MILITARY SEALIFT FLEET SUPPORT COMMAND
NORFOLK, VIRGINIA
SPECIFICATIONS FOR USNS RICHARD E BYRD (T-AKE 4)
USCG No.: CG831781 ABS ID No.: 08154762 IMO No.: 9300609
N33205-26-R-XXXX
(30 March 2026-28 May 2026)
March 2026 ROH Availability
PRINCIPAL DIMENSIONS
LENGTH..........................................689 ft 0 in
BREADTH.......................................105 ft 7in
FULL LOAD WL............................30 ft 6 in ABL
GROSS TONNAGE.........................43,758 TONS
MAXIMUM DISPLACEMENT.......41,470 TONS
USNS BYRD
(TAKE 4)
AWP - N32205-26-R-0001
2026-03-30 - ROH
WORK ITEM INDEX REPORT
| Item Number |
| Title |
| Category |
| SECTION 0000 |
| GENERAL SERVICES AND REQUIREMENTS |
| 0001 |
| TAKE-SWI-SCOPE GENERAL REQUIREMENTS AND |
| NSP |
| 0002 |
| TAKE-SWI-TECHNICAL AND MANUFACTURES |
| NSP |
| 0003 |
| TAKE_SWI_APPROACH, BERTHING AND MOORING |
| NSP |
| 0004 |
| TAKE-SWI-TESTING AND QUALITY ASSURANCE |
| NSP |
| 0005 |
| TAKE_SWI_HIGH VOLTAGE ELECTRICAL SAFETY |
| NSP |
| 0006 |
| TAKE_SWI_HEAVY WEATHER PLAN |
| NSP |
| 0007 |
| TAKE_SWI_COLD WEATHER PLAN |
| NSP |
| 0010 |
| TAKE_SWI_FURNISH OFFICE FOR OMT (OCONUS) |
| A |
| 0011 |
| TAKE-SWI-GENERAL SERVICES FOR SHIP |
| A |
| 0012 |
| TAKE-SWI-INFORMATION TECHNOLOGY SERVICES |
| A |
| 0013 |
| TAKE-SWI-INTEGRATED PROJECT PLANNING AND |
| A |
| 0014 |
| TAKE-SWI-WEIGHT AND MOMENT REPORT |
| A |
| 0016 |
| TAKE-SWI-FIRE PROTECTION AND SHIPS SAFETY |
| A |
| 0017 |
| TAKE-SWI-HANDLING SHIPS STORES |
| A |
| 0018 |
| TAKE-SWI-DELIVERY AND REDELIVERY OF THE VESSEL |
| A |
| 0019 |
| TAKE-SWI-SHIPBOARD ACCESS AND SECURITY |
| A |
| 0020 |
| TAKE-SWI-GAS FREE CERTIFICATES |
| A |
| 0021 |
| TAKE-SWI-CLEAN AND GAS FREE TANKS VOIDS |
| A |
| 0022 |
| TAKE-SWI-MACHINERY SPACE TURN-OVER DOCK TRIALS |
| A |
| 0023 |
| TAKE-SWI-HAZARDOUS WASTE DISPOSAL AT A |
| A |
| 0024 |
| TAKE-SWI-PHYSICAL SECURITY AT PRIVATE |
| NSP |
| 0025 |
| TAKE-SWI-PHYSICAL SECURITY AT PRIVATE |
| B |
| 0030 |
| TAKE-SWI-CONTINUATION OF SERVICES |
| B |
| SECTION 0100 |
| HULL AND STRUCTURAL |
| 0101 |
| TAKE-CSI-BALLAST TANK ZINC INSPECTION (2.5 YR) |
| A |
| 0102 |
| TAKE-CSI-FOOD WASTE TANK INSPECTION (2.5 YR) |
| A |
| 0103 |
| Various Topside Deck ASA Replacement |
| A |
| 0107 |
| Flying Bridge Deck Preservation |
| A |
| 0130 |
| Chain Locker Sounding Tube Installation (VR25-0015) |
| A |
| 0153 |
| TAKE_CCSI_ABS INTERMEDIATE SURVEY - TANK |
| A |
MSC Corrective Maintenance
Engineering Report
| 0156 |
| TAKE_CCSI_FLIGHT DECK PRESERVATION (3 YR) |
| A |
| 0157 |
| Renew Hanger Bay Non-skid Specification |
| A |
| 0161 |
| TAKE-CCSI-AIRCRAFT TIE DOWN REPLACEMENT |
| A |
| 0163 |
| TAKE_CCSI_FLIGHT DECK SAFETY NET INSPECTION AND |
| A |
| 0166 |
| Frame 58 State Room Glass Repair |
| A |
| 0167 |
| TAKE_CSI_Hold 3 Deck Insultion and Phenolic Deck Grating Repair |
| A |
| 0171A |
| TAKE-CCSI-WASTE WATER SLUDGE TANK PRESERVATION |
