This is a Request for Proposals (RFP) for a Multiple Award Task Order Contract (MATOC) issued by the Federal Highway Administration's Western Federal Lands Highway Division for highway, road, and bridge construction projects in Idaho, Montana, and surrounding states. The RFP (Solicitation #69056724R000007) seeks to award up to six Indefinite Delivery/Indefinite Quantity (IDIQ) contracts, with three reserved for small businesses, for a 3-year period with a shared maximum capacity of $60 million.

The scope includes improvements to low-volume and low-speed roadways, ranging from resurfacing/restoration/rehabilitation to full reconstruction, with projects typically under $7 million. Work may include earthwork, soil stabilization, structures, bridges, walls, drainage, surfacing, culverts, paving, and parking lots, often in environmentally sensitive areas. Proposals are due January 28, 2024 at 2:00 PM local time. The evaluation will use Lowest Price Technically Acceptable criteria, with factors including contractor experience, bonding capacity (minimum $1.5M single contract), past performance, and price on a sample project. The contract will support various federal partners including the National Park Service, Fish and Wildlife Service, US Forest Service, and Bureau of Land Management, with funding through Federal Lands Access Program and Federal Lands Transportation Program.

View the file

Other files

File Type Posted
QA_1-24-2025.pdf PDF
QA_1-22-2025_2.pdf PDF
QA_1-22-2025.pdf PDF
Amendment A003.pdf PDF
QA_1-16-2025.pdf PDF
QA_1-13-2025.pdf PDF
QA_1-10-2025.pdf PDF
QA_1-7-2025.pdf PDF
QA_1-6-2025.pdf PDF
Amendment A002.pdf PDF
Amendment A001.pdf PDF
J.4 Sample Project_MT NP GLAC HQ(3).pdf PDF
J.2 Technical Information Form 1.pdf PDF
J.3 Past Performance Form 2.pdf PDF
J.1 Master Subcontracting Plan.pdf PDF
J.4 Sample Project Plans.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MULTIPLE AWARD TASK ORDER CONTRACT (MATOC)

REQUEST FOR PROPOSALS (RFP)

Solicitation #: 69056724R000007

LOWEST PRICE TECHNICALLY ACCEPTABLE

(Proposals Due Date: See Page A-3, Block 13A)

Idaho, Montana, and Surrounding Areas Indefinite Delivery/ Indefinite Quantity (IDIQ) Multiple

Award Task Order Contract (MATOC)

ISSUING OFFICE: U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

610 EAST FIFTH STREET

VANCOUVER, WA 98661-3801

Phone: (360) 619-7520 email: wfl.contracts@dot.gov

PROPOSAL REMINDERS

Electronic proposals will be accepted. Submit proposals in accordance with the instruction in section

L. Before submitting your proposal, please review the following:

• Have you completed the Authority to Sign?

• Have you completed and signed the SF1442, Solicitation, Offer & Award?

• Have you acknowledged all amendments?

• Have you registered and completed your

Representations & Certifications in the System of Award Management?

• Have you completed the general information, technical proposal, and price proposal?

QUICK INDEX

Part I – The Schedule

Part II – Contract Clauses

Part III – List of Documents, Exhibits, and Attachments

Part IV – Representations and

Instructions mailto:wfl.contracts@dot.gov

PROJECT NAME Idaho, Montana, and Surrounding Areas Indefinite Delivery/

Indefinite Quantity (IDIQ) Multiple Award Task Order

Contract (MATOC)

NATIONAL FOREST/PARK Multiple

COUNTY Multiple

STATE Multiple

Offer Submittal Checklist

Project: Idaho, Montana, and Surrounding Areas IDIQ MATOC

OFFER SUBMITTAL CHECKLIST

Before submitting your offer, please review the following:

Done?

Is this in the

Proposal?

Offer Delivery

Did I send hard copy proposals to the correct address?

Did I Email proposal modification attachments to the correct email box?

Pages A-3 & A-4 (SF 1442, Solicitation Offer & Award)

Did I include our firm name and address in block 14?

Did I include our firm’s phone number in block 15?

Did I include our firm’s remittance address in block 16?

(Use when different than block 14)

Did I include my Unique Entity Identifier (formerly DUNS) and my Cage

Code?

Did I include the number & date of all amendments in block 19?

Did the appropriate official sign/date in block 20A, 20B & 20C?

Authority to Sign

Did I include a completed form for each person signing the SF1442?

Proposal Submittal- Provisions- See Section K

Did I include Section K and fill out contact information on page K-8?

Proposal Submittal- See Section L & M

Did I include a Technical Information Form 1 (attachment J.2) for each project submitted for Evaluation Factor 1?

Did I include a letter from my bonding agent indicating current bonding limits for

Evaluation Factor 2?

Did I include Past Performance Information made available from project owners for

Factor 3, if applicable? If not available, did I provide Past Performance Form 2

(attachment J.3)?

Did I include the price proposal/Bid Schedule for the Sample Project (attachment J.4) for

Factor 4?

Did I include all other written submittals required by the evaluation factors and subfactors listed in section M?

System for Award Management (SAM) https://www.sam.gov/portal/public/SAM/

Is our SAM record active and information up to date?

Have we completed our online representations and certifications in SAM?

Veteran Reporting (FAR Clause 52.222-37)

If applicable, did I ensure our firm has completed this annual report?

NOTE: The Contractor is fully responsible to verify that all data is correct each time a offer package is submitted. Failure to properly input and/or update your data may cause the offer to be rejected.

Driving Directions to our Vancouver Washington Office:

Directions to WFLHD https://www.sam.gov/portal/public/SAM/ https://www.google.com/maps/place/610+E+5th+St,+Vancouver,+WA+98661/data=!4m2!3m1!1s0x5495a8ae3f2d7083:0x5b7adcfa96ade37a?hl=en

Authority to Sign

INSTRUCTIONS: When the offeror/principal is a corporation, include this certification with your offer.

Corporate Certificate

I, ____________________________________________ (name), certify that I am the

________________________________________(title), of the corporation named as the Offeror/Principal herein;

that _________________________________________(name), who signed this offer and/or bid bond on behalf of ___________________________ (company name) is

________________________________________ (title) of this corporation;

that the offer was duly signed for and on behalf of said corporation by authority and scope of its governing body, and within the scope of its corporate powers.

_____________________________________ (signature) Affix Corporate Seal

_____________________________________ (title)

INSTRUCTIONS: When the offeror/principal is a limited liability company, include this certification with your offer/bid.

Limited Liability Certificate

I, ____________________________________________ (name), certify that I am the

________________________________________(title), of the limited liability company named as the Offeror/Principal herein;

that _________________________________________(name), who signed this offer and/or bid bond on behalf of ___________________________ (company name) is

________________________________________ (title) of this company;

that the offer was duly signed for and on behalf of said company by authority and scope of its governing body, and within the scope of its powers.

_____________________________________ (signature) Affix Company Seal (as applicable) ___________________________________ (title)

INSTRUCTIONS: When the offeror/principal is a partnership, include this certification with your offer/bid.

Authority to Bind Partnership

This certifies that the names and signatures of all partners are listed below, and that the person signing the proposal has the authority to actually bind the partnership pursuant to its partnership agreement. Each of the partners individually has full authority to enter into and execute contractual instruments on behalf of said partnership, except as follows:

(State “None” or describe limitations, if any)

This authority shall remain in full force and effect until such time as the revocation of authority by any cause whatsoever has been furnished in writing to and acknowledge by the Contracting Officer.

(Include names and signatures of all partners)

INSTRUCTIONS: When the offeror/principal is a joint venture, include this certification with your offer/bid.

Authority to Bind Joint Venture

This certifies that the person signing the proposal has the authority to actually bind the joint venture pursuant to its joint venture agreement, and that each of the named persons listed below individually has full authority to enter into and execute contractual instruments on behalf of said joint venture, except as follows:

(State “None” or describe limitations, if any)

This authority shall remain in full force and effect until such time as the revocation of authority by any cause whatsoever has been furnished in writing to and acknowledge by the Contracting Officer.

(Include names and signatures of all applicable individuals)

INSTRUCTIONS: When the offeror/principal is a sole proprietorship, the signature on the offer/bid and on the bonds must be as follows:

Sole Proprietorship Requirement

An Offeror/Principal that is a sole proprietorship must submit an offer/bid and a bond signed by the sole proprietor, or by one duly authorized to sign for the sole proprietor. If the signature is by someone other than the sole proprietor, a copy of the power of attorney authorizing the individual to sign must be provided with the offer/bid.

Table of Contents

TABLE OF CONTENTS

Contents

PART I – THE SCHEDULE .................................................................................................................... A-1

SECTION A. SOLICITATION/CONTRACT FORM NOTICE TO OFFERORS SF 1442,

SOLICITATION, OFFER AND AWARD .......................................................................................... A-1

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS .................................................... B-1

SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK ............................... C-1

SECTION D – PACKAGING AND MARKING ................................................................................ D-1

SECTION E – INSPECTION AND ACCEPTANCE .......................................................................... E-1

SECTION F – DELIVERIES OR PERFORMANCE .......................................................................... F-1

SECTION G – CONTRACT ADMINISTRATION DATA ................................................................ G-1

SECTION H – SPECIAL CONTRACT REQUIREMENTS ............................................................... H-1

PART II – CONTRACT CLAUSES ......................................................................................................... I-1

SECTION I – FEDERAL ACQUISITION REGULATION CONTRACT CLAUSES ....................... I-1

Part III – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS ................................ J-1

SECTION J – LIST OF ATTACHMENTS ........................................................................................... J-1

PART IV – REPRESENTATION AND INSTRUCTIONS ..................................................................... K-1

SECTION K – REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF

OFFERORS OR RESPONDENTS ...................................................................................................... K-1

SECTION L – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS OR

RESPONDENTS .................................................................................................................................. L-1

SECTION M – EVALUATION FACTORS FOR AWARD .............................................................. M-1

Table of Contents

RESERVED

A-1

Notice to Offerors

Project: Idaho, Montana and Surrounding Areas IDIQ MATOC

PART I – THE SCHEDULE

SECTION A. SOLICITATION/CONTRACT FORM NOTICE TO OFFERORS SF 1442,

SOLICITATION, OFFER AND AWARD

A.1 NOTICE TO OFFERORS

I. Solicitation Overview

The primary objective of this solicitation is to solicit qualified firms for Multiple Award Task Order

Contracts (MATOC), covering a 3-year period, for Highway, Bridge, and Road projects in Idaho and

Montana, and projects in the surrounding areas (states bordering Idaho and Montana). The Federal

Highway Administration plans to award up to six Indefinite Delivery, Indefinite Quantity (IDIQ) construction contracts, anticipating at least three will be reserved for Small Business concerns.

II. Pre-proposal Information

This solicitation and subsequent contracts are governed by the Federal Acquisition Regulation (FAR) and agency supplemental regulations. Task Orders to be issued under a contract will be subject to the

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14 or

FP-24, U.S. Customary Units, or any subsequent FP that may be applied to the Task Order, as well as supplemental specifications and plan sheets. An electronic version of the FP-14 and FP-24 may be found at https://highways.dot.gov/federal-lands/specs.

REPRESENTATIONSS AND CERTIFICATIONS - Submit or update REPS and CERTS online at https://sam.gov before proposal submittal. For more details, go to FAR Provision 52.204-8 Annual

Representations and Certifications (see page K-1). If you have previously registered on-line and the

NAICS code for this solicitation is different than the code listed in your online file, please note the amended changes on the lines provided in FAR 52.204-8.

NOTICE OF SAM REGISTRATION – You must have an active System for Award Management

(SAM) profile prior to submittal of your offer. Failure to register prior to submittal of your offer will make your offer non-responsive. See FAR Subpart 4.1103(b). Register online at https://.sam.gov.

Solicitation Discrepancies: If an Offeror believes the requirements in this solicitation contain an error, omission, or are otherwise unsound, the Offeror shall immediately notify the Contracting Officer (CO) in writing with supporting rationale.

Form SF 1442 - Particular attention should be paid to Standard Form l442, Solicitation, Offer and Award, to assure that Blocks 14, 15, 16, 19, 20A, and 20C are completed correctly. Sign Block 20B. You must submit a completed ‘Authority to Sign’ document. You must also complete the representations and certifications contained in the Contract Provisions beginning on page K-1. Failure to furnish or complete any of the above may result in your offer being rejected.

Facsimile and email proposals, modifications, and withdrawals. Facsimile and email proposals are not authorized for this solicitation. Proposals may be modified or withdrawn by email if such notice is received by the time specified for receipt of proposals. The Government will not be responsible for any failure attributable to the transmission or receipt of email data. EMAIL WFL.Contracts@dot.gov. To confirm receipt, call 360.619.7520.

Proposal Submittals - See Subsections L and M.

https://highways.dot.gov/federal-lands/specs https://sam.gov/ https://.sam.gov/ mailto:WFL.Contracts@dot.gov

A-2

Notice to Offerors

Project: Idaho, Montana and Surrounding Areas IDIQ MATOC

Fraud Alert - Current and potential U.S. Department of Transportation (DOT) Contractors have recently been receiving fraudulent letters purporting to be issued by DOT. These fraudulent letters request that the

Contractors resubmit their banking information to DOT. If you receive such a letter, please DO NOT complete the requested worksheet that is attached to the letters and DO NOT release any information. To register or update information, Contractors are required to go directly through the System for Award

Management (SAM) website and never through a third party. You can access SAM at https://sam.gov.

III. Post Award Information

Contractor Performance Evaluations. This office posts performance evaluations in the Contractor

Performance Assessment Reporting System (CPARS). Upon receiving an email notice of evaluation availability, you will have 60 days to review the evaluation online and submit comments. If you are unable to access the system, call 360.619.7520 for assistance or for a copy of the evaluation.

Task Orders – All work will be issued by Task Order.

https://sam.gov/

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

Federal Highway Administration

FHWA WESTERN FED LANDS DIVISION

610 E FIFTH STREET

Vancouver WA 98661

690567

Federal Highway Administration

FHWA WESTERN FED LANDS DIVISION

610 E FIFTH STREET

Vancouver, WA 98661

a. NAME

ACQUISITIONS

b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

360-619-7520

1x 12/16/2024

69056724R000007

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

This solicitation is designated Idaho, Montana, and Surrounding Areas Indefinite

Delivery/ Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC)

IN STRICT ACCORDANCE WITH:

MATOC Description/Specifications/Statement of Work

Federal Acquisition Regulations (FAR) and Transportation Acquisition Regulations

(TAR)

11. The Contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

calendar days and complete it within ________________ ________________ calendar days after receiving

* Specified on each TO-RFP

01/28/2024

NSN 7540-01-155-3212

x

_____________ copies to perform the work required are due at the place specified in Item 8 by ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 8/2014)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

A-3

Specified on each TO-RFP

(Required on a Task Order basis)

See Block 10

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

Federal Highway Administration

FHWA WESTERN FED LANDS DIVISION

610 E FIFTH STREET

Vancouver WA 98661

690567

DEAN UMATHUM

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 3304(a)

STANDARD FORM 1442 (REV. 8/2014) BACK

A-4

Unique Entity Identifier (SAM.gov):

Cage Code:

As determined on each task order.

As determined on each task order.

As determined on each task order.

As determined on each task order.

Federal Highway Administration

FHWA WESTERN FED LANDS DIVISION

610 E FIFTH STREET

Vancouver WA 98661

X

A-5

Continuation SF 1442

Block 9 FOR GENERAL INFORMATION, call 360.619.7520 from the hours of 8:00 a.m. to

4:00 p.m. local time or e-mail us at wfl.contracts@dot.gov.

FOR TECHNICAL INFORMATION (plan and specification questions only), requests for technical information about this project will only be accepted in writing.

Submit questions via e-mail at wfl.plans-spec@dot.gov.

QUESTIONS/ANSWERS POSTED ONLINE, you can view questions and answers on

SAM.gov.

• Insert the solicitation number in “Keyword / Solicitation #:”

• Scroll to the project.

• Make sure you are on the most recent view and look in the right section of the page for the most recent Q&A document.

SUBCONTRACTING PLAN. This Request for Proposals requires an Offeror who is a large business to submit a Master Subcontracting Plan prior to MATOC Award. A large business is one whose average gross annual receipts over the past three years equals $45.0 million or more. For your information, the subcontracting plan form is included in the appendix section of this RFP. This requirement does not apply to small businesses.

mailto:wfl.contracts@dot.gov mailto:wfl.plans-spec@dot.gov https://sam.gov/content/home

A-6

Continuation SF 1442

B-1

SECTION B - Supplies or Services and Prices/Costs

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 SERVICES AND PRICE/COSTS

ITEM

No.

DESCRIPTION

00101

Construction, Multiple Award Task Order Contract (MATOC).

Highway/Bridge/Road projects in Idaho and Montana, and projects in the surrounding areas (states that border Idaho and Montana).

The Government will review the General Information. The Technical submittal is evaluated for each factor (Technical Factor 1 – Proposed Prime Contractors Recent and Relevant Experience, Technical

Factor 2 – Bonding Capacity, and Technical Factor 3 – Past Performance) to determine Offerors as

Technically Acceptable or Technically Unacceptable. The Technically Unacceptable firms will be notified of their exclusion from further evaluation and consideration for award.

Only those firms determined to be Technically Acceptable will have their sample project price submittal considered. Award will be based on the evaluation criteria listed in Section M.

CLAUSES AND PROVISIONS

1. Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text. FAR provisions and clauses incorporated by reference can be accessed on the Internet at https://www.acquisition.gov/far/. Offerors are strongly encouraged to review the provisions and clauses referenced in this document before submitting a proposal.

2. Clauses and provisions in this document are numbered in sequence, but do not necessarily appear in consecutive order.

3. Section K, L and M will be physically removed from the award but deemed incorporated by reference.

https://www.acquisition.gov/far/

B-2

SECTION B - Supplies or Services and Prices/Costs

C-1

SECTION C – Description/Specifications/Statement of Work

SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1. OVERVIEW

The purpose of this Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple-Award Task Order

Contract (MATOC) is to provide highway, road, and bridge construction in the states of Idaho and

Montana. Projects will primarily involve improvements to low-volume and low-speed roadways ranging from 3R (resurfacing, restoration, and rehabilitation) to full reconstruction. Projects may include, but are not limited to the following: earthwork, soil stabilization, structures, bridges, walls, drainage, surfacing, culverts, paving, parking lots, and other miscellaneous items of work. Projects may be located in environmentally sensitive areas that necessitate context-sensitive construction techniques and processes.

The work will involve a variety of partners including but not limited to the National Park Service

(NPS), Fish and Wildlife Service (FWS), United States Forest Service (USFS), Bureau of Land

Management (BLM), States, and local municipal agencies. Funding sources will include but not be limited to the Federal Lands Access Program (FLAP) and the Federal Lands Transportation Program

(FLTP).

It is currently estimated that the maximum value of the MATOC will not exceed a shared

$60,000,000 capacity. It is anticipated that the average construction task order under the MATOC will be below $7,000,000. The predominant geographic areas are the states of Idaho and Montana.

Umbrella Contracts – WFLHD intends to award up to six Indefinite Delivery-Indefinite-Quantity

Multiple-Award Task Order Contracts (MATOC). The number of actual awards is dependent upon the merits of the proposals received. This solicitation is a Partial Small Business Reserve and three MATOCs are reserved for small business concerns. The combined maximum quantity to be ordered over the life of all awarded contracts is $60,000,000. The combined maximum quantity for the MATOC contracts is calculated as the sum of all Task Order awards and Task Order Modifications. Each MATOC contract will be for a 3-year period.

MATOC Minimum Guarantee - The minimum amount guaranteed over the life of each MATOC contract is $10,000.

Task Orders - All work will be awarded on a Task Order basis. Task Orders will vary in size, ranging from approximately $250 thousand to $20 million.

As requirements develop and funding becomes available, Task Order Requests for Proposal (TO-RFP) will be issued. Unless there is a set-aside for small business, TO-RFP will be issued to all MATOC contractors. If a project is set-aside for small business, the TO-RFP will be issued only to small business

MATOC contractors.

Types of Task Orders - Task Orders may be Firm-Fixed-Price (FFP) or FFP with economic price adjustments.

Anticipated Projects - Table 1 lists the currently anticipated projects. This list is provided for informational purposes only. The Government is not guaranteeing the delivery of these projects via this

MATOC contract.

C-2

Table 1. Currently Anticipated ID/MT MATOC Projects

Project Code Project Name Program

Anticipated

Award

Year

Estimated

Costs

MT FWS RRL TSPAR(1) SPARROW POND BRIDGE FLTP - FWS 2025

Between

$250,000 and

$700,000

MT PRAIRIE 2016(3)

MILWAUKEE BRIDGE

RESURFACING AND

REHABILITATION

FLAP 2025

Between

$5,000,000 and

$10,000,000

MT NP GLAC P HQ(3)

GLAC HQ PARKING AREA

REHABILITATION, PHASE 3

FLTP 2025

Between

$700,000 and

$2,000,000

MT NP GLAC 12(2) &

MT FLAP BLACKF 12(1)

REHABILITATION OF TWO

MEDICINE ROAD

FLAP 2025

Between

$10,000,000 and

$20,000,000

ID FLAP FS SC

MULTI(1)

CUSTER MOTORWAY AND

YANKEE FORK ROAD

IMPROVEMENTS

FLAP 2026

Between

$700,00 and

$2,000,000

ID FLAP ADA 2019(1)

WESTERN HERITAGE

BYWAY - SWAN FALLS ROAD

FLAP 2026

Between

$2,000,000 and

$5,000,000

MT FLAP SILVER

2021(1)

ROOSEVELT DRIVE SAFETY

AND REHABILITATION

PROJECT

FLAP 2026

Between

$5,000,000 and

$10,000,000

ID FS NEZPR117 221(1)

NATIONAL FOREST SYSTEM

ROAD 221 REHABILITATION

FS 2026

Between

$10,000,000 and

$20,000,000

Total Estimated Dollar Value $60,000,000

C.2. SPECIFICATIONS

It is anticipated that most of the work will generally incorporate the specifications and design standards of

American Association State Highway Transportation Officials (AASHTO), and specifications based on the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14 and FP-24).

Websites - The following web sites contain information that may be used in the development of Task

Orders. Other information not contained in the below websites also may be used in the development of

Task Orders.

C-3

Project: Idaho, Montana, and Surrounding Areas IDIQ MATOC

Standard Specifications (FP) - The Standard Specifications for Construction of Roads and

Bridges on Federal Highway Projects (FP-14 and FP-24) are issued primarily for constructing roads and bridges on Federal Highway projects under the direct administration of the Federal

Highway Administration. View the FP online at: http://flh.fhwa.dot.gov/resources/pse/specs/

Western Federal Lands Highway (WFLHD) Library of Supplemental Specifications (FP-14 and FP-24) - Special Contract Requirements (SCRs) supplement the FP. A library of SCRs may be viewed at https://highways.dot.gov/federal-lands/specs/wfl-los/fp-14-library for the FP-

14 and https://highways.dot.gov/federal-lands/specs/wfl-los/fp-24-library for the FP-24.

These documents are periodically updated and do not include all the SCR’s that may be developed for a project.

Federal Lands Highway (FLH) Standard Drawings - FLH standard drawings include various design details that may be included in a project. Files are available in MicroStation® and

Acrobat® formats http://flh.fhwa.dot.gov/resources/pse/standard/.

Construction Management Resources – At this link contractors can access various manuals, forms, tests and so on for use during contract administration. You can view these documents at:

https://flh.fhwa.dot.gov/resources/construction/forms/wfl/.

C.3. WAGE RATES

Construction Wage Rate Requirements are applicable to construction Task Orders awarded under this contract.

C.4. ORDERING PROCEDURES FOR COMPETITIVE TASK ORDERS.

It is anticipated that most, if not all, of the Task Orders will be awarded based on competition between all MATOC contract holders.

(1) Task Order (TO) proposals – Proposals will not be publicly opened. Following the opening of proposals and verification of responsiveness for any TO proposal that was solicited without discussions and fair opportunity was provided, award will be based on price only. Price tabulations will be posted to SAM.gov post award. Other circumstances that may prevent the posting of the price tabulations are at the COs discretion.

If your pricing submittal is considered confidential and you prefer it not be released to SAM.gov, provide a justification, in writing, on or before the TO proposal due date. The justification shall demonstrate the harm inflicted by the release of the price tabulations to your organization. The CO will analyze the justification and determine if the price tabulations will be posted.

(2) Task Order Synopsis - When the Government requires work under the MATOC and time allows, a

Task Order-Synopsis will be posted on SAM.gov. The synopsis will provide a brief description of the project and the anticipated solicitation issue date. In some instances, the synopsis may be issued via e-mail.

(3) Task Order Requests for Proposals (TO-RFP) - When the Government requires work under the

MATOC, a TO-RFP will be issued. The TO-RFP will include information concerning the project such as, contract requirements, physical data, drawings, site visit details, evaluation criteria, and submission requirements (e.g., bid schedule, proposal requirements, etc.).

http://flh.fhwa.dot.gov/resources/pse/specs/ https://highways.dot.gov/federal-lands/specs/wfl-los/fp-14-library https://highways.dot.gov/federal-lands/specs/wfl-los/fp-24-library http://flh.fhwa.dot.gov/resources/pse/standard/ https://flh.fhwa.dot.gov/resources/construction/forms/wfl/

C-4

(4) Task Order Pre-award Expenses - The Contractor will not be reimbursed for proposal preparation, attendance during negotiations, site visits, walk-through, or other pre-award Task Order costs.

(5) Site Visits - Failure to visit the site cannot be used as an excuse for omission or miscalculation in offers. The Government may or may not schedule a joint site visit for individual Task Orders.

(6) Proposal Contents - Depending upon the requirements of each TO-RFP, the Contractor may be required to provide a price proposal only, or a technical proposal and a price proposal. Respond within the number of calendar days stated in the TO-RFP by submitting a proposal to the CO.

(7) Contract Prices - Bid Schedules - Payment for items listed in the Bid Schedule constitutes full compensation for furnishing all labor, equipment, services, and materials needed to complete construction. Include in the prices for the items listed in the Bid Schedule all costs for the specified work, whether or not specifically listed in the Bid Schedule.

(8) Bid Bonds. Submit bid bonds with the Task Order proposal as required in the TO-RFP.

(9) Proposal Deviations - Proposals that deviate from the TO requirements may be rejected or delay award.

(10) Declining a Task Order - With the exception of the sample project being issued with this solicitation to evaluate pricing, contractors are not required to submit a proposal for each TO-RFP.

The Contractor must decline a project by written notice to the CO stating the reason and submit no later than 2 business days prior to the TO-RFP proposal due date.

(11) Fair Opportunity - All MATOC Contractors will be given fair opportunity to be considered for each order exceeding the micro-purchase threshold issued under this MATOC except as provided below:

(a) The agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays;

(b) Only one awardee is capable of providing the supplies or services required at the level of quality required because the supplies or services ordered are unique or highly specialized;

(c) The order must be issued on a sole-source basis in the interest of economy and efficiency because it is a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order.

(d) It is necessary to place an order to satisfy a minimum guarantee;

(e) For orders exceeding the simplified acquisition threshold, a statute expressly authorizes or requires that the purchase be made from a specified source; or

(f) The Contracting Officer sets aside the order for small businesses (see Section C.6).

In determining eligibility to compete, the CO considers such factors as performance on Task Orders under the MATOC contract, quality, timeliness, special expertise, or other factors the CO determines are relevant to award of a particular Task Order. Failure to prosecute the work diligently on Task

Orders may be cause for the CO to determine a contractor in-eligible to compete on a TO-RFP.

Additional factors that may make a contractor ineligible include poor past performance, failure to propose on TO-RFPs, or a Sole Source action is justified.

