About this file

This document contains details for a federal solicitation to design and construct a parking facility and solar tower at a Veterans Affairs medical center campus in Mather, California. The solicitation is a total Service-Disabled Veteran-Owned Small Business set-aside issued by the VA Northern California Healthcare System. Offerors must be verified in the Vendor Information Pages database and eligible at the time of proposal submission and award. The contractor will furnish all labor, materials, equipment, and professional services required to complete the design-build project according to the provided statement of work, specifications, and drawings. The period of performance is 485 calendar days from notice to proceed. The estimated value of the procurement is between $2,000,000 to $5,000,000.

View the file

Other files

File Type Posted
ATTACHMENT B - PHASE 1 FACTOR 3 - Past Performance Questionnaire.docx DOCX document
S06 - 36C26122R0021 0003.docx DOCX document
Amendment 0002 Attachment -612-121 Land Expansion North and East Femoyer Lots 75 CD.pdf PDF
Amendment 0002 Attachment - 612A4-18-200 PARKING LOT IMPROVEMENTS AT MATHER 100 CONSTRUCTION DOCUMENTS 2020-06-15 - COMBINED.pdf PDF
Amendment 0002 Attachment Response to RFI for Solicitation No 36C26122R0021.pdf PDF
Amendment 0002 Attachment - Civil-Land.pdf PDF
Amendment 0002 Attachment - 19-565.1 Sac VA Water System_Final.pdf PDF
Amendment 0002 Attachment - Site Plan- Project limits - Design-Build parking.pdf PDF
S06 - 36C26122R0021 0002.docx DOCX document
Amendment 0002 Attachment -Oncology Approx Location 4.pdf PDF
Amendment 0002 Attachment -VAMC19-001_Record DWGs_092421.pdf PDF
Amendment 0002 Attachment - 2021-05-05 Submittal Return 32 31 40-1.0-Complete with detail.pdf PDF
Amendment 0002 Attachment - Draft ALTA Survey - 5.16 acre parcel - Sacramento County - 9.1.17.pdf PDF
ATTACHMENT I - REQUEST FOR INFORMATION (RFI) FORM.docx DOCX document
S06 - Solicitation Amendment No.36C26122R0021 0001.docx DOCX document
ATTACHMENT C - PHASE 2 FACTOR 4 - Offerors Key Personnel.docx DOCX document
ATTACHMENT D - Supplemental Pricing Breakdown.docx DOCX document
Edited Land Expansion North and East Femoyer Lots 75 CD.pdf PDF
ATTACHMENT F - DBA Wage Determination CA20220007 02252022.pdf PDF
Combined Specs V3.2 2.pdf PDF
ATTACHMENT G - Brand Name Justification For Emergency Call Boxes Only Redacted.pdf PDF
ATTACHMENT H - Pre-Proposal Site Visit Conference Briefing Slides.pptx PPTX presentation
ATTACHMENT B - PHASE 1 FACTOR 3 - Past Performance Questionnaire.docx DOCX document
S02 - Solicitation No. 36C26122R0021.docx DOCX document
ATTACHMENT E - Map of VAMC - Mather Campus.pdf PDF
ATTACHMENT A - PHASE 1 FACTOR 2 - EXPERIENCE.xlsx XLSX spreadsheet
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N56W24720 N. Corporate Circle Sussex, WI 53089 800-451-1460 www.rathcommunications.com

RP8500080

Ver. 7 04/21

36” Emergency Call Station

Installation & Operations Manual

Emergency Tower Phone

• 2100-TSL Landline Solar Tower

• 2100-TSC Cellular Solar Tower

• 2100-TSV VoIP Solar Tower

• 2100-TSW Wi-Fi VoIP Solar Tower

Made in the USA 2 Year Warranty vhamachoffml Highlight

Thank you for purchasing RATH’s Solar Tower Phone. We are the largest Emergency Communication Manufacturer in North America and have been in business for over 35 years.

We take great pride in our products, service, and support. Our Emergency Products are of the highest quality. Our experienced customer support teams are available to remotely assist with site preparation, installation, and maintenance. It is our sincere hope that your experience with us has and will continue to surpass your expectations.

Thank you for your business, The RATH® Team

N56W24720 N. Corporate Circle Sussex, WI 53089 800-451-1460 www.rathcommunications.com

Table of Contents Description

Safety Guidelines

Site Preparation

Items Needed

Installation

Communication

Phone Programming

Phone Testing

Adjusting The Volume

Troubleshooting

Wiring

Back

Description

Safety Guidelines

Figure 1: Front & Back View

Front

• ADA compliant (hands free operation)

• LED call status indicator

• Powder coated steel construction inside and out

• Aluminum access panels powder coated inside and out

• Weather and vandal resistant

• Blue beacon and strobe

• Strobe turns on upon phone activation

• Recessed illuminated face plate

• Internal anchor base plate

• 4 hour phone battery backup*

• 145 watt solar panel

• 90 amp hour battery

• Ability to program up to 5 emergency numbers

• Remote or on-site programmable*

• Panels secured with security screws

• Torx bit provided to access panel

• Save these instructions. This manual contains important instructions that will assist you during installation and with maintenance.

• Keep all the components secure and protected during storage.

• Be careful of finished surfaces during transport and installation to avoid damaging the finish.

• Installation and maintenance should only be performed by qualified electricians.

• It is recommended that a minimum of 2 people perform installation.

• Do not install phone during extreme weather conditions.

• Do not touch uninsulated phone wires or terminals unless the phone line has been disconnected at the network interface.

Features:

Height 11’ (with solar panel) Width 10-3/4” Depth 6” Thickness of Steel 11 Gauge Weight 395 lbs.

Tower Specifications:

*Not applicable for Cellular application Face Plate

Tower Site Preparation

1. Concrete mounting pad should be at least 16” in depth and 2’ in diameter.

2. Insert the 3/4” x 12” galvanized rods per mounting template provided.

3. A minimum of 2” of thread must be exposed above level of concrete.

4. Let concrete set for a minimum of 48 hours to cure.

Panel 1

Panel 2

Face Plate

Items Needed for Installation

• Concrete for 16” deep, 2’ diameter slab

• RATH® Kit 7476* or 7477**

• #1 Phillips screwdriver

• 1/4” driver

• Torx bit (provided to remove Access Panels)

*7476 (For New Concrete)

• (4) 3/4” x 12” galvanized anchor bolts

• (12) 3/4” flat washers

• (4) 3/4” hex nuts

• (4) 3/4” SAE washers

• (4) split lock washers

**7477 (For Existing Concrete)

• (4) anchors

• (4) 3/4” x 4” galvanized anchor bolts

• (1) setting tool

• (8) 3/4” flat washers

• (4) split lock washers

• 1/4” spanner adapter (provided to remove Access Panel 1)

• Adjustable wrench

• Analog phone line (if using a Landline)

• Phone cable (if using a Landline)

Tower and Solar Panel Installation

1. Lay Tower on one side with the base of the Tower next to the concrete pad, protecting the Tower surface.

2. Assemble solar/strobe tube to the top of the Tower using the four bolts, flat washers, and lock washers.

The mounting hardware is in a bag attached to the solar tube.

3. The solar panel bracket comes with all hardware tightened to prevent any disconnections in transit.

Loosen (do not remove) all hardware connections EXCEPT the four connections on the inner bracket as shown below. These four connections are the factory preset solar panel angle.

4. Mount solar panel bracket to solar/strobe tube. Make sure bracket will be facing south once secured to the tube. Use the three provided hose clamps.

DO NOT

LOOSEN

DO NOT

LOOSEN

Secure solar bracket to solar/strobe tube with the three provided hose clamps. The two bracket surfaces contacting the strobe tube must be flush once secured. Solar panel is very heavy so be sure they are tightened down prior to installation.

Battery Installation

1. Remove Access Panel 2 (see Figure 1).

2. Install battery shelf in Tower. The sides of the shelf align with slots in the bottom of the Tower.

3. Install battery on shelf in Tower. Mount so that the power cable connection is on top of the battery.

4. Connect the power cables to the battery, red to positive and black to negative.

Note: Batteries that will not be installed within 90 days should be connected to RATH® Charger #RP7700100AV. Failure to do this may result in the battery not working correctly upon installation or shortening of the battery life.

Power Cable Connection

90 Ah Battery

• 1/4” spanner adapter (provided to remove Access Panel 1)

• Adjustable wrench

• Analog phone line (if using a Landline)

• Phone cable (if using a Landline)

5. Mount solar panel to solar panel bracket. Use the four sets of hardware provided (bolt/lock, nut/washer).

6. IMPORTANT: Tighten all screws on the solar panel mounting bracket and solar panel once panel has been attached to the bracket.

7. Solar panel position is preset to winter months due to lower amounts of sunlight. We recommend you keep it at the factory preset angle.

Secure solar panel bracket to solar panel in four locations with provided hardware (two per side).

8. Open up the black electrical box on back of solar panel by removing the screws. Open up the “knock out” that will be facing the ground. Connect the power cable leading out of the solar tube through the “knock out” and attach to the terminals in the electrical box. Connect red to positive and black to negative which are the outer two terminals. Secure the weather tight connection to the box and reattach cover by installing the screws.

9. Using a voltmeter, measure across the positive and negative contacts to confirm the panel is generating approximately 20 volts on a sunny day.

10. Align the Tower mounting holes with the 3/4” galvanized rods and lift on to the concrete slab. Put a lock washer on each along with a nut and secure tightly.

RED wire to POSITIVE BLACK wire to NEGATIVE

Adjusting the Photocell (If Equipped):

1. Slide the cover to the proper position on the photocell in order for the blue light to be lit at the proper time (see drawing below). The cell may need to be partially covered if the Tower is near a light source.

Solar Panel Wiring and Testing:

1. Open Access Panel 1 (see Figure 1) using the torx bit to remove the security screws.

2. Remove the cover of the NEMA 4 enclosure by loosening the four corner screws.

3. Locate the Sun Saver in the NEMA 4 enclosure (see drawing below).

4. Using a voltmeter, check each set of terminals for Solar, Battery, and Load. If voltage is low, recheck connections.

The voltage for each terminal should measure between:

Solar Terminals: 19v - 26v Battery Terminals: 11v - 17v Load Terminals: 11v - 13v

Sun Saver

Photocell

Cover

Communication Landline:

To connect your analog phone line to the Tower:

1. Open Access Panel 1 (see Figure 1) using the torx bit to remove the security screws.

2. Locate the gray phone cable coming out of the NEMA 4 box.

3. Connect the gray phone cable to the phone cable that was run through the conduit either by connecting the modular jack or the red and green wires.

Page 6 Page 7

LTE Cellular (Units Are Carrier Specific):

1. Open the Cellular Gateway by unscrewing the screw on the left side of the front cover with a Phillips screwdriver and gently pull up on the left side.

2. Insert standard size SIM card (25mm x 15mm) into J4 with the perforated edge first and the gold contact side facing downward. Push until you hear it click. If SIM card does not click into place, the wrong size SIM card is being used.

Note: Do NOT use a nano or micro size SIM card with an adapter. The adapter edge can catch and cause permanent damage.

3. Wait for the LED lights to turn on. Check the SIM LED to make sure it is amber colored. If it is flashing red, check that the SIM card has been inserted correctly and has an active 4G data/voice plan.

4. A signal strength test is recommended. Check the signal strength by using the built-in network signal strength scanner. To use the scanner function, turn on SW1 dipswitch 1 to ON (check that dipswitch 4 is also ON). When finished, turn SW1 dipswitch 1 back to “OFF”.

5. The RUN LED should change color to flashing green when the main power connection is made. If you see any other color, please consult the LED indication chart below.

LOW COVERAGE MEDIUM COVERAGE

LED COLORS

OPTIMAL COVERAGE

Minimum Signal Strength for Operation

6. Place the lid back on the top of the Cellular Gateway and fasten the lid with the screw.

VoIP & Wi-Fi VoIP:

See additional manual.

RUN LED FLASHES GREEN POWER SUPPLY IS OK

BAT LED IS ALWAYS ON BATTERY IS OK

SIM LED IS AMBER DEVICE IS CONNECTED TO THE NETWORK

COVERAGE LED IS GREEN OR AMBER GOOD COVERAGE

SLIC LED IS GREEN DEVICE IS IN STANDBY

Phone Programming

1. You can program the phone on-site or remotely.

Note: Cellular applications cannot be remotely programmed.

2. If programming on-site, remove the face plate (see Figure 1).

3. Remove the cover of the NEMA 4 enclosure by loosening the 4 corner screws.

On-Site Programming:

Remote Programming:

Step 1: To Begin Program Mode A. Press Enter Step 2: To Program Emergency Numbers A. Press 1, Enter, (phone number), Stop Note: Press 2-5 in step 2A for emergency numbers 2-5 as needed Step 3: To Program Location Message A. To turn on message Press 1, 3, Enter, 2 B. Press 6, Record (speak message) Stop (to replay message Press 6, Play) C. For no message Press 1, 3, Enter, 0 Step 4: To Program Auto Disconnect Time (Default is 5 minutes, lowest interval is 1 minute) A. Press 8, Enter, (3 digit number in minutes) Ex: 2 minutes = 002 Step 5: To Exit Program Mode A. Press Stop for 3 seconds

Step 1: To Begin Program Mode A. Call into phone by dialing the number of the Tower B. After first simulated ring, Press #, # (Wait for 4 tones) C. Key in security code (Default is 1111) (Wait for confirmation tones) Step 2: To Program Emergency Numbers A. Press 1, *, (Phone number), *, # (Wait for confirmation tones) Note: Emergency numbers (2-5) repeat step 2A pressing (2-5) as needed Step 3: To Program Location Message A. To turn on message press 1, 3, *, 2 (Wait for confirmation tones) B. Press 6, *, (Speak message) #, *, # (Wait for confirmation tones)

i. To replay message Press 6, # (Wait for confirmation tones) C. For NO message Press 1, 3, *, 0 (Wait for confirmation tones) Step 4: To Program Auto Disconnect Time (Default is 5 minutes, lowest interval is 1 minute) A. Press 8, *, (3 digit number in minutes) Ex: 2 minutes = 002 Step 5: To Exit Program Mode A. Press *, #, 0 (You will hear a beep, beep) *, # (You will hear a buzz)

Keypad

Phone Testing

* RATH® recommends the Tower phone be tested on a regular basis to ensure proper operation.

* RATH® recommends the 12 volt battery be replaced every 2 years. (Part #: RP7700084A)

Adjusting the Volume

Did you hear a dial tone?

Did the strobe start flashing immediately after the button was pushed?

Did the red LED become a solid light when you pushed the button?

Did the red LED flash and approximately 15-20 seconds later the called party started talking to you? (Delay is due to the phone telling the other party your location via the “Location Message”) Can you hear the other party clearly? (If not, see “Adjust Speaker” below)

Can the other party hear you clearly? (If not, see “Adjust Microphone” below)

When the party you called hangs up, does the strobe stop?

If you have answered YES to all questions, you have successfully installed and tested the phone. If you answer NO to any question, proceed to the Troubleshooting Section.

Push the emergency button on the front of the Tower:

Yes No

Volume Adjust VR1

Mic Sensitivity VR2

If the volume is too low or high, adjust it by referring to the diagram and instructions below.

Note: Refer to the instructions under “Programming the Phone” to access the circuit board.

Adjusting the Microphone:

If the person you are calling reports your voice is not loud enough, increase the Microphone Sensitivity by adjusting VR2 a 1/4 turn clockwise (requires a small Phillips screwdriver).

Adjusting the Speaker:

If the voice of the person you call is not loud enough in the phone speaker, increase the volume by adjusting VR1 a 1/4 turn clockwise.

RATH® SmartPhone

Troubleshooting

Problem Possible Cause & Solutions

No dial tone when the button is pushed:

• Check to make sure the phone line is connected to SmartPhone board.

Audio is low from the speaker:

• Speaker control needs to be adjusted. Go to “Speaker Adjustment” on page 9.

• Make sure the speaker holes are not blocked.

Audio is distorted from the speaker:

• Speaker control needs to be adjusted. Go to “Speaker Adjustment” on page 9.

• Make sure there are no items touching the speaker inside the Tower.

When the called party hangs up, strobe continues to flash:

• Phone company or phone system is not providing a disconnect signal. Contact the appropriate party to make sure the disconnect signal is provided.

• Press * , # to simulate disconnect signal.

When the called party hangs up, strobe continues to flash for one minute:

• Slow disconnecting signal from the communication source. This is considered normal operation.

When the called party hangs up, busy signal is heard through speaker:

• Phone company or phone system is not providing a disconnect signal.

• Operator needs to press *, # to disconnect the call.

• Disconnect time on phone needs to be lowered (see page 8).

Tower appears non-functional.

Strobe does not flash and no audio is heard from the speaker when button is pushed:

• Access the waterproof enclosure containing the Sun Saver Regulator located behind the face plate (see Figure 1).

• Disconnect the two wires connected to the “solar” terminals. Using a voltmeter, measure the voltage across the two terminals. It should read approximately 20 volts dc on a sunny day. If voltage is low or 0, the panel may be damaged.

• Disconnect the two wires connected to the “battery” terminals on the Sun Saver Regulator. Using a voltmeter, measure the voltage across the two terminals. It should be 12.8 volts dc. If voltage is low, battery may not be getting charged or holding a charge. If voltage is 0, check to make sure the battery is connected properly.

• Verify 12 volts are going to the SmartPhone board.

Tower works in the afternoon but not at night or early in the morning:

• Be sure the solar panel is not shaded by trees or other objects.

• Access the waterproof enclosure containing the Sun Saver Regulator located behind the face plate (see Figure 1).

• Disconnect the two wires connected to the “solar” terminals. Using a voltmeter, measure the voltage across the two terminals. It should read approximately 20 volts dc on a sunny day. If voltage is low or 0, the panel may be damaged.

• Disconnect the two wires connected to the “battery” terminals on the Sun Saver Regulator. Using a voltmeter, measure the voltage across the two terminals. It should be 12.8 volts dc. If voltage is low, battery may not be getting charged or holding a charge. If voltage is 0, check to make sure the battery is connected properly.

Blue light stays on constantly, even though it should only be on at night.

• Check photocell adjustment on page 6.

• Cover the opening of the photo eye. The blue light should go out. If the light stays lit, photodiode may be damaged.

Wiring

Optional