S02 Atch 6 General Conditions Breakout.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Y1DA--626-25-102 - Apheresis-Mohs Storage Room Compliance Upgrade
Solicitation number
36C24925B0002
Issued by

About this file

The file is a General Conditions Breakout spreadsheet for a federal construction contract, detailing line-item costs for project management, site conditions, and general conditions. The spreadsheet provides a comprehensive breakdown of potential costs, including project management roles (Project Manager, Superintendent, Safety Manager), bonds and insurance, and site-specific temporary facilities and services. Each line item is currently set at $0, suggesting this is a template or placeholder document for cost allocation.

The associated federal contract opportunity is a construction project (Solicitation Number 36C24925B0002) for the Department of Veterans Affairs Tennessee Valley Healthcare System in Nashville, TN. The project involves upgrading the Apheresis-Mohs Storage Room, which includes installing three constant volume DDC VAV boxes, re-heat piping, control system connections, and associated architectural repairs. The project has a 60-calendar-day performance period, requires working outside normal hours, and mandates specific safety and coordination requirements, including obtaining VA contractor identification badges and maintaining strict infection control protocols.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GC Breakout

GENERAL CONDITIONS BREAKOUT
When entering a line item for General Conditions costs on Schedule of Values, a breakout of the General Conditions costs must be provided. Per VAAR 852.236-88 Contract Changes-Supplement, paragraph (b)(10), the following contractual restrictions apply: Overhead and contractor’s fee percentages shall be considered to include insurance other than mentioned herein, field and office supervisors and assistants, security police, use of small tools, incidental job burdens, and general home office expenses and no separate allowance will be made therefore. Assistants to office supervisors include all clerical, stenographic and general office help. Incidental job burdens include, but are not necessarily limited to, office equipment and supplies, temporary toilets, telephone and conformance to OSHA requirements. Items such as, but not necessarily limited to, review and coordination, estimating and expediting relative to contract changes are associated with field and office supervision and are considered to be included in the contractor’s overhead and/or fee percentage.
General Condition DescriptionValue
Project Management:$ - 0
Superintendent(s)$ - 0
Safety Manager$ - 0
CPM Scheduler$ - 0
Quality Assurance/Quality Control$ - 0
Project Manager (s)$ - 0
Project Executive$ - 0
Field Office Engineer$ - 0
Field Office Support Staff$ - 0
Project Expeditor$ - 0
Assistant Superintendent (s)$ - 0
Project Manager Subtotal:$ - 0
Bonds and Insurance (excluding any for Subcontractors):$ - 0
Builder’s Risk Insurance$ - 0
General Liability Insurance$ - 0
Security, Payment & Performance Bonds$ - 0
Bonds and Insurance Subtotal:$ - 0
Site Conditions:$ - 0
Temporary Power Consumption (Offices)$ - 0
Temporary Power Consumption (General Site Use)$ - 0
Temporary Water and Sewer Consumption$ - 0
Temporary Water Hookup, Distribution & Meters$ - 0
Temporary Electrical Hookup, Distribution & Meters$ - 0
Temporary Telephone & Network System Installation$ - 0
Temporary Telephone & Internet Consumption Fees$ - 0
Temporary Fire Protection$ - 0
Temporary Heating & Cooling$ - 0
Temporary Fencing$ - 0
Temporary Covered Walkways$ - 0
SWPPP Measures$ - 0
Temporary Entries and Truck Washes$ - 0
Street Cleaning (by G.C.)$ - 0
Traffic Control Measures$ - 0
Temporary Barricades & Signage$ - 0
Temporary Roads & Walkways (install & maintenance)$ - 0
Temporary Lighting$ - 0
Temporary Partitions & Covered Floor Openings$ - 0
Temporary Toilets/Sanitary Measures$ - 0
Temporary Laydown (prep and restoration)$ - 0
Security System/Watchman$ - 0
Pre-construction Photo Documentation$ - 0
Progress Photos$ - 0
Temporary Protection (in place work/adjacent structures)$ - 0
$ - 0
$ - 0
$ - 0
General Conditions Total$ - 0