| A |
| 0171C |
| TAKE-CCSI-WASTE WATER SLUDGE TANK PRESERVATION |
| A |
| 0171F |
| TAKE-CCSI-WASTE WATER SLUDGE TANK PRESERVATION |
| A |
| 0181 |
| TAKE-CCSI-TOPSIDE CRADLES AND FOUNDATIONS |
| A |
| SECTION 0200 |
| PROPULSION MACHINERY |
| 0201 |
| TAKE-CSI-PROPULSION MOTOR AND COOLER CLEANING, INSPECTION AND MAINTENANCE (2.5 YR) (SCSI) |
| A |
| 0203 |
| TAKE-CSI-A-MDE RESILIENT MOUNT REPLACEMENT (10 |
| A |
| 0204 |
| TAKE_CSI_MDE CONTROL SAFETY INSPECTION AND TEST |
| A |
| 0205 |
| TAKE_CSI_AUTOMATION AND PROPULSION CONTROL |
| A |
| 0206 |
| TAKE_CSI_VULKAN COUPLING INSPECTIONS (1 YR) (SCSI) |
| A |
| 0213 |
| MDE EXHAUST PIPE RESILIENT MOUNT REPLACEMENT (VR21-0052) |
| A |
| 0215 |
| Engines Fuel Meters COV Replacement (VR22-0027) |
| A |
| 0231 |
| MDE Splash Oil and Test Circuit Mod (T-ALT 381) Rev1 |
| A |
| 0290 |
| INDUSTRIAL ASSISTANCE COMMISSIONING SD7000 PROPULSOIN CONTROL UPGRADE |
| A |
| 0301A |
| TAKE_CSI_CLEANING MAIN GENERATORS AND |
| A |
| 0302 |
| Life-raft Emergency Lighting Mods iaw SOLAS |
| A |
| 0304 |
| TAKE CSI HIGH VOLTAGE, SHIPS SERVICE, AND |
| A |
| 0306 |
| TAKE-CSI-EMERGENCY GENERATOR - INSPECT AND |
| A |
| 0311 |
| MX Box Terminal Blocks Replacement (VR21-0051) |
| A |
| 0353 |
| TAKE_CCSI_THERMOGRAPHIC SURVEY (1 YR) |
| A |
| 0355 |
| TAKE_CSI_OVERHAUL AND TEST CIRCUIT BREAKERS (10 |
| A |
| 0370 |
| Switchboard Discrepancy Repairs (VR21-0005 and VR20-0058) |
| A |
| 0391 |
| Eaton Time Delay Relay Replacement (T-ALT 496) |
| A |
| SECTION 0400 |
| COMMUNICATION AND NAVIGATION |
| 0404 |
| TAKE_CSI_OE-570 WSC ANTENNA SYSTEM MAINTENANCE |
| A |
| 0407 |
| TAKE_CSI_CALIBRATE ELECTRONIC TEST EQUIPMENT |
| A |
| 0408 |
| TAKE-CSI-WIND SPEED MEASURING AND INDICATION |
| A |
| 0450 |
| TAKE_CSI_ANNUAL INTEGRATED BRIDGE EQUIPMENT |
| A |
| 0453 |
| TAKE_CCSI_ANNUAL GYRO SYSTEM |
| A |
| 0454 |
| TAKE-CCSI-ANNUAL VDR RECERTIFICATION |
| A |
| 0455 |
| TAKE_CCSI_ANNUAL RADIO COMMUNICATION |
| A |
| 0460 |
| TAKE_CCSI_ANNUAL INSPECTION OF MANUALLY |
| A |
MSC Corrective Maintenance
Engineering Report
| SECTION 0500 |
| AUXILIARY MACHINERY |
| 0502 |
| MISC PIPING REPAIRS (VR 24-0007) |
| A |
| 0503 |
| TAKE_CSI_CARGO CRANE INSPECTION (1 YR) (SCSI) |
| A |
| 0506 |
| TAKE_CSI_EMERGENCY DIESEL GENERATOR -ANNUAL |
| A |
| 0508 |
| TAKE-CSI-HELO HANGAR CRANE LOAD TEST (5 YR) |
| A |
| 0509 |
| Hot Water Recirculating Pump and Motor Replacement (VR20-0059) |
| A |
| 0512A |
| TAKE_CSI_MAGAZINE SPRINKLER GAUGE CALIBRATION (1 |
| A |
| 0516 |
| TAKE_CSI_SEWAGE SYSTEM PIPING CLEANING (2.5 YR) |
| A |
| 0518B |
| TAKE_CSI_HTFW COOLER REGASKETING (5 YR) |
| A |
| 0527 |
| TAKE-CSI-BRINE SYSTEM FLUSH (5 YR) |
| A |
| 0551 |
| TAKE_CCSI_OVERHAUL PLATE COOLERS (10 YR) |
| A |
| 0552 |
| Ship Service Reefer Plant Hose Replacements (VR22-0025) |
| A |
| 0554 |
| TAKE_CCSI_INSPECT, TEST AND CERTIFY MACHINERY |
| A |
| 0561B |
| TAKE-CCSI-GAUGE CALIBRATION (2.5 YR) |
| A |
| 0562 |
| TAKE_CCSI_SCBA ANNUAL INSPECTION (INTERSPIRO) |
| A |
| 0563A |
| TAKE_CCSI_SCBA COMPRESSOR AND FILLING STATION |
| A |
| 0565B |
| TAKE-CCSI-FIXED GAS FIREFIGHTING SYSTEM |
| A |
| 0567B |
| TAKE-CCSI-FIXED FOAM FIREFIGHTING SYSTEM |
| A |
| 0568A |
| TAKE_CCSI_WATER MIST-SPRAY-SPRINKLER SYSTEM |
| A |
| 0569 |
| TAKE_CCSI_FIRE AND SMOKE DETECTION ALARM SYSTEM |
| A |
| 0570 |
| TAKE_CCSI_PORTABLE FIRE EXTINGUISHER SERVICE (1 |
| A |
| 0571 |
| TAKE_CCSI_FIRE AND SMOKE DAMPER SERVICE (1 YR) |
| A |
| 0572 |
| TAKE_CCSI_DEEP FAT FRYER AND RANGE HOOD FIRE |
| A |
| 0573 |
| TAKE_CCSI_FIRE HOSES (1 YR) |
| A |
| 0574 |
| TAKE_CCSI_FIRE DOORS AND SHUTTERS (1 YR) (SCSI) |
| A |
| 0576 |
| Central Seawater and LTFW Pump Overhaul |
| A |
| 0578 |
| TAKE-CCSI-BOLL AND KIRCH AUTO FLUSH LO FILTER |
| A |
| 0584 |
| CARGO BRINE SYSTEM PIPE ULTRASONIC TESTING (VR24-0010) |
| A |
| SECTION 0600 |
| HABITABILITY OUTFITTING AND FURNISHINGS |
| 0602 |
| Terrazzo Deck Replacement |
| A |
| 0610 |
| TAKE-CSI-GALLEY AND MSO EQUIPMENT CALIBRATION |
| A |
| 0646 |
| Ship's Laundry Controller Replacement |
| A |
| 0651 |
| TAKE_CCSI_ANNUAL LIFEBOAT AND DAVIT INSPECTION |
| A |
| 0653 |
| TAKE_CCSI_ANNUAL RESCUE BOAT AND DAVIT |
| A |
| 0655 |
| TAKE_CCSI_IMMERSION SUIT SERVICE (3 YR) |
| A |
| 0656 |
| TAKE_CCSI_ANNUAL LIFE RAFT CERTIFICATION |
| A |
| 0657 |
| TAKE_CCSI_ACCOMMODATION LADDER INSPECTION (1 |
| A |
MSC Corrective Maintenance
Engineering Report
| 0659 |
| TAKE-CCSI-PILOT BOARDING EQUIPMENT AND |
| A |
| 0662 |
| TAKE_CCSI_DEEP FAT FRYER INSPECTION (1 YR) |
| A |
| 0666 |
| TAKE-CCSI-INSPECT, TEST AND CERTIFY MATERIAL |
| A |
| 0668 |
| TAKE-CCSI-INSPECT, TEST AND CERTIFY MATERIAL |
| A |
| 0669 |
| TAKE-CCSI-BATTERY REPLACEMENT MATERIAL |
| A |
| 0673 |
| TAKE-CCSI-READY SERVICE LOCKER OVERHAUL (5 YR) |
| A |
| 0801 |
| Prestage Door Control Board Replacement (T-ALT 574) |
| A |
| 0802A |
| TAKE-CSI-AIR CONDITIONING PLANT COMPRESSOR |
| A |
| 0851 |
| TAKE_CCSI_GALLEY VENTILATION SYSTEM AND |
| A |
| 0852 |
| TAKE_CCSI_LAUNDRY VENT CLEANING (2.5 YR) |
| A |
| 0952 |
| TAKE-CCSI-UNDERWATER INSPECTION IN LIEU OF |
| A |
| 0958 |
| TAKE-CCSI-PROPELLER CLEAN AND POLISH AND HULL |
| A |
| SECTION 1000 |
| UNDERWAY REPLENISHMENT EQUIPMENT |
| 1001 |
| REFURBISH_OUTHAUL_ANTI_SLACK_DEVICE_ASD_AND_T |
| A |
| 1002 |
| SLIDING BLOCK ELECTRIC BRAKE REFURBISHMENT AND |
| A |
| 1003 |
| REFURBISH WINCH OVERLOAD SLIP CLUTCH |
| A |
| 1052 |
| TAKE-CSI-GYPSY WINCH AND MASTER CONTROL PEDESTAL PRESERVATION (5 YR) |
| A |
| 1058 |
| TAKE-CSI-HAULING WINCH BAND BRAKE |
| A |
| 1062 |
| TAKE-CSI-HIGHLINE SPANWIRE WINCH BAND BRAKE |
| A |
| 1075 |
| TAKE-CSI-HIGH PRESSURE GAUGE CALIBRATION (2 YR) |
| A |
| 1080 |
| TAKE-CSI-GYPSY WINCH REFURBLISHMENT (15 YR) |
| A |
image1.jpeg image2.jpeg