Factor 6 Cost Proposal Breakdown.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Roof replacement at MFE ATCT (McAllen, TX) Federal contract opportunity
Solicitation number
Not on record
Issued by
Department of Transportation Federal Aviation Administration Southwestern Region

About this file

The file is a Factor 6 Cost Proposal Breakdown template for a roof replacement and modernization project at the McAllen, TX Air Traffic Control Tower (ATCT) for the Federal Aviation Administration's Southwestern Region. The detailed pricing template breaks down potential costs across multiple categories including prime contractor and subcontractor work, with line items for specific construction activities such as roofing systems replacement, foundation beam construction, HVAC work, storefront door replacement, abatement, and utility relocation. While the template shows placeholder "$0" values, it provides a structured framework for contractors to comprehensively price out a complex facility modernization effort involving civil, architectural, and mechanical system upgrades. The project scope includes replacing PVC roof membranes, vinyl sidings, constructing new structural framing with EIFS, replacing exterior doors, reconstructing walkways, upgrading HVAC systems, and performing lead paint abatement.

View the file

Other files for this federal contract opportunity

Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Modernization

Standardized Proposal BreakdownDATE PREPARED: MMM DD - YYYY
PROJECT:
VENDOR:
PREPARER:PREPARER'S CONTACT INFORMATION:
ITEMEQUIPMENT COSTS - $MATERIAL COSTS - $LABOR COSTS - $OTHER COSTS - $TOTAL ITEM COST - $
TOTALTOTALTOTALTOTAL
PRIME
Replace roofing systems$ - 0$ - 0$ - 0$ - 0$ - 0
Construct foundation beam and metal stud framing$ - 0$ - 0$ - 0$ - 0$ - 0
Relocated utilizes and HVAC exterior work$ - 0$ - 0$ - 0$ - 0$ - 0
Install EIFS and new openings$ - 0$ - 0$ - 0$ - 0$ - 0
Entry concrete work$ - 0$ - 0$ - 0$ - 0$ - 0
Replace storefront door and windows$ - 0$ - 0$ - 0$ - 0$ - 0
Replace defogger system$ - 0$ - 0$ - 0$ - 0$ - 0
HVAC work in bld interior$ - 0$ - 0$ - 0$ - 0$ - 0
Abatement$ - 0$ - 0$ - 0$ - 0$ - 0
Scaffolding system, heavy equipment, and cranes$ - 0$ - 0$ - 0$ - 0$ - 0
Additional Items (please specify):$ - 0$ - 0$ - 0$ - 0$ - 0

Subtotal $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

SUBCONTRACTOR
Mobilization/Demobilization$ - 0$ - 0$ - 0$ - 0$ - 0
Removal/Demolition$ - 0$ - 0$ - 0$ - 0$ - 0
Installation$ - 0$ - 0$ - 0$ - 0$ - 0
Permits$ - 0$ - 0$ - 0$ - 0$ - 0
Additional Items (please specify):$ - 0$ - 0$ - 0$ - 0$ - 0

Subtotal $ - 0 $ - 0 $ - 0 $ - 0

$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Subtotal$ - 0$ - 0$ - 0$ - 0
Profit$ - 0$ - 0
Overhead$ - 0$ - 0
TOTAL$ - 0
Instructions For Use: Enter the component cost in the white cells only. The pink cells have embedded formulas. Entering data directly into these cells will overwrite the embedded formulas. Include a narrative description of the modernization effort along with your technical proposal and standardized proposal breakdown.