About this file

This document provides details for a federal solicitation notice seeking bids to upgrade domestic hot and cold water systems at a Department of Veterans Affairs medical center in San Diego, California. The solicitation will be issued as an Invitation for Bid conducted in accordance with FAR Part 14, seeking bids from Service-Disabled Veteran-Owned Small Businesses only. Interested vendors must be registered in SAM and verified by the VA Center for Veterans Enterprise by the bid submission deadline of August 1st, 2022. The work includes replacing domestic water piping and fixtures in Buildings 1, 2 and 11 and integrating a water treatment and monitoring system. Bidders must provide pricing for five specified water treatment system manufacturers. The contract will be a firm-fixed-price award with a performance period of approximately 450 calendar days from the notice to proceed.

View the file

Other files

File Type Posted
S07-ABSTRACT OF BID- 664-19-304 (1)-SIGNED DSG-POSTED 9-14-2022.pdf PDF
S06-SOLICITATION AMENDMENT_36C10F22B0001 A00006.pdf PDF
P07-WAGE DETERMINATION- UPDATED 08-05-22.pdf PDF
S06-Solicitation Amendment -A00005- 08-15-2022-COMBINED-DSG.pdf PDF
S06-SOLICITATION DOCUMENT _36C10F22B0001 A00004.pdf PDF
SOLICITATION-DESCRIPTION.pdf PDF
Technical Question Tracking Sheet - Domestic Water Upgrades.202200801_AV.pdf PDF
S07-ABSTRACT OF BID- SIGN IN SHEET- 664-19-304.pdf PDF
S06-asbestos survey.pdf PDF
S06_SOLICITATION DOCUMENT_36C10F22B0001 A00003.pdf PDF
S05-REQUEST FOR INFORMATION RESPONSE_Technical Question Tracking Sheet - Domestic Water Upgrades.20220722 (003).pdf PDF
S04-Virtual Meeting - Upgrade Domestic Hot and Cold water systems (1).pdf PDF
S05-REQUEST FOR INFORMATION RESPONSE_Technical Question Tracking Sheet - Domestic Water Upgrades.20220722.pdf PDF
S06-VASDHS Asbestos Operations and Mainteneance Plan (Edited Final Draft).docx DOCX document
Price Schedule - A00002-7-21-2022.pdf PDF
SDVA_TR_Coverage.pdf PDF
S06-SOLICITATION DOCUMENTS_36C10F22B0001_A00002.pdf PDF
RFI 002.AE.20220720.pdf PDF
S05-RFI 01 - SYGNOS INC-Response DG-7-11-2022.pdf PDF
S06-Solicitation Amendments_36C10F22B0001 A00001.pdf PDF
S04-SDVA Legionella-Pre Bid Presentation.pdf PDF
S02-664-19-304 San Diego VA LIDAR Download Links.pdf PDF
S04-SIGN-IN SHEET.pdf PDF
S04-PRE-BID SITE VISIT 664-19-304.pdf PDF
S02-UPDATED-664-19-304.SPECIFICATIONS_100CD.20220503-ADD01.20220706.pdf PDF
S04-SITE VISIT-Room Change.pdf PDF
Price Schedule .pdf PDF
S02_ SOLICITATION DOCUMENT_36C10F22B0001_ISSUED 6_24_2022.pdf PDF
S02-UPDATED-664-19-304.SPECIFICATIONS_100CD.20220503-REV01-052322 - Copy.pdf PDF
S02-664-19-304 Bldg 2 DWG 20200610 - Copy.pdf PDF
S02-664-19-304 Bldg 1 DWG 20200610 red - Copy.pdf PDF
36C10F22B0001_3.docx DOCX document
S05-REQUEST FOR INFORMATION FORM- 664-19-304.docx DOCX document
wage determination 6-24-2022.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Osler Ln

Gilman Dr

La Jolla Village Dr

S a n

D ie g o

F w y

V ill a L a

VICINITY MAP

B1

B11

J o lla

D r

Osler

Gilman Dr

La Jolla Village Dr

I-

V ill a

PROJECT LOCATION KEY PLAN

B1 B11

Ln D r

L a

Jo lla

Parking

S an

D ie g o

F w y

G ilm a n D r

M edica l

Cntr Dr

UCSD

3350 LA JOLLA VILLAGE DRIVE

B2

PROJECT REVIEW

DATE: APPROVED: DIRECTOR

DATE: APPROVED: ASSOCIATE DIRECTOR

DATE: APPROVED: ASSISTANT DIRECTOR

DATE: APPROVED: CHIEF OF STAFF

DATE:

APPROVED: CHIEF ENGINEERDATE:

APPROVED: ASSOCIATE DIRECTOR, PATIENT CARE SERVICES

DATE: APPROVED:

DATE: APPROVED:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

MECHANICAL:

(502) 481-8548(310) 357-7031

B

IM

/6

-1

-3

U p g ra d e D o m e s ti c H

C

W a te r

S y s te m s

/6

-1

-3

-B L

D G

-M E

P .r v t

/1

/2

:3

:2

P

M

11G-001

COVER & DRAWING INDEX

TRIPLE C The A/E Group

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

(562) 452-7175

Mat Perkins

P2S ENGINEERING, INC.

9665 Chesapeake Drive, Suite 230

San Diego, CA 92123

(619) 618-2347

Mikhail Fuks

Upgrade Domestic H&C Water

Systems

3350 La Jolla Village Dr, San Diego, CA 92161

664-19-304

06/10/2020 M. Perkins G. Chiurazzi

100% CONSTRUCTION

DOCUMENTS

SAN DIEGO VA HEALTH CARE SYSTEM

(SDVAHCS)

Upgrade Domestic H&C Water Systems

BUILDING 11

CLIENT:

VA San Diego Health Care System

3350 La Jolla Village Drive San Diego, CA 92161

100% Construction Documents - Issued for Construction

JUNE 10, 2020

VA PROJECT NO : 664-19-304

SCOPE OF WORK

SHEET INDEX

Sheet Number Sheet Name 35% SD 65% DD 100% CD

GENERAL

11G-001 COVER & DRAWING INDEX Yes Yes Yes

11G-010 PLUMBING GENERAL NOTES Yes Yes Yes

11G-011 GENERAL INFECTION CONTROL NOTES AND SYMBOLS Yes Yes Yes

PLUMBING

11P-001 PLUMBING LEGEND Yes Yes Yes

11PL100 PLUMBING BASEMENT FLOOR OVERALL PLAN Yes Yes Yes

11PL100A PLUMBING FIXTURE PLAN - BASEMENT - EAST Yes Yes Yes

11PL100B PLUMBING FIXTURE PLAN - BASEMENT - SOUTHWEST Yes Yes Yes

11PL100C PLUMBING FIXTURE PLAN - BASEMENT - NORTHWEST Yes Yes Yes

11PP100 DOMESTIC WATER PIPING PLAN - BSMT INTERSTITIAL - OVERALL Yes Yes Yes

11PP100A DOMESTIC WATER PIPING PLAN - BSMT INTERSTITIAL - EAST Yes Yes Yes

11PP100B DOMESTIC WATER PIPING PLAN - BSMT INTERSTITIAL - SOUTHWEST Yes Yes Yes

11PP100C DOMESTIC WATER PIPING PLAN - BSMT INTERSTITIAL - NORTHWEST Yes Yes Yes

11PL101 PLUMBING FIRST FLOOR OVERALL PLAN Yes Yes Yes

11PL101A PLUMBING FIXTURE PLAN - FIRST FLOOR - EAST Yes Yes Yes

11PL101B PLUMBING FIXTURE PLAN - FIRST FLOOR - SOUTHWEST Yes Yes Yes

11PL101C PLUMBING FIXTURE PLAN - FIRST FLOOR - NORTHWEST Yes Yes Yes

11PP101 DOMESTIC WATER PIPING PLAN - FIRST FLR INTERSTITIAL - OVERALL Yes Yes Yes

11PP101A DOMESTIC WATER PIPING PLAN - FIRST FLOOR INTERSTITIAL - EAST Yes Yes Yes

11PP101B DOMESTIC WATER PIPING PLAN - FIRST FLOOR INTERSTITIAL - SOUTHWEST Yes Yes Yes

11PP101C DOMESTIC WATER PIPING PLAN - FIRST FLOOR INTERSTITIAL - NORTHWEST Yes Yes Yes

11PL102 PLUMBING SECOND FLOOR OVERALL PLAN Yes Yes Yes

11PL102A PLUMBING FIXTURE PLAN - SECOND FLOOR - EAST Yes Yes Yes

11PL102B PLUMBING FIXTURE PLAN - SECOND FLOOR - SOUTHWEST Yes Yes Yes

11PL102C PLUMBING FIXTURE PLAN - SECOND FLOOR - NORTHWEST Yes Yes Yes

11P-501 PLUMBING DETAILS AND SCHEDULES Yes Yes Yes

11P-601 DOMESTIC WATER RISER DIAGRAM No No Yes

11P-701 PLUMBING SCHEDULES No No Yes

11P-702 PLUMBING SCHEDULES No No Yes

11P-801 PLUMBING AND MECHANICAL CONTROLS RISER DIAGRAM No No Yes

ELECTRICAL

11E-001 ELECTRICAL SYMBOL LEGEND AND ABBREVIATIONS No Yes Yes

11EP100A POWER PLAN - BASEMENT - EAST No Yes Yes

11EP100B POWER PLAN - BASEMENT - NORTHWEST No Yes Yes

11EP100C POWER PLAN - BASEMENT - SOUTHWEST No Yes Yes

11EP101A POWER PLAN - FIRST FLOOR - EAST No Yes Yes

11EP101B POWER PLAN - FIRST FLOOR - NORTHWEST No Yes Yes

11EP101C POWER PLAN - FIRST FLOOR - SOUTHWEST No Yes Yes

11EP102A POWER PLAN - SECOND FLOOR - EAST No Yes Yes

11EP102B POWER PLAN - SECOND FLOOR - NORTHWEST No Yes Yes

11EP102C POWER PLAN - SECOND FLOOR - SOUTHWEST No Yes Yes

11E-601 PARTIAL ONE LINE DIAGRAMS No Yes Yes

11E-701 ELECTRICAL SCHEDULES No Yes Yes

THIS PROJECT MUST BE “STAND ALONE”. THAT IS, THE PROJECT CANNOT DEPEND ON

ANOTHER PROJECT OR OTHER FUNDING SOURCE TO MAKE THE FINAL RESULT COMPLETE

AND USABLE.

The contractor shall completely prepare the site for building operations, and shall furnish all labor and materials, and perform all work, for the Legionella Domestic Water Prevention Project in Building 11 at the Veterans Administration Health Care System, San Diego CA, as required by the project drawings and specifications.

