This document includes an attachment providing a supplemental pricing breakdown for a solicitation. The solicitation is for a design-build project to construct parking and a solar tower at the South East Campus of the VA Northern California Healthcare System. Key details include that the project magnitude is between $2,000,000 to $5,000,000, it is a total SDVOSB set-aside, and offerors must be verified in VIP prior to submission and award. The contractor must provide all labor, materials, equipment, transportation, and engineering services required by the statement of work, specifications, and drawings. The period of performance is 485 calendar days from notice to proceed. Pricing is broken down by division and includes categories for material, labor, equipment, and other costs, with totals provided.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP No. 36C26122R0021 Attachment D – Supplemental Pricing Breakdown
| DESCRIPTION |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER (Specify) |
| TOTAL |
Division 01 -General Requirements
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
Division 02 – Existing Conditions
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
Division 03 - Concrete
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
Division 09 - Finishes
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
Division 10 - Specialties
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
Division 12 - Furnishings
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
Division 26 – Electrical/Safety/Security
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
Division 31 - Earthwork
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
Division 32 – Exterior Improvements
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
Division 33 - Utilities
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
Total Design and Build
| SUB TOTAL |
| $ |
| $ |
| Overhead |
| $ |
| $ |
| Profit |
| $ |
| $ |
| Bonds and Insurance |
| $ |
| $ |
| TOTAL Proposal |
| $ |
| $ |
Note: All other costs may be included as a separate item and shall be specified in this breakdown.