This is a technical specification document and design drawing for rail repair work at the USDA Agricultural Research Service Sugarcane Research Laboratory in Houma, Louisiana. The project involves installation of a 60-foot structural fiberglass/composite track rail with minimum 30,000 PSI compressive strength to support an existing research cart system with an approximate total weight of 3,900 pounds (3,000 lb cart plus 600 lb plant per wheel, totaling 900 lbs per wheel).
The installation requires complete materials, equipment, and labor to set the extruded fiberglass/composite track rail in concrete troughs, including surface preparation, alignment, temporary supports, grout bedding, and sealing of joints. The specification mandates that primary attachment shall be achieved through a grout bedding system (basis of design: SIKADUR-42 Grout-Pak or STONHARD Elastomeric Grout as approved equivalents), not by sealant alone. Exposed top joints must be sealed with elastomeric polyurethane sealant (basis of design: SIKAFLEX NP 1 for non-sag joints or SIKAFLEX SL 1 for self-leveling horizontal joints). The contractor must verify concrete trough dimensions, cleanliness, and soundness; remove all laitance, dust, curing compounds, and contaminants; set rail to required elevation and alignment using temporary supports; place grout continuously to achieve full bearing with no voids; and protect the work from loading and traffic until manufacturer-required cure is achieved. The drawing depicts both demolition and new installation sections showing rail configuration, concrete foundation details, and trench drain considerations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_1232SA26Q0438_Amd_0004.pdf | ||
| RFI 3 and Response.docx | DOCX document | |
| Sol_1232SA26Q0438_Amd_0003.pdf | ||
| RFI Response.docx | DOCX document | |
| Makrolon.pdf | ||
| Sol_1232SA26Q0438_Amd_0002.pdf | ||
| Sol_1232SA26Q0438_Amd_0001.pdf | ||
| RFI Responses Houma Roof Repl.docx | DOCX document | |
| Attachment 5 - Wage Determination.pdf | ||
| Attachment 4 -Roof Specifications.pdf | ||
| Sol_1232SA26Q0438.pdf | ||
| Attachment 1 - SOW (1).docx | DOCX document | |
| Attachment 3 - Rail Specifications.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXISTING RESEARCH CART WHEEL
EXISTING CONCRETE FOUNDATION
EXISTING CONCRETE FOUNDATION
60' STRUCTURAL FIBERGLASS TRACK RAIL WITH
MINIMUM 30,000 PSI. COMPRESSIVE STRENGTH
EXISTING TRENCH DRAIN
EXISTING RESEARCH CART WHEEL. APPROXIMATE
WEIGHT OF CART IS 3,000 LBS, PLANT WITH 600LBS.
TOTAL APPROXIMATE WEIGHT PER WHEEL 900LBS.
REMOVE EXISTING 3" x 2" x 1/4"
ANGLE COMPLETE
SAW CUT FULL DEPTH AND
REMOVE EXISTING CONCRETE
COMPLETE FULL LENGTH OF
RAIL TO EXTENTS INDICATED
2 3 /4"
3"± 1'-0"± VA
RI
ES
EXISTING CONCRETE FOUNDATION
4"±
GRIND TRENCH BOTTOM SMOOTH
AT CONCRETE REMOVAL
R100
FILL RAIL VOID WITH 9000PSI GROUT. BASIS OF DESIGN: SIKAGROUT
713. SEAL GROUT PLACEMENT HOLES IN RAIL WITH POLYURETHANE
ELECTROMETRIC SEALANT. GROUT HOLES SPACED AS
RECOMMENDED BY GROUT MANUFACTURER TO ACHEIVE SOLID FILL. 2 7/8"±
3"
5/8"±
1/2"±
1/2
FRP / POLYESTER TROUGH PROFILE
2 1/8"±3 5/8"±2 1/8"±
3 1 /8"
SETTING BED / SEALANT. AS SPECIFIED BELOW
3 7/8"±
60' STRUCTURAL FIBERGLASS TRACK RAIL WITH
MINIMUM 30,000 PSI. COMPRESSIVE STRENGTH
PPM
REVISIONS
Agricultural
Service Research
DESCRIPTION
SHEET
DATEc P.A.
FIRM
U
NO.
DEPM
SAFETY & HEALTH
REAL PROPERTY
A
DATE
PROJECT NO.
SUSDA
BY
AGRICULTURAL RESEARCH SERVICE
OF
THE
DESIGNER
PROJECT MANAGER
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson M Adams
ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT
USDA AGRICULTURAL RESEARCH SERVICE
SUGARCANE RESEARCH LABORATORY
HOUMA, LOUISIANA
PHOTOMETRIC BLDG RAIL REPAIR
R100 X X03/18/2026
REH
JLF
DRL FACILITIES ENGINEERING BRANCH
5106 SUNNYSIDE AVENUE
BELTSVILLE, MD 20705-5100
FORT COLLINS, CO 80526
XXX
XXXX
WN
XXX
CM
JS
SCALE:
RAIL SECTION
3"=1'-0"
R100
SCALE: 3"=1'-0"
3"0 6" 1'
DEMOLITION NEW
FIBERGLASS TRACK RAIL SET IN CONCRETE TROUGH
PART 1 – GENERAL
1.1 SUMMARY
PROVIDE LABOR, MATERIALS, EQUIPMENT, AND INCIDENTALS NECESSARY TO INSTALL EXTRUDED FIBERGLASS/COMPOSITE TRACK RAIL IN FORMED CONCRETE TROUGHS, INCLUDING SURFACE PREPARATION, ALIGNMENT, TEMPORARY SUPPORTS, GROUT BEDDING, AND SEALING OF EXPOSED TOP JOINTS. PRIMARY ATTACHMENT SHALL BE BY GROUT BEDDING SYSTEM, NOT BY SEALANT ALONE. HIGH-STRENGTH EPOXY GROUT PRODUCTS SUCH AS SIKADUR-42 GROUT-PAK ARE DESCRIBED BY SIKA AS 100% SOLIDS, MOISTURE-TOLERANT EPOXY GROUTING
SYSTEMS USED FOR PRECISION GROUTING UNDER EQUIPMENT AND UNDER CRANE RAILS.
