S02 - Att D. IFC Drawings 1.pdf
PDF 16 MB Posted
- Solicitation number
- 36C26223B0016_1
About this file
This document provides details on a federal contract opportunity to modernize a pathology department building for the Department of Veterans Affairs. The solicitation number is 36C26223B0016_1 and seeks offers to modernize Pathology Department Building 1 at the VA medical center referenced by VA-24-00001439. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22. The opportunity type is a solicitation and the document includes an attached 16MB PDF file containing drawings related to the project's infrastructure and facilities specifications. Details on response dates, award timing, and pricing terms are not provided in this summary document.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A R C H I T E C T
EX
P
I RES
A UGUST
3 1 , 2
1#C 14152
S T
A
T E
OF CA L I FOR
N
IA
ER
IC
H . DAVY
OFFICE OF
CONSTRUCTION AND
FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
ENGINEER OF RECORD
SHEET TITLE
F
E
D
C
B
A
VA FORM
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
ARCHITECT OF RECORD
APPROVED PROJECT DIRECTOR
PROJECT PHASE
BUILDING CONSTRUCTION
PROJECT TITLE
PROJECT LOCATION
ISSUE DATE CHECK BY DRAWN BY
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
08 - 6231
REVISIONS: DATE:NO.
664-18-333
BLDG #1
3350 LA JOLLA VILLAGE DR., SAN DIEGO, CA 92161
100% CONSTRUCTION DOCUMENTS
FULLY SPRINKLEREDFERNANDO ESTRELLA
JULY 09, 2021
PROGRAM DESIGN 20% 09/13/20191
REVIEWED IN ACCORDANCE
WITH THE REQUIREMENTS
OF CFM
BY: ____________________
DATE: ________________
U.S. DEPARTMENT OF
VETERANS AFFAIRS
ENGINEERING SERVICES
SCHEMATIC DESIGN 35% 11/19/2019
MAJOR SYSTEMS 50% 12/19/2019
DESIGN DEVELOPMENT 65% 04/03/2020
CONSTRUCTION DOCUMENTS 95% 03/19/2021
CONSTRUCTION DOCUMENTS 100% 05/11/2021
IFC DOCUMENTS 07/09/2021
MODERNIZE PATHOLOGY DEPT., BLDG. 1
GI-001
TITLE SHEET, GENERAL NOTES
JM / JT RA / LL
RM #
D
C B
A
MODERNIZE PATHOLOGY DEPT. BLDG. 1
664-18-333
3350 LA JOLLA VILLAGE DRIVE, SAN DIEGO, CA, 92161
ABBREVIATIONS
SYMBOL LEGEND
VICINITY MAP
SHEET INDEX
PROJECT TEAM
DEDUCTIVE ALTERNATES
APPLICABLE CODE
QUALITY CONTROL STATEMENT
X'-XX"
X'-XX"
X'-XX"
CENTERCEN
CLOSETCLO
ASPHALT CONCRETE
PAVING
AC
EXISTING(E)
& AND
NUMBER OR POUND#
COLD WATERCW
BEAMBM
AVG AVERAGE
@ AT
COPPER
CONTROL JOINT
CONTRACT (OR)
CONTINUOUS OR CONTINUE
CONSTRUCTION
CONNECTION
CONCRETE MASONRY UNIT
CONCRETE
COLUMN
CLEAR (ANCE)
CIRCUMFERENCE
CIRCLE
CERAMIC TILE
CERAMIC
CENTIMETER (S)
CEMENT
CEILING HEIGHT
CEILING
CAST IRON
CAST-IN-PLACE CONCRETE
CASEMENT
CARPET (ED)
CALK (ING), CAULK (ING)
CABINET
CPR
CJT
CONTR
CONT
CONST
CX
CMU
CONC
COL
CLR
CIRC
CIR
CT
CER
CM
CEM
CHT
CLG
CI
CIPC
CSMT
CPT
CK
CAB
BUILT UP ROOFING
BUILDING
BRONZE
BOTTOM
BOTH SIDES
BOARD
BLOCKING
BLOCK
BITUMINOUS
BEVELED
BETWEEN
BELOW
BEARING PLATE
BASEMENT
BUR
BLDG
BRZ
BOT
BS
BD
BLKG
BLK
BIT
BVL
BET
BEL
BPL
BSMT
AUTOMATIC
ASPHALT
ARCHITECT (URAL)
APPROXIMATE
ANODIZED
ANCHOR BOLT
ALUMINUM
ALTERNATE
AIR CONDITIONING
AGGREGATE
ADHESIVE
ACOUSTICAL TILE
ACCESS PANEL
ABOVE FINISHED FLOOR
ABOVE
AUTO
ASPH
ARCH
APPROX
ANOD
AB
ALUM.
ALT
A/C
AGG
ADH
ACT
AP
AFF
ABV
PROPERTY LINE
CENTERLINE
PARTITIONPTN
POINTPT
PREFINISHEDPFN
WEST, OR WIDTH, WIDEW
WSH WASHER
WH WATER HEATER
TOB TOP OF BEAM
TOP OF CONCRETETOC
SHOWERSHR
OFFICEOFF
WITHW/
VERIFY IN FIELDVIF
VENT THROUGH ROOFVTR
UNLESS NOTED OTHERWISEUNO
TOP OF PARAPETTOP
TEMPORARYTEMP
SQ IN SQUARE INCH
SF SQUARE FEET
REQUIRE (D)REQ
QUANTITYQTY
PLUMBINGPLBG
NUMBERNO
WROUGHT IRON
WOOD
WITHOUT
WIRE MESH
WIRED GLASS
WINDOW
WELDED WIRE FABRIC
WATERPROOFING
WATER CLOSET
WAINSCOT
WI
WD
W/O
WM
WG
WIN
WWF
WP
WC
WSCT
VINYL TILE
VERTICAL
VENEER
VAPOR BARRIER
VT
VERT
VNR
VB
URINAL
UNFINISHED
UR
UNF
TYPICAL
TREAD
TRANSOM
TOP OF WALL
TOP OF STEEL
TOP OF SLAB
TONGUE & GROOVE
TOILET PAPER DISPENSER
THICK (NESS)
TELEVISION
TELEPHONE
TYP
T
TR
TW
TST
TSL
T&G
TPD
THK
TV
TEL
SYSTEM
SUSPENDED
STRUCTURAL
STORM DRAIN
STORAGE
STEEL
STANDARD
STAINLESS STEEL
SPECIFICATION (S)
SPECIAL
SPEAKER
SOUTH
SOUNDPROOF (ING)
SOLID CORE
SKYLIGHT
SIMILAR
SHELF, SHELVING
SHEET
SECTION
SEALANT
SCHEDULE
SAFETY GLASS
SYS
SUSP
STR
SD
STO
ST
STD
SST
SQ
SPEC
SPL
SPK
S
SP
SC
SKL
SIM
SH
SHT
SEC
SNT
SCH
SFGL
RUBBER TILE
ROUGH OPENING
ROOM
ROOFING
ROOF DRAIN
RISER
RIGHT OF WAY
RIGHT HAND
REVISION (S), REVISED
REMOVE
REINFORCE (D), (ING)
REFRIGERATOR
RADIUS
RBT
RO
RM
RFG
RD
R
ROW
RH
REV
REM
REINF
REFR
RAD
PREFABRICATE (D)
PRECAST CONCRETE
POUNDS PER SQUARE INCH
POUNDS PER SQUARE FOOT
POLYVINYL CHLORIDE
PLYWOOD
PLATE
PLASTIC LAMINATE
PLASTER
PERIMETER
PERFORATE (D)
PARTICLE BOARD
PARKING
PARALLEL
PANIC BAR
PANEL
PAINT (ED)
PFB
PCC
PSI
PSF
PVC
PWD
PL
PLAM
PLAS
PERI
PERF
PBD
PK
PAR
PB
PNL
PNT
OVERALL
OUTSIDE DIAMETER
OPPOSITE
OPEN-WEB JOIST
OPENING
ON CENTER (S)
OA
OD
OPP
OJ
OPG
OC
NOT TO SCALE
NOT IN CONTRACT
NORTH
NOMINAL
NOISE REDUCTION
NATURAL
NTS
NIC
N
NOM
NR
NAT
SQUARE
TFTI TENANT FURNISHED
TENANT INSTALLED
CFCI CONTRACTOR FURNISHED
CONTRACTOR INSTALLED
GASKET (ED)GKT
GROUNDGND
GYPSUMGYP
GENERALGEN
GROUT
GRADE, GRADING
GLASS BLOCK
GLASS, GLAZING
GENERAL CONTRACT (OR)
GALVANIZED
GAGE, GAUGE
GT
GD
GLB
GL
GC
GALV
GA
HEXAGONALHEX
HTG HEATING
HOURHR
HOT WATERHW
AIR CONDITIONING
HOSE BIBB
HORIZONTAL
HOLLOW CORE
HEIGHT
HEATING/VENTILATION/
HEADER
HARDWOOD
HARDWARE
HANDHOLE
HB
HOR
HC
HT
HVAC
HDR
HWD
HDW
HH
INSUL
INT
INSULATE (D), (ION)
INTERIOR
IN INCH
INSIDE DIAMETERID
J
JC
JT
JANITOR'S CLOSET
JOINT
JOIST
J-BOX JUNCTION BOX
KIT
KO
KITCHEN
KNOCKOUT
L
LAB
LAD
LB
LAM
LAV
LH
LT(G)
LL
LABORATORY
LADDER
LAG BOLT
LAMINATE (D)
LAVATORY
LEFT HAND
LENGTH
LIGHT-(ING)
LIVE LOAD
MB
MH
MFR
MAS
MTL
MAX
MECH
MC
MEMB
MET
MACHINE BOLT
MANHOLE
MANUFACTURE (ER)
MASONRY
MATERIAL (S)
MAXIMUM
MECHANIC (AL)
MEDICINE CABINET
MEMBRANE
METAL
MOE MEANS OF EGRESS
MED MEDIUM
LINEARLIN
MULLION
MOUNT (ED), (ING)
MOLDING, MOULDING
MODULAR
MISCELLANEOUS
MIRROR
MINIMUM
MILLWORK
MILLIMETER (S)
METER (S)
MUL
MT
MLD
MOD
MISC
MIR
MIN
MWK
MM
M
CL
PL
CATHETERIZATIONCATH
KEYNOTE REFERENCE
REVISION
FINISH MATERIAL REFERENCE
EQUIPMENT NUMBER
PARTIAL BULDING SECTION
REFERENCE NUMBER
SHEET NUMBER
WALL OR DETAIL SECTION
REFERENCE NUMBER
SHEET NUMBER
WALL OR DETAIL CALLOUT
REFERENCE NUMBER
SHEET NUMBER
REFERENCE DETAIL
REFERENCE NUMBER
SHEET NUMBER
ELEVATION DETAIL
REFERENCE NUMBER
SHEET NUMBER
ELEVATION REFERENCE
ROOM NAME, NUMBER & AREA
DOOR NUMBER
WINDOW TYPE
PARTITION TYPE
STRUCTURAL GRID REFERENCE
MATCHLINE
LEVEL LINE, CONTROL POINT,
OR DATUM
DIMENSION TO FACE OF STUD
DIMENSION TO CENTER-LINE OF
BUILDING MATERIAL
CLEAR DIMENSION TO
BUILDING MATERIAL
CENTERLINE, PROJECTIONS, EXT.
