S06 36C25222B0022 0003 Att4_Appx A - FHCC Asbestos Hazmat Testing Report.pdf
PDF 4 MB Posted
- Attached to
- Z1DA--Project 556-20-013 Renovate Bldg 134 CLC 3A/C at the Captain James A. Lovell FHCC in North Chicago, IL
- Solicitation number
- 36C25222B0022
About this file
This document contains an asbestos survey report for Building 134 at the Captain James A. Lovell Federal Health Care Center in North Chicago, IL. The survey identified several asbestos containing materials throughout the building including floor tiles, ceiling tiles, mastic, pipe insulation, and transite boards. Regulated asbestos containing materials were found in quantities exceeding thresholds that require abatement under applicable EPA, OSHA and state regulations prior to any renovation that could disturb the materials. The report provides location details and quantity estimates of identified asbestos containing materials to inform future abatement work. It also outlines regulatory requirements and limitations of the survey.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASBESTOS & HAZMAT TESTING REPORT FOR 35% SD SUBMISSION
CAPT. JAMES LOVELL FED. HEALTH CARE CENTER
RENOVATE BUILDING 134 – WINGS 3A & 3C CLC
PROJECT 556-20-013
Date: May 25, 2021
Items: Summary Results of Asbestos & HazMat Survey and Cost Estimate
Inspector: Brett Brumbaugh, Castle Hill Associates
Findings: Asbestos and Universal Wastes are present in the work area No lead-based paint is present in the work area
ASBESTOS CONTAINING
MATERIALS
LOCATIONS QUANTITY
Pipe insulation on straight runs and elbows
Inaccessible wall chases for Bathroom A303, A310, Janitor Closet A312, and Lounge A316
~120 lf
Pipe insulation on mud fittings on fiberglass insulated piping
Roof drains in A301, A306, A314;
Inaccessible wall chases for Bathroom A303, A310, Janitor Closet A312, and Lounge A316
~ 36 fittings
Transite cement sheets behind recessed radiators
A301, A302, A304, A305, A306, A306A, A307, A309, A313, A316
12 each = 96 sf
UNIVERSAL WASTE MATERIAL LOCATIONS QUANTITY
Fluorescent light tubes A301, A302, A303, A304, A305, A306, A306A, A307, A308, A309, A310, A311, A312, A313, A316, and corridor
120 tubes
Batteries in exit lights Corridors 3 each
Estimator: Brett Brumbaugh
Notes: Based on 2022 construction and bidding (normal working hours)
EXCLUDES:
• Overtime or shift work.
INCLUDES:
• Bonds, insurance, contractor overhead and profit
• Prevailing wage rates for Chicago, IL
Cost Index: Chicago, IL
Description Material Quantity Unit Cost Amount
Section 02 82 11
Asbestos Removal Pipe insulation on straight runs and elbows 120 55.00 $6,600.00
Pipe insulation mud fittings 36 55.00 $1,980.00
Transite sheets 96 25.00 $2,400.00
OSHA Testing CPIH (day) 3 900.00 $2,700.00
VA VPIH Air Monitoring (day) 3 900.00 $2,700.00
Section 02 84 16
Tubes and Batteries 120 5.00 $600.00
TOTAL COSTS $16,980.00
ASBESTOS SAMPLING REPORT
for
N. CHICAGO, IL
PROJECT:
PROJECT 556-20-013
Assessment Date:
MAY 17, 2021
CONSULTANT:
CASTLE HILL ASSOCIATES, LLC
1197 FARNSWORTH RD., UNIT E
WATERVILLE, OH 43566
567-952-0212 www.CASTLEHILLASSOCIATES.com http://www.castlehillassociates.com/
TABLE OF CONTENTS
• ASBESTOS & LEAD PAINT SAMPLING SUMMARY
• ABESTOS BULK SAMPLING DESCRIPTIONS AND LAB RESULTS
• LEAD PAINT XRF READINGS AND RESULTS
• ASBESTOS LABORATORY REPORT
• ASBESTOS LABORATORY CERTIFICATIONS
• INSPECTOR CERTIFICATIONS
• PREVIOUS ASBESTOS SURVEY REPORT
ASBESTOS INSPECTION SUMMARY
On May 17, 2021, Brett Brumbaugh performed an asbestos survey prior to the gut-rehab renovation project in Building 135, 3rd Floor “A” Wing of the Capt. James Lovell Fed. Health Care Center in N.
Chicago, IL. Bulk samples were collected of suspect asbestos containing materials in the renovation area. Prior to this sampling, Castle Hill was provided with previous sampling results, and was informed that asbestos is known to be located in the pipe insulation and transite board in the “A” wing. There were 9 additional bulk samples taken as part of this survey with the materials identified in the report included in this submission.
Bulk sampling as part of this project was based upon the appearance, texture, and location of the suspect materials. All bulk samples were analyzed utilizing current EPA methods for PLM (Polarized Light Microscopy) by EMSL Analytical in Plymouth, MI. This lab is accredited by the NIST, NVLAP program (National Institute of Standards and Technology, National Voluntary Laboratory Accreditation Program) and also an American Industrial Hygiene Association (AIHA) accredited laboratory.
ASBESTOS INSPECTION FINDINGS
As a result of this inspection, current sampling, and previous surveys/sampling, it has been determined that asbestos containing materials are present in the renovation area of the building. As part of the planned renovations, these materials must be removed in accordance with current Federal, State, and Local asbestos regulations in addition to the VA standards and guidelines for asbestos removal.
LEAD-BASED PAINT FINDINGS
There was no lead-based paint identified in the renovation areas in the renovation areas.
UNIVERSAL WASTES FINDINGS
There were universal wastes identified in the renovation area (fluorescent light tubes and batteries in exit light fixtures).
Respectfully Submitted, Brett L. Brumbaugh, REPA, CESCO State of Illinois Asbestos Inspector - License # 100-09972 EPA Lead Paint Risk Assessor - EPA License # LBP-R-I216003-1 mjones Cloud+ mjones
ASBESTOS SAMPLING PROTOCOL
The bulk samples were collected from locations that were selected to be representative of the building materials. Sampling was accomplished using the simplified sampling scheme referenced in the AHERA regulations and found in the “Pink Book”. Locations of individual samples are referenced on this report.
The samples were either collected with a coring tool designed for asbestos sampling or placed into a plastic bag for laboratory analysis. The samples were analyzed via polarized light microscopy with dispersion staining, using the “Interim method for the Determination of Asbestos in Bulk Insulation Samples” found in Appendix A to Subpart F in 40 CFR Part 763.
