Attachment_4_Davis Bacon
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 4.pdf | ||
| Amendment 3.pdf | ||
| Revised_Drawings.pdf | ||
| Revised_Specifications Part 1.pdf | ||
| Amendment 2_SF_30.pdf | ||
| Amendment_1.pdf | ||
| !Solicitation.pdf | ||
| Attachment_6_PAL Fire Plan_jun2006.pdf | ||
| Attachment_1_Specifications Part 1.pdf | ||
| Attachment_3_Drawings.pdf | ||
| Attachment_2_Specifications Part 2.pdf | ||
| Attachment_5_SF_24_Bid Bond.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL DECISION: CA20100029 03/12/2010 CA29
Date: March 12, 2010
General Decision Number: CA20100029 03/12/2010
Superseded General Decision Number: CA20080029
State: California
Construction Types: Building, Heavy (Heavy and Dredging) and
Highway
Counties: Alameda, Calaveras, Contra Costa, Fresno, Kings, Madera, Mariposa, Merced, Monterey, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus and
Tuolumne Counties in California.
BUILDING CONSTRUCTION PROJECTS; DREDGING PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); HIGHWAY CONSTRUCTION PROJECTS
Modification Number Publication Date
0 03/12/2010
ASBE0016-001 01/01/2010
AREA 1: ALAMEDA, CONTRA COSTA, LAKE, MARIN, MENDOCINO,
MONTEREY, NAPA, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA
CLARA, SANTA CRUZ, SOLANO, & SONOMA COUNTIES
AREA 2: ALPINE, AMADOR, BUTTE, CALAVERAS, COLUSA, DEL NORTE,
EL DORADO, FRESNO, GLENN, HUMBOLDT, KINGS, LASSEN, MADERA,
MARIPOSA, MERCED, MODOC, MONO, NEVADA, PLACER, PLUMAS,
SACRAMENTO, SAN JOAQUIN, SHASTA, SIERRA, SISKIYOU, STANISLAU,
SUTTER, TEHEMA, TRINITY, TULARE, TUOLUMNE, YOLO, & YUBA COUNTIES
Rates Fringes
Asbestos Workers/Insulator
(Includes the application of all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems)
Area 1......................$ 50.43 16.66
Area 2......................$ 39.78 16.66
ASBE0016-004 01/01/2010
Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)....$ 15.18 2.80
BOIL0549-001 01/01/2009
AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA
CLARA COUNTIES
AREA 2: REMAINING COUNTIES
BOILERMAKER
Area 1......................$ 40.17 22.32
Area 2......................$ 37.01 22.25
BRCA0003-001 08/01/2008
MARBLE FINISHER..................$ 28.02 12.12
BRCA0003-003 08/01/2008
MARBLE MASON.....................$ 39.22 18.58
BRCA0003-005 05/01/2009
BRICKLAYER
( 1) Fresno, Kings, Madera, Mariposa, Merced....$ 32.74 16.81
( 7) San Francisco, San
Mateo.......................$ 38.73 18.97
( 8) Alameda, Contra
Costa, San Benito, Santa
Clara.......................$ 38.01 17.39
( 9) Calaveras, San
Joaquin, Stanislaus, Toulumne....................$ 33.49 16.00
(16) Monterey, Santa Cruz...$ 34.04 20.14
BRCA0003-008 07/01/2009
TERRAZZO FINISHER................$ 30.25 11.57
TERRAZZO WORKER/SETTER...........$ 38.93 19.32
BRCA0003-011 04/01/2009
AREA 1: Alameda, Contra Costa, Monterey, San Benito, San
Francisco, San Mateo, Santa Clara, Santa Cruz
AREA 2: Calaveras, San Joaquin, Stanislaus, Tuolumne
AREA 3: Fresno, Kings, Madera, Mariposa, Merced
TILE FINISHER
Area 1......................$ 21.34 10.89
Area 2......................$ 21.16 11.02
Area 3......................$ 20.85 10.16
Tile Layer
Area 1......................$ 38.51 12.17
Area 2......................$ 34.31 12.12
Area 3......................$ 29.70 11.46
CARP0034-001 07/01/2009
Diver
Assistant Tender, ROV
Tender/Technician...........$ 35.75 24.16
Diver standby...............$ 40.33 24.16
Diver Tender................$ 39.33 24.16
Diver wet...................$ 80.66 24.16
Manifold Operator (mixed gas)........................$ 44.33 24.16
Manifold Operator (Standby).$ 39.33 24.16
DEPTH PAY (Surface Diving):
050 to 100 ft $2.00 per foot
101 to 150 ft $3.00 per foot
151 to 220 ft $4.00 per foot
SATURATION DIVING:
The standby rate shall apply until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. The diver rate shall be paid for all saturation hours.
DIVING IN ENCLOSURES:
Where it is necessary for Divers to enter pipes or tunnels, or other enclosures where there is no vertical ascent, the following premium shall be paid: Distance traveled from entrance 26 feet to 300 feet: $1.00 per foot. When it is necessary for a diver to enter any pipe, tunnel or other enclosure less than 48" in height, the premium will be
$1.00 per foot.
WORK IN COMBINATION OF CLASSIFICATIONS:
Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.
