Amendment_1.pdf
PDF 2 MB Posted
- Attached to
- RECOVERY: Dinkey Mill Barracks Project Federal contract opportunity
- Solicitation number
- RFP-AG-9702-S-10-0008
About this file
Amendment_1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 4.pdf | ||
| Amendment 3.pdf | ||
| Revised_Drawings.pdf | ||
| Revised_Specifications Part 1.pdf | ||
| Amendment 2_SF_30.pdf | ||
| Attachment_1_Specifications Part 1.pdf | ||
| Attachment_3_Drawings.pdf | ||
| Attachment_2_Specifications Part 2.pdf | ||
| Attachment_5_SF_24_Bid Bond.pdf | ||
| Attachment_4_Davis Bacon.pdf | ||
| !Solicitation.pdf | ||
| Attachment_6_PAL Fire Plan_jun2006.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 5
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
Amendment 1 May 4, 2010
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
Southern Sierra Province 1600 Tollhouse Road Clovis, CA 93611
Southern Sierra Province Acquisitions 1600 Tollhouse Road Clovis, CA 93611
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
To Offerors
RFP-AG-9702-S-10-0008
9B. DATED (SEE ITEM 11)
5/3/2010
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning _1___ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return Original
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
copies to the issuing office.
DINKEY MILL BARRACKS PROJECT
High Sierra Ranger District, Sierra National Forest
The purpose of this amendment is to:
1.) Incorporate attached site plan drawings to solicitation, pages CU1 and CU3.
2.) Replace Pages M1 and M2 with the attached pages M1 and M2.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Patrick J. Gallegos, Contracting Officer
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
X
Y 2 269 600
X
X
Y 2 270 000
X
Y 2 270 400
X
Y 2 270 800
X
Y 2 271 200
X
X
X
X
X
X
Y 2 269 600
X
Y 2 270 000
X
Y 2 270 400
X
Y 2 270 800
X
Y 2 271 200
X
TANK
MEADOW
ASPH
DINKEY
C R
EEK
R
O A
D
CREEK
ASPH
BARRACKS 1
B A
R R
A C
K S
BARRACKS 3
BARRACKS 6
B A
R R
A C
K S
SHEET OF
DRAWING
PROJECT NUMBER
CHECKED BY
SCALE
DATE
CHECKED BY
DESIGNED BY
DRAWN BY
A/E
F O
R E
S T
D R
A W
IN
G
P R
O
JE
C T
N A
M E
N A
M E
FOREST
REGION
SOUTHWEST
PACIFIC
DATENO. REVISIONS
R5
SERVICE
U S D A
D
IN
K E
Y M
IL
L
W O
R K
C E
N
TE
R
S
IT
E U
TI
LI
TY
P
LA
N
CU1
AS NOTED
05/2008
USFS
GGG
S
IE
R R
A N
A T
IO
N
A L
F O
R E
S T
BARRACKS 1
B A
R R
A C
K S
BARRACKS 3
BARRACKS 6
B A
R R
A C
K S
SHEET OF
DRAWING
PROJECT NUMBER
CHECKED BY
SCALE
DATE
CHECKED BY
DESIGNED BY
DRAWN BY
A/E
F O
R E
S T
D R
A W
IN
G
P R
O
JE
C T
N A
M E
N A
M E
FOREST
REGION
SOUTHWEST
PACIFIC
DATENO. REVISIONS
R5
SERVICE
U S D A
D
IN
K E
Y M
IL
L
W O
R K
C E
N
TE
R
S
IT
E W
A
TE
R
CU3
AS NOTED
05/2008
USFS
GGG
U3
S
IE
R R
A N
A T
IO
N
A L
F O
R E
SHEET OF
DRAWING
PROJECT NUMBER
CHECKED BY
SCALE
DATE
CHECKED BY
DESIGNED BY
DRAWN BY
A/E
FOREST
REGION
SOUTHWEST
PACIFIC
DATENO. REVISIONS
R5
SERVICE
U S D A
D
IN
K E
Y M
IL
L
B A
R R
A C
K S
LE
G
E N
D ,S
C H
E D
U
LE
,N O
TE
S
M1.0
AS NOTED
03/15/2010
W DEBOER
W DEBOER
S
IE
R R
A N
A T
IO
N
A L
F O
R E
NOTE: SEAL ALL CABINET TO CABINET AND
DUCTWORK TO CABINET CONNECTIONS
WITH MASTIC.
FURNACE
1-5/8" FRAMING CHANNEL SUPPORT FRAME,
LENGTHWISE UNDER BACK AND FRONT (BEHIND
NOTE: IF LOCAL CODES REQUIRE, INSTALL 24 GA. MIN GALVANIZED STEEL PAN
WITH 2" LIP UNDER ENTIRE FURNACE. INSTALL OVERFLOW DRAIN LINE TO
NOTICEABLE LOCATION; VERIFY WITH COR.
USE 1x1x1/8" (MIN) CLIP ANGLE FOR ATACHMENT
FLEXIBLE CONNECTOR, TYP.
ELECTRICAL CONNECTION
& DISCONNECT NOT SHOWN
PVC INTAKE AND VENT PIPING UP TO CONCENTRIC VENT/INTAKE TERMINATION KIT.
LOCATE CLOSE TO THE RIDGELINE, FLASH UP UNDER THE ROOF RIDGE CAP IF POSSIBLE
AND EXTEND ABOVE THE SNOW LEVEL. SUPPORT BOTH VERTICALLY AND LATERALLY,
INDEPENDENT OF THE FURNACE. INSULATE AS REQUIRED BY THE MANUFACTURER.
GAS CONNECTION WITH
DRIP LEG, FLEXIBLE
CONNECTOR & PLUGGED
TEST TAP.
SPRING HANGERS, MASON
INDUSTRIES TYPE HS, SIZED
FOR HANGER LOAD.
CONDENSATE TRAP) AND TRANSVERSE AS REQUIRED
SO SUPPORT RODS ARE NOT IN FRONT OF FURNACE
TO RAFTERS OR BLOCKING BETWEEN RAFTERS
HANGERS UNDER ENTIRE DUCT, TYP.
STRAP HANGERS PER SMACNA; LOOP
OR ACCESS PANELS. BOTTOM OF FURNACE AND
EVAPORATOR
COIL
LINED CANS ABOVE RETURN GRILLES WITH SHEET METAL NOSE ON
LEADING EDGE OF LINER. TOP OF CAN SAME HEIGHT AS TOP OF
FURNACE RETURN AIR PLENUM. USE 14X25 GRILLES AND 14"Ø BRANCH
DUCTS WHERE TRUSSES ARE 16" O.C.
LINED SUPPLY AND RETURN PLENUMS, EACH MINIMUM 48" LONG.
COMPLETELY SEAL ALL DUCT CUT-IN AND DOVETAIL CONNECTIONS,
INCLUDING ALL CUT EDGES OF DUCTLINER.
3/4" SCHD 40 PVC DRAIN LINE WITH ELBOW AND PIPE INCREASER
FOR INDIRECT WASTE RECEPTOR FOR BOTH FURNACE AND COOLING
COIL CONDENSATE DRAIN LINES; 2% SLOPE ALONG ENTIRE LENGTH.
ROUTE CONTINUOUSLY SUPPORTED ABOVE PLYWOOD ATTIC FLOOR
OVER TO WALL, DOWN IN THE WALL, THEN OUT APPROXIMATELY 6"
ABOVE THE FLOOR AND ELBOW DOWN TO FLOOR DRAIN IN CLOSET.
SUPPORT STUB OUT WITH UNISTRUT AND CLAMPS; SEE DETAIL
5/P3.1. ROUTE SECONDARY EVAPORATOR COIL DRAIN LINE (3/4"
COPPER) OVER AND STUB DOWN THROUGH THE CEILING ABOVE THE
SAME FLOOR DRAIN. DO NOT EXTEND THE LINE DOWN TO THE DRAIN;
TRIM THE STUB BELOW THE CEILING WITH A CHROME ESCUTCHEON.
MOUNT A SIGN ON THE WALL ADJACENT TO THE FAN SWITCH; SIGN
SHALL BE BLACK PHENOLIC WITH MINIMUM 1/4" HIGH ENGRAVED WHITE
LETTERS: "THIS FAN IS PART OF THE BUILDING VENTILATION SYSTEM,
AND SHOULD REMAIN ON CONTINUOUSLY DURING SCHEDULED
OCCUPIED PERIODS.
LINED RETURN AIR PLENUM, I.D. FULL SIZE OF FURNACE CABINET
OPENING, MINIMUM 4' LONG.
TAPERED SHEET METAL TRANSITION FROM FURNACE DUCT FLANGES TO
COIL CABINET INLET; DO NOT USE FILLER PLATE (NO ABRUPT
TRANSITION); NO LINING; EXTERNAL DUCT WRAP ONLY.
BOTTOM OF EVAPORATOR COIL AT SAME ELEVATION.
NO SPRINKLER PIPING IN THIS PORTION OF THE ATTIC TRUSSES, EXCEPT
LENGTHWISE ALONG VERTICAL TRUSS MEMBERS. ANY TRANSVERSE
PIPING MUST BE DOWN LOW, BETWEEN LOWER TRUSS CHORDS, OR UP
HIGH BETWEEN HORIZONTAL TOP TRUSS MEMBER
FAN COIL INSTALLATION IS SIMILAR, WITH PLENUM LENGTHS ADJUSTED
TO FIT THE MECHANICAL PLAN, AND A TAPERED TRANSITION BETWEEN
THE FAN COIL DISCHARGE FLANGES AND THE LINED SUPPLY PLENUM.
MINIMUM CLEAR INSIDE DIMENSIONS OF LINED SUPPLY PLENUM IS 18"W
x 22-3/4"H. TRANSITION HAS DUCT WRAP, NO DUCTLINER. PLENUM
O.D. IS LARGER THAN TRANSITION AT THE JUNCTION, PROTECTING THE
EDGE OF THE DUCTLINER; LOOK IS SIMILAR TO THAT SHOWN WHERE
TRANSITION FROM FURNACE MEETS THE EVAPORATOR COIL CABINET.
SHEET OF
DRAWING
PROJECT NUMBER
CHECKED BY
SCALE
DATE
CHECKED BY
DESIGNED BY
DRAWN BY
A/E
FOREST
REGION
SOUTHWEST
PACIFIC
DATENO. REVISIONS
R5
SERVICE
U S D A
D
IN
K E
Y M
IL
L
B A
R R
A C
K S
M E
C H
A N
IC
A
L P
LA
N
M2.0
AS NOTED
03/15/2010
W DEBOER
W DEBOER
S
IE
R R
A N
A T
IO
N
A L
F O
R E
File details come from the government source that posted it. Updated .