The regulations require specific numbers of samples be obtained per homogeneous area. For example when sampling for joint compound or asbestos in hard plaster (sprayed-on or troweled-on surfacing materials) samples are to be taken based on the following increments: 0 to 1000 square feet of material, 3 samples are necessary. From 1001 to 5000 square feet, 5 samples are necessary, over 5000 square feet 7 samples are required. If during analysis any samples are found to contain asbestos, the entire homogeneous area is delineated as asbestos containing material. In the case of pipe insulation or other types of manufactured materials, the regulations require only enough samples to ascertain whether asbestos is present. In this case, the minimum amount of samples to collect and analyze is usually three.
The sampling performed in this inspection followed these sampling guidelines.
ASBESTOS GLOSSARY OF TERMS
Friable asbestos material: means any material containing more than 1 percent asbestos as determined using the method specified in appendix E, subpart E, 40 CFR part 763 section 1, Polarized Light Microscopy, that, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure.
Category I Non-friable Asbestos Containing Material (ACM) means asbestos containing packings, gaskets, resilient floor coverings, and asphalt roofing products containing more that 1 percent asbestos as determined using the method specified in appendix E, subpart E, 40 CFR part 763, Section 1, Polarized Light Microscopy.
Category II Non-friable ACM means any material, excluding Category I non-friable ACM, containing more than 1 percent asbestos as determined using the method specified in appendix E, subpart E, 40 CFR part 763, section 1, Polarized Light Microscopy that when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.
Regulated Asbestos Containing Material (RACM): means (a) Friable asbestos material, (b) Category I non-friable ACM that has become friable, (c) category I non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading, or (d) Category II non-friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material expected in the course of demolition or renovation operations regulated by this subpart.
ASBESTOS BULK SAMPLE DESCRIPTIONS & RESULTS
Facility: Capt. James Lovell Fed. Health Care Center – N. Chicago, IL Project: 556-17-016 Renovate Building 135 for HR Area: Building 135, 3rd Floor, “A” Wing Sampling Date: May 17, 2021 Analysis Date: May 18, 2021 Laboratory: EMSL Analytical – Plymouth, MI Sampler: Brett Brumbaugh
SAMPLE
HA MATERIAL DESCRIPTION SAMPLE LOCATION LABORATORY
ANALYSIS RESULT
1 A Black tar behind transite in radiator areas 306 No Asbestos Detected
2 A Black tar behind transite in radiator areas 321 No Asbestos Detected
3 A Black tar behind transite in radiator areas 319 No Asbestos Detected
4 B Hard plaster (base & finish coats) Elevator lobby No Asbestos Detected
5 B Hard plaster (base & finish coats) A314 No Asbestos Detected
6 B Hard plaster (base & finish coats) A307 No Asbestos Detected
7 C Drywall joint compound A301 No Asbestos Detected
8 C Drywall joint compound Hallway by elevators No Asbestos Detected
9 C Drywall joint compound A309 No Asbestos Detected
Note: Asbestos containing materials are defined by containing greater than 1% asbestos.
mjones Cloud+ mjones Cloud+ mjones Cloud+ mjones
LEAD PAINT XRF TESTING DATA
Project: Capt. James Lovell VAMC - N. Chicago, IL
Project: Renovate Bldg. 134 - Wings 3A & 3C CLC 556-20-013
Inspector: Brett Brumbaugh
Date: 5/17/2021
XRF Mfg.: Viken Detection
Model: Pb200i
Type: XRF Lead Paint Analyzer
Serial # 2757
Reading # Building Area Component Paint Color Pb Conc.
mg/cm2 Result
1 3rd Fl. A Wing - Room A316 Metal door frame White -0.1 Negative
2 3rd Fl. A Wing - Room A316 Wood door White 0.2 Negative
3 3rd Fl. A Wing - Room A316 Plaster wall White 0.0 Negative
4 3rd Fl. A Wing - Room A316 Metal door frame White 0.6 Negative
5 3rd Fl. A Wing - Room A316 Metal radiator cover White 0.3 Negative
6 3rd Fl. A Wing - Room A316 Metal window trim White 0.0 Negative
7 3rd Fl. A Wing - Hall by A316 Metal door frame Tan 0.4 Negative
8 3rd Fl. A Wing - Hall by A316 Plaster wall White 0.0 Negative
9 3rd Fl. A Wing - Stairwell Metal door frame White 0.5 Negative
10 3rd Fl. A Wing - Stairwell Cinder block wall White -0.1 Negative
11 3rd Fl. A Wing - Room A311 Ceramic wall tile White 0.1 Negative
12 3rd Fl. A Wing - Lobby Drywall wall White 0.1 Negative
13 3rd Fl. A Wing - Room A308 Metal door White -0.2 Negative
14 3rd Fl. A Wing - Room A306 Plaster wall White 0.2 Negative
15 3rd Fl. A Wing - Elevator Lobby Ceramic wall tile White 0.2 Negative
16 3rd Fl. A Wing - Elevator Lobby Wood door White 0.0 Negative
ASBESTOS LABORATORY REPORT
EMSL Analytical, Inc.
15111 Northville Rd Plymouth, MI 48170
Tel/Fax: (734) 668-6810 / (734) 668-8532 http://www.EMSL.com / annarborlab@emsl.com
082101182EMSL Order:
Customer ID: CHAS42
Customer PO: VA
Project ID:
Attention: Phone:Brett Brumbaugh (567) 952-0212
Fax:Castle Hill Associates, LLC
Received Date:218-A Mechanic St. 05/18/2021 10:30 AM
Analysis Date:Waterville, OH 43566 05/18/2021
Collected Date:
Project: JAMES LOVELL VA - BLDG. 134
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
082101182-0001
None DetectedNon-fibrous (Other)84%Cellulose16%Black
Fibrous
Homogeneous
Tar
082101182-0002
None DetectedNon-fibrous (Other)84%Cellulose16%Black
Fibrous
Homogeneous
Tar
082101182-0003
None DetectedMica
Non-fibrous (Other)
5%
95%
White
Non-Fibrous
Homogeneous
Plaster
082101182-0004
None DetectedMica
Non-fibrous (Other)
4%
96%
White
Non-Fibrous
Homogeneous
Plaster
082101182-0005
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Texture
082101182-0005A
None DetectedMica
Non-fibrous (Other)
3%
97%
White
Non-Fibrous
Homogeneous
Joint Compound
082101182-0006
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Texture
082101182-0006A
None DetectedMica
Non-fibrous (Other)
2%
98%
White
Non-Fibrous
Homogeneous
Joint Compound
Analyst(s)
Conner Frymier (8) Ryan Shannon, Laboratory Manager or Other Approved Signatory
EMSL maintains liability limited to cost of analysis . Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations . The report reflects the samples as received.
Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 600/M4-82-020 “Interim Method”) but augmented with procedures outlined in the 1993 (”final”) version of the method. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non- friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis . Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Estimation of uncertainty is available on request.
Samples analyzed by EMSL Analytical, Inc. Plymouth, MI NVLAP Lab Code 101048-4
Initial report from: 05/19/2021 09:21:02
Page 1 of 1ASB_PLM_0008_0001 - 1.78 Printed: 5/19/2021 9:21 AM
OrderID: 082101182
LABORATORY CERTIFICATIONS
INSPECTOR CERTIFICATIONS
PREVIOUS ASBESTOS SURVEY REPORT
Tropical Environmental, Inc.
10976 Fairbluff Ave.
Huntley, IL. 60142
(224) 569-3277 (224) 569-3278 fax www.TropicalEnvironmental.com
December 19, 2011
Mr. Royal Eckstein Captain James A. Lovell FHCC 3001 Green Bay Road North Chicago, Illinois 60064
RE: U.S. Department of Veterans Affairs (VA)
Captain James A. Lovell Federal Health Care Center Building # 134
Dear Mr. Eckstein:
Tropical Environmental, Inc. (Tropical) performed a limited asbestos assessment of the above referenced location in general accordance with:
• The Commercial and Public Buildings Asbestos Abatement Act (225 ILCS 207) enforced by the Illinois Department of Public Health (IDPH)
• The Asbestos Hazard Emergency Response Act (40 CFR 763) enforced by the U.S.
Environmental Protection Agency (USEPA), and
• The Asbestos Hazard Communication requirements (29 CFR 1910.1001(i) enforced by the U.S. Occupational Safety and Health Administration (OSHA).
Tropical performed the limited survey to identify and sample suspect asbestos-containing materials (ACM) in the facility. Samples of suspect asbestos-containing material (ACM) were submitted to a National Voluntary Laboratory Accreditation Program (NVLAP) certified laboratory for analysis. Laboratory results indicate that some of the suspect material contains asbestos. Please refer to the attached report for details on the survey.
Please feel free to contact me at (224) 269-3277 or by email at info@tropicalenvironmental.com with any comments or questions regarding Tropical’s investigation and this report.
Sincerely, Mark Haines President mailto:info@tropicalenvironmental.com
Table of Contents Page
Executive Summary
1.1 Project Purpose and Background
2.0 Asbestos Survey
2.1 Asbestos Survey Methodology
2.2 Asbestos Results
2.3 Applicable Regulations
3.0 Findings and Recommendations
4.0 Limitations
5.0 References & Definitions
Appendices
Appendix A: Asbestos Survey Analytical Summary Table Appendix B: Asbestos Laboratory Results, Laboratory Certifications and Chain-of-Custodies Appendix C: Tropical Employee Certifications Appendix D: Material/Sample Location Drawings Appendix E: Photographs of ACM Positives
Asbestos Survey
Building # 134 North Chicago, IL www.TropicalEnvironmental.com
Executive Summary
Tropical Environmental, Inc. (Tropical) was retained by the VA to provide an Asbestos Survey of all buildings, as defined by VA representatives, located on the Captain James A. Lovell Federal Health Care Center Campus in North Chicago, IL. The field assessment and sampling was performed from July 19, 2011 to October 5, 2011.
Building 134 is a brick clad, three story structure with a basement. The building was constructed in 1961 and used as nursing home care. The building has approximately 120,000 square feet of floor space. Suspect fire-doors were noted throughout and shall be presumed ACM.
Tropical performed a visual survey of building materials and collected representative samples of homogeneous suspect ACM, in accordance with EPA requirements, guidelines and standard industry practices. The samples were submitted to a National Voluntary Laboratory Accreditation Program (NVLAP) accredited laboratory for bulk analysis.
This report addresses the asbestos survey completed for Building #134.
Based on the bulk sampling and laboratory analyses, suspect materials were reported to contain asbestos, including the following:
HSA
Sample
Material Description
Material Condition
Material Quantity
Material Location
Laboratory Results
FT3
9”X9”
BROWN
W/TAN
STREAKS
FLOOR TILE
AND
ASSOCIATED
MASTIC
NONFRIABLE
77 SF
CLOSETS IN
C3, C6, C7, C16L, A6B, AND OUTSIDE
A1
PC 1.3%- PC
2.4 %
CHRYSOTILE
http://www.tropicalenvironmental.com/
Building # 134 www.TropicalEnvironmental.com
HSA
Sample
Material Description
Material Condition
Material Quantity
Material Location
Laboratory Results
FT7
9”X9” BLACK
W/WHITE
STREAKS
FLOOR TILE
AND
ASSOCIATED
MASTIC
NONFRIABLE
307 SF ROOM C2
PC 1.3%- PC
4.4%
CHRYSOTILE
LN1
BLUE
SPLOTCHY
LINOLEUM
NONFRIABLE 1100 SF ROOM B2A 0.3%-9.2%
CHRYSOTILE
PF
HARD
FITTINGS ON
FIBERGLASS
FRIABLE
UNABLE
TO
QUANTIFY
THROUGHOUT
10%
CHRYSOTILE
10%
AMOSITE
PI PIPE
INSULATION FRIABLE
UNABLE
TO
QUANTIFY
TRHOUGHOUT
CRAWLSPACE
PC TRACE -
30%
Based on the bulk sampling and laboratory analyses, suspect materials were reported to contain asbestos at less than 1%, including the following:
HSA
Sample #
Material Description
Material Condition
Material Quantity
Material Location
Laboratory Results
FT2
12”X12” OFF
WHITE
W/BROWN
SPLOTCHES
FLOOR TILE
NONFRIABLE 7191 SF BASEMENT
CORRIDORS
<0.25% - 0.3%
CHRYSOTILE
VF
BROWN
VINYL
FLOOR WITH
DOT
PATTERN
NONFRIABLE
1200 SF
ROOMS
A14,C12
CORRIDOR
NEXT TO C4
0.3%
Building # 134
Photographs of the ACM are included in Appendix E.
Every attempt was made to thoroughly evaluate and assess the presence and condition of suspect ACM throughout the building. Any suspect ACM identified during renovation that is not specifically listed in this report should be assumed positive until it can be thoroughly evaluated, assessed, sampled, and analyzed prior to disturbance, in accordance with applicable regulatory standards.
Building # 134 www.TropicalEnvironmental.com
1.0 Introduction
Tropical Environmental, Inc. (Tropical) was retained by the VA to provide an Asbestos Survey of all buildings, as defined by VA representatives, located on the Captain James A. Lovell Federal Health Care Center Campus in North Chicago, IL. The field assessment and sampling was performed from July 19, 2011 to October 5, 2011.
This report addresses the asbestos survey completed for Building #134.
The asbestos survey was performed by Illinois Department of Public Health (IDPH) licensed asbestos inspectors Mr. Mark Haines, license #100-00919, and Ms. Terri Lewis, license #100- 07366.
1.1 Project Purpose and Background
The asbestos survey was conducted to identify accessible asbestos containing materials in the building.
1.2 Scope of Work
Tropical performed an asbestos survey to determine and quantify ACM in accessible areas. The ACM survey included the following activities:
• Visual inspection of all accessible areas of the building, as identified by VA representatives to be included in the scope of this project.
• Collection of bulk samples of identified suspect ACM per homogeneous materials in accessible areas of the building.
• NVLAP accredited laboratory analysis of suspect ACM bulk samples by polarized light microscopy (PLM) to first positive result per homogeneous material.
• Preparation of a final report that includes sample locations of representative ACM and the laboratory’s analytical report.
Building # 134 www.TropicalEnvironmental.com
2.0 Asbestos Survey
2.1 Asbestos Survey Methodology
Only currently certified and licensed inspector(s) and (if appropriate) trainee(s) were utilized for this inspection.
The inspector(s) first reviewed supplied building documents, if applicable, which may have included the asbestos management plan, previous inspection reports, blue prints, and as built drawings, etc. A property/structure(s) walk-thru was then conducted to locate, identify, measure and separate previously identified asbestos containing materials and suspect asbestos containing materials into homogeneous areas. The material’s current condition was also evaluated during the walk-thru. Material conditions were evaluated utilizing the following terminology, Good, Damaged & Significantly Damaged.
Samples were collected using EPA approved methods specifically designed for sample collection. Samples were taken utilizing the randomly distributive manner method while simultaneously applying amended water. Samples were immediately placed in a pre-labeled re-sealable plastic bag. To prevent accidental exposure, sample containers are made of a durable plastic designed to provide and airtight seal. The sampling instrument was subsequently wiped with a clean moist cloth to decontaminate the tool, prevent the potential release of asbestos fibers, and prevent cross contamination of subsequent samples. Following the collection of each sample, the sample location was patched as appropriate. Sample areas were touched to determine friability.
The following chart, as detailed by 40 CFR 763.86, is typically used (and in certain cases, required) for sampling surfacing building materials for asbestos content:
< 1000 s/f 3 samples 1000 – 5000 s/f 5 samples >5000 s/f 7 samples
9 samples are recommended by the EPA for all samples
A group letter or combination of letter and number was assigned to each homogenous material.
This combination serves as a prefix to identify materials of similar composition, texture, color, and date of installation. Each sample was then assigned a sample number such as 01, 02, 03, etc.
All samples were identified on a signed and dated Chain-of-Custody document, which accompanied the samples to the laboratory.
Building # 134
To ensure both quality and objectivity, an independent laboratory was used. Laboratories are selected based on their current accreditations. The laboratory chosen participates in the National Voluntary Laboratory Accreditation Program (NVLAP) for quality control procedures (NVLAP Lab Code: 101202-0). As specified in 40 CFR Chapter I (1-1-87 edition) Part 763, Subpart F, Appendix A.
Suspected asbestos samples were analyzed using polarized light microscopy (PLM) / dispersion staining techniques in accordance with the EPA Method documents “US EPA 600/M4-82-020, 1982” & “US EPA 600/R-93/118, 1993”. Detection limits for this type of analysis are approximately one percent (by volume). All samples were analyzed by International Asbestos Testing Laboratories of Mt. Laurel, New Jersey (IATL), a National Voluntary Laboratory Accreditation Program (NVLAP) accredited asbestos laboratory. Laboratory accreditations are provided in Appendix B.
Some materials may not be accurately identified and/or quantified by PLM. As an example, the original fabrication of vinyl floor tile routinely involved milling of asbestos fibers to extremely small sizes. As a result, these fibers may go undetected under the standard PLM method.
Transmission Electron Microscopy (TEM) is required for a more definitive analysis of these materials. These types of flooring materials that are reported by laboratory analysis to be non-asbestos by PLM analysis are routinely submitted to an accredited laboratory for analysis under TEM for verification of asbestos content. One hundred and fifty-eight (158) samples were tested with TEM analysis for this building.
2.2 Asbestos Results
ASBESTOS CONTAINING MATERIALS
Suspect asbestos containing materials were identified and sampled in accordance with the above-referenced survey methodology. Laboratory results for suspect materials that were identified and sampled are included in Appendix A, entitled “Table I, Asbestos Survey Analytical Summary.”
Please reference the material location included on the drawings provided in Appendix D.
According to the AHERA Model Accreditation Plan, non-suspect material such as fiberglass, foam rubber and plastics do not warrant sampling.
2.3 Applicable Regulations
EPA's National Emission Standard for Hazardous Air Pollutants (NESHAP) (40 CFR 61, Building # 134 www.TropicalEnvironmental.com
Subpart M) categorizes asbestos-containing thermal system insulation (TSI) and sprayed-on or troweled-on asbestos as regulated ACM (RACM). Miscellaneous materials (floor tile and floor tile mastic) are classified as Category I Non-Friable Asbestos; and transite material is classified as Category II Non-Friable Asbestos, unless the material is made friable during demolition.
Friable ACM is material that can be crumbled, pulverized, or reduced to a powder by hand.
NESHAP requires at least ten working days’ notification prior to any renovation or demolition activity that will disturb greater than 160 square feet or 260 linear feet of ACM materials. ACM removed during abatement must be disposed of at a landfill approved by the EPA to receive asbestos wastes. NESHAP states that regulated asbestos-containing material (RACM), including friable ACM and non-friable ACM that has become or has a high probability of becoming friable, present in quantities exceeding 260 lineal feet on pipes or 160 square feet on facility components must be removed prior to the commencement of any demolition activities.
