S05-RFI 01 - SYGNOS INC-Response DG-7-11-2022.pdf
PDF 187 KB Posted
- Solicitation number
- 36C10F22B0001
About this file
This document outlines a solicitation for upgrade work to domestic hot and cold water systems at the Veterans Affairs Medical Center campus in San Diego, California. The Department of Veterans Affairs seeks to award a firm-fixed-price contract to furnish all labor, materials, equipment, and services necessary to introduce monitoring and control systems into existing domestic hot and cold water distribution piping in Buildings 1, 2, and 11 on the campus. Interested Service-Disabled Veteran-Owned Small Businesses must be registered in the System for Award Management and verified through the Veterans Affairs Center for Veterans Enterprise to be considered for the award. Bids are due no later than August 1st, 2022 and the period of performance is approximately 450 calendar days from notice to proceed.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTRUCTIONS - BID FORM TEMPLATE
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples -- square yards -- SY, cubic yards -- CY, square feet -- SF, linear feet -- LF, board feet -- BF, each -- EA, pound -- LB).
Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2 ). Items and units of measure will be fur--nished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5 ) for item listed in column 1.
Col 6. 7, and 8 Labor Costs. Enter in Col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1.
Enter in Col 7 the average rate per mahour (manday ) and in Col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in Col 1 ) which are special to the contract and of significant dollar value. Identify Subcontractor costs here and include back-up documentation on how these costs were derived.
Col 10 Line Total. Self-explanatory.
NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
1 TOTAL MATERIAL COSTS: -$ -$ (Column 5 Total)
2 TOTAL LABOR COSTS: -$ 0 (Column 8 Total)
3 TOTAL OTHER DIRECT COSTS: -$ 0 (Column 9 Total)
4 TOTAL DIRECT COSTS: -$ 0 (Column 10 Total, = Items 1 + 2 + 3)
5 OVERHEAD @ ____________% -$ (Item 4 x Item 8 %)
6 PROFIT @ ____________% -$ (Item 4 x Item 6 %)
7 SUBTOTAL: -$ (Item 4 + 5 + 6)
8 BOND @ ____________% -$ (Item 7 x Item 8 %)
9 TOTAL PRICE: -$ (Item 7 + 8))
INSTRUCTIONS TO OFFERORS
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs (and attached supporting information ) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal the offeror shall, under the conditions stated in FAR 15.804-2, be required to submit a certificate of current cost or pricing data
(see FAR 15.804 ).
2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit and submit with this form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from known data to the estimate, and
c. The contingencies used by the offeror in their proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate ), and made available to the contracting officer or his authorized representative upon request.
4. Submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such negotiations prior to contract award.
(Reverse of Construction Cost Estimate Breakdown)
CLIN 01 - CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5) LABOR COSTS
MANHOURS
MANDAYS
(6)
AVERAGE
RATE
(7)
TOTAL
(8)
OTHER
DIRECT
COSTS
(9)
LINE TOTAL
(10)
DIVISION 01 - GENERAL REQUIREMENTS -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY CONTROLS ENGINEER -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY INSPECTIONS -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY COMMISSIONING -$ -$ -$ -$ -$
DIVISION 02 - EXISTING CONDITIONS/ABATEMENT -$ -$ -$ -$ -$
DIVISION 05 - METALS -$ -$ -$ -$ -$
DIVISION 07 - THERMAL AND MOISTURE PROTECTION -$ -$ -$ -$ -$
DIVISION 08 - OPENINGS -$ -$ -$ -$ -$
DIVISION 09 - FINISHES -$ -$ -$ -$ -$
DIVISION 13 - SPECIAL CONSTRUCTION -$ -$ -$ -$ -$
DIVISION 22 - PLUMBING -$ -$ -$ -$ -$
DIVISION 23 - HVAC -$ -$ -$ -$ -$
DIVISION 26 - ELECTRICAL -$ -$ -$ -$ -$
DIVISION 27 - COMMUNICATIONS -$ -$ -$ -$ -$
CLOSE-OUT DOCUMENTS -$ -$ -$ -$
CLIN 02 - CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5) LABOR COSTS
MANHOURS
MANDAYS
(6)
AVERAGE
RATE
(7)
TOTAL
(8)
OTHER
DIRECT
COSTS
(9)
LINE TOTAL
(10)
DIVISION 01 - GENERAL REQUIREMENTS -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY CONTROLS ENGINEER -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY INSPECTIONS -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY COMMISSIONING -$ -$ -$ -$ -$
DIVISION 02 - EXISTING CONDITIONS/ABATEMENT -$ -$ -$ -$ -$
DIVISION 05 - METALS -$ -$ -$ -$ -$
DIVISION 07 - THERMAL AND MOISTURE PROTECTION -$ -$ -$ -$ -$
DIVISION 08 - OPENINGS -$ -$ -$ -$ -$
DIVISION 09 - FINISHES -$ -$ -$ -$ -$
DIVISION 13 - SPECIAL CONSTRUCTION -$ -$ -$ -$ -$
DIVISION 22 - PLUMBING -$ -$ -$ -$ -$
DIVISION 23 - HVAC -$ -$ -$ -$ -$
DIVISION 26 - ELECTRICAL -$ -$ -$ -$ -$
DIVISION 27 - COMMUNICATIONS -$ -$ -$ -$ -$
CLOSE-OUT DOCUMENTS -$ -$ -$ -$
CLIN 03 - CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5) LABOR COSTS
MANHOURS
MANDAYS
(6)
AVERAGE
RATE
(7)
TOTAL
(8)
OTHER
DIRECT
COSTS
(9)
LINE TOTAL
(10)
DIVISION 01 - GENERAL REQUIREMENTS -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY CONTROLS ENGINEER -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY INSPECTIONS -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY COMMISSIONING -$ -$ -$ -$ -$
DIVISION 02 - EXISTING CONDITIONS/ABATEMENT -$ -$ -$ -$ -$
DIVISION 05 - METALS -$ -$ -$ -$ -$
DIVISION 07 - THERMAL AND MOISTURE PROTECTION -$ -$ -$ -$ -$
DIVISION 08 - OPENINGS -$ -$ -$ -$ -$
DIVISION 09 - FINISHES -$ -$ -$ -$ -$
DIVISION 13 - SPECIAL CONSTRUCTION -$ -$ -$ -$ -$
DIVISION 22 - PLUMBING -$ -$ -$ -$ -$
DIVISION 23 - HVAC -$ -$ -$ -$ -$
DIVISION 26 - ELECTRICAL -$ -$ -$ -$ -$
DIVISION 27 - COMMUNICATIONS -$ -$ -$ -$ -$
CLOSE-OUT DOCUMENTS -$ -$ -$ -$
CLIN 004 - CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5) LABOR COSTS
MANHOURS
MANDAYS
(6)
AVERAGE
RATE
(7)
TOTAL
(8)
OTHER
DIRECT
COSTS
(9)
LINE TOTAL
(10)
DIVISION 01 - GENERAL REQUIREMENTS -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY CONTROLS ENGINEER -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY INSPECTIONS -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY COMMISSIONING -$ -$ -$ -$ -$
DIVISION 02 - EXISTING CONDITIONS/ABATEMENT -$ -$ -$ -$ -$
DIVISION 05 - METALS -$ -$ -$ -$ -$
DIVISION 07 - THERMAL AND MOISTURE PROTECTION -$ -$ -$ -$ -$
DIVISION 08 - OPENINGS -$ -$ -$ -$ -$
DIVISION 09 - FINISHES -$ -$ -$ -$ -$
DIVISION 13 - SPECIAL CONSTRUCTION -$ -$ -$ -$ -$
DIVISION 22 - PLUMBING -$ -$ -$ -$ -$
DIVISION 23 - HVAC -$ -$ -$ -$ -$
DIVISION 26 - ELECTRICAL -$ -$ -$ -$ -$
DIVISION 27 - COMMUNICATIONS -$ -$ -$ -$ -$
CLOSE-OUT DOCUMENTS -$ -$ -$ -$
CLIN 05 - CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5) LABOR COSTS
MANHOURS
MANDAYS
(6)
AVERAGE
RATE
(7)
TOTAL
(8)
OTHER
DIRECT
COSTS
(9)
LINE TOTAL
(10)
DIVISION 01 - GENERAL REQUIREMENTS -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY CONTROLS ENGINEER -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY INSPECTIONS -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY COMMISSIONING -$ -$ -$ -$ -$
DIVISION 02 - EXISTING CONDITIONS/ABATEMENT -$ -$ -$ -$ -$
DIVISION 05 - METALS -$ -$ -$ -$ -$
DIVISION 07 - THERMAL AND MOISTURE PROTECTION -$ -$ -$ -$ -$
DIVISION 08 - OPENINGS -$ -$ -$ -$ -$
DIVISION 09 - FINISHES -$ -$ -$ -$ -$
DIVISION 13 - SPECIAL CONSTRUCTION -$ -$ -$ -$ -$
DIVISION 22 - PLUMBING -$ -$ -$ -$ -$
DIVISION 23 - HVAC -$ -$ -$ -$ -$
DIVISION 26 - ELECTRICAL -$ -$ -$ -$ -$
DIVISION 27 - COMMUNICATIONS -$ -$ -$ -$ -$
CLOSE-OUT DOCUMENTS -$ -$ -$ -$
CLIN 06 - CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5) LABOR COSTS
MANHOURS
MANDAYS
(6)
AVERAGE
RATE
(7)
TOTAL
(8)
OTHER
DIRECT
COSTS
(9)
LINE TOTAL
(10)
DIVISION 01 - GENERAL REQUIREMENTS -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY CONTROLS ENGINEER -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY INSPECTIONS -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY COMMISSIONING -$ -$ -$ -$ -$
DIVISION 02 - EXISTING CONDITIONS/ABATEMENT -$ -$ -$ -$ -$
DIVISION 05 - METALS -$ -$ -$ -$ -$
DIVISION 07 - THERMAL AND MOISTURE PROTECTION -$ -$ -$ -$ -$
DIVISION 08 - OPENINGS -$ -$ -$ -$ -$
DIVISION 09 - FINISHES -$ -$ -$ -$ -$
DIVISION 13 - SPECIAL CONSTRUCTION -$ -$ -$ -$ -$
DIVISION 22 - PLUMBING -$ -$ -$ -$ -$
DIVISION 23 - HVAC -$ -$ -$ -$ -$
DIVISION 26 - ELECTRICAL -$ -$ -$ -$ -$
DIVISION 27 - COMMUNICATIONS -$ -$ -$ -$ -$
CLOSE-OUT DOCUMENTS -$ -$ -$ -$
CLIN 07 - CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5) LABOR COSTS
MANHOURS
MANDAYS
(6)
AVERAGE
RATE
(7)
TOTAL
(8)
OTHER
DIRECT
COSTS
(9)
LINE TOTAL
(10)
DIVISION 01 - GENERAL REQUIREMENTS -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY CONTROLS ENGINEER -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY INSPECTIONS -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY COMMISSIONING -$ -$ -$ -$ -$
DIVISION 02 - EXISTING CONDITIONS/ABATEMENT -$ -$ -$ -$ -$
DIVISION 05 - METALS -$ -$ -$ -$ -$
DIVISION 07 - THERMAL AND MOISTURE PROTECTION -$ -$ -$ -$ -$
DIVISION 08 - OPENINGS -$ -$ -$ -$ -$
DIVISION 09 - FINISHES -$ -$ -$ -$ -$
DIVISION 13 - SPECIAL CONSTRUCTION -$ -$ -$ -$ -$
DIVISION 22 - PLUMBING -$ -$ -$ -$ -$
DIVISION 23 - HVAC -$ -$ -$ -$ -$
DIVISION 26 - ELECTRICAL -$ -$ -$ -$ -$
DIVISION 27 - COMMUNICATIONS -$ -$ -$ -$ -$
CLOSE-OUT DOCUMENTS -$ -$ -$ -$
CLIN 08 - CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5) LABOR COSTS
MANHOURS
MANDAYS
(6)
AVERAGE
RATE
(7)
TOTAL
(8)
OTHER
DIRECT
COSTS
(9)
LINE TOTAL
(10)
DIVISION 01 - GENERAL REQUIREMENTS -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY CONTROLS ENGINEER -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY INSPECTIONS -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY COMMISSIONING -$ -$ -$ -$ -$
DIVISION 02 - EXISTING CONDITIONS/ABATEMENT -$ -$ -$ -$ -$
DIVISION 05 - METALS -$ -$ -$ -$ -$
DIVISION 07 - THERMAL AND MOISTURE PROTECTION -$ -$ -$ -$ -$
DIVISION 08 - OPENINGS -$ -$ -$ -$ -$
DIVISION 09 - FINISHES -$ -$ -$ -$ -$
DIVISION 13 - SPECIAL CONSTRUCTION -$ -$ -$ -$ -$
DIVISION 22 - PLUMBING -$ -$ -$ -$ -$
DIVISION 23 - HVAC -$ -$ -$ -$ -$
DIVISION 26 - ELECTRICAL -$ -$ -$ -$ -$
DIVISION 27 - COMMUNICATIONS -$ -$ -$ -$ -$
CLOSE-OUT DOCUMENTS -$ -$ -$ -$
CLIN 09 - CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5) LABOR COSTS
MANHOURS
MANDAYS
(6)
AVERAGE
RATE
(7)
TOTAL
(8)
OTHER
DIRECT
COSTS
(9)
LINE TOTAL
(10)
DIVISION 01 - GENERAL REQUIREMENTS -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY CONTROLS ENGINEER -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY INSPECTIONS -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY COMMISSIONING -$ -$ -$ -$ -$
DIVISION 02 - EXISTING CONDITIONS/ABATEMENT -$ -$ -$ -$ -$
DIVISION 05 - METALS -$ -$ -$ -$ -$
DIVISION 07 - THERMAL AND MOISTURE PROTECTION -$ -$ -$ -$ -$
DIVISION 08 - OPENINGS -$ -$ -$ -$ -$
DIVISION 09 - FINISHES -$ -$ -$ -$ -$
DIVISION 13 - SPECIAL CONSTRUCTION -$ -$ -$ -$ -$
DIVISION 22 - PLUMBING -$ -$ -$ -$ -$
DIVISION 23 - HVAC -$ -$ -$ -$ -$
DIVISION 26 - ELECTRICAL -$ -$ -$ -$ -$
DIVISION 27 - COMMUNICATIONS -$ -$ -$ -$ -$
CLOSE-OUT DOCUMENTS -$ -$ -$ -$
CLIN 010 - CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5) LABOR COSTS
MANHOURS
MANDAYS
(6)
AVERAGE
RATE
(7)
TOTAL
(8)
OTHER
DIRECT
COSTS
(9)
LINE TOTAL
(10)
DIVISION 01 - GENERAL REQUIREMENTS -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY CONTROLS ENGINEER -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY INSPECTIONS -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY COMMISSIONING -$ -$ -$ -$ -$
DIVISION 02 - EXISTING CONDITIONS/ABATEMENT -$ -$ -$ -$ -$
DIVISION 05 - METALS -$ -$ -$ -$ -$
DIVISION 07 - THERMAL AND MOISTURE PROTECTION -$ -$ -$ -$ -$
DIVISION 08 - OPENINGS -$ -$ -$ -$ -$
DIVISION 09 - FINISHES -$ -$ -$ -$ -$
DIVISION 13 - SPECIAL CONSTRUCTION -$ -$ -$ -$ -$
DIVISION 22 - PLUMBING -$ -$ -$ -$ -$
DIVISION 23 - HVAC -$ -$ -$ -$ -$
DIVISION 26 - ELECTRICAL -$ -$ -$ -$ -$
DIVISION 27 - COMMUNICATIONS -$ -$ -$ -$ -$
CLOSE-OUT DOCUMENTS -$ -$ -$ -$
CLIN 011 - CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5) LABOR COSTS
MANHOURS
MANDAYS
(6)
AVERAGE
RATE
(7)
TOTAL
(8)
OTHER
DIRECT
COSTS
(9)
LINE TOTAL
(10)
DIVISION 01 - GENERAL REQUIREMENTS -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY CONTROLS ENGINEER -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY INSPECTIONS -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY COMMISSIONING -$ -$ -$ -$ -$
DIVISION 02 - EXISTING CONDITIONS/ABATEMENT -$ -$ -$ -$ -$
DIVISION 05 - METALS -$ -$ -$ -$ -$
DIVISION 07 - THERMAL AND MOISTURE PROTECTION -$ -$ -$ -$ -$
DIVISION 08 - OPENINGS -$ -$ -$ -$ -$
DIVISION 09 - FINISHES -$ -$ -$ -$ -$
DIVISION 13 - SPECIAL CONSTRUCTION -$ -$ -$ -$ -$
DIVISION 22 - PLUMBING -$ -$ -$ -$ -$
DIVISION 23 - HVAC -$ -$ -$ -$ -$
DIVISION 26 - ELECTRICAL -$ -$ -$ -$ -$
DIVISION 27 - COMMUNICATIONS -$ -$ -$ -$ -$
CLOSE-OUT DOCUMENTS -$ -$ -$ -$
CLIN 012 - CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5) LABOR COSTS
MANHOURS
MANDAYS
(6)
AVERAGE
RATE
(7)
TOTAL
(8)
OTHER
DIRECT
COSTS
(9)
LINE TOTAL
(10)
DIVISION 01 - GENERAL REQUIREMENTS -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY CONTROLS ENGINEER -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY INSPECTIONS -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY COMMISSIONING -$ -$ -$ -$ -$
DIVISION 02 - EXISTING CONDITIONS/ABATEMENT -$ -$ -$ -$ -$
DIVISION 05 - METALS -$ -$ -$ -$ -$
DIVISION 07 - THERMAL AND MOISTURE PROTECTION -$ -$ -$ -$ -$
DIVISION 08 - OPENINGS -$ -$ -$ -$ -$
DIVISION 09 - FINISHES -$ -$ -$ -$ -$
DIVISION 13 - SPECIAL CONSTRUCTION -$ -$ -$ -$ -$
DIVISION 22 - PLUMBING -$ -$ -$ -$ -$
DIVISION 23 - HVAC -$ -$ -$ -$ -$
DIVISION 26 - ELECTRICAL -$ -$ -$ -$ -$
DIVISION 27 - COMMUNICATIONS -$ -$ -$ -$ -$
CLOSE-OUT DOCUMENTS -$ -$ -$ -$
CLIN 013 - CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5) LABOR COSTS
MANHOURS
MANDAYS
(6)
AVERAGE
RATE
(7)
TOTAL
(8)
OTHER
DIRECT
COSTS
(9)
LINE TOTAL
(10)
DIVISION 01 - GENERAL REQUIREMENTS -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY CONTROLS ENGINEER -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY INSPECTIONS -$ -$ -$ -$ -$
DIVISION 01 - THIRD-PARTY COMMISSIONING -$ -$ -$ -$ -$
DIVISION 02 - EXISTING CONDITIONS/ABATEMENT -$ -$ -$ -$ -$
DIVISION 05 - METALS -$ -$ -$ -$ -$
DIVISION 07 - THERMAL AND MOISTURE PROTECTION -$ -$ -$ -$ -$
DIVISION 08 - OPENINGS -$ -$ -$ -$ -$
DIVISION 09 - FINISHES -$ -$ -$ -$ -$
DIVISION 13 - SPECIAL CONSTRUCTION -$ -$ -$ -$ -$
DIVISION 22 - PLUMBING -$ -$ -$ -$ -$
DIVISION 23 - HVAC -$ -$ -$ -$ -$
DIVISION 26 - ELECTRICAL -$ -$ -$ -$ -$
DIVISION 27 - COMMUNICATIONS -$ -$ -$ -$ -$
CLOSE-OUT DOCUMENTS -$ -$ -$ -$
File details come from the government source that posted it. Updated .