RFP_8100_JNH3000_ATT_9_v1.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- Aviation Telephone System & Services
- Solicitation number
- RFP 8100 JNH3000
- Issued by
- Texas
About this file
This file is a milestone payment schedule and deliverables alignment document for the City of Austin's Aviation Telephone System & Services contract at Austin-Bergstrom International Airport (AUS). The contract is structured around ten milestones spanning project initiation through closeout, with deliverables-based payment authorization required at each gate. The project phases include Project Initiation & Planning (due within 15 days of kickoff), Network Readiness Confirmation (45 days), System Design Approval (60 days), Installation Readiness (prior to installation start), Cutover Readiness (minimum 30 days prior to first cutover), Deployment Completion (prior to formal testing), Testing and Training Completion (prior to Final Acceptance), Stabilization Completion (within 10 days after stabilization period), Final Acceptance, and Project Closeout (within 30 days after Final Acceptance). Each milestone requires written Aviation approval of specified deliverables before payment authorization.
The payment structure is distributed across the ten milestones with percentages ranging from 5% to 15%, totaling 100% of the contract value upon final acceptance. Milestone payments are contingent solely on written acceptance of required deliverables by Aviation; work performance alone does not authorize payment. The contract establishes a clear acceptance gate framework requiring specific documentation at each phase, including baseline project schedules, network assessment reports, system design packages, installation plans, cutover plans, testing results, training completion evidence, stabilization packages, and final closeout documentation. The warranty period and initial maintenance and support services do not commence until Final Acceptance is granted, and Aviation reserves the right to withhold payment for incomplete or deficient deliverables.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP_8100_JNH3000_ATT_12_v1.pdf | ||
| RFP_8100_JNH3000_ATT_4_v1.pdf | ||
| RFP_8100_JNH3000_ATT_3_v1.pdf | ||
| RFP_8100_JNH3000_ATT_1_v1.pdf | ||
| RFP_8100_JNH3000_ATT_6_v1.pdf | ||
| RFP_8100_JNH3000_ATT_14_v1.pdf | ||
| RFP_8100_JNH3000_ADD_4_v1.pdf | ||
| RFP_8100_JNH3000_ADD_6_v1.pdf | ||
| RFP_8100_JNH3000_ADD_3_v1.pdf | ||
| RFP_8100_JNH3000_ADD_5_v1.pdf | ||
| RFP_8100_JNH3000_ATT_5_v1.pdf | ||
| RFP_8100_JNH3000_ATT_7_v1.pdf | ||
| RFP_8100_JNH3000_ATT_2_v1.pdf | ||
| RFP_8100_JNH3000_ATT_11_v1.xlsx | XLSX spreadsheet | |
| RFP_8100_JNH3000_ATT_13_v1.xlsx | XLSX spreadsheet | |
| RFP_8100_JNH3000_ATT_8_v1.pdf | ||
| RFP_8100_JNH3000_ATT_10_v1.xlsx | XLSX spreadsheet | |
| IFB_2200_CSH1061_ATT_10_v1.docx | DOCX document | |
| RFP_8100_JNH3000_ADD_2_v1.pdf | ||
| RFP_8100_JNH3000_ATT_15_v1.pdf | ||
| RFP_8100_JNH3000_ADD_1_v1.pdf | ||
| RFP_8100_JNH3000_ATT_2_v2.pdf | ||
| RFP_8100_JNH3000_ATT_1_v7.pdf | ||
| RFP_8100_JNH3000_ATT_4_v2.pdf |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Milestone Payments
| Payment Principle: | |||
| Payments are authorized only upon acceptance of required deliverables. Work performance alone does not constitute payment approval. | |||
| Milestone-Based Payment Schedule | |||
| Milestone | Description | Deliverables Required (Section References) | Payment % |
| M1 | Project Initiation & Planning | Approved Baseline Project Schedule (Sections 8.2 / 9.2.8.2) | 5% |
| M2 | Network Readiness Confirmation | Network Assessment Report Approved (Sections 8.3 / 9.4) | 10% |
| M3 | Design Approval | System Design Package and ACD (Automatic Call Distribution) Flow Design Approved (Sections 8.4 / 9.5.6) | 15% |
| M4 | Installation Readiness | Installation Plan and Installation Readiness Confirmation Approved (Sections 8.5 / 9.8.12) | 15% |
| M5 | Cutover Readiness | Approved Cutover Plan (Sections 8.6) | 10% |
| M6 | Deployment Completion | Installation Completion Confirmation / System Ready for Testing (Section 9.12) | 10% |
| M7 | Testing, Training, and Knowledge Transfer Completion | Approved Testing Deliverables, Training Completion, Knowledge Transfer Completion (Sections 8.7 / 8.8 / 8.9 / 9.12 / 9.13) | 10% |
| M8 | Stabilization Completion | Stabilization Completion Package Approved (Sections 8.10 / 9.12.6 / 9.14) | 10% |
| M9 | Final Acceptance | Written Final Acceptance Notice (Sections 9.12.6 / 9.14) | 10% |
| M10 | Project Closeout | Final Closeout Documentation Package Approved (Sections 8.12, 9.14.10) | 5% |
| No milestone payment shall be released without written Aviation acceptance of required deliverables | |||
| Warranty and Initial Maintenance & Support Period do not commence until Final Acceptance | |||
| Aviation reserves the right to withhold payment for incomplete or deficient deliverables |
&"-,Bold"&14&F
Deliverables
| Milestone / Acceptance Gate / Payment Alignment | ||||||
| Phase | Milestone | Primary Deliverable / Evidence | Acceptance Gate | Timeline Requirement | Suggested Payment Trigger | Suggested Payment % |
| Contract Initiation | Project Kickoff Completion | Approved baseline Project Schedule (Sec. 8.2 / 9.2.9.2) | Aviation approval of baseline schedule | Within 15 days of Project Kickoff | Written approval of baseline schedule | 5% |
| Assessment | Network Assessment Completion | Network Assessment Report (Sec. 8.3 / 9.4) | Aviation approval of report | Within 45 days of Project Kickoff | Written approval of Network Assessment Report | 10% |
| Design | System Design Approval | System Design Package and ACD Call Flow Design (Sec. 8.4 / 9.5.6) | Aviation written approval of design | Within 60 days of Project Kickoff | Written approval of System Design Package | 15% |
| Implementation Readiness | Installation Authorization | Installation Plan and Installation Readiness Confirmation (Sec. 8.5 / 9.8.12) | Aviation installation authorization | Prior to installation start | Written approval of installation readiness confirmation | 15% |
| Cutover Readiness | Cutover Authorization | Cutover Plan (Sec. 8.6) | Aviation cutover approval | Minimum 30 days prior to first cutover | Written approval of Cutover Plan | 10% |
| Deployment | Deployment Completion | Installed and configured system ready for testing (9.12) | Aviation written confirmation installation complete | Prior to formal testing phases | Written confirmation of Installation completion | 10% |
| Testing & Training | Testing and Training Completion | Testing results, training completion evidence, knowledge transfer deliverables (Sec. 8.7 / 8.9 / 9.12 / 9.13) | Aviation written approval of testing and training completion | Prior to Final Acceptance determination | Written approval of testing and training completion | 10% |
| Stabilization | Stabilization Completion | Stabilization Completion Package (Sec. 8.10 / 9.12.6/ 9.14) | Aviation stabilization acceptance | Within 10 days after stabilization period | Written approval of stabilization package | 10% |
| Final Acceptance | Final Acceptance Granted | Final Acceptance documentation (Sec. 9.12.6 / 9.14) | Written Final Acceptance by Aviation | After completion of all acceptance prerequisites | Written Final Acceptance notice | 10% |
| Closeout | Project Closeout Completion | Final Closeout Documentation Package (Sec. 8.12 / 9.14.10) | Aviation acceptance of closeout deliverables | Within 30 days after Final Acceptance | Written approval of closeout documentation | 5% |