CARP0034-003 07/01/2009
Piledriver.......................$ 35.75 24.16
CARP0035-002 07/01/2009
AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa
Clara counties
AREA 2: Monterey, San Benito, Santa Cruz Counties
AREA 4: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, San
Joaquin, Stanislaus, Tuolumne Counties
CARPENTER
AREA 1:
(1) Carpenter..............$ 36.50 20.96
(2) Hardwood Floorlayer;
Shingler; Power Saw
Operator; Steel Scaffold
& Steel Shoring Erector;
Saw Filer..................$ 36.65 20.96
(3) Bridge Builder.........$ 36.50 20.96
(4) Millwright.............$ 36.60 22.55
AREA 2:
(1) Carpenter..............$ 30.62 20.96
(2) Hardwood Floorlayer;
Shingler; Power Saw
Operator; Steel Scaffold
& Steel Shoring Erector;
Saw Filer..................$ 30.77 20.96
(3) Bridge Builder.........$ 36.50 20.96
(4) Millwright.............$ 33.12 22.55
AREA 4:
(1) Carpenter..............$ 29.27 20.96
(2) Hardwood Floorlayer;
Shingler; Power Saw
Operator; Steel Scaffold
& Steel Shoring Erector;
Saw Filer..................$ 29.42 20.96
(3) Bridge Builder.........$ 36.50 20.96
(4) Millwright.............$ 31.77 22.55
CARP0035-007 07/01/2009
AREA 3: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, San
Modular Furniture Installer
Area 1
Installer I................$ 21.60 13.89
Installer II...............$ 18.17 13.89
Lead Installer.............$ 25.05 14.39
Master Installer...........$ 29.27 14.39
Area 2
Installer I................$ 18.95 13.89
Installer II...............$ 16.00 14.39
Lead Installer.............$ 21.92 14.39
Master Installer...........$ 25.55 14.39
Area 3
Installer I................$ 18.00 13.89
Installer II...............$ 15.23 13.89
Lead Installer.............$ 20.80 14.39
Master Installer...........$ 24.22 14.39
CARP0035-008 08/01/2009
AREA 4: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, San
Drywall Installers/Lathers:
Area 1......................$ 36.50 21.40
Area 2......................$ 30.62 21.40
Area 4......................$ 29.77 21.40
Drywall Stocker/Scrapper
Area 1......................$ 18.25 13.29
Area 2......................$ 15.31 13.29
Area 4......................$ 14.89 13.29
ELEC0006-001 12/01/2008
ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO,
SAN MATEO, SANTA CLARA, AND SANTA CRUZ COUNTIES
Sound & Communications
Installer...................$ 29.87 3%+11.95
Technician..................$ 34.01 3%+11.95
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.
ELEC0006-007 06/01/2009
SAN FRANCISCO COUNTY
ELECTRICIAN......................$ 53.05 21.685
ELEC0006-008 12/01/2006
CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN
JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES
Communications System
Installer...................$ 23.47 3%+10.65
Technician..................$ 26.72 3%+10.65
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.
ELEC0100-002 12/01/2009
FRESNO, KINGS, AND MADERA COUNTIES
ELECTRICIAN......................$ 32.35 3%+14.70
ELEC0100-005 12/01/2008
FRESNO, KINGS, MADERA
Communications System
Installer...................$ 26.24 3%+11.95
Technician..................$ 29.88 3%+11.95
SCOPE OF WORK
Includes the installation testing, service and maintenance, of the following systems which utilize the transmission and/or transference of voice, sound, vision and digital for commercial, education, security and entertainment purposes for the following: TV monitoring and surveillance, background-foreground music, intercom and telephone interconnect, inventory control systems, microwave transmission, multi-media, multiplex, nurse call system, radio page, school intercom and sound, burglar alarms, and low voltage master clock systems.
A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS
Background foreground music, Intercom and telephone interconnect systems, Telephone systems Nurse call systems, Radio page systems, School intercom and sound systems, Burglar alarm systems, Low voltage, master clock systems, Multi-media/multiplex systems, Sound and musical entertainment systems, RF systems, Antennas and Wave Guide, B. FIRE ALARM SYSTEMS Installation, wire pulling and testing
C. TELEVISION AND VIDEO SYSTEMS Television monitoring and surveillance systems Video security systems, Video entertainment systems, Video educational systems, Microwave transmission systems, CATV and CCTV
D. SECURITY SYSTEMS Perimeter security systems Vibration sensor systems Card access systems Access control systems, Sonar/infrared monitoring equipment
E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE
INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO
THE ABOVE LISTED SYSTEMS SCADA (Supervisory Control and
Data Acquisition) PCM (Pulse Code Modulation) Inventory
Control Systems, Digital Data Systems Broadband and
Baseband and Carriers Point of Sale Systems, VSAT Data
Systems Data Communication Systems RF and Remote Control
Systems, Fiber Optic Data Systems
WORK EXCLUDED Raceway systems are not covered (excluding
Ladder-Rack for the purpose of the above listed systems).
Chases and/or nipples (not to exceed 10 feet) may be installed on open wiring systems. Energy management systems. SCADA (Supervisory Control and Data Acquisition) when not intrinsic to the above listed systems (in the scope). Fire alarm systems when installed in raceways
(including wire and cable pulling) shall be performed at the electrician wage rate, when either of the following two
(2) conditions apply:
1. The project involves new or major remodel building trades construction.
2. The conductors for the fire alarm system are installed in conduit.
ELEC0234-001 06/01/2009
MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES
ELECTRICIAN......................$ 39.48 3%+19.92
ELEC0302-001 06/01/2009
CONTRA COSTA COUNTY
CABLE SPLICER....................$ 51.36 3%+18.75
ELECTRICIAN......................$ 45.21 3%+18.75
* ELEC0332-001 11/30/2009
SANTA CLARA COUNTY
CABLE SPLICER....................$ 54.71 3%+22.28
ELECTRICIAN......................$ 47.57 3%+21.28
FOOTNOTES: Work under compressed air or where gas masks are required, orwork on ladders, scaffolds, stacks, "Bosun's chairs," or other structures and where the workers are not protected by permanent guard rails at a distance of 40 to
60 ft. from the ground or supporting structures: to be paid one and one-half times the straight-time rate of pay.
Work on structures of 60 ft. or over (as described above):
to be paid twice the straight-time rate of pay.
