIRE RATINGS OF NEW CONSTRUCTION AND EXISTING
CONSTRUCTION AS INDICATED ON DRAWINGS. THIS INCLUDES PATCHING
PENETRATIONS IN SHAFTS, WALLS, SLABS AND ROOF. ONLY U.L. APPROVED
METHODS, MATERIALS AND INSTALLATION ARE ACCEPTABLE.
10. MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL DRAWINGS SHOW
INFORMATION IN A DIAGRAMMATIC FASHION WITHOUT DIMENSIONING. THE GENERAL
CONTRACTOR IS TO COORDINATE THE LOCATIONS OF ALL MECHANICAL, PLUMBING
AND ELECTRICAL EQUIPMENT WITH RESPECT TO THE ARCHITECTURAL AND
STRUCTURAL DETAILING OF SHAFTS, CHASES, CEILING CONSTRUCTION, ETC.
11. CONTRACTOR IS RESPONSIBLE FOR VERIFYING DIMENSIONS IDENTIFIED AND NOT
IDENTIFIED IN THE CONTRACT DOCUMENTS WITH THE EXISTING AND NEW
CONSTRUCTION ELEMENTS. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION
BETWEEN THE CONTRACT DOCUMENTS, INSTALLED AND UNINSTALLED
CONSTRUCTION BEFORE THE ORDERING OF MATERIALS AND EQUIPMENT. NOTIFY
ARCHITECT AND OWNER’S REPRESENTATIVE/COR OF ANY DISCREPANCIES OR
MISSING DIMENSIONS.
12. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR GENERAL
ORIENTATION AND CONTEXT ONLY.
13. THE TERM "ALIGN" MEANS TO INSTALL DIFFERENT/SIMILAR COMPONENTS OF
CONSTRUCTION TO PROVIDE A FLUSH FINISH SURFACE.
14. ALL DIMENSIONS INDICATED ARE TO FACE OF EXISTING MEMBERS, FACE OF NEW
STRUCTURAL MEMBERS, FACE OF NEW MASONRY, FACE OF NEW STUDS OR COLUMN
GRID LINES UNLESS NOTED OTHERWISE.
15. FLOOR ELEVATION 100’-0” IS EQUAL TO THE FINISH FLOOR SLAB OF THE EXISTING
SLAB FLOOR CONSTRUCTION UNLESS OTHERWISE NOTED.
16. ROUGH OPENINGS SHALL ALLOW FOR SHIM SPACE.
17. CONTRACTOR TO PROVIDE WORK WHERE DETAILS AND NOTES ARE IDENTIFIED AS
“TYPICAL” OR “SIMILAR” EACH INSTANCE THAT IS THE SAME IN NATURE TO THE
DETAIL, AREA, OR ITEM REFERENCED.
18. PROVIDED WORK SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR.
CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF DELIVERY, MOUNTING,
INSTALLATION, NECESSARY BLOCKING AND ROUGH-IN.
19. INSTALLED WORK IS THE CONTRACTOR INSTALLING OWNER FURNISHED MATERIALS
AND EQUIPMENT. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF MATERIAL
DELIVERY, MOUNTING, INSTALLATION AND ROUGH IN.
20. FURNISHED WORK IS THE CONTRACTOR FURNISHING THE MATERIALS AND
EQUIPMENT TO THE OWNER. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF
DELIVERY AND ROUGH-IN.
21. ALL PROVIDED WORK SHALL BE WITH NEW MATERIALS UNLESS SPECIFICALLY
CALLED OUT AS SALVAGED OR RELOCATED WITHIN THE CONTRACT DOCUMENTS.
22. ALL PERSONS DIRECTLY OR INDIRECTLY ASSOCIATED WITH THE PROJECT SHALL BE
FAMILIAR WITH THE RULES AND REGULATIONS OF THE OCCUPATIONAL SAFETY AND
HEALTH ACT, AND IMPLEMENT THOSE RULES AS THEY APPLY TO THIS PROJECT.
23. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL
UTILITY LINES. LOCATIONS SHOWN ARE APPROXIMATE. REPAIR ALL DAMAGE TO
UTILITY LINES CAUSED BY CONSTRUCTION OPERATIONS AT NO COST TO THE
OWNER.
24. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPORARY BRACING AND SHORING
REQUIRED DURING CONSTRUCTION.
25. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ADJACENT
CONSTRUCTION, FINISHES, EQUIPMENT, AND TRAVEL ROUTE TO AND FROM THE
CONSTRUCTION SITE. ANY DAMAGE OR UNACCEPTABLE WEAR BY THE
CONSTRUCTION TEAM SHALL BE REPAIRED/REPLACED BY THE CONTRACTOR AT NO
COST TO THE OWNER.
26. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT
DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER
QUALITY OF WORK, AS DETERMINED BY THE COR, SHALL BE PROVIDED.
27. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND…