This file is a set of construction contract documents for a federal renovation project at the Robert J. Dole VA Medical Center in Wichita, Kansas. The project involves renovating Buildings 5 and 5B to support mental health services, with a total project area of 969 square feet on the first floor. The contract documents include architectural, mechanical, plumbing, electrical, and fire suppression plans and specifications dated May 21, 2024.

The renovation scope encompasses interior partition construction, flooring and wall finishes, plumbing fixtures including wall-mounted lavatories, HVAC systems with VAV terminal units and fan-powered units, electrical lighting and power distribution, fire suppression sprinkler systems, and fire alarm systems. Key project requirements include full sprinkler coverage, compliance with ADA accessibility standards, fire-rated wall construction in specific locations, and coordination of all building systems. The project includes two bid deduct alternates for removal of sinks from exam rooms. Design professionals on the project include Alesia Architecture P.C., BDH Engineering, and Farris Engineering. The contractor must coordinate with existing building systems, conduct field verification of existing conditions, maintain continuous utility operations, and submit shop drawings for approval. The contract documents establish requirements for materials quality, testing, system commissioning, and commissioning training prior to occupancy.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUILDING 5B

RICHARD

JOSEPH

ONKEN

A-5125

A

R C H I T E

C

T

S T

A T

E

O F N E B

R A

S K

A

5/21/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

BDH Engineering 440 Regency Parkway, Suit 135 Omaha, Nebraska 68114 Phone: (402) 981-5527

Farris Engineering 12700 W Dodge Rd, Omaha, NE 68154 Phone: (402) 330-5900

A on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t

6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t

6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t

CONTRACT DOCUMENTS RENOVATE 5 & 5B FOR

MENTAL HEALTH

589A7-23-306

5b

WICHITA, KS

A

B

C

D

E

F

21 MAY 2024 RJO IJM

A u to d e s k D o c s /1

A -2

-3

R e n o v a te B ld g b f o r

M e n ta l H e a lt h

/5

A

-2

-3

.A rc h

R

-R e n o v a te B ld g b f o r M e n ta l H e a lt h

.r v t

/2

/2

:2

:5

A

M

GI001

COVER SHEET

Robert J. Dole VA Medical Center

R en ov at e b F or M en ta l H ea lth

C on tr ac t D oc um en ts

5/

/2

Renovate 5 & 5b For Mental Health 5500 E Kellogg Ave, Wichita, KS 67218

1" = 200'-0"1

WICHITA VA SITE PLAN

GENERAL INFORMATION

GI001 COVER SHEET

GI002 LIFE SAFETY CODE NARRATIVE

EQUIPMENT

LIFE SAFETY

GI101 FIRST FLOOR - LIFE SAFETY PLAN

INTERIOR DESIGN

AE701 DOOR AND FRAME TYPES, DETAILS AND DOOR SCHEDULE

AE801 PARTITION TYPES

AE802 PARTITION & TRANSITION DETAILS

AE905 INTERIOR ELEVATIONS

IN101 FIRST FLOOR - INTERIOR FLOOR FINISH PLAN

IN601 INTERIOR SCHEDULES AND DETAILS

QH101 FIRST FLOOR - EQUIPMENT PLAN

MECHANICAL

MG101 MECHANICAL SYMBOLS LEGEND AND GENERAL NOTES

MH101 FIRST FLOOR MECHANICAL PLANS

M-501 MECHANICAL DETAILS AND SCHEDULES

PLUMBING

PG101 PLUMBING SYMBOLS LEGEND AND GENERAL NOTES

PL101 FIRST FLOOR PLUMBING PLAN

P-501 PLUMBING DETAILS AND SCHEDULES

ELECTRICAL

EG101 ELECTRICAL SYMBOLS LEGEND AND GENERAL NOTES

ED101 FIRST FLOOR ELECTRICAL DEMOLITION PLAN

EL101 FIRST FLOOR LIGHTING PLAN

EP101 FIRST FLOOR POWER PLAN

E-501 ELECTRICAL DETAILS

FA101 FIRST FLOOR FIRE ALARM PLAN

FG101 FIRE SUPPRESSION SYMBOLS LEGEND AND GENERAL NOTES

FX101 FIRST FLOOR FIRE SUPPRESSION PLAN

ARCHITECTURAL

AG001 ARCHITECTURAL ABBREVIATIONS, LEGENDS AND NOTES

AD101 DEMOLITION PLANS

AE101 FIRST FLOOR PLAN

AC101 FIRST FLOOR - REFLECTED CEILING PLAN

Mark Revisions: Date:

UP

SSSSSS

S S

S S

S S

S S

S S

S S

SSSSSS

S S

S S

S S

S S

S S

S S

SMOKE PARTITION

SYMBOL

SOC PLAN LEGEND

DESCRIPTION

1-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

3-HOUR FIRE BARRIER

SMOKE BARRIER

1-HOUR SMOKE BARRIER

2-HOUR SMOKE BARRIER

3-HOUR SMOKE BARRIER

4-HOUR FIRE BARRIER

4-HOUR SMOKE BARRIER

30-MINUTE SMOKE BARRIER

30-MINUTE FIRE BARRIER

S S

S

S

S

S

S

S

S

S

S S

ELEVATOR

152-5

ELEVATOR

153-5

ELEV.

EQUIP.

154-5

RECEPTION

162-5

WOMEN'S

161-5

MEN'S

168-5

COMM.

158-5

JAN

160-5

STAIR

156-5

WAITING

151-5

INTERVIEW

155-5

HALLWAY

157-5

VESTIBULE

169-5

ELECTRICAL

170-5

FIRE

SPRINKLER

MECH. RM.

171-5OFFICE

172-5

OFFICE

173-5

OFFICE

174-5

OFFICE

175-5

504 SF

GROUP

THERAPY

167-5

HALLWAY

176-5

OFFICE

178-5

OFFICE

179-5

STAIR

171-5

VESTIBULE

159-5

110 SF

POLICE

163-5

VESTIBULE

150-5

120 SF

EXAM

OFFICE

166D-5

120 SF

EXAM

OFFICE

166C-5

125 SF

EXAM

OFFICE

166B-5

125 SF

EXAM

OFFICE

166A-5

122 SF

COPY WORK

ROOM

165-5

10'-0"

'-6

'-6

9'-7"

155 SF

HALLWAY

157B-5

6'-0"

GH166C

GH166D

GH166B

GH166A

GH163

GH165

S-1 93' - 3"

21 sec

113' - 4"

26 sec

S-2

81' - 1"

18 sec

S-3

AE701

'-0

EXIT MARKER

S-1 S-2 S-3

RICHARD

JOSEPH

ONKEN

A-5125

A

R C H I T E

C

T

S T

A T

E

O F N E B

R A

S K

A

5/21/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

BDH Engineering 440 Regency Parkway, Suit 135 Omaha, Nebraska 68114 Phone: (402) 981-5527

Farris Engineering 12700 W Dodge Rd, Omaha, NE 68154 Phone: (402) 330-5900

A on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t

6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t

6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t

CONTRACT DOCUMENTS RENOVATE 5 & 5B FOR

MENTAL HEALTH

589A7-23-306

5b

WICHITA, KS

A

B

C

D

E

F

21 MAY 2024 RJO IJM

A u to d e s k D o c s /1

A -2

-3

R e n o v a te B ld g b f o r

M e n ta l H e a lt h

/5

A

-2

-3

.A rc h

R

-R e n o v a te B ld g b f o r M e n ta l H e a lt h

.r v t

/2

/2

:2

:5

A

M

GI101

FIRST FLOOR - LIFE SAFETY PLAN

1/4" = 1'-0"1

FIRST FLOOR - FLOOR PLAN

EGRESS PATH INFORMATION

Mark OCCUPANCY CLASSIFICATION Length EGRESS PATH MAXIMUM PERMITTED

EP 01 BUSINESS 93' - 2 29/32" 300' - 0"

EP 02 BUSINESS 113' - 3 31/32" 300' - 0"

EP 03 BUSINESS 81' - 1 5/32" 300' - 0"

EXIT CAPACITY COMPARISON

EGRESS PATH

NAME

EGRESS COMPLETE

CLEAR WIDTH

EGRESS CAPACITY

FACTOR

EGRESS COMPONENT

OCCUPANT LOAD CAPACITY

EXPECTED

OCCUPANT LOAD

S-1 38" 0.2 150 50

S-2 38" 0.2 190 165

S-3 38" 0.2 190 165

OCCUPANT LOAD CALCULATION

ZONE Area OCCUPANCY LOAD FACTOR OCCUPANCY LOAD

AMBULATORY HEALTHCARE BUSINESS 5537 SF 150 37

1. THE CONTRACTOR SHALL INSPECT THE SITE, STUDY EXISTING CONDITIONS, REVIEW DRAWINGS AND SPECIFICATIONS.

CONTRACTOR SHALL ADJUST FOR ACTUAL FIELD CONDITIONS AT NO ADDITIONAL EXPENSE TO THE THE GOVT..

2. CONTRACTOR SHALL TAKE ALL MEASUREMENTS FOR THE WORK AND BE RESPONSIBLE FOR SAME. COORDINATE THE WORK AND SHOP DRAWINGS WITH ALL OTHER TRADES AFFECTED AND MAKE ANY NECESSARY OFFSETS TO CONCEAL PIPING AND DUCTWORK AND TO CLEAR EQUIPMENT, STRUCTURAL MEMBERS AND OTHER OBSTRUCTIONS.

3. ALL UTILITIES AND SERVICES SHALL BE KEPT IN CONTINUOUS OPERATION UNLESS WRITTEN PERMISSION IS OTHERWISE GRANTED BY THE GOVT.. CONTRACTOR MUST

CONTACT VA'S COR PRIOR TO ANY SHUTDOWNS.

4. ALL MATERIALS AND EQUIPMENT SHALL BE NEW, OF THE BEST QUALITY AND FREE FROM DEFECTS.

5. MANUFACTURER AND MODEL NUMBERS SPECIFIED ESTABLISH THE TYPE AND QUALITY REQUIRED, UNLESS OTHERWISE NOTED.

6. ALL WORK SHALL COMPLY WITH APPLICABLE REGULATIONS, CODES AND ORDINANCES.

7. THE CONTRACTOR SHALL PERFORM ALL TESTS AS SPECIFIED OR AS NECESSARY TO DEMONSTRATE A COMPLETE AND SATISFACTORY INSTALLATION.

8. INSTALL THE SPECIFIED FIRE STOPPING (SLEEVES, WRAP, CONDUIT, ETC.) AT RATED CONSTRUCTION (NEW OR EXISTING) OR SMOKE PARTITIONS:

A. REPLACE FIRE STOP AT ALL PENETRATIONS WHERE NEW DEVICES/LINES USE EXISTING PENETRATIONS OF RATED BARRIERS.

B. REPLACE FIRE STOP AT ALL EXISTING PENETRATIONS OF RATED BARRIERS WHERE EXISTING LINES HAVE BEEN MODIFIED OR RELOCATED.

C. FIRE STOP ALL NEWLY CREATED PENETRATIONS WHERE NEW DEVICES/LINES PENETRATE EXISTING FLOORS, CEILINGS AND OTHER RATED BARRIERS.

D. FIRE STOP ALL NEW PENETRATIONS WHERE NEW DEVICES/LINES PENETRATE THROUGH NEWLY CONSTRUCTED RATED BARRIERS OR SMOKE PARTITIONS.

E. USE ONLY APPROVED FIRE CAULKING AND FIRE STOPS (SEE SPECIFICATIONS).

9. ALL METAL STUD AND GYPSUM WALLBOARD PARTITIONS ARE DIMENSIONED TO THE OUTSIDE FINISH FACE OF WALL AND TO THE COLUMN GRID UNLESS OTHERWISE NOTED.

10. ALL GYPSUM BOARD SHALL BE TYPE 'X' FIRE CODE GYPSUM BOARD AND SHALL BE MOLD AND MOISTURE RESISTANT.

11. PROVIDE WOOD BLOCKING OR 16 GA. SHEET METAL BACKING PLATES IN ALL WALLS TO RECEIVE WALL HUNG ACCESSORIES, SUCH AS EQUIPMENT, GRAB BARS, MILLWORK, COAT HOOKS, AND DOOR STOPS, ETC. IF WOOD BLOCKING IS USED, PROVIDE AS FIRE-RESISTANT.

12. THE CONTRACTOR SHALL WORK WITH THE CONDITIONS AS THEY EXIST AT THE SITE. ALL ABOVE CEILING CONDITIONS SHALL BE REVIEWED, AND MODIFICATIONS IDENTIFIED, COORDINATED, AND INCORPORATED INTO THE SHOP DRAWING PROCESS. COORDINATE ALL ABOVE CEILING WORK TO ENSURE A COMPLETE AND OPERATIONAL SYSTEM AT NO ADDITIONAL COST TO THE GOVT.. COORDINATION SHALL INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING:

A. THE GOVT.'S EQUIPMENT REQUIREMENTS.

B. THE CEILING SUPPORT SYSTEM.

C. THE MECHANICAL DUCTWORK SYSTEM.

D. THE LIGHTING FIXTURES.

E. ELECTRICAL WIRING AND CONDUIT SYSTEMS.

F. THE PLUMBING AND PIPING SYSTEMS.

G. FIRE PROTECTION SYSTEMS

H. THE COMMUNICATIONS AND SPECIAL SYSTEMS.

13. ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK. CONTRACTOR SHALL NOT BE ALLOWED

EXTRA COSTS DUE TO FAILURE TO REVIEW ENTIRE SET OF DOCUMENTS.

14. ALL NEW STUD WALLS AND GYPSUM BOARD SHALL EXTEND TO STRUCTURE UNLESS NOTED OTHERWISE.

15. WHEN WALL PARTITIONS OF DIFFERENT FIRE RATING INTERSECT, THE HIGHEST RATED PARTITION TAKES PRECEDENT. MAINTAIN RATING BEHIND RECESSED AREAS IN WALLS.

16. ALL CORRIDOR WALLS ARE REQUIRED TO BE SMOKE TIGHT, WHETHER THEY ARE FIRE RATED OR NOT. REPAIR AND EXTEND AT LEAST THE CORRIDOR SIDE OF NON-RATED

CORRIDOR WALLS TO STRUCTURE, UNLESS NOTED OTHERWISE, SEE WALL TYPES.

17. COORDINATE CONSTRUCTION REQUIREMENTS WITH CIVIL, STRUCTURAL, MECHANICAL, FIRE PROTECTION, PLUMBING AND ELECTRICAL DRAWINGS.

18. FURNITURE SHOWN IS N.I.C., UNLESS NOTED OTHERWISE.

19. EQUIPMENT SHALL BE PROVIDED BY THE GOVT. AND INSTALLED BY THE CONTRACTOR AS SCHEDULED, UNLESS NOTED OTHERWISE.

GENERAL ARCHITECTURAL NOTES

SEE SECTION 01 00 00 - GENERAL REQUIREMENTS FOR FULL

DESCRIPTION OF DEDUCT ALTERNATES. REFER TO DRAWINGS FOR

ADDITIONAL NOTES AND DIRECTIONS RELATED TO DEDUCT

ALTERNATES.

LIST OF BID DEDUCT ALTERNATES

1. Removal of half of the sinks from the exam rooms.

2. Removal of other half of the sinks from the exam rooms.

BID ITEMS & DEDUCT ALTERNATES

FRONT APPROACH, PULL SIDE FRONT APPROACH, PUSH SIDE

NOTE: X=12" MINIMUM IF DOOR HAS

BOTH A CLOSER AND LATCH

HINGE SIDE APPROACHES - SWINGING DOORS

LATCH SIDE APPROACHES - SWINGING DOORS

NOTE:

1. ALL DOORS IN ALCOVES SHALL COMPLY WITH CLEARANCES FOR FRONT APPROACHES.

HINGE APPROACH, PULL SIDE HINGE APPROACH, PUSH SIDE

LATCH APPROACH, PULL SIDE LATCH APPROACH, PUSH SIDE

NOTE: X=36" MINIMUM IF Y=60"; X=42"

MINIMUM IF Y=54".

NOTE: Y=48" MINIMUM IF DOOR HAS

BOTH A LATCH AND CLOSER.

NOTE: Y=54" MINIMUM IF DOOR HAS

CLOSER.

NOTE: Y=48" MINIMUM IF DOOR HAS

CLOSER.

FRONT APPROACHES - SWINGING DOORS

MIN.

1'-6"

M

IN

M

IN

X

54" MIN.

M

IN

5' -0

X

MIN.

2'-0"

M

IN

M

IN

MIN.

2'-0" X X

Y

Y

Y

PULL SIDE PUSH SIDE

POCKET OR HINGE APPROACH - SLIDING BARN DOORS

POCKET OR HINGE APPROACH STOP OR LATCH APPROACH

FRONT AND SIDE APPROACHES - NO DOORS

M

IN

M

IN

2'-0"42

M

IN

22" MIN. 42

M

IN

GENERAL SYMBOLS

A101

SIM

A101

SIM

1i

A101

SIM

D

SCALE:1

View Name

1/8" = 1'-0"

A

NTRUE

NORTH

A

B

EARTH

EARTH GRAVEL

CONCRETE

METALS

BRICK

CMU

TILE

STONE

WOOD

GYPSUM

GLASS

INSULATION

REGULAR

STEEL ALUMINUM

FACE COMMON

CMU

CERAMIC

MARBLE LIMESTONE

FINISH BLOCKING

PLASTER OR GWB

LARGE SCALE SMALL SCALE

BATT OR LOOSE RIGID

SURFACE

ACTUAL SQ. FT.

PROGRAMMED SQ. FT.

ROOM NUMBER

DOOR NUMBER

KEYNOTE

WALL TYPE

REVISION NUMBER

ELEVATION INDICATION

COLUMN GRID

IDENTIFICATION

NORTH ARROW

XXX WINDOW NUMBER

DETAIL TITLE

BUILDING SECTION

WALL SECTION

EXTERIOR/INTERIOR

ELEVATION

INTERIOR MULTI-VIEW

ELEVATION

ELEVATION NUMBER

SHEET ON WHICH

ELEVATION IS DRAWN

ELEVATION NUMBER

SHEET ON WHICH

ELEVATION IS DRAWN

MATERIALS REFERENCE

Room Name

150 PSF / 150 SF

PROPERTY CORNER

PROPERTY LINE

4" UNDERGROUND COMMUNICATION

(NO. INDICATES NO. OF DUCTS)

4" UNDERGROUND DUCT

(NO. INDICATES NO. OF DUCTS)

TELEPHONE LINE OH

UNDERGROUND ELECTRICAL

CONDUIT

OVERHEAD POWER LINE

ELECTRICAL MANHOLE

P/T = POWER & TELEPHONE

W/ STREET LIGHT

W/ DOWN GUY (NO. INDICATES LENGTH, CLASS

GUY & ANCHOR STRENGTH)

POWER POLE (NO. INDICATES LENGTH &

CLASS)

REMOVE OR ABANDON LINE

VALVE

GAS LINE

IRRIGATION WATER MAIN

FIRE WATER LINE

WATER LINE

STORM SEWER

SANITARY SEWER FORCE MAIN

SANITARY SEWER

CURB LINE

STREET CENTER LINE

BUILDING

EXISTING NEW

SITE

EXISTING NEW

S

MH CO

SFM

SS SS

MH

CLAL

Y.D.

F.H.

W

F

IRM

G

4M

P T

P T

P

UG

T

2-T

P

UG

T

2-T

POLE

4M

45-2

45-2

G

IRM

F

Y.D.

F.H.