ELEC0595-001 06/01/2009
ALAMEDA COUNTY
CABLE SPLICER....................$ 50.06 3%+22.25
ELECTRICIAN......................$ 44.50 3%+22.25
ELEC0595-002 12/01/2009
CALAVERAS AND SAN JOAQUIN COUNTIES
CABLE SPLICER....................$ 37.13 7.5%+20.04
ELECTRICIAN
(1) Tunnel work.............$ 34.65 7.5%+20.04
(2) All other work.........$ 33.00 7.5%+20.04
ELEC0617-001 06/01/2009
SAN MATEO COUNTY
ELECTRICIAN......................$ 50.00 20.83
ELEC0684-001 01/01/2010
MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES
ELECTRICIAN......................$ 34.10 3%+16.90
CABLE SPLICER = 110% of Journeyman Electrician
ELEC1245-001 06/01/2009
LINE CONSTRUCTION
(1) Lineman; Cable splicer..$ 44.47 13.11
(2) Equipment specialist
(operates crawler tractors, commercial motor vehicles, backhoes, trenchers, cranes (50 tons and below), overhead & underground distribution line equipment)...........$ 35.52 12.07
(3) Groundman...............$ 27.17 11.82
(4) Powderman...............$ 39.71 12.23
HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day
ELEV0008-001 01/01/2010
ELEVATOR MECHANIC................$ 54.89 20.035
FOOTNOTE:
PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service.
PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after
Thanksgiving, and Christmas Day.
ENGI0003-008 07/01/2009
Dredging: (DREDGING:
CLAMSHELL & DIPPER DREDGING;
HYDRAULIC SUCTION DREDGING:)
AREA 1:
(1) Leverman...............$ 38.94 22.58
(2) Dredge Dozer; Heavy duty repairman.............$ 33.98 22.58
(3) Booster Pump
Operator; Deck
Engineer; Deck mate;
Dredge Tender; Winch
Operator...................$ 32.86 22.58
(4) Bargeman; Deckhand;
Fireman; Leveehand; Oiler..$ 29.56 22.58
AREA 2:
(1) Leverman...............$ 40.94 22.58
(2) Dredge Dozer; Heavy duty repairman.............$ 35.98 22.58
(3) Booster Pump
Operator; Deck
Engineer; Deck mate;
Dredge Tender; Winch
Operator...................$ 34.86 22.58
(4) Bargeman; Deckhand;
Fireman; Leveehand; Oiler..$ 31.56 22.58
AREA DESCRIPTIONS
AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED,
NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN,
SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS,
SUTTER, YOLO, AND YUBA COUNTIES
AREA 2: MODOC COUNTY
THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2
AS NOTED BELOW:
ALPINE COUNTY:
Area 1: Northernmost part
Area 2: Remainder
CALAVERAS COUNTY:
Area 1: Remainder
Area 2: Eastern part
COLUSA COUNTY:
Area 1: Eastern part
ELDORADO COUNTY:
Area 1: North Central part
FRESNO COUNTY:
GLENN COUNTY:
LASSEN COUNTY:
Area 1: Western part along the Southern portion of border with Shasta County
MADERA COUNTY:
Area 1: Except Eastern part
MARIPOSA COUNTY
MONTERREY COUNTY
Area 1: Except Southwestern part
Area 2: Southwestern part
NEVADA COUNTY:
Area 1: All but the Northern portion along the border of
Sierra County
PLACER COUNTY:
Area 1: Al but the Central portion
PLUMAS COUNTY:
Area 1: Western portion
SHASTA COUNTY:
Area 1: All but the Northeastern corner
SIERRA COUNTY:
Area 1: Western part
SISKIYOU COUNTY:
Area 1: Central part
SONOMA COUNTY:
Area 1: All but the Northwestern corner
TEHAMA COUNTY:
Area 1: All but the Western border with Mendocino & Trinity
Counties
TRINITY COUNTY:
Area 1: East Central part and the Northeastern border with
Shasta County
TUOLUMNE COUNTY:
Area 2: Eastern part
ENGI0003-018 06/29/2009
"AREA 1" WAGE RATES ARE LISTED BELOW
"AREA 2" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1
RATES.
SEE AREA DEFINITIONS BELOW
OPERATOR: Power Equipment
(Undefined) (AREA 1:)
GROUP 1.....................$ 37.77 21.69
GROUP 2.....................$ 36.24 21.69
GROUP 3.....................$ 34.76 21.69
GROUP 4.....................$ 33.38 21.69
GROUP 5.....................$ 32.11 21.69
GROUP 6.....................$ 30.79 21.69
GROUP 7.....................$ 29.65 21.69
GROUP 8.....................$ 28.51 21.69
GROUP 8-A...................$ 28.30 21.69
OPERATOR: Power Equipment
(Undefined) (Cranes and
Attachments - AREA 1:)
GROUP 1
Cranes.....................$ 38.65 21.69
Oiler......................$ 29.39 21.69
Truck crane oiler..........$ 31.68 21.69
GROUP 2
Cranes.....................$ 36.89 21.69
Oiler......................$ 29.18 21.69
Truck crane oiler..........$ 31.42 21.69
GROUP 3
Cranes.....................$ 35.14 21.69
Hydraulic..................$ 30.79 21.69
Oiler......................$ 28.90 21.69
Truck Crane Oiler..........$ 31.18 21.69
OPERATOR: Power Equipment
(Undefined) (Piledriving -
AREA 1:)
GROUP 1
Lifting devices............$ 38.99 21.69
Oiler......................$ 29.73 21.69
Truck crane oiler..........$ 32.01 21.69
GROUP 2
Lifting devices............$ 37.17 21.69
Oiler......................$ 29.46 21.69
Truck Crane Oiler..........$ 31.76 21.69
GROUP 3
Lifting devices............$ 35.49 21.69
Oiler......................$ 29.24 21.69
Truck Crane Oiler..........$ 31.47 21.69
GROUP 4.....................$ 33.72 21.69
GROUP 5.....................$ 31.08 21.69
GROUP 6.....................$ 28.85 21.69
OPERATOR: Power Equipment
(Undefined) (Steel Erection -
AREA 1:)
GROUP 1
Cranes.....................$ 39.62 21.69
Oiler......................$ 30.07 21.69
Truck Crane Oiler..........$ 32.30 21.69
GROUP 2
Cranes.....................$ 37.85 21.69
Oiler......................$ 29.80 21.69
Truck Crane Oiler..........$ 32.08 21.69
GROUP 3
Cranes.....................$ 36.37 21.69
Hydraulic..................$ 31.42 21.69
Oiler......................$ 29.58 21.69
Truck Crane Oiler..........$ 31.81 21.69
GROUP 4.....................$ 34.35 21.69
GROUP 5.....................$ 33.05 21.69
(Undefined) (Tunnel and
Underground Work - AREA 1:)
SHAFTS, STOPES, RAISES:
GROUP 1....................$ 33.87 21.69
GROUP 1-A..................$ 36.34 21.69
GROUP 2....................$ 32.61 21.69
GROUP 3....................$ 31.28 21.69
GROUP 4....................$ 30.14 21.69
GROUP 5....................$ 29.00 21.69
UNDERGROUND:
GROUP 1....................$ 33.77 21.69
GROUP 1-A..................$ 36.24 21.69
GROUP 2....................$ 32.51 21.69
GROUP 3....................$ 31.18 21.69
GROUP 4....................$ 30.04 21.69
GROUP 5....................$ 28.90 21.69
FOOTNOTE: Work suspended by ropes or cables, or work on a
Yo-Yo Cat: $.60 per hour additional.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Operator of helicopter (when used in erection work);
Hydraulic excavator, 7 cu. yds. and over; Power shovels, over 7 cu. yds.