ELEVATION LINES
PROPERTY LINES, BOUNDARY LINES
HIDDEN, FUTURE, OR EXISTING TO
BE REMOVED
BREAKLINE
NORTH
I HEREBY CERTIFY THAT THE DOCUMENT SHOWN AND MARKED IN THIS
SUBMITTAL IS THAT PROPOSED TO BE INCORPORATED WITH DESIGN
PROJECT# 664-18-333, PO# 664-C90290, AE# VA262-16-D-0152, TO#
36C25819N0244, IS IN COMPLIANCE WITH THE CONTRACT DOCUMENTS, AND IS
SUBMITTED FOR GOVERNMENT APPROVAL.
PREPARED BY:
DESIGNER OF RECORD (DOR) ERIC DAVY DATE
ALL WORK SHALL COMPLY WITH THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS, AS ADOPTED BY THE
GOVERNING AUTHORITIES:
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
NFPA 101 LIFE SAFETY CODE, 2018
NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900
NFPA 1 FIRE CODE, 2018 EDITION
NFPA 10 STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2018 EDITION
NFPA 12 STANDARD ON CARBON DIOXIDE EXTINGUISHING SYSTEMS, 2018 EDITION
NFPA 13 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2019 EDITION
NFPA 70 NATIONAL ELECTRIC CODE (NEC), 2017 EDITION
NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE, 2019 EDITION
NFPA 90A STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS, 2018 EDITION
NFPA 99 HEALTH CARE FACILITIES CODE, 2018 EDITION
IBC INTERNATIONAL BUILDING CODE, 2018 EDITION (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS)
IPC INTERNATIONAL PLUMBING CODE, 2015 EDITION
OSHA OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION STANDARDS. (INCLUDING:29 CRF 1926 OSHA CONSTRUCTION
INDUSTRY REGULATIONS.)
EOSH
EMERGENCY / OCCUPATIONAL SAFETY AND HEALTH
VOLUME 29, PART 1910
VOLUME 29, PART 1926
VOLUME 40,
VOLUME 49, PART 397
VA VA FIRE PROTECTION DESIGN MANUAL, 7TH EDITION - DECEMBER 2015
VA VA CONSTRUCTION STANDARDS
VA VA SEISMIC DESIGN REQUIREMENTS, H-18-8
VA
VA DESIGN MANUALS
PG-18-09 SPACE PLANNING CRITERIA
PG-18-10
PG-18-12
PG-18-15 (VOLUME C)
VA VA INTERIOR DESIGN MANUAL
VA VA SURGICAL & ENDOVASCULAR SERVICES DESIGN GUIDE, APRIL, 2016
VA ALERT-CARDIOVASCULAR LABORATORY SERVICES DESIGN GUIDE, APRIL, 2016
VA HVAC DESIGN MANUAL, NOVEMBER 2017
VA PLUMBING DESIGN MANUAL, MAY 2018
ASHRAE VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY, STANDARD 62.1-2016
ASHRAE STANDARD 15 - 2007, SAFETY STANDARD FOR REFRIGERATION SYSTEMS
ADAAG ADA ACCESSIBILITY GUIDELINES
ABAAS
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS, INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN
GUIDE (PG-18-13) LATEST EDITION
SMACNA DUCT CONSTRUCTION STANDARDS
ACI
BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE AND COMMENTARY
(ACI 318)
AISC
MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL
STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION
EPACT ENERGY POLICY ACT OF 2005
DOE
DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL BUILDINGS,10 CFR PARTS 433, 434 AND 435.
MOU
FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS:MEMORANDUM OF UNDERSTANDING
•• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY, AND TRANSPORTATION
MANAGEMENT.
•• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION
01010 OF THE VA MASTER CONSTRUCTION SPECIFICATION.
BUILDING NUMBER: 1 (CONSTRUCTED IN ACCORDANCE WITH THE
VA HOSPITAL BUILDING SYSTEM AND NOT
ONE OF THE CONVENTIONAL NFPA 220
CONSTRUCTION TYPES)
LOCATIONS: 1ST FLOOR - NORTHWEST, BASEMENT,
INTERSTITIAL SPACE, 2ND FLOOR ROOF,
NORTHWEST SITE AND ACCESS.
AREA OF WORK: 17,457 S.F. (1ST FLOOR)
THE PROJECT WILL SATISFY THE COMPLETE ICRA CLASS IV ABATEMENT,
DEMOLITION AND RENOVATION OF THE EXISTING CLINICAL LAB, ANATOMICAL
PATHOLOGY AND ALL AFFECTED ANCILLARY SPACES. THE PROJECT INCLUDES
CIVIL, LANDSCAPE, STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL,
COMMUNICATION, FIRE SUPPRESSION AND SPECIALIZED MEDICAL SYSTEMS.
REMOVAL AND REPLACEMENT OF BUILT-IN ELEMENTS, EQUIPMENT, FINISHES, &
SYSTEMS REQUIRED TO SUPPORT THE FUNCTIONAL AREAS:
• CYTOLOGY / HISTOLOGY - ANATOMICAL PATHOLOGY (INCLUDING GROSS
ROOM)
• MICROBIOLOGY (BSL-2 & BSL-3 LABS)
• CORE LAB - CLINICAL PATHOLOGY
• BLOOD BANK/ HEMATOLOGY
• ADMINISTRATIVE AREAS, INCLUDING RESTROOMS, OFFICES, AND STAFF
LOUNGES.
• SUPPORT/UTILITY AREAS, INCLUDING MECHANICAL, ELECTRICAL,
HOUSEKEEPING AND JANITORIAL.
• SEND OUT
THE PHASED PROJECT WILL INCLUDE THE COMPLETE INSTALL AND REMOVAL OF
A MODULAR BUILDING AND TRAILER. THE INTENT OF THE PHASING PLANS IS TO
PERMIT THE CONTINUOUS OPERATION OF REQUIRED ACTIVITIES AT THE VA
HEALTHCARE CENTER DURING THE MODERNIZATION. THE CONTRACTOR IS TO
COMPLETE AND RECEIVE APPROVAL FROM THE VA COR BEFORE STARTUP OF
WORK FOR ANY PHASE. INCLUDING COORDINATION AND PARTICIPATION OF
LICENSING AND COMMISSIONING SERVICES.
*DEFERRED APPROVALS:
• MODULAR BUILDING (MICROBIOLOGY) DESIGN AND ENGINEERING
• MOBILE OFFICE TRAILER (ADMINISTRATION) DESIGN
• PUBLIC ADDRESS AND MASS NOTIFICATION SYSTEMS
(DEFERRED APPROVALS NEED TO MEET THE SAME CODE REQUIREMENTS AND
GUIDELINES)
*REFER TO SHEET GI-002
OWNER: VA SAN DIEGO HEALTHCARE SYSTEM
3350 LA JOLLA VILLAGE DRIVE,
SAN DIEGO CA 92161
ENGINEERING SERVICES - BLDG 1,
RM BB108 (MC138)
CONTACT: FERNANDO ESTRELLA
858.552.8585 ext. 6178
FERNANDO.ESTRELLA@VA.GOV
ARCHITECT: DAVY ARCHITECTURE
1053 10TH AVENUE,
SAN DIEGO CA 92101
CONTACT: JENNIFER TIMMONS
619.238.3811 EXT.34
JTIMMONS@DAVYARCHITECTURE.COM
CIVIL ENGINEER: COFFMAN ENGINEERS, INC
1455 FRAZEE RD SUITE 600,
SAN DIEGO, CA 92108
CONTACT: JON ARENZ
858.536.3100
JON.ARENZ@COFFMAN.COM
STRUCTURAL ENGINEER: AARK ENGINEERING
1870 CORDEL COURT STE 202,
EL CAJON CA 92020
CONTACT: AARON STEELE
619.312.6336
STEELE@AARKENGINEERING.COM
MECHANICAL & PLUMBING COFFMAN ENGINEERS, INC
ENGINEER: 1455 FRAZEE RD SUITE 600,
SAN DIEGO, CA 92108
CONTACT: PHILIP BAKER
858.536.3100
PHILLIP.BAKER@COFFMAN.COM
ELECTRICAL ENGINEER: COFFMAN ENGINEERS, INC
1455 FRAZEE RD SUITE 600,
SAN DIEGO, CA 92108
CONTACT: RAEJEAN FERRIOLO
858.536.3100
FERRIOLO@COFFMAN.COM
FIRE PROTECTION: COFFMAN ENGINEERS, INC
1455 FRAZEE RD SUITE 600,
SAN DIEGO, CA 92108
CONTACT: DEREK DUVAL
858.536.3100
DEREK.DUVAL@COFFMAN.COM
INDUSTRIAL HYGIENIST: ENCORP
16700 VALLEY VIEW AVENUE, SUITE 100
LA MIRADA, CA 90638
CONTACT: ALEXANDER BLANKEVOORT
714.523.9811
ABLANKEVOORT@ENCORP.NET
COST ESTIMATING: OCMI
2150 W WASHINGTON ST #203,
SAN DIEGO, CA 92110
CONTACT: MICHAEL MEJIA
619.291.4600
MMEIJIA@OCMI.COM
ROOM NAME
000 SF
REVIEWED BY:
DESIGN QUALITY CONTROL JAMES MURRAY DATE
(DQC) MANAGER
PROJECT LOCATION
3350 LA JOLLA
VILLAGE DRIVE
SAN DIEGO, CA 92161
PROJECT SCOPE
GROUP A
1. OFFICE SWING SPACE:
USE UNOCCUPIED SPACE WITHIN FACILITY
FOR TEMPORARY OFFICE SPACE. COST
SAVINGS INCLUDES TRAILER RENTAL AND
ASSOCIATED SITE PREP.
2. EQUIPMENT:
PROVIDE ALL COSTS ASSOCIATED TO
RELOCATION OF EXISTING EQUIPMENT AS
SEPARATE LINE ITEM, BREAKOUT COSTS PER
PHASE.
3. CLERSTORY WINDOWS:
REMOVE CLERSTORY WINDOWS FROM
ADMINISTRATIVE OFFICES. REPLACE WITH
GYPSUM BOARD AND PAINT.
4. NOT USED
5. METAL STUDS:
WHERE PERMITTED BY SPAN TABLES AND IN
STUDS THAT DO NOT SUPPORT BACKING,
PROVIDE 18" GAGE METAL STUDS.
MH-5.03 MECHANICAL DETAILS
MH-5.04 MECHANICAL DETAILS
MH-6.01 MECHANICAL SCHEDULES
MH-6.02 MECHANICAL SCHEDULES
MH-6.03 MECHANICAL SCHEDULES
MH-7.00 MECHANICAL CONTROL DIAGRAMS
MH-7.01 MECHANICAL CONTROL DIAGRAMS
MH-7.02 MECHANICAL CONTROL DIAGRAMS
MH-7.03 MECHANICAL CONTROL DIAGRAMS
MH-7.04 MECHANICAL CONTROL DIAGRAMS
MH-7.05 MECHANICAL CONTROL DIAGRAMS
MH-7.06 MECHANICAL AIRFLOW DIAGRAMS
MH-7.07 MECHANICAL DIAGRAMS
MH-7.08 MECHANICAL DIAGRAMS
10 - PLUMBING
PI-0.01 PLUMBING GENERAL NOTES LEGENDS AND SHEET INDEX
PL-1.01 BASEMENT INTERSTITIAL - ALL PHASE PLUMBING PLAN - DEMO
PL-1.02 LEVEL 1 - OVERALL PLUMBING FIXTURE PLAN - DEMO
PL-1.03 LEVEL 1 INTERSTITIAL - ALL PHASE PLUMBING PLAN - DEMO
PL-1.11 BASEMENT INTERSTITIAL - ALL PHASE PLUMBING PLAN - NEW
PL-1.12 LEVEL 1 - ALL PHASE PLUMBING FIXTURE PLAN - NEW
PL-1.13 LEVEL 1 INTERSTITIAL - ALL PHASE PLUMBING PLAN - NEW
PL-2.01 BASEMENT INTERSITIAL - PLUMBING PLAN - PHASE 2 - DEMO
PL-2.02 LEVEL 1 INTERSTITIAL - PLUMBING PLAN - PHASE 2 - DEMO
PL-2.11 BASEMENT INTERSTITIAL - PLUMBING PLAN - PHASE 2 - NEW
PL-2.12 LEVEL 1 INTERSTITIAL - PLUMBING PLAN - PHASE 2 - NEW
PL-2.21 BASEMENT INTERSTITIAL - PLUMBING PLAN - PHASE 3 - DEMO
PL-2.22 LEVEL 1 INTERSTITIAL - PLUMBING PLAN - PHASE 3 - DEMO
PL-2.31 BASEMENT INTERSTITIAL - PLUMBING PLAN - PHASE 3 - NEW
PL-2.32 LEVEL 1 INTERSTITIAL - PLUMBING PLAN - PHASE 3 - NEW
PL-2.41 BASEMENT INTERSTITIAL - PLUMBING PLAN - PHASE 4 - DEMO
PL-2.42 LEVEL 1 INTERSTITIAL - PLUMBING PLAN - PHASE 4 - DEMO
PL-2.51 BASEMENT INTERSTITIAL - PLUMBING PLAN - PHASE 4 - NEW
PL-2.52 LEVEL 1 INTERSTITITAL - PLUMBING PLAN - PHASE 4 - NEW
PL-5.01 PLUMBING DETAILS
PL-5.02 PLUMBING DETAILS AND DIAGRAMS
PL-5.03 PLUMBING DIAGRAMS
PL-5.04 ENLARGED PLUMBING PLANS
PL-6.01 PLUMBING SCHEDULES
11 - ELECTRICAL
E-0.1 ELECTRICAL SYMBOLS AND ABBREVIATIONS
E-0.2 ELECTRICAL GENERAL NOTES
E-1.1 LEVEL 1 - PHASING PLANS
ED-1.1 LEVEL 1 - POWER DEMOLITION PLAN
ED-1.2 LEVEL 1 - LIGHTING DEMOLITION PLANS
EL-1.1 LEVEL 1 - LIGHTING PLAN
EP-1.1 LEVEL 1 - OVERALL POWER PLANS
EP-1.2 LEVEL 1 INTERSTITIAL - POWER PLAN
EP-4.1 LEVEL 1 - POWER PLAN - HISTOLOGY/CYTOLOGY
EP-4.2 LEVEL 1 - POWER PLAN - CORE LAB/BLOOD BANK
EP-4.3 LEVEL 1 - POWER PLAN - MICROBIOLOGY
EP-4.4 LEVEL 1 - POWER PLAN - ADMIN. NORTH
EP-4.5 LEVEL 1 - POWER PLAN - ADMIN. SOUTH
EP-5.1 LEVEL 1 - POWER MECHANICAL PLAN - OVERALL
EP-5.2 LEVEL 2 - POWER MECHANICAL PLAN
EP-5.3 LEVEL 1 - ENLARGED MECH RM. POWER PLAN
EP-6.1 SINGLE LINE DIAGRAM
EP-6.2 SINGLE LINE DIAGRAM
EP-6.3 SINGLE LINE DIAGRAM
EP-6.4 SINGLE LINE DIAGRAM
EP-6.5 ELECTRICAL PANEL SCHEDULES
EP-6.6 ELECTRICAL PANEL SCHEDULES
EP-6.7 ELECTRICAL PANEL SCHEDULES
EP-6.8 ELECTRICAL PANEL SCHEDULES
EP-6.9 MECHANICAL EQUIPMENT SCHEDULES
EP-6.10 ELECTRICAL DETAILS
ES-1.0 ELECTRICAL SITE POWER AND LIGHTING PLAN
ET-1.1 LEVEL 1 - TELECOMMUNICATIONS PLANS
ET-4.1 ENLARGED - TELECOMMUNICATION ROOM
ET-6.1 TELECOMMUNICATION DETAILS
ET-6.2 TELECOMMUNICATION DETAILS
ET-6.3 TELECOMMUNICATION DETAILS
EY-1.1 LEVEL 1 - SYSTEMS PLANS
EY-6.1 SYSTEM DETAILS
12 - FIRE PROTECTION
F-0.1 FIRE PROTECTION SYSTEMS GENERAL SHEET
FD-1.1 LEVEL 1 - FIRE SPRINKLER DEMOLITION PLANS
FD-1.2 LEVEL 1 - FIRE ALARM DEMOLITION PLANS
FD-1.3 LEVEL 1 - INTERSTITIAL - FIRE ALARM DEMOLITION PLANS
FS-1.1 LEVEL 1 - FIRE SPRINKLERS PLANS
FS-1.2 LEVEL 1 INTERSTITIAL - FIRE SPRINKLER PLANS
FA-1.1 LEVEL 1 - FIRE ALARM PLANS
FA-1.2 LEVEL 1 INTERSTITIAL - FIRE ALARM PLANS
Grand total: 231
08 - STRUCTURAL
S-0.1 GENERAL STRUCTURAL NOTES & ABBREVIATIONS
S-0.2 EQUIPMENT ANCHORAGE SCHEDULES
S-1.1 LEVEL 1 FLOOR PLAN - EQUIPMENT PLAN
S-1.2 LEVEL 2 INTERSTITIAL DECK - EQUIPMENT PLAN
S-1.3 LEVEL 2 ROOF PLAN - EQUIPMENT PLAN
S-5.1 STRUCTURAL DETAILS
S-5.2 STRUCTURAL DETAILS
S-5.3 STRUCTURAL DETAILS
S-5.4 STRUCTURAL DETAILS
S-5.5 STRUCTURAL DETAILS
S-6.1 STRUCTURAL DETAILS
S-6.2 STRUCTURAL DETAILS
S-6.3 STRUCTURAL DETAILS
09 - MECHANICAL
MI-0.01 MECHANICAL GENERAL NOTES LEGENDS, AND SHEET INDEX
MS-1.00 MODULAR BUILDINGS MECHANICAL PLANS
MS-1.01 MODULAR BUILDINGS MECHANICAL DIAGRAMS
MS-1.02 MODULAR BUILDINGS MECHANICAL DIAGRAMS
MS-1.03 MODULAR BUILDINGS SPECIFICATIONS
MH-1.01 BASEMENT - ALL PHASE MECHANICAL PIPING PLAN - DEMO
MH-1.02 LEVEL 1 INTERSTITIAL - ALL PHASE HVAC PLAN AREA A - DEMO
MH-1.03 LEVEL 1 INTERSTITIAL - ALL PHASE HVAC PLAN AREA B - DEMO
MH-1.04 LEVEL 1 INTERSTITIAL - ALL PHASE HVAC PLAN AREA C - DEMO
MH-1.05 LEVEL 1 INTERSTITIAL - ALL PHASE HVAC PIPING PLAN AREA A - DEMO
MH-1.06 LEVEL 1 INTERSTITIAL - ALL PHASE HVAC PIPING PLAN AREA B - DEMO
MH-1.07 LEVEL 1 INTERSTITIAL - ALL PHASE HVAC PIPING PLAN AREA C - DEMO
MH-1.08 LEVEL 1 INTERSTITIAL - ENLARGED NORTH MECH RM PLAN - DEMO
MH-1.09 LEVEL 1 INTERSTITIAL - ENLARGED SOUTH MECH RM PLAN - DEMO
MH-1.11 BASEMENT - ALL PHASE MECHANICAL PIPING PLAN - NEW
MH-1.12 LEVEL 1 - MECHANICAL HVAC ZONE PLAN
MH-1.13 LEVEL 1 - ALL PHASE HVAC GRD PLAN - NEW
MH-1.14 LEVEL 1 INTERSTITIAL - ALL PHASE HVAC PLAN AREA A - NEW
MH-1.15 LEVEL 1 INTERSTITIAL - ALL PHASE HVAC PLAN AREA B - NEW
MH-1.16 LEVEL 1 INTERSTITIAL - ALL PHASE HVAC PLAN AREA C - NEW
MH-1.17 LEVEL 1 INTERSTITIAL - ALL PHASE HVAC PIPING PLAN AREA A - NEW
MH-1.18 LEVEL 1 INTERSTITIAL - ALL PHASE HVAC PIPING PLAN AREA B - NEW
MH-1.19 LEVEL 1 INTERSTITIAL - ALL PHASE HVAC PIPING PLAN AREA C - NEW
MH-1.20 LEVEL 2 - ALL PHASE MECHANICAL ROOF PLAN - NEW
MH-1.21 LEVEL 1 INTERSTITIAL - ENLARGED NORTH MECH RM PLAN - NEW
MH-1.22 LEVEL 1 INTERSTITIAL - ENLARGED SOUTH MECH RM PLAN - NEW
MH-2.01 LEVEL 1 INTERSTITIAL - HVAC PLAN AREA A - PHASE 2 - DEMO
MH-2.02 LEVEL 1 INTERSTITIAL - HVAC PLAN AREA B - PHASE 2 - DEMO
MH-2.03 LEVEL 1 INTERSTITIAL - HVAC PLAN AREA C - PHASE 2 - DEMO
MH-2.04 LEVEL 1 INTERSTITIAL - HVAC PIPING PLAN AREA A - PHASE 2 - DEMO
MH-2.05 LEVEL 1 INTERSTITIAL - HVAC PIPING PLAN AREA B - PHASE 2 - DEMO
MH-2.06 LEVEL 1 INTERSTITIAL - HVAC PIPING PLAN AREA C - PHASE 2 - DEMO
MH-2.07 LEVEL 1 INTERSTITIAL - ENLARGED NORTH MECH RM - PHASE 2 - DEMO
MH-2.08 LEVEL 1 INTERSTITIAL - ENLARGED SOUTH MECH RM - PHASE 2 - DEMO
MH-2.10 LEVEL 1 - HVAC GRD PLAN PHASE 2 - NEW
MH-2.11 LEVEL 1 INTERSTITIAL - HVAC PLAN AREA A - PHASE 2 - NEW
MH-2.12 LEVEL 1 INTERSTITIAL - HVAC PLAN AREA B - PHASE 2 - NEW
MH-2.13 LEVEL 1 INTERSTITIAL - HVAC PLAN AREA C - PHASE 2 - NEW
MH-2.14 LEVEL 1 INTERSTITIAL - HVAC PIPING PLAN AREA A - PHASE 2 - NEW
MH-2.15 LEVEL 1 INTERSTITIAL - HVAC PIPING PLAN AREA B - PHASE 2 - NEW
MH-2.16 LEVEL 1 INTERSTITIAL - HVAC PIPING PLAN AREA C - PHASE 2 - NEW
MH-2.17 LEVEL 1 INTERSTITIAL - ENLARGED NORTH MECH RM - PHASE 2 - NEW
MH-2.18 LEVEL 1 INTERSTITIAL - ENLARGED SOUTH MECH RM - PHASE 2 - NEW
MH-2.21 LEVEL 1 INTERSTITIAL - HVAC PLAN AREA A - PHASE 3 - DEMO
MH-2.22 LEVEL 1 INTERSTITIAL - HVAC PLAN AREA B - PHASE 3 - DEMO
MH-2.23 LEVEL 1 INTERSTITIAL - HVAC PLAN AREA C - PHASE 3 - DEMO
MH-2.24 LEVEL 1 INTERSTITIAL - HVAC PIPING PLAN AREA A - PHASE 3 - DEMO
MH-2.25 LEVEL 1 INTERSTITIAL - HVAC PIPING PLAN AREA B - PHASE 3 - DEMO
MH-2.26 LEVEL 1 INTERSTITIAL - HVAC PIPING PLAN AREA C - PHASE 3 - DEMO
MH-2.27 LEVEL 1 INTERSTITIAL - ENLARGED NORTH MECH RM - PHASE 3 - DEMO
MH-2.30 LEVEL 1 - HVAC GRD PLAN - PHASE 3 - NEW
MH-2.31 LEVEL 1 INTERSTITIAL - HVAC PLAN AREA A - PHASE 3 - NEW
MH-2.32 LEVEL 1 INTERSTITIAL - HVAC PLAN AREA B - PHASE 3 - NEW
MH-2.33 LEVEL 1 INTERSTITIAL - HVAC PLAN AREA C - PHASE 3 - NEW
MH-2.34 LEVEL 1 INTERSTITIAL - HVAC PIPING PLAN AREA A - PHASE 3 - NEW
MH-2.35 LEVEL 1 INTERSTITIAL - HVAC PIPING PLAN AREA B - PHASE 3 - NEW
MH-2.36 LEVEL 1 INTERSTITIAL - HVAC PIPING PLAN AREA C - PHASE 3 - NEW
MH-2.37 LEVEL 1 INTERSTITIAL - ENLARGED NORTH MECH RM - PHASE 3 - NEW
MH-2.50 LEVEL 1 - HVAC GRD PLAN - PHASE 4 - NEW
MH-2.51 LEVEL 1 - INTERSTITIAL HVAC PLAN AREA A - PHASE 4 - NEW
MH-2.52 LEVEL 1 - INTERSTITIAL HVAC PLAN AREA B - PHASE 4 - NEW
MH-2.53 LEVEL 1 - INTERSTITIAL HVAC PLAN AREA C - PHASE 4 - NEW
MH-3.01 MECHANICAL SECTION VIEWS
MH-5.01 MECHANICAL DETAILS
MH-5.02 MECHANICAL DETAILS
01 - GENERAL INFORMATION
GI-001 TITLE SHEET, GENERAL NOTES
GI-002 GENERAL INFORMATION NOTES
GI-003 GENERAL CONSTRUCTION NOTES
GI-004 EXISTING OVERALL SITE PLAN
GI-005 OVERALL BLDG. PLAN - 1ST FLOOR PLAN
02 - GENERAL CONTRACT
GC-001 LEVEL 1 & SITE PHASING PLANS - OVERALL
GC-003 PHASE 2 - ENLARGED ILSM PLANS
GC-004 PHASE 3 - ENLARGED ILSM PLANS
GC-005 PHASE 4 - ENLARGED ILSM PLANS
03 - CIVIL
C-1.0 EXISTING CONDITIONS AND DEMOLITION
C-2.0 LAYOUT AND PAVING PLAN
C-3.0 PRECISE GRADING PLAN
C-4.0 UTILITY PLAN
C-5.0 DETAILS
C-5.1 DETAILS
04 - ARCHITECTURAL SITE
AS-101 ENLARGED SITE PLANS
AS-102 SITE DETAILS
AS-103 MODULAR BUILDINGS PLANS
AS-104 MODULAR BUILDING / MATRIX
05 - LIFE SAFETY
LS-0.1 LIFE SAFETY CODE SHEET
LS-1.1 LEVEL 1 - LIFE SAFETY PLAN
LS-1.2 LEVEL 1 INTERSTITIAL - LIFE SAFETY PLAN
06 - ARCHITECTURAL
AD-101 LEVEL 1 - EXISTING / DEMO FLOOR PLAN
AD-102 LEVEL 1 - EXISTING / DEMO RCP
AD-103 LEVEL 1 - EXISTING / DEMO INTERSTITIAL PLAN
AD-201 LEVEL 2 - EXISTING / DEMO FLOOR & ROOF PLAN
AE-101 LEVEL 1 - FLOOR PLAN
AE-102 LEVEL 1 - REFLECTED CEILING PLAN
AE-103 LEVEL 1 - INTERSTITIAL PLAN
AE-201 LEVEL 2 - FLOOR & ROOF PLAN
AE-501 EXTERIOR ELEVATIONS
AE-502 EXTERIOR ELEVATIONS
AE-601 OVERALL BUILDING SECTIONS
AE-602 OVERALL BUILDING SECTIONS
AE-603 WALL SECTIONS
AE-701 INTERIOR ELEVATIONS
AE-702 INTERIOR ELEVATIONS
AE-703 INTERIOR ELEVATIONS
AE-704 INTERIOR ELEVATIONS
AE-705 INTERIOR ELEVATIONS
AE-706 INTERIOR ELEVATIONS
AE-707 INTERIOR ELEVATIONS
AE-708 INTERIOR ELEVATIONS
AE-709 INTERIOR ELEVATIONS
AE-710 INTERIOR ELEVATIONS
AE-711 INTERIOR ELEVATIONS
AE-712 INTERIOR ELEVATIONS
AE-713 INTERIOR ELEVATIONS
AE-801 DOOR SCHEDULE & TYPES
AE-802 LOUVER, STOREFRONT & WINDOW SCHEDULE & TYPES
AE-900 WALL TYPES & DETAILS
AE-901 NON-STRUCTURAL FRAMING DETAILS
AE-902 FLOOR & WALL DETAILS
AE-903 DOOR & WINDOW DETAILS
AE-904 SUSPENDED CEILINGS
AE-905 SUSPENDED CEILINGS
AE-906 SUSPENDED ACOUSTIC TILE CEILING
AE-907 SUSPENDED GYPSUM BOARD CEILING
AE-908 SUSPENDED GYPSUM BOARD CEILING
AE-909 FRAMED GYPSUM BOARD CEILING
AE-910 BACKING & CASEWORK DETAILS
AE-911 ACCESSIBILITY DETAILS
AE-912 ROOF & MISCELLANEOUS DETAILS
AE-913 VA STANDARD DETAILS
AE-914 VA STANDARD DETAILS
AF-101 FINISH PLAN & SCHEDULE
AF-102 SIGNAGE PLAN & DETAILS
07 - EQUIPMENT
QH-101 EQUIPMENT PLAN & SCHEDULE - OVERALL PLAN
QH-102 EQUIPMENT PLAN & SCHEDULE - HISTOLOGY / CYTOLOGY
QH-103 EQUIPMENT PLAN & SCHEDULE - CORE LAB / BLOOD BANK
QH-104 EQUIPMENT PLAN & SCHEDULE - MICROBIOLOGY
QH-105 EQUIPMENT PLAN & SCHEDULE - ADMIN
QH-106 EQUIPMENT PLAN & SCHEDULE - SEND OUT
INFORMATIONINFO
FACE OF FINISHFOF
FINISH FLOORFF
6. MICROBIOLOGY TRAILER:
PROVIDE SITE WORK COSTS AS SEPARATE
LINE ITEM. PROVIDE ALL OTHER WORK
ASSOCIATED TO MICROBIOLOGY TRAILER AS
SEPARATE LINE ITEM.
7. AC UNIT PLACEMENT:
CONSIDER AC UNITS TO BE LOCATED ON THE
ROOF TO PREVENT HAVING TO OPEN UP
FLOORS FOR INSTALLATION OF EQUIPMENT.
SAVINGS INCLUDES COSTS ASSOCIATED TO
DECK DEMO, DECK INSTALLATION, AND
FRAMING MEMBERS FOR UNKNOWN DECK
CONSTRUCTION.
8. SNEEZE GUARDS:
ELIMINATE SNEEZE GUARDS.
GROUP B CONT'D
3. ELECTRICAL ROUGH-INS:
REMOVE FUTURE ELECTRICAL ROUGH-INS
AS SPECIFIED IN THE VA DESIGN GUIDES.
4. BSL-2 FAN:
REMOVE REDUNDANCY BY PROVIDING
SINGLE EXHAUST FAN SERVING BSL-2.
5. AHU COILS:
ALTERNATE BID COILS SHALL REPLACE THE
COPPER-COPPER COILS INSIDE THE AIR
HANDLING UNITS WITH A CORROSION-
RESISTANT E-COAT ALUMINUM COIL.
6. TERMINAL UNIT REPLACEMENT FOR AIR
CONTROL VALVES:
REPLACE 8 AIR CONTROL VALVES WITH VAV
TERMINAL UNIT BOXES. THE ACV’S AND
THEIR TU REPLACEMENTS ARE IDENTIFIED
ON THE MECHANICAL EQUIPMENT
SCHEDULES.
NFPA 241 STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS, 2019 EDITION
DRAWINGSDWG
NFPA 45 STANDARD ON FIRE PROTECTION FOR LABORATORIES USING CHEMICALS, 2019 EDITION
GROUP B
1. TELECOMM CONDUIT:
REMOVE CABLING CONDUIT FROM WALL
CAVITY THROUGHOUT PROJECT. BUNDLE
CABLES AS ALTERNATE.
2. MC CABLE:
USES OF HOSPITAL RATED MC CABLE
INSTEAD OF METALIC CONDUIT.
NIH BIO SAFETY IN MICROBIOLOGICAL AND BIOMEDICAL LABS (BMBL) 6TH ED
ISSUE FOR CONSTRUCTION
I HEREBY CERTIFY THAT THE DOCUMENT SHOWN AND MARKED IN THIS
SUBMITTAL IS THAT PROPOSED TO BE INCORPORATED WITH DESIGN
PROJECT# 664-18-333, PO# 664-C90290, AE# VA262-16-D-0152, TO#
36C25819N0244, IS IN COMPLIANCE WITH THE CONTRACT DOCUMENTS, AND IS
SUBMITTED FOR GOVERNMENT APPROVAL.
PREPARED BY:
DESIGNER OF RECORD (DOR) ERIC DAVY DATE
REVIEWED BY:
DESIGN QUALITY CONTROL JAMES MURRAY DATE
(DQC) MANAGER
07/09/2021
07/09/2021
ISSUED FOR CONSTRUCTION
EX
P
I RES
A UGUST
3 1 , 2
1#C 14152
S T
A
T E
OF CA L I FOR
N
IA
ER
IC
H . DAVY
OFFICE OF
CONSTRUCTION AND
FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
ENGINEER OF RECORD
SHEET TITLE
F
E
D
C
B
A
VA FORM
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
ARCHITECT OF RECORD
APPROVED PROJECT DIRECTOR
PROJECT PHASE
BUILDING CONSTRUCTION
PROJECT TITLE
PROJECT LOCATION
ISSUE DATE CHECK BY DRAWN BY
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
08 - 6231
REVISIONS: DATE:NO.
664-18-333
BLDG #1
3350 LA JOLLA VILLAGE DR., SAN DIEGO, CA 92161
100% CONSTRUCTION DOCUMENTS
FULLY SPRINKLEREDFERNANDO ESTRELLA
JULY 09, 2021
PROGRAM DESIGN 20% 09/13/20191
REVIEWED IN ACCORDANCE
WITH THE REQUIREMENTS
OF CFM
BY: ____________________
DATE: ________________
U.S. DEPARTMENT OF
VETERANS AFFAIRS
ENGINEERING SERVICES
SCHEMATIC DESIGN 35% 11/19/2019
MAJOR SYSTEMS 50% 12/19/2019
DESIGN DEVELOPMENT 65% 04/03/2020
CONSTRUCTION DOCUMENTS 95% 03/19/2021
CONSTRUCTION DOCUMENTS 100% 05/11/2021
IFC DOCUMENTS 07/09/2021
MODERNIZE PATHOLOGY DEPT., BLDG. 1
GI-002
GENERAL INFORMATION NOTES
JM / JT RA / LL
GENERAL
1. CONTRACTOR SHALL SUBMIT REQUEST FOR INFORMATION (RFI'S) REGARDING
ANY KNOWN DISCREPANCIES WITH THE CONTRACT DOCUMENTS OR
UNFORESEEN SITE CONDITIONS TO THE VA AND THE ARCHITECT FOR
CLARIFICATION PRIOR TO NOTICE TO PROCEED.
2. DIMENSIONS SHALL NOT BE SCALED FROM THE PLANS, SECTIONS, ELEVATIONS
OR DETAILS. ALL DRAWINGS ARE APPROXIMATE AND ARE GIVEN FOR
ESTIMATING PURPOSES
3. THE CONTRACTOR SHALL FURNISH ALL MATERIALS, LABOR, EQUIPMENT,
TRANSPORTATION AND SERVICES NECESSARY FOR THE SATISFACTORY
COMPLETION OF THE WORK.
4. A PRE-CONSTRUCTION CONFERENCE BETWEEN THE VA COR, OTHER VA
PROJECT STAKE HOLDERS, THE ARCHITECT, AND THE CONTRACTOR WITH ALL
OF HIS MAJOR SUBCONTRACTORS SHALL BE HELD IMMEDIATELY AFTER SIGNING
OF THE OWNER-CONTRACTOR AGREEMENT AND PRIOR TO THE START OF ANY
WORK.
5. UNLESS OTHERWISE NOTED, DIMENSIONS ARE 70 COLUMN CENTERLINE, FACE
OF FINISH PARTITION, FACE OF MASONRY WALLS AND FACE OF EXISTING WALLS.
6. ALL CUTTING AND PATCHING SHALL BE DONE BY THE GENERAL CONTRACTOR AS
OUTLINED IN THE GENERAL CONDITIONS OF THE SPECIFICATIONS. PATCHES IN
FINISH SURFACES SHALL MATCH THE ADJACENT SURFACES IN MATERIAL, FINISH
AND QUALITY.
7. NEW WORK EXTENDING EXISTING CONDITIONS SHALL ALIGN WITH AND MATCH
EXISTING WORK EXCEPT WHERE OTHERWISE DIMENSIONED OR DETAILED.
8. ALL SOUND RATED WALLS OR PARTITIONS SHALL EXTEND TO THE UNDERSIDE OF
THE STRUCTURE OR DECK ABOVE UNLESS OTHERWISE NOTED. THESE
PARTITIONS SHALL BE ENTIRELY SEALED OFF WITH CLOSURE GASKETS AND/OR
ACOUSTICAL SEALANT AT BOTTOM, TOP, SIDES AND ANT OTHER ABUTMENT
WHERE A SOUND LEAK WOULD OTHERWISE OCCUR. ALL PENETRATIONS SUCH
AS PIPING, CONDUITS, DUCTS, ETC., IN SUCH PARTITIONS SHALL BE PACKED AND
SEALED ALONG THE PERIMETER OF THE PENETRATION.
9. IN THE CASE OF NON-RATED PARTITIONS, CARRY METAL STUDS TO THE
STRUCTURE ABOVE, AND HOLD THE GYPSUM BOARD TO 6" MINIMUM ABOVE THE
FINISHED CEILING.
10. PROVIDE 45 STC RATING BETWEEN PATIENT ROOMS. PRO\/IDE 55 STC RATING
BETWEEN PATIENT ROOM AND PUBLIC SPACE PROVIDED 65 STC RATING
BETWEEN PATIENT ROOM AND SERVICE AREA. PROVIDE 45 STC RATING
BETWEEN PATIENT ROOM AND ACCESS CORRIDOR.
11. DUE TO MANUFACTURER'S VARIATION WITH SIZE OF EQUIPMENT, CASEWORK,
PLUMBING FIXTURES, ETC., ALL DIMENSIONS REFERRING TO THE SPACE WHERE
SUCH ITEMS ARE BUILT-IN SHALL BE VERIFIED WITH THE ITEM SUPPLIED.
12. GENERAL CONTRACTOR AND THE SUBCONTRACTORS THAT AS A SERVICE
PROVIDER TO THE VETERANS AND VETERAN AFFAIRS HEALTHCARE ARE TO
WEAR APPROPRIATE ATTIRE, I.E. CLEAN CLOTHING IN THE COMMON AREA
EXCLUDING THE WORK AREA.
13. CUTTING OF HOLES THROUGH CONCRETE SHALL BE BY DIAMOND CORE DRILL
OR PNEUMATIC HAMMER. IMPACT ELECTRIC MANUAL HAMMER TYPE DRILLS WILL
NOT BE ALLOWED.
14. JACKHAMMER NO HEAVIER THAN 70 LBS SHALL BE USED WHEN REMOVING
LIGHT-WEIGHT LATEX MASTIC CONCRETE TOPPINGS FROM PATIO AREAS.
15. CONTRACTOR TO PROVIDE COLOR COPIES OF MARKED-UP RECORD SET PLANS
TO VA CONTRACTING OFFICER UPON PROJECT COMPLETION.
16. SPECIAL TOOLS: IF ANY PART OF EQUIPMENT FURNISHED UNDER THIS
CONTRACT REQUIRES SPECIAL TOOLS FOR MAINTENANCE, ADJUSTMENT,
SETTINGS OR DISASSEMBLY/REASSEMBLY, THESE TOOLS SHALL BE FURNISHED
WITH EQUIPMENT AS A STANDARD ACCESSORY.
17. ALL DIMENSIONS ARE APPROXIMATE: CONTRACTOR TO VERIFY FIELD
CONDITIONS PRIOR TO START OF CONSTRUCTION.
18. CONTRACTOR TO PATCH AND REPAIR ALL WALLS, FLOORS, CEILINGS AND OTHER
ITEMS DAMAGED DURING CONSTRUCTION TO MATCH EXISTING/INTENDED
FUNCTIONS AND CONDITIONS.
19. CONTRACTOR TO LOCATE ALL "V.A. RETAINED" MATERIAL TO THE LOCATION
DIRECTED BY VA CONTRACTING OFFICER; VA CONTRACTING OFFICER WILL
COORDINATE WITH CONTRACTOR.
20. ALL MATERIAL NOT IDENTIFIED AS "V.A. RETAINED" IS TO BE REMOVED FROM THE
WORK AREA BY CONTRACTOR.
21. REMOVE AND RELOCATE OR REROUTE ANY UTILITIES WHICH PRESENT AN
OBSTRUCTION TO GENERAL CONSTRUCTION FOR THIS PROJECT.
22. ALL UTILITIES SHALL BE ROUTED TO CLEAR OBSTRUCTIONS, MAINTAINING CLEAR
ACCESS FROM CATWALK AT ALL TIMES.
23. PROVIDE SEISMIC SUPPORT & BRACING TO ALL UTILITIES & GENERAL
CONSTRUCTION IN PROJECT.
24. UTILITIES SHALL BE RUN CONCEALED EXCEPT IN UNFINISHED AREAS.
25. ALL PENETRATIONS THROUGH FLOORS AND SMOKE BARRIERS SHALL BE
TIGHTLY SEALED AND FIRE-STOPPED. ANY EXISTING CORE CUTS ARE TO BE
FILLED WITH SIMILAR MATERIAL USING 12- GAUGE BACKING PLATE.
26. CONTRACTOR TO MAINTAIN EXISTING CORRIDOR RATINGS DURING
CONSTRUCTION.
27. CONTRACTOR TO PROVIDE 5/8" TYPE "X" GYP. BOARD INTERIOR TEMPORARY
WALL SEPARATING OCCUPIED SPACES FROM PROJECT AREA(S). BARRIER TO BE
AIR-TIGHT FLOOR TO CEILING WITH SECURED OPENING. FOR EXTERIOR,
CONTRACTOR TO PROVIDE 5/8" FIRE-RATED DENSGLASS FOR TEMPORARY WALL
SEPARATING OCCUPIED SPACES FROM PROJECT AREA(S). PROVIDE WALK- OFF
MATS AT INTERIOR ENTRY TO PROJECT AREA.
28. PROVIDE 6" SOUND-ATTENUATING BLANKET OVER ALL ROOMS EXCEPT WAITING
AREAS, CORRIDORS AND ROOMS WITH HARD GYPSUM BOARD LIDS. PROVIDE 6"
SOUND-ATTENUATING BLANKET OVER CONFERENCE ROOMS. ALL WALLS SHALL
HAVE SOUND BATTS ACHIEVING STC-44. THE ENCLOSURE IN THE INTERSTITIAL
SPACE SHALL BE STC-45. CAULK AND SEAL ALL WALL PENETRATIONS, AND SEAL
EDGES OF GYPSUM BOARD.
29. SPRAY FIREPROOFING ON ALL STRUCTURAL STEEL MEMBERS ACCORDING TO
FIREPROOFING SCHEDULE.
30. ALL PRODUCTS & MANUFACTURERS SHALL BE VERIFIED WITH VA PM THROUGH
SUBMITTAL PROCESS.
31. DIMENSIONS ARE TO FACE OF STUD/ STRUCTURE U.N.O.
32. TEMPORARY CONCRETE ON STUD BARRIERS TO BE FINISHED PAINTED WITH
CORE BASE ON THE OUTSIDE.
33. THE GENERAL CONTRACTOR & ALL SUBCONTRACTORS SHALL CAREFULLY &
THOROUGHLY EXAMINE THE PROJECT SITE, FIELD VERIFY ALL CONDITIONS,
GRADES, ELEVATIONS & DIMENSIONS OF THE VARIOUS FEATURES OF THE
EXISTING SITE CONDITIONS. ANY DISCREPANCIES &/OR CONDITIONS NEEDING
CLARIFICATION SHALL BE REPORTED IMMEDIATELY TO THE VA COR BEFORE
BEGINNING WORK.
34. ALL PROPERTY LINES, EASEMENTS AND BUILDINGS, BOTH EXISTING AND
PROPOSED, THAT HAVE BEEN DIVULGED TO THE ARCHITECT, ARE SHOWN ON
THE SITE PLAN.
35. THE GENERAL CONTRACTOR & ALL SUBCONTRACTORS SHALL BE SOLELY
RESPONSIBLE FOR THE ENFORCEMENT OF ALL REQUIREMENTS & REGULATIONS
& SHALL PERFORM ALL WORK ON THIS PROJECT IN COMPLIANCE WITH CAL
O.S.H.A., THE INDUSTRIAL ACCIDENT COMMISSION OF THE STATE OF CALIFORNIA,
& ALL LOCAL, STATE AND FEDERAL SAFETY AND HEALTH STANDARDS, LAWS AND
REGULATIONS. ALL CONSTRUCTION FABRICATION & INSTALLATIONS SHALL
CONFORM TO THE LATEST ADOPTED EDITIONS OF THE C.B.C., C.P.C., C.E.C., &
ANY OTHER FEDERAL, STATE AND LOCAL CODES, REGULATIONS & ORDINANCES
OF THE GOVERNING AGENCY HAVING JURISDICTION OVER THE PROJECT.
36. DUE TO THE REPROGRAPHICS PROCESS, THESE PLANS MAY NOT BE ACCURATE
TO SCALE. ALL DIMENSIONS SHALL TAKE PRECEDENCE OVER THE SCALE
SHOWN & IN NO CASE SHALL WORKING DIMENSIONS BE SCALED FROM THE
PLANS, SECTIONS, ELEVATIONS OR DETAILS.
37. WHERE CONSTRUCTION DETAILS ARE NOT SHOWN OR NOTED FOR ANY PART OF
THE WORK, DETAILS SHALL BE THE SAME AS FOR OTHER SIMILAR FIRST-CLASS
WORK FOR THE TRADE INVOLVED. THE VA COR AND ARCHITECT SHALL BE
NOTIFIED IMMEDIATELY, IN WRITING, OF ANY ALTERNATE, NON-STANDARD, OR
UNTESTED METHOD(S) PROPOSED.
GENERAL CONTINUED
39. THE STRUCTURAL, MECHANICAL, PLUMBING & ELECTRICAL DRAWINGS ARE
SUPPLEMENTARY TO THE ARCHITECTURAL DRAWINGS. SHOULD THERE BE ANY
DISCREPANCY BETWEEN THE VARIOUS DRAWINGS, IT SHALL BE BROUGHT TO
THE ARCHITECT'S ATTENTION FOR CLARIFICATION.
40. THE CONTRACTOR SHALL CONSULT THE ELECTRICAL, MECHANICAL, & PLUMBING
DRAWINGS FOR LOCATION OF ALL ROUGH OPENINGS THROUGH WALLS & FLOOR
SLABS & NOTIFY THE ARCHITECT OF ANY ITEMS THAT DO NOT CONFORM WITH
THE INTENT INDICATED ON THESE DRAWINGS.
41. THE CONTRACTOR SHALL COORDINATE WITH THE VA'S REPRESENTATIVE FOR
INSTALLATION OF ANY SPECIAL EQUIPMENT NOT SHOWN IN THESE DRAWINGS.
THE CONTRACTOR SHALL VERIFY EQUIPMENT LOCATIONS WITH THE VA'S
REPRESENTATIVE AND/OR EQUIPMENT MANUFACTURER FOR PROPER SIZE AND
LOCATION OF FOUNDATION OR SLAB DEPRESSIONS, DRAINS, AND WARPS.
42. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO LOCATE &
PROTECT ANY UNDERGROUND OR CONCEALED CONDUIT, PLUMBING, OR OTHER
UTILITIES WHERE NEW WORK IS BEING PERFORMED.
43. DIMENSIONS ARE TYPICAL TO FACE OF MASONRY OR CONCRETE AND TO
CENTERLINE OF STUD, UNLESS OTHERWISE NOTED. LARGER SCALE DETAILS
GOVERN OVER SMALLER SCALE DETAILS.
44. THE CONTRACTOR SHALL VERIFY THE SIZE AND LOCATION OF ALL UTILITY LINES
AND STUBS TO THE BUILDING(S) AS MAY BE INDICATED ON THE PLANS. THE
CONTRACTOR SHALL BE REQUIRED TO BRING ALL UTILITY LINES (WATER,
SEWER, GAS AND ELECTRICAL) INTO THE BUILDING FROM POINTS AS INDICATED
ON THE PLANS, READY FOR SERVICE.
45. THE CONTRACTOR SHALL COMPLY WITH SAFETY RESTRICTIONS AS REQUIRED
FOR WORKERS AND PEDESTRIAN PROTECTION DURING THE ENTIRE
CONSTRUCTION PROCESS.
46. RUBBISH AND DEBRIS RESULTING FROM THE WORK OF VARIOUS TRADES SHALL
BE REGULATED, COLLECTED AND REMOVED FROM THE PROJECT SITE AND
LEGALLY DISPOSED OF PRIOR TO DELIVERY OF MATERIALS TO THE
CONSTRUCTION ZONE AND AT THE END OF THE WORK SHIFT. THE CONTRACTOR
SHALL COORDINATE WITH THE VA'S REPRESENTATIVE FOR AN ACCEPTABLE
ACCESS ROUTE AND TIME. UNDER NO CIRCUMSTANCES SHALL THE
CONTRACTOR, HIS SUBCONTRACTORS, OR ANY OF THEIR EMPLOYEES USE ANY
AREA OUTSIDE THE CONSTRUCTION ZONE WITHOUT PRIOR CLEARANCE FROM
THE VA'S REPRESENTATIVE.
47. ANY REVISION OR ADDITIONAL WORK REQUIRED DUE TO FIELD CONDITIONS OR
LOCAL GOVERNING AUTHORITIES SHALL BE BROUGHT TO THE ATTENTION OF
THE ARCHITECT AND CONTRACTING OFFICER BEFORE PROCEEDING
REGARDLESS OF COST, TIME OR MATERIAL INCREASE.
48. THE CONTRACTOR SHALL PROVIDE PROTECTION AS REQUIRED TO PREVENT ANY
DAMAGE TO MATERIALS & CONSTRUCTION PREVIOUS TO & DURING
CONSTRUCTION & AFTER INSTALLATION, AS WELL AS EXISTING CONSTRUCTION
ADJACENT TO THE JOB SITE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
PROTECTING ALL FINISHES & MATERIALS, & FOR REPAIRING AND/OR REPLACING
ALL ITEMS THAT ARE DAMAGED OR SOILED DURING CONSTRUCTION AS
REQUIRED TO THE VA CONTRACTING OFFICER'S APPROVAL AT NO ADDITIONAL
COST TO THE VA.
49. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE CODES LISTED UNDER
THE PROJECT DATA HEADING ON THIS SHEET. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO BE FAMILIAR WITH ALL CODES AND ORDINANCES, CITY OR
STATE, AS REQUIRED FOR THE CONSTRUCTION OF THIS PROJECT. WHERE ANY
CONFLICTS OCCUR BETWEEN FEDERAL, STATE AND LOCAL LAWS, CODES,
ORDINANCES, AND REGULATIONS, THE MOST STRINGENT SHALL GOVERN.
50. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE REQUIREMENTS
OF BOTH THE VA AND FAR. WORK PERFORMED IN CALIFORNIA SHALL ACCOUNT
FOR THE CALIFORNIA BUILDING CODE AND TITLE 24, CALIFORNIA CODE OF
REGULATIONS (C.C.R.), BUT FEDERAL REGULATIONS SHALL GOVERN.
51. IT IS THE INTENT OF THESE DRAWINGS TO INDICATE A COMPLETE AND FINISHED
PRODUCT MATCHING AND/OR ABUTTING EXISTING CONSTRUCTION IN A NEAT
AND PROFESSIONAL MANNER.
52. ALL ITEMS TO BE REMOVED AND RELOCATED OR REPLACED SHALL BE HANDLED
WITH PROPER CARE AND STORED IN A SAFE LOCATION TO PREVENT DAMAGE,
OR BE REPLACED AT THE CONTRACTOR'S EXPENSE.
53. THE CONTRACTOR SHALL PROVIDE WRITTEN REQUESTS FOR UTILITY
SHUTDOWNS TO THE VA'S REPRESENTATIVE AT LEAST 14 DAYS PRIOR TO THE
EVENT. WORK REQUIRING SHUTDOWNS MAY BE REQUIRED TO BE PERFORMED
OUTSIDE NORMAL WORK HOURS.
54. IF WORK ADJOINS AREAS THAT WILL BE OCCUPIED DURING CONSTRUCTION, THE
CONTRACTOR AND SUBCONTRACTORS SHALL COOPERATE WITH THE VA TO
MAINTAIN CONTINUOUS OPERATION. IF CONFLICTS OCCUR, THE INTERESTS OF
THE VA SHALL GOVERN. THE CONTRACTOR SHALL MAKE EVERY EFFORT TO
MINIMIZE THE IMPACT OF CONSTRUCTION IN AFFECTED AREAS.
