S06 - VA Medical Center Alterations Volume 1.pdf
PDF 33 MB Posted
- Solicitation number
- 36C25224Q0414
About this file
This document is a special notice for a federal contract opportunity issued by the Department of Veterans Affairs (VA) for Architect/Engineer (A/E) design services for the renovation of Building 133 Laboratory Services at the Captain James A. Lovell Federal Health Care Center in North Chicago, IL.
The VA is seeking qualifications from Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) located within a 250-mile radius of the project site for a single-award, firm-fixed price contract. The design services will include design, specification, and construction period services to renovate various laboratory spaces in Building 133. Key evaluation factors include professional qualifications, specialized experience, capacity to meet the schedule, past performance, and utilization of small business subcontractors. SF 330 qualifications are due by 10:00 am CDT on May 30, 2024, and the VA will select the most highly qualified firm for negotiations. The VA may also utilize the submitted SF 330s for future smaller design projects up to the simplified acquisition threshold.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Medical Center Alterations Volume 1
| R.GI101 COVER SHEET VOLUME 1 |
| R.GI102 INDEX OF DRAWINGS VOLUME 1 |
| R.GI103 INDEX OF DRAWINGS VOLUME 1 |
| R.GI104 INDEX OF DRAWINGS VOLUME 1 |
| R.GI105 INDEX OF DRAWINGS VOLUME 1 |
| R.GI109 GENERAL AND ARCHITECTURAL SYMBOLS |
| R.GC0001 PHASING NOTES |
| R.GC100E PHASING BASEMENT FLOOR PLAN EXISTING |
| R.GC101E PHASING FIRST FLOOR PLAN EXISTING |
| R.GC102E PHASING SECOND FLOOR PLAN EXISTING |
| R.GC103E PHASING THIRD FLOOR PLAN EXISTING |
| R.GC110E LIFE SAFETY BASEMENT FLOOR PLAN EXISTING |
| R.GC111E LIFE SAFETY FIRST FLOOR PLAN EXISTING |
| R.GC112E LIFE SAFETY SECOND FLOOR PLAN EXISTING |
| R.GC113E LIFE SAFETY THIRD FLOOR PLAN EXISTING |
| R.AD120J BASEMENT FLOOR PLAN SECTOR J ARCHITECTURAL DEMOLITION |
| R.AD120K BASEMENT FLOOR PLAN SECTOR K ARCHITECTURAL DEMOLITION |
| R.AD120N BASEMENT FLOOR PLAN SECTOR N ARCHITECTURAL DEMOLITION |
| R.AD120Q BASEMENT FLOOR PLAN SECTOR Q ARCHITECTURAL DEMOLITION |
| R.AD120R BASEMENT FLOOR PLAN SECTOR R ARCHITECTURAL DEMOLITION |
| R.AD120U BASEMENT FLOOR PLAN SECTOR U ARCHITECTURAL DEMOLITION |