NESHAP also states that Category 1 non-friable ACM does not need to be removed prior to demolition if it is not in poor condition and has become friable. Friable materials (with the exception of roofing products) and transite are typically required to be removed prior to a demolition. Asbestos containing floor tile and mastic are typically required to be removed from concrete prior to recycling. Agencies such as Cook County require all asbestos containing materials be removed prior to demolition. If a facility is demolished by intentional burning, all regulated asbestos containing materials including Category I and Category II non-friable ACM must be removed before burning.
The Occupational Safety and Health Administration (OSHA) Construction Industry Standard (29 CFR 1926.1101) categorizes the removal of asbestos containing materials by “class” of material.
Specific requirements for the removal of OSHA classified materials include, but are not limited to, regulated work areas, air monitoring, engineering controls, work practices, personal protective equipment, notification and training.
The U.S. Department of Transportation (DOT) requires special procedures for packaging, labeling and transportation of asbestos wastes to disposal facilities. Other regulations may apply depending upon the contractor’s means and methods.
Tropical recommends the use of certified and licensed asbestos personnel for all planned disturbance of known and suspect asbestos containing products. In accordance with IDPH, IEPA, U.S.EPA and OSHA regulations asbestos containing materials must be removed by and disposed of by a certified/licensed asbestos abatement personnel/contractor.
Building # 134
3.0 Findings and Recommendations
Suspect materials identified, sampled and analyzed as part of this survey were reported to contain asbestos in regulated quantities.
Materials identified in this report as ACM must be handled in accordance with applicable regulations as provided herein, and must be abated if they will be impacted by any planned renovation activity.
The owner or operator of a demolition or renovation activity and prior to the commencement of the demolition or renovation shall thoroughly inspect the affected facility or part of the facility where the demolition or renovation operation will occur for the presence of asbestos, including Category I and Category II non-friable ACM.
It shall be at the owner’s discretion that a copy of this report is provided to any contractor bidding on work in the area(s) covered by this assessment. The owner may also elect to provide a copy of the report to the contractor on site during any renovation and/or demolition activities.
Contractors should use caution and be advised and directed that during renovation or demolition of a structure that concealed materials may be discovered, therefore, should suspect materials not identified in this inspection become exposed or made aware, you should cease operations that may disturb, dislodge or disrupt the material until it is sampled and analyzed for its possible asbestos content.
Although the efforts and intentions of our inspector(s) are always to sample all suspect materials, due to the nature of sampling, (destructive sampling, limited sample locations, visual assumption, etc.) some materials (such as floor tile/linoleum mastic/adhesive) may be excluded from the sampling process. These materials shall be assumed positive for asbestos unless sampled and analyzed otherwise. The client assumes and retains all responsibility and authority to conduct further sampling and analysis at their expense.
If additional suspect asbestos containing materials are identified during the renovation, those materials should be assumed to be positive for asbestos until they can be assessed, sampled, and analyzed by a NVLAP accredited laboratory.
Building # 134 www.TropicalEnvironmental.com
4.0 Limitations
The conclusions of this report are Tropical’s professional opinions, based solely upon visual site observations and interpretations of laboratory analyses, as described in this report. The opinions presented herein apply to the site conditions existing at the time of Tropical’s investigation and interpretation of current regulations pertaining to asbestos. Therefore, Tropical’s opinions and recommendations may not apply to future conditions that may exist at the site, which we have not had the opportunity to evaluate. It should be noted that conditions change and that materials constantly degrade. All applicable federal, state and local regulations should always be verified prior to any work that will disturb or dislodge materials confirmed, assumed or presumed to contain asbestos, Tropical’s assessment was limited to observation, sampling and the analysis of suspect asbestos containing products in accessible portions of the area(s) covered by this survey. Materials in the building that are not considered building materials, are unusual or de minimis, or were inaccessible, due to common construction techniques, to the inspector were excluded from the inspection. As a result, additional asbestos containing building materials may be present in inaccessible areas (e.g. between walls, ceiling spaces enclosed by wallboard, interior of fire doors, etc.) of the structure that were not observed during the survey.
This inspection report is designed to assist the client in the understanding of the regulations regarding asbestos, however, it should not be used as a substitution for obtaining and familiarizing yourself with, including the compliance of, all asbestos related regulations including, but not limited to, 40 CFR, Chapter 61, Subpart M (National Emission Standard for Asbestos) prior to the start of any renovation or demolition activity that will disturb or dislodge asbestos containing materials or suspect/assumed asbestos containing materials.
This report has been prepared for the exclusive use of the intended client, for the specific application to the defined property as addressed in this report. Any additional user of this report shall determine the suitability of the material contained herein for their intended use, and any such user assumes all risks and liability in connection therewith. No claim is made that these findings will remain applicable to future site activities and conditions. Interpretations by any such user from information contained in this report or the drawing of conclusions by any such user from information contained in this report shall be undertaken solely at the risk of said party.
At all times during the performance of the inspection, safety was a priority. Due to the emphasis on safety, there were no injuries, there was no building contamination, and there were no asbestos exposures to either Tropical Environmental, Inc personnel or building occupants.
Building # 134 www.TropicalEnvironmental.com
The asbestos survey was conducted in a manner consistent with that level of care and skill ordinarily exercised by members of the environmental profession under similar conditions. No other warranty or guarantee, express or implied, is included or intended in this Report or otherwise.
Building # 134 www.TropicalEnvironmental.com
5.0 References & Definitions
Illinois Department of Public Health (IDPH)
Asbestos Abatement Act, 105 ILCS 105
Asbestos Abatement for Public and Private Schools and Commercial and Public Buildings in Illinois, 77 Illinois Administrative Code 855
Commercial and Public Building Asbestos Abatement Act, 225 ILCS 207
United States Environmental Protection Agency (USEPA)
Asbestos Hazard Emergency Response Act (AHERA), 40 CFR, Part 763
National Emission Standards for Hazardous Air Pollutants (NESHAP), Asbestos, 40 CFR, Part 61, November 20, 1990
Guidance for Controlling Asbestos-Containing Materials in Buildings (EPA 560/5-85/024), June
Illinois Environmental Protection Agency (IEPA)
Emission Standards and Limitations for Stationary sources, Asbestos 35 IAC, Part 228
United States Occupational Safety and Health Administration (OSHA)
Occupational Exposure to Asbestos, Final Rule, 29 CFR, Pars 1910 and 1926 (August 10, 1994)
Cook County Department of Environmental Control (CCDEC)
Cook County Environmental Control Act
Asbestos Containing Products means, according to the U.S. EPA Method 600/R-93/116, Regulated Asbestos Containing Materials (RACM) are those materials found to contain greater than 1% asbestos per volume of bulk material sampled, by PLM. The term is not intended to include de minimis or inaccessible materials that do not present a risk of harm to public health and that generally would not be the subject of enforcement actions if brought to the attentions of appropriated regulatory agencies.