55. DUST SCREENS OF EITHER PLASTIC CURTAINS OR PLYWOOD PARTITIONS SHALL
BE MAINTAINED ADJACENT TO & SEPARATING AREAS OF CONSTRUCTION FROM
ADJOINING OCCUPIED AREAS. SCREENS SHALL EXTEND A DISTANCE TO ALLOW
WORK WITHOUT DISRUPTING THE ADEQUATE FUNCTIONING OF THE FACILITY
CIRCULATION. SCREENS SHALL BE RELOCATED AS NECESSARY FOR EA. PHASE
OF THE PROJECT. CONTRACTOR SHALL COORDINATE WITH COR FOR THE
SCREEN LOCATIONS.
56. ALL REQUIRED EXITS FROM OCCUPIED PORTIONS OF THE BUILDING MUST BE
MAINTAINED AT ALL TIMES. THE CONTRACTOR SHALL ESTABLISH PROCEDURES
TO MINIMIZE CIRCULATION OF CONSTRUCTION PERSONNEL AND MATERIALS
THROUGH OCCUPIED PORTIONS OF THE BUILDING. THE CONTRACTOR SHALL
IMMEDIATELY CLEAN DUST AND DIRT FROM CORRIDOR AREAS NOT PROTECTED
BY DUST SCREENS.
57. STORAGE OF ALL MATERIALS, EQUIPMENT & SUPPLIES SHALL BE LIMITED TO
SCHEDULED AREAS OF WORK IN PROGRESS, OR DESIGNATED EXTERIOR
LOCATIONS APPROVED BY & ARRANGED W/ THE VA CONTRACTING OFFICER.
58. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY BLOCKING, BACKING,
FRAMING, HANGERS OR OTHER SUPPORT FOR ALL FIXTURES, EQUIPMENT,
CASEWORK, FURNISHINGS AND ALL OTHER ITEMS AS REQUIRED, INCLUDING BUT
NOT LIMITED TO: TOWEL BARS, GRAB BARS, WINDOW TREATMENT, TELEPHONE
BACKBOARDS, WATER HEATERS, AND CABINETRY.
59. THE GENERAL CONTRACTOR SHALL NOT MAKE ANY SUBSTITUTION OF
MATERIALS OR EQUIPMENT WITHOUT THE WRITTEN CONSENT OF THE
CONTRACTING OFFICER.
60. COMPLETED CONSTRUCTION SHALL BE CLEANED, LABELS REMOVED, & ALL
OTHER TOUCH-UP COMPLETED TO THE SATISFACTION OF THE VA
REPRESENTATIVE PRIOR TO FINAL ACCEPTANCE.
61. WHERE PAVING, WALKS AND/OR LANDSCAPED AREAS ARE DISTURBED OR
DAMAGED DURING CONSTRUCTION, THEY SHALL BE REPAIRED OR REPLACED TO
MATCH EXISTING CONDITIONS AT CONTRACTORS EXPENSE.
62. THE GENERAL CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER
IMMEDIATELY OF ANY SPECIFIED MATERIALS OR EQUIPMENT WHICH ARE EITHER
UNAVAILABLE OR WILL CAUSE A DELAY IN THE CONSTRUCTION COMPLETION
SCHEDULE.
63. ALL GYPSUM BOARD SURFACES, WALLS AND CEILINGS SHALL BE TAPED AND
FEATHERED SMOOTH TO RECEIVE WALL FINISH. ALL WALLS AND CEILINGS SHALL
RECEIVE A MINIMUM OF ONE COAT SEALER AND PAINT TO COVER. WATER
RESISTANT TYPE "GREEN" BOARD SHALL BE USED IN ALL RESTROOMS,
SHOWERS, AND EXTERIOR AREAS.
64. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPLYING
TEMPORARY ELECTRICAL POWER TO THE JOB SITE FOR USE BY ALL
CONSTRUCTION TRADES.
65. ALL SUBCONTRACTORS SHALL MAINTAIN THE PREMISES CLEAN AND FREE FROM
ALL TRASH AND DEBRIS. THE FIXTURES, EQUIPMENT, GLAZING, FLOORS, ETC.
SHALL BE LEFT CLEAN AND READY FOR EITHER THE NEXT TRADE OR
OCCUPANCY.
66. NO HAZARDOUS MATERIALS SHALL BE USED OR STORED AT THE PROJECT SITE
WHICH EXCEED THE QUANTITIES LISTED IN U.B.C. TABLE 3-D AND 3-E.
67. AFTER THE PROJECT IS OCCUPIED, ANY CHANGE IN USE OR OCCUPANCY WHICH
CAUSES AN INCREASE IN OCCUPANT LOAD SHALL COMPLY WITH ALL OF THE
REQUIREMENTS FOR THE INCREASED LOAD.
68. SIDE YARDS USED FOR AREA INCREASES SHALL BE PERMANENTLY MAINTAINED.
69. THE CONTRACTOR SHALL THOROUGHLY CAULK, FLASH &/OR SEAL AROUND ALL
WALL &/OR ROOF PENETRATIONS THAT ARE MADE AS PART OF THE CONTRACT
WORK TO CREATE A WATERTIGHT CONDITION.
70. ALL EXIT DOORS ARE TO BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF
A KEY OR SPECIAL KNOWLEDGE. FLUSH BOLTS OR SURFACE BOLTS ARE
PROHIBITED (ALSO APPLIES TO GATES).
GENERAL CONTINUED
71. THE MAXIMUM EFFORT REQUIRED TO OPERATE DOORS SHALL NOT EXCEED 5
LBS. FOR EXTERIOR DOORS AND 5 LBS. FOR INTERIOR DOORS, SUCH PULL OR
PUSH EFFORT BEING APPLIED AT RIGHT ANGLES TO HINGED DOORS, AND AT THE
CENTER PLANE OF SLIDING OR FOLDING DOORS. WHEN FIRE DOORS ARE
REQUIRED, THE MAXIMUM EFFORT TO OPERATE THE DOOR MAY BE INCREASED
TO 15 LBS WHEN ALLOWED BY AUTHORITY HAVING JURISDICTION.
72. ALL DOOR HARDWARE TO BE LEVER-TYPE PER STATE OF CALIFORNIA AND SHALL
BE INSTALLED @ 3'-0" A.F.F., UNLESS OTHERWISE NOTED.
73. PROVIDE FLOOR MOUNTED STOPS, 4" MAX. FROM WALL FOR ALL DOORS UNLESS
OTHERWISE NOTED.
74. ALL PRIMARY ENTRANCES TO THE BUILDING SHALL BE ACCESSIBLE PER NFPA
101. BUILDING ENTRANCES SHALL BE IDENTIFIED BY SIGN WITH THE
INTERNATIONAL SYMBOL OF ACCESSIBILITY, A WHITE FIGURE ON A BLUE
BACKGROUND, PER NFPA 101.
75. THE PATH OF EXIT TRAVEL SHALL BE IDENTIFIED BY EXIT SIGNS PER NFPA 101.
EXIT SIGNS SHALL BE READILY VISIBLE FROM ANY DIRECTION OF APPROACH.
EXIT SIGNS SHALL BE LOCATED AS NECESSARY TO CLEARLY INDICATE THE
DIRECTION OF EXIT TRAVEL. ALL EXIT SIGNS SHALL BE INTERNALLY ILLUMINATED
WITH MINIMUM 6" HIGH LETTERS PER NFPA 101, C.F.C. SECTION 12.108(a). THE
CONTRACTOR SHALL COORDINATE LOCATION OF ALL EXIT SIGNS WITH VA COR
AND ARCHITECT PRIOR TO INSTALLATION .
76. EACH VENT SHALL RISE VERTICALLY TO A POINT NOT LESS THAN SIX (6) INCHES
ABOVE THE FLOOD-LEVEL RIM OF THE FIXTURE SERVED BEFORE OFFSETTING
HORIZONTALLY OR BEFORE BEING CONNECTED TO ANY OTHER VENT.
77. NO HVAC DUCTS TO HAVE A CROSS SECTIONAL AREA OF 6 SQUARE FEET OR
GREATER.
SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION
1. THE DRAWINGS ARE ARRANGED BY DESIGN DESCIPLINE FOR CLARITY. THE
GENERAL CONTRACTOR IS REQUIRED TO PROVIDE ALL OF THE WORK SHOWN
ON ALL OF THE DRAWINGS UNLESS SPECIFICALLY NOTED OTHERWISE.
ARRANGEMENT IS NOT TO DIVIDE THE WORK AMONG THE TRADES. FOR
EXAMPLE A CONDIUT MAY BE REQUIRED FOR MECHANICAL EQUIPMENT, BUT
PROVIDED BY AN ELECTRICIAN.
2. THE CONTRACTING OFFICER'S INTERPRETATION OF THE DRAWINGS AND
SPECIFICATIONS WILL BE FINAL, SUBJECT TO THE DISPUTES CLAUSE.
3. LARGE SCALE DRAWINGS SUPERSEDE SMALL SCALE DRAWINGS.
4. DIMENSIONS GOVERN IN ALL CASES. SCALING OF DRAWINGS MAY BE DONE ONLY
FOR GENERAL LOCATION AND GENERAL SIZE OF ITEMS.
5. DIMENSIONS SHOWN OF EXISTING WORK AND ALL DIMENSIONS REQUIRED FOR
WORK THAT IS TO CONNECT WITH EXISTING WORK SHALL BE VERIFIED BY THE
CONTRACTOR BY ACTUAL MEASUREMENT OF THE EXISTING WORK. ANY WORK
AT VARIANCE WITH THAT SPECIFIED OR SHOWN IN THE DRAWINGS SHALL NOT BE
PERFORMED BY THE CONTRACTOR UNTIL APPROVED IN WRITING BY THE
CONTRACTING OFFICER.
6. ALL WORK TO BE CONSIDERED NEW CONSTRUCTION UNLESS NOTED
OTHERWISE
SPECIAL INSPECTIONS REQUIRED PER IBC 2018
1. SEE SPECIFICATION FOR SPECIAL TESTING AND INSPECTION REQUIREMENTS.
PROJECT SCHEDULE AND PHASING OF THE WORK
1. THE CONTRACTOR SHALL SUBMIT FOR APPROVAL BY VA COR AN INTERIM
PROJECT SCHEDULE OF HIS OPERATIONS WITH INTERIM PHASING PLANS PRIOR
TO NOTICE TO PROCEED. REFER TO SPECIFICATION SECTION: 01 32 16.15
2. AREA OF WORK TO BE FULLY ABATED AND CLEAR OF HAZARDOUS MATERIALS
BEFORE PROCEEDING WITH CONSTRUCTION.
3. THE INTENT OF THE PROJECT IS TO PERMIT THE CONTINUOUS OPERATION OF
REQUIRED ACTIVITIES AT THE VA HEALTHCARE CENTER DURING CONSTRUCTION.
