S02 - 556-B55 Plumbing Record Dwgs.pdf
PDF 24 MB Posted
- Solicitation number
- 36C25224Q0414
About this file
This document is a Special Notice for a Request for SF330s (Architect/Engineer Qualifications) for a firm-fixed-price contract to provide design, specification, and construction period services for the renovation of Building 133 Pathology and Laboratory Medicine Services spaces at the Captain James A. Lovell FHCC in North Chicago, IL.
The Department of Veterans Affairs is seeking qualifications from Service-Disabled Veteran-Owned Small Business (SDVOSB) firms located within a 250-mile radius of the project site. The NAICS code is 541310 with a $12.5 million size standard. Evaluation factors include professional qualifications, specialized experience, capacity to perform the work, past performance, geographic proximity, claims history, and commitment to using small business subcontractors. Discussions will be held with at least the top three most qualified firms before selection of the most preferred firm for contract negotiations. The VA may also utilize the submitted SF330s for other smaller design projects up to the simplified acquisition threshold.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2021-10-28 NOTE: FOR EXISTING CONDITIONS, VERIFY IN FIELD
| P1 GENERAL NOTES SCHEDULES AND SYMBOLS |
| P2 UNDERGROUND PLUMBING AND FIRE PROTECTION PLAN - AREA D |
| P3 UNDERGROUND PLUMBING AND FIRE PROTECTION PLAN - AREA D1 AND DETAILS |
| P4 UNDERGROUND PLUMBING AND FIRE PROTECTION PLAN - AREA D2 |
| P5 BASEMENT PLUMBING AND FIRE PROTECTION PLAN - AREA D |
| P6 BASEMENT PLUMBING AND FIRE PROTECTION PLAN - AREA D1 AND DETAILS |
| P7 BASEMENT PLUMBING AND FIRE PROTECTION PLAN - AREA D2 |
| P8 FIRST FLOOR PLUMBING AND FIRE PROTECTION PLAN-AREA D |
| P9 FIRST FLOOR PLUMBING AND FIRE PROTECTION PLAN - AREA D1 |
| P10 FIRST FLOOR PLUMBING AND FIRE PROTECTION PLAN - AREA D2 |
| P11 SECOND FLOOR PLUMBING AND FIRE PROTECTION PLAN - AREA D |
| P12 SECOND FLOOR PLUMBING AND FIRE PROTECTION PLAN - AREA D1 |
| P13 SECOND FLOOR PLUMBING AND FIRE PROTECTION PLAN - AREA D2 |
| P14 THIRD FLOOR PLUMBING AND FIRE PROTECTION PLAN - AREA D |
| P15 THIRD FLOOR PLUMBING AND FIRE PROTECTION PLAN - AREA D1 |
| P16 THIRD FLOOR PLUMBING AND FIRE PROTECTION PLAN - AREA D2 |
| P17 PENTHOUSE PLUMBING AND FIRE PROTECTION PLAN - AREA D |
| P18 SERVICE PIPING DIAGRAMS |
| P19 SERVICE PIPING DIAGRAMS |
| P20 SERVICE PIPING DIAGRAMS |
| P21 SERVICE PIPING DETAILS |
| P22 WASTE AND VENT RISER DRAWINGS |
| P23 PARTIAL PLANS AND DETAILS |
| P24 SERVICE PIPING DIAGRAMS AND DETAILS |
| P25 WASTE AND VENT RISER DIAGRAMS AND DETAILS |
File details come from the government source that posted it. Updated .