GROUP 2: Highline cableway; Hydraulic excavator, 3-1/2 cu.
yds. up to 7 cu. yds.; Licensed construction work boat operator, on site; Power blade operator (finish); Power shovels, over 1 cu. yd. up to and including 7 cu. yds.
m.r.c.
GROUP 3: Asphalt milling machine; Cable backhoe; Combination backhoe and loader over 3/4 cu. yds.; Continuous flight tie back machine assistant to engineer or mechanic; Crane mounted continuous flight tie back machine, tonnage to apply; Crane mounted drill attachment, tonnage to apply;
Dozer, slope brd; Gradall; Hydraulic excavator, up to 3 1/2
cu. yds.; Loader 4 cu. yds. and over; Long reach excavator;
Multiple engine scraper (when used as push pull); Power shovels, up to and including 1 cu. yd.; Pre-stress wire wrapping machine; Side boom cat, 572 or larger; Track loader 4 cu. yds. and over; Wheel excavator (up to and including 750 cu. yds. per hour)
GROUP 4: Asphalt plant engineer/box person; Chicago boom;
Combination backhoe and loader up to and including 3/4 cu.
yd.; Concrete batch plant (wet or dry); Dozer and/or push cat; Pull- type elevating loader; Gradesetter, grade checker (GPS, mechanical or otherwise); Grooving and grinding machine; Heading shield operator; Heavy-duty drilling equipment, Hughes, LDH, Watson 3000 or similar;
Heavy-duty repairperson and/or welder; Lime spreader;
Loader under 4 cu. yds.; Lubrication and service engineer
(mobile and grease rack); Mechanical finishers or spreader machine (asphalt, Barber-Greene and similar); Miller
Formless M-9000 slope paver or similar; Portable crushing and screening plants; Power blade support; Roller operator, asphalt; Rubber-tired scraper, self-loading (paddle-wheels, etc.); Rubber- tired earthmoving equipment (scrapers); Slip form paver (concrete); Small tractor with drag; Soil stabilizer (P & H or equal); Spider plow and spider puller;
Tubex pile rig; Unlicensed constuction work boat operator, on site; Timber skidder; Track loader up to 4 yds.;
Tractor-drawn scraper; Tractor, compressor drill combination; Welder; Woods-Mixer (and other similar Pugmill equipment)
GROUP 5: Cast-in-place pipe laying machine; Combination slusher and motor operator; Concrete conveyor or concrete pump, truck or equipment mounted; Concrete conveyor, building site; Concrete pump or pumpcrete gun; Drilling equipment, Watson 2000, Texoma 700 or similar; Drilling and boring machinery, horizontal (not to apply to waterliners, wagon drills or jackhammers); Concrete mixer/all; Person and/or material hoist; Mechanical finishers (concrete)
(Clary, Johnson, Bidwell Bridge Deck or similar types);
Mechanical burm, curb and/or curb and gutter machine, concrete or asphalt); Mine or shaft hoist; Portable crusher; Power jumbo operator (setting slip-forms, etc., in tunnels); Screed (automatic or manual); Self-propelled compactor with dozer; Tractor with boom D6 or smaller;
Trenching machine, maximum digging capacity over 5 ft.
depth; Vermeer T-600B rock cutter or similar
GROUP 6: Armor-Coater (or similar); Ballast jack tamper;
Boom- type backfilling machine; Assistant plant engineer;
Bridge and/or gantry crane; Chemical grouting machine, truck-mounted; Chip spreading machine operator; Concrete saw (self-propelled unit on streets, highways, airports and canals); Deck engineer; Drilling equipment Texoma 600, Hughes 200 Series or similar up to and including 30 ft.
