S06 36C25222B0022 0003 Att5_Spec 015719 - Temporary Environmental Controls.pdf
PDF 145 KB Posted
- Attached to
- Z1DA--Project 556-20-013 Renovate Bldg 134 CLC 3A/C at the Captain James A. Lovell FHCC in North Chicago, IL
- Solicitation number
- 36C25222B0022
About this file
This document provides the specifications for temporary environmental controls for a construction project. The project involves renovating Building 134 at the Captain James A. Lovell Federal Health Care Center in North Chicago, Illinois under solicitation number 36C25222B0022 issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12. The specifications require the contractor to control environmental pollution, debris, sediment, chemical waste, and noise during construction. The contractor must submit an environmental protection plan, conduct environmental monitoring, and clean the site upon completion of work. Requirements include proper disposal of hazardous waste and compliance with federal, state, and local environmental laws and regulations.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Captain James A. Lovell FHCC VA: 556-20-013 Renovate CLC 3A/C North Chicago, IL 60064
12-23-2021(Revised 02-04-2022) 100% Bid Documents
01-01-21
01 57 19 -1
SECTION 01 57 19
TEMPORARY ENVIRONMENTAL CONTROLS
PART 1 - GENERAL
1.1 DESCRIPTION
This section specifies the control of environmental pollution and damage that the Contractor must consider for air, water, and land resources.
It includes management of visual aesthetics, noise, solid waste, radiant energy, and radioactive materials, as well as other pollutants and resources encountered or generated by the Contractor. The Contractor is obligated to consider specified control measures with the costs included within the various contract items of work.
Environmental pollution and damage is defined as the presence of chemical, physical, or biological elements or agents which:
1. Adversely effect human health or welfare,
2. Unfavorably alter ecological balances of importance to human life,
3. Effect other species of importance to humankind, or;
4. Degrade the utility of the environment for aesthetic, cultural, and historical purposes.
Definitions of Pollutants:
1. Chemical Waste: Petroleum products, bituminous materials, salts, acids, alkalis, herbicides, pesticides, organic chemicals, and inorganic wastes.
2. Debris: Combustible and noncombustible wastes, such as leaves, tree trimmings, ashes, and waste materials resulting from construction or maintenance and repair work.
3. Sediment: Soil and other debris that has been eroded and transported by runoff water.
4. Solid Waste: Rubbish, debris, garbage, and other discarded solid materials resulting from industrial, commercial, and agricultural operations and from community activities.
5. Surface Discharge: The term "Surface Discharge" implies that the water is discharged with possible sheeting action and subsequent soil erosion may occur. Waters that are surface discharged may terminate in drainage ditches, storm sewers, creeks, and/or "water of the United States" and would require a permit to discharge water from the governing agency.
North Chicago, IL 60064
12-23-2021(Revised 02-04-2022)
01 57 19 -2
6. Rubbish: Combustible and noncombustible wastes such as paper, boxes, glass and crockery, metal and lumber scrap, tin cans, and bones.
7. Sanitary Wastes:
a. Sewage: Domestic sanitary sewage and human and animal waste.
b. Garbage: Refuse and scraps resulting from preparation, cooking, dispensing, and consumption of food.
1.2 QUALITY CONTROL
Establish and maintain quality control for the environmental protection of all items set forth herein.
Record on daily reports any problems in complying with laws, regulations, and ordinances. Note any corrective action taken.
1.3 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
U.S. National Archives and Records Administration (NARA):
33 CFR 328....................Definitions
1.4 SUBMITTALS
In accordance with Section, 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND
SAMPLES, furnish the following:
1. Environmental Protection Plan: After the contract is awarded and prior to the commencement of the work, the Contractor shall meet with the Contracting Officer’s Representative (COR) to discuss the proposed Environmental Protection Plan and to develop mutual understanding relative to details of environmental protection. Not more than 20 days after the meeting, the Contractor shall prepare and submit to the Contracting Officer for approval, a written and/or graphic Environmental Protection Plan including, but not limited to, the following:
a. Name(s) of person(s) within the Contractor's organization who is (are) responsible for ensuring adherence to the Environmental
Protection Plan.
b. Name(s) and qualifications of person(s) responsible for manifesting hazardous waste to be removed from the site.
c. Name(s) and qualifications of person(s) responsible for training the Contractor's environmental protection personnel.
North Chicago, IL 60064
12-23-2021(Revised 02-04-2022)
01 57 19 -3
d. Description of the Contractor's environmental protection personnel training program.
e. A list of Federal, State, and local laws, regulations, and permits concerning environmental protection, pollution control, noise control and abatement that are applicable to the
Contractor's proposed operations and the requirements imposed by those laws, regulations, and permits.
f. Procedures to provide the environmental protection that comply with the applicable laws and regulations. Describe the procedures to correct pollution of the environment due to accident, natural causes, or failure to follow the procedures as described in the
Environmental Protection Plan.
g. Permits, licenses, and the location of the solid waste disposal area.
h. Environmental Monitoring Plans for the job site including land, water, air, and noise.
i. Inclusion of “best management practices” and methodologies.
Approval of the Contractor's Environmental Protection Plan will not relieve the Contractor of responsibility for adequate and continued control of pollutants and other environmental protection measures.
1.5 PROTECTION OF ENVIRONMENTAL RESOURCES
Protect environmental resources within the project boundaries and those affected outside the limits of permanent work during the entire period of this contract. Confine activities to areas defined by the specifications and drawings.
Reduction of Noise: Minimize noise using every action possible. Perform noise-producing work in less sensitive hours of the day or week as directed by the COR. Maintain noise-produced work at or below the decibel levels and within the time periods specified.
1. Perform construction activities involving repetitive, high-level impact noise only as allowed by the COR. Repetitive impact noise on the property shall not exceed the following dB limitations:
Time Duration of Impact Noise Sound Level in dB
More than 12 minutes in any hour 70
Less than 30 seconds of any hour 85
Less than three minutes of any hour 80
Less than 12 minutes of any hour 75
North Chicago, IL 60064
12-23-2021(Revised 02-04-2022)
01 57 19 -4
2. Measure sound level for noise exposure due to the construction at least once every five successive working days while work is being performed above 55 dB(A) noise level. Measure noise exposure at the property line or 15 m (50 feet) from the noise source, whichever is greater. Measure the sound levels on the A weighing network of a
General Purpose sound level meter at slow response. To minimize the effect of reflective sound waves at buildings, take measurements at
900 to 1800 mm (three to six feet) in front of any building face.
Submit the recorded information to the COR noting any problems and the alternatives for mitigating actions.
Final Clean-up: On completion of project and after removal of all debris, rubbish, and temporary construction, Contractor shall leave the construction area in a clean condition satisfactory to the COR. Cleaning shall include off the station disposal of all items and materials not required to be salvaged, as well as all debris and rubbish resulting from demolition and new work operations.
- - - E N D - - -
| SECTION 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS |
| PART 1 - GENERAL |
| 1.1 DESCRIPTION |
| 1.2 QUALITY CONTROL |
| 1.3 references |
| 1.4 Submittals |
| 1.5 PROTECTION OF ENVIRONMENTAL RESOURCES |