BASE BID Scope of Work shall include:

1. The installation of "zone" isolation valves on the domestic hot and cold water piping systems as shown on the project documents.

2. The removal and replacement of all existing DCW and DHW valves as indicated on these drawings.

3. The installation of eighteen (18) water quality monitoring stations in Buildings 11.

4. The installation of one (1) remote read temperature sensors and transmitters on the domestic hot water return systems.

5. Reconfiguration of the domestic hot water line on level 2 for optimized temperature efficiency.

6. The installation of new Thermostatic Mixing Valves (or recalibrating of existing) for all plumbing fixtures with hot water service for scald protection.

7. The disconnection and removal of unused or abandoned domestic water piping systems as indicated on the project plans. All removed branch lines shall be capped not more than 1.5 pipe diameters from active supply piping.

DEDUCTIVE ALTERNATE #1 - Unused or abandoned domestic water piping shall remain in place.

Triple C A&E Group, the A-E of record for the San Diego VA Healthcare System on Project 664-19-304, located in San Diego, California can certify that no Asbestos Containing Building Materials (ACBM) or Lead Based Products were designed/specified in the design.

_________________________ Signature 06/10/2020 Date

Author: Mat Perkins, AIA NCARB, PMP, LEED BD+C Triple C - The A&E Group

BASE BID - ALLOWANCE

The base bid shall include all work indicated by the drawings and specifications. The base bid shall also include a +20% plumbing fixture quantity, valve quantity and piping LF allowance to account for plumbing fixture removals not indicated on the drawings due to active hospital environment. (See Specification Section 01 00 00 - General Requirements)

Revisions: Date:

THIRD-PARTY INSPECTIONS: COMPREHENSIVE THIRD-PARTY INSPECTIONS, TESTING AND

WRITTEN REPORTS FOR ALL DIVISIONS (PAID BY THE GENERAL CONTRACTOR).

CONTRACTOR SHALL EMPLOY THIRD PARTY INSPECTION CONSULTANTS TO PERFORM ALL

INSPECTIONS REQUIRED BY THIS CONTRACT. THE VA HAS NO INSPECTION CAPABILITY. ANY

REFERENCE TO VA INSPECTIONS SHALL BE BY A THIRD-PARTY INSPECTOR QUALIFIED TO

PERFORM THE WORK. CREDENTIALS SHALL BE SUPPLIED TO THE VA/AE AS REQUIRED BY

THIS CONTRACT. ALL INSPECTIONS, TESTING, CERTIFICATIONS, AND PERMITS (SEE

SPECIFICATION 01 00 00 AND 01 91 00) ARE TO BE PAID FOR BY THE GENERAL CONTRACTOR.

THE VA WILL NOT PAY FOR OR PERFORM ANY REQUIRED INSPECTIONS. VA INSPECTIONS

ARE FOR VA USE ONLY, WHEN PERFORMED, AND DO NOT REDUCE THE INSPECTION BURDEN

ON THE CONTRACTOR.

PHASING SEQUENCE/PRIORITIES

1. BUILDING 11 - BASEMENT - NW

2. BUILDING 11 - BASEMENT - SW

3. BUILDING 11 - BASEMENT - E

4. BUILDING 11 - FIRST FLOOR - NW

5. BUILDING 11 - FIRST FLOOR - SW

6. BUILDING 11 - FIRST FLOOR - E

7. BUILDING 11 - SECOND FLOOR - NW

8. BUILDING 11 - SECOND FLOOR - SW

9. BUILDING 11 - SECOND FLOOR - E

CONTRACT LINE ITEM NUMBERS

This project shall be phased and bid by building level and to separate the work associated with the removal of dead legs. The contractor shall include the following CLIN when preparing bids:

CLIN #9 - Building 11/L0 SOW CLIN #10 - Building 11/L1 SOW CLIN #11 - Building 11/L2 SOW

(See Specification Section 01 00 00 - General Requirements)

PHASING PLAN

WORK SHALL BE PHASED BY FLOOR (L0-L2) AND THEN AREA (AS SHOWN ON

THE PHASING SEQUENCE). CONTRACTOR TO PROVIDE SCHEDULE FOR VA/AE

APPROVAL PRIOR TO STARTING ANY WORK THAT IDENTIFIES THE SEQUENCE

OF FLOOR/QUADRANT PHASES TO BE COMPLETED FOR THE PROJECT.

CONTRACTOR SHALL IDENTIFY LENGTH OF TIME FOR EACH PHASE AND

COORDINATE WORK TO COMPLY WITH ICRA REQUIREMENTS SHOWN ON

G-011. PHASING PLAN SHALL INCLUDE ALL ANTICIPATED SHUTDOWNS AND A

PLAN TO MINIMIZE DISRUPTION OF BUILDING SERVICES DURING NORMAL

HOURS OF OPERATION. FACILITY HOURS OF OPERATION ARE 7:00 AM TO 4:30

PM MONDAY THROUGH FRIDAY.

Expires 6.30.16Expires: 6/30/1821

6/1 0/2

1 HALF-TONED OR LIGHT LINES INDICATE EXISTING CONSTRUCTION TO REMAIN. DASHED BOLD LINES INDICATE EXTENT OF

DEMOLITION.

2. SEE COVER SHEET FOR PROJECT REQUIREMENTS AND ADDITIONAL INFORMATION.

3. THESE DRAWINGS HAVE BEEN PREPARED USING (AS-DESIGNED) DOCUMENTS PROVIDED BY THE OWNER. NEITHER THE OWNER OR THE ARCHITECT WARRANT THESE TO BE (AS-BUILT) DOCUMENTS AND ACTUAL CONDITIONS MAY VARY. THE DRAWINGS SUPPORT

THE INTENT OF THE PHASED REPLACEMENT OF THE MECHANICAL EQUIPMENT.

4. TEMPORARY BRACING OR SHORING OF THE EXISTING MASONRY WALL MAY BE NECESSARY, AND SHALL BE THE RESPONSIBILITY

OF THE CONTRACTOR.

6. CONTRACTOR SHALL COORDINATE DEMOLITION ACTIVITIES TO MEET APPROVAL OF CODE AGENCIES. COORDINATE DEMOLITION WORK WITH ALL DISCIPLINES. CONTRACTOR SHALL DISPOSE OF ALL ITEMS PER SPECIFICATIONS. THE CONTRACTING OFFICER REPRESENTATIVE (COR) RESERVES THE RIGHT TO SELECT SPECIFIC ITEMS FOR SALVAGE. THESE ITEMS SHALL BE IDENTIFIED

DURING THE PRE-CONSTRUCTION WALK THROUGH.

7. CONTRACTOR SHALL PATCH AND REPAIR ALL OPENINGS, VOIDS OR PENETRATIONS LEFT BY THE REMOVAL OF EXISTING CONSTRUCTION, EQUIPMENT, PIPING, DUCTS, ETC. TO MAINTAIN THE INTEGRITY OF THE WALL AND/OR ROOF. REMOVE ALL SUPPORTS THAT ARE NOT TO BE REUSED. PROTECT SURFACES AND EQUIPMENT DESIGNATED AS EXISTING TO REMAIN AND/OR UNDISTURBED. PREPARE PATCHED AREAS TO RECEIVE FINISHES WHERE FINISHES ARE REQUIRED.

8. THE ACCESSIBLE PARKING AREA AND PUBLIC RIGHT-OF-WAY OF THE PROJECT SITE WILL BE IMPACTED BY CONSTRUCTION ACTIVITIES. TEMPORARY BARRICADES PERTAINING TO THE CONTRACTOR'S ACTIVITIES SHALL BE INSTALLED TO PREVENT POSSIBLE INJURY IN AND AROUND DEMOLITION AND CONSTRUCTION AREAS IN ACCORDANCE WITH THE LATEST OSHA REQUIREMENTS.

COORDINATE CONTRACTOR STAGING AREA WITH TEMPORARY ACCESSIBLE PARKING AND PUBLIC ACCESS WITH CONTRACTING OFFICER REPRESENTATIVE (COR)PRIOR TO CONSTRUCTION. PROTECT PARKING SIGNAGE WITHIN PROJECT AREA.

9. CONTRACTOR SHALL SAWCUT NEW OPENINGS AND/OR PENETRATIONS. COORDINATE NEW MASONRY OPENINGS WITH THE MASONRY MODULAR. PATCH CAVITIES SMOOTH WHERE CUT PORTIONS OF EXISTING MASONRY WALLS REMAIN. SEE SPECIFICATIONS FOR CUTTING AND PATCHING AND DEMOLITION FOR RELATED DEMOLITION WORK.

10. SEE MECHANICAL DRAWINGS FOR WORK REQUIRED WITHIN OFFICE TOWERS. COORDINATE BUILDING'S SYSTEM SHUTDOWN

WITH CONTRACTING OFFICER REPRESENTATIVE (COR) AND TENANTS.

11. WHEREVER EXISTING EQUIPMENT, FIXTURES, PIPING, DUCTS, ETC. ARE REQUIRED TO BE REMOVED - SUCH REMOVAL SHALL INCLUDE ALL ANCHORS, HANGERS, BASE, SUPPORT, ETC. AFTER REMOVAL, FLOORS, WALLS AND CEILINGS SHALL BE PATCHED AND

MATCH ADJACENT SURFACES MATERIAL, TEXTURE AND COLOR.

1. ALTHOUGH SIGNIFICANT EFFORTS HAVE BEEN MADE TO COORDINATE DIMENSIONS, THERE MAY BE DISCREPANCIES AND/OR OMISSIONS. IF ENCOUNTERED, CONTACT THE CONTRACTING OFFICER REPRESENTATIVE (COR) FOR ADDITIONAL INFORMATION. IF THERE IS A DIMENSIONAL VARIANCE BETWEEN DISCIPLINES OR SIGNIFICANT OMISSION OR CONFLICT WITHIN A DISCIPLINE, CONTRACTING OFFICER REPRESENTATIVE (COR) PRIOR TO BID. IF DISCREPANCIES ARE DISCOVERED AFTER THE BID, CONTRACTOR SHALL CONFIRM DIMENSIONS WITH CONTRACTING OFFICER

REPRESENTATIVE (COR) PRIOR TO CONSTRUCTION OF THE AFFECTED AREA.

2. ACTUAL CONSTRUCTION CONDITIONS AND/OR MATERIAL AND EQUIPMENT SIZES MAY NOT BE THOSE ANTICIPATED BY THE DESIGNERS. THROUGH FIELD INVESTIGATION AND SHOP DRAWINGS CONTRACTOR SHALL VERIFY DIMENSIONS

AND RECOMMEND DIMENSIONAL MODIFICATIONS AS REQUIRED.

3. ARCHITECTURAL DIMENSIONS MAY BE FOUND ON FLOOR PLANS, EXPANDED PLANS, REFLECTED CEILING PLANS, SECTIONS, DETAILS, DOOR SCHEDULES, INTERIOR ELEVATIONS AND EXTERIOR ELEVATIONS.

4. ADDITIONAL DIMENSIONS MAY BE SHOWN ON STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS.

MECHANICAL AND ELECTRICAL EQUIPMENT SCHEDULES MAY ALSO CONTAIN DIMENSIONAL INFORMATION RELATED TO

EQUIPMENT SIZES AND CLEARANCES.

5. DESIGNATIONS ARE NOTED AS NOMINAL, NOT ACTUAL (2 X 4 STUD); DIMENSIONS ARE SHOWN AS ACTUAL, NOT NOMINAL (1 1/2" X 3 1/2" STUD). DIMENSIONS ARE NOT ROUNDED, BUT UN-ROUNDED DIMENSIONS SHOULD NOT BE VIEWED AS MAXIMUM CONSTRUCTION TOLERANCE. (FOR INSTANCE, MASONRY OPENING DIMENSIONS MAY BE SHOWN IN THE 16THS OF AN INCH, BUT STANDARD MASONRY CONSTRUCTION TOLERANCES MAY BE +/- 1/4").

FLOOR PLAN DIMENSIONS

1. THE LOWEST FLOOR OVERALL BUILDING DIMENSIONS ARE FROM THE OUTSIDE FACE OF THE FOUNDATION WALL TO THE OPPOSITE OUTSIDE FACE OF THE FOUNDATION WALL (OR, FROM OUTSIDE GRIDLINE TO OUTSIDE GRIDLINE) AS

SHOWN.

2. DIMENSIONS FOR NON-LOAD BEARING WALLS ARE TO ONE FACE OF THE STUDS, BOTH FACES OF MASONRY WALLS, OR BOTH FACES OF CONCRETE WALLS, ETC, UNLESS NOTED OTHERWISE.

3. WALL DIMENSIONS ARE ACTUAL, NOT NOMINAL (UNLESS NOTED AS "NOM").

4. DOOR OPENING DIMENSIONS IN FRAME CONSTRUCTION (WOOD OR STEEL STUDS) ARE TYPICALLY SHOWN AT THEIR CENTERLINES. HOWEVER, WHEN THE EDGE OF THE DOOR IS IMPORTANT, OR MAKES THE PLACEMENT CLEARER, THE

DIMENSION MAY BE TO THE ACTUAL FRAME EDGE.

5. DOOR DIMENSIONS IN LOAD-BEARING MASONRY AND CONCRETE WALLS ARE TO "ROUGH" OPENINGS (FACES OF MASONRY OR CONCRETE). TYPICAL DOOR ROUGH OPENING DIMENSIONS ARE THE FRAME WIDTH PLUS 1/2" (1/4"

CLEARANCE EACH SIDE) AND PLUS 1/2" TOTAL FOR THE HEAD/SILL DIMENSIONS.

6. "TYPICAL" DOOR FRAME CLEARANCE DIMENSIONS TO ADJACENT WALLS: BETWEEN FRAME FACES AND FACES OF STUDS, OR FACES OF MASONRY OR CONCRETE, AT NEARBY PERPENDICULAR WALLS ARE TYPICALLY 4", DEPENDING ON HARDWARE CLEARANCES AND FRAME REQUIREMENTS (2.5"-DOOR HANDLE PLUS 1" -WALL STOP PLUS 1/2" GB=4.0")

7. SOME DIMENSIONS REQUIRED TO BE CLEAR, SUCH AS AT REQUIRED EXIT WAYS, APPLIANCE COVES OR PREFABRICATED STAIR ENCLOSURES, ARE NOTE "CLR" AND ARE SHOWN TO THE FACES OF FINISHES.

8. DIMENSIONS DESIGNATED WITH "MIN" INDICATE THE MINIMUM CLEARANCE OR SEPARATION REQUIRED.

ROOF PLAN DIMENSIONS

1. UN-DIMENSIONED LOCATIONS OF ROOFTOP EQUIPMENT AND CONSTRUCTION OFTEN MAY BE DETERMINED BY THE FLOOR PLAN BELOW, SUCH AS ROOF HATCH DETERMINED BY REFERENCE TO A FIXED WALL AND LADDER, OR

MECHANICAL EQUIPMENT DETERMINED BY DUCT PENETRATIONS BETWEEN JOISTS.

2. UN-DIMENSIONED ITEMS SUCH AS EQUIPMENT RAILS, HVAC EQUIPMENT, SCREEN WALLS, ANTENNAS, WALK PADS, LADDERS, SCUPPER LOCATIONS, ETC. MAY BE LOCATED FROM MECHANICAL AND ELECTRICAL DRAWINGS OR LOCATED BY SCALING. CONFIRM ALL ROOF ITEM DIMENSIONS WITH THE CONTRACTING OFFICER REPRESENTATIVE

(COR) PRIOR TO CONSTRUCTION.

VERTICAL DIMENSIONS

1. UNLESS NOTED OTHERWISE, THE FIRST FLOOR REFERENCE ELEVATION IS 100'-0". THIS IS REFERENCED TO A GROUND ELEVATION (ABOVE MSI.) AS SHOWN IN CIVIL OR STRUCTURAL DRAWINGS. ELEVATIONS BELOW 0'-0" ARE "-"

(PREFIXED WITH A MINUS SIGN).

2. BUILDING, FLOOR AND ROOF HEIGHTS SHOWN ON ARCHITECTURAL DRAWINGS ARE TO TOP OF DECKING OR

SHEATING, BUT DO NOT INCLUDE FINISHES OR ROOFING MATERIAL.

3. WALL OPENINGS: DOOR AND LOUVER HEIGHTS ARE TO FINISH HEIGHTS (UNLESS THEY ARE IN LOAD-BEARING MASONRY OR CONCRETE WALLS, WHERE THEY ARE TO ROUGH OPENINGS). HEIGHT REFERENCES SHOULD BE TO THE

NEXT LOWER FINISH FLOOR ELEVATION

4. LIGHTING HEIGHTS ON WALLS ARE TO CENTERLINES OF THE ELECTRICAL BOXES, UNO. EQUIPMENT, VENT, PLUMBING AND FIXTURE ELEVATIONS ARE TO CENTERLINES OF THE WALL PENETRATIONS, UNO.

5. SOME VERTICAL DIMENSIONS ARE SHOWN ON PLANS FOR DEPRESSIONS, RIDGES, CURBS, AND ELEVATION CHANGES. A PLAN ELEVATION CHANGE SYMBOL LOOKS LIKE A STEP OR VERTICAL "Z" AND INDICATES THE + OR -

ELEVATION CHANGE IN INCHES FROM THE FFE NEXT TO IT.

FIRE LIFE SAFETY NOTES

1. IF ENCOUNTERED, FIRE RATED ASSEMBLIES, INCLUDING FIREPROOFING, DAMAGED DURING CONSTRUCTION MUST BE RESTORED TO THEIR ORIGINAL CONDITION.

2. FIRE RESISTIVE ASSEMBLIES, FIRE-RESISTIVE CONSTRUCTION, AND THE MEANS OF EGRESS MUST BE MAINTAINED AT ALL TIMES. WHEN IT IS NOT POSSIBLE TO MAINTAIN FIRE-RESISTIVE ASSEMBLIES, FIRE-RESISTIVE CONSTRUCTION AND/OR MEANS

OF EGRESS, TEMPORARY CONSTRUCTION BARRIERS AND/OR A FIRE WATCH MUST BE PROVIDED.

FIRE SAFETY DURING CONSTRUCTION, ALTERATIONS AND DEMOLITION

1. FIRE DEPARTMENT ACCESS ROADS SHALL BE ESTABLISHED AND MAINTAINED AT ALL TIMES PER LOCAL FIRE DEPARTMENT.

2. FIRE DEPARTMENT WATER MAINS AND FIRE HYDRANTS SHALL BE OPERATIONAL AT ALL TIMES AND SHALL BE IN ACCORDANCE WITH LOCAL FIRE DEPARTMENT.

3. FIRE EXTINGUISHERS SHALL BE PROVIDED FOR BUILDINGS UNDER CONSTRUCTION. THE NUMBER AND TYPE OF EXTINGUISHERS SHALL BE AS REQUIRED BY THE PLANS AND SPECIFICATIONS.

4. COMBUSTIBLE DEBRIS SHALL NOT ACCUMULATE WITHIN BUILDINGS.

5. CUTTING AND WELDING OPERATIONS SHALL BE IN ACCORDANCE WITH LOCAL FIRE CODES.

6. FIRE PROTECTION SYSTEMS SHALL BE MAINTAINED OPERATIONAL AT ALL TIMES PER LOCAL FIRE CODES.

7. REQUIRED MEANS OF EGRESS COMPONENTS SHALL BE MAINTAINED AT ALL TIMES. TEMPORARY EXITING SHALL BE APPROVED BY VA FIRE/SAFETY..

8. FIRE-RESISTIVE ASSEMBLIES AND CONSTRUCTION SHALL BE MAINTAINED.

9. PLASTIC FILM (VISQUEEN) WHEN USED FOR DUST PROTECTION, SHALL BE FLAME-RETARDANT.

10. SMOKE DETECTORS SHALL BE COVERED OR REMOVED DURING ALTERATIONS. WHEN REQUIRED BY THE STATE FIRE MARSHAL OR LOCAL FIRE DEPARTMENT, HEAT DETECTORS MAY BE SUBSTITUTED FOR SMOKE DETECTORS DURING ALTERATIONS.

11. ALL FIRE HYDRANTS, WATER SUPPLY TO FIRE HYDRANTS, AND FIRE DEPARTMENT VEHICLE ACCESS ROADWAYS SHALL BE INSTALLED, TESTED AND PLACED IN SERVICE PRIOR TO AND DURING THE TIME OF CONSTRUCTION. INSTALLATION MUST BE

COORDINATED WITH LOCAL FIRE DEPARTMENT IN THE FIELD.

FIRE EXTINGUISHERS

1. TEMPORARY- CONTRACTOR SHALL PROVIDE JOB SITE WITH TEMPORARY PORTABLE FIRE EXTINGUISHERS AND SHALL MAINTAIN THEM DURING THE COURSE OF CONSTRUCTION. EACH EXTINGUISHER SHALL BE 10 lb. CAPACITY, CAPABLE OF EXTINGUISHING CLASS A, B & C FIRES. ALL EXTINGUISHERS SHALL BE U.L. LABELED AND SHALL BE DRY CHEMICAL TYPE. FIRE EXTINGUISHERS SHALL BE MAINTAINED IN ACCORDANCE WITH NFPA 10.

FIRE SPRINKLER SYSTEM

1. THE BUILDING IS EQUIPPED WITH A FIRE SPRINKLER SYSTEM.

FIRE & SMOKE DAMPERS

1. THE BUILDING IS EQUIPPED WITH FIRE & SMOKE DAMPERS.

EXIT AND EMERGENCY LIGHTING

1. EXIT SIGNS SHALL CLEARLY INDICATE DIRECTION LEADING TO EXTERIOR WITH MINIMUM 6" HIGH LETTERS AT REQUIRED EXITS, EXIT DISCHARGE AND AT ALL CORRIDOR INTERSECTIONS AND CHANGES OF DIRECTION. EXIT WAY;

CORRIDORS AND STAIRS SHALL BE ILLUMINATED BY A SUITABLE EMERGENCY LIGHTING SYSTEM TO OPERATE WHEN NORMAL POWER IS INTERRUPTED. EMERGENCY LIGHTING SHALL PROVIDE A MINIMUM OF 5 FOOT CANDLE POWER AT FLOOR LEVEL. EXIT DOOR SHALL SWING IN THE DIRECTION OF EXIT OVER A LANDING NOT MORE THAN 1/2"

BELOW THE THRESHOLD.

2. EXIT AND EMERGENCY LIGHTING SHALL CONFORM WITH THE LOCAL AND CURRENT NEC GUIDELINES.

RATED DOOR AND WINDOW ASSEMBLIES

1. THE BUILDING IS EQUIPPED WITH RATED DOOR ASSEMBLIES.

2. EXISTING RATINGS ARE TO BE MAINTAINED. NEW RATED DOORS SHALL CLEARLY LABEL DOOR AND FRAME

RATING, DO NOT PAINT LABELS.

FIRE STOPPING

1. FIRE STOPPING IS REQUIRED.

GENERAL

1. ANY DECORATIONS USED SHALL BE NON-COMBUSTIBLE OR FLAME-PROOFED IN AN APPROVED MANNER.

2. INSULATION APPLIED TO EXTERIOR SURFACE OF DUCTS LOCATED IN BUILDINGS SHALL HAVE A FLAME SPREAD OF NOT MORE THAN 25 AND SMOKE-DEVELOPED RATING OF NOT MORE THAN 50 WHEN TESTED AS A COMPOSITE INSTALLATION, INCLUDING INSULATION, FACING MATERIALS, TAPES AND ADHESIVES NORMALLY APPLIED.

3. ALL INSULATION MATERIALS INSTALLED WITHIN FLOOR-CEILING ASSEMBLIES, ROOF CEILING ASSEMBLIES, WALLS SHALL HAVE A FLAME-SPREAD RATING NOT TO EXCEED 25 AND A SMOKE DENSITY NOT TO EXCEED 50 WHEN

TESTED IN ACCORDANCE WITH ASTM E 84.

4. ALL FLOOR, WALL, AND CEILING PENETRATIONS FOR PIPING, DUCTS, CONDUIT, ETC. SHALL BE SEALED WITH A UL

APPROVED METHOD AND MATERIAL APPROVED BY BUILDING.

1. THESE GENERAL NOTES APPLY TO ALL DRAWINGS.

2. COMPLY WITH ALL APPLICABLE CODES, RULES, AND REGULATIONS WHEN REQUIRED BY CODE, ALL WORK MUST BE INSPECTED AND APPROVED

BY LOCAL AUTHORITIES.

3. ALL EXISTING CONDITIONS AND DIMENSIONS SHALL BE VERIFIED BY THE CONTRACTOR(S) PRIOR TO FABRICATION AND CONSTRUCTION. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THESE DRAWINGS, WHICH AFFECT THE SCOPE AND INTENT OF THE WORK DESCRIBED IN CONSTRUCTION DOCUMENTS, SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER REPRESENTATIVE (COR) IMMEDIATELY.

4. GENERAL CONTRACTOR SHALL COORDINATE ALL MECHANICAL AND ELECTRICAL DUCT SIZES AND LOCATIONS.

5. ALL EXITS TO BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR SPECIAL KNOWLEDGE.

6. WALL OUTLETS, SWITCHES,THERMOSTATS, ETC. TO BE INSTALLED LEVEL WITH EACH OTHER AND PLUMB.

7. THE WORK INDICATED IN THE NOTES DESCRIBES THE GENERAL SCOPE OF WORK ONLY AND IS NOT INTENDED TO BE INCLUSIVE OF ALL WORK

REQUIRED TO COMPLETE FULL SCOPE OF WORK.

8. DO NOT MEASURE DRAWINGS. ALL DIMENSIONS SHALL BE FIELD VERIFIED. ALL DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE

CONTRACTING OFFICER REPRESENTATIVE (COR).

9. FIELD VERIFICATION: BEFORE BIDDING AND DURING CONSTRUCTION, CONTRACTOR SHALL VERIFY THAT ACTUAL CONDITIONS ARE THOSE REFLECTED BY THE CONTRACT DOCUMENTS. REPORT DISCREPANCIES TO CONTRACTING OFFICER REPRESENTATIVE (COR) PRIOR TO BIDDING OR PERFORMING WORK RELATED TO ANY DISCREPANCIES. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

10. MOST EXPENSIVE BID: IF THERE ARE SCHEDULES, SYSTEMS, SUBCONTRACT, OR MATERIAL CONFLICTS NOT BROUGHT TO THE CONTRACTING OFFICER REPRESENTATIVE (COR)'S ATTENTION PRIOR TO BIDDING, THE CONTRACTOR WILL BE DEEMED TO HAVE ELECTED THE MORE COSTLY

TIME, METHOD, SYSTEM, PRODUCT, SUBCONTRACT AND/OR MATERIAL.

11. NIC: CONSTRUCTION OF WORK INDICATED ON DRAWINGS AS "NIC" IS NOT IN THE CONTRACT. HOWEVER, THE CONTRACTOR SHALL

COORDINATE ITS WORK, WITH WORK INDICATED AS NIC.

12. SITE COORDINATION: COORDINATE ALL SITE OPERATIONS WITH OWNER, INCLUDING STAGING AREAS, MATERIAL STORAGE, ACCESS TO WORK, TIMING OF WORK, NOISY OPERATIONS, INTERRUPTION OF UTILITIES, ETC. SEE SPECIFICATIONS.

13. TRADE COORDINATION: CONTRACTOR SHALL COORDINATE THE PLACEMENT OF EACH TRADE'S WORK SO THAT THERE ARE NO CONFLICTS AND NO SYSTEM'S OPERATION OR FUNCTION IMPAIRED. IT IS ESPECIALLY IMPORTANT TO COORDINATE PENETRATIONS THROUGH FOUNDATIONS, FLOORS, WALLS AND CEILING SPACES. SEE SPECIFICATIONS.

14. PROVIDE GALVANIC SEPARATION MATERIAL, ACCEPTABLE TO CONTRACTING OFFICER REPRESENTATIVE (COR), BETWEEN DISSIMILAR METALS.

SEE SPECIFICATIONS.

15. ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY SHALL BE FIRE TREATED. SEE SPECIFICATIONS. ALL SURFACE ATTACHED METAL SHALL BE SEPARATED FROM CONCRETE OR MASONRY BY NON-METALLIC MATERIAL SUCH AS #30 FELT, "PEEL AND STICK" OR OTHER MATERIAL AS

APPROVED BY CONTRACTING OFFICER REPRESENTATIVE (COR).

16. EXTERIOR / INTERIOR ELEVATIONS DO NOT SHOW ALL EQUIPMENT, FIXTURES, DEVICES, MECHANICAL, PLUMBING OR ELECTRICAL ITEMS. SEE ARCHITECTURAL, INTERIOR, MECHANICAL AND ELECTRICAL PLANS FOR ADDITIONAL ELEVATION COORDINATION.

17. CONTRACTOR TO COORDINATE WITH RECENT ROOF INSTALLATION WARRANTY REQUIREMENTS TO ENSURE NO VIOLATIONS OCCUR.

CONTRACTOR TO EMPLOY A CERTIFIED ROOFING INSPECTOR MEETING THE REQUIREMENTS OF THE INSTALLED ROOF. ALL WARRANTY

VIOLATIONS WILL BE REQUIRED TO BE CORRECTED PRIOR TO CLOSE OUT.

18. ANY CUTTING/WELDING WILL REQUIRE DAILY BURN PERMITS TO BE COORDINATED WITH COR.

19. THESE DRAWINGS ARE DIAGRAMMATIC. THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY OF COORDINATION WITH VARIOUS TRADES AND INCLUDE TURNS, BENDS, ADDITIONAL LENGTHS OF PIPING AND ELEVATION CHANGES, AND TRANSITIONS WITHOUT ADDITIONAL COST TO THE OWNER. CONTRACTOR SHALL ALSO ASSUME FULL RESPONSIBILITY FOR COORDINATION WITH EXISTING CONDITIONS INCLUDING RELOCATIONS, PENETRATIONS, AND OTHERWISE RECONFIGURING EXISTING SYSTEMS TO COORDINATE WITH NEW WORK.

1. STANDARDS: GENERAL PAINTING SPECIFICATIONS FOR THIS PROJECT ARE DEFINED BY THE PROJECT SPECIFICATION 09 91 00 AND ARE BASED ON THE MPI ARCHITECTURAL PAINTING SPECIFICATION MANUAL FOR NEW WORK AND THE MPI MAINTENANCE REPAINTING MANUAL FOR RENOVATION OR REPAINTING WORK.

2. PAINTING WORK: INCLUDES TAPING, SURFACE PREPARATION, CLEANING, DE-RUSTING, PRIMING, FIELD PAINTING AND FINISHING AS REQUIRED BY STANDARD PRACTICE, MANUFACTURER OR SPECIFICATION.

REQUIRED COATS OF PAINT OR STAIN ARE IN ADDITION TO SHOP PRIMING, SURFACE TREATMENT AND FINISHING. THE WORK ALSO INCLUDES PAINTING CLEANUP AND REMOVAL OF OVERSPRAY, DRIPS AND SPLATTERS. THE SPECIFICATIONS MAY REQUIRE OTHER TYPES OF PAINTING, INCLUDING, BUT NOT LIMITED TO, FIELD APPLIED SPECIAL COATINGS AND FACTORY PRIMING.

3. PROJECT PAINTING SCOPE: EXCEPT AS NOTED OTHERWISE, CONTRACTOR IS TO FIELD PAINT INTERIOR AND EXTERIOR EXPOSED ITEMS AND BUILDING SURFACES, WHETHER OR NOT PREVIOUSLY PAINTED, AND ALL NEW ITEMS AND SURFACES. THIS INCLUDES, BUT IS NOT LIMITED TO, FACTORY-PRIMED ITEMS, GALVANIZED SHEET METAL AND EXPOSED PIPING AND FITTINGS (INCLUDING IRON AND PVC). EXTERIOR EXPOSED MASONRY AND CONCRETE SHALL BE SEALED, UNLESS NOTED OTHERWISE OR NOT RECOMMENDED BY MANUFACTURER.

PAINTING SCOPE ITEMS MAY BE FOUND IN FINISH SCHEDULES, DRAWINGS, SPECIFICATIONS (09 91 00) AND

PAINTING GENERAL NOTES. THESE SOURCES ARE COMPLEMENTARY, NOT MUTUALLY EXCLUSIVE.

4. MECHANICAL AND ELECTRICAL PAINTING: INCLUDES FIELD PAINTING OF INTERIOR AND EXTERIOR EXPOSED PIPES, DUCTS, HANGERS, EXPOSED STEEL AND IRON WORK AND PRIMED METAL SURFACES OF EQUIPMENT IN EXPOSED AREAS INSTALLED UNDER MECHANICAL AND ELECTRICAL WORK, EXCEPT AS OTHERWISE INDICATED. PAINTING OF ELECTRICAL AND MECHANICAL WORK IN ELECTRICAL AND MECHANICAL ROOMS IS NOT REQUIRED UNLESS NOTED OTHERWISE IN THE PROJECT MANUAL. COLOR-CODING OF PIPING FOR MECHANICAL AND PLUMBING WORK IS COVERED IN THE MECHANICAL OR PLUMBING SPECIFICATIONS.

5. APPLICATION: EACH COAT OF PAINT SHALL TERMINATE AT AN EDGE, CORNER, CHANGE OF MATERIALS OR CHANGE OF PAINT COLOR. COMPLETED PAINTING SHALL NOT IMPEDE THE INTENDED OPERATION OF ANY

ITEM, SUCH AS WINDOWS, DRAWERS, HINGES, DOORS, ETC.

6. TOUCH-UP: SURFACES REQUIRING TOUCH-UP SHALL BE REPAIRED AS REQUIRED. PAINT TEXTURE, GLOSS AND COLOR SHALL MATCH EXISTING. IF TOTAL TOUCH-UP AREA ON ONE SURFACE IS LARGER THAN 1 SQUARE FOOT, OF IF TEXTURE, GLOSS AND COLOR CANNOT BE MATCHED, THE ENTIRE SURFACE SHALL BE REPAINTED

TO ENCLOSING EDGES OR CORNERS.

7. DO NOT PAINT: UNLESS OTHERWISE INDICATED, DO NOT PAINT ITEMS THAT ARE SPECIFIED FACTORY- FINISHED OR INSTALLER-FINISHED. ALSO, UNLESS OTHERWISE INDICATED, DO NOT PAINT SUCH ITEMS AS ACOUSTIC MATERIALS, HARDWARE, PRE-FINISHED FIXTURES AND EQUIPMENT, PRE-FINISHED MECHANICAL AND ELECTRICAL EQUIPMENT, SWITCH AND OUTLET PLATES, THERMOSTATS, LIGHTING FIXTURES, SWITCHGEAR, MOTORS, DISTRIBUTION PANELS AND INTERIOR AND EXTERIOR SIGNAGE. IF THERE IS A QUESTION WHETHER OR NOT TO PAINT AN ITEM OR SURFACE, CONTACT THE CONTRACTING OFFICER

REPRESENTATIVE (COR) FOR INSTRUCTIONS PRIOR TO PAINTING.

8. EXPOSED FINISH METAL SURFACES: UNLESS OTHERWISE INDICATED, DO NOT PAINT METAL SURFACES OF ANODIZED ALUMINUM, STAINLESS STEEL, NICKEL, CHROMIUM PLATE, COPPER, BRASS, BRONZE AND SIMILAR

FINISHED MATERIALS.

9. CONCEALED SURFACES: UNLESS OTHERWISE INDICATED, DO NOT PAINT SURFACES SUCH AS WALLS AND CEILINGS IN CONCEALED AND GENERALLY INACCESSIBLE AREAS, INCLUDING FURRED AREAS, UTILITY TUNNELS, PIPE SPACES, CHASES AND DUCT SHAFTS. WATERPROOF SEAL CONCRETE IN PIPE SPACE.

10. OPERATING PARTS AND SENSING DEVICES: UNLESS OTHERWISE INDICATED, DO NOT PAINT MOVING PARTS OF OPERATING UNITS SUCH AS VALVES, DAMPER OPERATORS, LINKAGES, MOTOR AND FAN SHAFTS, LIGHT

SENSING OR EMITTING DEVICES THAT MIGHT NOT FUNCTION PROPERLY IF PAINTED.

11. CODE-REQUIRED LABELS: DO NOT PAINT OVER CODE-REQUIRED LABELS.

12. ALL FLOORS ARE TO BE CLEANED AND SEALED AT COMPLETION OF WORK. NO EPOXY PAINT

1. THE PRIMARY OBJECT OF APPLYING SEALANT IS TO FACILITATE WEATHER TIGHTNESS AT THE EXTERIOR BUILDING ENVELOPE AND WATER TIGHTNESS AT INTERIOR WET\DAMP LOCATIONS. PROPER PRIMING MUST

BE USED WITH SEALANTS.

2. THE PRIMARY OBJECT OF APPLYING CAULKING IS TO ENHANCE APPEARANCE AND FINISH AT INTERIOR APPLICATIONS AND IN SOME SITUATIONS TO REDUCE AIRFLOW, SUCH AS AT DUCTS, INTERIOR SIDES OF THE EXTERIOR ENVELOPE AND AT FIREWALL/SMOKE BARRIER PENETRATIONS (FIRE CAULKING) AND TO DECREASE SOUND TRANSMISSION THROUGH WALLS AND CEILINGS. OTHER USES MAY BE NOTED IN THE SPECIFICATIONS AND/OR ON THE DRAWINGS. IF THERE ARE QUESTIONS ABOUT WHERE OR WHAT TYPE OF SEALANT OR CAULKING SHOULD BE USED, CONTACT THE CONTRACTING OFFICER REPRESENTATIVE (COR).

3. SPECIFIED SEALANT (AND BACKER RODS, AS REQUIRED) SHALL BE USED AT HORIZONTAL AND VERTICAL

CONCRETE JOINTS AND AS NOTED.

4. SPECIFIED SEALANT AND BACKER RODS, OR EXPANSION JOINT MATERIAL, AS REQUIRED, SHALL BE USED

AT MASONRY AND CONCRETE CONTROL JOINTS.

5. APPLY SEALANT TAPE OR TWO CONTINUOUS BEADS OF SEALANT BETWEEN PERIMETER SOLE PLATES AND FOUNDATIONS, SLABS AND FLOOR DECKS. SET EXTERIOR THRESHOLDS IN SEALANT UNLESS NOTED

OTHERWISE.

6. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL AROUND BOTH SIDES OF DOOR FRAMES.

7. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL AROUND INTERIOR WALL MOUNTED EQUIPMENT

FRAMES AND EXPOSED SUPPORTS.

8. SPECIFIED SEALANT OR CAULK SHALL BE USED AT JOINTS BETWEEN DIFFERENT WALL MATERIALS (TILE TO

BRICK, CMU TO GYPSUM BOARD, WOOD TO STONE, METAL PANEL TO P-LAM, ETC).

9. USE SPECIFIED CAULK OR SEALANT AT WALL MATERIAL GAPS OR 1/16TH INCH OR MORE.

10. SEAL ALL AROUND ATTACHMENTS TO, AND PENETRATIONS THROUGH, FLOORS AND WALLS.

11. USE SPECIFIED SEALANT AROUND WALL, FLOOR AND CEILING PIPE PENETRATIONS. WHERE

ESCUTCHEONS ARE SPECIFIED OR PROVIDED, SET THE ESCUTCHEONS IN A BED OF SEALANT.

12. USE SPECIFIED CAULK OR SEALANT AROUND PENETRATIONS IN EXTERIOR WALLS AND SOFFITS, SUCH AS AT HOSE BIBS, FD CONNECTIONS, ELECTRIC SERVICE ENTRIES, GAS PIPE ENTRIES, ELECTRIC OUTLETS, LIGHTING, VENTS, ETC.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

MECHANICAL:

(502) 481-8548(310) 357-7031

B

IM

/6

-1

-3

U p g ra d e D o m e s ti c H

C

W a te r

S y s te m s

/6

-1

-3

-B L

D G

-M E

P .r v t

/1

/2

:3

:2

P

M

11G-010

PLUMBING GENERAL NOTES

TRIPLE C The A/E Group

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

(562) 452-7175

Mat Perkins

P2S ENGINEERING, INC.

9665 Chesapeake Drive, Suite 230

San Diego, CA 92123

(619) 618-2347

Mikhail Fuks

Upgrade Domestic H&C Water

Systems

3350 La Jolla Village Dr, San Diego, CA 92161

664-19-304

06/10/2020 M. Perkins G. Chiurazzi

100% CONSTRUCTION

DOCUMENTS

GENERAL NOTES GENERAL FIRE AND LIFE SAFETY NOTESGENERAL DIMENSIONING NOTES GENERAL PAINTING NOTES

GENERAL SEALANT / CAULKING NOTES

GENERAL DEMOLITION AND PHASING NOTES

FIRE AND LIFE SAFETY NOTES DURING CONSTRUCTION

Revisions: Date:

SEISMIC BRACING NOTES

1. CONTRACTOR SHALL PROVIDE SEISMIC ANCHORAGE AND BRACING FOR PLUMBING EQUIPMENT THAT IS DIRECTLY MOUNTED ON THE FLOOR OR ROOF AND PLUMBING EQUIPMENT THAT IS SUSPENDED FROM THE FLOOR, WALL OR SUPPORTED BY VIBRATION ISOLATORS IN COMPLIANCE WITH THE LATEST CALIFORNIA

BUILDING CODE.

2. PROVIDE ANCHORAGE CALCULATIONS AND DETAILS CERTIFIED BY A STRUCTURAL ENGINEER REGISTERED IN

THE STATE OF CALIFORNIA.

3. THE INSTALLATION SHALL BE SUBJECT TO THE APPROVAL OF THE STRUCTURAL ENGINEER, VA SAN DIEGO AND

FIRE DEPARTMENTS.

4. WHERE BRACING AND ANCHORAGE DETAILS ARE NOT SHOWN ON THE DRAWINGS OR IN THE GUIDELINES, THE FIELD INSTALLATION SHALL BE SUBJECT TO THE APPROVAL OF THE ARCHITECT, STRUCTURAL ENGINEER, AND

MECHANICAL ENGINEER.

5. REFER TO STRUCTURAL DRAWINGS FOR CONCRETE ANCHOR TYPE AND INSTALLATION REQUIREMENTS.

6. PIPING AND CONDUIT CROSSING BUILDING SEISMIC SEPARATIONS SHALL BE PROVIDED WITH APPROVED

FLEXIBLE CONNECTORS.