W

AL

SS SS

MH

SFM

S

MH CO

GRID COORDINATES

SECTION LINE

CONTOURS

SPOT ELEVATIONS

DRAINAGE DITCH OR SWALE

CONCRETE PAVEMENT (SECTION)

BITUMINOUS PAVEMENT (SECTION)

CONTRACTION JOINT FOR PAVEMENT

BORINGS, TEXT

TREES, DECIDUOUS - WITH

DIAMETER

EVERGREEN - WITH HEIGHT

SHRUBS

CHAIN-LINK FENCE

BARBED WIRE FENCE

SECURITY FENCE XX XX

XX

XX XX

XX

12"

10'

HIGH

12" (TO BE REMOVED)

10' (TO BE REMOVED)

HOLE #3

90 X 10W 90 X 10 W (TOP OF WALL)

90 X 10C 90 X 10 C (TOP OF CURB)

90 X 10P 90 X 10 P (TOP OF PAVEMENT)

90 X 10 90 X 10

SEC 24

SEC 25

290 N

90 W

09 20 00.A11

A101

SIM

DETAIL SECTION

AE201

RICHARD

JOSEPH

ONKEN

A-5125

A

R C H I T E

C

T

S T

A T

E

O F N E B

R A

S K

A

5/21/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

BDH Engineering 440 Regency Parkway, Suit 135 Omaha, Nebraska 68114 Phone: (402) 981-5527

Farris Engineering 12700 W Dodge Rd, Omaha, NE 68154 Phone: (402) 330-5900

A on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t

6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t

6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t

CONTRACT DOCUMENTS RENOVATE 5 & 5B FOR

MENTAL HEALTH

589A7-23-306

5b

WICHITA, KS

A

B

C

D

E

F

21 MAY 2024 RJO IJM

A u to d e s k D o c s /1

A -2

-3

R e n o v a te B ld g b f o r

M e n ta l H e a lt h

/5

A

-2

-3

.A rc h

R

-R e n o v a te B ld g b f o r M e n ta l H e a lt h

.r v t

/2

/2

:2

:5

A

M

AG001

ARCHITECTURAL ABBREVIATIONS,

LEGENDS AND NOTES

A

A/C AIR CONDITIONING

AB ANCHOR BOLT / AIR BLENDER

ABS ACRYLONITRILE-BUTADIENE-STYRENE

AC ALTERNATING CURRENT / AIR COMPRESSOR

ACP ASBESTOS CEMENT PIPE

ACU AIR CONDITIONING UNIT

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES ACT

ADJ ADJACENT / ADJUSTABLE

ADR ACCESS DOOR

AFF ABOVE FINISH FLOOR

AHJ AUTHORITY HAVING JURISDICTION

AHU AIR HANDLING UNIT

AL ALUMINUM

ALT ALTERNATE

APPROX APPROXIMATELY

APT APARTMENT

ARCH ARCHITECT(URAL)

ASPH ASPHALT

AT ACOUSTICAL PANEL CEILING

ATB AIR TERMINAL BOX

ATD AIR TRANSFER DUCT

ATU AIR TERMINAL UNIT

AUX AUXILIARY

AVG AVERAGE

AWC ACOUSTICAL WALLCOVERING

AZ AZIMUTH

B

BB BALLED AND BURLAPPED

BD BOARD

BDD BACK DRAFT DAMPER

BE BOTTOM ELEVATION

BL BUILDING LINE

BLDG BUILDING

BLKG BLOCKING

BM BENCH MARK / BEAM

BR BARE ROOT

BRG BEARING

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

C

C/C CENTER TO CENTER

CAB CABINET

CB CIRCUIT BREAKER / CATCH BASIN

CC COOLING UNIT

CE COVER ELEVATION

CEM CEMENT

CFM CUBIC FEET PER MINUTE

CFS CONCRETE FLOOR SEALER

CG CORNER GUARD

CH CHILLER

CI CURB INLET / CAST IRON

CIP CAST IRON PIPE

CJ CONTROL JOINT OR CONTRACTION JOINT

CKT CIRCUIT

CL CENTER LINE

CLG CEILING

CLO CLOSET

CLR CLEAR

CM CENTIMETER

CMH CUBIC METER PER HOUR

CMP CORRUGATED METAL PIPE

CMT CERAMIC MOSAIC TILE

CMU CONCRETE MASONRY UNIT

CO CLEANOUT / CARBON MONOXIDE

CO2 CARBON DIOXIDE

COL COLUMN

COMB COMBINATION / COMBINE

COMP COMPRESSIBLE

CONC CONCRETE

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTINUOUS / CONTINUATION

CONTR CONTRACTOR

CORR CORRIDOR

CP CEMENT PIPE

CPT CARPET

CSF CUBIC FEET PER SECOND

CT CERAMIC TILE / COOLING TOWER

CTR CENTER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CUYD CUBIC YARD

CW COLD WATER

D

D DRAIN / DIFFUSER

DA DENTAL AIR

DBL DOUBLE

DEPR DEPRESSED

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL

DIFF DIFFUSER

DIP DUCTILE IRON PIPE

DISC DISCONNECT

DISP DISPENSER

DIST DISTRIBUTION

DK DECK

DL DEAD LOAD

DN DOWN

DO DITTO

DPR DAMPER

DR DOOR

DS DOWNSPOUT

DV DENTAL VACUUM

DWG DRAWING

DWL DOWEL

ABBREVIATIONS

JT JOINT

K

KC MIL THOUSAND CIRCULAR MILS

KCJ KEYED CONSTRUCTION JOINT

KIT KITCHEN

KPA KILOPASCALS

KS KITCHEN SINK

KV KILOVOLT

KVA KILOVOLT AMPERE

KW KILOWATTS

L

L LITER

LA LABORATORY AIR

LAB LABORATORY

LAM LAMINATE

LAV LAVATORY

LBS POUNDS

LF LINEAR FEET

LIN LINEAR

LL LIVE LOAD

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LMU LIGHTWEIGHT MASONRY UNITS

LONG LONGITUDINAL

LPM LITERS PER MINUTE

LT LIGHT

LT WT LIGHT WEIGHT

LTG LIGHTING

LV LABORATORY VACUUM

LVL LEVEL

LVT LUXURY VINYL TILE

M

M METER

M2 SQUARE METER

M3 CUBIC METER

MA MEDICAL AIR

MAINT MAINTENANCE

MAR MARBLE

MAS MASONRY

MAT MATERIAL / ENTRY CARPET

MAX MAXIMUM

MBH 1000 BTUH

MDO MEDIUM DENSITY OVERLAY

MECH MECHANICAL

MET METAL

MFR MANUFACTURER

MG MOTOR GENERATOR / MEDICAL GAS

MH MANHOLE

MIN MINIMUM

MLO MAIN LUGS ONLY

MM MILLIMETER

MO MASONRY OPENING

MTD MOUNTED

MTG MOUNTING

MULL MULLION

MV MEDICAL VACUUM

N

N NITROGEN

N2O NITROUS OXIDE

NEC NATIONAL ELECTRICAL CODE

NFPA NATIONAL FIRE PROTECTION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

O

O/S OFFSET

OA OUTSIDE AIR

OBD OPPOSED BLADE DAMPER

OC ON CENTER

OD OUTSIDE DIAMETER

OF OUTSIDE FACE

OPNG OPENING

OPP OPPOSITE

OX OXYGEN

OZ OUNCE

P

P PAINT / PUMP / PENDANT

PA PASCAL

PART PARTITION

PAVT PAVEMENT

PC POINT OF CURVATURE

PCF POUNDS PER CUBIC FOOT

PED PEDESTAL

PERP PERPENDICULAR

PHC PREHEAT COIL

PHVAC PLUMBING, HEATING, VENTILATING AND AIR

CONDITIONING

PI POINT OF INTERSECTION

PIV POST INDICATOR VALVE

PKG PARKING

PL PLASTIC LAMINATE / PROPERTY LINE / PLATE

PLAS PLASTER

PLBG PLUMBING

PLF POUNDS PER LINEAR FOOT

PLYWD PLYWOOD

PNL PANEL

PR PAIR

PROJ PROJECTION

PRV PRESSURE REGULATING VALVE

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT POINT OF TANGENCY / PORCELAIN TILE

PTVC POINT OF VERTICAL CURVATURE

PVC POLYVINYL CHLORIDE

PVI POINT OF VERTICAL INTERSECTION

PVT POINT OF VERTICAL TANGENCY

DWP DOMESTIC WATER PUMP

E

E EPOXY

EA EACH / EXHAUST AIR

EF EACH FACE / EXHAUST FAN

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRIC(AL)

