Attachment J-7.A.1 Illustrative Task Order 1 Cost Proposal Forms.xls
XLS spreadsheet 112 KB Posted
- Attached to
- Infrastructure Needs Program
- Solicitation number
- RFP294-2008-003
About this file
Attachment J-7A.1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 4 to RFP 294-2008-003.doc | DOC document | |
| Amendment 3 to RFP 294-2008-003.doc | DOC document | |
| Amendment 2 to RFP 294-2008-003.doc | DOC document | |
| Attachment J-7.B.2 Illustrative Task Order 2 Drawings.pdf | ||
| Attachment J-1 Background.doc | DOC document | |
| Attachment J-7.B Illustrative Task Order 2.doc | DOC document | |
| Attachment J-6 Disclosure of Lobbying Activities.doc | DOC document | |
| INP RFP 294-2008-003.doc | DOC document | |
| Attachment J-7.B.1 Illustrative Task Order 2 Cost Proposal Forms.xls | XLS spreadsheet | |
| Attachment J-3 Environmental Threshold Decision INP.pdf | ||
| Attachment J-7 Illustrative Task Orders Intro.doc | DOC document | |
| Attachment J-7.A Illustrative Task Order 1.doc | DOC document | |
| Attachment J-4 Geographic Codes.doc | DOC document | |
| Attachment J-2 Mission_Order_21.pdf | ||
| Attachment J-5 Contractor Performance Report | — |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Illustrative Task Order
| Cost Proposal Form A-1-1 (Works & Materials) of Illustrative Task Order No. 1 of RFP 294-2008-003 | ||||
| Proposed unit costs (as of the date of issuance of this RFP) must be provided for each item in the list below. Indicative quantities/volumes are provided for pricing purposes only. Total costs are not required, and if furnished, will be ignored. The information provided on this and other Annex A-1 forms will serve as an element of the Offeror's cost proposal for Illustrative Task Order No.1 and will have a dual purpose. The first purpose will be to provide USAID a basis for comparing the various costs proposed by the various Offerors. The second and equally important purpose of the cost proposal will be to provide USAID points of reference that it can use in evaluating proposals received under actual RFTOPs under awarded INP IQCs. Given this latter purpose, Offerors are cautioned to be realistic in preparing their cost proposals. | ||||
| Item | Description: Work performed to the Hashemite Kingdom of Jordan - Specifications for Highway and Bridge Construction | Unit | Quantity to use in pricing unit cost | Proposed Installed / In-place Unit Cost in US$ |
| Excavation and Earthworks | ||||
| 1 | Excavation and Removal after exhausting all on-site use options | Cu m | 8,500 | |
| 2 | Ditch Excavation | Cu m | 150 | |
| Embankment Construction | ||||
| 3 | Subgrade Replacement (200 mm) | Cu m | 1,600 | |
| 4 | Filling Layers (200 mm) | Cu m | 500 | |
| 5 | Topping (Selected material) | Cu m | 1,800 | |
| Site Cleaning | ||||
| 6 | Remove Existing Dumped Materials | Cu m | 80 | |
| 7 | Pulverization | Cu m | 3,500 | |
| Installed Sub-base and Base-course layers | ||||
| 8 | Sub-Base 150 mm thick | Sq m | 8,000 | |
| 9 | Sub-Base 200 mm thick, | Sq m | 36,000 | |
| 10 | Base Course 100 mm thick, | Sq m | 8,000 | |
| 11 | Base Course 150 mm thick, | Sq m | 72,000 | |
| 12 | Base Course 200 mm thick, | Sq m | 8,000 | |
| Bituminous Construction (Supply and use) | ||||
| 13 | Pime coat (MC-70) | Sq m | 36,000 | |
| 14 | Tack coat (RC-70 or RC-250) | Sq m | 40,000 | |
| Bituminous Wearing Course (supply and use) | ||||
| 15 | 40 mm thick bituminous wearing course | Sq m | 36,000 | |
| 16 | 50 mm thick bituminous wearing course | Sq m | 36,000 | |
| 17 | 60 mm thick bituminous wearing course | Sq m | 36,000 | |
| Bituminous Binder Course (supply and use) | ||||
| 18 | 50 mm thick bituminous binder course | Sq m | 36,000 | |
| 19 | 60 mm thick bituminous binder course | Sq m | 36,000 | |
| 20 | 70 mm thick bituminous binder course | Sq m | 36,000 | |
| 21 | 30mm - 3/8" asphalt wearing course for sidewalks | Sq m | 4,000 | |
| Asphalt Patching and leveling course | ||||
| 22 | Replace damaged areas in the existing roads, | Sq m | 350 | |
| 23 | Hot Asphalt mix . for patching and leveling course | Tonne | 10 | |
| Asphalt Milling | ||||
| 24 | Miling of existing asphalt up to 20mm | Sq m | 200 | |
| 25 | Ditto but 30mm thick. | Sq m | 200 | |
| 26 | Ditto but 40mm thick. | Sq m | 200 | |
| 27 | Ditto but 50mm thick. | Sq m | 200 | |
| Road Crossings | ||||
| Supplying and laying reinfrced concrete pipes | ||||
| 28 | 600 mm dia. R.C. concrete pipe | L.m | 80 | |
| 29 | 800 mm dia. R.C. concrete pipe . | L.m | 80 | |
| 30 | 1000 mm dia. R.C. concrete pipe. | L.m | 80 | |
| Stormwater Drainage Pipes | ||||
| Supplying and laying reinfrced concrete pipes | ||||
| 31 | 300 mm dia R.C. pipe | L.m | 480 | |
| 32 | 400 mm dia R.C. pipe | L.m | 480 | |
| 33 | 500 mm dia R.C. pipe | L.m | 480 | |
| 34 | 600 mm dia R.C. pipe | L.m | 480 | |
| 35 | 750 mm dia R.C. pipe | L.m | 1,800 | |
| 36 | 800 mm dia R.C. pipe | L.m | 1,800 | |
| 37 | 900 mm dia R.C. pipe | L.m | 1,800 | |
| 38 | 1000 mm dia R.C. pipe | L.m | 1,800 | |
| Drainage Manholes and Inlets | ||||
| Supply and install precast Manhole size 1X1 m | ||||
| 39 | Depth not exceeding 2.5 m | Each | 80 | |
| 40 | Depth not exceeding 3.5 m | Each | 80 | |
| 41 | Depth not exceeding 4.00 m | Each | 80 | |
| Supply and install precast Manhole size 1.2X1.2 m | ||||
| 42 | Depth not exceeding 2.5 m | Each | 14 | |
| 43 | Depth not exceeding 3.5 m | Each | 14 | |
| 44 | Depth not exceeding 4.00 m | Each | 14 | |
| Supply and install precast Manhole size 1.5X1.5 m | ||||
| 45 | Depth not exceeding 2.5 m | Each | 6 | |
| 46 | Depth not exceeding 3.5 m | Each | 6 | |
| 47 | Depth not exceeding 4.0 m | Each | 6 | |
| Sewerage Works | ||||
| Supply and lay 8" UPVC pipes | ||||
| 48 | a. Depth not exceeding 2.50 m. | L.m | 850 | |
| Supply and lay 12" UPVC pipes | ||||
| 49 | a. Depth not exceeding 1.50 m. | L.m | 600 | |
| 50 | b. Depth not exceeding 2.00 m. | L.m | 1,400 | |
| 51 | c. Depth not exceeding 2.50 m. | L.m | 600 | |
| 52 | d. Depth not exceeding 3.00 m. | L.m | 600 | |
| 53 | e. Depth not exceeding 3.50 m. | L.m | 600 | |
| 54 | f. Depth not exceeding 4.00 m. | L.m | 600 | |
| Supply and lay Precast Concrete circular sewage manholes. | ||||
