S02 Atch 4 Calculation of Contractor Self Performed Work.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Y1DA--626-25-102 - Apheresis-Mohs Storage Room Compliance Upgrade
Solicitation number
36C24925B0002
Issued by

About this file

The file is an Excel spreadsheet attachment titled "Calculation of Contractor Self Performed Work" for Solicitation Number 36C24925B0002, a construction project at the Tennessee Valley Healthcare System. The document requires offerors (specifically for NAICS code 236220) to demonstrate that at least 15 percent of the contract performance personnel costs must be performed by a Service Disabled Veteran Owned Small Business (SDVOSB), either by the prime contractor or verified SDVOSB subcontractors. The spreadsheet provides a template for contractors to break down personnel and material/equipment costs by specification division, with sections for calculating self-performed work percentage, including home office overhead, profit/fee, and bond costs. The form mandates detailed cost tracking and identification of personnel costs for the prime contractor and subcontractors, with a focus on verifying the SDVOSB participation requirement.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK 36C24925B0002
Offerors for Contractors (NAICS code 236220) must provide at least 15 percent (general construction) of the cost of the contract performance incurred for personnel must be performed by the Service Disabled Veteran Owned Small Business (SDVOSB) awardee or those of a verified SDVOSB subcontractor. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible service disabled veteran-owned small business concerns. Below is a suggested format.
Specification DivisionSB Vendor (Y or N)Personnel CostMaterial/Equipment Costs
Prime$0.00$0.00
Sub$0.00$0.00
Sub$0.00$0.00
Sub$0.00$0.00
Sub$0.00$0.00
Sub$0.00$0.00
Sub$0.00$0.00
Sub$0.00$0.00
Sub$0.00$0.00
Sub$0.00$0.00
Sub$0.00$0.00
(Add additional lines as necessary for each Division applicable to this project)$0.00$0.00
Sub Total (Personnel Costs, Material /Equipment Costs)$0.00
Percentage0Profit$0.00
Percentage0Home Office Overhead$0.00
Percentage0Bond$0.00
Grand Total$0.00
Calculation of self-performed personnel costs:
1. Total personnel costs * both prime and all subcontractors:$0.00
2. Subtract all subcontractor personnel costs* that are not SDVOSB
companies that will perform work on this contract:$0.00
3. Remainder is ‘Total amount of work to be self-performed under the
Contract:$0.00
4. Self-performed work = Line 3/Line 1 x 100 =ERROR:#DIV/0!
*personnel costs include labors, mechanics, other tradesmen, and office personnel directly
charged to the project (includes project manager, job superintendent, administrative,
estimators, etc.)

File details come from the government source that posted it. Updated .