Factor 6 Cost Proposal Breakdown.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- Roof replacement at MFE ATCT (McAllen, TX) Federal contract opportunity
- Solicitation number
- Not on record
About this file
The file is a Factor 6 Cost Proposal Breakdown template for a roof replacement and modernization project at the McAllen, TX Air Traffic Control Tower (ATCT) for the Federal Aviation Administration's Southwestern Region. The detailed pricing template breaks down potential costs across multiple categories including prime contractor and subcontractor work, with line items for specific construction activities such as roofing systems replacement, foundation beam construction, HVAC work, storefront door replacement, abatement, and utility relocation. While the template shows placeholder "$0" values, it provides a structured framework for contractors to comprehensively price out a complex facility modernization effort involving civil, architectural, and mechanical system upgrades. The project scope includes replacing PVC roof membranes, vinyl sidings, constructing new structural framing with EIFS, replacing exterior doors, reconstructing walkways, upgrading HVAC systems, and performing lead paint abatement.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 697DCK-25-R-00056-0008.pdf | ||
| 697DCK-25-R-00056-0007.pdf | ||
| Questions and Answers.docx | DOCX document | |
| MFE - Revised Specifications 1 of 2.pdf | ||
| MFE - Revised Specifications 2 of 2.pdf | ||
| QA Attachment 01 - Original Drawings part 2 of 2.pdf | ||
| QA Attachment 01 - Original Drawings part 1 of 2.pdf | ||
| 697DCK-25-R-00056-0006.pdf | ||
| QA Attachment 02 - PreBid Attendance Sheets.pdf | ||
| 697DCK-25-R-00056-0005.pdf | ||
| 697DCK-25-R-00056-0004.pdf | ||
| 697DCK-25-R-00056-0003.pdf | ||
| 697DCK-25-R-00056-0002.pdf | ||
| 697DCK-25-R-00056-0001.pdf | ||
| 697DCK-25-R-00056.pdf | ||
| Attachment 01a - Drawings.pdf | ||
| Attachment 02 - Wage Determination_TX20230255.pdf | ||
| Attachment 04 - Past Performance Questionnaire.pdf | ||
| Attachment 03 - Uniform Bipartisan Infrastructure Law Data Report.xlsx | XLSX spreadsheet | |
| Attachment 01b - EOSH.pdf | ||
| Attachment 01 - Specifications.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Modernization
| Standardized Proposal Breakdown | DATE PREPARED: MMM DD - YYYY |
| PROJECT: |
| VENDOR: | |||||
| PREPARER: | PREPARER'S CONTACT INFORMATION: | ||||
| ITEM | EQUIPMENT COSTS - $ | MATERIAL COSTS - $ | LABOR COSTS - $ | OTHER COSTS - $ | TOTAL ITEM COST - $ |
| TOTAL | TOTAL | TOTAL | TOTAL | ||
| PRIME | |||||
| Replace roofing systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Construct foundation beam and metal stud framing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Relocated utilizes and HVAC exterior work | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Install EIFS and new openings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Entry concrete work | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Replace storefront door and windows | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Replace defogger system | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| HVAC work in bld interior | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Abatement | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Scaffolding system, heavy equipment, and cranes | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| SUBCONTRACTOR | |||||
| Mobilization/Demobilization | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Removal/Demolition | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Installation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Permits | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0 $ - 0 $ - 0 $ - 0
| $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Profit | $ - 0 | $ - 0 | ||
| Overhead | $ - 0 | $ - 0 | ||
| TOTAL | $ - 0 | |||
| Instructions For Use: Enter the component cost in the white cells only. The pink cells have embedded formulas. Entering data directly into these cells will overwrite the embedded formulas. Include a narrative description of the modernization effort along with your technical proposal and standardized proposal breakdown. |
File details come from the government source that posted it. Updated .