ELEV ELEVATOR

EMBED EMBEDMENT

EMD ESTIMATED MAXIMUM DEMAND

EMT ELECTRICAL METAL TUBING

EQ EQUAL

EQUIP EQUIPMENT

ET EXPANSION TANK

EVAC MEDICAL GAS EVACUATION

EW EACH WAY

EWC ELECTRICAL WATER COOLER

EWH ELECTRICAL WATER HEATER

EXH EXHAUST

EXIST EXISTING

EXP EXPOSED

EXPN EXPANSION

EXT EXTERIOR

F

F FIRE MAIN

FA FIRE ALARM

FCU FAN COIL UNIT

FD FLOOR DRAIN / FIRE DAMPER

FD / SD COMBINATION FIRE AND SMOKE DAMPER

FDC FIRE DEPARTMENT CONNECTION

FDN FOUNDATION

FDR FEEDER

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FH FIRE HYDRANT

FHC FIRE HOSE CABINET

FIN FINISH

FIX FIXTURE

FL FLOOR

FM FORCE MAIN / FACTORY MUTUAL

FP FIREPROOFING / FIRE PUMP

FPM FEET PER MINUTE

FR FIRE RATED

FRP FIBERGLASS REINFORCED PLASTIC

FS FLOW SWITCH

FT FEET

FTG FOOTING

FVC FIRE VALVE CABINET

G

G GAS / GRILLE

GA GAGE

GALV GALVANIZED

GB GRAB BAR

GBD GRAVITY BACKDRAFT DAMPER

GEN GENERATOR

GFRC GLASS FIBER REINFORCED CONCRETE

GI GALVANIZED IRON

GL GLASS

GLB GLASS BLOCK

GP GLAZED PAINT

GPM GALLONS PER MINUTE

GR GRADE

GRV GRAVITY ROOF VENTILATOR

GWB GYPSUM WALLBOARD

GYP GYPSUM

H

HB HOSE BIBB

HC HEATING COIL

HDNR HARDENER

HDW HARDWARE

HDWD HARDWOOD

HK1E HOOK ONE END

HK2E HOOK TWO ENDS

HM HOLLOW METAL

HORIZ HORIZONTAL

HP HORSEPOWER

HPT HIGH POINT

HR HOUR

HS HIGH STRENGTH

HT HEIGHT

HTG HEATING

HTR HEATER

HVAC HEATING, VENTILATING AND AIR CONDITIONING

HW HOT WATER

HWC HOT WATER CIRCULATING

HZ HERTZ

I

IA INSTRUMENT AIR

IC INTERCOM

ICB INTEGRAL COVE BASE

ID INSIDE DIAMETER

IE INVERT ELEVATION

IF INSIDE FACE

IN INCH

INSUL INSULATION

INT INTERIOR

J

JAN JANITOR

JB JUNCTION BOX

JP JOCKEY PUMP

JST JOIST

Q

QT QUARRY TILE

R

R RADIUS / REGISTER

RA RETURN AIR

RB RESILIENT BASE

RCP REINFORCED CONCRETE PIPE

RD ROOF DRAIN

REF REFERENCE

REFL REFLECTED

REG REGISTER

REINF REINFORCED

REQD REQUIRED

REV REVERSE / REVISION

RF RETURN FAN

RGS RIGID GALVANIZED STEEL

RH ROOF HOOD / RELATIVE HUMIDITY / REHEAT

RHC REHEAT COIL

RM ROOM

RO ROUGH OPENING

ROW RIGHT OF WAY

RT RESILIENT TILE

RWC RIGID WALLCOVERING

S

S STAIR / STAIN / SURFACE / SANITARY

SA SUPPLY AIR / SOUND ATTENUATOR

SAN SANITARY

SCH SCHEDULE

SD SMOKE DAMPER / SUB DRAIN

SECT SECTION

SF SUPPLY FAN

SHT SHEET

SIM SIMILAR

SOG SLAB-ON-GRADE

SP SUMP PUMP

SPEC SPECIFICATIONS

SPF SPRAY POLYURETHANE FOAM

SQ SQUARE

SS SERVICE SINK / STORM SEWER

SSO STORM SEWER OVERFLOW

SSTL STAINLESS STEEL

ST STAIR TREAD

STA STATION

STD STANDARD

STE STANDARD TAPERED END

STIFF STIFFENER

STIR STIRRUP

STL STEEL

STOR STORAGE

STR STRUCTURAL

SUSP SUSPENDED

SW SWITCH

SWGR SWITCHGEAR

SYM SYMMETRICAL

T

T TREAD

T&B TOP AND BOTTOM

T&G TONGUE AND GROOVE

TC TOP OF CURB

TE TOP ELEVATION

TEL TELEPHONE

TEMP TEMPERATURE

TER TERRAZZO

TLT TOILET

TOPO TOPOGRAPHY

TOS TOP OF STEEL

TOW TOP OF WALL

TP TOP OF PAVEMENT

TRANS TRANSVERSE

TYP TYPICAL

U

UC UNDERCUT

UG UNDERGROUND

UH UNIT HEATER

UNO UNLESS NOTED OTHERWISE

UR URINAL

UV UNIT VENTILATOR

V

V VOLT

VAV VARIABLE AIR VOLUME

VB VINYL BASE

VC VERTICAL CURVE

VCP VITRIFIED CLAY PIPE

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VEST VESTIBULE

VFD VARIABLE FREQUENCY DRIVE

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

W

W WATT / WATER

W/ WITH

W/O WITHOUT

WAGD WASTE ANESTHESIA GAS DISPOSAL

WC WATER CLOSET

WD WOOD

WDW WINDOW

WH WATER HEATER / WALL HYDRANT

WP WEATHERPROOF

WPFG WATERPROOFING

WS WATER STOP

WT WEIGHT

WWF WELDED WIRE FABRIC

X

XFMR TRANSFORMER

Y

YD YARD

YH YARD HYDRANT

HAZARDOUS MATERIALS

1. IF THE CONTRACTOR ENCOUNTERS MATERIAL THAT COULD BE HAZARDOUS, THE CONTRACTOR SHALL STOP WORK AND NOTIFY THE GOVERNMENT

IMMEDIATELY FOR DIRECTION.

GENERAL FIREPROFFING NOTES

1. FIRE RATED CONSTRUCTION AT WALL PENETRATIONS, (CONSTRUCTION TO CONFORM TO MANUFACTURER'S FIRE RATED / TEST ASSEMBLIES.)

2. FIRE CAULK ALL AND PENETRATIONS AT FIRE WALLS / PARTITIONS AND FLOORS. CONFORM WITH THE TESTED / SUBMITTED FIRE RATED ASSEMBLY.

USE RED FIRE CAULK AND LABEL WALL WITH U.L. DESIGN NUMBER. FIRE RATED WALLS SHOWN ON PLAN.

3. AND REPAIR ALL EXISTING FIREPROOFING ON EXISTING STRUCTURAL MEMBERS, INCLUDING THAT WHICH IS UNCOVERED NEEDING REPAIR AND THAT

WHICH IS DISTURBED DURING CONSTRUCTION.

4 DURING CONSTRUCTION ALL CEILING TILES ARE TO BE REPLACED AT THE END OF EACH SHIFT FOR AREAS OUTSIDE OF THE CONSTRUCTION BARRIER.

1/4" = 1'-0"1

GUIDE FOR CLEARANCES AT DOORS

504 SF

GROUP

THERAPY

167-5

130 SF

OFFICE

174-5

130 SF

OFFICE

175-5

122 SF

COPY WORK

ROOM

165-5

121 SF

RECEPTION

162-5

91 SF

ELEV.

EQUIP.

154-5

65 SF

ELEVATOR

153-5

65 SF

ELEVATOR

152-5

503 SF

WAITING

151-5

54 SF

INTERVIEW

155-5

135 SF

VESTIBULE

150-5

267 SF

STAIR

156-5

42 SF

COMM.

158-5

39 SF

VESTIBULE

159-5

19 SF

JAN

160-5

502 SF

HALLWAY

157-5

174 SF

WOMEN'S

161-5

174 SF

MEN'S

168-5

39 SF

VESTIBULE

169-5

62 SF

ELECTRICAL

170-5

78 SF

FIRE

SPRINKLER

MECH. RM.

171-5

127 SF

OFFICE

172-5

127 SF

OFFICE

173-5

269 SF

HALLWAY

176-5

131 SF

OFFICE

178-5

131 SF

OFFICE

179-5

269 SF

STAIR

171-5

Redundant Room

STORAGE

164-5

A

B

C

A

A

A

A

D

D

D

4' -0

5'-8"

DEMOLITION PLAN LEGEND:

FULL HEIGHT ONE-HOUR FIRE RATED TEMPORARY PARTITION

ELEMENT TO BE REMOVED, TYP.

INDICATES AREA TO BE REMOVED, TYP

EXISITING CONSTRUCTION TO REMAIN UNO.

RICHARD

JOSEPH

ONKEN

A-5125

A

R C H I T E

C

T

S T

A T

E

O F N E B

R A

S K

A

5/21/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

BDH Engineering 440 Regency Parkway, Suit 135 Omaha, Nebraska 68114 Phone: (402) 981-5527

Farris Engineering 12700 W Dodge Rd, Omaha, NE 68154 Phone: (402) 330-5900

A on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t

6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t

6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t

CONTRACT DOCUMENTS RENOVATE 5 & 5B FOR

MENTAL HEALTH

589A7-23-306

5b

WICHITA, KS

A

B

C

D

E

F

21 MAY 2024 RJO IJM

A u to d e s k D o c s /1

A -2

-3

R e n o v a te B ld g b f o r

M e n ta l H e a lt h

/5

A

-2

-3

.A rc h

R

-R e n o v a te B ld g b f o r M e n ta l H e a lt h

.r v t

/2

/2

:2

:5

A

M

AD101

DEMOLITION PLANS

DEMOLITION KEYNOTE LEGEND

KEY KEYNOTE

A REMOVE GWB AND METAL STUD WALL SYSTEM

B REMOVE FOLDING ROOM DIVIDER AND RELATED MECHANISM

C REMOVE CABINETWORK, SHELVING, BASES.

D FULL HEIGHT ONE-HOUR FIRE RATED TEMPORARY PARTITION

GENERAL DEMOLITION NOTES

1 DASHED BOLD LINES INDICATE EXTENT OF DEMOLITION INCLUDING THE FOLLOWING:

* INTERIOR PARTITIONS (REMOVED TO STRUCTURE)

* CEILINGS, INCLUDING CEILING SUSPENSION SYSTEM, MISC. STEEL SUPPORTS FOR SUSPENDED

EQUIPMENT, SUSPENDED EQUIPMENT, LIGHT FIXTURES, DIFFUSERS AND GRILLES ETC.

* FLOOR FINISHES (TO CONCRETE) INCLUDING CARPET, RVT, SHEET VINYL, CERAMIC TILE, QUARRY

TILE, BRICK PAVERS, ETC.

* DOORS AND FRAMES UNLESS NOTED OTHERWISE IN DOOR SCHEDULE

* WINDOW GLAZING AND FRAMES UNLESS NOTED OTHERWISE

* BRICK AND BACK-UP WALL SYSTEM

* CABINETWORK, SHELVING, BASES

* TOILET PARTITIONS AND ACCESSORIES

* TACK BOARDS, MARKER BOARDS, PEGBOARDS, DISPLAY BOARDS

* EQUIPMENT ITEMS

* PLUMBING FIXTURES

2 CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS.

3 ALL LIGHT OR HALFTONE LINES INDICATE EXISTING TO REMAIN.

4 SEE SPECIFICATIONS SECTIONS FOR CUTTING AND PATCHING AND DEMOLITION 02 41 00.

5 SEE ROOM FINISH SCHEDULE, MECHANICAL PLANS, AND ELECTRICAL PLANS FOR EXTENT OF NEW

CEILING CONSTRUCTION OR CEILING PATCHING IN EXISTING AREAS.