1.2 PERFORMANCE REQUIREMENTS
A. INSTALLED RAIL SHALL BE FULLY SUPPORTED, TRUE TO LINE AND GRADE, AND CAPABLE OF TRANSFERRING IMPOSED SERVICE LOADS INTO
THE CONCRETE TROUGH WITHOUT VOIDS OR UNSUPPORTED BEARING POINTS.
B. PROVIDE AN ELASTOMERIC RAIL GROUT RECOMMENDED BY THE MANUFACTURER FOR ADHESION TO BOTH RAIL AND CONCRETE WHILE
MAINTAINING LINE AND GRADE.
C. EXPOSED TOP JOINTS, WHERE REQUIRED, SHALL BE SEALED WITH AN ELASTOMERIC POLYURETHANE SEALANT COMPATIBLE WITH BOTH
CONCRETE AND FIBERGLASS/COMPOSITE SUBSTRATES.
PART 2 – PRODUCTS
2.1 GROUT BEDDING MATERIALS
A. FLEXIBLE GROUT OPTION: PROVIDE ELASTOMERIC RAIL GROUT DESIGNED FOR ADHESION TO RAIL AND CONCRETE WHILE MAINTAINING LINE AND GRADE, WITH VIBRATION-DAMPENING CHARACTERISTICS; BASIS OF DESIGN: STONHARD ELASTOMERIC GROUT OR APPROVED EQUAL.
2.2 JOINT SEALANT
PROVIDE ONE-COMPONENT OR APPROVED EQUIVALENT POLYURETHANE ELASTOMERIC SEALANT FOR SEALING EXPOSED TOP JOINTS AFTER GROUT CURE; BASIS OF DESIGN: SIKAFLEX NP 1 FOR NON-SAG JOINTS OR SIKAFLEX SL 1 FOR SELF-LEVELING HORIZONTAL JOINTS, AS
APPLICABLE.
2.3 ACCESSORIES
PROVIDE SHIMS, TEMPORARY SUPPORTS, ALIGNMENT FIXTURES, BOND-BREAKERS, BACKER ROD WHERE NEEDED, PRIMERS IF REQUIRED BY SEALANT MANUFACTURER, AND ALL MISCELLANEOUS ITEMS NECESSARY FOR A COMPLETE INSTALLATION IN ACCORDANCE WITH THE RAIL AND GROUT MANUFACTURER’S WRITTEN INSTRUCTIONS. MANUFACTURER COMPATIBILITY REQUIREMENTS SHALL GOVERN FINAL PRODUCT
SELECTION.
PART 3 – EXECUTION
3.1 EXAMINATION AND PREPARATION
A. VERIFY CONCRETE TROUGH DIMENSIONS, CLEANLINESS, DRYNESS, AND SOUNDNESS PRIOR TO INSTALLATION.
B. REMOVE LAITANCE, DUST, CURING COMPOUNDS, LOOSE MATERIAL, OILS, AND CONTAMINANTS THAT WOULD IMPAIR BOND.
C. CONFIRM THE FIBERGLASS/COMPOSITE RAIL MANUFACTURER PERMITS THE PROPOSED GROUT TYPE. USE ELASTOMERIC GROUT
3.2 INSTALLATION
A. SET RAIL TO REQUIRED ELEVATION, ALIGNMENT, AND GAUGE USING TEMPORARY SUPPORTS AND CONTROL POINTS.
B. PLACE GROUT CONTINUOUSLY BENEATH AND AROUND RAIL IN ACCORDANCE WITH GROUT MANUFACTURER’S INSTRUCTIONS TO ACHIEVE
FULL BEARING WITH NO VOIDS.
C. DO NOT USE SEALANT AS THE PRIMARY ATTACHMENT MEDIUM. PRIMARY RAIL SUPPORT AND ATTACHMENT SHALL BE BY THE SPECIFIED
GROUT BEDDING SYSTEM.
D. AFTER GROUT CURE, CLEAN AND SEAL EXPOSED TOP JOINT, IF REQUIRED, WITH POLYURETHANE SEALANT. TOOL SEALANT TO PROVIDE A
NEAT, WATERTIGHT JOINT PROFILE.
3.3 FIELD QUALITY CONTROL
A. VERIFY FINAL RAIL ALIGNMENT, BEARING SUPPORT, AND JOINT CONDITION.
B. REPLACE OR REPAIR RAILS EXHIBITING MISALIGNMENT, VOIDED GROUT SUPPORT, OR SEALANT FAILURE.
C. PROTECT INSTALLED WORK FROM LOADING AND TRAFFIC UNTIL GROUT AND SEALANT ACHIEVE MANUFACTURER-REQUIRED CURE.