This document is a technical engineering drawing from Arup USA Inc for the Fermilab Long-Baseline Neutrino Facility, specifically detailing monorail beam specifications for underground structural components. The drawing includes a comprehensive table of crane and monorail beam requirements, covering critical technical parameters such as maximum crane payload (16.5-20.0 US short tons), ultimate load capacities, beam flange dimensions, trolley specifications, and power requirements for different monorail locations (center, outer, and bridge cranes).

The technical specifications include detailed notes on beam fabrication, installation tolerances, electrical connections, and load distribution. Key requirements include: each crane shall have a joined control system monitoring simultaneous movements, powered by a continuous busbar fixed to the structural monorail beam, and load testing at 150% of maximum service load. The document emphasizes that the monorail crane beams are provisional and subject to reconfirmation after the hoist supplier provides final working loads and beam flange requirements, with lateral beam stability to be confirmed by FRA (likely Fermilab Research Alliance).

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CL BM

SPLICE

CL

SUPT

PER PLAN UG-FD-SS-200 SERIES

MONORAIL SUPPORT

BEAM

GALV PL 0'-0 1/2" (0.013m)

(0.076m)

0' - 3"

(0.076m)

0' - 3"

3/8

TYP 3 SIDES

TYP EACH

BEAM

(0 .30

5m

1'

- 0

NOTES:

1. SURVEY AS-BUILT SUPPORT LOCATIONS AND COORDINATE BEAM FABRICATION AND

ERECTION PRIOR TO AND THROUGHOUT ERECTION.

CJP, REMOVE BACKER BARS,

GRIND SMOOTH AT TOP AND BOT

OF FLANGE

(7/8)

PJP,CJP AT CM/GC OPTION

5/16 5/16

TYP

(0 .47

0m

1'

- 6

1/ 2"

(0.016m) 0' - 0 5/8"

(0 .03

8m

0'

- 1

1/ 2"

(0.203m)

0' - 8" TYP

BU18.5-1

TABLE1: CRANE AND MONORAIL BEAM ASSUMPTIONS AND REQUIREMENTS

MONORAIL BEAM REQUIREMENTS CRANE TROLLY CRANE FUNCTIONS

MONORAIL BEAM

LOCATION

CRANE TYPE MAXIMUM CRANE

PAYLOAD

MAX ULTIMATE LOAD

MONORAIL BEAM

MAX FLANGE BOTTOM

WIDTH

MIN # WHEELS PER

TROLLEY

MIN LENGTH OF

TROLLEY

LIFTING RANGE

(MINIMUM)

CRANE LIFTING

SPEED

CRANE TRAVELLING

SPEED

POWER REQUIRED

US SHORT TONS

(METRIC TONS)

US SHORT TONS

(METRIC TONS)

IN (mm) IN (mm) (ft) m fpm (mpm) fpm (mpm)

CENTER MONORAIL CRANE 16.5 (15.0) 32.0 (29.0) 8 (200) 8 60 (1524) 15 (4.572)

OUTER MONORAIL CRANE 16.5 (15.0) 32.0 (29.0) 8 (200) 8 60 (1524)

OUTER BRIDGE CRANE 20.0 (18.2) 46.2 (41.9) 8 (200) 8 60 (1524)

NOTES:

1. MONORAIL CRANE IS ASSUMED TO BE AFFIXED TO A TROLLEY WHICH HANGS BELOW THE BEAM. THE TROLLEY WHEELS ARE ASSUMED

TO DISTRIBUTE LOAD EQUAILY TO EACH SIDE OF THE BEAM FLANGE.

2. BRIDGE CRANE TYPE IS AN OVERHEAD CRANE MOUNTED ON A TRAVELING BRIDGE WHICH SPANS BETWEEN THE TWO OUTER MONORAIL BEAMS. THE CRANE BRIDGE IS ASSUMED TO HANG BELOW THE STRUCTURAL SUPPORT BEAMS, WITH A TROLLEY AT EACH END OF THE BRIDGE. THE TROLLEY WHEELS ARE ASSUMED TO DISTRIBUTE LOAD EQUALLY TO EACH SIDE OF THE BEAM FLANGE.

3. ALL CRANES SUPPORTED BY THE MONORAIL BEAMS SHALL BE HAVE A JOINED CONTROL SYSTEM WHICH MONITORS THE MOVEMENTS

AND LOCATIONS OF ALL SYSTEMS SIMULTANEOUSLY.