6 SEE ROOM FINISH SCHEDULE FOR EXTENT OF NEW FLOORING MATERIAL IN EXISTING AREAS.

7 SEE ROOM FINISH SCHEDULE FOR EXTENT OF NEW WALL COVERING MATERIAL IN EXISTING AREAS.

WHERE NEW FINISHES ARE REQUIRED REMOVE EXISTING WALL FINISHES, (TEXRURED PLASTIC COATING, VINYL WALL COVERING, PANELING, BASE, ETC.).

8 CONTRACTOR TO VERIFY ALL WALL CONSTRUCTION & FINISHES NOTED FOR REMOVAL. TAKE INTO

ACCOUNT ANY DISCREPANCY AND MAKE PROPER ADJUSTMENT TO ACCOMPLISH REQUIRED

CONSTRUCTION & FINISHES. IF STRUCTURAL INTEGRITY IS VIOLATED, CONTACT ARCHITECT.

COORDINATE PHASING WITH OWNER

9 COORDINATE REMOVAL OF FURNITURE AND EXISTING EQUIPMENT WITH OWNER.

10 SAW CUT EDGES OF EXISTING FLOOR SLAB FOR REMOVAL AND INSTALLATION OF UTILITIES. REFER TO

MECHANICAL AND ELECTRICAL DRAWINGS.

11 REMOVE FURRING OR GWB ONLY WHERE REQUIRED TO COMPLETE CONSTRUCTION. PATCH AND MATCH WALLS AS REQUIRED TO COMPLETE AND MATCH EXISTING CONDITIONS, UNLESS AN ALTERNATIVE

MATERIAL AND FINISH IS INDICATED.

12 REMOVE CEILINGS ONLY AS REQUIRED FOR NEW CONSTRUCTION. REINSTALL, REPLACE OR PATCH AS

REQUIRED.

1/4" = 1'-0"1

FIRST FLOOR - DEMOLITION PLAN

S S

S S

S S

S S

S S

S S

SSSS

S S

S S

S S

SS

S S

S S

S S

ELEVATOR

152-5

ELEVATOR

153-5

ELEV.

EQUIP.

154-5

RECEPTION

162-5

WOMEN'S

161-5

MEN'S

168-5

COMM.

158-5

JAN

160-5

STAIR

156-5

WAITING

151-5

INTERVIEW

155-5

HALLWAY

157-5

VESTIBULE

169-5

ELECTRICAL

170-5

FIRE

SPRINKLER

MECH. RM.

171-5OFFICE

172-5

OFFICE

173-5

OFFICE

174-5

OFFICE

175-5

504 SF

GROUP

THERAPY

167-5

HALLWAY

176-5

OFFICE

178-5

OFFICE

179-5

STAIR

171-5

VESTIBULE

159-5

110 SF

POLICE

163-5

VESTIBULE

150-5

120 SF

EXAM

OFFICE

166D-5

120 SF

EXAM

OFFICE

166C-5

125 SF

EXAM

OFFICE

166B-5

125 SF

EXAM

OFFICE

166A-5

122 SF

COPY WORK

ROOM

165-5

10'-0"

'-6

'-6

9'-7"

155 SF

HALLWAY

157B-5

6'-0"

Q Q

Q

Q

Q

Q

Q

Q

Q Q

GH166C

GH166D

GH166B

GH166A

GH163

GH165

13'-2"

8' -4

'-8

8'-10"

6'-8"

AE101

2AE101

G G

H

E

E

125 SF

EXAM

OFFICE

166A-5

125 SF

EXAM

OFFICE

166B-5

F

F

120 SF

EXAM

OFFICE

166C-5

120 SF

EXAM

OFFICE

166D-5

SMOKE PARTITION

SYMBOL

SOC PLAN LEGEND

DESCRIPTION

1-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

3-HOUR FIRE BARRIER

SMOKE BARRIER

1-HOUR SMOKE BARRIER

2-HOUR SMOKE BARRIER

3-HOUR SMOKE BARRIER

4-HOUR FIRE BARRIER

4-HOUR SMOKE BARRIER

30-MINUTE SMOKE BARRIER

30-MINUTE FIRE BARRIER

S S

S

S

S

S

S

S

S

S

S S

RICHARD

JOSEPH

ONKEN

A-5125

A

R C H I T E

C

T

S T

A T

E

O F N E B

R A

S K

A

5/21/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

BDH Engineering 440 Regency Parkway, Suit 135 Omaha, Nebraska 68114 Phone: (402) 981-5527

Farris Engineering 12700 W Dodge Rd, Omaha, NE 68154 Phone: (402) 330-5900

A on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t

6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t

6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t

CONTRACT DOCUMENTS RENOVATE 5 & 5B FOR

MENTAL HEALTH

589A7-23-306

5b

WICHITA, KS

A

B

C

D

E

F

21 MAY 2024 RJO IJM

A u to d e s k D o c s /1

A -2

-3

R e n o v a te B ld g b f o r

M e n ta l H e a lt h

/5

A

-2

-3

.A rc h

R

-R e n o v a te B ld g b f o r M e n ta l H e a lt h

.r v t

/2

/2

:2

:5

A

M

AE101

FIRST FLOOR PLAN

GENERAL NOTES

1 ALL NEW CONSTRUCTION IS INDICATED BOLD OR FULL TONE.

2 ALL INTERIOR WALLS WILL BE TYPE "A" CONSTRUCTION UNLESS OTHERWISE INDICATED. REFER TO

SHEET A-801.

3 ALL METAL STUD AND GYPSUM WALLBOARD PARTITIONS ARE DIMENSIONED TO THE OUTSIDE FACE AND

TO COLUMN GRID UNLESS OTHERWISE NOTED.

4 WHEN WALL PARTITIONS OF DIFFERENT FIRE RATING INTERSECT, THE HIGHEST RATED PARTITION TAKES

PRECEDENT. MAINTAIN RATING BEHIND FIRE EXTINGUISHER CABINETS, ETC.

5 CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO CONSTRUCTION.

6 REFER TO THE Q SERIES FOR ARCHITECTURAL CABINETWORK AND EQUIPMENT NUMBERS.

7 REFER TO SHEET AE802 FOR TYPICAL BACKING DETAIL WITHIN INTERIOR WALL PARTITION, HANDRAILS, CUBICAL CURTAIN TRACKS, CORNER GUARDS ETC.

8 ALL EXISTING TO REMAIN CEILING AND WALL GRILLES, DIFFUSERS AND LIGHTS ETC. TO BE CLEANED.

9 VERIFY THAT THE EXISTING WALLS REQUIRING FIRE RATING ARE MAINTAINED, REPAIRED AND EXTENDED

TO STRUCTURE.

10 ALL CORRIDOR WALLS ARE REQUIRED TO BE SMOKE TIGHT, WHETHER THEY ARE FIRE RATED OR NOT.

REPAIR AND EXTEND AT LEAST THE CORRIDOR SIDE OF NON-FIRE RATED CORRIDOR WALLS TO

STRUCTURE, UNLESS NOTED OTHERWISE NOTED. SEE PARTITION TYPES SHEET.

11 REFER TO LIFE SAFETY PLANS FOR LOCATION OF REQUIRED FIRE WALLS.

12 ALL FURNITURE SHOWN HALF TONE WILL BE OWNER FURNISHED AND OWNER INSTALLED.

PROJECT AREA

FIRST FLOOR: 969 SF

SECOND FLOOR: 000 SF

TOTAL: 969 SF

1/4" = 1'-0"1

FIRST FLOOR - FLOOR PLAN

1/4" = 1'-0"2

FIRST FLOOR - DEDUCT ALTERNATE 1

1/4" = 1'-0"3

FIRST FLOOR - DEDUCT ALTERNATE 2

KEYNOTE LEGEND

KEY KEYNOTE

E SINKS IN EXAM OFFICE 166A AND 166B REMOVED FROM SCOPE.

F SINKS IN EXAM OFFICE 166C AND 166D REMOVED FROM SCOPE.

G SECURITY SCREEN TO BE ADDED TO WINDOWS OF SECURE ROOM.

H WALL REPAIR TO BE PERFORMED WHERE NECESSARY.

a b

R

R

R

R

R

R R

R

R

R

SSSSSS

S S

S S

S S

S S

S S

S S

EXISTING GYPSUM WALL BOARD CEILING

EXISTING SUSPENDED ACOUSTICAL REMAIN

EXISTING SUPPLY AIR GRILLE - SEE MECHANICAL

EXISTING RETURN AIR GRILLE - SEE MECHANICAL

EXISTING RECESSED 2X2 LIGHT FIXTURE - SEE ELECTRICAL

EXISTING RECESSED 2X4 LIGHT FIXTURE - SEE ELECTRICAL

STRIP LIGHTING

CAN LIGHT

EXIT LIGHT

WIRELESS ACCESS POINT

SPEAKER

SMOKE DETECTOR

OCCUPANCY SENSOR

VIDEO SURVEILLANCE CAMERA

REFLECTED CEILING LEGEND

GYPSUM WALL BOARD CEILING

SUSPENDED ACOUSTICAL CEILING

SUPPLY AIR GRILLE - SEE MECHANICAL

RETURN AIR GRILLE TO - SEE MECHANICAL

RECESSED 2X2 LIGHT FIXTURE - SEE ELECTRICAL

RECESSED 2X4 LIGHT FIXTURE - SEE ELECTRICAL

STRIP LIGHTING

CAN LIGHT

EXIT LIGHT

WIRELESS ACCESS POINT

SPEAKER

SMOKE DETECTOR

OCCUPANCY SENSOR

VIDEO SURVEILLANCE CAMERA

SS

SDOS

OSOS

WAPWAP

CCTVCCTV

125 SF

EXAM

OFFICE

166A-5

125 SF

EXAM

OFFICE

166B-5

120 SF

EXAM

OFFICE

166D-5

120 SF

EXAM

OFFICE

166C-5

155 SF

HALLWAY

157B-5

502 SF

HALLWAY

157-5

122 SF

COPY WORK

ROOM

165-5

110 SF

POLICE

163-5

91 SF

ELEV.

EQUIP.

154-5

121 SF

RECEPTION

162-5

503 SF

WAITING

151-5

135 SF

VESTIBULE

150-5

65 SF

ELEVATOR

153-5

65 SF

ELEVATOR

152-5

54 SF

INTERVIEW

155-5

267 SF

STAIR

156-5

42 SF

COMM.

