Amendment 06--RFP LBNF-368455-BF.pdf
PDF 125 KB Posted
- Attached to
- Central Monorail Hoist Commissioning
- Solicitation number
- RFP-LBNF-368455-BF
About this file
This document is Amendment 06 to Solicitation RFP LBNF-368455-BF for the Long-Baseline Neutrino Facility/Deep Underground Neutrino Experiment Central Monorail Hoist Commissioning project. The amendment provides clarifications to two contractor questions received on August 4, 2025, with responses addressing bus bar procurement and hoist load testing requirements.
The first question asked whether the awardee should procure bus bars for central monorail hoists, to which FFDG (Fermi Forward Discovery Group, LLC) clarified that bus bars will be procured and installed by another subcontractor, with the awardee having input on installation. The second question concerned load testing, and FFDG specified that load test certification is included in the Statement of Work Appendix B for the 20-ton capacity Yale Cable King Electric Wire Rope Hoist (model FEW20-92MT15L4), with the subcontractor expected to perform a load test using water bags after installation. The proposal due date remains August 8, 2025, and the amendment was issued by Bridget Fugett, LBNF Procurement Specialist.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT TO SOLICITATION
AMENDMENT NO.
DATE OF AMENDMENT:
August 4, 2025
SOLICITATION NO.
RFP LBNF-368455-BF
DATE ISSUED:
August 4, 2025
PROJECT NO.
N/A
PROPOSAL DUE DATE:
August 8, 2025
TITLE OF PROJECT:
Long-Baseline Neutrino Facility/Deep Underground Neutrino Experiment Central Monorail Hoist Commissioning
This Amendment is to provide answers from questions received via email 08/04/2025.
Question: Please clarify if FFDG would like the awardee to procure bus bar for the central monorail hoists that are already purchased. Amendment 05 states that a different subcontractor will install this bus bar however it is not clear if the materials are already purchased or if FFDG wishes the awardee to procure this bus bar.
Answer: The bus bars are going to be procured and installed by another Subcontractor on the project. The awardee for the Central Monorail Hoist Installation and Commissioning will have input on the installation to ensure that there are no concerns.
Question: Will FFDG provide weight for the load testing of hoists?
Answer: The load Test Certification that is required for the Columbus McKinnon Hoist is included in the Statement of Work Appendix B. This has been determined based on the manufacturer requirements for the model FEW20-92MT15L4 the 20 ton capacity Yale Cable King Electric Wire Rope Hoist. There will still be a load test performed by the chosen Subcontractor once the hoists have been installed. This will most likely be done with water bags provided by the Subcontractor.
Fermi Forward Discovery Group, LLC.
630 East Summit Street Lead, SD 57754 M.S 123
Bridget Fugett LBNF Procurement Specialist (815)-245-9847
File details come from the government source that posted it. Updated .