RFQ26006744 State Solar Sites.docx
DOCX document 25 KB Posted
- Solicitation number
- RFQ26006744
- Issued by
- Providence County, Rhode Island
About this file
This document is an inventory of solar photovoltaic systems across Rhode Island state facilities, prepared in connection with a retail electricity supply service solicitation by the State of Rhode Island's Department of Administration. The file details eleven existing solar installations and two planned installations at various state buildings and facilities, including the William Powers Building, Department of Transportation Building, Army National Guard facilities, Rhode Island College, and multiple Department of Environmental Management locations. The existing systems range in size from 9.1 kW to 550.2 kW, with installation dates spanning from approximately 2018 to 2025. Two planned solar installations are scheduled for completion in Fall 2026 and Winter 2026, with system sizes of 150 kW and 499 kW respectively. All facilities utilize either electricity or a combination of electricity and natural gas as fuel sources. Historic output data for all systems is not available in this documentation.
The accompanying electricity supply service solicitation (MPA 623 Pricing Event) is restricted to invited, MPA 623-qualified vendors, with pricing submissions due June 23, 2026 at 1:00 p.m. EDT through Ocean State Procures. The State requires a minimum 15% MBE participation on the total procurement dollar value and mandates specific insurance coverage including $1 million combined single-limit liability, $100,000 workers' compensation, and $1 million automobile liability. Vendor pricing must be submitted on a firm, fixed unit price basis with F.O.B. destination delivery terms using the Exhibit 2 Pricing Form. Effective January 1, 2026, the State withholds a 0.33% contract administrative fee at invoice payment on all eligible contracts. The solicitation does not disclose contract term, renewal options, or estimated total contract value.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
State Solar Sites
Existing Solar PV Department of Administration - William Powers Building Install Date: unknown Fuel Type: Electricity & Natural Gas System Size: 180.5 kW Historic Output not available
Department of Transportation Building Install Date: unknown Fuel Type: Electricity & Natural Gas System Size: 67.2 kW Historic Output not available
Department of Health – Cannon Building Install Date: unknown Fuel Type: Electricity & Natural Gas System Size: 40.3kW Historic Output not available
Division of Public Utilities & Carriers/Public Utilities Commission Building Install Date: unknown Fuel Type: Electricity & Natural Gas System Size: 55.8 kW Historic Output not available
Army National Guard - Combined Services Maintenance Shop Install Date: ~2018 Fuel Type: Electricity & Natural Gas System Size: 550.2 kW Historic Output not available
Army National Guard – Armory Building Install Date: ~2020 Fuel Type: Electricity & Natural Gas System Size: 207.3 kW Historic Output not available
RI Veteran’s Home Install Date: unknown Fuel Type: Electricity & Natural Gas System Size: 43.7 kW Historic Output not available
Rhode Island College Install Date: unknown Fuel Type: Electricity & Natural Gas System Size: 111.6 kW Historic Output not available
Department of Environmental Management – Coastal Resources Building Install Date: unknown Fuel Type: Electricity & Natural Gas System Size: 9.1 kW Historic Output not available
Department of Environmental Management – Roger Wheeler Beach Building Install Date: unknown Fuel Type: Electricity & Natural Gas System Size: 26.4 kW Historic Output not available
RI Attorney General Building – Cranston Install Date: ~2019 Fuel Type: Electricity & Natural Gas System Size: 84 kW Historic Output not available
Department of Environmental Management – Prudence Island Facility Install Date: 2025 Fuel Type: Electricity System Size: 20.2 kW Historic Output not available
Planned Solar PV:
Army National Guard – Bristol Amory Install Date: Fall 2026 Fuel Type: Electricity & Natural Gas System Size: 150 kW Historic Output not available
Army National Guard – AASF Building Install Date: Winter 2026 Fuel Type: Electricity & Natural Gas System Size: 499 kW Historic Output not available