158-5

39 SF

VESTIBULE

159-5

174 SF

WOMEN'S

161-5

19 SF

JAN

160-539 SF

VESTIBULE

169-5

174 SF

MEN'S

168-5

62 SF

ELECTRICAL

170-5

78 SF

FIRE

SPRINKLER

MECH. RM.

171-5

127 SF

OFFICE

172-5127 SF

OFFICE

173-5

504 SF

GROUP

THERAPY

167-5

130 SF

OFFICE

175-5

130 SF

OFFICE

174-5269 SF

HALLWAY

176-5

269 SF

STAIR

171-5

131 SF

OFFICE

178-5

131 SF

OFFICE

179-5

8' 0" AFF

8' 0" AFF

8' 0" AFF

8' 0" AFF8' 0" AFF

8' 0" AFF

8' 0" AFF

SMOKE PARTITION

SYMBOL

SOC PLAN LEGEND

DESCRIPTION

1-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

3-HOUR FIRE BARRIER

SMOKE BARRIER

1-HOUR SMOKE BARRIER

2-HOUR SMOKE BARRIER

3-HOUR SMOKE BARRIER

4-HOUR FIRE BARRIER

4-HOUR SMOKE BARRIER

30-MINUTE SMOKE BARRIER

30-MINUTE FIRE BARRIER

S S

S

S

S

S

S

S

S

S

S S

RICHARD

JOSEPH

ONKEN

A-5125

A

R C H I T E

C

T

S T

A T

E

O F N E B

R A

S K

A

5/21/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

BDH Engineering 440 Regency Parkway, Suit 135 Omaha, Nebraska 68114 Phone: (402) 981-5527

Farris Engineering 12700 W Dodge Rd, Omaha, NE 68154 Phone: (402) 330-5900

A on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t

6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t

6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t

CONTRACT DOCUMENTS RENOVATE 5 & 5B FOR

MENTAL HEALTH

589A7-23-306

5b

WICHITA, KS

A

B

C

D

E

F

21 MAY 2024 RJO IJM

A u to d e s k D o c s /1

A -2

-3

R e n o v a te B ld g b f o r

M e n ta l H e a lt h

/5

A

-2

-3

.A rc h

R

-R e n o v a te B ld g b f o r M e n ta l H e a lt h

.r v t

/2

/2

:2

:0

A

M

AC101

FIRST FLOOR - REFLECTED CEILING

PLAN

GENERAL REFLECTED CEILING NOTES

1 PROVIDE GYPSUM WALL BOARD AND METAL STUD BULK HEADS WHERE CEILINGS OF DIFFERENT HEIGHTS

ABUT. DO NOT BUILD BULKHEADS OF ACOUSTICAL CEILING MATERIALS UNLESS SPECIFICALLY DETAILED.

2 REFER TO MECHANICAL DRAWINGS (M SERIES) FOR QUANTITY AND TYPE OF DIFFUSERS, RETURN AIR GRILLES, AND EXHAUST GRILLES. SCRIBE CEILING MATERIALS CAREFULLY FOR A TIGHT FIT.

3 REFER TO ELECTRICAL DRAWINGS (E SERIES) FOR QUANTITY AND TYPE OF LIGHTS, SPEAKERS, DETECTORS, POWER OUTLETS, ETC. SCRIBE CEILING MATERIALS CAREFULLY. WHERE NO DEVICES ARE SHOWN ON PLANS, FIELD VERIFY LOCATION & QUANTITY OF DEVICES IN EXISTING CEILING. THESE

DEVICES WILL BE RELOCATED TO THE NEW CEILING.

4 ALTHOUGH NOT SPECIFICALLY SHOWN, THE ENTIRE PROJECT HAS FIRE SPRINKLER HEADS IN CEILING.

SCRIBE CEILING MATERIALS CAREFULLY FOR A TIGHT FIT.

5 ACOUSTIC TILE CEILING TO BE AT-1 UNLESS NOTED OTHERWISE.

6 REFER TO ROOM FINISH SCHEDULE FOR CEILING HEIGHTS AND MATERIAL LOCATIONS.

7 REFER TO ROOM FINISH SCHEDULE FOR THE EXTENT OF GRID SYSTEM. REFLECTED CEILING PLANS

SHOW TILE PATTERNS.

8 CONTRACTOR TO FIELD VERIFY EXTENT OF CEILING REPLACEMENT. CONTRACTOR TO COORDINATE WITH

ALL TRADES.

9 ALL EXISTING TO REMAIN GRILLES, DIFFUSERS AND LIGHTS ETC. TO BE CLEANED

10 CONTRACTOR TO COORDINATE WITH ALL TRADES.

11 UNLESS NOTED OTHERWISE, TYPICAL CEILING HEIGHT TO BE 8'-0".

1/4" = 1'-0"1

FIRST FLOOR - REFLECTED CEILING PLAN

F

FLUSH

@ RATED

DOORS

@ NON-RATED

DOORS

* 4"

8"

N

FLUSH

HOLLOW METAL

2"

SCHEDULE

SEE DOOR 2"

HOSPITAL

STOPS @

INTERIOR

DOORS

ONLY

4" S

E E

D O

O R

S C

H E

D U

LE

HOLLOW METAL FRAME

BOTTOM OF FRAME

4" MATCH EXISTING FRAMES

45°

TYP.

4"

HOLLOW METAL FRAME

WALL - SEE

PLAN FOR TYPE

WALL (WHERE OCCURS)

- SEE PLAN FOR TYPE

V A

R

IE

S

S E

E P

LA

N

1/ 2"

1/ 2"

2"

VARIES

SEE PLAN

1/2"1/2"

4"

WALL - SEE

PLAN FOR TYPE

SEALANT - EA. SIDE

& ALL AROUND, TYP.

HOLLOW METAL

FRAME

ADJACENT WALL

WHERE OCCURS

SEALANT - EA. SIDE

& ALL AROUND, TYP.

HOLLOW

METAL

FRAME

A

HEAD JAMB

B3" = 1'-0" 3" = 1'-0"

WALL - SEE

PLAN FOR TYPE

MOUNTING SCREWS

SECURITY SCREEN

EXISTING EXTERIOR WALL

EXISTING WINDOW FRAME

RICHARD

JOSEPH

ONKEN

A-5125

A

R C H I T E

C

T

S T

A T

E

O F N E B

R A

S K

A

5/21/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

BDH Engineering 440 Regency Parkway, Suit 135 Omaha, Nebraska 68114 Phone: (402) 981-5527

Farris Engineering 12700 W Dodge Rd, Omaha, NE 68154 Phone: (402) 330-5900

A on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t

6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t

6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t

CONTRACT DOCUMENTS RENOVATE 5 & 5B FOR

MENTAL HEALTH

589A7-23-306

5b

WICHITA, KS

A

B

C

D

E

F

21 MAY 2024 RJO IJM

A u to d e s k D o c s /1

A -2

-3

R e n o v a te B ld g b f o r

M e n ta l H e a lt h

/5

A

-2

-3

.A rc h

R

-R e n o v a te B ld g b f o r M e n ta l H e a lt h

.r v t

/2

/2

:2

:0

A

M

AE701

DOOR AND FRAME TYPES, DETAILS

AND DOOR SCHEDULE

DOOR SCHEDULE

DOOR NUMBER ROOM NAME DOOR SIZE HARDWARE DOOR MATERIAL DOOR TYPE DOOR FINISH FRAME TYPE

FRAME

MATERIAL FRAME FINISH FIRE RATING REMARKS

GH163 POLICE 3'-6" x 7'-0" HW-SH-3 HM F P-3 1 HM P-3 FE 15 MIN LEVEL 3

GH165 COPY WORK ROOM 3'-4" x 7'-0" HW-4N WD N S-1 1 HM P-3 GLASS TYPE MG-1

GH166A EXAM OFFICE 4'-0" x 7'-0" HW-4N WD N S-1 1 HM P-3 GLASS TYPE LG-1

GH166B EXAM OFFICE 4'-0" x 7'-0" HW-4N WD N S-1 1 HM P-3 GLASS TYPE LG-1

GH166C EXAM OFFICE 4'-0" x 7'-0" HW-4N WD N S-1 1 HM P-3 GLASS TYPE LG-1

GH166D EXAM OFFICE 4'-0" x 7'-0" HW-4N WD N S-1 1 HM P-3 GLASS TYPE LG-1

1/4" = 1'-0"1

HOLLOW METAL OR WOOD DOOR TYPES

1/4" = 1'-0"2

FRAME TYPES

1 1/2" = 1'-0"4

HOSPITAL STOPS

1 1/2" = 1'-0"5

DOOR FRAME OFFSET

GLASS TYPE SCHEDULE NOTES:

A: COMPLY WITH UL LEVEL 3 PROTECTION LEVEL, SPSA - SUPER POWER SMALL ARMS

REMARKS:

1. SEE SPECIFICATIONS FOR DOOR HARDWARE

2. SEE SHEETS AE701 FOR DOOR RAME DETAILS

GLASS TYPE SCHEDULE

REF TYPE Description Thickness Remarks

1 MG-1 CLEAR, TEMPERED TONGLESS FLOAT 6mm --

2 LG-1 LAMINATED GLASS 9.5mm

3" = 1'-0"3

DOOR DETAILS A

6" = 1'-0"6

SECURITY SCREEN DETAIL

FIRE RATING - NON-RATED

STC RATING - 45-49

TEST: U.L. Design No. U465

TEST: TL 99-103

RATING INFORMATION

SAME AS "A" WITH

NO SOUND INSULATION

SAME AS "A6" WITH

NO SOUND INSULATION

6" NON-LOAD BEARING WALL

FRAMING SYSTEM

3 5/8" NON-LOAD BEARING WALL

FRAMING SYSTEM

STC RATING - 40 TEST: TL 99-160

STRUCTURAL DECK

CEILING LINE

5/8" F.R. GWB BOTH SIDES

FIRESTOP BOTH SIDES

(FIRE AND/ OR SMOKE WALL)

FLOOR LINE

SECTION

SOUND INSULATION

A A6

A1 A7

Q

Q1

Q6

Q7

NO SCALE

WALL TYPE

Q7Q6Q1Q

AE802

RICHARD

JOSEPH

ONKEN

A-5125

A

R C H I T E

C

T

S T

A T

E

O F N E B

R A

S K

A

5/21/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

BDH Engineering 440 Regency Parkway, Suit 135 Omaha, Nebraska 68114 Phone: (402) 981-5527

Farris Engineering 12700 W Dodge Rd, Omaha, NE 68154 Phone: (402) 330-5900

A on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t

6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t

6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t

CONTRACT DOCUMENTS RENOVATE 5 & 5B FOR

MENTAL HEALTH

589A7-23-306

5b

WICHITA, KS

A

B

C

D

E

F

21 MAY 2024 RJO IJM

A u to d e s k D o c s /1

A -2

-3

R e n o v a te B ld g b f o r

M e n ta l H e a lt h

/5

A

-2

-3

.A rc h

R

-R e n o v a te B ld g b f o r M e n ta l H e a lt h

.r v t

/2

/2

:2

:0

A

M

AE801

PARTITION TYPES

INTERIOR PARTITION NOTES

1. UPGRADE GWB TO TILE BACKER (MR GWB) WHERE CALLED FOR BY SPEC. SECTION 09 22 16 AND

WHERE DRAWINGS CALL FOR ADHERED CSMU TILE VENEER.

