Amendment 0002 Attachment - Civil-Land.pdf
PDF 6 MB Posted
- Solicitation number
- 36C26122R0021
About this file
This set of documents includes civil engineering construction drawings and a related federal contract opportunity solicitation. The construction drawings depict site plans, demolition plans, grading plans, utility plans, and details for a medical specialty clinic project located in Mather, CA. The project involves construction of a new building at 10535 Hospital Way. The drawings provide specifications for site work including erosion control, paving, drainage and landscaping.
The related federal contract opportunity is solicitation number 36C26122R0021 for design-build services to construct a parking area and solar tower at the VA Northern California Healthcare System's southeast campus in Mather, CA. The procurement is set aside solely for service-disabled veteran-owned small businesses. Offerors must be verified in the Vendor Information Pages database. The contractor will provide all labor, materials, equipment and engineering services required to complete the project according to the statement of work, specifications and drawings. The period of performance is 485 calendar days from notice to proceed.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W
W W
W W
W
W
W
W W
W W
W
WW
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W W W W W W W W W W W W W W W W W W
W W W
WW
W
EEEEEEEEEEEE
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
W W
W W
W W
FS
FS
FS
FS
W W
W W
W W
W
INTERNATIONAL DRIVE
FE
M
O Y
E R
S
TR
E E
T
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
CONSULTANTS: PROJECT MANAGER: ACG Project Number
4/
/2
9:
:5
AM
NOT FOR
CONSTRUCTION
NOT FOR
CONSTRUCTION
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
RC OT
DESIGN MEDICAL
SPECIALTY CLINIC
10535 HOSPITAL WAY
MATHER, CA 95655
18-237-Q12
SEPTEMBER 10, 2021
612-122
FULLY SPRINKLERED
100% CONSTRUCTION DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511
Apogee Consulting Group, P.A.
Headquarters:
www.acg-pa.com 919-858-7420 @ COPYRIGHT Apogee Consulting Group, P.A.
04/10/2020 06/04/2020 06/26/2020 01/26/2021 04/06/2021
04/20/2021
07/15/2021
35% SECHMATIC DESIGN DOCUMENTS
65% DESIGN DEVELOPMENT
65% DESIGN DEVELOPMENT - RE-SUBMISSION
65% DESIGN DEVELOPMENT - RE-SUBMISSION
95% CONSTRUCTION DOCUMENTS
95% CONSTRUCTION DOCUMENTS -
RE-SUBMISSION
95% CONSTRUCTION DOCUMENTS
NORTH
EC-1
#833
SITE LEGEND
EXISTING CONDITONS MAP
SITE NOTES
W W
W W
W
W W
W W
W
WW
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W W W W W W W W W W W W W W
W W W
WW
EEEEEEEE
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
W
W W
W W
W W
W
INTERNATIONAL DRIVE
FE
M
O Y
E R
S
TR
E E
T
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
CONSULTANTS: PROJECT MANAGER: ACG Project Number
4/
/2
9:
:5
AM
NOT FOR
CONSTRUCTION
NOT FOR
CONSTRUCTION
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
RC OT
DESIGN MEDICAL
SPECIALTY CLINIC
10535 HOSPITAL WAY
MATHER, CA 95655
18-237-Q12
SEPTEMBER 10, 2021
612-122
FULLY SPRINKLERED
100% CONSTRUCTION DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511
Apogee Consulting Group, P.A.
Headquarters:
www.acg-pa.com 919-858-7420 @ COPYRIGHT Apogee Consulting Group, P.A.
04/10/2020 06/04/2020 06/26/2020 01/26/2021 04/06/2021
04/20/2021
07/15/2021
35% SECHMATIC DESIGN DOCUMENTS
65% DESIGN DEVELOPMENT
65% DESIGN DEVELOPMENT - RE-SUBMISSION
65% DESIGN DEVELOPMENT - RE-SUBMISSION
95% CONSTRUCTION DOCUMENTS
95% CONSTRUCTION DOCUMENTS -
RE-SUBMISSION
95% CONSTRUCTION DOCUMENTS
NORTH
DM-1
#833
EROSION CONTROL LEGEND
SITE LEGEND
ABBREVIATIONS
DEMOLITION AND EROSION
CONTROL PLAN
DEMOLITION NOTES
W W
W
W
W
W W
W W
W
WW
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W W W W W W W W W W W W W W W W W W W
W W W
WW
W
EEEEEEEEEEEE
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
W W
W
FS
W W
W W
W W
W
INTERNATIONAL DRIVE
FE
M
O Y
E R
S
TR
E E
T
C
CD-1
B
CD-1
A
CD-1
D
CD-1
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
CONSULTANTS: PROJECT MANAGER: ACG Project Number
4/
/2
9:
:5
AM
NOT FOR
CONSTRUCTION
NOT FOR
CONSTRUCTION
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
RC OT
DESIGN MEDICAL
SPECIALTY CLINIC
10535 HOSPITAL WAY
MATHER, CA 95655
18-237-Q12
SEPTEMBER 10, 2021
612-122
FULLY SPRINKLERED
100% CONSTRUCTION DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511
Apogee Consulting Group, P.A.
