RFP_Public_Design_18451_Addendum_02.pdf

PDF 165 KB Posted

Attached to
RECS RFP Design for Deferred Maintenance at MCF-Oa
Solicitation number
2000018451
Issued by
Washington County, Minnesota

About this file

This document is Addendum #2 to a Request for Proposal issued by the Minnesota Department of Administration's Real Estate and Construction Services (RECS) for design services related to deferred maintenance projects at the Minnesota Corrections Facility-Oak Park Heights in Stillwater. The addendum documents the attendance of nine firms at the mandatory meeting held on July 21, 2026, including Auromira Architects, CBS Squared Inc., Quetica LLC, Wold AE, TWP Architects, Ericksen Ellison & Associates, Inspec, Busch Architects Inc., and DLR Group. The RFP solicits full architectural, mechanical, and electrical engineering design services for four deferred maintenance projects: hot water and hot water recirculating piping replacement, backup chiller upgrades, campus-wide tuck pointing and caulking, and campus-wide roof evaluation. Site work and assessment access is restricted to Monday through Friday between 8:00 a.m. and 2:00 p.m., excluding holidays. All work will be issued in a single bid package with cost estimates provided as a lump sum, with phasing to be determined later. The anticipated contract term runs from September 1, 2026 through August 31, 2028, with an option to extend an additional three years.

The addendum addresses sixteen questions and answers clarifying project requirements, including confirmation that B3 is not required, that existing building plans and specifications will be provided to the selected consultant, and that masonry evaluation must be conducted hands-on from a lift rather than visually from the ground plane. Consultants are advised to budget for lift access to view higher wall elevations and roof areas. The state does not anticipate asbestos-containing materials but will contract with a third party to test and abate if any is encountered. Additional site assessments, such as infrared scanning of the roof, will be determined once a consultant is on board. Lidar scanning at exterior locations is permitted as an option. The addendum specifies that submissions should not include marketing materials or AI-generated content and notes that no page limit exists. Contact information for the electrical system mounted to razor wire will be provided to the awarded consultant for pricing inquiries regarding removal and reinstallation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REAL ESTATE AND CONSTRUCTION SERVICES

309 Administration Building

50 Sherburne Ave St. Paul, Minnesota 55155

Voice: (651) 201.2550

TTY: (800) 627.3529

FAX: (651) 215.6245

http://mn.gov/admin/

Addendum #2

Date: July 24, 2026

Request for Proposal: RECS RFP Design for Deferred Maintenance Projects at Oak Park Heights RECS Project Number: 78OP0042 Event ID: 2000018451

Subject: RFP Mandatory Meeting Attendees, Questions & Answers

Mandatory Meeting Attendees:

The following firms attended the mandatory meeting held on July 21, 2026:

• Auromira Architects

• CBS Squared, Inc.

• Quetica, LLC

• Wold AE

• TWP Architects

• Ericksen Ellison & Associates

• Inspec

• Busch Architects, Inc.

• DLR Group

Questions & Answers:

Question #1: Will B3 be required as part of this project?

Answer #1: No

Question #2: Please confirm that all work will be issued in a single bid package.

Answer #2: Yes, the intent of the project is to bid the construction as one bid package

Question #3: Should we budget a lift to look at the masonry or can we access the catwalk on the roof to look at the higher wall elevations and other areas on the roof?

Answer #3: Yes, consultants should budget a lift to view masonry http://mn.gov/admin/ http://mn.gov/admin/

Question #4: Do you know if any existing materials contain asbestos?

Answer #4: We do not anticipate ACM, however if any is encountered or suspected the owner will contract with a third party to test and if necessary, abate

Question #5: Should painting the lintels be included in the general repairs for the walls?

Answer #5: Yes

Question #6: You mentioned that you have existing plans, do you have existing drawings for the wall elevations?

Answer #6: Yes. Any pertinent drawings and plans will be available to the awarded consultant

Question #7: You mentioned phasing, for our cost estimate do you want it shown as a lump sum and determine phasing later?

Answer #7: Yes

Question #8: Do you want another infrared scan as part of the roof assessment?

Answer #8: This will be determined once we have a consultant on board

Question #9: Are there specific times/days that we are allowed access to the site for site work/assessment?

Answer #9: Monday through Friday, between 8:00 am to 2:00 pm, excluding holidays.

Question #10: Is there a page limit?

Answer #10: No. However, please refrain from including marketing materials or using AI‑generated content.

Question #11: Can you provide a contact for the detection electrical system mounted to the razor wire to the winning bidder to ask about pricing of removal and reinstalling that system?

Answer #11: Yes, will be provided to awarded consultant

Question #12: Are the existing exterior metal stairs included in the scope of work? If so, clarify the scope of work.

Answer #12: No

Question #13: What is the anticipated frequency of site visits during the construction phase for projects #1 and #2?

Answer #13: See RFP and the bullet points assigned to each project. Any additional site visits will be discussed

Question #14: Will the existing building plans and specifications be provided to the selected team?

Answer #14: Yes, will be provided to awarded consultant

Question #15: Is it an option to utilize lidar scanning at exterior locations?

Answer #15: Yes

Question #16: Are you looking for evaluation of masonry exteriors to be hands on from a lift or should it be visual from the ground plane?

Answer #16: See Question & Answers #3 above.

End of Addendum #2

Mandatory Meeting Attendees:
Questions & Answers:

File details come from the government source that posted it. Updated .