Building # 134
Asbestos Types are Chrysotile (white asbestos making up approximately 95% of all asbestos used in the United States), Amosite (brown asbestos making up approximately 5% of all asbestos used in the United States), Crocidolite (blue asbestos making up approximately less than 5% of all asbestos used in the United States), and rarely found in buildings are Anthophyllite, Tremolite & Actinolite.
Category I Non-friable Asbestos-Containing Material (ACM) means asbestos-containing packing, gaskets, resilient floor covering, and asphalt roofing products containing more than 1 percent asbestos as determined using the method specified in appendix E, subpart E, 40 CFR part 763, section 1, Polarized Light Microscopy.
Category II Non-friable ACM means any material, excluding Category I nonfriable ACM containing more than 1 percent asbestos as determined using the methods specified in appendix E, subpart E, 40 CFR part 763, section 1, Polarized Light Microscopy that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.
Damaged means less than 25% localized damage or less than10% distributed damage.
Demolition means the wrecking or taking out of any load-supporting structural member of a facility together with any related handling operations or the intentional burning (i.e. practice burns) of any facility.
Facility means any institutional, commercial, public, industrial, or residential structure, installation, or building (including any structure, installation, or building containing condominiums or individual dwelling units operated as a residential cooperative, but excluding residential buildings having four or fewer dwelling units); any ship; and any active or inactive waste disposal site. For purposes of this definition, any building, structure, or installation that contains a loft used as a dwelling is not considered a residential structure, installation, or building. Any structure, installation, or building that was previously subject to the Asbestos NESHAP is not excluded, regardless of its current use or function.
Friable Asbestos Material means any material containing more than 1 percent asbestos as determined using the method specified in appendix E, subpart E, 40 CFR part 763 section 1, Polarized Light Microscopy, that, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure.
Homogeneous Area -- an area of surfacing materials, thermal surface insulation, or miscellaneous material that is uniform in color and texture and has the same installation date.
Miscellaneous Material means interior building material on structural components, structural members or fixtures, such as floor and ceiling tiles, and does not include surfacing material or thermal system insulation.
Multi-layered Material means a material that has a presence of discrete individual layers. EPA does not
Building # 134 www.TropicalEnvironmental.com regard a sheet of “plasterboard,” sheetrock,” “wallboard,” or “gypsum board” by itself a multi-layered material.
Polarized Light Microscopy means an optical microscopy technique for analyzing bulk samples for asbestos in which the sample is illuminated with polarized light (light which vibrates in only one plane) to distinguish between different types of asbestos fibers by their shape and unique optical properties.
Potential Significant Damage means circumstances in which:
1) Friable ACBM is in an area regularly used by building occupants, including maintenance personnel, in the course of their normal activities.
2) There are indications that there is a reasonable likelihood that the material or its covering will become significantly damaged, deteriorated, or delaminated due to factors such as changes in building use, changes in operations and maintenance practices, changes in occupancy, or recurrent damage.
3) The material is subject to major or continuing disturbance, due to factors including, but not limited to, accessibility or, under certain circumstances, vibration or air erosion.
Regulated Asbestos-Containing Material (RACM), as defined in 40 CFR 61.141, means
(a) Friable asbestos material,
(b) Category I non-friable ACM that has become friable,
(c) Category I non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading, or
(d) Category II non-friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of demolition or renovation operations.
Renovation means altering a facility or one or more facility components in any way, including the stripping or removal of Regulated Asbestos Containing Materials (RACM) from a facility component. A renovation could be, but not limited to, any interior renovation or remodel not affecting load-supporting structural members or a roof replacement.
Significantly Damaged means 25% (or greater) localized damage or 10% (or greater) distributed damage.
Surfacing means any material that was sprayed-on or troweled-on, or otherwise applied to surfaces, such as acoustical plaster on ceilings and fireproofing materials on structural members, or other materials on surfaces for acoustical, fireproofing, or other purposes.
Thermal Systems Insulation means material applied to pipes, fittings, boilers, breeching, tanks, ducts, or other interior structural components to prevent heat loss or gain, or water condensation, or for other purposes.
Building # 134 www.TropicalEnvironmental.com
Transmission Electron Microscopy means a method of microscopic analysis, which utilizes an electron beam that is focused onto a thin sample. As the beam penetrates (transmits) through the sample, the difference densities produces an image on a fluorescent screen from which samples can be identified and counted. Also used for analyzing air samples for asbestos.
Key to Common Asbestos Related Abbreviations
ACM ........................................ Asbestos-Containing Material
ACBM ................................. Asbestos-Containing Building Material
AHERA............................. Asbestos Hazard Emergency Response Act
CFR ..........................................Code of Federal Regulations
DOT ......................................... Department of Transportation
EPA ..................................... Environmental Protection Agency
FR ................................................... Federal Register
HEPA ....................................... High Efficiency Particulate Air
HVAC ....................... Heating, Ventilating and Air Conditioning Systems
IDPH ................................... Illinois Department of Public Health
LEA ............................................. Local Education Agency
MAP ............................................ Model Accreditation Plan
NESHAP ............... National Emission Standards for Hazardous Air Pollutants
NIOSH ...................... National Institute of Occupational Safety and Health
NIST .......................... National Institute for Standards and Technology
NVLAP .................... National Voluntary Laboratory Accreditation Program
OSHA .......................... Occupational Safety and Health Administration
APPENDIX A
Asbestos Survey Analytical Summary
INSPECTORS: Terri Lewis and Mark Haines
DATE: 8/4/2011
TABLE 1
ASBESTOS SURVEY ANALYTICAL SUMMARY
BUILDING: 134
1 OF 11 Last Modified By: cwesthoff On: 12/13/11
KEY:
ACCESSIBILITY: 1-Low 2-Medium 3-High NAD - No Asbestos Detected
1 2 3 4 N F 1 2 3
Room C1
Room C10
Room C11
Room B3
Room A301
Corridor outside Room B3A corridor outside Room A12
Corridor outside Room A14
Corridor outside Room A2
Corridor outside Room A5
Corridor outside Room A6B
Corridor outside Room C9A
NAD
Room B3A
Room A13A
Room C13
Room A309
Ceiling tile, 2x4 (2x2 pattern), sm. Fissures/ho
Carpet Adhesive, blue carpet
Carpet Adhesive, orange carpet
Carpet Adhesive, blue, green & purple carpet
MMCT1
X
CA2 MM
CA3 MM
CONDITION
7 = Any remaining friable ACBM or friable suspected ACBM.