AT NO TIME SHALL ANY WORK INTERFERE WITH THE VA'S NORMAL OPERATION
WITHOUT ACCEPTANCE PRIOR TO START OF CONSTRUCTION.
4. ALL WORK TO BE COMPLETED ON A PER PHASE BASIS.
5. THE CONTRACTOR SHALL DEVELOP A SCHEDULE OF CONSTRUCTION WHICH
INCLUDES THE NECESSARY ACTIONS TO MAINTAIN THE OPERATION OF THE
ADJACENT FUNCTION (INCLUDING ON THE FLOOR ABOVE AND BELOW) DURING
THE CONSTRUCTION PROCESS.
6. THE CONTRACTOR SHALL SUBMIT FOR APPROVAL A SCHEDULE DETAILING WORK
PLANS, INCLUDING BUT NOT LIMITED TO, ACTIVATION PRIOR TO STARTING ANY
PHASE. THIS TIME SHALL BE COORDINATED WITH THE VA COR AND BE INCLUDED
IN THE OVERALL PROJECT CONSTRUCTION SCHEDULE.
7. THE VA RESIDENT ENGINEER WILL REVIEW THE CONTRACTOR'S SCHEDULE TO
VERIFY MOST EFFICIENT TIMING OF THE CONTRACT WORK TO AVOID CONFLICTS
WITH THE CURRENT VA OPERATIONS.
8. CONTRACTOR SHOULD BE AWARE THAT IT IS POSSIBLE SCHEDULE
SIMULTANEOUS AND / OR STAGGERED SHUTDOWNS, HOWEVER EACH WILL
REQUIRE A SEPARATE IMPACT PERMIT AND WILL UNDERGO ITS OWN DEDICATED
PROCESS. AS SUCH, THERE ARE NO GUARANTEES WITH REGARDS TO DATE OR
DURATION OF THE SHUTDOWN.
9. SHUTDOWN COORDINATION HAS A 21-DAY NOTICE REQUIREMENT.
10. NO DEMOLITION WILL BEGIN WITHOUT SHUTDOWN COORDINATION AND WRITTEN
AUTHORIZATION TO MOVE FORWARD FROM THE HOSPITAL STAFF. THIS IS
INTENDED TO MINIMIZE DISRUPTIONS IN AN ACTIVE HOSPITAL, AND OUTAGES
MUST BE COORDINATED AS THEY AFFECT PATIENT CARE. FOR CLARITY: EMAIL
TRAFFIC MAY BE CONSIDERED "WRITTEN AUTHORIZATION," BUT ONLY IF IT
ORIGINATES FROM A VA.GOV EMAIL ADDRESS.
11. AS THIS IS AN ACTIVE HEALTHCARE FACILITY SEEING PATIENT ON LIFE-SAFETY
EQUIPMENT, THE CONTRACTOR UNDERSTANDS THAT IT MAY NOT BE POSSIBLE
TO WORK DURING STANDARD DUTY HOURS, AND THAT THIRD-SHIFT LABOR IS
EXPECTED IN ANY PATIENT CARE AREA SO AS TO MINIMIZE DISRUPTION TO
PATIENTS AND THE CARE THAT THEY RECEIVE.
12. UPON RECEIPT OF APPROPRIATE CONTACT INFORMATION AND SHUTDOWN
DATES, THE CONTRACTOR IS RESPONSIBLE FOR SCHEDULING AND
COORDINATING ACCESS TO AFFECTED AREAS BY WORKING WITH THE COR AND
THE VA POLICE.
SUBCONTRACTS & WORK COORDINATION
1. NOTHING CONTAINED IN THIS CONTRACT SHALL BE CONSTRUCTED AS CREATING
ANY CONTRACTUAL RELATIONSHIP BETWEEN ANY SUB CONTRACTOR AND THE
GOVERNMENT. DIVISIONS OR SECTIONS OF SPECIFICATION S ARE NOT
INTENDED TO CONTROL THE CONTRACTOR IN DIVIDING WORK AMONG
SUBCONTRACTORS, OR TO LIMIT WORK PERFORMED BY ANY TRADE.
2. THE CONTRACTOR SHALL BE RESPONSIBLE TO THE GOVERNMENT FOR ACTS
AND OMISSIONS OF HIS/HER OWN EMPLOYEES, AND SUBCONTRACTORS AND
THEIR EMPLOYEES.THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR
COORDINATION OF THE WORK OF THE TRADES, SUBCONTRACTORS, AND
MATERIAL SUPPLIERS.
3. THE CONTRACTOR SHALL, IN ADVANCE OF THE WORK, PREPARE COORDINATION
DRAWINGS SHOWING THE LOCATION OF OPENINGS THROUGH SLABS, THE PIPE
SLEEVES AND HANGER INSERTS, AS WELL AS THE LOCATION AND ELEVATION OF
UTILITY LINES, INCLUDING, BUT NOT LIMITED TO, CONVEYOR SYSTEMS,
PNEUMATIC TUBES, DUCTS, AND CONDUITS AND PIPES 2 INCHES AND LARGER IN
DIAMETER. THESE DRAWINGS, INCLUDING PLANS, ELEVATIONS, AND SECTIONS
AS APPROPRIATE, SHALL CLEARLY SHOW THE MANNER IN WHICH THE UTILITIES
FIT INTO THE AVAILABLE SPACE AND RELATE TO EACH OTHER AND TO EXISTING
BUILDING ELEMENTS. DRAWINGS SHALL BE OF APPROPRIATE SCALE TO SATISFY
THE PREVIOUSLY STATED PURPOSES, BUT NOT SMALLER THAN 3/8-INCH SCALE.
DRAWINGS MAY BE COMPOSITE (WITH DISTINCTIVE COLORS FOR THE VARIOUS
TRADES) OR MAY BE SEPARATE BUT FULLY COORDINATED DRAWINGS (SUCH AS
SEPIAS OR PHOTOGRAPHIC PAPER REPRODUCIBLE) OF THE SAME SCALE.
SEPARATE DRAWINGS SHALL DEPICT IDENTICAL BUILDING AREAS OR SECTIONS
AND SHALL BE CAPABLE OF BEING OVERLAID IN ANY COMBINATION. THE
SUBMITTED DR A WIN CS FOR A GIVEN AREA OF THE PROJECT SHALL SHOW THE
WORK OF ALL TRADES THAT WILL BE INVOLVED IN THAT PARTICULAR AREA. SIX
COMPLETE COMPOSITE DRAWINGS OR SIX COMPLETE SETS OF SEPARATE
REPRODUCIBLE DRAWINGS SHALL BE RECEIVED BY THE GOVERNMENT NOT
LESS THAN 20 DAYS PRIOR TO THE SCHEDULED START OF THE WORK IN THE
AREA ILLUSTRATED BY THE DRAWINGS, FOR THE PURPOSE OF SHOWING THE
CONTRACTOR'S PLANNED METHODS OF INSTALLATION. THE OBJECTIVES OF
SUCH DRAWINGS ARE TO PROMOTE CAREFULLY PLANNED WORK SEQUENCE
AND PROPER TRADE COORDINATION, IN ORDER TO ASSURE THE EXPEDITIOUS
SOLUTIONS OF PROBLEMS AND THE INSTALLATION OF LINES AND EQUIPMENT
AS CONTEMPLATED BY THE CONTRACT DOCUMENTS WHILE AVOIDING OR
MINIMIZING ADDITIONAL COSTS TO THE CONTRACTOR AND TO THE
GOVERNMENT. IN THE EVENT THE CONTRACTOR, IN COORDINATING THE
VARIOUS INSTALLATIONS AND IN PLANNING THE METHOD OF INSTALLATION,
FINDS A CONFLICT IN LOCATION OR ELEVATION OF ANY OF THE UTILITIES WITH
THEMSELVES, WITH STRUCTURAL ITEMS OR WITH OTHER CONSTRUCTION ITEMS,
HE/SHE SHALL BRING THIS CONFLICT TO THE ATTENTION OF THE CONTRACTING
OFFICER IMMEDIATELY. IN DOING SO, THE CONTRACTOR SHALL EXPLAIN THE
PROPOSED METHOD OF SOLVING THE PROBLEM OR SHALL REQUEST
INSTRUCTIONS AS TO HOW TO PROCEED IF ADJUSTMENTS BEYOND THOSE OF
USUAL TRADES COORDINATION ARE NECESSARY. UTILITIES INSTALLATION
WORK WILL NOT PROCEED IN ANY AREA PRIOR TO THE SUBMISSION AND
COMPLETION OF THE GOVERNMENT REVIEW OF THE COORDINATED DRAWINGS
FOR THAT AREA, NOR IN ANY AREA IN WHICH CONFLICTS ARE DISCLOSED BY THE
COORDINATION DRAWINGS, UNTIL THE CONFLICTS HAVE BEEN CORRECTED TO
THE SATISFACTION OF THE CONTRACTING OFFICER. IT IS THE RESPONSIBILITY
OF THE CONTRACTOR TO SUBMIT THE REQUIRED DRAWINGS IN A TIMELY
MANNER CONSISTENT WITH THE REQUIREMENTS TO COMPLETE THE WORK
COVERED BY THIS CONTRACT WITHIN THE PRESCRIBED CONTRACT TIME. SEE
THE GOVERNMENT OR ITS REPRESENTATIVES WILL NOT UNDER TAKE TO SETTLE
ANY DIFFERENCES BETWEEN THE CONTRACTOR AND SUBCONTRACTORS OR
BETWEEN SUBCONTRACTORS.
4. THE GOVERNMENT RESERVES THE RIGHT TO REFUSE TO PERMIT EMPLOYMENT
ON THE WORK OR REQUIRE DISMISSAL FROM THE WORK OF ANY
SUBCONTRACTOR WHO, BY REASON OF PREVIOUS UNSATISFACTORY WORK
ON DEPARTMENT OF VETERANS AFFAIRS PROJECTS OR FOR ANY OTHER
REASON, IS CONSIDERED BY THE CONTRACTING OFFICER TO BE INCOMPETENT
OR OTHER WISE OBJECTIONABLE.
GOVERNING CODES
GENERAL: THE VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES
AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE
MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY
AND THE CONSTRUCTION OF NEXT STRUCTURES. VA DESIGN MANUALS AND MASTER
SPECIFICATIONS SPECIFY OTHER CODES AND STANDARDS THE VA FOLLOWS ON ITS
PROJECTS:
1. VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD
STANDARD APPLICATION GUIDE AND OTHER GUIDANCE IN THE TECHNICAL
INFORMATION LIBRARY (TIL) HTTP://.CFM.VA.GOV/TIL/
2. 2018 INTERNATIONAL BUILDING CODE (IBC) INCLUDING INTERNATIONAL
MECHANICAL AND PLUMBING CODES
3. 2018 NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 101 LIFE SAFETY CODE
(SEE NOTES BELOW)
4. 2018 NFPA NATIONAL FIRE CODES Y/WITH THE EXCEPTION OF NFPA 5000 AND
NFPA 900 OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .