Illustrative Task Order

Cost Proposal Form A-1-1 (Works & Materials) of Illustrative Task Order No. 1 of RFP 294-2008-003
Proposed unit costs (as of the date of issuance of this RFP) must be provided for each item in the list below. Indicative quantities/volumes are provided for pricing purposes only. Total costs are not required, and if furnished, will be ignored. The information provided on this and other Annex A-1 forms will serve as an element of the Offeror's cost proposal for Illustrative Task Order No.1 and will have a dual purpose. The first purpose will be to provide USAID a basis for comparing the various costs proposed by the various Offerors. The second and equally important purpose of the cost proposal will be to provide USAID points of reference that it can use in evaluating proposals received under actual RFTOPs under awarded INP IQCs. Given this latter purpose, Offerors are cautioned to be realistic in preparing their cost proposals.
ItemDescription: Work performed to the Hashemite Kingdom of Jordan - Specifications for Highway and Bridge ConstructionUnitQuantity to use in pricing unit costProposed Installed / In-place Unit Cost in US$
Excavation and Earthworks
1Excavation and Removal after exhausting all on-site use optionsCu m8,500
2Ditch ExcavationCu m150
Embankment Construction
3Subgrade Replacement (200 mm)Cu m1,600
4Filling Layers (200 mm)Cu m500
5Topping (Selected material)Cu m1,800
Site Cleaning
6Remove Existing Dumped MaterialsCu m80
7PulverizationCu m3,500
Installed Sub-base and Base-course layers
8Sub-Base 150 mm thickSq m8,000
9Sub-Base 200 mm thick,Sq m36,000
10Base Course 100 mm thick,Sq m8,000
11Base Course 150 mm thick,Sq m72,000
12Base Course 200 mm thick,Sq m8,000
Bituminous Construction (Supply and use)
13Pime coat (MC-70)Sq m36,000
14Tack coat (RC-70 or RC-250)Sq m40,000
Bituminous Wearing Course (supply and use)
1540 mm thick bituminous wearing courseSq m36,000
1650 mm thick bituminous wearing courseSq m36,000
1760 mm thick bituminous wearing courseSq m36,000
Bituminous Binder Course (supply and use)
1850 mm thick bituminous binder courseSq m36,000
1960 mm thick bituminous binder courseSq m36,000
2070 mm thick bituminous binder courseSq m36,000
2130mm - 3/8" asphalt wearing course for sidewalksSq m4,000
Asphalt Patching and leveling course
22Replace damaged areas in the existing roads,Sq m350
23Hot Asphalt mix . for patching and leveling courseTonne10
Asphalt Milling
24Miling of existing asphalt up to 20mmSq m200
25Ditto but 30mm thick.Sq m200
26Ditto but 40mm thick.Sq m200
27Ditto but 50mm thick.Sq m200
Road Crossings
Supplying and laying reinfrced concrete pipes
28600 mm dia. R.C. concrete pipeL.m80
29800 mm dia. R.C. concrete pipe .L.m80
301000 mm dia. R.C. concrete pipe.L.m80
Stormwater Drainage Pipes
Supplying and laying reinfrced concrete pipes
31300 mm dia R.C. pipeL.m480
32400 mm dia R.C. pipeL.m480
33500 mm dia R.C. pipeL.m480
34600 mm dia R.C. pipeL.m480
35750 mm dia R.C. pipeL.m1,800
36800 mm dia R.C. pipeL.m1,800
37900 mm dia R.C. pipeL.m1,800
381000 mm dia R.C. pipeL.m1,800
Drainage Manholes and Inlets
Supply and install precast Manhole size 1X1 m
39Depth not exceeding 2.5 mEach80
40Depth not exceeding 3.5 mEach80
41Depth not exceeding 4.00 mEach80
Supply and install precast Manhole size 1.2X1.2 m
42Depth not exceeding 2.5 mEach14
43Depth not exceeding 3.5 mEach14
44Depth not exceeding 4.00 mEach14