1 = Damaged or significantly damaged TSI ACM. 3 = Significantly damaged friable surfacing ACM.
SAMPLE # MATERIAL SAMPLE LOCATION
CONDITION: 1-No damage 2-Slighly Damaged 3-Damaged 4-Significantly Damaged
5 = ACBM with potential for damage.
2 = Damaged friable surfacing ACM. 4 = Damaged or significantly damaged friable miscellaneous ACM.
MATERIAL TYPE: Thermal System Insulation (TSI), Surfacing Material (SM), Miscellaneous Material (MM)
AHERA Assessment Categories:
6 = ACBM with potential for significant damage.
ASBESTOS RESULTSMATERIAL TYPE
CA1 MM Carpet Adhesive, gold carpet Room A13
MATERIAL DESCRIPTION & DRAWING
MAP INDICATOR SYMBOL
HSA ID
CA4 MM
Notes
FRIABILITY ACCESS
ASSESSMENT
CATEGORY
Quantity
NAD
NAD
X
X
X
NAD
NAD
X
X
X
X
X
X X
X
X
X
X
TABLE 1
ASBESTOS SURVEY ANALYTICAL SUMMARY
BUILDING: 134
2 OF 11 Last Modified By: cwesthoff On: 12/13/11
KEY:
ACCESSIBILITY: 1-Low 2-Medium 3-High NAD - No Asbestos Detected
1 2 3 4 N F 1 2 3
CONDITION
7 = Any remaining friable ACBM or friable suspected ACBM.
1 = Damaged or significantly damaged TSI ACM. 3 = Significantly damaged friable surfacing ACM.
SAMPLE # MATERIAL SAMPLE LOCATION
CONDITION: 1-No damage 2-Slighly Damaged 3-Damaged 4-Significantly Damaged
5 = ACBM with potential for damage.
2 = Damaged friable surfacing ACM. 4 = Damaged or significantly damaged friable miscellaneous ACM.
MATERIAL TYPE: Thermal System Insulation (TSI), Surfacing Material (SM), Miscellaneous Material (MM)
AHERA Assessment Categories:
6 = ACBM with potential for significant damage.
ASBESTOS RESULTSMATERIAL TYPE
MATERIAL DESCRIPTION & DRAWING
MAP INDICATOR SYMBOL
HSA ID Notes
FRIABILITY ACCESS
ASSESSMENT
CATEGORY
Quantity
Room A13
Room A13A
Room B13B
Room B3B
NAD
NAD
NADRoom C100
NAD
Room A13A
Room A6
Room A6
Ceiling tile, 2x4, fissured/dots
Ceiling tile, 1x1, white w/ holes
CT6
MMCT2
CT5
Ceiling tile, 2x2, white, smooth
MM Ceiling tile, 2x4, deep fissured
Room C2
Room C15B
NAD
Ceiling tile, 1x1, white w/ fissures (patch) NAD
Ceiling tile, 1x1, white, rough
XCT7 MM
CT4 MM
CT3 MM
MM
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
TABLE 1
ASBESTOS SURVEY ANALYTICAL SUMMARY
BUILDING: 134
3 OF 11 Last Modified By: cwesthoff On: 12/13/11
KEY:
ACCESSIBILITY: 1-Low 2-Medium 3-High NAD - No Asbestos Detected
1 2 3 4 N F 1 2 3
CONDITION
7 = Any remaining friable ACBM or friable suspected ACBM.
1 = Damaged or significantly damaged TSI ACM. 3 = Significantly damaged friable surfacing ACM.
SAMPLE # MATERIAL SAMPLE LOCATION
CONDITION: 1-No damage 2-Slighly Damaged 3-Damaged 4-Significantly Damaged
5 = ACBM with potential for damage.
2 = Damaged friable surfacing ACM. 4 = Damaged or significantly damaged friable miscellaneous ACM.
MATERIAL TYPE: Thermal System Insulation (TSI), Surfacing Material (SM), Miscellaneous Material (MM)
AHERA Assessment Categories:
HSA ID Notes
FRIABILITY ACCESS
ASSESSMENT
CATEGORY
Quantity
Corridor outside Room A105
Corridor outside Room C123
Corridor outside Room C120
Corridor outside Room C115
Brown/silver foil paper
Room C108
Room C117
Closet outside Room A1
Room A1
NAD
NAD
Room A1
Ceiling tile, 2x2, textured rough
Room A2
Fire Stopping
Corridor outside Room C106
DI Duct insulation (horse hair/canvas cover)
Ceiling tile, 2x2, textured rough
MM
EBM MM
MM
FS
NAD
NAD
Room A305
CT8 MM
Exposed baseboard mastic
X
X
X
X
X
X
X
X
X
X
X
X
TABLE 1
ASBESTOS SURVEY ANALYTICAL SUMMARY
BUILDING: 134
4 OF 11 Last Modified By: cwesthoff On: 12/13/11
KEY:
ACCESSIBILITY: 1-Low 2-Medium 3-High NAD - No Asbestos Detected
1 2 3 4 N F 1 2 3
CONDITION
7 = Any remaining friable ACBM or friable suspected ACBM.
1 = Damaged or significantly damaged TSI ACM. 3 = Significantly damaged friable surfacing ACM.
SAMPLE # MATERIAL SAMPLE LOCATION
CONDITION: 1-No damage 2-Slighly Damaged 3-Damaged 4-Significantly Damaged
5 = ACBM with potential for damage.
2 = Damaged friable surfacing ACM. 4 = Damaged or significantly damaged friable miscellaneous ACM.