7. PROVIDE COMPLETE SEISMIC ANCHORAGE AND BRACING FOR EQUIPMENT UNDER THE PLUMBING SECTION

WEIGHING OVER 400 POUNDS THAT IS DIRECTLY MOUNTED ON THE FLOOR OR ROOF AND PLUMBING EQUIPMENT WEIGHING OVER 20 POUNDS THAT IS SUSPENDED FROM THE FLOOR, ROOF, WALL OR SUPPORTED

BY VIBRATION ISOLATORS AS SHOWN ON THE EQUIPMENT ANCHORAGE DRAWINGS.

8. A COPY OF THE APPROVED BRACING & ANCHORAGE OF EQUIPMENT SHALL BE PROVIDED AND KEPT AT THE JOB

SITE AT ALL TIMES.

Expires 6.30.16Expires: 6/30/1821

6/1

INFECTION CONTROL / DUST

CONTROL PARTITION /

BARRIER

INFECTION CONTROL/DUST

CONTROL EGRESS DOOR NON-

TRANSFERRING MULTI-

SHEETED ADHESIVE FLOOR

PADS

PATH OF DEMOLITION/TRASH

REMOVAL TRAVEL

CONSTRUCTION LIMIT LINE

NOT IN CONTRACT AREA

STICKY

MAT

WEEKLY CHANGED

OR MORE AS NEEDED

PRE-FILTER

FLEX

DUCT

MONTHLY CHANGED

HEPA FILTER

HEPA NEGATIVE

AIR UNIT WITH

NEW FILTERS AT

PROJECT START

PROVIDE STICKY MATS (CHANGED

END OF EVERY SHIFT OR MORE IF

NECESSARY TO MAINTAIN

CLEANLINESS).

DIGITAL MANOMETER WITH

INDICATOR, ALARMS AND DAILY

REPORTS,SHALL BE AT -0.03" W.G. OR

GREATER AT ALL TIMES. IF ALARM

SOUNDS, STOP WORK AND VERIFY ALL

OPENING SUCH AS DOOR ARE

CLOSED AND/OR CHANGE OUR

NEGATIVE AIR PRE-FILTER.

SUPPLY DUCTS

EITHER KEEP

RUNNING OR COVER

WHEN RUNNING TO

KEEP DUST OUT.

A

V

O

TAPE ALL SERVICES TO

PROTECT AGAINST

CONTAMINATION

E

FIRE EXTINGUISHER ON

PORTABLE FLOOR

BRACKET (SHALL REQUIRE

MORE THAN ONE.)

PROVIDE TEMPORARY

ENCLOSURE AT AREAS TO

REMAIN OPERATIONAL, SEE

DETAIL

D5

11G-011

Sim

PREFABRICATED

TEMPORARY

SEPARATION WALL TO BE

IN ACCORDANCE WITH

NFPA 241, SECTIONS 8.6.2

AND 8.7.3. (BASIS OF

DESIGN STARC SYSTEMS

OR APPROVED EQUAL)

FLOOR LINE

EXISTING

CEILING SYSTEM

EXISTING

STRUCTURE

FIRE RATED PLASTIC

TO PREVENT DUST

INSTALL PRIOR TO

CONSTRUCTION

/1

F

IN

IS

H E

D F

L O

O R

T O

U N

D E

R S

ID

E

O F

S T

R U

C T

U R

E

V E

R

IF

Y F

L O

O R

T O

F L O

O R

H E

IG

H

T

EXISTING

SPRINKLER

SYSTEM

SPRINKLER SYSTEM TO BE

FULLY OPERATIONAL DURING

CONSTRUCTION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

MECHANICAL:

(502) 481-8548(310) 357-7031

B

IM

/6

-1

-3

U p g ra d e D o m e s ti c H

C

W a te r

S y s te m s

/6

-1

-3

-B L

D G

-M E

P .r v t

/1

/2

:3

:3

P

M

11G-011

GENERAL INFECTION CONTROL NOTES

AND SYMBOLS

TRIPLE C The A/E Group

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

(562) 452-7175

Mat Perkins

P2S ENGINEERING, INC.

9665 Chesapeake Drive, Suite 230

San Diego, CA 92123

(619) 618-2347

Mikhail Fuks

Upgrade Domestic H&C Water

Systems

3350 La Jolla Village Dr, San Diego, CA 92161

664-19-304

06/10/2020 M. Perkins G. Chiurazzi

100% CONSTRUCTION

DOCUMENTS

A. IMPLEMENT INFECTION CONTROL RISK ASSESSMENT

(ICRA) PROCEDURES AS PER THE VA MEDICAL CENTER

ICRA PLAN AND AS DIRECTED BY THE CONTRACTING

OFFICER REPRESENTATIVE (COR).

B. COORDINATE ALL DEMOLITION/ CONSTRUCTION DEBRIS

PATH OF TRAVEL AND INTERIM LIFE SAFETY MEASURES

(ILSM) WITH THE COR. ALL INTERIOR DOORS THAT LEAD

TO THE CONSTRUCTION SITE SHALL BE POSTED AS PER

THE ISLM PLAN.

C. OBTAIN INFECTION CONTROL PERMIT PRIOR TO

BEGINNING WORK.

D. THE ONE HOUR FIRE RATED CONSTRUCTION BARRIERS

SHALL BE CONSTRUCTED PRIOR TO BEGINNING OTHER

WORK.

E. CONSTRUCT ANTEROOM AT ENTRANCES TO

CONSTRUCTION AREAS AND REQUIRE ALL

CONSTRUCTION PERSONNEL TO PASS THROUGH THIS

ROOM TO BE VACUUMED WITH HEPA VACUUM CLEANER

PRIOR TO LEAVING THE SITE.

F. FIRE PROTECTION SYSTEMS SHALL REMAIN FUNCTIONAL

FOR OCCUPIED AREAS ON THE FLOOR.

G. PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION

AREAS; REVIEW WITH COR AND VA SAFETY GROUP.

H. MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.

I. MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION

AREA AT ALL TIMES (24/7). WHETHER OCCUPIED OR NOT,

THROUGHOUT DURATION OF PROJECT USING HEPA

EQUIPPED AIR FILTRATION UNITS.

J. CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM

THE OTHER AREAS OF THE MEDICAL CENTER; NO

RETURN AIR OR EXHAUST SHALL PASS INTO THE AREAS

OUTSIDE THE CONSTRUCTION AREA. ISOLATE HVAC

SYSTEM WITHIN CONSTRUCTION AREA TO PREVENT

CONTAMINATION OF EXISTING DUCT SYSTEM.

K. REDIRECT ALL MEDICAL CENTER PERSONNEL. PATIENTS

AND VISITORS SO THEY DO NOT EXIT THROUGH THE

CONSTRUCTION AREA. PROVIDE SIGNS ON DOORS INTO

THE CONSTRUCTION AREA THAT READS: "CONSTRUCTION

AREA-DO NOT ENTER".

L. GENERAL CONTRACTOR SHALL MAINTAIN DAILY LOGS

AND KEEP A CURRENT HOT WORK PERMIT ON SITE.

M. TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE

CONSTRUCTION AREA AND SHALL BE MONITORED TO

MAKE SURE THEY REMAIN EFFECTIVE.

N. MAINTAIN A CLEAN AND ORDERLY CONSTRUCTION AREA.

ALL DEBRIS REMOVAL SHALL BE IN COVERED CARTS

AND/OR CONTAINERS.

O. SEAL ALL HOLES, PUNCTURES, AND PENETRATIONS

FROM PIPES AND CONDUITS APPROPRIATELY AND

IMMEDIATELY TO MAINTAIN DUST PROTECTION AND

NEGATIVE AIR PRESSURE.

P. MAINTAIN STAFFING AND EQUIPMENT INCLUDING DUST

MOPS, WET MOPS, BROOMS, BUCKETS AND CLEAN

WIPING RAGS FOR CLEANING FINE DUST FROM FLOORS

AND ADJACENT OCCUPIED AREAS. ANY DUST TRACKED

OUTSIDE OF CONSTRUCTION AREA SHALL BE CLEANED

IMMEDIATELY.

Q. AFTER COMPLETION OF WORK: VACUUM CONSTRUCTION

AREA WITH HEPA FILTERED VACUUMS, WET MOP WITH

DISINFECTANT, REMOVE CONSTRUCTION BARRIERS

(UPON APPROVAL). PATCH OR REPAIR ANY DAMAGE

FROM CONSTRUCTION BARRIER REMOVAL AND REMOVE

ISOLATION OF VAC SYSTEM.

R. CONSTRUCTION BARRIERS SHALL NOT BE REMOVE UNTIL

PROJECT IS COMPLETED AND INSPECTED BY VA SAFETY

PERSONNEL, INFECTION CONTROL GROUP, AND COR.

ICRA NOTES:

ICRA SYMBOL LEGENDINFECTION CONTROL RISK

ASSESSMENT:

STEP 1: TYPE D

IDENTIFY THE TYPE OF CONSTRUCTION PROJECT

ACTIVITY (TYPE A–D)

TYPE A: INSPECTION AND NONINVASIVE ACTIVITIES.

TYPE B: SMALL-SCALE, SHORT-DURATION ACTIVITIES

THAT CREATE MINIMAL DUST.

TYPE C: WORK THAT GENERATES A MODERATE TO

HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR

REMOVAL OF ANY FIXED BUILDING COMPONENTS OR

ASSEMBLIES.

TYPE D: MAJOR DEMOLITION AND CONSTRUCTION

PROJECTS.

STEP 2: HIGH RISK

IDENTIFY THE PATIENT RISK GROUPS THAT WILL BE

AFFECTED.

IF MORE THAN ONE RISK GROUP WILL BE AFFECTED,

SELECT THE HIGHER RISK GROUP.

STEP 3: CLASS IV

MATCH THE PATIENT RISK GROUP (LOW, MEDIUM,

HIGH, HIGHEST) WITH THE PLANNED CONSTRUCTION

PROJECT TYPE (A, B, C, D) ON THE FOLLOWING

MATRIX, TO FIND THE CLASS OF PRECAUTIONS (I, II,

III OR IV) OR LEVEL OF INFECTION CONTROL

ACTIVITIES REQUIRED.

STEP 4: IDENTIFY THE AREAS SURROUNDING THE PROJECT

AREA, ASSESSING POTENTIAL IMPACT.

BELOW ABOVE NORTH SOUTH EAST WEST

_______________________RISK GROUP_____________________

LOW LOW N/A HIGH LOW LOW

STEP 5:

IDENTIFY SPECIFIC SITE OF ACTIVITY, FOR EXAMPLE,

PATIENT ROOMS, MEDICATION ROOM, AND SO ON.

STEP 6: IDENTIFY ISSUES RELATED TO: VENTILATION,

PLUMBING, AND ELECTRICAL IN TERMS OF THE

OCCURRENCE OF PROBABLE OUTAGES.

STEP 7. IDENTIFY CONTAINMENT MEASURES, USING PRIOR

ASSESSMENT. WHAT TYPES OF BARRIERS (FOR EXAMPLE,

SOLIDS WALLS)? WILL HEPA FILTRATION BE REQUIRED?

STEP 8. CONSIDER POTENTIAL RISK OF WATER DAMAGE. IS

THERE A RISK DUE TO COMPROMISING STRUCTURAL

INTEGRITY (FOR EXAMPLE, WALL, CEILING, ROOF)?

NOTE: RENOVATION/CONSTRUCTION AREA SHALL BE

ISOLATED FROM THE OCCUPIED AREAS DURING

CONSTRUCTION AND SHALL BE NEGATIVE WITH RESPECT TO

SURROUNDING AREAS.

STEP 9. WORK HOURS: CAN OR WILL THE WORK BE DONE

DURING NON-PATIENT-CARE HOURS?

STEP 10. DO PLANS ALLOW FOR ADEQUATE NUMBER OF

ISOLATION/NEGATIVE AIRFLOW ROOMS?

STEP 11. DO THE PLANS ALLOW FOR THE REQUIRED NUMBER

AND TYPE OF HAND-WASHING SINKS?

STEP 12. DOES THE INFECTION PREVENTION AND CONTROL

STAFF AGREE WITH THE MINIMUM NUMBER OF SINKS FOR

THIS PROJECT? (VERIFY AGAINST FACILITY GUIDELINES

INSTITUTE (FGI) DESIGN AND CONSTRUCTION GUIDELINES

FOR TYPES AND AREA.)

STEP 13. DOES THE INFECTION PREVENTION AND CONTROL

STAFF AGREE WITH THE PLANS RELATIVE TO CLEAN AND

SOILED UTILITY ROOMS?

STEP 14. PLAN TO DISCUSS THE FOLLOWING CONTAINMENT

ISSUES WITH THE PROJECT TEAM, FOR EXAMPLE, TRAFFIC

FLOW, HOUSEKEEPING, DEBRIS REMOVAL (HOW AND WHEN).

1/4" = 1'-0"

B5 INFECTION CONTROL MEASURES, TYPICAL CONSTRUCTION LAYOUT

1/2" = 1'-0"

D5 INFECTION CONTROL MEASURES, TEMPORARY WALL SECTION

Revisions: Date:

IMPAIRMENT TO THE BUILDING PLUMBING SYSTEM

1. IMPAIRMENT OF EXISTING PLUMBING SYSTEM IN ORDER TO INSTALL NEW PIPING SHALL BE LIMITED TO A MINIMUM AND SHALL BE AUTHORIZED BY THE PROJECT ENGINEER AND VA REPRESENTATIVE. BEFORE AUTHORIZATION IS GIVEN, CONTRACTOR SHALL VERIFY THAT THE FOLLOWING ITEMS ARE ACCOMPLISHED:

A. THE BUILDING WILL REMAIN IN OPERATION AND OCCUPIED OVER THE DURATION OF CONSTRUCTION

PROCESS. ANY DISRUPTIVE WORK/ACTIVITIES SHALL BE PERFORMED DURING OFF HOURS WITH PRIOR

APPROVAL OF V.A REPRESENTATIVE.

B. DETERMINE THE EXACT AREA OR LOCATION OF THE INTENDED IMPAIRMENT AND DURATION.

C. NOTIFY THE PROJECT ENGINEER OF THE AFFECTED AREA OF THE IMPAIRMENT.

2. WHEN ALL IMPAIRED PLUMBING SYSTEM IS RESTORED TO NORMAL WORKING ORDER, PROVIDE VERIFICATION

OF THE FOLLOWING:

A. VERIFY THAT ALL NEW CONNECTIONS TO THE PLUMBING SYSTEM ARE TESTED AND PROVEN TO HAVE

NO LEAKAGE.

B. ADVISE PROJECT ENGINEER THAT THE PIPING SERVICE HAS BEEN FULLY RESTORED.

CONSTRUCTION INFECTION CONTROL PLAN

1. CONTRACTOR SHALL SUBMIT A CONSTRUCTION PHASING PLAN FOR INFECTION CONTROL TO PROJECT ENGINEER FOR APPROVAL PRIOR TO STATING THE PROJECT, PROVIDE FOLLOWING ITEMS AS MINIMUM

REQUIREMENT:

A. TEMPORARY PLUMBING BYPASS CONNECTION.

B. REMOVAL OF EXISTING PIPING, WASTE MATERIAL AND SPILL.

C. NEW AND EXISTING PIPES MUST BE SEALED LIQUID TIGHT.

D. EXISTING SEWER PIPES SHALL BE DISPOSED AS HAZARDOUS WASTE.

E. PROTECTION SURROUNDING AREA AND FLOOR FROM SEWAGE SPILLS.

F. PROVIDE INFECTION CONTROL BARRIERS FOR THE WORKING AREA.

Expires 6.30.16Expires: 6/30/1821

6/1

DN DOWN

WC WATER CLOSET

FLUSH VALVEFV

YH YARD HYDRANT

TD TRENCH DRAIN

FOV

FOR

FOS

FUEL OIL VENT

FUEL OIL RETURN

FUEL OIL SUPPLY

ES

EEW

EMERGENCY SHOWER

EMERGENCY EYEWASH

CWV COMBINATION WASTE AND VENT

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE

ACID NEUTRALIZING TANK

ACID RESISTANT VENT THROUGH ROOF

BALANCING COCK

BOTTOM OF PIPE

BRITISH THERMAL UNIT

BTU PER HOUR

CLOTHES WASHER BOX

CUBIC FEET PER HOUR

CLEANOUT

CLEANOUT TO GRADE

CIRCULATION PUMP

DOUBLE CLEANOUT

DRINKING FOUNTAIN

ELEVATION

ELECTRIC WATER HEATER

ELECTRIC WATER COOLER

DEGREES FAHRENHEIT

FLOOR CLEANOUT

FINISHED FLOOR ELEVATION

FEET

GUTTER DRAIN

GREASE INTERCEPTOR

GALLONS PER HOUR

GALLONS PER MINUTE

GAS WATER HEATER

HORSEPOWER

HEAD

INCHES

INVERT

KILOWATT

1,000 BTUH

MIXING VALVE

NOT APPLICABLE

NOT IN CONTRACT

NUMBER

NORMALLY CLOSED

NORMALLY OPEN

OUTSIDE SCREW AND YOKE

PHASE

POUNDS PER SQUARE INCH GAUGE

STATIC PRESSURE

TYPICAL

YARD BOX

WALL CLEANOUT

AFF

AFG

ANT

AVTR

B.C.

BOP

BTU

BTUH

CWB

CFH

CO

COTG

CP

DCO

DF

EL

EWH

EWC

°F

FCO

FFE

FT

GD

GI

GPH

GPM

GWH

HP

HD

IN

INV

kW MBh

MV

NA

NIC

No. #

N.C.

N.O.

OS&Y

Ph

PSIG

SP

TYP

YB

WCO

DOUBLE CLEANOUT TO GRADEDCOTG

ESEW EMERGENCY SHOWER EYE WASH

POWERS OF HARDNESS

PH

HOSE BIBBHB

DS DOWNSPOUT

DSN DOWNSPOUT NOZZLE

PLUMBING SYMBOL LEGEND

NOTE: NOT ALL ABBREVIATIONS OR SYMBOLS APPLY TO THIS PROJECT

ABBREVIATIONS

A

PENETRATION

TEST PLUG (PRESS/TEMP)

(WH) (HB)

RD/OD/DD

DCOTG

FCO/COTG

FS/FD/AD

VTR

ROOF DRAIN/OVERFLOW DRAIN/DECK DRAIN

TWO WAY OR DOUBLE CLEANOUT TO GRADE

FLOOR CLEANOUT/CLEANOUT TO GRADE

FLOOR SINK , FLOOR DRAIN , AREA DRAIN

WATER HAMMER ARREST0R

FITTING (PETE'S PLUG)

POINT OF CONNECTION TO EXISTING

AQUASTAT

PRESSURE GAUGE AND GAUGE COCK

THERMOMETER

STRAINER WITH BLOWDOWN VALVE & HOSE BIBB

NEW PIPE CONNECTION TO EXISTING PIPING

EXISTING PIPE TO BE REMOVED

EXISTING PIPING TO REMAIN

NEW PIPING

FLEXIBLE CONNECTION

UNIVERSAL TEMPERATURE-PRESSURE

ORIFICE UNION

FLANGED UNION

UNION

RISE IN PIPE

DROP IN PIPE

CAPPED OUTLET

SIDE CONNECTION

BOTTOM CONNECTION, 45° OR 90°

TOP CONNECTION, 45° OR 90°

ECCENTRIC REDUCER

REDUCER OR INCREASER

PIPE GUIDE

DIRECTION OF FLOW

MAV MANUAL AIR VENT (MAV)

AAV AUTOMATIC AIR VENT (AAV)

TRAP PRIMER WITH ACCESS PANELTP

SLOPE OF PIPE

VENT THROUGH ROOF

AG AIR GAP FITTING

WALL HYDRANT, HOSE BIBB

KEYED NOTE

OR

SCHEMATIC SYMBOLS

ABBREVIATIONSYMBOL DESCRIPTION

XX

255' OF 6" @ 0.15%SLOPE

SLOPE AND LINEAL FOOTAGE

F.D.C.FIRE DEPARTMENT INLET CONNECTION F.D.C.

SAS SASSANITARY MANHOLE

M.H. M.H.(E)

GM

WM

REDUCED PRESSURE BACKFLOW PREVENTER

STORM DRAIN

IRRIGATION

F.H.(E)F.H.

LP

PP

C.O.(E)C.O.

