Revised_Drawings.pdf

PDF 12 MB Posted

Attached to
RECOVERY: Dinkey Mill Barracks Project Federal contract opportunity
Solicitation number
RFP-AG-9702-S-10-0008
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Southwest

About this file

Amendment_2_Revised Drawings

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY: Dinkey Mill Barracks Project, newest first.
File Type Posted
Amendment 4.pdf PDF
Amendment 3.pdf PDF
Revised_Specifications Part 1.pdf PDF
Amendment 2_SF_30.pdf PDF
Amendment_1.pdf PDF
Attachment_1_Specifications Part 1.pdf PDF
Attachment_4_Davis Bacon.pdf PDF
Attachment_3_Drawings.pdf PDF
Attachment_2_Specifications Part 2.pdf PDF
Attachment_5_SF_24_Bid Bond.pdf PDF
!Solicitation.pdf PDF
Attachment_6_PAL Fire Plan_jun2006.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET OF

DRAWING

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

A/E

F O

R E

S T

D R

A W

IN

G

P R

O

JE

C T

N A

M E

N A

M E

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO. REVISIONS

R5

SERVICE

U S D A

P S

W D

IN

K

Y M

IL

L

W O

R K

C E

N

TE

R B

A R

R A

C K

S

C O

V E

R S

H E

E T

T1.0

06/06/2008

P A

C

IF

IC

S

O U

TH

W

E S

T E

X P

E R

IM

E

N T

S

TA

TI

O

N

1 23

APPROVED

CHECKED BY

DATE

CHECKED BY

DATE

CHECKED BY

DATE

REGIONAL ENGINEER

DATE

RECOMMEND

CHECKED BY

DATE

CHECKED BY

DATE

CHECKED BY

DATE

FOREST ENGINEER

DATE

FOREST SUPERVISOR

DATE

CIM-2721-1 PSW DINKEY MILL BARRACKS

N

IC

BARRACKS 1

B A

R R

A C

K S

BARRACKS 6

B A

R R

A C

K S

A G

G R

EG

A

TE

SU

R

FA

C E

NIC

A A

A

A

SHEET OF

DRAWING

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

A/E

F O

R E

S T

D R

A W

IN

G

P R

O

JE

C T

N A

M E

N A

M E

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO. REVISIONS

R5

SERVICE

U S D A

D

IN

K E

Y M

IL

L

W O

R K

C E

N

TE

R

S E

P

TI

C /G

A S

S Y

S

TE

M F

O R

B A

R R

A C

K S

AS NOTED

05/2009

USFS

GGG

S

IE

R R

A N

A T

IO

N

A L

F O

R E

S T

X

Y 2 269 600

X

X

Y 2 270 000

X

Y 2 270 400

X

Y 2 270 800

X

Y 2 271 200

X

X

X

X

X

X

Y 2 269 600

X

Y 2 270 000

X

Y 2 270 400

X

Y 2 270 800

X

Y 2 271 200

X

TANK

MEADOW

ASPH

DINKEY

C R

EEK

R

O A

D

CREEK

ASPH

BARRACKS 1

B A

R R

A C

K S

BARRACKS 3

BARRACKS 6

B A

R R

A C

K S

SHEET OF

DRAWING

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

A/E

F O

R E

S T

D R

A W

IN

G

P R

O

JE

C T

N A

M E

N A

M E

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO. REVISIONS

R5

SERVICE

U S D A

D

IN

K E

Y M

IL

L

W O

R K

C E

N

TE

R

S

IT

E U

TI

LI

TY

P

LA

N

CU1

AS NOTED

05/2008

USFS

GGG

S

IE

R R

A N

A T

IO

N

A L

F O

R E

S T

BARRACKS 1

B A

R R

A C

K S

BARRACKS 3

BARRACKS 6

B A

R R

A C

K S

SHEET OF

DRAWING

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

A/E

F O

R E

S T

D R

A W

IN

G

P R

O

JE

C T

N A

M E

N A

M E

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO. REVISIONS

R5

SERVICE

U S D A

D

IN

K E

Y M

IL

L

W O

R K

C E

N

TE

R

S

IT

E W

A

TE

R

CU3

AS NOTED

05/2008

USFS

GGG

U3

S

IE

R R

A N

A T

IO

N

A L

F O

R E

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

A/E

FO

R

ES

T:

D R

A W

IN

G

PR

O

JE

C

T N

A M

E:

N A

M E:

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO.

REVISIONS

R5

SERVICE

U S D A

PA

C

IF

IC

S O

U

TH

W

ES

T R

EG

IO

N

S

TA

N D

A R

D B

A R

R A

C K

S D

E S

IG

N

KI

JL

PJC

PJC

4/20/2010

S1.0

S

TR

U C

TU

R

A L

G E

N E

R A

L N

O

TE

NONE

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

A/E

FO

R

ES

T:

D R

A W

IN

G

PR

O

JE

C

T N

A M

E:

N A

M E:

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO.

REVISIONS

R5

SERVICE

U S D A

PA

C

IF

IC

S O

U

TH

W

ES

T R

EG

IO

N

S

TA

N D

A R

D B

A R

R A

C K

S D

E S

IG

N

KI

JL

PJC

PJC

4/20/2010

S2.0

FO

U

N D

A

TI

O N

P

LA

N

@ 11"x17"

1/8" = 1'-0"

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

A/E

FO

R

ES

T:

D R

A W

IN

G

PR

O

JE

C

T N

A M

E:

N A

M E:

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO.

REVISIONS

R5

SERVICE

U S D A

PA

C

IF

IC

S O

U

TH

W

ES

T R

EG

IO

N

S

TA

N D

A R

D B

A R

R A

C K

S D

E S

IG

N

KI

JL

PJC

PJC

4/20/2010

S2.1

S

LA

B L

A

YO

U T

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

A/E

FO

R

ES

T:

D R

A W

IN

G

PR

O

JE

C

T N

A M

E:

N A

M E:

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO.

REVISIONS

R5

SERVICE

U S D A

PA

C

IF

IC

S O

U

TH

W

ES

T R

EG

IO

N

S

TA

N D

A R

D B

A R

R A

C K

S D

E S

IG

N

KI

JL

PJC

PJC

4/20/2010

S2.2

FO

U

N D

A

TI

O N

D E

TA

IL

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

A/E

FO

R

ES

T:

D R

A W

IN

G

PR

O

JE

C

T N

A M

E:

N A

M E:

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO.

REVISIONS

R5

SERVICE

U S D A

PA

C

IF

IC

S O

U

TH

W

ES

T R

EG

IO

N

S

TA

N D

A R

D B

A R

R A

C K

S D

E S

IG

N

KI

JL

PJC

PJC

4/20/2010

S3.0

R O

O F

P

LA

N

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

A/E

FO

R

ES

T:

D R

A W

IN

G

PR

O

JE

C

T N

A M

E:

N A

M E:

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO.

REVISIONS

R5

SERVICE

U S D A

PA

C

IF

IC

S O

U

TH

W

ES

T R

EG

IO

N

S

TA

N D

A R

D B

A R

R A

C K

S D

E S

IG

N

KI

JL

PJC

PJC

4/20/2010

S3.1

R O

O F

D E

TA

IL

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

A/E

FO

R

ES

T:

D R

A W

IN

G

PR

O

JE

C

T N

A M

E:

N A

M E:

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO.

REVISIONS

R5

SERVICE

U S D A

PA

C

IF

IC

S O

U

TH

W

ES

T R

EG

IO

N

S

TA

N D

A R

D B

A R

R A

C K

S D

E S

IG

N

KI

JL

PJC

PJC

4/20/2010

S4.0

TY

P

IC

A

L

FR

A M

IN

G

S C

H E

D U

LE

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

A/E

FO

R

ES

T:

D R

A W

IN

G

PR

O

JE

C

T N

A M

E:

N A

M E:

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO.

REVISIONS

R5

SERVICE

U S D A

PA

C

IF

IC

S O

U

TH

W

ES

T R

EG

IO

N

S

TA

N D

A R

D B

A R

R A

C K

S D

E S

IG

N

KI

JL

PJC

PJC

4/20/2010

S4.1

TY

P

IC

A

L

FR

A M

IN

G

D E

TA

IL

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

A/E

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO. REVISIONS

R5

SERVICE

U S D A

D

IN

K E

Y M

IL

L

B A

R R

A C

K S

LE

G

E N

D ,S

C H

E D

U

LE

,N O

TE

S

M1.0

AS NOTED

03/15/2010

W DEBOER

W DEBOER

S

IE

R R

A N

A T

IO

N

A L

F O

R E

NOTE: SEAL ALL CABINET TO CABINET AND

DUCTWORK TO CABINET CONNECTIONS

WITH MASTIC.

FURNACE

1-5/8" FRAMING CHANNEL SUPPORT FRAME,

LENGTHWISE UNDER BACK AND FRONT (BEHIND

NOTE: IF LOCAL CODES REQUIRE, INSTALL 24 GA. MIN GALVANIZED STEEL PAN

WITH 2" LIP UNDER ENTIRE FURNACE. INSTALL OVERFLOW DRAIN LINE TO

NOTICEABLE LOCATION; VERIFY WITH COR.

USE 1x1x1/8" (MIN) CLIP ANGLE FOR ATACHMENT

FLEXIBLE CONNECTOR, TYP.

ELECTRICAL CONNECTION

& DISCONNECT NOT SHOWN

PVC INTAKE AND VENT PIPING UP TO CONCENTRIC VENT/INTAKE TERMINATION KIT.

LOCATE CLOSE TO THE RIDGELINE, FLASH UP UNDER THE ROOF RIDGE CAP IF POSSIBLE

AND EXTEND ABOVE THE SNOW LEVEL. SUPPORT BOTH VERTICALLY AND LATERALLY,

INDEPENDENT OF THE FURNACE. INSULATE AS REQUIRED BY THE MANUFACTURER.

GAS CONNECTION WITH

DRIP LEG, FLEXIBLE

CONNECTOR & PLUGGED

TEST TAP.

SPRING HANGERS, MASON

INDUSTRIES TYPE HS, SIZED

FOR HANGER LOAD.

CONDENSATE TRAP) AND TRANSVERSE AS REQUIRED

SO SUPPORT RODS ARE NOT IN FRONT OF FURNACE

TO RAFTERS OR BLOCKING BETWEEN RAFTERS

HANGERS UNDER ENTIRE DUCT, TYP.

STRAP HANGERS PER SMACNA; LOOP

OR ACCESS PANELS. BOTTOM OF FURNACE AND

EVAPORATOR

COIL

LINED CANS ABOVE RETURN GRILLES WITH SHEET METAL NOSE ON

LEADING EDGE OF LINER. TOP OF CAN SAME HEIGHT AS TOP OF

FURNACE RETURN AIR PLENUM. USE 14X25 GRILLES AND 14"Ø BRANCH

DUCTS WHERE TRUSSES ARE 16" O.C.

LINED SUPPLY AND RETURN PLENUMS, EACH MINIMUM 48" LONG.

COMPLETELY SEAL ALL DUCT CUT-IN AND DOVETAIL CONNECTIONS,

INCLUDING ALL CUT EDGES OF DUCTLINER.

3/4" SCHD 40 PVC DRAIN LINE WITH ELBOW AND PIPE INCREASER

FOR INDIRECT WASTE RECEPTOR FOR BOTH FURNACE AND COOLING

COIL CONDENSATE DRAIN LINES; 2% SLOPE ALONG ENTIRE LENGTH.

ROUTE CONTINUOUSLY SUPPORTED ABOVE PLYWOOD ATTIC FLOOR

OVER TO WALL, DOWN IN THE WALL, THEN OUT APPROXIMATELY 6"

ABOVE THE FLOOR AND ELBOW DOWN TO FLOOR DRAIN IN CLOSET.

SUPPORT STUB OUT WITH UNISTRUT AND CLAMPS; SEE DETAIL

5/P3.1. ROUTE SECONDARY EVAPORATOR COIL DRAIN LINE (3/4"

COPPER) OVER AND STUB DOWN THROUGH THE CEILING ABOVE THE

SAME FLOOR DRAIN. DO NOT EXTEND THE LINE DOWN TO THE DRAIN;

TRIM THE STUB BELOW THE CEILING WITH A CHROME ESCUTCHEON.

MOUNT A SIGN ON THE WALL ADJACENT TO THE FAN SWITCH; SIGN

SHALL BE BLACK PHENOLIC WITH MINIMUM 1/4" HIGH ENGRAVED WHITE

LETTERS: "THIS FAN IS PART OF THE BUILDING VENTILATION SYSTEM,

AND SHOULD REMAIN ON CONTINUOUSLY DURING SCHEDULED

OCCUPIED PERIODS.

LINED RETURN AIR PLENUM, I.D. FULL SIZE OF FURNACE CABINET

OPENING, MINIMUM 4' LONG.

TAPERED SHEET METAL TRANSITION FROM FURNACE DUCT FLANGES TO

COIL CABINET INLET; DO NOT USE FILLER PLATE (NO ABRUPT

TRANSITION); NO LINING; EXTERNAL DUCT WRAP ONLY.

BOTTOM OF EVAPORATOR COIL AT SAME ELEVATION.

NO SPRINKLER PIPING IN THIS PORTION OF THE ATTIC TRUSSES, EXCEPT

LENGTHWISE ALONG VERTICAL TRUSS MEMBERS. ANY TRANSVERSE

PIPING MUST BE DOWN LOW, BETWEEN LOWER TRUSS CHORDS, OR UP

HIGH BETWEEN HORIZONTAL TOP TRUSS MEMBER

FAN COIL INSTALLATION IS SIMILAR, WITH PLENUM LENGTHS ADJUSTED

TO FIT THE MECHANICAL PLAN, AND A TAPERED TRANSITION BETWEEN

THE FAN COIL DISCHARGE FLANGES AND THE LINED SUPPLY PLENUM.

MINIMUM CLEAR INSIDE DIMENSIONS OF LINED SUPPLY PLENUM IS 18"W

x 22-3/4"H. TRANSITION HAS DUCT WRAP, NO DUCTLINER. PLENUM

O.D. IS LARGER THAN TRANSITION AT THE JUNCTION, PROTECTING THE

EDGE OF THE DUCTLINER; LOOK IS SIMILAR TO THAT SHOWN WHERE

TRANSITION FROM FURNACE MEETS THE EVAPORATOR COIL CABINET.

SHEET OF

DRAWING

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

A/E

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO. REVISIONS

R5

SERVICE

U S D A

D

IN

K E

Y M

IL

L

B A

R R

A C

K S

M E

C H

A N

IC

A

L P

LA

N

M2.0

AS NOTED

03/15/2010

W DEBOER

W DEBOER

S

IE

R R

A N

A T

IO

N

A L

F O

R E

File details come from the government source that posted it. Updated .