This is a Questions & Answers document for an IDIQ Multiple Award Task Order Contract (MATOC) covering Idaho, Montana and surrounding areas. The Q&A addresses proposal submission requirements and clarifications for the solicitation number 69056724R000007.
Key details include: Proposals must be submitted as hardcopy via in-person delivery or mail/package service (no electronic submissions allowed); the scope of work covers road, paving, and bridge construction with specific project details to be shared during a virtual contractor call; a $1.5 million minimum contract value requirement applies to all bidders regardless of business size; past performance information must use form J.3 if CPARS data is unavailable; the sample project pricing should only use Schedule B from document "1-J.4+Sample+Project_MT+NP+GLAC+HQ(3)"; the Master Subcontracting Plan must be submitted with proposals by January 28, 2025; and sister company experience cannot be used for Factor 1 requirements - only prime contractor experience is considered. The sample project included is at 75% design and will be solicited separately when at 100% design.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QA_1-24-2025.pdf | ||
| QA_1-22-2025_2.pdf | ||
| QA_1-22-2025.pdf | ||
| Amendment A003.pdf | ||
| QA_1-13-2025.pdf | ||
| QA_1-10-2025.pdf | ||
| QA_1-7-2025.pdf | ||
| QA_1-6-2025.pdf | ||
| Amendment A002.pdf | ||
| Amendment A001.pdf | ||
| J.4 Sample Project_MT NP GLAC HQ(3).pdf | ||
| RFP_69056724R000007_ID MT MATOC_Final.pdf | ||
| J.2 Technical Information Form 1.pdf | ||
| J.3 Past Performance Form 2.pdf | ||
| J.1 Master Subcontracting Plan.pdf | ||
| J.4 Sample Project Plans.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No./ Project
Idaho, Montana, and Surrounding Areas
Indefinite Delivery/ Indefinite Quantity
(IDIQ) Multiple
General Technical Question Answer Date
X
Do you have a proposed scope of work this
MATOC would cover and perhaps proposed project list with size/scope?
We are still researching the proposed scope of work, however, we plan on sharing a proposed project list with range of magnitude (pricing) as well as a general type of work (road, paving, bridge) during the presentation on the virtual contractor call. I also anticipate that we will post the list when we post the call agenda at the end of next week.
7/25/24
X Must proposals be mailed, or is electronic submission acceptable?
A hardcopy of the proposal must be received by in-person delivery or mail/package delivery service. See page A-
1, section: "Facsimile and email proposals, modifications, and withdrawals"
This will be clarified under Amendment
A002.
1/3/25
X Are hand-delivered proposals allowed? Yes 1/3/25
X
If we mail the proposal, may the entire submission be included in one binder, or must it be separated into multiple binders?
See section L.3 General Instructions (page L-
4 of RFP) for submittal requirements.
1/3/25
X Is there a specific organizational format or structure required for mailed submissions?
See section L.4. PROPOSAL SUBMITTAL
INSTRUCTION (page L-6 of RFP) for organizational submission format.
1/3/25
X
Should the General Information section of the submission be in a separate binder or included before the technical section in the same binder?
See section L.4. PROPOSAL SUBMITTAL
INSTRUCTION (page L-6 of RFP) for submittal information.
1/3/25
Check General or Technical
X
Are we required to use the provided "J.3 Past
Performance Form"? May we submit previously completed Past Performance Questionnaires
(PPQs) for relevant projects instead?
Per page L-6 of the RFP, "FACTOR 3
CRITERIA: For projects submitted for the
Factor 1 criteria, if there is no past performance information available in
CPARS, submit copies of any completed past performance evaluations made available from the project owner. For any project submitted for the Factor 1 criteria where past performance information is not available in CPARS and the project owner does not have an equivalent past performance evaluation, Offerors should submit J.3 Past
Performance Form 2, which must be filled out by the project owner."
1/3/25
X
There are two sample project files provided:
1-J.4+Sample+Project_MT+NP+GLAC+HQ(3)
2-J.4+Sample+Project+Plans
For the Price Submittal, should we submit
Schedule B from both files?
Only submit pricing for Schedule B of the sample project. Submit pricing based on quantities provided in the Bid Schedule in document "1-
J.4+Sample+Project_MT+NP+GLAC+HQ(3)"
1/3/25
X
The front page of the RFP states that Electronic proposals will be accepted. However, page A-1 says that email proposals are not authorized for this solicitation, and page L-7 indicates hard copies of proposals are to be mailed. Please clarify if proposals may be emailed, or if a hard copy must be submitted. If hard copy is required, will FedEx also be acceptable, or must it be sent via US Mail?
A hardcopy of the proposal must be received by in-person delivery or mail/package delivery service. See page A-
1, section: "Facsimile and email proposals, modifications, and withdrawals"
This will be clarified under Amendment
A002.
1/2/25
X
I read in the solicitation that the intent is to award to at least three small businesses.
But I see in the past performance requirements there is a $1.5 Million minimum contract value.
Does that apply to small businesses who may be interested in applying?
The $1.5 million minimum contract value is a minimum project requirement for Factor
1: Proposed Prime Contractor Recent and
Relevant Experience, regardless of business size, per SECTION M- EVALUATION FACTORS
FOR AWARD list on page M-1 of the RFP.
1/6/25
X
For the sample bid for MT NP GLAC HQ(3) we do not see a temporary traffic control supervisor item. It has been our experience that FHA projects usually have this item. Are we to assume traffic control supervisor is incidental to other traffic control items or will a bid item be added?
Please bid according to solicitation documents.”
1/8/25
X
Will the sample project be awarded? Will the pricing submitted with the offer to the RFP be used when the sample project is awarded?
The sample project will not be awarded at this time. When the sample project is at
100% design, it will be solicited separately and the bid pricing will be separate from the pricing being solicited for the sample project, which is at approximately 75% design.
1/13/25
X
J-1 of the aforementioned solicitation list a
Maser Subcontracting Plan. Will this plan need to be submitted with the proposal due
01/28/2025, or only after award from the successful contractors?
Please submit the Master Subcontracting
Plan with your proposal submission. This will be clarifed under Amendment A003
1/16/25
X
Would we be able to submit projects completed by a sister company for recent and relevant experience?
Per Factor 1: Proposed Prime Contractor
Recent and Relevant Experience, "Provide a brief narrative for a minimum of two and maximum of five projects performed by the offeror as the prime contractor meeting the following requirements:
(1) The offeror was the prime contractor awarded a public agency (Federal, State, County, Local) construction contract; AND..."
Any project submitted for Factor 1 must be performed by the by the offeror as the
Prime. The Government is not considering team experience.