S02 - 815IC3040 Bid Set Dwgs LINC Bk01.pdf
PDF 16 MB Posted
- Attached to
- Y1QA--815IC3040 - Facility Renovations - Long Island NC 36C786-20-B-0029 is Replacing 36C786-20-B-0011
- Solicitation number
- 36C78620B0029
About this file
This federal contract opportunity solicitation is seeking proposals for facility renovations at Long Island National Cemetery in North Carolina. Solicitation number 36C78620B0029 replaces a previous solicitation 36C786-20-B-0011 due to an inability to meet the rule of two for a total SDVOSB set-aside. The opportunity is now open to all small businesses. The Department of Veterans Affairs National Cemetery Administration is the contracting agency. Proposals were due by the date listed on the Federal Business Opportunities website where this solicitation was posted. The work involves renovations to existing facilities, as indicated by reference to bid set drawings in an attached PDF file.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
FARMINGDALE, NEW YORK
JUNE 8, 2020 DCW BJS Dwg. of 70
Office of Design and Construction
Service
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
LONG ISLAND NATIONAL CEMETERY
FACILITY RENOVATION,
IMPROVEMENTS, AND REPAIRS
815IC3040FINAL CONSTRUCTION
DOCUMENTSLEO A DALY
(612) 338-8741
ECS MID-ATLANTIC, LLC
(847) 279-0366
O'CONNOR CONSTRUCTION
MANAGEMENT, INC.
(202) 299-0530
GORDON - The LA Group Joint Venture, LLC
The LA Group
40 Long Alley
Saratoga Springs, NY 12866
(518) 587-8100
GORDON
148 S. Queen Street, Suite 201
Martinsburg, WV 25401
(304) 725-8456
FINAL CONSTRUCTION DOCUMENTS SUBMISSION
COVER SHEET
GI001
FACILITY RENOVATION, IMPROVEMENTS, AND REPAIRS
PROJECT NUMBER: 815IC3040
FINAL CONSTRUCTION DOCUMENTS
DEPARTMENT OF
VETERANS AFFAIRS
FARMINGDALE, NEW YORK
LONG ISLAND NATIONAL CEMETERY
GORDON - The LA Group Joint Venture, LLC
The LA Group
40 Long Alley
Saratoga Springs, NY 12866
(518) 587-8100
GORDON
148 S. Queen Street, Suite 201
Martinsburg, WV 25401
(304) 725-8456
P L A N N I N G A R C H I T E C T U R E E N G I N E E R I N G I N T E R I O R S
EST. 1915
1200 NINETEENTH STREET
SUITE 220
PH. 202-861-4600
WASHINGTON, DC 20036
LEO A DALY.
WWW.LEOADALY.COM
DRAWING INDEX
NO. DRAWING DRAWING TITLE
1. GI-001 COVER SHEET
CIVIL
2. GI-002 GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS
3. VL100 OVERALL EXISTING CONDITIONS PLAN
4. VL101 EXISTING CONDITIONS PLAN
5. VL102 EXISTING CONDITIONS PLAN
6. GI100 OVERALL SITE DEVELOPMENT PLAN
7. GI200 CONSTRUCTION SEQUENCING PLAN
8. GC101 EROSION AND SEDIMENT CONTROL PLAN
9. GC102 EROSION AND SEDIMENT CONTROL PLAN
10. GC501 EROSION AND SEDIMENT CONTROL NOTES & DETAILS
11. CD101 SITE DEMOLITION PLAN
12. CD102 SITE DEMOLITION PLAN
13. CS101 SITE LAYOUT, UTILITY, AND GRADING PLAN
14. CS102 SITE LAYOUT, UTILITY, AND GRADING PLAN
15. DT500 SITE DETAILS
ARCHITECTURE
16. AD101 DEMOLITION PLAN - ADMINISTRATION BUILDING
17. AD102 MAINTENANCE BUILDING - DEMOLITION PLAN
18. AE001 ADMINISTRATION BUILDING - LIFE SAFETY PLAN
19. AE002 MAINTENANCE BUILDING - LIFE SAFETY PLAN
20. AE003 TOOL STORAGE BUILDINGS - LIFE SAFETY PLAN
21. AE100 GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS
22. AE101 FLOOR PLANS - ADMINISTRATION BUILDING
23. AE102 MAINTENANCE BUILDING - FLOOR PLAN
24. AE103 MATERIAL STORAGE BUILDING - PLAN, SECTION, ELEVATION
25. AE104 MATERIAL STORAGE - SECTION, ELEVATION, AND DETAIL
26. AE105 TOOL STORAGE BUILDING - PLAN, SECTION, AND ELEVATION
27. AE201 ELEVATIONS - ADMINISTRATION BUILDING
28. AE202 MAINTENANCE BUILDING - EXTERIOR ELEVATION
29. AE301 REFLECTED CEILING PLAN - ADMINISTRATION BUILDING
30. AE302 MAINTENANCE BUILDING - REFLECTED CEILING PLAN
31. AE303 MATERIAL AND TOOL STORAGE BUILDINGS - REFLECTED CEILING PLANS
32. AE310 MAINTENANCE BUILDING - WALL SECTIONS AND DETAILS
33. AE311 MATERIAL STORAGE BUILDING - WALL SECTION DETAILS
34. AE401 INTERIOR ELEVATIONS AND DETAILS
35. AE410 MAINTENANCE BUILDING - INTERIOR ELEVATIONS AND DETAILS
36. AE600 PARTITION TYPES
37. AE610 DOOR AND WINDOW SCHEDULE
INTERIOR DESIGN
38. IN101 FINISH PLAN - ADMINISTRATION PLAN
39. IN102 MAINTENANCE BUILDING - FINISH PLAN AND SCHEDULE
40. IF101 FURNITURE PLAN - ADMINISTRATION BUILDING
41. IF102 MAINTENANCE BUILDING - FURNITURE PLAN
42. IX102 MAINTENANCE BUILDING - SIGNAGE PLAN
ELECTRICAL
43. E-001 ELECTRICAL SYMBOL LEGEND
44. E-101 ELECTRICAL FLOOR PLANS LEVEL 1 ADMIN
45. E-102 ELECTRICAL FLOOR PLANS - MAINTENANCE BUILDING
46. E-103 ELECTRICAL FLOOR PLANS - MATERIALS AND TOOL STORAGE
47. E-601 ELECTRICAL SCHEDULES, DETAILS, AND ONE-LINE DIAGRAMS
48. E-602 ELECTRICAL PANEL SCHEDULES AND ONE-LINE DIAGRAMS - ADMIN BUILDING
49. E-603 ELECTRICAL PANEL SCHEDULES
MECHANICAL
50. M-001 MECHANICAL SYMBOLS AND ABBREVIATIONS
51. M-101 HVAC FLOOR PLANS - ADMINISTRATION BUILDING
52. M-102 HVAC FLOOR PLANS - MAINTENANCE BUILDING
53. M-103 HVAC FLOOR PLANS - MATERIAL STORAGE BUILDING
54. M-302 HVAC SECTIONS AND LARGE SCALE PLANS - MAINTENANCE BUILDING
55. M-501 HVAC DETAILS
56. M-601 MECHANICAL CONTROLS - ADMINISTRATION BUILDING
57. M-602 MECHANICAL CONTROLS - MAINTENANCE BUILDING
58. M-603 MECHANICAL CONTROLS - MAINTENANCE AND MATERIAL STORAGE BUILDING
59. M-701 MECHANICAL SCHEDULES
PLUMBING
60. P-001 PLUMBING SYMBOLS AND ABBREVIATIONS
61. P-101 PLUMBING FLOOR PLANS - ADMINISTRATION BUILDING
62. P-102 PLUMBING FLOOR PLANS - MAINTENANCE BUILDING
63. P-103 PLUMBING FLOOR PLAN - MATERIAL STORAGE BUILDING
64. P-501 PLUMBING LARGE SCALE PLAN, RISER DIAGRAMS AND SCHEDULES AND DETAILS
STRUCTURAL
65. S-001 STRUCTURAL GENERAL NOTES
66. SB101 TOOL STORAGE FOUNDATION AND FRAMING PLAN
67. SB102 MATERIAL STORAGE FOUNDATION AND FRAMING PLAN
68. SB103 EXISTING MAINTENANCE BUILDING FLOOR AND CEILING LEVEL RENOVATIONS
69. SB501 FOUNDATION DETAILS
70. SF501 FRAMING DETAILS
145 LAKE DRIVE
SUITE 102
PH. 412-206-1470
WEXFORD, PENNSYLVANIA 15090
ECS MID-ATLANTIC, LLC
FAX: 412-927-1273
WWW.ECSLIMITED.COM
6110 EXECUTIVE BOULEVARD
SUITE 440
PH. 202-299-0530
ROCKVILLE, MD 20852
OCMI, INC.
WWW.OCMI.COM
Project Title
Location
Issue Date Checked Drawn
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
FARMINGDALE, NEW YORK
JUNE 8, 2020 DCW BJS Dwg. of 70
Office of Design and Construction
Service
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
LONG ISLAND NATIONAL CEMETERY
FACILITY RENOVATION,
IMPROVEMENTS, AND REPAIRS
815IC3040FINAL CONSTRUCTION
DOCUMENTSLEO A DALY
(612) 338-8741
ECS MID-ATLANTIC, LLC
(847) 279-0366
O'CONNOR CONSTRUCTION
MANAGEMENT, INC.
(202) 299-0530
GORDON - The LA Group Joint Venture, LLC
The LA Group
40 Long Alley
Saratoga Springs, NY 12866
(518) 587-8100
GORDON
148 S. Queen Street, Suite 201
Martinsburg, WV 25401
(304) 725-8456
FINAL CONSTRUCTION DOCUMENTS SUBMISSION
GENERAL NOTES, SYMBOLS, AND
ABBREVIATIONS
GI002
REVERSE CURBTRANSCURB
FAR FLOOR AREA RATIO
FC FACE OF CURB
FD FOUNTAIN DRAIN
FF FIRST FLOOR OR FINISHED FLOOR
FG FINISHED GRADE
FH FIRE HYDRANT
FIN FINISHED
FLR FLOOR
FN FENCE
FP FLOOD PLAIN
FOC FACE OF CURB
FOY FOYER
FP FLAG POLE OR FIRE PROTECTION
FPS FEET PER SECOND
FR FROM
FT FEET
FWS FLOWER WATERING STATION
G GAS
GAL GALLON
GDR GUARD RAIL
GEN GENERATOR
GFA GROSS FLOOR AREA
GIP GALVANIZED IRON PIPE
GL GROUND LEVEL
GOVT GOVERNMENT
GR GRADE
GR GUARD RAIL
GS GROUND SHOT
H HORIZONTAL
HC HANDICAP
HCP HANDICAPPED
HDPE HIGH DENSITY POLYETHYLENE
HDR HEADER
HDWL HEADWALL
HGL HYDRAULIC GRADE LINE
HH HAND HOLE
HP HIGH POINT OR HIGH PRESSURE
HR HAND RAIL
HT HEIGHT
HW HOT WATER
HWSR HOT WATER SUPPLY & RETURN
HWY HIGHWAY
HYD HYDRANT
HYDR HYDRAULIC
I RAINFALL INTENSITY
ID INSIDE DIAMETER
IGC IN-GROUND CREMAINS
IN INCH
INV INVERT
IP IRON PIPE
IPF IRON PIPE FOUND
IPS IRON PIPE SET
IRR IRRIGATION
IW IRRIGATION WATER
JB JUNCTION BOX
K ONE THOUSAND (KILO)
KWY KEYWAY
L LENGTH
LAT LATERAL
LF LINEAR FEET
LOC LOCATION
LONG LONGITUDE
LOS LINE OF SIGHT
LP LOW POINT OR LOW PRESSURE
LT LIGHT OR LEFT
LL LOWER LEVEL
MAINT MAINTENANCE
MAT MATERIAL
MAX MAXIMUM
MB MAIL BOX
MECH MECHANICAL
MED MEDIUM
MEMO MEMORANDUM
MEP MECHANICAL, ELECTRICAL, PLUMBING
MFG MANUFACTURING
MGT MANAGEMENT
MH MANHOLE
MI MILE
MIN MINIMUM
MISC MISCELLANEOUS
ML MATERIALS LIST
MN MAGNETIC NORTH
MOD MODEL OR MODIFY
MON MONUMENT
MS MEDIAN STRIP
MSL MEAN SEA LEVEL
MTG MEETING
MTL MATERIAL
MULT MULTIPLE
MUNIC MUNICIPAL
N NORTH
N/F NOW OR FORMERLY
NA NOT APPLICABLE
NAT NATURAL
NATL NATIONAL
NBC NATIONAL BUILDING CODE
NBL NORTH BOUND LANE
NCA NATIONAL CEMETERY ADMINISTRATION
NE NOT EXCEEDING
NFA NET FLOOR AREA
NFV NOT FIELD VERIFIED
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NRCP NON-REINFORCED CONCRETE PIPE
NTP NOTICE TO PROCEED
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OH OVERHANG
OHC OVERHEAD COMMUNICATIONS
OHE OVERHEAD ELECTRIC
OS OVER-SIZED
OZ OUNCE
P PERIMETER
PAR PARALLEL
PAT PATTERN
PB PULL BOX
PC POINT OF CURVATURE
PCA PORTLAND CEMENT ASSOCIATION
PCC POINT OF COMPOUND CURVE
PCEP POINT OF CURVE, EDGE OF PAVEMENT
PCT PERCENT
PCTC POINT OF CURVE, TOP OF CURB
PERF PERFORATED
PED PEDESTAL
PG PAGE
PGL POINT OF GRADE LINE
PH PROFILE HOLE
PI POINT OF INTERSECTION
A AREA OR ARC
AC ACRE
ADA AMERICANS WITH DISABILITIES ACT
AGE ABOVE GROUND ELECTRIC
AGEC ABOVE GROUND ELECTRIC CONDUIT
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
APPROX APPROXIMATE
ARCH ARCHITECTURAL
ASPH ASPHALT
AVE AVENUE
AWWA AMERICAN WATER WORKS ASSOCIATION
A/C AIR CONDITIONING
BC BOTTOM OF CURB
BF BASEMENT FLOOR
BFP BACKFLOW PREVENTER
BFV BUTTERFLY VALVE
BITUM BITUMINOUS
BL BASE LINE
BLDG BUILDING
BLVD BOULEVARD
BM BENCHMARK
BOE BOTTOM OF EXCAVATION
BOV BLOW OFF VALVE
BRG BEARING
BRL BUILDING RESTRICTION LINE
BV BALL VALVE
BW BOTTOM OF WALL
C COEFFICIENT OF RUNOFF
CALC CALCULATE
CB CATCH BASIN OR CHORD BEARING
CC CENTER TO CENTER
CCTV CLOSED CIRCUIT TELEVISION
CD CONSTRUCTION DOCUMENTS OR CONTRACT DOCUMENTS
CDW CHILLED DRINKING WATER
CDWR CHILLED DRINKING WATER RETURN
CDWS CHILLED DRINKING WATER SUPPLY
CEM CEMENT OR CEMETERY
CF CONTRACTOR FURNISHED
CFS CUBIC FEET PER SECOND
CG CURB AND GUTTER
CHD CHORD
CIP CAST IRON PIPE
CJ CONTRACTION JOINT
CL CENTERLINE
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CND CONDUIT
CNR CORNER
CO CLEANOUT
COL COLUMN
COMM COMMUNICATIONS
CONC CONCRETE
COND CONDITION OR CONDENSER
CONF CONFERENCE
CONN CONNECTION
CON CONTAMINATED
CONSTR CONSTRUCTION
CONT CONTINUATION
CONTR CONTRACT OR CONTRACTOR
COR CONTRACTING OFFICER'S REPRESENTATIVE
COTG CLEANOUT TO GRADE
COV COVER OR CUT OFF VALVE
CPP CORRUGATED PLASTIC PIPE
CRN CROWN
CSB CONCRETE SPLASH BLOCK
CSI CONSTRUCTION SPECIFICATIONS INSTITUTE
CSS COMMITTAL SERVICE SHELTER
CSP CONCRETE SEWER PIPE
CT COURT
CTR CENTER OR CONTOUR
CTRL CONTROL
CTS COOLING TOWER SUPPLY
CTV CABLE TELEVISION
CV CONTROL VALVE
CW CLOCKWISE
CWP COLD WATER PIPING
D DEPTH
DAT DATUM
DB DEED BOOK OR DESIGN-BUILD
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DEPT DEPARTMENT
DEP DEPRESSED
DESC DESCRIPTION
DET DETAIL
DI DROP INLET
DIA DIAMETER
DIFF DIFFERENCE
DIP DUCTILE IRON PIPE
DIST DISTANCE
DM DROP MANHOLE
DOC DOCUMENT
DOM DOMESTIC
DR DRIVE
DRE DECOMPOSED ROCK ELEVATION
DS DOWNSPOUT
DWG DRAWING
D/W DRIVEWAY
D DELTA
EA EACH
EBL EAST BOUND LANE
EC EDGE OF CONCRETE
EG EDGE OF GUTTER
EJ EXPANSION JOINT
ELEV ELEVATION
ELEC ELECTRICAL
ENTR ENTRANCE
EOI END OF INFORMATION
EP EDGE OF PAVEMENT
EPA ENVIRONMENTAL PROTECTION AGENCY
ES END SECTION
ESMT EASEMENT
ETO EARLY TURNOVER
EPT EXTERNAL PIPE THREAD
EQ EQUAL
EW END WALL
EXP EXPANSION
EX EXISTING
EXT EXTERIOR
E&S EROSION AND SEDIMENT CONTROL
PIV POST INDICATOR VALVE
PL PROPERTY LINE
POTW POTABLE WATER
PP POLYPROPYLENE (PLASTIC)
PPC PRE-PLACED CRYPT
PR PROPOSED
PRC POINT OF REVERSE CURVE
PRELIM PRELIMINARY
PROP PROPOSED
PSI POUNDS PER SQUARE INCH
PSL PIPE SLEEVE
PT POINT OF TANGENCY
PV PRIVATE VAULT
PVC POLY VINYL CHLORIDE (PLASTIC PIPE)
PVI POINT OF VERTICAL INTERSECTION
PVMT PAVEMENT
PVT POINT OF VERTICAL TANGENCY
P&P PLAN AND PROFILE
Q FLOW, AMOUNT OF RUNOFF
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
QUAL QUALITY
R RISER, RADIUS
RAD RADIANS
RCP REINFORCED CONCRETE PIPE
RD ROAD, ROOF DRAIN
RDC REDUCER
RE RESIDENT ENGINEER
RE/COR RESIDENT ENGINEER / CONTRACTING OFFICER REPRESENTATIVE
REP REPAIR
REQ REQUIRED
REV REVISION
RGP ROUGH GRADING PLAN
RPA RESOURCE PROTECTION AREA
RR RAILROAD
RTE ROUTE
RT RIGHT
RV RELIEF VALVE
RW RETAINING WALL
R/W RIGHT-OF-WAY
SAN SANITARY
SB SPLASH BLOCK
SBL SOUTH BOUND LANE
SCHED SCHEDULE
SD STORM DRAIN
SDMH STORM DRAIN MANHOLE
SEC SECTION
SEG SEGMENT
SEL SELECT
SEW SEWER
SF SQUARE FEET
SJ SCORED JOINT
SLV SLEEVE
SMH STEAM MANHOLE
SOV SHUT OFF VALVE
SP SITE PLAN
SPEC SPECIFICATION
SPKLR SPRINKLER
SQ SQUARE
SS SANITARY SEWER, STORM SEWER OR STEAM SUPPLY
ST STREET
STA STATION
STD STANDARD
STE STEAM
STK STACK
STM STORM
SUPT SUPPORT
SURV SURVEY
SVC SERVICE
S/W SIDEWALK
SWG SEWAGE
Sx CROSS SLOPE
SYM SYMBOL
T TANGENT
T&M TIME AND MATERIALS
TB TEST BORE
TBRL TO BE REPLACED
TC TOP OF CURB
TCP TERRA COTTA PIPE, TRAFFIC CONTROL PLAN
TELE TELEPHONE
TH TEST HOLE
TNL TUNNEL
TOB TOP OF BANK
TOC TOP OF CURB
TOP TOP OF PAVEMENT
TOPO TOPOGRAPHY
TP TEST PIT, TELEPHONE POLE
TW TOP OF WALL
TYP TYPICAL
UD UNDERDRAIN
U/G UNDERGROUND
UGC UNDERGROUND COMMUNICATIONS
UGE UNDERGROUND ELECTRIC
UFC UNIFORM FIRE CODE
UL UPPER LEVEL
UON UNLESS OTHERWISE NOTED
UP UTILITY POLE
UTIL UTILITY
V VERTICAL
VA VETERANS ADMINISTRATION, VIRGINIA
VAR VARIES
VC VERTICAL CURVE
VCP VITRIFIED CLAY PIPE
VEL VELOCITY
VERT VERTICAL
VF VERTICAL FOOT
VIC VICINITY
VID VIDEO
VIF VERIFY IN FIELD
VOL VOLUME
W WATER, WEST OR WIDE
W/ WITH
W/O WITHOUT
WBL WEST BOUND LANE
WI WROUGHT IRON
WL WATER LINE
WM WATER MAIN OR WATER METER
WO WORK ORDER
WSE WATER SURFACE ELEVATION
WT WATER TIGHT
WW WASTE WATER
X-ING CROSSING
YI YARD INLET
YR YEAR
Z SIDE SLOPES
CIVIL LEGEND ABBREVIATIONS
EXISTING
BOUNDARY/RIGHT-OF-WAY LINE
ADJACENT BOUNDARY LINE
EASEMENT LINE
ROAD CENTERLINE
HEADER CURB
CURB & GUTTER
EDGE OF PAVEMENT
CHAIN LINK FENCE
OVERHEAD UTILITY LINE
UNDERGROUND UTILITY LINE
WATER MAIN
BUILDINGS
CONCRETE SIDEWALK
SANITARY SEWER MAIN
STORM SEWER LINE
TREES/SHRUBS
LIMITS OF GRADING
INDEX CONTOUR LINE
INTERMEDIATE CONTOUR LINE
SPOT ELEVATIONS
MISCELLANEOUS SIGNS
SITE LIGHT WITH POLE
DRIP LINE OF TREES
ORNAMENTAL FENCE
SOIL PROFILE BOUNDARY
WIRE FENCE
EDGE OF GRAVEL
GUARDRAIL
EDGE OF CONCRETE
SANITARY SEWER CLEANOUT
SANITARY SEWER MANHOLE
STORM SEWER MANHOLE
STORM SEWER YARD INLET
STORM SEWER CATCH BASIN
STORM SEWER RIP-RAP
STORM SEWER END SECTION
FIRE HYDRANT
WATER VALVE
WATER METER
FLAG POLE
UTILITY POLE
FEATURE WALL
OVERHEAD COMMUNICATIONS LINE
UNDERGROUND COMMUNICATIONS LINE
GROUND LIGHT
UTILITY POLE GUY WIRE
SANITARY SEWER FORCE MAIN
LIMITS OF WORK
UNDERGROUND GAS LINE
HEADSTONE FACE DIRECTION
BURIAL CRYPT PLOTS
DRIP LINE OF BRUSH
WETLANDS
GRAVESITE GRID MONUMENT
BURIAL SECTION MARKER
UTILITY BOX/PULL BOX
BOLLARD
MOUNTABLE CURB
STORM DRAINAGE CLEANOUT
DETAIL LABEL
SOIL PROFILE SYMBOL
PARKING COUNT
TEST-PIT
JERSEY BARRIER
GENERAL NOTES:
1. THE PROPOSED SITE IMPROVEMENTS FOR 'LONG ISLAND NATIONAL CEMETERY, FACILITY RENOVATION, IMPROVEMENTS, AND REPAIRS' INCLUDES, BUT
IS NOT LIMITED TO, GRADING OF THE EXISTING SOILS SPOILS AREA, CONSTRUCTION OF A PAVED DRIVE WITH WASH AREAS, CONSTRUCTION OF VALLEY GUTTER TO PROVIDE POSITIVE DRAINAGE, REMOVAL OF EXISTING STORAGE CONTAINERS, VARIOUS BUILDING RENOVATIONS, NEW STORAGE BUILDINGS, AND FENCING/SCREENING UPGRADES AND REPAIRS. THE PROJECT IS LOCATED IN FARMINGDALE, NEW YORK.
2. THE TOPOGRAPHIC CONTOUR INTERVAL IS ONE (1) FOOT. TOPOGRAPHIC INFORMATION IS BASED ON FIELD RUN TOPOGRAPHY BY RLT ENGINEERING, GEOLOGY, AND LAND SURVEYING, P.C. DATED SEPTEMBER 17, 2019. THE HORIZONTAL DATUM IS REFERENCED TO ARBITRARY PLANE COORDINATE SYSTEM WITH A MERIDIAN CONSISTENT WITH THE PROPERTY AS DEPICTED ON "EQUIPMENT BUILDING EXISTING CONDITION PLAN" DWG #B1.1, NATIONAL CEMETERY ADMINISTRATION OFFICE OF DESIGN AND CONSTRUCTION DATED AUGUST 4, 2014. THE VERTICAL DATUM IS REFERENCED TO ARBITRARY VERTICAL DATUM AS DEPICTED ON "EQUIPMENT BUILDING EXISTING CONDITION PLAN" DWG #B1.1, NATIONAL CEMETERY ADMINISTRATION
OFFICE OF DESIGN AND CONSTRUCTION DATED AUGUST 4, 2014.
3. THE SUBJECT PROPERTY IS LOCATED ON F.E.M.A. MAP 36103C0620H DATED SEPTEMBER 25, 2009. NO PORTIONS OF THE PROJECT AREA ARE LOCATED
WITHIN THE 100-YEAR FLOODPLAIN AREA (ZONE X).
4. SEE THIS SHEET FOR LEGEND OF SYMBOLS USED HEREIN.
5. BURIAL CEREMONIES MAY BE SCHEDULED THROUGHOUT THE COURSE OF THIS PROJECT. DURING ALL CEREMONIES, ALL WORK MUST STOP, ESPECIALLY WHEN HEAVY EQUIPMENT ACTIVITY OR NOISE PRODUCING WORK IS BEING DONE. LIGHT WORK ACTIVITY CAN CONTINUE IF IT DOES NOT CREATE NOISE OR DISTRACTIONS TO THE CEREMONY. COORDINATE DAILY ACTIVITIES WITH THE CEMETERY DIRECTOR OR HIS APPROVED
REPRESENTATIVE TO ACCOMMODATE SCHEDULED BURIALS.
6. DUE TO THE SENSITIVE NATURE OF THE CEMETERY SITE, CONTRACTOR SHALL MAINTAIN EACH WORK AREA IN A CLEAN AND ORDERLY APPEARANCE.
TRASH AND WASTE MATERIALS SHALL BE STORED IN APPROVED CONTAINERS AND ROUTINELY DISPOSED OF OFF-SITE. CLEANUP SHALL BE REQUIRED
AT THE END OF EACH DAY AND/OR MORE FREQUENTLY AS REQUIRED.
7. AFFECT OF WORK ON PUBLIC ACCESS SHALL BE MINIMIZED AND SHALL BE COORDINATED WITH THE CEMETERY DIRECTOR. ANY ALTERED PUBLIC TRAFFIC ROUTES SHALL BE WELL DEFINED WITH PROFESSIONALLY MADE SIGNAGE AND/OR OTHER APPROVED CONVENTIONAL METHODS.
CONTRACTOR SHALL PROVIDE TWO SIGNS SIMILAR TO THE CEMETERY'S "PARDON OUR APPEARANCE" SIGNS. SIZE TO BE A MINIMUM OF 4'X5' HIGH MOUNTED ON TWO 4"X4" POSTS, PLACED IN A LOCATION AS DETERMINED BY THE CEMETERY DIRECTOR. TEXT SIZE SHALL BE MAXIMUM SIZE PROPORTIONAL TO WIDTH/HEIGHT OF SIGN. TEXT WILL BE PROVIDED BY CEMETERY DIRECTOR.
8. THERE SHALL BE AT ALL TIMES WHEN WORK IS BEING DONE, A COMPETENT PERSON WHO IS APPRISED OF THE CONDITION AND PROGRESS OF ALL AREAS OF WORK ON SITE. THIS PERSON SHALL BE ABLE TO SPEAK FOR AND ACT IN THE BEHALF OF THE CONTRACTOR. THEY SHALL BE AWARE AND KNOWLEDGEABLE OF ALL THE SAFETY CONCERNS ON THE JOB SITE. THEY SHALL BE EMPOWERED TO IMMEDIATELY AND EFFECTIVELY MITIGATE THE
ACTIONS OF ANY WORKMAN ON SITE.
CONSTRUCTION NOTES:
1. THE CONTRACTING OFFICER REPRESENTATIVE AND CONTRACTOR ARE RESPONSIBLE FOR REVIEWING THE PLANS PRIOR TO CONSTRUCTION AND
NOTIFYING THE U.S. DEPARTMENT OF VETERANS AFFAIRS OF ANY CIRCUMSTANCES FOUND WITHIN THESE PLANS IN NEED OF VERIFICATION SO THAT
APPROPRIATE REVISIONS CAN BE MADE, IF WARRANTED.
2. DEVELOPMENT OF THE SITE INCLUDING CONSTRUCTION AND MATERIALS SHALL BE IN CONFORMANCE WITH THE U.S. DEPARTMENT OF VETERANS AFFAIRS REQUIREMENTS AND LOCAL/STATE CONSTRUCTION STANDARDS AND SPECIFICATIONS, WHERE APPLICABLE.
3. EROSION AND SEDIMENT CONTROL DEVICES ARE TO BE IN PLACE PRIOR TO ANY CONSTRUCTION. REFER TO EROSION AND SEDIMENT CONTROL PLAN
FOR PHASING AND DETAILS.
4. ALL LAND ON OR OFF-SITE WHICH IS DISTURBED BY CONSTRUCTION AND WHICH IS NOT BUILT UPON OR SURFACED SHALL BE ADEQUATELY STABILIZED
TO CONTROL EROSION AND SEDIMENTATION.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE U.S. DEPARTMENT OF VETERANS AFFAIRS OF ANY CHANGES OR CONDITIONS
ATTACHED TO PERMITS REQUIRED FOR CONSTRUCTION.
6. THE CONTRACTOR SHALL PROVIDE ADEQUATE MEANS OF CLEANING TRUCKS AND/OR EQUIPMENT OF MUD AND DEBRIS, PRIOR TO ENTERING PAVED AREAS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CLEAN STREETS OF MUD AND/OR LAYING DUST AND TO TAKE ALL APPROPRIATE MEASURES NECESSARY TO ENSURE THAT STREETS ARE KEPT IN A CLEAN AND DUST FREE CONDITION AT ALL TIMES.
7. THE CONTRACTOR SHALL VISIT THE SITE AND SHALL VERIFY EXISTING CONDITIONS PRIOR TO STARTING CONSTRUCTION ACTIVITIES.
8. THE CONTRACTOR SHALL CLEAR THE SITE OF ALL TREES, BUILDINGS, FOUNDATIONS, ETC. WITHIN THE LIMITS OF CONSTRUCTION AND SHALL BE RESPONSIBLE FOR COORDINATING ANY DISCONNECTION AND/OR ABANDONMENT OF EXISTING UTILITIES AND STRUCTURES. IF NECESSARY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND ABANDONING ALL EXISTING WELLS AND/OR SEPTIC DRAIN FIELDS AND COORDINATING
THEIR ABANDONMENT WITH THE HEALTH DEPARTMENT.
9. CONTRACTOR SHALL CONTACT NEW YORK 811 AT 1-800-272-4480 OR BY DIALING 811 ON A NEW YORK PHONE LINE OR NEWYORK-811.COM A MINIMUM OF TWO (2) FULL BUSINESS DAYS PRIOR TO ANY EXCAVATION WITHIN AREAS SERVED BY UNDERGROUND UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING THE PRESENCE OF ANY UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION.
10. GORDON DOES NOT CERTIFY TO THE LOCATION OF OR THE EXISTENCE OF ANY EXISTING UNDERGROUND UTILITIES. ANY UNDERGROUND UTILITIES SHOWN HEREON ARE BASED UPON AVAILABLE RECORDS AND DISCUSSION WITH THE OWNER. THIS DOES NOT CONSTITUTE A GUARANTEE OF THEIR ACTUAL LOCATIONS OR THAT THEY HAVE ALL BEEN SHOWN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DIGGING OF TEST HOLES PRIOR TO BEGINNING ANY CONSTRUCTION. THESE TEST HOLES WILL BE MADE TO VERIFY ALL CROSSINGS BETWEEN NEW AND EXISTING FACILITIES AND AT CRITICAL GRADE CHANGES. IF CONDITIONS ARE FOUND IN THE FIELD, WHICH ARE MATERIALLY DIFFERENT FROM THE PLANS, THE CONTRACTOR SHALL NOTIFY GORDON SO THAT APPROPRIATE REVISIONS IF WARRANTED CAN BE MADE TO THE PLANS AT THE GOVERNMENT'S EXPENSE.
11. GORDON DOES NOT CERTIFY TO THE SUB-SURFACE CONDITIONS OF THE SITE, THE LOCATION OF UNDERLYING ROCK, OR THE LOCATION OF POTENTIAL SINKHOLES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DIGGING OF TEST HOLES TO VERIFY SUB-SURFACE CONDITIONS PRIOR TO BEGINNING ANY CONSTRUCTION. IF SINKHOLES ARE FOUND IN THE FIELD, REMEDIATION WILL BE REQUIRED AS SPECIFIED BY A QUALIFIED
GEOTECHNICAL ENGINEERING FIRM.
12. ALL TESTS, STUDIES, ETC., REQUIRED DURING CONSTRUCTION WILL BE CARRIED OUT BY A THIRD PARTY ENGINEERING FIRM AND PAID FOR BY THE
CONTRACTOR.
13. ALL PROPOSED ELEVATIONS AS SHOWN HEREIN ARE FINISHED GRADE UNLESS OTHERWISE NOTED.
14. MAINTAIN A MINIMUM VERTICAL CLEARANCE OF ONE (1) FOOT SIX (6) INCHES BETWEEN CROSSING OF ALL UTILITY LINES UNLESS OTHERWISE NOTED.
15. EARTHWORK SHALL BE COMPACTED IN ACCORDANCE WITH SPECIFICATION 31 20 00.
16. THE CONTRACTING OFFICER REPRESENTATIVE, CONTRACTOR, AND/OR SURVEYOR SHALL BE RESPONSIBLE FOR NOTIFYING THE U.S. DEPARTMENT OF VETERANS AFFAIRS OF ANY CONDITIONS FOUND IN THE FIELD PRIOR TO STAKEOUT THAT VARY FROM THE APPROVED PLANS OR THAT MAKE CONSTRUCTABILITY IMPOSSIBLE SO THAT APPROPRIATE REVISIONS CAN BE MADE PRIOR TO STAKEOUT AND/OR CONSTRUCTION. ANY OBSERVATIONS REGARDING APPARENT INCONSISTENCIES IN THE PLANS SHALL BE BROUGHT TO THE U.S. DEPARTMENT OF VETERANS AFFAIRS ATTENTION FOR
VERIFICATION PRIOR TO STAKEOUT.
17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INITIATING, MAINTAINING AND SUPERVISING ALL SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE PERFORMANCE OF ITS WORK AND THE WORK OF ITS SUBCONTRACTORS. GORDON SHALL NOT HAVE CONTROL OVER, CHARGE OF, OR RESPONSIBILITY FOR THE CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES OR FOR SAFETY PRECAUTIONS AND
PROGRAMS IN CONNECTION WITH THE WORK.
NORTH ARROW
DEMOLISHED
EXISTING
PROPOSEDEXISTING
TO REMAIN
B-1
B-2
B-3
B-4
B-5
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
FARMINGDALE, NEW YORK
JUNE 8, 2020 DCW BJS Dwg. of 70
Office of Design and Construction
Service
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
LONG ISLAND NATIONAL CEMETERY
FACILITY RENOVATION,
IMPROVEMENTS, AND REPAIRS
815IC3040FINAL CONSTRUCTION
DOCUMENTSLEO A DALY
(612) 338-8741
ECS MID-ATLANTIC, LLC
(847) 279-0366
O'CONNOR CONSTRUCTION
MANAGEMENT, INC.
(202) 299-0530
GORDON - The LA Group Joint Venture, LLC
The LA Group
40 Long Alley
Saratoga Springs, NY 12866
(518) 587-8100
GORDON
148 S. Queen Street, Suite 201
Martinsburg, WV 25401
(304) 725-8456
FINAL CONSTRUCTION DOCUMENTS SUBMISSION
OVERALL EXISTING CONDITIONS
PLAN
VL100
B-#
FULL DEPTH BORING FOR
BUILDINGS/STRUCTURES
NOTE: REFER TO THE EARTH MOVING SPECIFICATIONS
FOR THE GEOTECHNICAL REPORT AND BORING LOGS.
MAINTENANCE YARD
SEE DRAWINGS GC101, CD101, CS101,
AND ARCHITECTURAL DRAWINGS
SPOILS STORAGE AREA
SEE DRAWINGS GC102, CD102, AND CS102
ADMINISTRATION
BUILDING RENOVATION
SEE ARCHITECTURAL DRAWINGS
G
D
D
D
D
D
W
W W
W W
EX. 3/4" SCH 80 PVC WATERLINE
(SHOWN PER PLANS ENTITLED, "LONG
ISLAND NATIONAL CEMETERY,
ADMINISTRATION / PUBLIC RESTROOM
RENOVATIONS AND NEW EQUIPMENT
STORAGE BUILDING," PREPARED BY M-T-R,
DATED 8/6/14, VA PROJECT #815CM3038)
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
FARMINGDALE, NEW YORK
JUNE 8, 2020 DCW BJS Dwg. of 70
Office of Design and Construction
Service
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
LONG ISLAND NATIONAL CEMETERY
FACILITY RENOVATION,
IMPROVEMENTS, AND REPAIRS
815IC3040FINAL CONSTRUCTION
DOCUMENTSLEO A DALY
(612) 338-8741
ECS MID-ATLANTIC, LLC
(847) 279-0366
O'CONNOR CONSTRUCTION
MANAGEMENT, INC.
(202) 299-0530
GORDON - The LA Group Joint Venture, LLC
The LA Group
40 Long Alley
Saratoga Springs, NY 12866
(518) 587-8100
GORDON
148 S. Queen Street, Suite 201
Martinsburg, WV 25401
(304) 725-8456
FINAL CONSTRUCTION DOCUMENTS SUBMISSION
EXISTING CONDITIONS PLAN
VL101
KEY MAP
NOT TO SCALE
GC101
CD101
CS101
GC102
CD102
CS102
MH
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
EX. WATERLINE
(NOT FIELD VERIFIED, CONTRACTOR TO
VERIFY SIZE, TYPE, AND LOCATION AS
NEEDED TO MAKE NEW CONNECTIONS)
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
FARMINGDALE, NEW YORK
JUNE 8, 2020 DCW BJS Dwg. of 70
Office of Design and Construction
Service
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
LONG ISLAND NATIONAL CEMETERY
FACILITY RENOVATION,
IMPROVEMENTS, AND REPAIRS
815IC3040FINAL CONSTRUCTION
DOCUMENTSLEO A DALY
(612) 338-8741
ECS MID-ATLANTIC, LLC
(847) 279-0366
O'CONNOR CONSTRUCTION
MANAGEMENT, INC.
(202) 299-0530
GORDON - The LA Group Joint Venture, LLC
The LA Group
40 Long Alley
Saratoga Springs, NY 12866
(518) 587-8100
GORDON
148 S. Queen Street, Suite 201
Martinsburg, WV 25401
(304) 725-8456
FINAL CONSTRUCTION DOCUMENTS SUBMISSION
EXISTING CONDITIONS PLAN
VL102
KEY MAP
NOT TO SCALE
GC101
CD101
CS101
GC102
CD102
CS102
Project Title
Location
Issue Date Checked Drawn
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
FARMINGDALE, NEW YORK
JUNE 8, 2020 DCW BJS Dwg. of 70
Office of Design and Construction
Service
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
LONG ISLAND NATIONAL CEMETERY
FACILITY RENOVATION,
IMPROVEMENTS, AND REPAIRS
815IC3040FINAL CONSTRUCTION
DOCUMENTSLEO A DALY
(612) 338-8741
ECS MID-ATLANTIC, LLC
(847) 279-0366
O'CONNOR CONSTRUCTION
MANAGEMENT, INC.
(202) 299-0530
GORDON - The LA Group Joint Venture, LLC
The LA Group
40 Long Alley
Saratoga Springs, NY 12866
(518) 587-8100
GORDON
148 S. Queen Street, Suite 201
Martinsburg, WV 25401
(304) 725-8456
FINAL CONSTRUCTION DOCUMENTS SUBMISSION
OVERALL SITE DEVELOPMENT PLAN
GI100
MAINTENANCE YARD
SEE DRAWINGS GC101, CD101, CS101,
AND ARCHITECTURAL DRAWINGS
SPOILS STORAGE AREA
SEE DRAWINGS GC102, CD102, AND CS102
ADMINISTRATION
BUILDING RENOVATION
SEE ARCHITECTURAL DRAWINGS
C
A
B
PRIMARY CONSTRUCTION ACCESS
FOR ADMINISTRATION BUILDING RENOVATIONS ONLY
PRIMARY CONSTRUCTION ACCESS
FOR MAINTENANCE YARD IMPROVEMENTS ONLY
PRIMARY CONSTRUCTION ACCESS
FOR SPOILS STORAGE AREA IMPROVEMENTS ONLY
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
FARMINGDALE, NEW YORK
JUNE 8, 2020 DCW BJS Dwg. of 70
Office of Design and Construction
Service
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
LONG ISLAND NATIONAL CEMETERY
FACILITY RENOVATION,
IMPROVEMENTS, AND REPAIRS
815IC3040FINAL CONSTRUCTION
DOCUMENTSLEO A DALY
(612) 338-8741
ECS MID-ATLANTIC, LLC
(847) 279-0366
O'CONNOR CONSTRUCTION
MANAGEMENT, INC.
(202) 299-0530
GORDON - The LA Group Joint Venture, LLC
The LA Group
40 Long Alley
Saratoga Springs, NY 12866
(518) 587-8100
GORDON
148 S. Queen Street, Suite 201
Martinsburg, WV 25401
(304) 725-8456
FINAL CONSTRUCTION DOCUMENTS SUBMISSION
CONSTRUCTION SEQUENCING PLAN
GI200
A
B
C
LIMITS OF WORK
CONTRACTOR PRIMARY
CONSTRUCTION ACCESS
GRAPHIC LEGEND:
MAINTENANCE YARD
IMPROVEMENTS
SPOILS STORAGE AREA
IMPROVEMENTS
ADMINISTRATION BUILDING
RENOVATION
SEQUENCE OF CONSTRUCTION:
1. PREPARE AND SUBMIT A DETAILED CONSTRUCTION SEQUENCING PLAN, PROJECT
SCHEDULE, TRAFFIC CONTROL PLAN, NETWORK ANALYSIS SYSTEM IN
ACCORDANCE WITH SPECIFICATION 01 32 17 TO THE RESIDENT
ENGINEER/CONTRACTING OFFICER REPRESENTATIVE (RE/COR).
2. CONFIRM ALL APPLICABLE LOCAL, STATE AND REGULATIVE AGENCY PERMITS ARE
ACQUIRED PRIOR TO CONSTRUCTION AND THE CONDITIONS OF ALL APPLICABLE
PERMITS ARE COMPLIED WITH THROUGHOUT CONSTRUCTION.
3. INSTALL TEMPORARY CONSTRUCTION FENCING AND TEMPORARY SIGNAGE (IF
APPLICABLE).
4. COMPLETE INSTALLATION OF EROSION AND SEDIMENT CONTROLS FOR THE WORK
AREAS WHERE WORK WILL BE PERFORMED. INSTALL IMMEDIATELY PRIOR TO THE
START OF THE WORK IN ACCORDANCE WITH THE APPROVED EROSION AND
SEDIMENT CONTROL PLAN.
5. MAINTENANCE BUILDING RENOVATIONS AND MAINTENANCE YARD IMPROVEMENTS
TO BE COMPLETED AND ACCEPTED BY THE VA PRIOR TO THE INITIATION OF
ADMINISTRATION BUILDING RENOVATIONS.
6. COMPLETE WORK IN EACH AREA AS FOLLOWS (LIST IS NOT INTENDED TO BE ALL
INCLUSIVE):
AREA A CONSISTS OF THE FOLLOWING WITHIN THE MAINTENANCE YARD:
1. REMOVAL OF EXISTING STORAGE CONTAINERS BY CONTRACTORS.
2. INSTALLATION OF NEW VALLEY GUTTER TO ENSURE POSITIVE DRAINAGE.
3. EXPANSION OF EXISTING ASPHALT PAVED PARKING AREA.
4. INSTALLATION OF A CONCRETE WASH PAD.
5. REMOVAL OF EXISTING EXTERIOR OUTLETS AND INSTALLATION OF NEW EXTERIOR
ELECTRIC OUTLETS FOR HEAVY EQUIPMENT BLOCK HEATERS AND ASSOCIATED
UNDERGROUND ELECTRIC LINES NECESSARY TO PROVIDE SERVICE TO THE
OUTLETS.
6. REMOVAL OF EXISTING PAVEMENT NECESSARY FOR THE INSTALLATION OF THE
NEW TOOL STORAGE BUILDING AND THE NEW MATERIAL STORAGE BUILDING.
7. REMOVAL OF EXISTING WOODEN PATIO AND CONCRETE RAMP AND REPLACE WITH
A CONCRETE PATIO AND RAMP.
8. EXISTING FENCE SLAT REMOVAL AND ASSOCIATED BLOCK SLAT REPLACEMENT.
9. REMOVE AND REPLACE EXISTING CHAIN LINK FENCE AND GATES.
10. TOOL STORAGE BUILDING AND MATERIAL STORAGE BUILDING CONSTRUCTION.
11. MAINTENANCE BUILDING RENOVATIONS. REFER TO ARCHITECTURAL DRAWINGS.
AREA B CONSISTS OF THE FOLLOWING WITHIN THE SOILS STORAGE AREA:
1. REGRADING OF SPOILS STORAGE AREA.
2. INSTALLATION OF NEW ASPHALT DRIVE THROUGH THE SOILS STORAGE WITH
ASSOCIATED TURN AROUND AREA.
3. EXISTING DRAINAGE REHABILITATION WITHIN RECESSED STORAGE AREA TO
ELIMINATE EXISTING PONDING ISSUE.
4. INSTALLATION OF A NEW SLIDING CHAINLINK GATE AT THE RECESSED STORAGE
AREA.
5. INSTALLATION OF NEW HYDRANTS AT NEW DRIVE ENTRY AND EXITS INTO SOIL
STORAGE AREA FOR VEHICLE WASH AREAS ALONG WITH ASSOCIATED WATER
SERVICE INFRASTRUCTURE.
6. REMOVAL OF PORTION OF EXISTING CHAINLINK FENCE AND INSTALLATION OF NEW
CHAINLINK FENCE WITH BLOCK SLATS.
AREA C CONSISTS OF THE FOLLOWING AT THE ADMINISTRATION BUILDING:
1. ADMINISTRATION BUILDING RENOVATIONS. REFER TO ARCHITECTURAL
DRAWINGS.
GENERAL SEQUENCING REQUIREMENTS:
BEFORE ANY GENERAL CONSTRUCTION ACTIVITIES MAY COMMENCE, THE CONTRACTOR SHALL:
1. RETAIN A PRIVATE UNDERGROUND LOCATOR SERVICE AT THEIR COST AND HAVE THEM PERFORM THE TRACING AND MARKING OF ALL THE EXISTING ONSITE BELOW GRADE IMPROVEMENTS WITHIN OR
ADJOINING THE CONTRACTOR WORK AREAS FOR THE PROJECT, WALK THE CONSTRUCTION AREAS
WITH THE RE/COR AND, IF REQUESTED BY THE RE/COR, ADJUST THE LOCATIONS OF THE NEW WORK AS REQUIRED TO AVOID CONFLICTS, DAMAGE, OR UNINTENDED INTERRUPTIONS OF THE SERVICES BEING PROVIDED BY THE UNDERGROUND FACILITIES. CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL
PAINT MARKINGS UPON COMPLETION OF WORK.
2. OBSERVE AND DOCUMENT THE FUNCTIONALITY OF THE IRRIGATION SYSTEM IN THE VICINITY OF THE
CONSTRUCTION AREA. DAMAGED OR NONFUNCTIONAL IRRIGATION SYSTEM EQUIPMENT NOT
IDENTIFIED AS BEING DAMAGED OR NON-FUNCTIONAL DURING THE PRE-CONSTRUCTION SURVEY SHALL BE FULLY REPAIRED AND MADE FUNCTIONAL IMMEDIATELY UPON DETECTION OF ANY DAMAGE, AT NO
ADDED COST TO THE OWNER.
3. COMPLETE ANY AND ALL OTHER CONTRACTUAL REQUIREMENTS AS IDENTIFIED ELSEWHERE IN THE
CONSTRUCTION DOCUMENTS
4. CONTROL TRUCK AND EQUIPMENT MOVEMENT SO THEY DO NOT TRANSIT BETWEEN ONGOING
SERVICES AT THE COMMITTAL SERVICE SHELTERS OR CHAPEL
5. CONTRACTOR'S PRIMARY STAGING AREA FOR OPERATION WILL BE ADJACENT TO THE CONSTRUCTION AREA THAT IS CURRENTLY ACTIVE AT ANY GIVEN TIME, WITHIN THE WORK AREA IDENTIFIED ON THE
CONTRACT DOCUMENTS.
6. THE CONTRACTOR MAY REQUEST LIMITED USE OF OPEN AREAS THROUGHOUT THE CEMETERY FOR SECONDARY STAGING. USE OF SUCH OPEN AREAS MUST APPROVED BY THE RE/COR AND MUST BE
DETERMINED TO BE OUT OF THE WAY OF DAILY OPERATIONS.
7. THE CONTRACTOR WILL BE RESPONSIBLE FOR ADEQUATE TRAFFIC CONTROL AND SIGNAGE TO SAFELY
REROUTE THE PUBLIC AND STAFF DURING DURING EXISTING CEMETERY ROAD CLOSURES.
8. ALL SIGNAGE AND TRAFFIC MARKINGS INCLUDING CONSTRUCTION SIGNAGE SHALL COMPLY WITH THE
NEW YORK MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES.
9. EXISTING FACILITIES DAMAGED BY CONTRACTOR DURING CONSTRUCTION OPERATIONS SHALL BE
REPLACED BY CONTRACTOR TO APPLICABLE AGENCY STANDARDS.
10. THE CONTRACTOR WILL BE RESPONSIBLE FOR GRADING ALL AREAS TO ENSURE POSITIVE DRAINAGE.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL AND LEGAL OFFSITE DISPOSAL OF ALL
WASTE MATERIAL GENERATED BY CONSTRUCTION.
12. THE CONTRACTOR MUST KEEP ALL EXISTING STREETS CLEAN AND CLEAR OF CONSTRUCTION RELATED
DEBRIS AND EQUIPMENT AT ALL TIMES
13. OFF - SITE TRACKING OF CONSTRUCTION SITE SEDIMENTS OR OTHER SUBSTANCES SHALL NOT BE ALLOWED. CONSTRUCTION SITE ENTRANCE/EXIT STABILIZATION MEASURES, ALONG WITH FREQUENT ADJACENT STREET SWEEPING OR CLEANING OF EQUIPMENT WASH RACK AREAS, SHALL BE EMPLOYED TO PREVENT OFF-SITE TRACKING AND TO CONTROL THE GENERATION OF FUGITIVE DUST. OFF - SITE
TRACKING CONTROLS WILL BE REQUIRED TO PROTECT ROADS AND FACILITIES WITH EXISTING
CEMETERY PROPERTY AS WELL AS EXTERIOR ROADS AND FACILITIES.
14. WHEREVER EXCAVATION FOR NEW UTILITY LINES CROSS EXISTING ROADS, AT LEAST ONE LANE MUST BE OPEN TO TRAFFIC AT ALL TIMES. FLAGGING PERSONNEL SHALL BE PROVIDED FOR SUCH INSTANCES OF ROAD WORK. WHERE EXISTING ROADS ARE BEING REMOVED, MODIFIED OR NEW ROADS ARE BEING
CONSTRUCTED, PROVIDE TEMPORARY ACCESS ROADS, FLAGGERS, AND /OR SIGNAGE TO SAFELY
MAINTAIN TRAFFIC FLOW AND VEHICULAR ACCESS TO AND FROM FUNCTIONING AREAS.
15. IN THE EVENT THAT ELECTRICAL POWER ON SITE WILL BE REQUIRED TO BE SHUT OFF FOR IMPROVEMENTS THE CONTRACTOR SHALL NOTIFY THE RE/COR AND CEMETERY DIRECTOR. SHUT OFF OF ELECTRICAL POWER MUST BE COORDINATED WITH AND APPROVED BY THE RE/COR AND CEMETERY DIRECTOR. THE CONTRACTOR MUST MAKE REASONABLE EFFORTS TO COMPLETE WORK AND LIMIT THE
TIME THAT THE CEMETERY GOES WITHOUT ELECTRICAL POWER.
16. THE CONTRACTOR WILL BE RESPONSIBLE FOR REMOVAL OF TEMPORARY FACILITIES REQUIRED BY THIS SEQUENCING PLAN AND BY THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL RESTORE ALL GRADES, LANDSCAPING, IRRIGATION, UTILITIES, SIDEWALK, CURB AND PAVEMENT ALTERED OR DAMAGED BY INSTALLATION OF USE OF TEMPORARY FACILITIES BACK TO THEIR PRE-CONSTRUCTION CONDITION OR TO THE PROPOSED CONDITION WHERE SPECIFIED BY THE CONTRACT DOCUMENTS.
MAINTENANCE OF TRAFFIC
1. PREPARE A CONSTRUCTION TRAFFIC CONTROL PLAN IN ACCORDANCE WITH PART 1.16 USE OF
ROADWAYS IN SPECIFICATION SECTION 01 00 02 GENERAL REQUIREMENTS (MINOR NCA PROJECTS).
2. TEMPORARY SIGNAGE IS REQUIRED THROUGHOUT THE PROJECT TO FACILITATE PUBLIC ACCESS TO THE
CEMETERY AND ADVANCE NOTIFICATION OF CONSTRUCTION ACTIVITIES.
3. CONTRACTOR SHALL USE THE PRIMARY CONSTRUCTION ACCESS IDENTIFIED IN THE CONSTRUCTION
DOCUMENTS UNLESS OTHERWISE AUTHORIZED IN ADVANCE BY THE RE/COR.
4. MAINTAIN ONE LANE OF TRAFFIC ON EXISTING CEMETERY ROADS OPEN TO THE PUBLIC AT ALL TIMES, UNLESS OTHERWISE AUTHORIZED BY THE RE/COR.
5. EXISTING ROADWAYS SHALL REMAIN CLEAN AND FREE OF DEBRIS. ALL DEBRIS SHALL BE REMOVED AS IT
OCCURS.
6. CONTRACTOR SHALL MAINTAIN CEMETERY ROADS USED DURING CONSTRUCTION ACTIVITIES THROUGH
REGULAR STREET SWEEPING.
7. CONTRACTOR SHALL ENSURE THE NOISE FROM TRUCK AND EQUIPMENT TRAFFIC DOES NOT INTERFERE
WITH FUNERAL SERVICES AT THE COMMITTAL SERVICE SHELTERS.
8. ROADWAY ACCESS TO THE ADMINISTRATION BUILDING AND MAINTENANCE YARD SHALL REMAIN OPEN AT ALL TIMES DURING CONSTRUCTION, INCLUDING PAVING OPERATIONS. ONE LANE CLOSURES AND THE
USE OF FLAGMEN IS ACCEPTABLE.
MATERIAL
STORAGE
BUILDING
FFE: 102.00
TOOL
STORAGE
BUILDING
FFE: 102.00
EX. 3/4" SCH 80 PVC WATERLINE
(SHOWN PER PLANS ENTITLED, "LONG
ISLAND NATIONAL CEMETERY,
ADMINISTRATION / PUBLIC RESTROOM
RENOVATIONS AND NEW EQUIPMENT
STORAGE BUILDING," PREPARED BY M-T-R,
DATED 8/6/14, VA PROJECT #815CM3038)
IP
SF
SF
SF
SF
SF
SF
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
FARMINGDALE, NEW YORK
JUNE 8, 2020 DCW BJS Dwg. of 70
Office of Design and Construction
Service
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
LONG ISLAND NATIONAL CEMETERY
FACILITY RENOVATION,
IMPROVEMENTS, AND REPAIRS
815IC3040FINAL CONSTRUCTION
DOCUMENTSLEO A DALY
(612) 338-8741
ECS MID-ATLANTIC, LLC
(847) 279-0366
O'CONNOR CONSTRUCTION
MANAGEMENT, INC.
(202) 299-0530
GORDON - The LA Group Joint Venture, LLC
The LA Group
40 Long Alley
Saratoga Springs, NY 12866
(518) 587-8100
GORDON
148 S. Queen Street, Suite 201
Martinsburg, WV 25401
(304) 725-8456
FINAL CONSTRUCTION DOCUMENTS SUBMISSION
EROSION AND SEDIMENT CONTROL
PLAN
GC101
KEY MAP
NOT TO SCALE
GC101
CD101
CS101
GC102
CD102
CS102
KEY NO. DESCRIPTION DETAIL/PG.
IP INLET PROTECTION
E&S KEY NOTE LEGEND:
STONE CONSTRUCTION ENTRANCE
INLET PROTECTION
STONE CHECK DAM
PERIMETER DIVERSION SWALE
REINFORCED SILT FENCE
E&S GRAPHIC LEGEND:
LIMITS OF CONSTRUCTION
SF REINFORCED SILT FENCE
EX. WATERLINE
(NOT FIELD VERIFIED, CONTRACTOR TO
VERIFY SIZE, TYPE, AND LOCATION AS
NEEDED TO MAKE NEW CONNECTIONS)
91 90
CE
IP
CD
CD
CD
CD
CD
DS
DS
DS
DS
DS
DS
SF
SF
SF
SF
SF
IP
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
FARMINGDALE, NEW YORK
JUNE 8, 2020 DCW BJS Dwg. of 70
Office of Design and Construction
Service
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
LONG ISLAND NATIONAL CEMETERY
FACILITY RENOVATION,
IMPROVEMENTS, AND REPAIRS
815IC3040FINAL CONSTRUCTION
DOCUMENTSLEO A DALY
(612) 338-8741
ECS MID-ATLANTIC, LLC
(847) 279-0366
O'CONNOR CONSTRUCTION
MANAGEMENT, INC.
(202) 299-0530
GORDON - The LA Group Joint Venture, LLC
The LA Group
40 Long Alley
Saratoga Springs, NY 12866
(518) 587-8100
GORDON
148 S. Queen Street, Suite 201
Martinsburg, WV 25401
(304) 725-8456
FINAL CONSTRUCTION DOCUMENTS SUBMISSION
EROSION AND SEDIMENT CONTROL
PLAN
GC102
KEY MAP
NOT TO SCALE
GC101
CD101
CS101
GC102
CD102
CS102
CE
KEY NO. DESCRIPTION DETAIL/PG.
STONE CONSTRUCTION ENTRANCE
WITH WASH RACK
IP INLET PROTECTION
CD STONE CHECK DAM
DS PERIMETER DIVERSION SWALE
SF REINFORCED SILT FENCE
E&S KEY NOTE LEGEND:
STONE CONSTRUCTION ENTRANCE
INLET PROTECTION
STONE CHECK DAM
PERIMETER DIVERSION SWALE
REINFORCED SILT FENCE
E&S GRAPHIC LEGEND:
LIMITS OF CONSTRUCTION
Project Title
Location
Issue Date Checked Drawn
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
FARMINGDALE, NEW YORK
JUNE 8, 2020 DCW BJS Dwg. of 70
Office of Design and Construction
Service
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
LONG ISLAND NATIONAL CEMETERY
FACILITY RENOVATION,
IMPROVEMENTS, AND REPAIRS
815IC3040FINAL CONSTRUCTION
DOCUMENTSLEO A DALY
(612) 338-8741
ECS MID-ATLANTIC, LLC
(847) 279-0366
O'CONNOR CONSTRUCTION
MANAGEMENT, INC.
(202) 299-0530
GORDON - The LA Group Joint Venture, LLC
The LA Group
40 Long Alley
Saratoga Springs, NY 12866
(518) 587-8100
GORDON
148 S. Queen Street, Suite 201
Martinsburg, WV 25401
(304) 725-8456
FINAL CONSTRUCTION DOCUMENTS SUBMISSION
EROSION AND SEDIMENT CONTROL
NOTES AND DETAILS
GC501
EROSION AND SEDIMENT CONTROL NOTES:
1. ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND FILLS SHALL
BE DONE IN ACCORDANCE WITH THE APPROVED E&S PLAN. A COPY OF THE APPROVED DRAWINGS
(STAMPED, SIGNED AND DATED BY THE REVIEWING AGENCY) MUST BE AVAILABLE AT THE PROJECT SITE
AT ALL TIMES. THE REVIEWING AGENCY SHALL BE NOTIFIED OF ANY CHANGES TO THE APPROVED PLAN
PRIOR TO IMPLEMENTATION OF THOSE CHANGES. THE REVIEWING AGENCY MAY REQUIRE A WRITTEN
SUBMITTAL OF THOSE CHANGES FOR REVIEW AND APPROVAL AT ITS DISCRETION.
2. AT LEAST 7 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING CLEARING AND
GRUBBING, THE RE/COR SHALL INVITE ALL CONTRACTORS, THE CEMETERY DIRECTOR, APPROPRIATE
MUNICIPAL OFFICIALS, THE E&S PLAN PREPARER, THE LICENSED PROFESSIONAL RESPONSIBLE FOR
OVERSIGHT OF CRITICAL STAGES OF IMPLEMENTATION OF THE E&S PLAN, AND A REPRESENTATIVE
FROM THE LOCAL CONSERVATION DISTRICT TO AN ON-SITE PRECONSTRUCTION MEETING.
3. AT LEAST 2 FULL BUSINESS DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR
EXPANDING INTO AN AREA PREVIOUSLY UNMARKED, NEW YORK 811 SHALL BE NOTIFIED AT
1-800-272-4480 FOR THE LOCATION OF EXISTING UNDERGROUND UTILITIES.
4. ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE
PROVIDED ON THE PLAN DRAWINGS. DEVIATION FROM THAT SEQUENCE MUST BE APPROVED IN
WRITING FROM THE GOVERNING AUTHORITY PRIOR TO IMPLEMENTATION.
5. PRIOR TO COMMENCING CLEARING AND GRADING, CONTRACTOR TO INSTALL PERIMETER EROSION
AND SEDIMENT CONTROLS.
6. AREAS TO BE FILLED ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO REMOVE TREES, VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL.
7. CLEARING, GRUBBING, AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS DESCRIBED IN
EACH STAGE OF THE CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, GRUBBING AND TOPSOIL
STRIPPING MAY NOT COMMENCE IN ANY STAGE OR PHASE OF THE PROJECT UNTIL THE E&S BMP'S
SPECIFIED BY THE BMP SEQUENCE FOR THAT STAGE OR PHASE HAVE BEEN INSTALLED AND ARE
FUNCTIONING AS DESCRIBED IN THIS E&S PLAN.
8. AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE LIMIT OF
WORK BOUNDARIES SHOWN ON THE PLAN MAPS. THESE AREAS MUST BE CLEARLY MARKED BEFORE
CLEARING AND GRUBBING OPERATIONS BEGIN.
9. TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED AT THE
LOCATION(S) SHOWN ON THE PLAN MAPS(S) IN THE AMOUNT NECESSARY TO COMPLETE THE FINISH
GRADING OF ALL EXPOSED AREAS THAT ARE TO BE STABILIZED BY VEGETATION. EACH STOCKPILE
SHALL BE PROTECTED IN THE MANNER SHOWN ON THE PLAN DRAWINGS. STOCKPILE HEIGHTS SHALL
NOT EXCEED 35 FEET. STOCKPILE SLOPES SHALL BE 2H:1V OR FLATTER.
10. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR
ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT
APPROPRIATE BEST MANAGEMENT PRACTICES TO MINIMIZE THE POTENTIAL FOR EROSION AND
SEDIMENT POLLUTION AND NOTIFY THE APPROPRIATE GOVERNING AUTHORITY.
11. ALL BUILDING MATERIALS AND WASTES SHALL BE REMOVED FROM THE SITE AND RECYCLED OR
DISPOSED OF IN ACCORDANCE WITH THE LOCAL/STATE REGULATIONS.
12. ALL OFF-SITE WASTE AND BORROW AREAS MUST HAVE AN E&S PLAN APPROVED BY THE APPROPRIATE
GOVERNING AUTHORITY FULLY IMPLEMENTED PRIOR TO BEING ACTIVATED.
13. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS CLEAN
FILL.
14. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMP'S SHALL BE MAINTAINED IN
ACCORDANCE WITH LOCAL AND STATE REGULATIONS. MAINTENANCE SHALL INCLUDE INSPECTIONS OF
ALL EROSION AND SEDIMENT BMP'S AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL
PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING, REMULCHING AND RENETTING MUST BE PERFORMED WITHIN 24 HOURS. IF
THE E&S BMP'S FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMP'S, OR MODIFICATIONS OF THOSE
INSTALLED WILL BE REQUIRED TO BE IMPLEMENTED WITHIN 48 HOURS.
15. A LOG SHOWING DATES THAT E&S BMP'S WERE INSPECTED AS WELL AS ANY DEFICIENCIES FOUND AND
THE DATE THEY WERE CORRECTED SHALL BE MAINTAINED ON THE SITE AND BE MADE AVAILABLE TO
REGULATORY AGENCY OFFICIALS AT THE TIME OF INSPECTION.
16. SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY OR SIDEWALK SHALL BE RETURNED TO THE
CONSTRUCTION SITE BY THE END OF EACH WORK DAY AND DISPOSED IN THE MANNER DESCRIBED IN
THIS PLAN. IN NO CASE SHALL THE SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE
DITCH, STORM SEWER, OR SURFACE WATER.
17. ALL SEDIMENT REMOVED FROM BMP'S SHALL BE DISPOSED OF IN THE MANNER DESCRIBED ON THE
PLAN DRAWINGS.
18. AREAS WHICH ARE TO BE TOPSOILED SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 3 TO 5 INCHES, 6
TO 12 INCHES ON COMPACTED SOILS, PRIOR TO PLACEMENT OF TOPSOIL. AREAS TO BE VEGETATED
SHALL HAVE A MINIMUM 4 INCHES OF TOPSOIL IN PLACE PRIOR TO SEEDING AND MULCHING. FILL
OUTSLOPES SHALL HAVE A MINIMUM OF 2 INCHES OF TOPSOIL.
19. ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE OR OTHER RELATED PROBLEMS. FILL INTENDED TO SUPPORT BUILDINGS, STRUCTURES
AND CONDUITS, ETC. SHALL BE COMPACTED IN ACCORDANCE WITH LOCAL REQUIREMENTS OR CODES.
20. ALL EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 9 INCHES IN
THICKNESS.
21. SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE HANDLED IN ACCORDANCE WITH
THE STANDARD AND SPECIFICATION FOR SUBSURFACE DRAIN OR OTHER APPROVED METHOD.
22. ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY UPON REACHING FINISHED
GRADE. CUT SLOPES IN COMPETENT BEDROCK AND ROCK FILLS NEED NOT BE VEGETATED. SEEDED
AREAS WITHIN 50 FEET OF A SURFACE WATER, OR AS OTHERWISE SHOWN ON THE PLAN DRAWINGS, SHALL BE BLANKETED ACCORDING TO THE STANDARDS OF THIS PLAN.
23. IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF THE
PROJECT, THE OPERATOR SHALL STABILIZE ALL DISTURBED AREAS. DURING NON-GERMINATING
MONTHS, MULCH OR PROTECTIVE BLANKETING SHALL BE APPLIED AS DESCRIBED IN THE PLAN. AREAS
NOT AT FINISHED GRADE, WHICH WILL BE REACTIVATED WITHIN 1 YEAR, MAY BE STABILIZED IN
ACCORDANCE WITH THE TEMPORARY STABILIZATION SPECIFICATIONS. THOSE AREAS WHICH WILL NOT
BE REACTIVATED WITHIN 1 YEAR SHALL BE STABILIZED IN ACCORDANCE WITH THE PERMANENT
STABILIZATION SPECIFICATIONS.
24. PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM, PERENNIAL 70% VEGETATIVE COVER
OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST
ACCELERATED EROSION. CUT AND FILL SLOPES SHALL BE CAPABLE OF RESISTING FAILURE DUE TO
SLUMPING, SLIDING, OR OTHER MOVEMENTS.
25. E&S BMP'S SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL AREAS TRIBUTARY TO THEM ARE
PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED BY ANOTHER BMP APPROVED BY THE
APPROPRIATE GOVERNING AUTHORITY.
26. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL
DISTURBED AREAS, THE RE/COR SHALL CONTACT THE LOCAL GOVERNING AUTHORITY FOR AN
INSPECTION PRIOR TO REMOVAL/CONVERSION OF THE E&S BMP'S.
27. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENT BMP'S
MUST BE REMOVED OR CONVERTED TO PERMANENT POST CONSTRUCTION STORMWATER
MANAGEMENT BMP'S. AREAS DISTURBED DURING REMOVAL OR CONVERSION OF THE BMP'S SHALL BE
STABILIZED IMMEDIATELY. IN ORDER TO ENSURE RAPID REVEGETATION OF DISTURBED AREAS, SUCH
REMOVAL/CONVERSIONS ARE TO BE DONE ONLY DURING THE GERMINATING SEASON.
28. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL
DISTURBED AREAS, THE RE/COR SHALL CONTACT THE LOCAL GOVERNING AUTHORITY TO SCHEDULE A
FINAL INSPECTION.
29. IN NO CASE SHALL CONCRETE WASHOUT BE ALLOWED TO ENTER ANY SURFACE WATERS OR
GROUNDWATER SYSTEMS.
30. THE SOIL EROSION WILL BE MAINTAINED WEEKLY AND AFTER EVERY STORM EVENTS BY THE
CONTRACTOR.
NOT TO SCALE
STONE CONSTRUCTION ENTRANCE
NOT TO SCALE
STONE CHECK DAM
NOT TO SCALE
REINFORCED SILT FENCE
NOT TO SCALE
PERIMETER DIVERSION SWALE
NOT TO SCALE
INLET PROTECTION
EX. 3/4" SCH 80 PVC WATERLINE
(SHOWN PER PLANS ENTITLED, "LONG
ISLAND NATIONAL CEMETERY,
ADMINISTRATION / PUBLIC RESTROOM
RENOVATIONS AND NEW EQUIPMENT
STORAGE BUILDING," PREPARED BY M-T-R,
DATED 8/6/14, VA PROJECT #815CM3038)
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
FARMINGDALE, NEW YORK
JUNE 8, 2020 DCW BJS Dwg. of 70
Office of Design and Construction
Service
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
LONG ISLAND NATIONAL CEMETERY
FACILITY RENOVATION,
IMPROVEMENTS, AND REPAIRS
815IC3040FINAL CONSTRUCTION
DOCUMENTSLEO A DALY
(612) 338-8741
ECS MID-ATLANTIC, LLC
(847) 279-0366
O'CONNOR CONSTRUCTION
MANAGEMENT, INC.
(202) 299-0530
GORDON - The LA Group Joint Venture, LLC
The LA Group
40 Long Alley
Saratoga Springs, NY 12866
(518) 587-8100
GORDON
148 S. Queen Street, Suite 201
Martinsburg, WV 25401
(304) 725-8456
FINAL CONSTRUCTION DOCUMENTS SUBMISSION
SITE DEMOLITION PLAN
CD101
KEY MAP
NOT TO SCALE
GC101
CD101
CS101
GC102
CD102
CS102
KEY NO. GRAPHIC DESCRIPTION
LIMITS OF CONSTRUCTION
EXISTING STORAGE CONTAINER
TO BE REMOVED AND DISPOSED
OFFSITE BY CONTRACTOR
SITE DEMOLITION LEGEND:
2 EXISTING FENCE TO REMAIN. REMOVE
EXISTING SLATS FROM FENCE
EX. CHAIN LINK FENCE, GATE, AND FOUNDATIONS,
TO BE REMOVED. INCLUDES EXCAVATION, CLEARING
AND GRUBBING AROUND FENCE LINE
EXISTING PATIO, CANOPY, CANOPY FOOTINGS,
PLANTERS, AND RAMP, INCLUDING SUB-BASE,
TO BE REMOVED
5 FOUR (4) EXISTING ELECTRIC
OUTLETS TO BE REMOVED
6 EXISTING PAVEMENT AND
SUBBASE TO BE REMOVED
7 EXISTING TREE TO BE RELOCATED
BY CEMETERY STAFF
8 EXISTING CURB TO BE
REMOVED
*ALL ITEMS TO BE DISPOSED OFFSITE BY CONTRACTOR UNLESS NOTED OTHERWISE.
VERIFY SIZE, TYPE, AND LOCATION AS
NEEDED TO MAKE NEW CONNECTIONS)
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
FARMINGDALE, NEW YORK
JUNE 8, 2020 DCW BJS Dwg. of 70
Office of Design and Construction
Service
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
LONG ISLAND NATIONAL CEMETERY
FACILITY RENOVATION,
IMPROVEMENTS, AND REPAIRS
815IC3040FINAL CONSTRUCTION
DOCUMENTSLEO A DALY
(612) 338-8741
ECS MID-ATLANTIC, LLC
(847) 279-0366
O'CONNOR CONSTRUCTION
MANAGEMENT, INC.
(202) 299-0530
GORDON - The LA Group Joint Venture, LLC
The LA Group
40 Long Alley
Saratoga Springs, NY 12866
(518) 587-8100
GORDON
148 S. Queen Street, Suite 201
Martinsburg, WV 25401
(304) 725-8456
FINAL CONSTRUCTION DOCUMENTS SUBMISSION
SITE DEMOLITION PLAN
CD102
KEY MAP
NOT TO SCALE
GC101
CD101
CS101
GC102
CD102
CS102
KEY NO. GRAPHIC DESCRIPTION
LIMITS OF CONSTRUCTION
SITE DEMOLITION LEGEND:
EX. CHAIN LINK FENCE, GATE, AND FOUNDATIONS,
TO BE REMOVED. INCLUDES EXCAVATION,
CLEARING AND GRUBBING AROUND FENCE LINE
2 REMOVE AND REPLACE EXISTING TRENCH
DRAIN INLET
EXISTING DRY WELL AND STORM SEWER PIPE
CONNECTION TO BE REMOVED UP TO THE
EXISTING TRENCH DRAIN
*ALL ITEMS TO BE DISPOSED OFFSITE BY CONTRACTOR UNLESS NOTED OTHERWISE.
4.5'-6" PVC
@2.0% MIN.
ADJUST EXISTING
STORM INLET TOP TO
FINAL GRADE
GS 100.2±
MATCH EX.
GS 100.2±
MATCH EX.
GS 100.3±
MATCH EX.
TOP 100.20
INV. 99.20
TOP 100.02
INV. OUT 97.52
ADJUSTED TOP 100.10
CONNECT TO EX. STR.
INV. IN 97.43
TOP 100.02
INV. 99.02
GS 100.1±
MATCH EX.
GS 100.1±
MATCH…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .