Y1DZ-- SAN DIEGO | Upgrade Domestic Hot and Cold water systems
Solicitation number
36C10F22B0001
Issued by

About this file

This document summarizes a solicitation for upgrade of domestic hot and cold water systems at the VA San Diego Healthcare System located in San Diego, California. The solicitation will be issued as an Invitation for Bid to replace domestic water piping and fixtures in Buildings 1, 2, and 11 on the medical center campus. Interested vendors must be Service-Disabled Veteran-Owned Small Businesses. The project includes introducing a water monitoring and control system. Bids are due August 1st and will be opened on or around August 2nd. The period of performance is approximately 450 calendar days. The magnitude of construction is estimated between $5 million to $10 million. A pre-bid conference will be held on June 30th and questions must be submitted by email to the contracting officer by the specified date.

View the file

Other files

File Type Posted
S07-ABSTRACT OF BID- 664-19-304 (1)-SIGNED DSG-POSTED 9-14-2022.pdf PDF
S06-SOLICITATION AMENDMENT_36C10F22B0001 A00006.pdf PDF
P07-WAGE DETERMINATION- UPDATED 08-05-22.pdf PDF
S06-Solicitation Amendment -A00005- 08-15-2022-COMBINED-DSG.pdf PDF
S06-SOLICITATION DOCUMENT _36C10F22B0001 A00004.pdf PDF
SOLICITATION-DESCRIPTION.pdf PDF
Technical Question Tracking Sheet - Domestic Water Upgrades.202200801_AV.pdf PDF
S07-ABSTRACT OF BID- SIGN IN SHEET- 664-19-304.pdf PDF
S06-asbestos survey.pdf PDF
S06_SOLICITATION DOCUMENT_36C10F22B0001 A00003.pdf PDF
S05-REQUEST FOR INFORMATION RESPONSE_Technical Question Tracking Sheet - Domestic Water Upgrades.20220722 (003).pdf PDF
S04-Virtual Meeting - Upgrade Domestic Hot and Cold water systems (1).pdf PDF
S05-REQUEST FOR INFORMATION RESPONSE_Technical Question Tracking Sheet - Domestic Water Upgrades.20220722.pdf PDF
S06-VASDHS Asbestos Operations and Mainteneance Plan (Edited Final Draft).docx DOCX document
Price Schedule - A00002-7-21-2022.pdf PDF
SDVA_TR_Coverage.pdf PDF
S06-SOLICITATION DOCUMENTS_36C10F22B0001_A00002.pdf PDF
RFI 002.AE.20220720.pdf PDF
S05-RFI 01 - SYGNOS INC-Response DG-7-11-2022.pdf PDF
S04-SDVA Legionella-Pre Bid Presentation.pdf PDF
S02-664-19-304 San Diego VA LIDAR Download Links.pdf PDF
S04-SIGN-IN SHEET.pdf PDF
S04-PRE-BID SITE VISIT 664-19-304.pdf PDF
S02-UPDATED-664-19-304.SPECIFICATIONS_100CD.20220503-ADD01.20220706.pdf PDF
S04-SITE VISIT-Room Change.pdf PDF
S02-664-19-304 Bldg 11 DWG 20200610 - Copy.pdf PDF
Price Schedule .pdf PDF
S02_ SOLICITATION DOCUMENT_36C10F22B0001_ISSUED 6_24_2022.pdf PDF
S02-UPDATED-664-19-304.SPECIFICATIONS_100CD.20220503-REV01-052322 - Copy.pdf PDF
S02-664-19-304 Bldg 2 DWG 20200610 - Copy.pdf PDF
S02-664-19-304 Bldg 1 DWG 20200610 red - Copy.pdf PDF
36C10F22B0001_3.docx DOCX document
S05-REQUEST FOR INFORMATION FORM- 664-19-304.docx DOCX document
wage determination 6-24-2022.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this am endment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 4

A00001 07/07/2022

664-22-1-5156-0001

644-19-304

003C4E

Department of Veterans Affairs

Office of Construction and Facilities Management (00CFM3B)

400 Mare Island Way Suite #100 Vallejo CA 94590

003C4E

Department of Veterans Affairs

Office of Construction and Facilities Management

400 Mare Island Way Suite # 100 Vallejo CA 94590

To all Offerors/Bidders

36C10F22B0001

06-24-2022

X

1 x

Solicitation Amendment A00001 on 36C10F22B0001, Project Number: 664-19-304 Upgrade Domestic Hot And Cold Water Systems at the VA San Diego Healthcare System, 3350 La Jolla Village Dr, San Diego, CA 92161.

1. The purpose of this solicitation amendment is to add additional language for pre-award survey submission requirements.

2. Providing the attached Pre-Proposal Conference/Site Visit document labeled "S04-SIGN-IN SHEET"

3. Providing the attached 2(two) Pre-Proposal Conference PowerPoints.

4. Change in CLIN #8, reference S02-UPDATED-664-19-304.SPECIFICATIONS_100CD.20220503-ADD01.20220706.

5. Providing other government furnished information: See the attached VA LIDAR Download Links.

6. Please see additional language to support the basis for award and revision of magnitude of construction.

7. Please see the remaining continuation page of block #14 of the SF30 for other information.

Dominik Gammon

Contracting Officer

Continuation Page of Block 14 SF-30

AMENDMENT OF SOLICITATION (continued)

Project Description: Upgrade Domestic Hot And Cold Water Systems

Project Location: VA San Diego Healthcare System Project No. 664-19-309

Solicitation No. 36C10F22B0001 Amendment A00001.

8. Additional Bid Submission Requirement to be submitted by the lowest apparent bidder upon government request prior to the pre-award survey :

“Pre-Award preliminary project schedule and phasing plan shall be submitted demonstrating the contractor’s proposed approach to completing the project within the 450 days maximum Period of Performance. The expected construction period of performance duration for each building includes all pre-construction activity and post-construction testing, third-party inspections, and commissioning.

Domestic Water Upgrades shall be phased by Building level and then quadrant, if applicable. The contractor shall provide a schedule for VA approval prior to commencing work that identifies the schedule for each phase including allowances to adhere to project ICRA requirements shown on the drawings, Contractor shall mitigate facility disruptions and shall coordinate all shutdowns with the VA at a minimum 30 calendar days prior to beginning work in that area. Night and weekend and off-hours premium time is mandated for noise abatement, utility shutdowns, and work occurring in sensitive patient care areas. Facility hours of operation are 7:30 AM to

4:30 PM Monday through Friday.

Bids shall include an allowance for this off-hours work requirement. Each quadrant or level (dependent on the approved phasing plan) shall be commissioned and accepted by the VA prior to beginning work on the next phase. The existing control system shall be augmented to serve the new equipment and to include updated/new controls of existing equipment. Existing controls shall always remain operational while integrating the new devices.”

9. Due to the number of interested bidders and sub-contractors present on the date of the pre-proposal conference/site visit walk. The Government determined it was in the best interest of all parties to switch the pre-proposal conference room to meet CDC guidelines based on room and size capacity. No other interest bidders were present at the original location BUILDING 11 ROOM B107 on 6/30/2022 after 1310 PDT after switching to the new location BUILDING 27 #ROOM 102. Therefore no other site visit shall be granted.

10. The Magnitude of the construction is hereby changed from $5,000,000 and $10,000,000 to $10,000,000 and

$20,000,000. Interested bidders are under no obligation to change their initial bid submission to meet the new magnitude of construction nor are they required to approach the upper limit of the magnitude of construction.

836.204 Disclosure of the magnitude of construction projects.

The contracting officer shall utilize the estimated price ranges defined in FAR 36.204(a) through (e) as further supplemented below when identifying the magnitude of a VA project in advance notices and solicitations:

(g) Between $5,000,000 and $10,000,000.

(h) For estimated price ranges greater than $10,000,000, the contracting officer shall identify the magnitude of a

VA project in advance notices and solicitations in terms of one of the following price ranges:

(1) Between $10,000,000 and $20,000,000.

Project Description: Upgrade Domestic Hot And Cold Water Systems

Project Location: VA San Diego Healthcare System

11. Any person entering the interstitial space must have a minimum of 2 hours of asbestos awareness training to meet

OSHA requirements, a medical exam confirming his/her ability to wear a positive air pressure respirator or a respirator designed specifically for the individual while wearing disposable overalls during field investigation in the interstitial. Leaving the catwalk system is not allowed. Documentation of training and respirator fit test is required at least 48hrs prior to the site visit.

• Government Determination: No interested bidder submitted the required documents to view the interstitial space at the time/date of the site visit walk-thru. Therefore no additional site visits shall be granted at this time.

12. Basis for Contract Award: An award will be made to the Lowest, Responsive, Responsible Bidder that is in accordance with FAR14.408 Award. Should the Government convert the IFB into an RFP the award shall be in accordance with FAR Part 15.504 Award to successful offeror.

Request for Information

1. The drawings, reference is made for installing CAT 5E cabling. Our understanding the current VA spec has been

CAT 6A for some time now. Will the VA confirm that this project requires CAT 5E cabling?

• Government Response: All new network cabling shall be CAT6A.

2. In the electrical plans, Keynote 5 states to provide (1) Cat 5E cable in ¾ conduit to patch panel in IT room on

First Floor. Provide RJ45 Connectors on each end of that Cat 5E cable:

a) There are 8 different IT rooms serving the 1st floor in Building 1. (4) located on 1st floor and (4) located in

1st floor interstitial space. The IT rooms in interstitial space will be consolidated in the future. Which IT room will be destinated for the data connections?

b) Is there any distance limitations on the data connections for the water monitoring system?

c) As it states, it’s conflicting what exactly the VA would like us to do. Does the VA want us to punch down one of the end of cat 5E in the IT room onto a patch panel while the other end with RJ45 connector? Or both ends to be terminated with RJ45 connectors?

d) If the VA wants us to punch down onto a patch panel, who is supplying the patch panel?

e) Does the VA want a ¾ conduit stub up/sleeve in the mechanical room/HAC room? Or a ¾ conduit connecting from the mechanical room/HAC room to the first floor IT room?

• Government Response:

a. Each water monitoring panel shall be networked to the local Telecommunication Room (TR) associated with the Level and Quadrant, as applicable. Coordinate final rack position and TR location with Owner.

b. CAT 6A network cable length shall not exceed 328 LF.

c. Follow Key Note 5, terminate both ends with RJ45 connectors.

d. Patch panels are contractor provided/contractor installed.

e. Follow Specification 27 05 33 Part 3.1. Provide complete conduit and/or cable tray. Each monitoring panel shall be networked to the local Telecommunication Room associated with the Level and Quadrant as applicable. Follow the Water Monitoring equipment provider’s requirements.

Project Description: Upgrade Domestic Hot And Cold Water Systems

Project Location: VA San Diego Healthcare System

See Attachment Documents

1. See attached document: S04-SIGN-IN-IN SHEET.

2. See attached document: S04-PRE-BID SITE VISIT 664-19-304.

3. See attached document: S02-664-19-304 San Diego VA LIDAR Download Links.

4. See attached document: S04-SDVA Legionella -Pre Bid Presentation.

5. See attached document: S02-UPDATED-664-19-304.SPECIFICATIONS_100CD.20220503-ADD01.20220706.

6. See attached document: S04-Site Visit-Room Change

End of Document