Headquarters:
www.acg-pa.com 919-858-7420 @ COPYRIGHT Apogee Consulting Group, P.A.
04/10/2020 06/04/2020 06/26/2020 01/26/2021 04/06/2021
04/20/2021
07/15/2021
35% SECHMATIC DESIGN DOCUMENTS
65% DESIGN DEVELOPMENT
65% DESIGN DEVELOPMENT - RE-SUBMISSION
65% DESIGN DEVELOPMENT - RE-SUBMISSION
95% CONSTRUCTION DOCUMENTS
95% CONSTRUCTION DOCUMENTS -
RE-SUBMISSION
95% CONSTRUCTION DOCUMENTS
NORTH
SP-1
#833
SITE LEGEND
ABBREVIATIONS
SITE PLAN
W W
W
W W
WW
W
W
W
W
W W
W W
W W
W
WWW
W W
W W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W W W W W W W W W W W W W W W W W W W
W
W W W W W
WWWW
W W
W
W
EEEEEE
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
W
W
W W
W
W W
W
W W
W W
W W
W W
W
W
NEW BUILDING
FF=99.17
C
CD-1
B
CD-1
A
CD-1
INTERNATIONAL DRIVE
D
CD-1
D
CD-1
D
CD-1
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
CONSULTANTS: PROJECT MANAGER: ACG Project Number
4/
/2
9:
:5
AM
NOT FOR
CONSTRUCTION
NOT FOR
CONSTRUCTION
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
RC OT
DESIGN MEDICAL
SPECIALTY CLINIC
10535 HOSPITAL WAY
MATHER, CA 95655
18-237-Q12
SEPTEMBER 10, 2021
612-122
FULLY SPRINKLERED
100% CONSTRUCTION DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511
Apogee Consulting Group, P.A.
Headquarters:
www.acg-pa.com 919-858-7420 @ COPYRIGHT Apogee Consulting Group, P.A.
04/10/2020 06/04/2020 06/26/2020 01/26/2021 04/06/2021
04/20/2021
07/15/2021
35% SECHMATIC DESIGN DOCUMENTS
65% DESIGN DEVELOPMENT
65% DESIGN DEVELOPMENT - RE-SUBMISSION
65% DESIGN DEVELOPMENT - RE-SUBMISSION
95% CONSTRUCTION DOCUMENTS
95% CONSTRUCTION DOCUMENTS -
RE-SUBMISSION
95% CONSTRUCTION DOCUMENTS
NORTH
CONSTRUCTION NOTES
GP-1
#833
SITE LEGEND
ABBREVIATIONS
BENCHMARK
GRADING PLAN
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
CONSULTANTS: PROJECT MANAGER: ACG Project Number
4/
/2
9:
:5
AM
NOT FOR
CONSTRUCTION
NOT FOR
CONSTRUCTION
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
RC OT
DESIGN MEDICAL
SPECIALTY CLINIC
10535 HOSPITAL WAY
MATHER, CA 95655
18-237-Q12
SEPTEMBER 10, 2021
612-122
FULLY SPRINKLERED
100% CONSTRUCTION DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511
Apogee Consulting Group, P.A.
Headquarters:
www.acg-pa.com 919-858-7420 @ COPYRIGHT Apogee Consulting Group, P.A.
04/10/2020 06/04/2020 06/26/2020 01/26/2021 04/06/2021
04/20/2021
07/15/2021
35% SECHMATIC DESIGN DOCUMENTS
65% DESIGN DEVELOPMENT
65% DESIGN DEVELOPMENT - RE-SUBMISSION
65% DESIGN DEVELOPMENT - RE-SUBMISSION
95% CONSTRUCTION DOCUMENTS
95% CONSTRUCTION DOCUMENTS -
RE-SUBMISSION
95% CONSTRUCTION DOCUMENTS
CONCRETE CURB1 CONCRETE CURB & GUTTER2
PAVEMENT SECTION4
SIDEWALK DETAIL3
BOLLARD5
CD-1
ROCK DISSIPATOR CHANNEL6
BIORETENTION PLANTER WITH OVERFLOW7
#833
SECTION VIEW AA SECTION VIEW BB
SECTION VIEW CC
CIVIL DETAILS
CURB RETURN8SECTION VIEW DD
W W
W
W
W
W
W
W W W W W W W W W W W W W W W W W W W W W W W
WW
W
W W
FS
FS
FS
INTERNATIONAL D
R
PARCEL THREE
161 M 4
M
INTERNATIONAL DRIVE
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
CONSULTANTS: PROJECT MANAGER: ACG Project Number
4/
/2
9:
:5
AM
NOT FOR
CONSTRUCTION
NOT FOR
CONSTRUCTION
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
RC OT
DESIGN MEDICAL
SPECIALTY CLINIC
10535 HOSPITAL WAY
MATHER, CA 95655
18-237-Q12
SEPTEMBER 10, 2021
612-122
FULLY SPRINKLERED
100% CONSTRUCTION DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511
Apogee Consulting Group, P.A.
Headquarters:
www.acg-pa.com 919-858-7420 @ COPYRIGHT Apogee Consulting Group, P.A.
04/10/2020 06/04/2020 06/26/2020 01/26/2021 04/06/2021
04/20/2021
07/15/2021
35% SECHMATIC DESIGN DOCUMENTS
65% DESIGN DEVELOPMENT
65% DESIGN DEVELOPMENT - RE-SUBMISSION
65% DESIGN DEVELOPMENT - RE-SUBMISSION
95% CONSTRUCTION DOCUMENTS
95% CONSTRUCTION DOCUMENTS -
RE-SUBMISSION
95% CONSTRUCTION DOCUMENTS
NORTH
OU-1
UTILITY CONSTRUCTION KEYNOTES
#833
SITE LEGEND
OVERALL UTILITY PLAN
STANDARD PIPE TRENCH WIDTH DETAIL
UTILITY NOTES
W W
W
W W
WW
W
W
W
W
W W
W W
W W
W
WWW
W W
W W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W W W W W W W W W W W W W W W W W W W
W
W W W W W
W
W
EEEEEEEEEEEEEEE
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
W
W
W
W W
W
W W
W W
W W
W W
W
W
INTERNATIONAL D
R
PARCEL THREE
161 M 4
FE
M
O
YE
R
ST
INTERNATIONAL DRIVE
FE
M
O Y
E R
S
TR
E E
T
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
CONSULTANTS: PROJECT MANAGER: ACG Project Number
4/
/2
9:
:5
AM
NOT FOR
CONSTRUCTION
NOT FOR
CONSTRUCTION
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
RC OT
DESIGN MEDICAL
SPECIALTY CLINIC
10535 HOSPITAL WAY
MATHER, CA 95655
18-237-Q12
SEPTEMBER 10, 2021
612-122
FULLY SPRINKLERED
100% CONSTRUCTION DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511
Apogee Consulting Group, P.A.
Headquarters:
www.acg-pa.com 919-858-7420 @ COPYRIGHT Apogee Consulting Group, P.A.
04/10/2020 06/04/2020 06/26/2020 01/26/2021 04/06/2021
04/20/2021
07/15/2021
35% SECHMATIC DESIGN DOCUMENTS
65% DESIGN DEVELOPMENT
65% DESIGN DEVELOPMENT - RE-SUBMISSION
65% DESIGN DEVELOPMENT - RE-SUBMISSION
95% CONSTRUCTION DOCUMENTS
95% CONSTRUCTION DOCUMENTS -
RE-SUBMISSION
95% CONSTRUCTION DOCUMENTS
NORTH
DP-1
#833
SITE PLAN DEDUCT ITEM 3*
BENCHMARK
SITE LEGEND
ABBREVIATIONS
PLANT SCHEDULE
GRASSES QTY BOTANICAL NAME COMMON NAME CONT. SPACING
790 MUHLENBERGIA RIGENS DEER GRASS 1 GAL 30" O.C.
L-101
PLANTING PLAN
1 1
0 10 20 40
1"= 20'SCALE:
NORTH
LANDSCAPING NOTES:
1. VERIFY ALL QUANTITIES AND REPORT ANY
DISCREPANCIES OR INACCURACIES IN THE PLANS TO THE
COR PRIOR TO PLANTING.
2. LANDSCAPE WORK SHALL INCLUDE THE FURNISHING,
INSTALLATION, AND WARRANTY OF ALL PLANTING
MATERIALS WITHIN THE PROJECT AREA.
3. THE LANDSCAPE CONTRACTOR SHALL ASCERTAIN THE
LOCATION OF ALL EXISTING AND NEW UNDERGROUND
UTILITIES PRIOR TO EXCAVATION FOR PLANTING.
DAMAGES TO UTILITIES CAUSED BY THE LANDSCAPE
OPERATION SHALL BE CORRECTED BY THE LANDSCAPE
CONTRACTOR AT NO COST TO THE GOVERNMENT.
4. LANDSCAPING SHALL REMAIN CLEAR FROM ANY FIRE
HYDRANTS ON THE SITE.