C-5

(12) Evaluation Method and Procedures - The basis of award for an individual Task Order may vary and will be described in the TO-RFP. Examples of a basis for award are:

(a) Based on price only.

(b) Based on both price and non-price factors, with the Task Order awarded to the Contractor offering the best value to the Government. The Government reserves the right to accept other than the lowest priced offer. The TO-RFP will describe whether price is less important, more important, or equal in importance to non-price factors.

(13) Award Decision - Whenever possible, award will be made without discussions. Task Orders will be

FFP or FFP with an economic price adjustment. The Government reserves the right to reject all offers.

(14) Task Order Award

Award Notification - The Task Order becomes binding when the Contracting Officer signs the order. Notice of Task Order award will be via email. The Notice to Proceed (NTP) may be issued separately, normally after receipt of acceptable performance and payment bonds.

(a) Insurance. Submit acceptable proof of insurance before beginning work.

(b) Performance & Payment Bonds. Submit Performance and Payment Bond documents upon request. Ensure the IDIQ contract number AND the Task Order number are included on each

Performance and Payment Bond document. Bond documents not containing the required information will be returned for correction. Bonds must be received in their original state.

Copies will not be approved.

(c) Task Order contract documents. When electronic copies of the awarded Task Order are not feasible, the Contractor will be provided paper copies. All further reproduction shall be at the Contractor's expense.

C.5. EXCEPTIONS TO FAIR OPPORTUNITY (SOLE SOURCE) TASK ORDERS

(1) The CO reserves the right to award a sole source Task Order in the following instances:

(a) The agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays; OR

(b) Only one IDIQ Contractor is capable of providing the supplies or services required at the level of quality required because the supplies or services ordered are unique or highly specialized;

OR

(c) The order must be issued on a sole-source basis in the interest of economy and efficiency as a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order; OR

(d) It is necessary to place an order to satisfy a minimum guarantee.

(2) Subcontractor costs under sole source Task Orders must show adequate competition. Adequate competition may normally be assumed when there are at least three independent subcontractor/supplier quotes.

(3) Upon request, provide copies of subcontractor/supplier quotes with profit and overhead separately identified. The subcontractor/supplier quotes shall be in enough detail for the government to discern the scope of the services and materials included in the price.

(4) All prices must be fair and reasonable. If required, audits may be performed. The Government may conduct negotiations.

C-6

C.6. TASK ORDERS SET-ASIDE FOR SMALL BUSINESSES

The CO may, at their discretion, set aside a Task Order for small business concerns. Task Orders set-aside for small business concerns will be competed among the small business MATOC contractors.

C.7. PERFORMANCE EVALUATIONS

(1) At the conclusion of each Task Order or when the Contractor’s performance is considered less than satisfactory, the Government will complete a Contractor’s performance evaluation. The evaluation will take into account all aspects of the Contractor’s performance. The Contractor will be provided a copy of the performance evaluation and an opportunity to discuss the evaluation.

(2) This office posts performance evaluations in the Contractor Performance assessment Reporting

System (CPARS) https://www.cpars.gov/. Upon receiving notice of evaluation availability, you will be given an opportunity to review the evaluation and submit comments. If you are unable to access the system, call 360.619.7520 for assistance or for a copy of the evaluation.

C.8. PROTESTS OF TASK ORDER AWARDS.

In accordance with FAR 16.505(a) (10), no protest under Subpart 33.1 is authorized in connection with the issuance or proposed issuance of an order under a Task Order contract except for a protest on the grounds that the order increases the scope, period, or maximum value of the contract or a protest of an order valued in excess of $10 million. Protests of orders in excess of $10 million may only be filed with the Government Accountability Office, in accordance with the procedures at FAR 33.104.

Ombudsman. If a Contractor believes they were not fairly considered for a particular Task Order, the

Contractor may present the matter to the CO. The Contractor may appeal the explanation or decision of the Contracting Officer to the Ombudsman. The DOT Task and Delivery Order Ombudsman is the

Associate Director, Office of Acquisition Policy, Oversight and Business Strategies (M-61) located in the

Office of the Senior Procurement Executive (M-60). The Ombudsman will review the Contractor's complaint, and in coordination with the CO, ensure that the Contractor was afforded a fair opportunity to be considered for the Task Order.

C.9. GENERAL CONTRACT REQUIREMENTS.

(1) Master Subcontracting Plan (applicable to Large Businesses). Implement and closely follow the approved “Master Subcontracting Plan.” The Contractor or the CO may request modifications to the Master Subcontracting Plan. Submit requests in writing. Changes will be incorporated by bilateral modification.

(2) Task Order, Individual Subcontracting Plan (applicable to Large Businesses). Submit a

Task Order, Individual Subcontracting plan as requested by the CO and/or required by the TO-

RFP.

C.10. MINIMUM STANDARDS FOR CRITICAL TASKS.

TO-RFPs may set minimum employee and firm qualifications for critical tasks. The Contractor may be required to provide personnel and firms that meet or exceed the minimum qualification standards established in the TO-RFP.

https://www.cpars.gov/

D - 1

SECTION D - Packaging and Marking

SECTION D – PACKAGING AND MARKING

D - 2

SECTION D - Packaging and Marking

E-1

SECTION E – Inspection & Acceptance

SECTION E – INSPECTION AND ACCEPTANCE

52.246-12 -- Inspection of Construction (Aug. 1996)

(a) Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not --

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.

(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may --

(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or

(2) Terminate for default the Contractor’s right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the

Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.

(End of Clause)

F-1

SECTION F – Deliveries or Performance

SECTION F – DELIVERIES OR PERFORMANCE

F.1. CLAUSES

52.252-2 -- Clauses Incorporated by Reference (Feb 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://www.acquisition.gov/far

FAR Number Title Date

52.211-13 52.211-13 Time Extensions

**NOTE** (Applicable to projects with interim or multiple completion dates)

Sep 2000

52.211-18 Variation of Estimated Quantity Apr 1984

52.236-15 Schedules for Construction Contracts Apr 1984

52.242-14 Suspension of Work Apr 1984

FULL TEXT CLAUSES

52.211-10 Commencement, Prosecution, And Completion Of Work (Apr 1984)

Alternate I (APR 1984)

The Contractor shall be required to (a) commence work under this contract within Specified in the Task

Order Clause calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than the number of calendar days

/date will be specified in the Task Order clause. The time stated for completion shall include final cleanup of the premises.

The completion date is based on the assumption that the successful offeror will receive the notice to proceed as specified in the Task Order clause. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

52.211-12 Liquidated Damages -- Construction (Sept 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount Specified on individual Task Orders for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

F.2 PERIOD OF SERVICE

This contract will be in effect for 36 months from the date of award. No work can be ordered after the 36 months have expired. All Task Orders will have their own completion date, which may extend beyond the end of the 36-month period.

https://www.acquisition.gov/far

F-2

SECTION F – Deliveries or Performance

G-1

SECTION G – Contract Administration Data

SECTION G – CONTRACT ADMINISTRATION DATA

G.1 ACCOUNTING & APPROPRIATION DATA

This data will be included in individual Task Order Award documents.

G.2 GOVERNMENT-FURNISHED PROPERTY

When applicable, the Task Order Special Contract Requirements (SCRs) will include property information. Use and maintain the property in accordance with the applicable property clauses. See Task

Order clauses (Clauses begin on page C-1 of each Task Order) and Task Order specifications.

G.3 CONTRACTING OFFICERS

The Contracting Officer(s) responsible for the MATOC contracts and soliciting/awarding Task Orders may be contacted at:

Western Federal Lands Highway Division

610 East Fifth Street

Vancouver WA 98661-3801

Email: WFL.Contracts@dot.gov

Phone: (360) 619-7520 mailto:WFL.Contracts@dot.gov

G-2

SECTION G – Contract Administration Data

H-1

SECTION H – Special Contract Requirements

SECTION H – SPECIAL CONTRACT REQUIREMENTS

H.1 SHOP DRAWINGS, SUBMITTALS, & AS-BUILTS

Prepare all shop drawings, submittals, and as-builts for each Task Order in accordance with requirements contained therein and in FAR clause 52.236-21 Specifications and Drawings for Construction.

H.2. USE OF RECOVERED MATERIALS ON FEDERAL LANDS HIGHWAY PROJECTS

Section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery

Act (RCRA) of 1976, as amended (42 U.S.C. 6901 et seq.), requires Federal, State, and local procuring agencies using appropriated Federal funds to purchase items composed of the highest percentage of recovered materials practical. Use of recovered materials is strongly encouraged on Federal Lands

Highway Projects. Highway construction items covered by the Environmental Protection Agency's

Comprehensive Guidelines for Procurement of Products Containing Recovered Materials include fly ash, ground granulated blast furnace slag, traffic barricades, traffic cones, hydraulic mulch and compost for mulch.

Use of fly ash and ground granulated blast furnace slag and construction materials containing fly ash and ground granulated blast furnace slag on Federal Lands Highway Projects:

• It is the policy of the United States Government that fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag shall have maximum practicable opportunity for incorporation into its construction projects.

• The Contractor agrees to investigate the use of fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag to the fullest extent consistent with the efficient performance of this contract. Both the contractor and the subcontractors are urged to seek out suppliers of fly ash and ground granulated blast furnace slag, cement and concrete containing fly ash and ground granulated blast furnace slag and to solicit bids for these materials.

• Names of firms that supply fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag are available from the American Coal

Ash Association and the National Slag Association.

H-2

SECTION H – Special Contract Requirements

PARTNERING*…