RICHARD E BYRD ROH 2 Cover Index rev5.docx

DOCX document 127 KB Posted

Attached to
Regular Overhaul (ROH) for USNS RICHARD E BRYD (T-AKE 4) in the Indo-Pacific Region
Solicitation number
N6264926RL002
Issued by

About this file

This document is a Specification and Work Item Index for the Regular Overhaul (ROH) of the USNS Richard E Byrd (T-AKE 4), a Military Sealift Fleet Support Command vessel. The comprehensive work index covers multiple sections including general services, hull and structural work, propulsion machinery, electrical systems, communication and navigation, auxiliary machinery, habitability, HVAC, drydocking, and underreplenishment equipment maintenance.

The vessel's specifications include a length of 689 feet, breadth of 105 feet 7 inches, gross tonnage of 43,758 tons, and maximum displacement of 41,470 tons. The overhaul is scheduled for 30 March 2026 to 28 May 2026, with work items ranging from zinc tank inspections and equipment maintenance to system upgrades and preservation tasks across various ship systems. The work index contains approximately 80 specific maintenance and inspection tasks categorized under different sections, with most items marked as Category A work items.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MILITARY SEALIFT FLEET SUPPORT COMMAND

NORFOLK, VIRGINIA

SPECIFICATIONS FOR USNS RICHARD E BYRD (T-AKE 4)

USCG No.: CG831781 ABS ID No.: 08154762 IMO No.: 9300609

N33205-26-R-XXXX

(30 March 2026-28 May 2026)

March 2026 ROH Availability

PRINCIPAL DIMENSIONS

LENGTH..........................................689 ft 0 in

BREADTH.......................................105 ft 7in

FULL LOAD WL............................30 ft 6 in ABL

GROSS TONNAGE.........................43,758 TONS

MAXIMUM DISPLACEMENT.......41,470 TONS

USNS BYRD

(TAKE 4)

AWP - N32205-26-R-0001

2026-03-30 - ROH

WORK ITEM INDEX REPORT

Item Number
Title
Category
SECTION 0000
GENERAL SERVICES AND REQUIREMENTS
0001
TAKE-SWI-SCOPE GENERAL REQUIREMENTS AND
NSP
0002
TAKE-SWI-TECHNICAL AND MANUFACTURES
NSP
0003
TAKE_SWI_APPROACH, BERTHING AND MOORING
NSP
0004
TAKE-SWI-TESTING AND QUALITY ASSURANCE
NSP
0005
TAKE_SWI_HIGH VOLTAGE ELECTRICAL SAFETY
NSP
0006
TAKE_SWI_HEAVY WEATHER PLAN
NSP
0007
TAKE_SWI_COLD WEATHER PLAN
NSP
0010
TAKE_SWI_FURNISH OFFICE FOR OMT (OCONUS)
A
0011
TAKE-SWI-GENERAL SERVICES FOR SHIP
A
0012
TAKE-SWI-INFORMATION TECHNOLOGY SERVICES
A
0013
TAKE-SWI-INTEGRATED PROJECT PLANNING AND
A
0014
TAKE-SWI-WEIGHT AND MOMENT REPORT
A
0015
TAKE-SWI-ILS-GFM
A
0016
TAKE-SWI-FIRE PROTECTION AND SHIPS SAFETY
A
0017
TAKE-SWI-HANDLING SHIPS STORES
A
0018
TAKE-SWI-DELIVERY AND REDELIVERY OF THE VESSEL
A
0019
TAKE-SWI-SHIPBOARD ACCESS AND SECURITY
A
0020
TAKE-SWI-GAS FREE CERTIFICATES
A
0021
TAKE-SWI-CLEAN AND GAS FREE TANKS VOIDS
A
0022
TAKE-SWI-MACHINERY SPACE TURN-OVER DOCK TRIALS
A
0023
TAKE-SWI-HAZARDOUS WASTE DISPOSAL AT A
A
0024
TAKE-SWI-PHYSICAL SECURITY AT PRIVATE
NSP
0025
TAKE-SWI-PHYSICAL SECURITY AT PRIVATE
B
0030
TAKE-SWI-CONTINUATION OF SERVICES
B
SECTION 0100
HULL AND STRUCTURAL
0101
TAKE-CSI-BALLAST TANK ZINC INSPECTION (2.5 YR)
A
0102
TAKE-CSI-FOOD WASTE TANK INSPECTION (2.5 YR)
A
0103
Various Topside Deck ASA Replacement
A
0107
Flying Bridge Deck Preservation
A
0130
Chain Locker Sounding Tube Installation (VR25-0015)
A
0137
Misc ABS Hits
A
0153
TAKE_CCSI_ABS INTERMEDIATE SURVEY - TANK
A
Page 1 of
4
Print Date:
08/07/2025