Supply and install precast Manhole size 1.5X1.5 m
45Depth not exceeding 2.5 mEach6
46Depth not exceeding 3.5 mEach6
47Depth not exceeding 4.0 mEach6
Sewerage Works
Supply and lay 8" UPVC pipes
48a. Depth not exceeding 2.50 m.L.m850
Supply and lay 12" UPVC pipes
49a. Depth not exceeding 1.50 m.L.m600
50b. Depth not exceeding 2.00 m.L.m1,400
51c. Depth not exceeding 2.50 m.L.m600
52d. Depth not exceeding 3.00 m.L.m600
53e. Depth not exceeding 3.50 m.L.m600
54f. Depth not exceeding 4.00 m.L.m600
Supply and lay Precast Concrete circular sewage manholes.
55a. Depth not exceeding 1.50 m.Each16
56b. Depth not exceeding 2.00 m.Each16
57c. Depth not exceeding 2.50 m.Each16
58d. Depth not exceeding 3.00 m.Each16
59e. Depth not exceeding 3.50 m.Each16
60f. Depth not exceeding 4.00 m.Each16
Miscellaneous Drainage Works
Concrete Works (complete without Reinforcement)
Reinforced Concrete for Retaining Walls (Supply and install)
61Concrete Class - B150Cu m200
62Concrete Class - B200Cu m300
63Concrete Class - B250Cu m500
64Concrete Class - B300Cu m300
6510 cm Side walk Concrete (B-200)Sq m200
66Reinforced Concrete B -200 for pipe encasement for any diameter including all necessary works, complete where instructed by the Engineer or shown on the drawings,reinforced steel to be paid seperately.Cu m150
67Supply and execute gravity retaining walls (B150 concrete)Cu m350
68Supply and execute gravity retaining walls (B200 concrete)Cu m350
69Supply and install where needed High Tensile Steel BarTonne120
PVC Ducts
Supply and lay PVC ducts and pipes
701-way, 100 mm dia.L.m2,300
712-way, 100 mm dia.L.m2,000
721-way, 200 mm diaL.m2,300
731-way, 300 mm diaL.m2,300
743-way, 150 mm diaL.m300
754-way, 150 mm diaL.m300
Precast Concrete Curbstone
76Supply and install Precast concrete CurbstoneL.m8,300
Stone Curbstones
77Supply and install Stone kerbsL.m8,300
Interlocking Blocks
78Supply and Install approved precast concrete interlocking tilesSq m4,000
Stone Tiles
79Adjust level of frame and cover of existing manholesEach38
80Supply and fix heavy duty cover for missed manholesEach12
81Construction of New Stone WallCu m500
Traffic Signs
Supply and fix
82Circular sign face 900 mm dia.Each10
83Circular sign face 600 mm dia.Each15
84Triangular sign face 600 mm deepEach5
85Triangular sign face 900 mm deepEach10
86Octagonal sign face 600 mm deepEach15
87Octagonal sign face 900 mm deepEach5
88Square Sign face 900mm deep .Each5
89Square Sign face 600mm deep .Each10
90Large Signs < 1 sq.m.Each10
91Large Signs > 1 sq.m.Sq m5
92Hazard warning sign 60cm x 30cmEach20
93Chervon I - 10Each5
Road Marking
94Continuous and/or intermittent Thermoplastic paintSq m1,200
95Continuous and/or intermittent Acrylic paintSq m750
96Edge line single cat eyesSq m200
97Double cat eyesSq m400
Embankment Protection
98Grouted rip rap protectionSq m1,000
Guard Rails
99Galvanized Steel guard railL.m4,000
100Stone Guard Rails(Pillars)Each100
Lighting Columns (supply and install)
101Single arm 12 m long street lighting columnEach6
102Ditto but double armEach26
103Single arm 10 m long street lighting columnEach6
104Ditto but double armEach26
105Single arm 8 m long street lighting columnEach6
106Ditto but double armEach26
107Single arm 6 m long street lighting columnEach6
108Ditto but double armEach26
Land Scaping _(Supply and Transplant)
109Trees ( 3-5 Years Age )Each30
110Palm Trees ( 3-5 Years Age )Each50
111Agricultural SoilCu.m800

&LRFP-294-2008-003&CATTACHMENTS

&CATTACHMENT J-7 &R&P

&A&RPage &P

Day Labor Schedule

Cost Proposal Form A-1-2 (Labor Schedule) of Illustrative Task Order No. 1 of RFP 294-2008-003
Proposed unit costs (as of the date of issuance of this RFP) must be provided for each item in the list below. Indicative quantities/volumes are provided for pricing purposes only. Total costs are not required, and if furnished, will be ignored. The information provided on this and other Annex A-1 forms will serve as an element of the Offeror's cost proposal for Illustrative Task Order No.1 and will have a dual purpose. The first purpose will be to provide USAID a basis for comparing the various costs proposed by the various Offerors. The second and equally important purpose of the cost proposal will be to provide USAID points of reference that it can use in evaluating proposals received under actual RFTOPs under awarded INP IQCs. Given this latter purpose, Offerors are cautioned to be realistic in preparing their cost proposals.
ItemDescriptionUnitQuantity to use in pricing unit costProposed Burdened Daily Unit Cost in US$
Labor Category (See notes below)
1Surveying Team (Including equipment & staff)Day100
2FormanDay100
3MasonDay100
4Mason HelperDay100
5CarpenterDay100
6Carpenter HelperDay100
7PlumberDay100
8Plumber HelperDay100
9ElectricianDay100
10Electrician HelperDay100
11Ironworker (Steel Fixer reinforcing)Day100
12Asphalt RakerDay100
13Asphalt DistributorDay100
14Form Setter (Road)Day100
15WelderDay100
16Welder AssistantDay100
17Pipe LayerDay100
18Power Tool OperatorDay100
19Equipment Operator / DriverDay100
20Steel fixerDay100
21Skilled LaborDay100
22Unskilled LaborDay100
23Flag ManDay100
24MasonDay100
25PlastererDay100
26Epoxy paintersDay100
27PainterDay100
28PlumberDay100
29PlastererDay100
30Mason (Brick, Block, Stone)Day100
31TilerDay100
32Concrete FinisherDay100
33Fiber Optic TechnicianDay100
34Grade CheckerDay100
35Drill OperatorDay100
36OH Powerline TechnicianDay100
37GreasemanDay100
38MechanicDay100
39Milling Machine OperatorDay100
40Truck DriversDay100
NOTES:
Labor rates include all fringes, dues, and other fees and adjustments as required by local law; excluding overhead & Profit

&LRFP-294-2008-003&CATTACHMENTS

&CATTACHMENT J-7&R &P

&A&RPage &P

Equipment Schedule

Cost Proposal Form A-1-3 (Equipment Schedule) of Illustrative Task Order No. 1 of RFP 294-2008-003
Proposed unit costs (as of the date of issuance of this RFP) must be provided for each item in the list below. Indicative quantities/volumes are provided for pricing purposes only. Total costs are not required, and if furnished, will be ignored. The information provided on this and other Annex A-1 forms will serve as an element of the Offeror's cost proposal for Illustrative Task Order No.1 and will have a dual purpose. The first purpose will be to provide USAID a basis for comparing the various costs proposed by the various Offerors. The second and equally important purpose of the cost proposal will be to provide USAID points of reference that it can use in evaluating proposals received under actual RFTOPs under awarded INP IQCs. Given this latter purpose, Offerors are cautioned to be realistic in preparing their cost proposals.
Equipment Description (See notes below)ModelCapacityQuantity to use in pricing unit costProposed Daily Unit Cost in US$
1GraderCAT 12G or Eq116 HpDay
2Track ExcavatorCAT 229 or EqDay
3Track ExcavatorCAT 320 or Eq.Day
4Wheel ExcavatorAikerman or Eq.Day
5Excavator w/ hammer3CX – JCB or Eq.Day
6Handheld JackhammerDay
7Plate CompactorDay
8Steel Roller (Earth)Bomag or Eq.l>2 TonDay
9Steel Roller (Earth)Bomag or Eq.2-5 TonDay
10Steel Roller (Earth)Bomag or Eq.10-12 TonDay
11Steel Roller (Earth)Bomag 217 or Eq.over 17 TonDay
12Steel Roller (Asphalt)Bettli or Eq.over 17 TonDay
13Tire Roller (Asphalt)Bomag or Eq.Day
14Wheel Loader CAT950 or Eq.120-145 HpDay
15Track Loader CAT955L or Eq.130-149 HpDay
16Asphalt Saw CutterDay
17Asphalt Finisher< 3.7mDay
18Asphalt Finisher> 3.7m widthDay
19Wheel Milling MachineVert. SP-500 or Eq.0.5 - 1 mDay
20Track Milling Machine1.0 -2.5 mDay
21Pick-up Truck4WDDay
22Dump Truck9-12 cu mSingle AxleDay
23Dump Truck15-18 cu mDouble AxleDay
24Water Truck50m3Day
25Bobcat with all accessoriesDay
26Truck CraneLong bed20 tons craneDay
27Truck CraneShort bed20 tons craneDay
28Generator SetGEP 50-3Day
29BulldozerD8 or <Day
30Bulldozer>D8Day
31Welding MachineDay
32Sheeps Foot rollerBomag or Eq.Day
33Crane, Backhoe, ShovelDay
34Concrete GrinderDay
35Concrete FinisherDay
36HydroseederDay
37ScraperDay
38Sweeper TruckDay
39Tractor (utility)Day
NOTES:
1) Equipment Rates includes Operator/Drivers, Fuel, Maintenance, mobilization/demobilization,
VAT, and all costs associated with operational, fully maintained machinery.
2) Specific Make and Model Types are presented: equivalent machinery from other manufacturers
shall also be reviewed for approval.
3) Equipment shall be 1990 or newer, unless otherwise approved.
4) Standby rates shall not exceed 8 hours per 24 hour work period.
5) For equipment utilized and not depicted rates shall be based on the most current edition of the Israeli building
Cost Data Book (DEKEL) multiplied by 0.85 as an adjustment to reflect prices(lower) in West Bank conditions.
6) Abbreviations: Eq = Equivalent, HR = Hour

&LRFP-294-2008-003 &CATTACHMENTS

&CATTACHMENT J-7&R&P

&A&RPage &P

Mark-up - ordered work

Cost Proposal Form A-1-4 (General and Other Cost Schedule) of Illustrative Task Order No. 1 of RFP 294-2008-003
All eight boxes in the right hand column of the form must be completed (using 0 if appropriate). The information provided on this and other Annex A-1 forms will serve as an element of the Offeror's cost proposal for Illustrative Task Order No.1 and will have a dual purpose. The first purpose will be to provide USAID a basis for comparing the various costs proposed by the various Offerors. The second and equally important purpose of the cost proposal will be to provide USAID points of reference that it can use in evaluating proposals received under actual RFTOPs under awarded INP IQCs. Given this latter purpose, Offerors are cautioned to be realistic in preparing their cost proposals.
ItemDescriptionPercentage **
1For Work Done by Subcontractor:
aPrime Contractor's Total Overhead - Site and Main Office (% of Subcontractor’s Price)
bPrime Contractor's Bonds and Insurance (% of Subcontractor’s Price)
cPrime Contractor's Risk and Profit (% of Subcontractor’s Price)
2For Supply of Additional Material or Equipment:
aPrime Contractor's Total Overhead - Site and Main Office (% of Supplier Price)
bPrime Contractor's Bonds and Insurance (% of Supplier Price)
cPrime Contractor's Risk and Profit (% of Supplier Price)
In $US
3Estimated Cost of Mobilization
4Estimated cost of De-mobilization
** Prime Contractor to insert % in this column against sub-items a, b, and c of Items 1 and 2 above. This is the percentage that the Offeror proposes as compensation to the Prime Contractor for any additional work or changes to existing scope.