LIGHT POLE

FENCING

POWER POLE

CLEANOUT

THRUST BLOCK

CONSTRUCTION

FIRE HYDRANT

VALVE WITH VALVE BOX

NATURAL GAS

FIRE PROTECTION

COLD WATER SUPPLY

SANITARY SEWER

SASSAS

WATER METER

NATURAL GAS METER

GATE VALVE

VALVE IN RISER

WM

GM

LP

PP

POST INDICATOR VALVE

PIV

PIV

W

F

SD

G

IRR

S EX. S

EX. W

EX. F

EX. G

EX. SD

EX. IRR

EXISTINGNEWDESCRIPTION

SITE UTILITY SYMBOLS

CARBON DIOXIDECO2

H

HE

AC

AR

CDA

LOX

LN

DV

DA

WAGD

IA

MV

O

NO

N

MA

DENTAL VACUUM

WASTE ANESTHESIA GAS DISPOSAL

INSTRUMENT AIR

DENTAL AIR

EXISTING PIPING

LIQUID NITROGEN

LIQUID OXYGEN

HYDROGEN

HELIUM

ACETYLENE

ARGON

COMPRESSED DRY AIR

ALARM PANEL (IN WALL)

MEDICAL VALVE BOX

MEDICAL GAS DROP

MEDICAL VACUUM

OXYGEN

NITROUS OXIDE

NITROGEN

MEDICAL AIR

O OXYGEN

CDA

CO2

AR

AC

HE

H

LN

LOX

MA

N

NO

O

MV

IA

WAGD

DA

DV

O

SYMBOL ABBREVIATION DESCRIPTION

DESCRIPTIONABBREVIATIONSYMBOL

PROCESS GASES

MEDICAL GAS SYMBOLS

S

VACUUM BREAKER

ATMOSPHERIC VACUUM BREAKER

PRESSURE STYLE

FLOW SWITCH

SOLENOID VALVE

FUEL GAS PRESSURE REGULATOR

DIAPHRAGM (PROCESS SYSTEMS)

OS&Y VALVE

GATE VALVE

GLOBE VALVE

BUTTERFLY VALVE

BALL VALVE

CHECK VALVE

PLUG VALVE

WATER PRESSURE REDUCING VALVE

PRESSURE RELIEF VALVE

TEMPERATURE AND PRESSURE RELIEF VALVE

2-WAY CONTROL VALVE

3-WAY MODULATING CONTROL VALVE

VALVE IN VERTICAL

REDUCED PRESSURE BACKFLOW PREVENTER (RPBP)

DRAIN VALVE

BALANCING VALVE/CIRCUIT SETTER MEASURING DEVICE

OR OR

OR

OR

DESCRIPTIONSYMBOL

VALVE SYMBOLS

P##

DRAWING NUMBER WHERE DETAILED

SECTION LETTER

DRAWING NUMBER WHERE DETAILED

DETAIL NUMBER

DRAWING NUMBER WHERE DETAILED

SECTION LETTER

DRAWING NUMBER WHERE DETAILED

DETAIL NUMBER

DRAWING NUMBER WHERE DETAILED

ELEVATION LETTER

LETTER REFER TO EQUIPMENT TYPE

NUMBER REFERS TO SPECIFIC EQUIPMENT

SYMBOL INDICATES FIXTURE/EQUIPMENT

IDENTIFIED IN EQUIPMENT SCHEDULE

SECTION SYMBOL

DETAIL SYMBOL

SECTION, ELEVATION, AND DETAIL TITLES

FIXTURE & EQUIPMENT SYMBOL

P-100

A

P-500

P-200

A

P-500

P-300

A

SCALE

ELEVATION

SCALE

DETAIL

SCALE

SECTION

IRR

INDIRECT WASTEIW

TW

TWR

SAN

V

DHWR

DCW

DHW

LA

IA

INW

IHWR

IHW

ICW

PD

SCW

IRR

NGH

NGM

G

LPG

ORD

RD

DIR

DIS

NPW

MU

ROR

ROS

CD

CA

AW

AV

PUMPED DISCHARGE LINE

IRRIGATION

SOFT COLD WATER

TEMPERED WATER (TEMP °F)

TEMPERED WATER RETURN (TEMP °F)

NATURAL GAS-HIGH PRESSURE

NATURAL GAS-MEDIUM PRESSURE

LAB COMPRESSED AIR

INSTRUMENT COMPRESSED AIR

INDUSTRIAL WASTE

REVERSE OSMOSIS RETURN

INDUSTRIAL HOT WATER RETURN

INDUSTRIAL HOT WATER

INDUSTRIAL COLD WATER

NATURAL GAS-LOW PRESSURE

LIQUIFIED PETROLEUM GAS

OVERFLOW ROOF DRAIN

STORM/ROOF DRAIN

SANITARY SEWER

DEIONIZED WATER RETURN

DEIONIZED WATER SUPPLY

VENT

NON-POTABLE WATER

MAKE-UP WATER

REVERSE OSMOSIS SUPPLY

140° DOMESTIC HOT WATER

140° DOMESTIC HOT WATER RETURN

DOMESTIC HOT WATER RETURN

DOMESTIC HOT WATER

DOMESTIC COLD WATER

CONDENSATE DRAIN

COMPRESSED AIR

ACID WASTE

ACID VENT

SHW SOFT HOT WATER

SAN

AV

AW

CA

CD

ROS

ROR

NPW

V

DIS

DIR

RD

ORD

LPG

G

NGM

NGH

SCW

PD

INW

IA

IW

LA

SHW

GW GREASE WASTEGW

GV GREASE VENT

ABBREVIATIONSYMBOL DESCRIPTION

PIPING SYMBOLS

ICW

IHW

IHWR

TWR (_ _ _)

TW (_ _ _)

GV

DCW

DHW

DHWR

DHW 140ºF

DHWR 140ºF

MU

DHW 140ºF

DHWR 140ºF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

MECHANICAL:

(502) 481-8548(310) 357-7031

B

IM

/6

-1

-3

U p g ra d e D o m e s ti c H

C

W a te r

S y s te m s

/6

-1

-3

-B L

D G

-M E

P .r v t

/1

/2

:3

:3

P

M

11P-001

PLUMBING LEGEND

TRIPLE C The A/E Group

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

(562) 452-7175

Mat Perkins

P2S ENGINEERING, INC.

9665 Chesapeake Drive, Suite 230

San Diego, CA 92123

(619) 618-2347

Mikhail Fuks

Upgrade Domestic H&C Water

Systems

3350 La Jolla Village Dr, San Diego, CA 92161

664-19-304

06/10/2020 M. Perkins G. Chiurazzi

100% CONSTRUCTION

DOCUMENTS

Revisions: Date:

3 4 5 6 7 8 9 10 12 13 14 15 16 17

A

B

C C.1

D

D.1

E

F

G

H

J

K

L

M

N

P

Q

R

WHEEL CHAIR

SHOP STORAGE

BA110B

MECH

BA111

MECH

BA112A

FITNESS

BA113

CORRIDOR

B103

CORRIDOR

B104

EQUIPMENT

STORAGE

BA110

Room

SW2-B

GENERAL

STORAGE

BA110A

ELEVATOR

S-1

EXAM RM

BA101F

EQUIPMENT

STORAGE

BA109A

MALE TOILET

BA109

OFFICE

BA105A

FEMALE TOILET

BA108

OFFICE

BA101E

THERAPY

BA101A

SCI THERAPY

BA101D

CORRIDOR

B105

FEMALE TOILET

BB111

MALE TOILET

BB112

MECH

BA106

CORRIDOR

B101

COMPUTER

BA103

OFFICE

BA103A

LOBBY

B102A

ELEVATOR

P-1

ELEVATOR

P-2

STAIR

SW1-B

MECH

BA100

COMPUTER AREA

BB102A

COMPUTER

BB100

CORRIDOR

B102

OCCUPATIONAL

THERAPY OFFICE

1B-107

CORRIDOR

B103

THERAPY

BA101

SOILED UTILITY

BB101

OFFICE

BA101B

CAST

BA101C

EQUIPMENT

STORAGE

WHEELCHAIR

REPAIR

BA105

ENGINEERING

BB108

OFFICE

BB108A

CONFERENCE

BB107

MECH

BB106

CORRIDOR

B106

COMPUTER

1B-201

OFFICE

BB104B

SUPPLY CHAIN

BB104

OFFICE

BB104C

CONFERENCE RM

BB104A

CORRIDOR

B108-11

ASST CHIEF

OFFICE

BB105C

GROUNDS WASTE

MGMT OFFICE

BB105B

CHIEF OFFICE

BB105A

MULTI OFFICE

BB105

OFFICE

BB104E

CHIEF INFO

OFFICER OFFICE

BB104D

HAS

BB103OFFICE

BB103B

COMPUTER

BB102

OFFICE

BB103A

TELEPHONE

OFFICE

BB113A

OFFICE

BB109A

OFFICE

BB109

OFFICE

BB109B

OFFICE

BB108C

STAIR

SW3-B

KITCHEN

BB110

F

P

L C

F

P

L B

/F3 11PL100B

F

P

L A

/F3 11PL100C

F

P

L A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

MECHANICAL:

KEY PLAN

(502) 481-8548(310) 357-7031

B

IM

/6

-1

-3

U p g ra d e D o m e s ti c H

C

W a te r

S y s te m s

/6

-1

-3

-B L

D G

-M E

P .r v t

/1

/2

:3

:4

P

M

11PL100

PLUMBING BASEMENT FLOOR OVERALL

PLAN

TRIPLE C The A/E Group

4401 Atlantic Avenue, Suite 200

Long Beach, CA 90807

(562) 452-7175

Mat Perkins

P2S ENGINEERING, INC.

9665 Chesapeake Drive, Suite 230

San Diego, CA 92123

(619) 618-2347

Mikhail Fuks

Upgrade Domestic H&C Water

Systems

3350 La Jolla Village Dr, San Diego, CA 92161

664-19-304

06/10/2020 M. Perkins G. Chiurazzi

100% CONSTRUCTION

DOCUMENTS

Scale: 1" = 10'-0"

G2 DOMESTIC WATER PIPING PLAN BASEMENT LEVEL OVERALL

8 9 10 12 13 14 15 16 1711

G

H

J

K

L

M

N

WC1.0.2

L1.0.4

UR1.0.2

EWC1.0.1EWC1.0.2

MALE TOILET

BB112

COMPUTER

BB100

ENGINEERING

BB108

OFFICE

BB108A

CONFERENCE

BB107

MECH

BB106

CORRIDOR

B106

COMPUTER

1B-201

OFFICE

BB104B

SUPPLY CHAIN

BB104

OFFICE

BB104C

CONFERENCE RM

BB104A

CORRIDOR

B108-11

ASST CHIEF

OFFICE

BB105C

GROUNDS WASTE

MGMT OFFICE

BB105B

CHIEF OFFICE

BB105A

MULTI OFFICE

BB105

OFFICE

BB104E

CHIEF INFO

OFFICER OFFICE

BB104D

HAS

BB103OFFICE

BB103B

COMPUTER

BB102

OFFICE

BB103A

TELEPHONE

OFFICE

BB113A

OFFICE

BB109A

OFFICE

BB109

OFFICE

BB109B

OFFICE

BB108C

STAIR

SW3-B

KITCHEN

BB110

F

P

L C

F

P

L B

X2

MALE TOILET

BB112

4 4

1 2

FD1.0.2

L1.0.1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .