S02 - 537-24-105 Construction Project Tracker.xlsx

XLSX spreadsheet 71 KB Posted

Attached to
Z2DA--537-24-105 OR Suite Lighting Replacement Federal contract opportunity
Solicitation number
36C25225B0018
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12

About this file

This Excel file is a comprehensive project tracking document for a Department of Veterans Affairs construction project at the Jesse Brown VAMC in Chicago, Illinois, focusing on an OR Suite Lighting Replacement. The project tracking spreadsheet includes detailed sections for construction performance periods, Request for Information (RFI) log, submittal log, punchlist, payment log, contract modifications, and meeting minutes. The construction period of performance is structured across five key tasks: Project Kick-Off Submittals, Coordination Submittals, Pre-Construction Submittals, Mobilization and Performance of the Work, and Closeout Submittals, with a total projected timeline spanning 428 calendar days after the Notice to Proceed (NTP). The project involves key personnel including a Contracting Officer (CO), Contract Specialist (CS), Contracting Officer's Representative (COR), and Engineering Supervisor, with ongoing tracking of project progress, daily logs, and contract modifications.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--537-24-105 OR Suite Lighting Replacement, newest first.
File Type Posted
S02 - VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING DEVIATION - 537-24-105.pdf PDF
36C25225B0018 0006.docx DOCX document
S05 - Pre-Bid RFI Responses 537-24-105 8.25.2025 - Working Copy.pdf PDF
36C25225B0018 0005.docx DOCX document
36C25225B0018 0004.docx DOCX document
S04 -Site visit Sign-in sheet - 8.14.2025 - 537-24-105.pdf PDF
S05 - Pre-Bid RFI Responses - 537-24-105 - 8.14.2025.pdf PDF
36C25225B0018 0003.docx DOCX document
36C25225B0018 0002.docx DOCX document
S04 - Pre-bid Site Visit Check-in Sheet - 537-24-105.pdf PDF
36C25225B0018 0001.docx DOCX document
S02 - Solicitation - 36C25225B0018_1 - 537-24-105 - OR Suite Lighting - Final 02.pdf PDF
S02 - Exhibit_3 537-24-105 SOC Floor Plan.pdf PDF
S02 - Wage Determinations - 7.9.2025 - 537-24-105.pdf PDF
S02 - Subcontractor Payment Summary.xlsx XLSX spreadsheet
S02 - Exhibit_4 ICRA 537-24-105.pdf PDF
S02 - Exhibit 2 - Construction Specification 537-24-105.zip ZIP file
S02 - Exhibit_1 - Work Scope Layouts 537-24-105.pdf PDF
S02 - VA Form 10-6001a Contract Progress Report.pdf PDF
36C25225B0018_1.docx DOCX document
S02 - VA Form 10101 CONTRACTOR PRODUCTION REPORT.pdf PDF
S02 - Handbook 6500 - 2.24.2021.pdf PDF
S02 - Exhibit 5 - 537-24-105_PG-18-10 Section 4.2.13 SURGERY Lighting.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

POP

Department of Veterans Affairs
537-19-124 Project Title
Jesse Brown VAMC
Chicago, Illinois
NTP Date:TBD
CONSTRUCTION PERIOD OF PERFORMANCE CHART (IN CALENDAR DAYS AFTER NTP)
Level CompleteCalendar Days for the WorkPlanned DateActual DateVA ReviewPlanned DateRevised DateTotal days after NTP
Task 1 – Project Kick-Off Submittals7714
Task 2 – Coordination Submittals452180
Task 3 – Pre-Construction Submittals2114115
Task 4 – Mobilization and Performance of the Work2710386
Task 5 – Closeout Submittals2121428

RFI LOG

Department of Veterans Affairs
537-24-105 OR Suite Lighting
Jesse Brown VAMC
Chicago, Illinois
REQUEST FOR INFORMATION LOG
REQUEST FOR INFORMATIONVA RESPONSE
RFI #ISSUE DATERESOLUTION ON THE FOLLOWINGNEED REPLY BY DATEDATEBYREQUEST FOR INFORMATION RESPONSEVA DAYS TO REPLY

SUBMITTAL LOG

Department of Veterans Affairs
537-24-105 OR Suite Lighting
Jesse Brown VAMC
Chicago, Illinois
SUBMITTAL LOG
REQUEST FOR SUBMITTAL REVIEWDESIGNER OF RECORD RESPONSEVA ACCEPTANCE / RESOLUTIONTIME ANALYTICS
IDISSUE DATESUMBITTAL BY SECTION OF WORKNEED REPLY BY DATEREPLY DATEREPLY FROMAE RECOMMENDATIONDATEREVIEW BYVA ACTIONDAYS TO REVIEWDAYS TO RESUBMITSUBMITTAL STATUS

PUNCHLIST

Department of Veterans Affairs
537-24-105 OR Suite Lighting
Jesse Brown VAMC
Chicago, Illinois
CONSTRUCTION PUNCHLIST
IDDATEDESCRIPTIONLOCATIONDIVISIONCONTRACTOR ACTION TAKENVA RESPONSECOMPLETION DATE

PAYMENT LOG

Department of Veterans Affairs
537-24-105 OR Suite Lighting
Jesse Brown VAMC
PENCIL COPY REVIEWIPPS PAYMENT HISTORY
PAY APP #SUBMITTAL DATEAMOUNTCOR APPROVAL DATESPDLNInvoice NumberAmountCheck NumberCheck Date
CONTRACT MODIFICATIONSCONTRACT AMOUNT
NumberAmountDatePO Number
P00001Original P.O. Amount
P00002Contract Modifications$0.00
P00003Current PO Amount$0.00
P00004Payments Issued$0.00
P00005Outstanding PO Amount$0.00
P00006
P00007
TOTAL$0.00-

MTG MINUTES

Department of Veterans Affairs
537-24-105 OR Suite Lighting
Jesse Brown VAMC
Chicago, Illinois
Meeting Date:% Complete:
General Contractor:Completion Date:
Prepared by:Days Remaining in Contract:

ID Date Description Responsible Party Due Date Status

MTG ATTENDANCE

Department of Veterans Affairs
537-24-105 OR Suite Lighting
Jesse Brown VAMC
Key P = Present, A = Absent
ATTENDEEPROGRESS MEETING DATE
NAMEPROJECT ROLExx/xx/xxxx/xx/xxxx/xx/xxxx/xx/xxxx/xx/xx
Ryan McMillinCO
Rich GoodmanCS
Eloy CerdaCOR
Jeremy HsuEng. Supervisor

DAILY LOGS

Department of Veterans Affairs
537-24-105 OR Suite Lighting
Jesse Brown VAMC

DAILY REPORT LOG

DAILY REPORT # REPORT DATE SUBMITTAL DATE SUMMARY OF WORK PERFORMED (INCLUDE ROOM NUMBERS) image1.jpeg