m.r.c.; Drill doctor; Helicopter radio operator;
Hydro-hammer or similar; Line master; Skidsteer loader, Bobcat larger than 743 series or similar (with attachments); Locomotive; Lull hi-lift or similar; Oiler, truck mounted equipment; Pavement breaker, truck-mounted, with compressor combination; Paving fabric installation and/or laying machine; Pipe bending machine (pipelines only); Pipe wrapping machine (tractor propelled and supported); Screed (except asphaltic concrete paving);
Self- propelled pipeline wrapping machine; Soils & materials tester; Tractor; Self-loading chipper; Concrete barrier moving machine
GROUP 7: Ballast regulator; Boom truck or dual-purpose
A-frame truck, non-rotating - under 15 tons; Truck-mounted rotating telescopic boom type lifting device, Manitex or similar (boom truck) - under 15 tons; Cary lift or similar;
Combination slurry mixer and/or cleaner; Drilling equipment, 20 ft. and under m.r.c.; Firetender (hot plant);
Grouting machine operator; Highline cableway signalperson;
Stationary belt loader (Kolman or similar); Lift slab machine (Vagtborg and similar types); Maginnes internal full slab vibrator; Material hoist (1 drum); Mechanical trench shield; Pavement breaker with or without compressor combination); Pipe cleaning machine (tractor propelled and supported); Post driver; Roller (except asphalt); Chip
Seal; Self-propelled automatically applied concrete curing mahcine (on streets, highways, airports and canals);
Self-propelled compactor (without dozer); Signalperson;
Slip-form pumps (lifting device for concrete forms); Tie spacer; Tower mobile; Trenching machine, maximum digging capacity up to and including 5 ft. depth; Truck- type loader
GROUP 8: Bit sharpener; Boiler tender; Box operator;
Brakeperson; Combination mixer and compressor
(shotcrete/gunite); Compressor operator; Deckhand; Fire tender; Forklift (under 20 ft.); Generator;
Gunite/shotcrete equipment operator; Hydraulic monitor; Ken seal machine (or similar); Mixermobile; Oiler; Pump operator; Refrigeration plant; Reservoir-debris tug (self-propelled floating); Ross Carrier (construction site);
Rotomist operator; Self-propelled tape machine; Shuttlecar;
Self-propelled power sweeper operator (includes vacuum sweeper); Slusher operator; Surface heater; Switchperson;
Tar pot firetender; Tugger hoist, single drum; Vacuum cooling plant; Welding machine (powered other than by electricity)
GROUP 8-A: Elevator operator; Skidsteer loader-Bobcat 743 series or smaller, and similar (without attachments); Mini excavator under 25 H.P. (backhoe-trencher); Tub grinder wood chipper
ALL CRANES AND ATTACHMENTS
GROUP 1: Clamshell and dragline over 7 cu. yds.; Crane, over
100 tons; Derrick, over 100 tons; Derrick barge pedestal-mounted, over 100 tons; Self-propelled boom-type lifting device, over 100 tons
GROUP 2: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Crane, over 45 tons up to and including 100 tons; Derrick barge, 100 tons and under;
Self-propelled boom-type lifting device, over 45 tons;
Tower crane
GROUP 3: Clamshell and dragline up to and including 1 cu.
yd.; Cranes 45 tons and under; Self-propelled boom-type lifting device 45 tons and under; Boom Truck or dual purpose A-frame truck, non-rotating over 15 tons;
Truck-mounted rotating telescopic boom type lifting device, Manitex or similar (boom truck) over 15 tons;
PILEDRIVERS
GROUP 1: Derrick barge pedestal mounted over 100 tons;
Clamshell over 7 cu. yds.; Self-propelled boom-type lifting device over 100 tons; Truck crane or crawler, land or barge mounted over 100 tons
GROUP 2: Derrick barge pedestal mounted 45 tons to and including 100 tons; Clamshell up to and including 7 cu.
yds.; Self-propelled boom-type lifting device over 45 tons;
Truck crane or crawler, land or barge mounted, over 45 tons up to and including 100 tons; Fundex F-12 hydraulic pile rig
GROUP 3: Derrick barge pedestal mounted under 45 tons; Self-propelled boom-type lifting device 45 tons and under;
Skid/scow piledriver, any tonnage; Truck crane or crawler, land or barge mounted 45 tons and under
GROUP 4: Assistant operator in lieu of assistant to engineer;
Forklift, 10 tons and over; Heavy-duty repairperson/welder
GROUP 5: Deck engineer
GROUP 6: Deckhand; Fire tender
STEEL ERECTORS
GROUP 1: Crane over 100 tons; Derrick over 100 tons; Self-propelled boom-type lifting device over 100 tons
GROUP 2: Crane over 45 tons to 100 tons; Derrick under 100 tons; Self-propelled boom-type lifting device over 45 tons to 100 tons; Tower crane
GROUP 3: Crane, 45 tons and under; Self-propelled boom-type lifting device, 45 tons and under
GROUP 4: Chicago boom; Forklift, 10 tons and over; Heavy-duty repair person/welder
GROUP 5: Boom cat
TUNNEL AND UNDERGROUND WORK
GROUP 1-A: Tunnel bore machine operator, 20' diameter or more
GROUP 1: Heading shield operator; Heavy-duty repairperson;
Mucking machine (rubber tired, rail or track type); Raised bore operator (tunnels); Tunnel mole bore operator
GROUP 2: Combination slusher and motor operator; Concrete pump or pumpcrete gun; Power jumbo operator
GROUP 3: Drill doctor; Mine or shaft hoist
GROUP 4: Combination slurry mixer cleaner; Grouting Machine operator; Motorman
GROUP 5: Bit Sharpener; Brakeman; Combination mixer and compressor (gunite); Compressor operator; Oiler; Pump operator; Slusher operator
AREA DESCRIPTIONS:
POWER EQUIPMENT OPERATORS, CRANES AND ATTACHMENTS,TUNNEL AND
UNDERGROUND [These areas do not apply to Piledrivers and
Steel Erectors]
AREA 1: ALAMEDA, BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED,
AREA 2 - MODOC COUNTY
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS
NOTED BELOW:
DEL NORTE COUNTY:
Area 1: Extreme Southwestern corner
FRESNO COUNTY
HUMBOLDT COUNTY:
Area 1: Except Eastern and Southwestern parts
LAKE COUNTY:
Area 1: Southern part
MADERA COUNTY
MENDOCINO COUNTY:
Area 1: Central and Southeastern parts
MONTEREY COUNTY
Area 1: All but the Central portion
Area 2: Reaminder
Area 1: All but the Western border with mendocino & Trinity
Area 1: East Central part and the Northeaster border with
TULARE COUNTY;
Area 2: Eastern Part
ENGI0003-019 06/29/2009
SEE AREA DESCRIPTIONS BELOW
(Undefined) (LANDSCAPE WORK
ONLY)
GROUP 1
AREA 1.....................$ 28.64 20.53
AREA 2.....................$ 30.64 20.53
GROUP 2
AREA 1.....................$ 25.04 20.53
AREA 2.....................$ 27.04 20.53
GROUP 3
AREA 1.....................$ 20.43 20.53
AREA 2.....................$ 22.43 20.53
GROUP DESCRIPTIONS:
GROUP 1: Landscape Finish Grade Operator: All finish grade work regardless of equipment used, and all equipment with a rating more than 65 HP.
GROUP 2: Landscape Operator up to 65 HP: All equipment with a manufacturer's rating of 65 HP or less except equipment covered by Group 1 or Group 3. The following equipment shall be included except when used for finish work as long as manufacturer's rating is 65 HP or less: A-Frame and
Winch Truck, Backhoe, Forklift, Hydragraphic Seeder
Machine, Roller, Rubber-Tired and Track Earthmoving
Equipment, Skiploader, Straw Blowers, and Trencher 31 HP up to 65 HP.
GROUP 3: Landscae Utility Operator: Small Rubber-Tired
Tractor, Trencher Under 31 HP.
AREA DESCRIPTIONS:
AREA 1: ALAMEDA, BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED,
AREA 2 - MODOC COUNTY
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS
NOTED BELOW:
DEL NORTE COUNTY:
Area 1: Extreme Southwestern corner
FRESNO COUNTY
HUMBOLDT COUNTY:
Area 1: Except Eastern and Southwestern parts
LAKE COUNTY:
Area 1: Southern part
MADERA COUNTY
MENDOCINO COUNTY:
Area 1: Central and Southeastern parts
MONTEREY COUNTY
Area 1: All but the Central portion
Area 2: Reaminder
Area 1: All but the Western border with mendocino & Trinity
Area 1: East Central part and the Northeaster border with
TULARE COUNTY;
Area 2: Eastern Part
IRON0002-004 07/01/2009
Ironworkers:
Fence Erector...............$ 26.58 15.24
Ornamental, Reinforcing and Structural..............$ 33.00 23.71
PREMIUM PAY:
$6.00 additional per hour at the following locations:
China Lake Naval Test Station, Chocolate Mountains Naval
Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training
Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine
Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB
$4.00 additional per hour at the following locations:
Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps
Logistics Center
$2.00 additional per hour at the following locations:
Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock
LABO0036-001 07/01/2007
SAN FRANCISCO AND SAN MATEO COUNTIES:
MASON TENDER, BRICK..............$ 26.93 16.50
FOOTNOTES: Underground work such as sewers, manholes, catch basins, sewer pipes, telephone conduits, tunnels and cut trenches: $5.00 per day additional. Work in live sewage:
$2.50 per day additional.
LABO0036-002 07/01/2007
SAN FRANCISCO AND SAN MATEO COUNTIES:
PLASTER TENDER...................$ 26.48 16.23
FOOTNOTES: Work on a suspended scaffold: $5.00 per day additional. Work operating a plaster mixer pump gun: $1.00 per hour additional.
LABO0067-002 12/01/2008
AREA "A" - ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN
MATEO AND SANTA CLARA COUNTIES
AREA "B" - ALPINE, AMADOR, BUTTE, CALAVERAS, COLUSA, DEL
NORTE, EL DORADO, FRESNO, GLENN, HUMBOLDT, KINGS, LAKE, LASSEN,
MADERA, MARIPOSA, MENDOCINO, MERCED, MODOC, MONTEREY, NAPA,
NEVADA, PLACER, PLUMAS, SACRAMENTO, SAN BENITO, SAN JOAQUIN,
SANTA CRUZ, SHASTA, SIERRA, SISKIYOU, SOLANO, SONOMA,
STANISLAUS, SUTTER, TEHAMA, TRINITY, TULARE, TUOLUMNE, YOLO AND
YUBA COUNTIES
Asbestos Removal Laborer
Areas A & B.................$ 18.08 6.60
LABORER - UNDEFINED (Lead
Removal)
Area A......................$ 34.15 6.11
Area B......................$ 33.15 6.11
ASBESTOS REMOVAL-SCOPE OF WORK: Site mobilization; initial site clean-up; site preparation; removal of asbestos-containing materials from walls and ceilings; or from pipes, boilers and mechanical systems only if they are being scrapped; encapsulation, enclosure and disposal of asbestos-containing materials by hand or with equipment or machinery; scaffolding; fabrication of temporary wooden barriers; and assembly of decontamination stations.
LABO0067-003 07/01/2009
AREA A: ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO
& SANTA CLARA
AREA B: ALPINE, AMADOR, BUTTE, CALAVERAS, COLUSA, DEL NORTE,
EL DORADO, FRESNO, GLENN, HUMBOLDT, KINGS, LAKE, LASSEN,
MADERA, MARIPOSA, MENOCINO, MERCED, MODOC, MONTEREY, NAPA,
NEVADA, PLACER, PLUMAS, SANCRMENTO, SAN BENITO, SAN JOAQUIN,
SANTA CRUZ, SIERRA, SHASTA, SISKIYOU, SOLANO, SONOMA,
STANISLAUS,TEHAMA,TRINITY, TULARE, TUOLUMNE, YOLO & YUBA
COUNTIES
LABORER - UNDEFINED (TRAFFIC
CONTROL/LANE CLOSURE)
Escort Driver, Flag Person
Area A.....................$ 26.89 14.93
Area B.....................$ 25.89 14.93
Traffic Control Person I
Area A.....................$ 27.19 14.93
Area B.....................$ 26.19 14.93
Traffic Control Person II
Area A.....................$ 24.69 14.93
Area B.....................$ 23.69 14.93
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of temporary/permanent signs, markers, delineators and crash cushions.
LABO0067-006 06/29/2009
AREA "A" - ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN
MATEO AND SANTA CLARA COUNTIES
AREA "B" - ALPINE, AMADOR, BUTTE, CALAVERAS, COLUSA, EL
DORADO, FRESNO, GLENN, KINGS, LASSEN, MADERA, MARIPOSA, MERCED,
MODOC, MONTEREY, NAPA, NEVADA, PLACER, PLUMAS, SACRAMENTO, SAN
BENITO, SAN JOAQUIN, SANTA CRUZ, SHASTA, SIERRA, SISKIYOU,
SOLANO, SONOMA, STANISLAUS, SUTTER, TEHAMA, TRINITY, TULARE,
TUOLUMNE, YOLO AND YUBA COUNTIES
Laborers: (CONSTRUCTION CRAFT
LABORERS - AREA A:)
Construction Specialist
Group.......................$ 27.84 14.93
GROUP 1.....................$ 27.14 14.93
GROUP 1-a...................$ 27.36 14.93
GROUP 1-c...................$ 27.19 14.93
GROUP 1-e...................$ 27.69 14.93
GROUP 1-f...................$ 27.72 14.93
GROUP 1-g (Contra Costa
County).....................$ 27.34 14.93
GROUP 2.....................$ 26.99 14.93
GROUP 3.....................$ 26.89 14.93
GROUP 4.....................$ 20.58 14.93
See groups 1-b and 1-d under laborer classifications.
Laborers: (CONSTRUCTION CRAFT
LABORERS - AREA B:)
Construction Specialist
Group.......................$ 26.84 14.93
GROUP 1.....................$ 26.14 14.93
GROUP 1-a...................$ 26.36 14.93
GROUP 1-c...................$ 26.19 14.93
GROUP 1-e...................$ 26.69 14.93
GROUP 1-f...................$ 26.72 14.93
GROUP 2.....................$ 25.99 14.93
GROUP 3.....................$ 25.89 14.93
GROUP 4.....................$ 19.58 14.93
See groups 1-b and 1-d under laborer classifications.
Laborers: (GUNITE - AREA A:)
GROUP 1.....................$ 28.10 14.93
GROUP 2.....................$ 27.60 14.93
GROUP 3.....................$ 27.01 14.93
GROUP 4.....................$ 26.89 14.93
Laborers: (GUNITE - AREA B:)
GROUP 1.....................$ 27.10 14.93
GROUP 2.....................$ 26.60 14.93
GROUP 3.....................$ 26.01 14.93
GROUP 4.....................$ 25.89 14.93
Laborers: (WRECKING - AREA A:)
GROUP 1.....................$ 27.14 14.93
GROUP 2.....................$ 26.99 14.93
Laborers: (WRECKING - AREA B:)
GROUP 1.....................$ 26.14 14.93
GROUP 2.....................$ 25.99 14.93
Landscape Laborer (GARDENERS, HORTICULTURAL & LANDSCAPE
LABORERS - AREA A:)
(1) New Construction........$ 26.89 14.93
(2) Establishment Warranty
Period......................$ 20.58 14.59
Landscape Laborer (GARDENERS, HORTICULURAL & LANDSCAPE
LABORERS - AREA B:)
(1) New Construction........$ 25.89 14.93
(2) Establishment Warranty
Period......................$ 19.58 14.59
FOOTNOTES:
Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers entitled to receive the wage rate set forth in Group 1-a below.
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker;
Chainsaw; Laser beam in connection with laborers' work;
Cast-in- place manhole form setter; Pressure pipelayer;
Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill;
Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2
yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches;
Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder;
Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types
(except as shown in Group 2); Ram set gun and stud gun;
Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work;
Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller;
Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder;
All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above
Group 1 wage rates. "Sewer cleaner" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage rates.
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding
GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $
.25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 1-g, CONTRA COSTA COUNTY: Pipelayer (including grade checking in connection with pipelaying); Caulker; Bander;
Pipewrapper; Conduit layer; Plastic pipe layer; Pressure pipe tester; No joint pipe and stripping of same, including repair of voids; Precast manhole setters, cast in place manhole form setters
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work);
Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew;
High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher;
Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification "material cleaner" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.
The material cleaner classification should not be used in the performance of "form stripping, cleaning and oiling and moving to the next point of erection".
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
LABO0067-010 06/29/2009
Tunnel and Shaft Laborers:
GROUP 1.....................$ 33.35 14.93
GROUP 2.....................$ 33.12 14.93
GROUP 3.....................$ 32.87 14.93
GROUP 4.....................$ 32.42 14.93
GROUP 5.....................$ 31.88 14.93
Shotcrete Specialist........$ 33.87 14.93
TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading;
Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman;
Gunite & shotcrete gunman & potman; Headermen; High pressure nozzleman; Miner - tunnel, including top and bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work);
Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang -muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
LABO0073-003 07/01/2009
CALAVERAS, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN,
STANISLAUS AND TUOLUMNE COUNTIES:
LABORER - UNDEFINED
Mason Tender-Brick..........$ 27.03 14.93
LABO0073-005 07/01/2009
JOAQUIN, STANISLAUS & TUOLUMNE
Plasterer tender.................$ 28.37 14.14
LABO0166-001 07/01/2006
ALAMEDA AND CONTRA COSTA COUNTIES:
Brick Tender.....................$ 25.91 14.65
FOOTNOTES: Work on jobs where heat-protective clothing is required: $2.00 per hour additional. Work at grinders: $.25 per hour additional. Manhole work: $2.00 per day additional.
LABO0166-002 07/01/2006
Plasterer tender.................$ 30.15 15.90
Gun Man $0.75 per hour additional
LABO0270-001 07/01/2008
SANTA CLARA & SANTA CRUZ COUNTIES
MASON TENDER, BRICK
Santa Clara.................$ 27.93 13.48
Santa Cruz..................$ 26.93 13.48
FOOTNOTE: $2.00 per hour for refactory work where heat-protective clothing is required.
LABO0270-005 07/01/2007
SANTA CLARA AND SANTA CRUZ COUNTIES
PLASTER TENDER
4 Stories and under.........$ 27.62 13.73
5 Stories and above.........$ 29.54 13.73
LABO0294-001 07/01/2009
FRESNO, KINGS AND MADERA COUNTIES
LABORER - UNDEFINED (Brick)
Mason Tender-Brick..........$ 27.03 14.93
LABO0297-001 08/01/2007
MONTEREY AND SAN BENITO COUNTIES
Plasterer tender.................$ 23.70 11.50
FOOTNOTE: Mixer person: $4.00 per day additional.
PAIN0016-001 07/01/2009
ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN MATEO, SANTA
CLARA, AND SANTA CRUZ COUNTIES
Painters:........................$ 34.00 15.87
PREMIUMS:
EXOTIC MATERIALS - $0.75 additional per hour.
SPRAY WORK: - $0.50 additional per hour.
INDUSTRIAL PAINTING - $0.25 additional per hour
[Work on industrial buildings used for the manufacture and processing of goods for sale or service; steel construction
(bridges), stacks, towers, tanks, and similar structures]
HIGH WORK:
over 50 feet - $2.00 per hour additional
100 to 180 feet - $4.00 per hour additional
Over 180 feet - $6.00 per houir additional
PAIN0016-003 01/01/2010
AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA
CLARA COUNTIES
AREA 2: CALAVERAS, MARIPOA, MERCED, MONTEREY, SAN BENITO, SAN
JOAQUIN, SANTA CRUZ, STANISLAUS & TUOLUMNE COUNTIES
Drywall Finisher/Taper
Area 1......................$ 41.16 15.68
AREA 1......................$ 40.66 16.18
Area 2......................$ 37.03 14.28
AREA 2......................$ 36.53 14.78
PAIN0016-012 01/01/2010
ALAMEDA, CONTRA COSTA, MARIPOSA, MERCED, MONTEREY, SAN BENITO,
SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SANTA CRUZ COUNTIES
SOFT FLOOR LAYER.................$ 43.66 14.82
PAIN0016-015 01/01/2010
CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE
PAINTER
Brush.......................$ 29.82 12.72
SPRAY/SANDBLAST: $0.50 additional per hour.
EXOTIC MATERIALS: $1.00 additional per hour.
HIGH TIME: Over 50 ft above ground or water level $2.00 additional per hour. 100 to 180 ft above ground or water level $4.00 additional per hour. Over 180 ft above ground or water level $6.00 additional per hour.
PAIN0016-022 07/01/2009
PAINTER..........................$ 37.62 15.87
PAIN0169-001 01/01/2010
FRESNO, KINGS, MADERA, MARIPOSA AND MERCED COUNTIES:
GLAZIER..........................$ 31.18 14.15
PAIN0169-005 01/01/2010
ALAMEDA CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN
MATEO, SANTA CLARA & SANTA CRUZ COUNTIES
GLAZIER..........................$ 41.51 17.66
PAIN0294-004 01/01/2010
FRESNO, KINGS AND MADERA COUNTIES
PAINTER
Brush, Roller...............$ 26.46 12.03
Drywall Finisher/Taper......$ 30.51 12.53
FOOTNOTE:
Spray Painters & Paperhangers recive $1.00 additional per hour. Painters doing Drywall Patching receive $1.25 additional per hour. Lead Abaters & Sandblasters receive
$1.50 additional per hour. High Time - over 30 feet (does not include work from a lift) $0.75 per hour additional.
PAIN0294-005 01/01/2010
FRESNO, KINGS & MADERA
SOFT FLOOR LAYER.................$ 30.12 11.40
PAIN0767-001 07/01/2009
CALAVERAS, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES:
GLAZIER..........................$ 33.53 16.20
PAID HOLIDAYS: New Year's Day, Martin Luther King, Jr. Day, President's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, and Christmas Day.
Employee rquired to wear a body harness shall receive $1.50 per hour above the basic hourly rate at any elevation.
PAIN1176-001 07/01/2009
HIGHWAY IMPR0VEMENT
Parking Lot Striping/Highway
Marking:
GROUP 1.....................$ 29.44 12.51
GROUP 2.....................$ 24.23 12.51
GROUP 3.....................$ 24.86 12.51
CLASSIFICATIONS
GROUP 1: Striper: Layout and application of painted traffic stripes and marking; hot thermo plastic; tape, traffic stripes and markings
GROUP 2: Gamecourt & Playground Installer
GROUP 3: Protective Coating, Pavement Sealing
PAIN1237-003 01/01/2010
CALAVERAS; SAN JOAQUIN COUNTIES; STANISLAUS AND TUOLUMNE
COUNTIES:
SOFT FLOOR LAYER.................$ 30.54 13.39
PLAS0066-002 07/01/2007
ALAMEDA, CONTRA COSTA, SAN MATEO AND SAN FRANCISCO COUNTIES:
PLASTERER........................$ 33.16 18.62
PLAS0300-001 07/01/2009
PLASTERER
AREA 188: Fresno...........$ 29.72 14.21
AREA 224: San Benito, Santa Clara, Santa Cruz.....$ 34.22 14.08
AREA 295: Calaveras & San
Joaquin Couonties...........$ 32.82 15.10
AREA 337: Monterey County..$ 31.01 13.93
AREA 429: Mariposa, Merced, Stanislaus, Tuolumne Counties...........$ 32.82 15.30
PLAS0300-005 07/01/2006
CEMENT MASON/CONCRETE FINISHER...$ 25.88 15.03
PLUM0038-001 07/01/2009
PLUMBER (Plumber, Steamfitter, Refrigeration
Fitter)..........................$ 47.11 34.39
PLUM0038-005 07/01/2009
Landscape/Irrigation Fitter
(Underground/Utility Fitter).....$ 40.03 28.43
PLUM0062-001 01/01/2010
MONTEREY AND SANTA CRUZ COUNTIES
PLUMBER & STEAMFITTER............$ 40.20 19.28
PLUM0159-001 07/01/2009
CONTRA COSTA COUNTY
Plumber and steamfitter
(1) Refrigeration...........$ 48.73 22.49
(2) All other work......