S02 - 556-B55 Structural Record Dwgs.pdf
PDF 18 MB Posted
- Solicitation number
- 36C25224Q0414
About this file
This document is a Special Notice for a Solicitation (Solicitation Number: 36C25224Q0414) from the Department of Veterans Affairs (VA) to establish a single award, firm-fixed price Architect/Engineer (A/E) contract for the design and construction period services for the renovation of Building 133 Pathology and Laboratory Medicine Services spaces at the Captain James A. Lovell FHCC in North Chicago, IL.
The VA is seeking SF330 qualifications submissions from Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) located within a 250-mile radius of the project site. Evaluation factors include professional qualifications, specialized experience, capacity to perform the work, past performance, local knowledge, claims history, and small business utilization. After evaluating the SF330s, the VA will hold discussions/interviews with at least three of the most highly qualified firms before selecting the most preferred firm for negotiations. The VA may also utilize the submitted SF330s for other smaller design projects up to the simplified acquisition threshold of $250,000.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2021-10-27 NOTE: MAY BE INACCURATE AND/OR OUT-OF-DATE. VERIFY IN FIELD.
VHANCHLidD Sticky Note
| SG1 CLINICAL ADDITION GENERAL NOTES AND DETAILS |
| B1 SOIL BORING LOGS |
| S1 CLINICAL ADDITION FOUNDATION PLAN AREA D |
| S2 CLINICAL ADDITION FOUNDATION PLAN AREA D1 AND SUB-BASEMENT |
| S3 CLINICAL ADDITION FOUNDATION PLAN AREA D2 |
| S4 CLINICAL ADDITION FIRST FLOOR FRAMING PLAN AREA D |
| S5 CLINICAL ADDITION FIRST FLOOR FRAMING PLAN AREA D1 |
| S6 CLINICAL ADDITION FIRST FLOOR FRAMING PLAN AREA D2 |
| S7 CLINICAL ADDITION SECOND FLOOR FRAMING PLAN AREA D |
| S8 CLINICAL ADDITION SECOND FLOOR FRAMING PLAN AREA D1 |
| S9 CLINICAL ADDITION SECOND FLOOR FRAMING PLAN AREA D2 |
| S10 CLINICAL ADDITION THIRD FLOOR FRAMING PLAN AREA D |
| S11 CLINICAL ADDITION THIRD FLOOR FRAMING PLAN AREA D1 |
| S12 CLINICAL ADDITION THIRD LEVEL AND PENTHOUSE FRAMING PLAN AREA D2 |
| S13 CLINICAL ADDITION FOURTH LEVEL AND PENTHOUSE FRAMING PLAN AREA D |
| S14 CLINICAL ADDITION FOURTH LEVEL AND PENTHOUSE FRAMING PLAN AREA D1 |
| S15 CLINICAL ADDITION PENTHOUSE AND ROOF AREAS D D1 AND D2 |
| S16 CLINICAL ADDITION AMBULANCE ENTRANCE FOUNDATION, FRAMING PLANS, AND DETAILS |
| S17 CLINICAL ADDITION MAIN ENTRANCE CANOPY- 133 ROOF PLAN AND DETAILS |
| S18 CLINICAL ADDITION MAIN ENTRANCE CANOPY- 133 FOUNDATION, GRADE PLANS, AND DETAILS |
| S19 CLINICAL ADDITION MAIN ENTRANCE CANOPY- 134 PLANS AND DETAILS |
| S20 CLINICAL ADDITION CART LIFT PLANS, SECTIONS AND DETAILS |
| S21 CLINICAL ADDITION FOUNDATION DETAILS AND FOOTING SCHEDULE |
| S22 CLINICAL ADDITION FOUNDATION DETAILS |
| S23 CLINICAL ADDITION COLUMN SCHEDLE AND DETAILS |
| S24 CLINICAL ADDITION BEAM SCHEDULES |
| S25 CLINICAL ADDITION BEAM, SLAB AND JOIST SCHEDULE |
| S26 CLINICAL ADDITIONS SECTIONS AND DETAILS |
| S27 CLINICAL ADDITION SECTIONS AND DETAILS |
| S28 CLINICAL ADDITION SECTIONS AND DETAILS |
| S29 CLINICAL ADDITION SECTIONS AND DETAILS |
| S30 CLINICAL ADDITION SELECTIONS AND DETAILS |
File details come from the government source that posted it. Updated .