RFI Responses Houma Roof Repl.docx

DOCX document 17 KB Posted

Attached to
Greenhouse Roof Replacement and Rail Replacement Federal contract opportunity
Solicitation number
1232SA26Q0438
Issued by
Department of Agriculture Agricultural Research Service

About this file

This is a Request for Information (RFI) responses document for USDA solicitation 1232SA26Q0438, addressing questions raised by potential contractors during the procurement for greenhouse roof replacement and rail replacement work. The RFI clarifies critical project requirements and constraints that contractors must incorporate into their proposals.

Key clarifications include: (1) Fiberglass rails are mandatory based on market research using LP Liberty Pultrusions specifications; stainless steel alternates are not acceptable due to corrosive fertilizer used on sugarcane carts; (2) The Period of Performance (POP) will be adjusted to accommodate the 6-week lead time for roof panels; (3) Warranty coverage includes one year of installer warranty plus manufacturer warranty on materials for acrylic panels; (4) A single individual may serve as Superintendent, Quality Control Manager, and SSHO provided they meet all position requirements and remain on-site during work, with the exception that fall protection work at heights of 15 feet or greater requires a second qualified SSHO on-site to monitor compliance with the Accident Prevention Plan; (5) The scope includes adjusting and straightening approximately 12 bent ridge vent frames on the south side of the greenhouse roof to enable proper closure, with contractors required to identify and report any additional damaged or bent ridge vents discovered during work for correction under a future contract. The Department of Agriculture Agricultural Research Service is the procuring agency for this project.

View the file

Other files for this federal contract opportunity

Other files attached to Greenhouse Roof Replacement and Rail Replacement, newest first.
File Type Posted
Sol_1232SA26Q0438_Amd_0004.pdf PDF
RFI 3 and Response.docx DOCX document
Sol_1232SA26Q0438_Amd_0003.pdf PDF
RFI Response.docx DOCX document
Makrolon.pdf PDF
Sol_1232SA26Q0438_Amd_0002.pdf PDF
Sol_1232SA26Q0438_Amd_0001.pdf PDF
Attachment 5 - Wage Determination.pdf PDF
Attachment 1 - SOW (1).docx DOCX document
Attachment 3 - Rail Specifications.pdf PDF
Sol_1232SA26Q0438.pdf PDF
Attachment 2 - Rail Drawing.pdf PDF
Attachment 4 -Roof Specifications.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI Responses for 1232SA26Q0438 Greenhouse Roof Replacement

1. Can USDA provide the Basis of Design (BOD) for the Fiberglass Rails? Response: When conducting market research BOD utilized LP Liberty Pultrusions in West Mifflin, PA. Phone: 412-466-8611. David Griffith, President. Reference quote No. 120925-JMF. Specifications from the quote were provided in the bid documents.

1. Will USDA accept alternate rails materials aka Stainless Steel in lieu of Fiberglass? Response: No. The fertilizer used on the sugarcane carts is highly corrosive to all types of steel.

1. The lead time on roof panels is 6 weeks, can the POP be adjusted to accommodate the lead time constraints for POP? Response: POP will be adjusted to accommodate lead time for materials.

1. Can USDA confirm that warranty requirements on acrylic panels are for materials only. Response: Warranty is one (1) year after installation (installer) and whatever the manufacturer warranty is on materials.

1. Please advise if a single individual can fulfill the roles of Superintendent, Quality Control Manager, and SSHO for this project. Response: Yes. As long as the one person meets all requirements for the three positions in the bid documents. The one person must be on site at all times when work is being conducted. EXCEPTION: The roof work is being done at height with fall risk. Any time that any workers are working 15 feet or higher above the ground or Crossing Greenhouse floor we require a second qualified SSHO at the site so both SSHO’s are monitoring the work and ensuring the safety program is implemented and administered in compliance with the contractor’s accepted Accident Prevention Plan (APP).

1. Per the SOW "Some of the ridge vents on the south side of the roof are damaged (bent) and not operating properly." During the site visit we were able to physically see two (2) conditions of "bent" ridge vent framing from the ground. Is that the extend of the damage? Is there a roof survey or report that was performed to confirm the full extent of the damaged (bent) roof framing members that can be shared? Response: There was no survey done. Include in the scope to adjust and straighten as much as possible to allow 12 bent ridge frames to close properly (this includes the two that can be seen from the ground). During the work note any other damaged or bent ridge vents that don’t close properly on the south or north sides and provide a report to the Contract Officer, with photos and locations, describing any other frames needing work. Additional work will be corrected under a future contract.

File details come from the government source that posted it. Updated .