S02 - 8 Chase Riser and Pipe Size Details.pdf

PDF 146 KB Posted

Attached to
Z1DA--578-26-006 - Repair Steam and Condensate Risers Building 1 - Phase 2 (CON)
Solicitation number
36C25226B0012
Issued by

About this file

This document is a technical detail sheet and specification guide for a steam and condensate piping system upgrade at a Department of Veterans Affairs facility. The project (Project #: 578-22-007, issued 10/19/21) involves installing new steam risers, condensate risers, isolation valves, finned tube heating elements, traps, and related components across four floors of a building with connections to an attic and tunnel.

The specification includes detailed pipe sizing requirements for vertical and horizontal runs throughout the building. Steam pipes range from 3 inches (attic to 4th floor) down to 1 inch (3rd to 4th floor), while condensate pipes range from 3/4 inches to 1 1/4 inches depending on location. Key installation details specified include: 8" type 'X' gypsum board on 3-5/8" metal studs spaced maximum 16" on center for fire protection; 18"x18" access panels at all valve locations; threaded rod deck penetrations with maximum 2" diameter and pipe hangers; new pipe insulation; firestopped floor penetrations; and 3-5/8" deep deflection tracks at the top of all door frames that remain unfastened to the top track. The drawings illustrate section and plan details for ceiling/deck and wall penetrations, as well as schematic diagrams showing the bottom-fed and top-fed steam riser configurations with trap and isolation valve placements at each floor level.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Room# Description

Pipe

Size(inch es)

Steam pipe from Attic to 4th floor 3

Steam pipe from 4th floor to 3rd floor 3

Steam pipe from 3rd floor to 2nd floor 2

Steam pipe from 2nd floor to 1st floor 1

Condensate pipe from 4th floor to 3rd floor 3/4

Condensate pipe from 3rd floor t0 2nd floor 1

Condensate pipe from 2nd floor to 1st floor 1 1/4

Condensate pipe from 1st floor to tunnel 1 1/4

Steam pipe from tunnel to 1st floor 1 1/2

Steam pipe from 1st floor to 2nd floor 1 1/4

Steam pipe from 2nd floor to 3rd floor 1

Steam pipe from 3rd floor to 4th floor 1

Horizontal steam pipe from supply to riser in attic 3

Horizontal steam pipe from supply to riser in tunnel 2

Horizontal condensate pipe from riser to condensate in tunnel 2

8) Chase & Riser Details
Chase & Riser Detail R1
RISER DIAGRAM r1

9) Pipe Sizes