About this file

This is a Past Performance Questionnaire form used by the Federal Aviation Administration (FAA) for source selection evaluation of contractors bidding on the Refurbish MFE ATCT project. The form requires completion by both the offeror and an evaluating organization representative.

The questionnaire evaluates contractors across seven key performance areas using a rating scale from Exceptional to Unsatisfactory: Quality of Products and Services, Performance as General Contractor/Architect/Engineer, Technical Requirements, Schedule adherence, Cost Control, Customer Satisfaction, and Overall Assessment. The form requires basic contract information including contractor details, contract number, dates, total value, and contract type. Evaluators must provide their contact information and duration of performance monitoring. The completed form must be returned to the FAA Contracting Officer, Elisha Distler, with the option to include additional comments on a separate page.

View the file

Other files for this federal contract opportunity

Other files attached to Roof replacement at MFE ATCT (McAllen, TX), newest first.
File Type Posted
697DCK-25-R-00056-0007.pdf PDF
Questions and Answers.docx DOCX document
697DCK-25-R-00056-0008.pdf PDF
Factor 6 Cost Proposal Breakdown.xlsx XLSX spreadsheet
QA Attachment 01 - Original Drawings part 1 of 2.pdf PDF
697DCK-25-R-00056-0006.pdf PDF
QA Attachment 02 - PreBid Attendance Sheets.pdf PDF
MFE - Revised Specifications 1 of 2.pdf PDF
MFE - Revised Specifications 2 of 2.pdf PDF
QA Attachment 01 - Original Drawings part 2 of 2.pdf PDF
697DCK-25-R-00056-0005.pdf PDF
697DCK-25-R-00056-0004.pdf PDF
697DCK-25-R-00056-0003.pdf PDF
697DCK-25-R-00056-0002.pdf PDF
697DCK-25-R-00056-0001.pdf PDF
Attachment 01a - Drawings.pdf PDF
Attachment 02 - Wage Determination_TX20230255.pdf PDF
Attachment 03 - Uniform Bipartisan Infrastructure Law Data Report.xlsx XLSX spreadsheet
Attachment 01b - EOSH.pdf PDF
697DCK-25-R-00056.pdf PDF
Attachment 01 - Specifications.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE QUESTIONNAIRE

Your assistance is requested in support of a source selection Please complete this Questionnaire and email or send by facsimile to Elisha Distler, Federal Aviation Administration Contracting Officer at:

Elisha.Distler@faa.gov Refurbish MFE ATCT Please ensure this form is completed, signed and return to the Contracting Officer.

TO BE COMPLETED BY OFFEROR

1. CONTRACTOR NAME & ADDRESS: 2. CONTRACT NO:

3. CONTRACT INITIATION DATE:

4. COMPLETION DATE:

5. TOTAL CONTRACT VALUE:

6. TYPE OF CONTRACT:

(Fixed Price, GMP, FPI, etc.)

7. DETAILED DESCRIPTION OF PROJECT

TO BE COMPLETED BY EVALUATING ORGANIZATION REPRESENTATIVE

8. EVALUATION: a. EVALUATOR'S NAME, POSITION (Project Manager/ COR/ Other) AND ORGANIZATION:

b. EVALUATOR'S PHONE NUMBER: c. MONTHS PERFORMANCE MONITORED BY EVALUATOR:

Please circle the response code for each topic (A – G) that best reflects your experience with this contractor.

EX = Exceptional S = Satisfactory US = Unsatisfactory VG = Very Good MG = Marginal N/O = Not Observed A. Quality of Products and Services - Assess the contractor’s conformance to contract requirements, specifications, and standards of good workmanship (e.g., technical, professional, environmental, or safety and health standards).

EX VG S MG US N/O

B. Performance – Assess the contractor’s performance as the General Contractor or Architect/Engineer (as appropriate) for the project.

EX VG S MG US N/O

C. Technical Requirements – Assess the contractor’s ability to fulfill the technical requirements of the contract.

EX VG S MG US N/O

D. Schedule – Assess the timeliness of contractor against the schedule of activities.

EX VG S MG US N/O

E. Cost Control – Assess the contractor’s ability to manage the contract budget and control costs.

EX VG S MG US N/O

F. Customer Satisfaction – Assess the contractor’s responsiveness to customer concerns and “user friendliness”

EX VG S MG US N/O

G. Overall Assessment.

EX VG S MG US N/O

Comments: One additional page can be added for comments, if applicable.

mailto:Robert.Higgins@faa.gov

1 CONTRACTOR NAME ADDRESS:
2 CONTRACT NO:
3 CONTRACT INITIATION DATE:
4 COMPLETION DATE:
5 TOTAL CONTRACT VALUE:
6 TYPE OF CONTRACT Fixed Price GMP FPI etc:
7 DESCRIPTION OF CONTRACT REQUIREMENTS:
If an Award Fee contract what was the average Award Fee:
Evaluator:
Text5:
Text6:
Check Box7: Off
Check Box8: Off
Check Box9: Off
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off
Check Box15: Off
Check Box16: Off
Check Box18: Off
Check Box19: Off
Check Box20: Off
Check Box21: Off
Check Box22: Off
Check Box23: Off
Check Box24: Off
Check Box25: Off
Check Box26: Off
Check Box27: Off
Check Box28: Off
Check Box29: Off
Check Box30: Off
Check Box31: Off
Check Box32: Off
Check Box33: Off
Check Box34: Off
Check Box35: Off
Check Box36: Off
Check Box37: Off
Check Box38: Off
Check Box39: Off
Check Box40: Off
Check Box41: Off
Check Box42: Off
Check Box43: Off
Check Box44: Off
Check Box45: Off
Check Box46: Off
Check Box47: Off
Check Box48: Off
Check Box49: Off

File details come from the government source that posted it. Updated .