| 55 | a. Depth not exceeding 1.50 m. | Each | 16 | |
| 56 | b. Depth not exceeding 2.00 m. | Each | 16 | |
| 57 | c. Depth not exceeding 2.50 m. | Each | 16 | |
| 58 | d. Depth not exceeding 3.00 m. | Each | 16 | |
| 59 | e. Depth not exceeding 3.50 m. | Each | 16 | |
| 60 | f. Depth not exceeding 4.00 m. | Each | 16 | |
| Miscellaneous Drainage Works | ||||
| Concrete Works (complete without Reinforcement) | ||||
| Reinforced Concrete for Retaining Walls (Supply and install) | ||||
| 61 | Concrete Class - B150 | Cu m | 200 | |
| 62 | Concrete Class - B200 | Cu m | 300 | |
| 63 | Concrete Class - B250 | Cu m | 500 | |
| 64 | Concrete Class - B300 | Cu m | 300 | |
| 65 | 10 cm Side walk Concrete (B-200) | Sq m | 200 | |
| 66 | Reinforced Concrete B -200 for pipe encasement for any diameter including all necessary works, complete where instructed by the Engineer or shown on the drawings,reinforced steel to be paid seperately. | Cu m | 150 | |
| 67 | Supply and execute gravity retaining walls (B150 concrete) | Cu m | 350 | |
| 68 | Supply and execute gravity retaining walls (B200 concrete) | Cu m | 350 | |
| 69 | Supply and install where needed High Tensile Steel Bar | Tonne | 120 | |
| PVC Ducts | ||||
| Supply and lay PVC ducts and pipes | ||||
| 70 | 1-way, 100 mm dia. | L.m | 2,300 | |
| 71 | 2-way, 100 mm dia. | L.m | 2,000 | |
| 72 | 1-way, 200 mm dia | L.m | 2,300 | |
| 73 | 1-way, 300 mm dia | L.m | 2,300 | |
| 74 | 3-way, 150 mm dia | L.m | 300 | |
| 75 | 4-way, 150 mm dia | L.m | 300 | |
| Precast Concrete Curbstone | ||||
| 76 | Supply and install Precast concrete Curbstone | L.m | 8,300 | |
| Stone Curbstones | ||||
| 77 | Supply and install Stone kerbs | L.m | 8,300 | |
| Interlocking Blocks | ||||
| 78 | Supply and Install approved precast concrete interlocking tiles | Sq m | 4,000 | |
| Stone Tiles | ||||
| 79 | Adjust level of frame and cover of existing manholes | Each | 38 | |
| 80 | Supply and fix heavy duty cover for missed manholes | Each | 12 | |
| 81 | Construction of New Stone Wall | Cu m | 500 | |
| Traffic Signs | ||||
| Supply and fix | ||||
| 82 | Circular sign face 900 mm dia. | Each | 10 | |
| 83 | Circular sign face 600 mm dia. | Each | 15 | |
| 84 | Triangular sign face 600 mm deep | Each | 5 | |
| 85 | Triangular sign face 900 mm deep | Each | 10 | |
| 86 | Octagonal sign face 600 mm deep | Each | 15 | |
| 87 | Octagonal sign face 900 mm deep | Each | 5 | |
| 88 | Square Sign face 900mm deep . | Each | 5 | |
| 89 | Square Sign face 600mm deep . | Each | 10 | |
| 90 | Large Signs < 1 sq.m. | Each | 10 | |
| 91 | Large Signs > 1 sq.m. | Sq m | 5 | |
| 92 | Hazard warning sign 60cm x 30cm | Each | 20 | |
| 93 | Chervon I - 10 | Each | 5 | |
| Road Marking | ||||
| 94 | Continuous and/or intermittent Thermoplastic paint | Sq m | 1,200 | |
| 95 | Continuous and/or intermittent Acrylic paint | Sq m | 750 | |
| 96 | Edge line single cat eyes | Sq m | 200 | |
| 97 | Double cat eyes | Sq m | 400 | |
| Embankment Protection | ||||
| 98 | Grouted rip rap protection | Sq m | 1,000 | |
| Guard Rails | ||||
| 99 | Galvanized Steel guard rail | L.m | 4,000 | |
| 100 | Stone Guard Rails(Pillars) | Each | 100 | |
| Lighting Columns (supply and install) | ||||
| 101 | Single arm 12 m long street lighting column | Each | 6 | |
| 102 | Ditto but double arm | Each | 26 | |
| 103 | Single arm 10 m long street lighting column | Each | 6 | |
| 104 | Ditto but double arm | Each | 26 | |
| 105 | Single arm 8 m long street lighting column | Each | 6 | |
| 106 | Ditto but double arm | Each | 26 | |
| 107 | Single arm 6 m long street lighting column | Each | 6 | |
| 108 | Ditto but double arm | Each | 26 | |
| Land Scaping _(Supply and Transplant) | ||||
| 109 | Trees ( 3-5 Years Age ) | Each | 30 | |
| 110 | Palm Trees ( 3-5 Years Age ) | Each | 50 | |
| 111 | Agricultural Soil | Cu.m | 800 |
&LRFP-294-2008-003&CATTACHMENTS
&CATTACHMENT J-7 &R&P
&A&RPage &P
Day Labor Schedule
| Cost Proposal Form A-1-2 (Labor Schedule) of Illustrative Task Order No. 1 of RFP 294-2008-003 | ||||
| Proposed unit costs (as of the date of issuance of this RFP) must be provided for each item in the list below. Indicative quantities/volumes are provided for pricing purposes only. Total costs are not required, and if furnished, will be ignored. The information provided on this and other Annex A-1 forms will serve as an element of the Offeror's cost proposal for Illustrative Task Order No.1 and will have a dual purpose. The first purpose will be to provide USAID a basis for comparing the various costs proposed by the various Offerors. The second and equally important purpose of the cost proposal will be to provide USAID points of reference that it can use in evaluating proposals received under actual RFTOPs under awarded INP IQCs. Given this latter purpose, Offerors are cautioned to be realistic in preparing their cost proposals. | ||||
| Item | Description | Unit | Quantity to use in pricing unit cost | Proposed Burdened Daily Unit Cost in US$ |
| Labor Category (See notes below) | ||||
| 1 | Surveying Team (Including equipment & staff) | Day | 100 | |
| 2 | Forman | Day | 100 | |
| 3 | Mason | Day | 100 | |
| 4 | Mason Helper | Day | 100 | |
| 5 | Carpenter | Day | 100 | |
| 6 | Carpenter Helper | Day | 100 | |
| 7 | Plumber | Day | 100 | |
| 8 | Plumber Helper | Day | 100 | |
| 9 | Electrician | Day | 100 | |
| 10 | Electrician Helper | Day | 100 | |
| 11 | Ironworker (Steel Fixer reinforcing) | Day | 100 | |
| 12 | Asphalt Raker | Day | 100 | |
| 13 | Asphalt Distributor | Day | 100 | |
| 14 | Form Setter (Road) | Day | 100 | |
| 15 | Welder | Day | 100 | |
| 16 | Welder Assistant | Day | 100 | |
| 17 | Pipe Layer | Day | 100 | |
| 18 | Power Tool Operator | Day | 100 | |
| 19 | Equipment Operator / Driver | Day | 100 | |
| 20 | Steel fixer | Day | 100 | |
| 21 | Skilled Labor | Day | 100 | |
| 22 | Unskilled Labor | Day | 100 | |
| 23 | Flag Man | Day | 100 | |
| 24 | Mason | Day | 100 | |
| 25 | Plasterer | Day | 100 | |
| 26 | Epoxy painters | Day | 100 | |
| 27 | Painter | Day | 100 | |
| 28 | Plumber | Day | 100 | |
| 29 | Plasterer | Day | 100 | |
| 30 | Mason (Brick, Block, Stone) | Day | 100 | |
| 31 | Tiler | Day | 100 | |
| 32 | Concrete Finisher | Day | 100 | |
| 33 | Fiber Optic Technician | Day | 100 | |
| 34 | Grade Checker | Day | 100 | |
| 35 | Drill Operator | Day | 100 | |
| 36 | OH Powerline Technician | Day | 100 | |
| 37 | Greaseman | Day | 100 | |
| 38 | Mechanic | Day | 100 | |
| 39 | Milling Machine Operator | Day | 100 | |
| 40 | Truck Drivers | Day | 100 | |
| NOTES: | ||||
| Labor rates include all fringes, dues, and other fees and adjustments as required by local law; excluding overhead & Profit |
&LRFP-294-2008-003&CATTACHMENTS
&CATTACHMENT J-7&R &P
&A&RPage &P
Equipment Schedule
| Cost Proposal Form A-1-3 (Equipment Schedule) of Illustrative Task Order No. 1 of RFP 294-2008-003 | |||||
| Proposed unit costs (as of the date of issuance of this RFP) must be provided for each item in the list below. Indicative quantities/volumes are provided for pricing purposes only. Total costs are not required, and if furnished, will be ignored. The information provided on this and other Annex A-1 forms will serve as an element of the Offeror's cost proposal for Illustrative Task Order No.1 and will have a dual purpose. The first purpose will be to provide USAID a basis for comparing the various costs proposed by the various Offerors. The second and equally important purpose of the cost proposal will be to provide USAID points of reference that it can use in evaluating proposals received under actual RFTOPs under awarded INP IQCs. Given this latter purpose, Offerors are cautioned to be realistic in preparing their cost proposals. | |||||
| Equipment Description (See notes below) | Model | Capacity | Quantity to use in pricing unit cost | Proposed Daily Unit Cost in US$ | |
| 1 | Grader | CAT 12G or Eq | 116 Hp | Day | |
| 2 | Track Excavator | CAT 229 or Eq | Day | ||
| 3 | Track Excavator | CAT 320 or Eq. | Day | ||
| 4 | Wheel Excavator | Aikerman or Eq. | Day | ||
| 5 | Excavator w/ hammer | 3CX – JCB or Eq. | Day | ||
| 6 | Handheld Jackhammer | Day | |||
| 7 | Plate Compactor | Day | |||
| 8 | Steel Roller (Earth) | Bomag or Eq. | l>2 Ton | Day | |
| 9 | Steel Roller (Earth) | Bomag or Eq. | 2-5 Ton | Day | |
| 10 | Steel Roller (Earth) | Bomag or Eq. | 10-12 Ton | Day | |
| 11 | Steel Roller (Earth) | Bomag 217 or Eq. | over 17 Ton | Day | |
| 12 | Steel Roller (Asphalt) | Bettli or Eq. | over 17 Ton | Day | |
| 13 | Tire Roller (Asphalt) | Bomag or Eq. | Day | ||
| 14 | Wheel Loader CAT | 950 or Eq. | 120-145 Hp | Day | |
| 15 | Track Loader CAT | 955L or Eq. | 130-149 Hp | Day | |
| 16 | Asphalt Saw Cutter | Day | |||
| 17 | Asphalt Finisher | < 3.7m | Day | ||
| 18 | Asphalt Finisher | > 3.7m width | Day | ||
| 19 | Wheel Milling Machine | Vert. SP-500 or Eq. | 0.5 - 1 m | Day | |
| 20 | Track Milling Machine | 1.0 -2.5 m | Day | ||
| 21 | Pick-up Truck | 4WD | Day | ||
| 22 | Dump Truck | 9-12 cu m | Single Axle | Day | |
| 23 | Dump Truck | 15-18 cu m | Double Axle | Day | |
| 24 | Water Truck | 50m3 | Day | ||
| 25 | Bobcat with all accessories | Day | |||
| 26 | Truck Crane | Long bed | 20 tons crane | Day | |
| 27 | Truck Crane | Short bed | 20 tons crane | Day | |
| 28 | Generator Set | GEP 50-3 | Day | ||
| 29 | Bulldozer | D8 or < | Day | ||
| 30 | Bulldozer | >D8 | Day | ||
| 31 | Welding Machine | Day | |||
| 32 | Sheeps Foot roller | Bomag or Eq. | Day | ||
| 33 | Crane, Backhoe, Shovel | Day | |||
| 34 | Concrete Grinder | Day | |||
| 35 | Concrete Finisher | Day | |||
| 36 | Hydroseeder | Day | |||
| 37 | Scraper | Day | |||
| 38 | Sweeper Truck | Day | |||
| 39 | Tractor (utility) | Day | |||
| NOTES: | |||||
| 1) Equipment Rates includes Operator/Drivers, Fuel, Maintenance, mobilization/demobilization, | |||||
| VAT, and all costs associated with operational, fully maintained machinery. | |||||
| 2) Specific Make and Model Types are presented: equivalent machinery from other manufacturers | |||||
| shall also be reviewed for approval. | |||||
| 3) Equipment shall be 1990 or newer, unless otherwise approved. | |||||
| 4) Standby rates shall not exceed 8 hours per 24 hour work period. | |||||
| 5) For equipment utilized and not depicted rates shall be based on the most current edition of the Israeli building | |||||
| Cost Data Book (DEKEL) multiplied by 0.85 as an adjustment to reflect prices(lower) in West Bank conditions. | |||||
| 6) Abbreviations: Eq = Equivalent, HR = Hour |
&LRFP-294-2008-003 &CATTACHMENTS
&CATTACHMENT J-7&R&P
&A&RPage &P
Mark-up - ordered work
| Cost Proposal Form A-1-4 (General and Other Cost Schedule) of Illustrative Task Order No. 1 of RFP 294-2008-003 | ||||
| All eight boxes in the right hand column of the form must be completed (using 0 if appropriate). The information provided on this and other Annex A-1 forms will serve as an element of the Offeror's cost proposal for Illustrative Task Order No.1 and will have a dual purpose. The first purpose will be to provide USAID a basis for comparing the various costs proposed by the various Offerors. The second and equally important purpose of the cost proposal will be to provide USAID points of reference that it can use in evaluating proposals received under actual RFTOPs under awarded INP IQCs. Given this latter purpose, Offerors are cautioned to be realistic in preparing their cost proposals. | ||||
| Item | Description | Percentage ** | ||
| 1 | For Work Done by Subcontractor: | |||
| a | Prime Contractor's Total Overhead - Site and Main Office (% of Subcontractor’s Price) | |||
| b | Prime Contractor's Bonds and Insurance (% of Subcontractor’s Price) | |||
| c | Prime Contractor's Risk and Profit (% of Subcontractor’s Price) | |||
| 2 | For Supply of Additional Material or Equipment: | |||
| a | Prime Contractor's Total Overhead - Site and Main Office (% of Supplier Price) | |||
| b | Prime Contractor's Bonds and Insurance (% of Supplier Price) | |||
| c | Prime Contractor's Risk and Profit (% of Supplier Price) | |||
| In $US | ||||
| 3 | Estimated Cost of Mobilization | |||
| 4 | Estimated cost of De-mobilization | |||
| ** Prime Contractor to insert % in this column against sub-items a, b, and c of Items 1 and 2 above. This is the percentage that the Offeror proposes as compensation to the Prime Contractor for any additional work or changes to existing scope. |