MSC Corrective Maintenance

Engineering Report

0156
TAKE_CCSI_FLIGHT DECK PRESERVATION (3 YR)
A
0157
Renew Hanger Bay Non-skid Specification
A
0161
TAKE-CCSI-AIRCRAFT TIE DOWN REPLACEMENT
A
0163
TAKE_CCSI_FLIGHT DECK SAFETY NET INSPECTION AND
A
0166
Frame 58 State Room Glass Repair
A
0167
TAKE_CSI_Hold 3 Deck Insultion and Phenolic Deck Grating Repair
A
0171A
TAKE-CCSI-WASTE WATER SLUDGE TANK PRESERVATION
A
0171C
TAKE-CCSI-WASTE WATER SLUDGE TANK PRESERVATION
A
0171F
TAKE-CCSI-WASTE WATER SLUDGE TANK PRESERVATION
A
0181
TAKE-CCSI-TOPSIDE CRADLES AND FOUNDATIONS
A
SECTION 0200
PROPULSION MACHINERY
0201
TAKE-CSI-PROPULSION MOTOR AND COOLER CLEANING, INSPECTION AND MAINTENANCE (2.5 YR) (SCSI)
A
0203
TAKE-CSI-A-MDE RESILIENT MOUNT REPLACEMENT (10
A
0204
TAKE_CSI_MDE CONTROL SAFETY INSPECTION AND TEST
A
0205
TAKE_CSI_AUTOMATION AND PROPULSION CONTROL
A
0206
TAKE_CSI_VULKAN COUPLING INSPECTIONS (1 YR) (SCSI)
A
0213
MDE EXHAUST PIPE RESILIENT MOUNT REPLACEMENT (VR21-0052)
A
0215
Engines Fuel Meters COV Replacement (VR22-0027)
A
0231
MDE Splash Oil and Test Circuit Mod (T-ALT 381) Rev1
A
0290
INDUSTRIAL ASSISTANCE COMMISSIONING SD7000 PROPULSOIN CONTROL UPGRADE
A
SECTION 0300
ELECTRICAL
0301A
TAKE_CSI_CLEANING MAIN GENERATORS AND
A
0302
Life-raft Emergency Lighting Mods iaw SOLAS
A
0304
TAKE CSI HIGH VOLTAGE, SHIPS SERVICE, AND
A
0306
TAKE-CSI-EMERGENCY GENERATOR - INSPECT AND
A
0311
MX Box Terminal Blocks Replacement (VR21-0051)
A
0353
TAKE_CCSI_THERMOGRAPHIC SURVEY (1 YR)
A
0355
TAKE_CSI_OVERHAUL AND TEST CIRCUIT BREAKERS (10
A
0370
Switchboard Discrepancy Repairs (VR21-0005 and VR20-0058)
A
0391
Eaton Time Delay Relay Replacement (T-ALT 496)
A
SECTION 0400
COMMUNICATION AND NAVIGATION
0404
TAKE_CSI_OE-570 WSC ANTENNA SYSTEM MAINTENANCE
A
0407
TAKE_CSI_CALIBRATE ELECTRONIC TEST EQUIPMENT
A
0408
TAKE-CSI-WIND SPEED MEASURING AND INDICATION
A
0450
TAKE_CSI_ANNUAL INTEGRATED BRIDGE EQUIPMENT
A
0453
TAKE_CCSI_ANNUAL GYRO SYSTEM
A
0454
TAKE-CCSI-ANNUAL VDR RECERTIFICATION
A
0455
TAKE_CCSI_ANNUAL RADIO COMMUNICATION
A
0460
TAKE_CCSI_ANNUAL INSPECTION OF MANUALLY
A
Page 2 of
4
Print Date:
08/07/2025

MSC Corrective Maintenance

Engineering Report

SECTION 0500
AUXILIARY MACHINERY
0501
CMWD Pipe Removal
A
0502
MISC PIPING REPAIRS (VR 24-0007)
A
0503
TAKE_CSI_CARGO CRANE INSPECTION (1 YR) (SCSI)
A
0506
TAKE_CSI_EMERGENCY DIESEL GENERATOR -ANNUAL
A
0508
TAKE-CSI-HELO HANGAR CRANE LOAD TEST (5 YR)
A
0509
Hot Water Recirculating Pump and Motor Replacement (VR20-0059)
A
0512A
TAKE_CSI_MAGAZINE SPRINKLER GAUGE CALIBRATION (1
A
N/A
N/A
A
0516
TAKE_CSI_SEWAGE SYSTEM PIPING CLEANING (2.5 YR)
A
0518B
TAKE_CSI_HTFW COOLER REGASKETING (5 YR)
A
0527
TAKE-CSI-BRINE SYSTEM FLUSH (5 YR)
A
0551
TAKE_CCSI_OVERHAUL PLATE COOLERS (10 YR)
A
0552
Ship Service Reefer Plant Hose Replacements (VR22-0025)
A
0554
TAKE_CCSI_INSPECT, TEST AND CERTIFY MACHINERY
A
N/A
N/A
A
0561B
TAKE-CCSI-GAUGE CALIBRATION (2.5 YR)
A
0562
TAKE_CCSI_SCBA ANNUAL INSPECTION (INTERSPIRO)
A
0563A
TAKE_CCSI_SCBA COMPRESSOR AND FILLING STATION
A
0565B
TAKE-CCSI-FIXED GAS FIREFIGHTING SYSTEM
A
0567B
TAKE-CCSI-FIXED FOAM FIREFIGHTING SYSTEM
A
0568A
TAKE_CCSI_WATER MIST-SPRAY-SPRINKLER SYSTEM
A
0569
TAKE_CCSI_FIRE AND SMOKE DETECTION ALARM SYSTEM
A
0570
TAKE_CCSI_PORTABLE FIRE EXTINGUISHER SERVICE (1
A
0571
TAKE_CCSI_FIRE AND SMOKE DAMPER SERVICE (1 YR)
A
0572
TAKE_CCSI_DEEP FAT FRYER AND RANGE HOOD FIRE
A
0573
TAKE_CCSI_FIRE HOSES (1 YR)
A
0574
TAKE_CCSI_FIRE DOORS AND SHUTTERS (1 YR) (SCSI)
A
0576
Central Seawater and LTFW Pump Overhaul
A
0578
TAKE-CCSI-BOLL AND KIRCH AUTO FLUSH LO FILTER
A
0584
CARGO BRINE SYSTEM PIPE ULTRASONIC TESTING (VR24-0010)
A
SECTION 0600
HABITABILITY OUTFITTING AND FURNISHINGS
0602
Terrazzo Deck Replacement
A
0610
TAKE-CSI-GALLEY AND MSO EQUIPMENT CALIBRATION
A
0646
Ship's Laundry Controller Replacement
A
0651
TAKE_CCSI_ANNUAL LIFEBOAT AND DAVIT INSPECTION
A
0653
TAKE_CCSI_ANNUAL RESCUE BOAT AND DAVIT
A
0655
TAKE_CCSI_IMMERSION SUIT SERVICE (3 YR)
A
0656
TAKE_CCSI_ANNUAL LIFE RAFT CERTIFICATION
A
0657
TAKE_CCSI_ACCOMMODATION LADDER INSPECTION (1
A
Page 3 of
4
Print Date:
08/07/2025

MSC Corrective Maintenance

Engineering Report

0659
TAKE-CCSI-PILOT BOARDING EQUIPMENT AND
A
0662
TAKE_CCSI_DEEP FAT FRYER INSPECTION (1 YR)
A
0666
TAKE-CCSI-INSPECT, TEST AND CERTIFY MATERIAL
A
0668
TAKE-CCSI-INSPECT, TEST AND CERTIFY MATERIAL
A
0669
TAKE-CCSI-BATTERY REPLACEMENT MATERIAL
A
0673
TAKE-CCSI-READY SERVICE LOCKER OVERHAUL (5 YR)
A
SECTION 0800
HVAC
0801
Prestage Door Control Board Replacement (T-ALT 574)
A
0802A
TAKE-CSI-AIR CONDITIONING PLANT COMPRESSOR
A
0805
M-Damper Overhaul
A
0851
TAKE_CCSI_GALLEY VENTILATION SYSTEM AND
A
0852
TAKE_CCSI_LAUNDRY VENT CLEANING (2.5 YR)
A
SECTION 0900
DRYDOCKING
0952
TAKE-CCSI-UNDERWATER INSPECTION IN LIEU OF
A
0958
TAKE-CCSI-PROPELLER CLEAN AND POLISH AND HULL
A
SECTION 1000
UNDERWAY REPLENISHMENT EQUIPMENT
1001
REFURBISH_OUTHAUL_ANTI_SLACK_DEVICE_ASD_AND_T
A
1002
SLIDING BLOCK ELECTRIC BRAKE REFURBISHMENT AND
A
1003
REFURBISH WINCH OVERLOAD SLIP CLUTCH
A
1052
TAKE-CSI-GYPSY WINCH AND MASTER CONTROL PEDESTAL PRESERVATION (5 YR)
A
1058
TAKE-CSI-HAULING WINCH BAND BRAKE
A
1062
TAKE-CSI-HIGHLINE SPANWIRE WINCH BAND BRAKE
A
N/A
N/A
N/A
A
1075
TAKE-CSI-HIGH PRESSURE GAUGE CALIBRATION (2 YR)
A
1080
TAKE-CSI-GYPSY WINCH REFURBLISHMENT (15 YR)
A
Page 4 of
4

image1.jpeg image2.jpeg

File details come from the government source that posted it. Updated .