MATERIAL TYPE: Thermal System Insulation (TSI), Surfacing Material (SM), Miscellaneous Material (MM)
AHERA Assessment Categories:
HSA ID Notes
FRIABILITY ACCESS
ASSESSMENT
CATEGORY
Quantity
Outside elevators across from Room A11
Corridor outside Room C3
Corridor outside Room C15A
Yellow mastic
Room C1
Yellow mastic
Floor tile, 12x12, off white, brown splotches
Yellow mastic
Floor tile, 12x12, blue splotchy Chrysotile - Trace Detected @ <0.25% - Per TEM report
Tan mastic
Corridor outside Room C6
Corridor outside Room A14
Tan mastic
Floor tile, 12x12, blue splotchy
Tan mastic
Corridor outside Room C16 Chrysotile - 0.3% Per TEM report
Corridor outside Room C14 NAD
Floor tile, 9x9, brown w/ tan streaks Chrysotile - PC 2.3%
Black mastic Chrysotile - PC 1.2%
Floor tile, 9x9, brown w/ tan streaks Chrysotile - PC 2.1%
Black mastic Chrysotile - PC 1.3%
Floor tile, 9x9, brown w/ tan streaks Chrysotile - PC 2.4%
Black mastic Chrysotile - PC 1.3%
77 sf
7,191 sf
Floor tile, 12x12, blue splotchy
Floor tile, 12x12, off white, brown splotches
4MMFT2
FT1 MM
Floor tile, 12x12, off white, brown splotches
Floor tile, 12x12, blue splotchy
MMFT3
Corridor outside Room A9
Corridor outside Room C1
Corridor outside Room C12
Room A2
Corridor outside Room A6A
Corridor outside Room C17A
NAD
Corridor outside Room C16C
Closet outside Room A1
NAD
X
X
X
X
X
X
X
X
X
TABLE 1
ASBESTOS SURVEY ANALYTICAL SUMMARY
BUILDING: 134
5 OF 11 Last Modified By: cwesthoff On: 12/13/11
KEY:
ACCESSIBILITY: 1-Low 2-Medium 3-High NAD - No Asbestos Detected
1 2 3 4 N F 1 2 3
CONDITION
7 = Any remaining friable ACBM or friable suspected ACBM.
1 = Damaged or significantly damaged TSI ACM. 3 = Significantly damaged friable surfacing ACM.
SAMPLE # MATERIAL SAMPLE LOCATION
CONDITION: 1-No damage 2-Slighly Damaged 3-Damaged 4-Significantly Damaged
5 = ACBM with potential for damage.
2 = Damaged friable surfacing ACM. 4 = Damaged or significantly damaged friable miscellaneous ACM.
MATERIAL TYPE: Thermal System Insulation (TSI), Surfacing Material (SM), Miscellaneous Material (MM)
AHERA Assessment Categories:
HSA ID Notes
FRIABILITY ACCESS
ASSESSMENT
CATEGORY
Quantity
Floor tile, 12x12, bright light blue splotchy
Tan mastic
Tan mastic
Floor tile, 9x9, black, w/ white streaks Chrysotile - PC 4.1%
Black mastic Chrysotile - PC 2.1%
Floor tile, 9x9, black, w/ white streaks Chrysotile - PC 3.8%
Black mastic Chrysotile - PC 1.3%
Floor tile, 9x9, black, w/ white streaks Chrysotile - PC 4.4%
Black mastic Chrysotile - PC 1.5%
Floor tile, 12x12, green w/ white stripes
Tan mastic
Floor tile, 12x12, green w/ white stripes
Tan mastic
Floor tile, 12x12, green w/ white stripes
Tan mastic
Floor tile, 12x12, off white w/ multi colored spe
Tan mastic
Floor tile, 12x12, off white w/ multi colored spe
Tan mastic
Floor tile, 12x12, off white w/ multi colored spe
Tan mastic
Floor tile, 12x12, bright light blue splotchy
MM
NAD
NAD
NADFT9 XRoom C114 X 5
FT8
307 sfRoom C2
Room C62MM
FT7 MM
FT6 MM
Room A4
Room A3
X
X
X
X
X
X
X
X
X
X
TABLE 1
ASBESTOS SURVEY ANALYTICAL SUMMARY
BUILDING: 134
6 OF 11 Last Modified By: cwesthoff On: 12/13/11
KEY:
ACCESSIBILITY: 1-Low 2-Medium 3-High NAD - No Asbestos Detected
1 2 3 4 N F 1 2 3
CONDITION
7 = Any remaining friable ACBM or friable suspected ACBM.
1 = Damaged or significantly damaged TSI ACM. 3 = Significantly damaged friable surfacing ACM.
SAMPLE # MATERIAL SAMPLE LOCATION
CONDITION: 1-No damage 2-Slighly Damaged 3-Damaged 4-Significantly Damaged
5 = ACBM with potential for damage.
2 = Damaged friable surfacing ACM. 4 = Damaged or significantly damaged friable miscellaneous ACM.
MATERIAL TYPE: Thermal System Insulation (TSI), Surfacing Material (SM), Miscellaneous Material (MM)
AHERA Assessment Categories:
HSA ID Notes
FRIABILITY ACCESS
ASSESSMENT
CATEGORY
Quantity
Floor tile, 12x12, light tan splotchy
Tan mastic
Floor tile, 12x12, light tan splotchy
Tan mastic
Floor tile, 12x12, light tan splotchy
Tan mastic
Yellow mastic
Floor tile, 12x12, light green splotchy
Yellow mastic
Floor tile, 12x12, gray splotchy
Tan mastic
Corridor outside Room A312
Corridor outside Room B333
Corridor outside Room B332
Corridor outside Room B317
Room B313
Corridor outside Room A306
Linoleum, blue, splotchy Chrysotile - 9.2%
Tan mastic NAD
Chrysotile - 0.3%
Chrysotile - 8.3%
Chrysotile - 7.7%
Chrysotile - 9.2%
Floor tile, 12x12, gray splotchy
Linoleum, blue, splotchy
Floor tile, 12x12, light green splotchy
MM
FT11 MM
FT10 MM
FT12 NAD
Room C115
NAD
Room C115
Room B2A
NAD
Corridor outside Room A302
X Per TEM Results
X X
1,078 sfLN1 MM
X
X
X
X
X
X
X
X
X
TABLE 1
ASBESTOS SURVEY ANALYTICAL SUMMARY
BUILDING: 134
7 OF 11 Last Modified By: cwesthoff On: 12/13/11
KEY:
ACCESSIBILITY: 1-Low…
This is the start of the file's text. The full file is on GovTribe.