5. ALL DEBRIS, ROCKS, ETC. LARGER THAN .5" ARE TO BE
REMOVED WITHIN ALL DISTURBED AREAS. ALL LARGE
CONCENTRATIONS OF GRAVEL & DEBRIS REGARDLESS
OF SIZE ARE TO BE REMOVED.
6. AMEND EXISTING SOIL PER SOILS TEST PRIOR TO
PLANTING. IF SOIL IS NOT SUITABLE FOR PLANTING, THEN
INSTALL A MINIMUM OF 6" OF APPROVED TOPSOIL TO ALL
PLANTING BEDS..
7. SOIL SHOULD BE TESTED AND AMENDED WITH LIME AND
FERTILIZER FOR HARDWOOD TREES ACCORDING TO SOIL
TEST RECOMMENDATIONS. SCARIFY PLANT PIT WALLS.
8. ALL DISTURBED AREAS THAT ARE NOT PLANTED SHALL
BE COVERED WITH 2" OF CRUSHED STONE TO MATCH
THE EXISTING STONE AT THE MEDICAL CENTER.
GROUNDCOVER PLANTING (TYPICAL)3 NTS
SHRUB AND GROUNDCOVER SPACING2 NTS
PLAN
PLAN
SECTION VIEW
PAVEMENT.
GROUNDCOVER PLANTS TO
BE TRIANGULARLY SPACED.
SCARIFIED SOIL.
ENGINEERED SOIL. SEE
CIVIL PLANS FOR STORM WATER
BASIN SOIL MATERIAL
FINISHED GRADE.
EQUAL
EQUAL
CURB OR EDGE OF PAVEMENT.
INDIVIDUAL PLANT SPACING 'X'.
REFER TO PLANT LIST FOR
SPACING EXCEPT WHERE NOTED
MASSES TO USE TRIANGULAR
ALL SHRUBS AND GROUNDCOVER
NOTE:
PLANT TYPES.
BETWEEN DIFFERENT
PROVIDE MIN. 18" SPACING
'X'
'X' 'X'
6"
M
IN
SETBACK FOR 36" O.C.
SETBACK FOR 24" O.C.
SETBACK FOR 48" - 60" O.C.
SETBACK FOR 6" O.C.
NOTES:
1. SEE PLANTING LEGEND FOR GROUNDCOVER SPECIES, SIZE AND SPACING DIMENSION.
2. SMALL ROOTS (14" OR LESS) THAT GROW AROUND, UP OR DOWN THE ROOT BALL PERIPHERY ARE CONSIDERED A NORMAL CONDITION IN CONTAINER PRODUCTION AND ARE ACCEPTABLE, HOWEVER THEY SHOULD BE ELIMINATED AT THE TIME OF PLANTING. ROOTS ON THE PERIPHERY CAN BE REMOVED AT THE
TIME OF PLANTING.
3. SETTLE SOIL AROUND ROOT BALL.
4. WHEN GROUNDCOVER PLANTINGS ARE USED IN MASSES, ENTIRE BED SHALL BE EXCAVATED AND TILLED
WITH SOIL AMENDMENTS PER SPECIFICATIONS.
5. O.C. = ON CENTER
PLANT SCHEDULE1 NTS
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTION
NOT FOR
CONSTRUCTION
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
Engineers Architects1
35% SECHMATIC DESIGN DOCUMENTS
65% DESIGN DEVELOPMENT
65% DESIGN DEVELOPMENT - RE-SUBMISSION
65% DESIGN DEVELOPMENT - RE-SUBMISSION
95% CONSTRUCTION DOCUMENTS
95% CONSTRUCTION DOCUMENTS -
RE-SUBMISSION
95% CONSTRUCTION DOCUMENTS
04/10/2020 06/04/2020 06/26/2020 01/26/2021 04/06/2021
04/20/2021
07/15/2021 18-237-Q12
10535 HOSPITAL WAY,
MATHER CA, 95655
DESIGN MEDICAL SPECIALTY
CLINIC
612-122
SEPTEMBER 10, 2021
S:\1.Projects\C19.0155 Mather North Building\06.Received\01.Project Documents\01.Client\2021-07-15 Landscape Plan\SHEET FILE\C18-237-C-101-Planting Plan.dwg, 8/27/2021 12:12:17 PM, GersonMejicanos
| Sheets and Views |
| C19.0155_Civil-EXISTING CONDITIONS MAP |
| C19.0155_Civil-DEMOLITION PLAN |
| C19.0155_Civil-SITE PLAN |
| C19.0155_Civil-GRADING PLAN |
| C19.0155_Civil-GRADING DETAILS |
| C19.0155_Civil-OVERALL UTILITY PLAN |
| C19.0155_Civil-DEDUCT |
File details come from the government source that posted it. Updated .