4. EACH CRANE SHALL HAVE ONE ELECTRICAL CONNECTION, AND SHALL BE POWERED BY CONTINUOUS BUSBAR FIXED TO THE STRUCTURAL MONORAIL BEAM. ALL TRAVELING ELECTRICAL COMPONENTS REQUIRED FOR THE CRANE TO MOVE SHALL BE SUPPLIED BY

THE CRANE INSTALLER.

5. MAXIMUM ULTIMATE LOAD INCLUDES THE CRANE PAYLOAD, THE WEIGHT OF ALL CRANE AND TROLLEY COMPONENTS, AND LOADING DYNAMIC EFFECTS, WITH LOAD FACTORS IN ACCORDANCE WITH THE 2015 INTERNATIONAL BUILDING CODE.

6. EACH MONORAIL BEAM LINE IS ASSUMED TO BE LOADED BY ONE CRANE AT A TIME. MULTIPLE CRANES OPERATING ON THE SAME MONORAIL BEAM LINE MAY OCCUR IF EITHER THE LOADS OCCUR AT A MINIMUM OF 25'-0" (7.620m) APART, OR IF THE TOTAL ULTIMATE LOAD TO THE MONORAIL BEAM DOES NOT EXCEED THE ULTIMATE LOAD INDICATED IN THE TABLE.

7. AT EACH HANGER LOCATION, THE ANCHOR GROUP SHALL BE TESTED TO 150% OF THE MAXIMUM SERVICE LOAD, ASSUMED TO BE 49.5 US SHORT TONS(44.9 US SHORT TONS) FOR THE OUTER BEAMS AND 31.5 US SHORT TONS (28.6 METRIC TONS FOR THE CENTER BEAMS, UNTIL

EQUIPMENT WEIGHTS, ETC. ARE VERIFIED.

32 (9.754) 32 (9.754) 20 (6.096)

15 (4.572) 19 (5.791)

75 (22.860) 75 (22.860) 75 (22.860)

(2) 3 PHASE, 480V, 70A, 54kVA

(1) 3 PHASE, 480V, 100A, 81kVA

(TOTAL EACH CAVERN)

MONORAIL BEAM NOTES:

1. MONORAIL CRANE BEAMS SHOWN ARE PROVISIONAL AND ARE TO BE

RECONFIRMED AFTER THE HOIST SUPPLIER PROVIDES FINAL WORKING LOADS

AND BEAM FLANGE REQUIREMENTS.

2. LATERAL STABILITY OF BEAM TO BE CONFIRMED BY FRA ONCE SUPPLIER HAS

PROVIDED LOADINGS.

3. SEE 4/UG-FD-SS-802 FOR BEAM LOAD ASSUMPTIONS

4. MILL, FABRICATION, AND ERECTION TOLERANCES SHALL BE IN ACCORDANCE

WITH AISC SPECIFICATION, AISC CODE OF STANDARD PRACTCE. WHERE

SPECIFIC TOLERANCES ARE ALSO SPECIFIED IN THE CONSTRUCTION

DOCUMENTS, THE MORE STRICT CRITERIA SHALL GOVERN, UNLESS NOTED

OTHERWISE.

Arup USA Inc 77 Water Street, New York NY 10005, T 212 896 3000 www.arup.com

DRAWING NO.

SCALE:

REV.

REVISIONS

DESIGNED

DRAWN

CHECKED

DESCRIPTIONDATEREV.

Fermilab Long-Baseline Neutrino Facility

/2

/1

/2

4/

:4 7:

P

M

415-1-6 UG-FD-SS-802

UNDERGROUND, STRUCTURAL

LBNF - FSCF - EXCAVATION

IB

AF

KS ARUP

ARUP

ARUP

TYPICAL CHAMBER MONORAIL

DETAILS, SHEET 2 OF 2

SCALE: 3" = 1'-0"

1TYPICAL MONORAIL BEAM SPLICE

3"=1'-0"

SCALE FEET

SCALE: 3" = 1'-0"

TYPICAL MONORAIL BUILT-UP

BEAM

SCALE: N.T.S.

CRANE AND MONORAIL BEAM

ASSUMPTIONS & REQUIREMENTS

1 11/02/18 60% FD SUBMISSION

2 02/08/19 90% FD SUBMISSION

3 05/03/19 100% FD SUBMISSION

4 11/26/19 ISSUED FOR CONSTRUCTION STAGE 1B