2. EXTEND FIRE RATED WALL CONSTRUCTION BEHIND RECESSED OR BUILT-IN EQUIPMENT SUCH AS FIRE EXTINGUISHER CABINETS (FEC), ELECTRICAL WATER COOLERS (EWC), ELECTRIC PANELS, ETC., UNO.

3. PROVIDE AND INSTALL ALL STIFFENERS, BRACING, BACK-UP PLATES & SUPPORTING BRACKETS

REQUIRED FOR THE INSTALLATION OF ALL CASEWORK AND OF ALL FLOOR MOUNTED OR

SUSPENDED MECHANICAL, ELECTRICAL OR LABORATORY EQUIPMENT.

4. WHERE HVAC OR OTHER MECHANICAL, ELECTRICAL AND PLUMBING ITEMS PENETRATE

PARTITIONS, STUDS SHALL BE BRACED AND FRAMED TO STRUCTURE AS REQUIRED TO PROVIDE

ADEQUATE SUPPORT. ALL PENETRATIONS THROUGH RATED WALLS SHALL BE SEALED TO

PROVIDE FIRE, SMOKE, AND/OR ACOUSTICAL ISOLATION OF SPACES WITH APPROPRIATE

FIRESTOP MATERIAL.

5. COORDINATE METAL STUD GAUGE WITH PRE-APPROVED EQUIPMENT ANCHORAGE. WHERE A

DISCREPANCY OCCURS, THE MORE STRINGENT REQUIREMENT SHALL GOVERN.

6. WHERE COLUMN FURRING STUDS EXCEED THE MANUFACTURER'S RECOMMENDED LIMITING

HEIGHTS, STUDS SHALL BE BRACED BACK TO THE STRUCTURE AS REQUIRED.

7. THERE SHALL BE NO BACK-TO-BACK ELECTRICAL, TELEPHONE, OR OTHER OUTLETS, EXCEPT

WHERE SPECIFICALLY SHOWN. AT ACOUSTICALLY SENSITIVE AREAS, SUCH AS EXAM ROOMS,

OFFICES, CLASSROOMS, ETC. OFFSET OUTLETS IN OPPOSITE SIDES OF THE WALL BY AT LEAST

TWO STUD CAVITIES.

8. WALL BASE NOT SHOWN ON WALL TYPES FOR CLARITY.

9. WHERE 'SEALANT' IS INDICATED ON WALL TYPES, PROVIDE ACOUSTIC (SOUND) SEALANT AT

NON-RATED WALLS AND FIRE-RATED SEALANT AT RATED WALLS AS REQUIRED BY FIRE RATING

TEST NUMBER.

10. PROVIDE SOUND INSULATION AS REQUIRED TO MEET STC RATING INDICATED ON WALL TYPE.

PROVIDE SOUND INSULATION IN WALLS AROUND THE FOLLOWING SPACES: CLASSROOMS,

CONFERENCE ROOMS, OFFICES, OPERATING ROOMS, EXAM ROOMS, PROCEDURE ROOMS,

COMMUNICATION AND ELECTRICAL ROOMS, MECHANICAL ROOMS, MECHANICAL AND ELEVATOR

SHAFTS, & TOILET AND LOCKER ROOMS. SOUND INSULATION IS NOT REQUIRED IN WALLS WITH

CASED OPENINGS OR OTHER UNENCLOSED OPENINGS. SOUND INSULATION IS NOT REQUIRED IN

ABOVE-CEILING WALL CAVITIES LOCATED OVER DOORS AND BORROWED LITES.

NOTE:

ALL PARTITION TYPES

INDICATED,

MAY-NOT BE USED. REFER TO

PLANS FOR MORE

INFORMATION.

TWO HOUR FIRE AND/ OR

SMOKE PARTITION

CONSTRUCTION

ONE HOUR FIRE AND/ OR SMOKE WALL

ONE HOUR FIREWALL

TWO HOUR FIRE WALL

TWO HOUR SHAFTWALL

PRIORITY 2

TWO HOUR FIRE AND/ OR SMOKE WALL

NON-RATED WALL

PRIORITY 1 (HIGHEST)

PRIORITY 3

PRIORITY 4

PRIORITY 5 (LOWEST)

HOLLOW METAL FRAME

(AS APPLICABLE)

METAL STUDS

NON-RATED WALL

WALL PRIORITY LEGEND

HIGHER PRIORITY WALL

HIGHER PRIORITY WALL

RATED WALL AND/ OR

SMOKE PARTITION

ONE HOUR CONSTRUCTION

1. CONTRACTOR SHALL COORDINATE

LOCATIONS OF HORIZONTAL FASTENERS.

ISOMETRIC

PLAN

GENERAL NOTES:

CUT HORIZONTAL FASTENER FROM STUD

FASTEN AT BOTH ENDS WITH MIN.

4 TAPPING SCREWS.

MTL. STUDS @ 16" O.C. MAX.

WALL FINISH

HEADER

18 GA TRACK1/8 1 1/2-16

JAMB STUDS (FULL HEIGHT)

18 GA TRACK

FOR OPENINGS GREATER THAN 12'-0" STUDS

ARE SUPPORTED VERTICALLY BY STRUCTURE

AND HORIZONTALLY BY DIAGONAL BRACING.

OPENING HEADER JAMB STUDS

UP TO 4'-0"

4'-0" TO 8'-0"

8'-0" TO 12'-0"

2-6" 18 GA

2-8" 16 GA

2-8" 16 GA

(2) 20 GA

(3) 20 GA

(4) 20 GA

A

A

TYP

BOX HEADER SECTION A-A

1/8 1 1/2-24

1/8

BOX HEADER ELEVATION

INTERIOR HOLLOW METAL

DOOR OR WINDOW FRAME

METAL STUD TRACK

SCREW ATTACH TRACK

TO BOTH JAMB STUDS

EXTRA METAL STUD

1/2" CONTROL JOINT SPACING

INSTALL SUITABLE BACKING

AT RATED WALLS

2 - 2O GA. METAL STUDS

NOTE:

SEE GWB SYSTEM SYSTEM SPECIFICATIONS FOR

LOCATION OF CONTROL JOINTS

METAL STUD MATCH GAUGE

OF VERTICAL STUDS

SEE FLOOR PLANS

FOR WALL TYPE

CORRIDOR

ROOM SIDE

10" CONT. 22 GA. SHEET

METAL BACKING AT BASE

(CORRIDOR SIDE ONLY)

FIRESTOP

STRUCTURAL DECK

TYPE S SCREWS

NOTE: FIRESTOP SYSTEM IS REQUIRED ONLY AT RATED WALL REFER TO LIFE SAFETY SERIES FOR LOCATIONS.

USE APPROPRIATE UL LISTED ASSEMBLY BASED ON WALL AND STRUCTURAL DECK CONSTRUCTION.

BLAZEFLAME (DSL2)

SLOTTED DEFLECTION TRACK

SECURE TO STRUCTURE WITH TWO

1/4" DRILLED ANCHORS AT 24" O.C.

BLAZEFLAME PERIMETER L-BEAD

SEE PLAN

VARIES

5/ 8"

GYPSUM WALL BOARD

MTL. STUDS @ 16" O.C. MAX.

2 X #12 S.M.S @ EA. @ EA. STUD

20 GA. SOLID, STUD-WALL RUNNER

TRACK PROVIDE ADDITIONAL

HORIZONTAL TRACKS AS

REQUIRED

CONT.

AS

REQ'D.

ISOMETRIC

CONT. TREATED WOOD BLOCKING:

2 x 6 FOR CASEWORK, PER DETAIL

FOR EQUIPMENT

10-24 X 1 1/2" WOOD SCREWS

(6 PER PIECE OF BLOCKING)

TREATED WOOD BLOCKING -

CUT TO FIT INTO METAL STUD

CONT.

AS

REQ'D.

MTL. STUDS @ 16" O.C. MAX.