| R.AD121J FIRST FLOOR PLAN SECTOR J ARCHITECTURAL DEMOLITION |
| R.AD121K FIRST FLOOR PLAN SECTOR K ARCHITECTURAL DEMOLITION |
| R.AD121N FIRST FLOOR PLAN SECTOR N ARCHITECTURAL DEMOLITION |
| R.AD121NO FIRST FLOOR PLAN SECTOR N ARCHITECTURAL DEMOLITION - BID OPTION |
| R.AD121P FIRST FLOOR PLAN SECTOR P ARCHITECTURAL DEMOLITION |
| R.AD121Q FIRST FLOOR PLAN SECTOR Q ARCHITECTURAL DEMOLITION |
| R.AD121R FIRST FLOOR PLAN SECTOR R ARCHITECTURAL DEMOLITION |
| R.AD122N SECOND FLOOR PLAN SECTOR N ARCHITECTURAL DEMOLITION |
| R.AD122P SECOND FLOOR PLAN SECTOR P ARCHITECTURAL DEMOLITION |
| R.AD122Q SECOND FLOOR PLAN SECTOR Q ARCHITECTURAL DEMOLITION |
| R.AD122R SECOND FLOOR PLAN SECTOR R ARCHITECTURAL DEMOLITION |
| R.AD123N THIRD FLOOR PLAN SECTOR N ARCHITECTURAL DEMOLITION |
| R.AD123P THIRD FLOOR PLAN SECTOR P ARCHITECTURAL DEMOLITION |
| R.AD123Q THIRD FLOOR PLAN SECTOR Q ARCHITECTURAL DEMOLITION |
| R.AD123R THIRD FLOOR PLAN SECTOR R ARCHITECTURAL DEMOLITION |
| R.AD12RE PARTIAL ROOF PLAN DEMOLITION |
| R.AD4001 ENLARGED PLAN |
| R.AD9001 DEMOLITION PHOTOGRAPHS |
| R.AD9002 DEMOLITION PHOTOGRAPHS |
| R.AD9003 DEMOLITION PHOTOGRAPHS |
| R.AD9004 DEMOLITION PHOTOGRAPHS |
| R.AE110E PARTIAL BASEMENT FLOOR PLAN |
| R.AE111E PARTIAL FIRST FLOOR PLAN |
| R.AE112E PARTIAL SECOND FLOOR PLAN |
| R.AE113E PARTIAL THIRD FLOOR PLAN |
| R.AE12RE PARTIAL ROOF PLAN |
| R.AE120J BASEMENT FLOOR PLAN SECTOR J ARCHITECTURAL |
| R.AE120N BASEMENT FLOOR PLAN SECTOR N ARCHITECTURAL |
| R.AE120Q BASEMENT FLOOR PLAN SECTOR Q ARCHITECTURAL |
| R.AE120R BASEMENT FLOOR PLAN SECTOR R ARCHITECTURAL |
| R.AE120U BASEMENT FLOOR PLAN SECTOR U ARCHITECTURAL |
| R.AE121J FIRST FLOOR PLAN SECTOR J ARCHITECTURAL |
| R.AE121K FIRST FLOOR PLAN SECTOR K ARCHITECTURAL |
| R.AE121NO FIRST FLOOR PLAN SECTOR N ARCHITECTURAL - BID OPTION |
| R.AE122N SECOND FLOOR PLAN SECTOR N ARCHITECTURAL |
| R.AE122P SECOND FLOOR PLAN SECTOR P ARCHITECTURAL |
| R.AE122Q SECOND FLOOR PLAN SECTOR Q ARCHITECTURAL |
| R.AE122R SECOND FLOOR PLAN SECTOR R ARCHITECTURAL |
| R.AE123N THIRD FLOOR PLAN SECTOR N ARCHITECTURAL |
| R.AE123P THIRD FLOOR PLAN SECTOR P ARCHITECTURAL |
| R.AE123Q THIRD FLOOR PLAN SECTOR Q ARCHITECTURAL |
| R.AE123R THIRD FLOOR PLAN SECTOR R ARCHITECTURAL |
| R.AE130J BASEMENT FLOOR PLAN SECTOR J REFLECTED CEILING |
| R.AE130K BASEMENT FLOOR PLAN SECTOR K REFLECTED CEILING |
| R.AE130N BASEMENT FLOOR PLAN SECTOR N REFLECTED CEILING |
| R.AE130R BASEMENT FLOOR PLAN SECTOR R REFLECTED CEILING |
| R.AE131J FIRST FLOOR PLAN SECTOR J REFLECTED CEILING |
| R.AE131K FIRST FLOOR PLAN SECTOR K REFLECTED CEILING |
| R.AE131N FIRST FLOOR PLAN SECTOR N REFLECTED CEILING |
| R.AE131NO FIRST FLOOR PLAN SECTOR N REFLECTED CEILING - BID OPTION |
| R.AE131P FIRST FLOOR PLAN SECTOR P REFLECTED CEILING |
| R.AE131Q FIRST FLOOR PLAN SECTOR Q REFLECTED CEILING |
| R.AE131R FIRST FLOOR PLAN SECTOR R REFLECTED CEILING |
| R.AE132N SECOND FLOOR PLAN SECTOR N REFLECTED CEILING |
| R.AE132P SECOND FLOOR PLAN SECTOR P REFLECTED CEILING |
| R.AE132Q SECOND FLOOR PLAN SECTOR Q REFLECTED CEILING |
| R.AE132R SECOND FLOOR PLAN SECTOR R REFLECTED CEILING |
| R.AE133N THIRD FLOOR PLAN SECTOR N REFLECTED CEILING |
| R.AE133P THIRD FLOOR PLAN SECTOR P REFLECTED CEILING |
| R.AE4102 LEAD LINING PLANS AND DETAILS |
| R.AE5020 PLAN DETAILS |
| R.AE5021 PLAN DETAILS |
| R.AE5022 PLAN DETAILS |
| R.AE5101 CEILING AND FOLDING PARTITION DETAILS |
| R.AE5301 PARTITION TYPES |
| R.AE5302 PARTITION TYPES |
| R.AE5303 RATED WALL PENETRATIONS |
| R.AE5501 ROOF AND SHOWER DETAILS |
| R.AE6001 DOOR SCHEDULE |
| R.AE6002 DOOR SCHEDULE |
| R.AE6101 DOOR, FRAME AND LOUVER ELEVATIONS |
| R.AE6201 DOOR DETAILS |
| R.AE6202 DOOR DETAILS |
| R.AF6001 FINISH SCHEDULE |
| R.AF6002 FINISH SCHEDULE |
| R.AF6003 FINISH SCHEDULE |
| R.AF6004 FINISH SCHEDULE |
| R.AF6005 FINISH SCHEDULE |
| R.AF6101 FINISH IDENTIFICATION |
| R.AF6102 FINISH IDENTIFICATION |
| R.AG2010 INTERIOR SIGNAGE ELEVATIONS |
| R.AG2011 INTERIOR SIGNAGE ELEVATIONS |
| R.AG6001 SIGN LOCATION SCHEDULE |
| R.IN120J BASEMENT FLOOR PLAN SECTOR J FLOOR PATTERN |
| R.IN120N BASEMENT FLOOR PLAN SECTOR N FLOOR PATTERN |
| R.IN120R BASEMENT FLOOR PLAN SECTOR R FLOOR PATTERN |
| R.IN121J FIRST FLOOR PLAN SECTOR J FLOOR PATTERN |
| R.IN121K FIRST FLOOR PLAN SECTOR K FLOOR PATTERN |
| R.IN121NO FIRST FLOOR PLAN SECTOR N FLOOR PATTERN - BID OPTION |
| R.IN122N SECOND FLOOR PLAN SECTOR N FLOOR PATTERN |
| R.IN122P SECOND FLOOR PLAN SECTOR P FLOOR PATTERN |
| R.IN122Q SECOND FLOOR PLAN SECTOR Q FLOOR PATTERN |
| R.IN122R SECOND FLOOR PLAN SECTOR R FLOOR PATTERN |
| R.IN130J BASEMENT FLOOR PLAN SECTOR J WALL PATTERN |
| R.IN130N BASEMENT FLOOR PLAN SECTOR N WALL PATTERN |
| R.IN130R BASEMENT FLOOR PLAN SECTOR R WALL PATTERN |
| R.IN130U BASEMENT FLOOR PLAN SECTOR U WALL PATTERN |
| R.IN131J FIRST FLOOR PLAN SECTOR J WALL PATTERN |
| R.IN131K FIRST FLOOR PLAN SECTOR K WALL PATTERN |
| R.IN131NO FIRST FLOOR PLAN SECTOR N WALL PATTERN - BID OPTION |
| R.IN132N SECOND FLOOR PLAN SECTOR N WALL PATTERN |
| R.IN132P SECOND FLOOR PLAN SECTOR P WALL PATTERN |
| R.IN132Q SECOND FLOOR PLAN SECTOR Q WALL PATTERN |
| R.IN132R SECOND FLOOR PLAN SECTOR R WALL PATTERN |
| R.IN133N THIRD FLOOR PLAN SECTOR N WALL PATTERN |
| R.IN133P THIRD FLOOR PLAN SECTOR P WALL PATTERN |
| R.IN133Q THIRD FLOOR PLAN SECTOR Q WALL PATTERN |
| R.IN2101 INTERIOR MILLWORK ELEVATIONS |
| R.IN2101O INTERIOR MILLWORK ELEVATIONS - BID OPTION |
| R.IN5001 INTERIOR MILLWORK DETAILS |
| R.IN5002O INTERIOR MILLWORK DETAILS - BID OPTION |
| R.QE120J1 BASEMENT FLOOR PLAN SECTOR J1 EQUIPMENT |
| R.QE120N1 BASEMENT FLOOR PLAN SECTOR N1 EQUIPMENT |
| R.QE120N2 BASEMENT FLOOR PLAN SECTOR N2 EQUIPMENT |
| R.QE120Q1 BASEMENT FLOOR PLAN SECTOR Q1 EQUIPMENT |
| R.QE120R1 BASEMENT FLOOR PLAN SECTOR R1 EQUIPMENT |
| R.QE120R3 BASEMENT FLOOR PLAN SECTOR R3 EQUIPMENT |
| R.QE121J1 FIRST FLOOR PLAN SECTOR J1 EQUIPMENT |
| R.QE121K1 FIRST FLOOR PLAN SECTOR K1 EQUIPMENT |
| R.QE121K2 FIRST FLOOR PLAN SECTOR K2 EQUIPMENT |
| R.QE121K3 FIRST FLOOR PLAN SECTOR K3 EQUIPMENT |
| R.QE121N1O FIRST FLOOR PLAN SECTOR N1 EQUIPMENT - BID OPTION |
| R.QE122N1 SECOND FLOOR PLAN SECTOR N1 EQUIPMENT |
| R.QE122N2 SECOND FLOOR PLAN SECTOR N2 EQUIPMENT |
| R.QE122P1 SECOND FLOOR PLAN SECTOR P1 EQUIPMENT |
| R.QE122P2 SECOND FLOOR PLAN SECTOR P2 EQUIPMENT |
| R.QE122P3 SECOND FLOOR PLAN SECTOR P3 EQUIPMENT |
| R.QE122P4 SECOND FLOOR PLAN SECTOR P4 EQUIPMENT |
| R.QE122Q1 SECOND FLOOR PLAN SECTOR Q1 EQUIPMENT |
| R.QE122Q2 SECOND FLOOR PLAN SECTOR Q2 EQUIPMENT |
| R.QE122R1 SECOND FLOOR PLAN SECTOR R1 EQUIPMENT |
| R.QE123N1 THIRD FLOOR PLAN SECTOR N1 EQUIPMENT |
| R.QE123P1 THIRD FLOOR PLAN SECTOR P1 EQUIPMENT |
| R.QE123P2 THIRD FLOOR PLAN SECTOR P2 EQUIPMENT |
| R.QE201 TYPICAL MOUNTING HEIGHTS EQUIPMENT |
| R.QE202 EQUIPMENT ELEVATIONS |
| R.QE203 EQUIPMENT ELEVATIONS |
| R.QE501 EQUIPMENT DETAILS |
| R.QE502 EQUIPMENT DETAILS |
| R.QE6010 EQUIPMENT SCHEDULE AND LEGENDS |
| R.FG0001 FIRE PROTECTION SYMBOLS, ABBREVIATIONS AND GENERAL NOTES |
| R.FG0002 FIRE ALARM SYSTEM LEGEND |
| R.FD100J BASEMENT FLOOR PLAN SECTOR J FIRE SUPPRESSION DEMOLITION |
| R.FD100N BASEMENT FLOOR PLAN SECTOR N FIRE SUPPRESSION DEMOLITION |
| R.FD100R BASEMENT FLOOR PLAN SECTOR R FIRE SUPPRESSION DEMOLITION |
| R.FD101J FIRST FLOOR PLAN SECTOR J FIRE SUPPRESSION DEMOLITION |
| R.FD101K FIRST FLOOR PLAN SECTOR K FIRE SUPPRESSION DEMOLITION |
| R.FD101NO FIRST FLOOR PLAN SECTOR N FIRE SUPPRESSION DEMOLITION - BID OPTION |
| R.FD102N SECOND FLOOR PLAN SECTOR N FIRE SUPPRESSION DEMOLITION |
| R.FD102P SECOND FLOOR PLAN SECTOR P FIRE SUPPRESSION DEMOLITION |
| R.FD102Q SECOND FLOOR PLAN SECTOR Q FIRE SUPPRESSION DEMOLITION |
| R.FD102R SECOND FLOOR PLAN SECTOR R FIRE SUPPRESSION DEMOLITION |
| R.FD103N THIRD FLOOR PLAN SECTOR N FIRE SUPPRESSION DEMOLITION |
| R.FD103P THIRD FLOOR PLAN SECTOR P FIRE SUPPRESSION DEMOLITION |
| R.FD110R BASEMENT FLOOR PLAN SECTOR R FIRE ALARM DEMOLITION |
| R.FD111J FIRST FLOOR PLAN SECTOR J FIRE ALARM DEMOLITION |
| R.FD111K FIRST FLOOR PLAN SECTOR K FIRE ALARM DEMOLITION |
| R.FD112N SECOND FLOOR PLAN SECTOR N FIRE ALARM DEMOLITION |
| R.FD112P SECOND FLOOR PLAN SECTOR P FIRE ALARM DEMOLITION |
| R.FD112Q SECOND FLOOR PLAN SECTOR Q FIRE ALARM DEMOLITION |
| R.FD112R SECOND FLOOR PLAN SECTOR R FIRE ALARM DEMOLITION |
| R.FD113N THIRD FLOOR PLAN SECTOR N FIRE ALARM DEMOLITION |
| R.FD113P THIRD FLOOR PLAN SECTOR P FIRE ALARM DEMOLITION |
| R.FX100H BASEMENT FLOOR PLAN SECTOR H FIRE PROTECTION |
| R.FX100J BASEMENT FLOOR PLAN SECTOR J FIRE PROTECTION |
| R.FX100N BASEMENT FLOOR PLAN SECTOR N FIRE PROTECTION |
| R.FX100Q BASEMENT FLOOR PLAN SECTOR Q FIRE PROTECTION |
| R.FX100R BASEMENT FLOOR PLAN SECTOR R FIRE PROTECTION |
| R.FX101J FIRST FLOOR PLAN SECTOR J FIRE PROTECTION |
| R.FX101K FIRST FLOOR PLAN SECTOR K FIRE PROTECTION |
| R.FX101NO FIRST FLOOR PLAN SECTOR N FIRE PROTECTION - BID OPTION |
| R.FX102N SECOND FLOOR PLAN SECTOR N FIRE PROTECTION |
| R.FX102P SECOND FLOOR PLAN SECTOR P FIRE PROTECTION |
| R.FX102Q SECOND FLOOR PLAN SECTOR Q FIRE PROTECTION |
| R.FX102R SECOND FLOOR PLAN SECTOR R FIRE PROTECTION |
| R.FX103N THIRD FLOOR PLAN SECTOR N FIRE PROTECTION |
| R.FX103P THIRD FLOOR PLAN SECTOR P FIRE PROTECTION |
File details come from the government source that posted it. Updated .