ISOMETRIC

PLAN

FEATHER OUT 36" MIN

FLOOR LEVELING FEATHERED OUT SO

FINISH FLOORING IS FLUSH WITH TOP

OF METAL EDGE STRIP

CARPET TILE

RESILIENT TRANSITION (TS-#)

RESILIENT FLOORING

RESILIENT FLOORING

RESILIENT FLOORING

RESILIENT TRANSITION (TS-#)

RICHARD

JOSEPH

ONKEN

A-5125

A

R C H I T E

C

T

S T

A T

E

O F N E B

R A

S K

A

5/21/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

BDH Engineering 440 Regency Parkway, Suit 135 Omaha, Nebraska 68114 Phone: (402) 981-5527

Farris Engineering 12700 W Dodge Rd, Omaha, NE 68154 Phone: (402) 330-5900

A on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t

6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t

6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t

CONTRACT DOCUMENTS RENOVATE 5 & 5B FOR

MENTAL HEALTH

589A7-23-306

5b

WICHITA, KS

A

B

C

D

E

F

21 MAY 2024 RJO IJM

A u to d e s k D o c s /1

A -2

-3

R e n o v a te B ld g b f o r

M e n ta l H e a lt h

/5

A

-2

-3

.A rc h

R

-R e n o v a te B ld g b f o r M e n ta l H e a lt h

.r v t

/2

/2

:2

:0

A

M

AE802

PARTITION & TRANSITION DETAILS

1 1/2" = 1'-0"1

WALL PRIORITY LEGEND

1 1/2" = 1'-0"2

TYP. WALL BACKING DETAIL

1 1/2" = 1'-0"3

HEADER SCHEDULE

1 1/2" = 1'-0"4

TYPICAL CONTROL JOINT

3" = 1'-0"5

FIRE BLKG AT OPEN CAVITY

3" = 1'-0"6

BASE METAL BACKING DETAIL

3" = 1'-0"7

STUD WALL ATTACH. TO CONC. DECK

1 1/2" = 1'-0"2A

TYP. WALL BACKING DETAIL

1 1/2" = 1'-0"2B

TYP. WALL BACKING DETAIL

3" = 1'-0"8

TRANSITION - RESILIENT TO CARPET (RESILIENT)

3" = 1'-0"9

TRANSITION - RESILIENT TO RESILIENT (RESILIENT)

FIRST FLOOR

0' - 0"

4' -3

FIRST FLOOR

0' - 0"

1/

2" 2'

-6

2' -0

2'

-9

/2

2' -1

0"

FIRST FLOOR

0' - 0"

4'-0" 4'-0"

3'-0" 3'-0" 3'-0"

IN601

IN601

IN601

FIRST FLOOR

0' - 0"

FIRST FLOOR

0' - 0"

AE701

FIRST FLOOR

0' - 0"

FIRST FLOOR

0' - 0"

FIRST FLOOR

0' - 0"

FIRST FLOOR

0' - 0"

4' -3

4' -0

FIRST FLOOR

0' - 0"

4' -0

3' -7

FIRST FLOOR

0' - 0"

FIRST FLOOR

0' - 0"

4' -0

FIRST FLOOR

0' - 0"

HR-1HR-1

2' -1

0"3' -4

CG-1

FIRST FLOOR

0' - 0"

HR-1 HR-1

2' -1

0"3' -4

CG-1

FIRST FLOOR

0' - 0"

HR-1

2' -1

0"3' -4

FIRST FLOOR

0' - 0"

HR-1 HR-1

2' -1

0"3' -4

CG-1

RICHARD

JOSEPH

ONKEN

A-5125

A

R C H I T E

C

T

S T

A T

E

O F N E B

R A

S K

A

5/21/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

BDH Engineering 440 Regency Parkway, Suit 135 Omaha, Nebraska 68114 Phone: (402) 981-5527

Farris Engineering 12700 W Dodge Rd, Omaha, NE 68154 Phone: (402) 330-5900

A on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t

6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t

6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t

CONTRACT DOCUMENTS RENOVATE 5 & 5B FOR

MENTAL HEALTH

589A7-23-306

5b

WICHITA, KS

A

B

C

D

E

F

21 MAY 2024 RJO IJM

A u to d e s k D o c s /1

A -2

-3

R e n o v a te B ld g b f o r

M e n ta l H e a lt h

/5

A

-2

-3

.A rc h

R

-R e n o v a te B ld g b f o r M e n ta l H e a lt h

.r v t

/2

/2

:2

:2

A

M

AE905

INTERIOR ELEVATIONS

3/8" = 1'-0"1

WORK ROOM ELEVATION - A

3/8" = 1'-0"2

WORK ROOM ELEVATION - B

3/8" = 1'-0"3

WORK ROOM ELEVATION - C

3/8" = 1'-0"4

WORK ROOM ELEVATION - D

3/8" = 1'-0"5

POLICA OFFICE ELEVATION - A

3/8" = 1'-0"6

POLICE OFFICE ELEVATION - B

3/8" = 1'-0"7

POLICE OFFICE ELEVATION - C

3/8" = 1'-0"8

POLICE OFFICE ELEVATION - D

3/8" = 1'-0"13

ELEVATION 1 - A

3/8" = 1'-0"14

ELEVATION 1 - B

3/8" = 1'-0"15

ELEVATION 1 - C

3/8" = 1'-0"16

ELEVATION 1 - D

1/2" = 1'-0"9

HALLWAY ELEVATION - A

1/2" = 1'-0"10

HALLWAY ELEVATION - B

1/2" = 1'-0"11

HALLWAY ELEVATION - C

3/8" = 1'-0"12

ELEVATION 2 - A

S S

S S

S S

S S

S S

S S

CPT-1

WSF-1 LVT-1

FLOOR FINISH LEGEND

ELEVATOR

152-5

ELEVATOR

153-5

ELEV.

EQUIP.

154-5

RECEPTION

162-5

WOMEN'S

161-5

MEN'S

168-5

COMM.

158-5

JAN

160-5

STAIR

156-5

WAITING

151-5

INTERVIEW

155-5

HALLWAY

157-5

VESTIBULE

169-5

ELECTRICAL

170-5

FIRE

SPRINKLER

MECH. RM.

171-5OFFICE

172-5

OFFICE

173-5

OFFICE

174-5

OFFICE

175-5

504 SF

GROUP

THERAPY

167-5

HALLWAY

176-5

OFFICE

178-5

OFFICE

179-5

STAIR

171-5

VESTIBULE

159-5

110 SF

POLICE

163-5

VESTIBULE

150-5

120 SF

EXAM

OFFICE

166D-5

120 SF

EXAM

OFFICE

166C-5

125 SF

EXAM

OFFICE

166B-5

125 SF

EXAM

OFFICE

166A-5

122 SF

COPY WORK

ROOM

165-5

10'-0"

'-6

'-6

9'-7"

155 SF

HALLWAY

157B-5

6'-0"

Q Q

Q

Q

Q

Q

Q

Q

Q Q

GH166C

GH166D

GH166B

GH166A

GH163

GH165

CG-1 CG-1

CG-1

HR-1HR-1

HR-1

HR-1

IN-04.01

IN-04.01

IN-04.01

IN-04.01

IN-04.01

IN-04.01

SMOKE PARTITION

SYMBOL

SOC PLAN LEGEND

DESCRIPTION

1-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

3-HOUR FIRE BARRIER

SMOKE BARRIER

1-HOUR SMOKE BARRIER

2-HOUR SMOKE BARRIER

3-HOUR SMOKE BARRIER

4-HOUR FIRE BARRIER

4-HOUR SMOKE BARRIER

30-MINUTE SMOKE BARRIER

30-MINUTE FIRE BARRIER

S S

S

S

S

S

S

S

S

S

S S

RICHARD

JOSEPH

ONKEN

A-5125

A

R C H I T E

C

T

S T

A T

E

O F N E B

R A

S K

A

5/21/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

BDH Engineering 440 Regency Parkway, Suit 135 Omaha, Nebraska 68114 Phone: (402) 981-5527

Farris Engineering 12700 W Dodge Rd, Omaha, NE 68154 Phone: (402) 330-5900

A on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t

6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t

6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t

CONTRACT DOCUMENTS RENOVATE 5 & 5B FOR

MENTAL HEALTH

589A7-23-306

5b

WICHITA, KS

A

B

C

D

E

F

21 MAY 2024 RJO IJM

A u to d e s k D o c s /1

A -2

-3

R e n o v a te B ld g b f o r

M e n ta l H e a lt h

/5

A

-2

-3

.A rc h

R

-R e n o v a te B ld g b f o r M e n ta l H e a lt h

.r v t

/2

/2

:2

:2

A

M

IN101

FIRST FLOOR - INTERIOR FLOOR

FINISH PLAN

1/4" = 1'-0"1

FIRST FLOOR - FLOOR PLAN

HR-1

SEE FLOOR PLAN

FOR WALL TYPE

HR-1

VINYL COVER W/

CONTINUOUS

RETAINER

ATTACHED TO METAL

STUDS, TYP.

/8

2'

FRONT VIEW SIDE VIEW

9"

LINE 1 GRADE 2 BRAILLE

CONCEALED

MECHANICAL

FASTENERS

(TYPICAL)

WALL

MESSAGE INSERT:

PAPER OR ACETATE

SHEET WITH DIGITAL

PRINT ON UPDATABLE

INSERT

(JUSTIFICATION = LEFT)

3/4"

LINE 2

LINE 3

LINE 4

3/8"

NOTES:

1. REFER TO SIGNAGE DESIGN MANUAL PG18-10 DATED MAY16, 2023; SIGN IN-04.01 MESSAGE LAYOUT A.

2. THIS TYPE IS THE PRIMARY ROOM IDENTIFICATION SIGN TYPE. THE ROOM NUMBER IS COMPOSED OF

RAISED, TACTILE CHARACTERS AND BAILLE, AND THE ROOM'S OCCUPANT/USE IN DISPLAYED ON AN

UPDATED INSERT.

3. IF MOUNTED ON GLASS REFER TO PAGE 102 OF THE SIGNAGE DESIGN MANUAL PG18-10 DATED MAY16,

4. TYPOGRAPHY: HELVETICA

5. WALL MOUNTED AT 60" TO TOP OF THE SIGN FROM FINISH FLOOR 2" OVER FROM FRAME, LATCH SIDE.

RAISED TACTILE TEXT

(JUSTIFICATION = LEFT)

FRAME

INSERT A

INSERT B

LINE 5

1/ 2"

1/

4" 3/

8" 1/

4" 5/

8" 1/

8" (T

YP

3/ 4"

3/ 4"

3/ 8"

3/ 4"

3/ 8"

3/ 4"

3/ 8"

3/ 4"

1/

8"

IN-04.01

IN-01.10

IN-03.01

5'

0"

2"

M

IN

6'

8"

IN-01.31

IN-13.01

1. SIGNAGE IS TO BE PLACED ON LATCH…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .