About this file
This is a Project Manual and Limited Asbestos and Lead Paint Survey Report for the State of Iowa Department of Administrative Services (IDAS) related to the NCCF AHU & Condenser Replacement Project for Units A and B located at 313 Lanedale, Rockwell City, Iowa. The project involves the replacement of Air Handling Unit (AHU) and condenser equipment in two residential houses at the facility. The bidding period was scheduled to open on May 8, 2026, with bids due on June 9, 2026. Bid evaluation and contract award were planned for June 10-12, 2026, with a Notice to Proceed issued on June 15, 2026. The construction phase was scheduled from September 4, 2026, through November 16, 2026, with final completion targeted for December 18, 2026. The project included separate construction schedules for Unit A (September 4 through October 14, 2026) and Unit B (October 8 through November 16, 2026), with both units following similar activity sequences including mobilization, demolition, equipment installation, electrical connections, controls integration, testing and commissioning, and closeout procedures.
The survey identified asbestos-containing materials requiring abatement prior to construction activities, including brown mastic under floor tile in House A (approximately 50 square feet containing 2% chrysotile asbestos) and black tar pipe wrap at AHUs in both houses (approximately 8 linear feet in each unit, assumed to contain asbestos). Lead-based paint (exceeding 0.5% by weight) was identified in the painted plaster ceiling above the stair landing in House A. The project manual was prepared by IMEG, with engineering disciplines certified by licensed professionals Tony DeLouis (Electrical, License #23167, Division 26 & 28) and Nate Jacques (Mechanical, License #21686, Division 23). The asbestos and lead paint survey was conducted by Atlas Technical Consultants LLC on March 31, 2026, with the report issued on April 16, 2026 (Atlas Project ID: 204BS09994). All identified hazardous materials required proper handling, notification, and abatement by qualified contractors in compliance with Iowa Department of Natural Resources, Iowa Workforce Development, OSHA, and USEPA regulations prior to renovation activities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFB950100-01 - Drawings.pdf | ||
| RFB950100-01 - Bid Form.pdf | ||
| RFB950100-01 - Notice to Bidders.docx | DOCX document | |
| 1389405-event.pdf | ||
| Bidding Documents and Project Manual.html | HTML file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT 9501.00 SEALS PAGE 00 0107 - 1
SECTION 00 0107
SEALS PAGE
I hereby certify that the portion of this technical submission described below was prepared by me or under my direct supervision and responsible charge.
Discipline: Electrical _ _____________________ Stamp:
Company Name: IMEG ______________
Address:_2882 106th St Urbandale, IA 50325_____
Telephone:_515-334-4317____________________
Name:_Tony DeLouis________________________ Responsibility: Division 26 & 28____________
License#:_23167____________________________ ______________________________________
I hereby certify that the portion of this technical submission described below was prepared by me or under my direct supervision and responsible charge.
Discipline:__ Mechanical_____________________ Stamp:
Company Name: IMEG______________________
Address: 2882 106th St Urbandale, IA 50325_____
Telephone: 515-334-4303____________________
Name: Nate Jacques_______________________ Responsibility: Division 23_______________
License#:__21686__________________________ _____________________________________
END OF SECTION
Activity ID Activity Name Original
Duration
Start Finish
State of Iowa DAS - NCCF AHU & Condenser Replacement Unit A&B - Bid ScheduleState of Iowa DAS - NCCF AHU & Condenser Replacement Unit A&B - Bid Schedule155 08-May-26 18-Dec-26
Pre ConstructionPre Construction 26 08-May-26 15-Jun-26
A1100 Open Contractor Bidding Period 22 08-May-26* 09-Jun-26
A1130 Bids Due 0 09-Jun-26* 09-Jun-26
A1110 Bid Evaluation & Contract Award 3 10-Jun-26 12-Jun-26
A1120 Notice To Proceed 1 15-Jun-26 15-Jun-26
Submittals & ProcurementSubmittals & Procurement 57 16-Jun-26 03-Sep-26
A1550 McGough Draft Submittals 2 16-Jun-26 17-Jun-26
A1560 AHU Equipment Submit,Review & Approve 20 18-Jun-26 16-Jul-26
A1580 Mechanical Materials Submit, Review & Approve 20 18-Jun-26 16-Jul-26
A1590 Electrical Materials Submit, Review & Approve 20 18-Jun-26 16-Jul-26
A1570 AHU Equipment Procure 35 17-Jul-26 03-Sep-26
A1600 Mechanical Material Procure 20 17-Jul-26 13-Aug-26
A1610 Electrical Material Procure 20 17-Jul-26 13-Aug-26
ConstructionConstruction 51 04-Sep-26 16-Nov-26
Unit AUnit A 28 04-Sep-26 14-Oct-26
A1150 Moblize & Security Orientation 2 04-Sep-26 08-Sep-26
A1160 Temporary Protection 1 09-Sep-26 09-Sep-26
A1170 Mechanical & Electrical Demolition 3 10-Sep-26 14-Sep-26
A1180 Ductwork Modifications 3 15-Sep-26 17-Sep-26
A1190 Condenser Install 3 18-Sep-26 22-Sep-26
A1210 AHU Installation 3 18-Sep-26 22-Sep-26
A1200 Lineset Install & Insulation 5 23-Sep-26 29-Sep-26
A1220 Electrical Connections 2 23-Sep-26 24-Sep-26
A1230 Controls Integration 5 25-Sep-26 01-Oct-26
A1240 Start Up & Testing 2 02-Oct-26 05-Oct-26
A1250 Test & Balance 1 06-Oct-26 06-Oct-26
A1260 Commissioning & Owner Training 1 07-Oct-26 07-Oct-26
A1270 Punchlist 5 08-Oct-26 14-Oct-26
Unit BUnit B 28 08-Oct-26 16-Nov-26
A1540 Moblize & Security Orientation 2 08-Oct-26 09-Oct-26
A1420 Temporary Protection 1 12-Oct-26 12-Oct-26
A1430 Mechanical & Electrical Demolition 3 13-Oct-26 15-Oct-26
A1440 Ductwork Modifications 3 16-Oct-26 20-Oct-26
A1450 Condenser Install 3 21-Oct-26 23-Oct-26
A1470 AHU Installation 3 21-Oct-26 23-Oct-26
A1460 Lineset Install & Insulation 5 26-Oct-26 30-Oct-26
A1480 Electrical Connections 2 26-Oct-26 27-Oct-26
A1490 Controls Integration 5 28-Oct-26 03-Nov-26
A1500 Start Up & Testing 2 04-Nov-26 05-Nov-26
A1510 Test & Balance 1 06-Nov-26 06-Nov-26
A1520 Commissioning & Owner Training 1 09-Nov-26 09-Nov-26
A1530 Punchlist 5 10-Nov-26 16-Nov-26
CloseoutCloseout 21 17-Nov-26 18-Dec-26
A1620 Substantial Completion 1 17-Nov-26 17-Nov-26
A1630 Closeout Procedures 30 18-Nov-26 17-Dec-26
A1640 Final Completion 0 18-Dec-26 18-Dec-26
10 17 24 31 07 14 21 28 05 12 19 26 02 09 16 23 30 06 13 20 27 04 11 18 25 01 08 15 22 29 06 13 20 27 03
May 2026 June 2026 July 2026 August 2026 September 2026 October 2026 November 2026 December 2026January 2027
Open Contractor Bidding Period
Bids Due
Bid Evaluation & Contract Award
Notice To Proceed
McGough Draft Submittals
AHU Equipment Submit,Review & Approve
Mechanical Materials Submit, Review & Approve
Electrical Materials Submit, Review & Approve
AHU Equipment Procure
Mechanical Material Procure
Electrical Material Procure
Moblize & Security Orientation
Temporary Protection
Mechanical & Electrical Demolition
Ductwork Modifications
Condenser Install
AHU Installation
Lineset Install & Insulation
Electrical Connections
Controls Integration
Start Up & Testing
Test & Balance
Commissioning & Owner Training
Punchlist
Moblize & Security Orientation
Temporary Protection
Mechanical & Electrical Demolition
Ductwork Modifications
Condenser Install
AHU Installation
Lineset Install & Insulation
Electrical Connections
Controls Integration
Start Up & Testing
Test & Balance
Commissioning & Owner Training
Punchlist
Substantial Completion
Closeout Procedures
Final Completion
Remaining Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
DOC NCCF AHU Replacement Unit A & B Bid Schedule - 04/29/2026
11117 Mockingbird Drive, Omaha, Nebraska, 68137
402.679.9747 | oneatlas.com
L I M I T E D A S B E S T O S A N D L E A D P A I N T S U R V E Y
PREPARED FOR:
Iowa Department of Administrative Services 109 SE 13th Street
Des Moines, IA 50319
PROJECT LOCATION:
NCCF AHU Replacement Project Houses A and B
313 Lanedale Rockwell City, Iowa
Project Date: March 31, 2026
Report Date: April 16, 2026
Atlas Project ID: 204BS09994
PREPARED BY:
Atlas Technical Consultants LLC 11117 Mockingbird Drive
Omaha, Nebraska i
April 16, 2026
Ms. Jennie Elliot State of Iowa DAS 109 SE 13th Street Des Moines, IA 50319 Email: Jennie.elliott@iowa.gov
Re: Limited Asbestos and Lead Paint Survey NCCF AHU Replacement Project Houses A and B 313 Lanedale Rockwell City, Iowa Atlas Project Number: 204BS09994
Dear Ms. Elliott, Atlas Technical Consultants LLC. (Atlas) is pleased to submit the attached Limited Asbestos and Lead Paint Survey Report for the above-referenced site. This report includes the findings, procedures, methodologies and analytical laboratory results for the survey performed.
Atlas appreciates the opportunity to perform these services for the Iowa Department of Administrative Services (IDAS), and we look forward to working with you in the future. If you need any assistance with the implementation of the recommendations contained in this report, please feel free to give us a call at (402)-679-9747 and we will respond promptly to your needs.
Sincerely, ATLAS TECHNICAL CONSULTANTS, LLC
Prepared By: Reviewed By:
Max Thies, CSMI Steve Hudson, MS, CIH, CIEC Environmental Technician Sr. Project Manager Iowa Asbestos Inspector #26-15559
Limited Asbestos and Lead Paint Survey
NCCF AHU Replacement Project Rockwell, IA
April 16, 2026 Atlas Project ID: 204BS09994 ii
T A B L E O F C O N T E N T S
LETTER OF TRANSMITTAL ............................................................................................... i
1.0 SCOPE OF SERVICES
2.0 GENERAL SITE CONDITIONS
3.0 ASBESTOS SURVEY
3.1 Regulation Review
3.2 Homogeneous Areas
3.3 Sampling Strategy
3.4 Laboratory Analytical Results
3.5 Suspect Asbestos-Containing Materials
4.0 LEAD PAINT TESTING
4.1 Regulation Review
4.2 Lead Paint Testing
5.0 CONCLUSIONS AND RECOMMENDATIONS
6.0 LIMITATIONS
APPENDICES
APPENDIX A: Asbestos Analytical Report and Chain of Custody
APPENDIX B: Lead Analytical Report and Chain of Custody
APPENDIX C: Photo Log
APPENDIX D: Staff Certifications
L I M I T E D A S B E S T O S A N D L E A D P A I N T S U R V E Y
NCCF AHU Replacement Project Houses A and B
313 Lanedale Rockwell City, Iowa
Atlas Project Number: 204BS09994
1.0 SCOPE OF SERVICES
The purpose of this project was to perform a survey for asbestos and lead paint that may be disturbed as part of the planned AHU replacement project in Houses A & B. One AHU unit to be replaced is located above the stair landing in each house.
Atlas provided a representative asbestos and lead paint survey in accordance with the referenced agreement and as outlined below:
1. Surfaces inspected and tested were limited to accessible surfaces that would potentially be disturbed as part of planned AHU replacement activities, per the scope of work indicated by McGough during the site inspection.
2. Identify suspect asbestos-containing materials (ACM) and surface coatings potentially containing lead paint.
3. Collect and analyze bulk samples of suspect asbestos containing materials and collect paint chip samples from representative surface coatings potentially containing lead paint.
4. Provide laboratory analysis of collected samples.
5. Provide a report of findings with copies and interpretation of analytical results and identifying the locations of asbestos-containing materials and lead paint.
2.0 GENERAL SITE CONDITIONS
The survey was conducted in the stair landings of Houses A & B at the NCCF Facility located in Rockwell City, Iowa. The survey area was limited to interior and exterior surfaces / materials that may be disturbed as part of the AHU Replacement Project
3.0 ASBESTOS SURVEY
On March 31, 2026, the areas to be disturbed in Houses A & B were inspected for ACM by inspector Steve Hudson of Atlas. Mr. Hudson has completed the requisite training for asbestos accreditation as inspector at a state approved training provider under TSCA Title II. Mr. Hudson’s State of Iowa Inspector number is 26-15559.
Planned renovation work was visually inspected for the presence of suspect ACM that may be impacted. Materials that were hidden, not accessible, or when sampled would damage the integrity of the structure, were not sampled as part of this survey. Materials visibly identified as non-asbestos (fibrous glass, foam rubber, wood, etc.) were not sampled. The asbestos survey consisted of three basic steps: 1) a visual inspection of the proposed work areas; 2) a determination of homogeneous areas with suspect surfacing, thermal system insulation, and miscellaneous materials; and 3) sampling accessible, friable and non-friable, suspect materials.
3.1 Regulation Review
In Iowa, asbestos activities are regulated by the Iowa Department of Natural Resources (IDNR) and Iowa Workforce Development (IWD), Division of Labor. IDNR regulates asbestos fiber emissions under Iowa Administrative Code 567 Chapter 23 (IAC 567−23) and asbestos-containing waste disposal under IAC 567−109. IWD regulates occupational exposure to asbestos under IAC 875−10 and asbestos removal and encapsulation activities under IAC 875−155.
IAC 567−23.1(3) adopts the USEPA asbestos NESHAP (40 CFR Part 61, Subpart M) by reference.
Subpart M regulates asbestos fiber emissions and asbestos waste disposal practices. It also requires the identification and classification of existing building materials prior to demolition or renovation activity. Under NESHAP, asbestos-containing building materials are classified as friable, Category I nonfriable, or Category II nonfriable ACM. Friable materials are those that, when dry, may be crumbled, pulverized, or reduced to powder by hand pressure. Category I nonfriable ACM includes packings, gaskets, resilient floor coverings, and asphalt roofing products containing more than 1% asbestos. Category II nonfriable ACM are any materials other than Category I materials that contain more than 1% asbestos.
Regulated ACM (RACM) must be removed before renovation or demolition activities that will disturb the materials. RACM includes:
• Friable ACM;
• Category I nonfriable ACM that has become friable or will be subjected to drilling, sanding, grinding, cutting, or abrading; and
• Category II nonfriable ACM that could be crumbled, pulverized, or reduced to powder during renovation or demolition activities.
The owner or operator must provide the IDNR and IWD with written notification of planned removal activities at least 10 working days prior to the commencement of asbestos abatement activities.
Removal of RACM must be conducted by an Iowa-permitted asbestos abatement contractor.
IAC 875−155 Asbestos Removal and Encapsulation requires that any asbestos-related activity conducted in a public building be performed by personnel licensed or permitted by the IWD.
Inspections for ACM must be conducted by IWD-licensed inspectors. Asbestos abatement must be performed by IWD-permitted asbestos abatement contractors. Management plans developed for the in-place management of asbestos-containing materials must be developed by an IWD-licensed management planner. When an abatement project design is prepared, it must be prepared by an IWD-licensed project designer.
IAC 875−10 adopts the Occupational Safety and Health Administration (OSHA) Asbestos standard for construction (29 CFR 1926.1101) by reference. The OSHA standard requires that employee exposure to airborne asbestos fibers be maintained below the permissible exposure limits (PEL) of
0.1 asbestos fibers per cubic centimeter (0.1 f/cc) of air as an 8-hour time-weighted average and
1.0 f/cc as a 30-minute excursion. The OSHA standard classifies construction and maintenance activities that could disturb ACM and specifies work practices and precautions that employers must follow when engaging in each class of regulated work.
3.2 Homogeneous Areas
Prior to sampling, homogeneous areas were identified in order to facilitate a sampling strategy. A homogeneous sampling area can be described as one or more areas with suspect material similar in appearance and texture that have the same installation date and function. The actual number of samples collected from each homogeneous sampling area may vary, dependent upon material type and the professional judgment of the inspector.
3.3 Sampling Strategy
The sampling strategy incorporated Asbestos Hazard Emergency Response Act (AHERA) requirements, quantities of suspect material, and the inspector’s judgment to aid in the identification of suspect asbestos-containing materials. If the analytical results indicated that all the samples collected per homogeneous area did not contain asbestos, then the homogeneous area (material) was considered non-asbestos-containing. However, if the analytical results of one or more of the samples collected per homogeneous area indicated that asbestos was present in quantities greater than one percent asbestos (as defined by USEPA), all of the homogeneous area (material) was treated as an asbestos-containing material regardless of any other analytical results. Materials which were visually determined to be non-asbestos (i.e. fibrous glass, foam rubber, etc.) by the accredited inspector were not required to be sampled. Actual collection of a bulk asbestos sample involves physically removing approximately one square inch (1 in2) of material and placing it in an airtight sample container. Sample containers were marked with a unique identification number, which was documented in the field notes.
3.4 Laboratory Analytical Results
A total of 10 samples in Houses A and B were collected from building materials suspected of containing asbestos. The samples were submitted under chain of custody to EMSL Analytical, Inc.
(EMSL) located at 200 Route 130 North Cinnaminson, New Jersey for analysis by polarized light microscopy (PLM) with dispersion staining techniques per the USEPA Method for the Determination of Asbestos in Bulk Building Materials (600/R-93-116). The percentage of asbestos, if applicable, was established by microscopic visual estimation. EMSL is an accredited laboratory by the National Voluntary Laboratory Accreditation Plan (NVLAP) No. 101048-0. Any material that contains greater than one percent (>1%) asbestos is considered an ACM and must be handled according to Occupational Safety and Health Administration (OSHA), USEPA, and all applicable state and local regulations.
Laboratory test results and chain of custody are provided in Appendix A.
3.5 Suspect Asbestos-Containing Materials
The following tables contain a list of suspect asbestos containing materials sampled:
Table 1A: Suspect Building Materials (House A)
Material Location Sample Number
Pipe Insulation Under Metal Jacket w/ Sealant (Yellow) NE Corner of North Stair Landing 1
12” x 12” Floor Tile White w/ Dark Streaks
North Stair Landing 2
Brown Mastic (Under 12”x12” Tile) North Stair Landing 3
Plaster Wall & Wall Texture North Stair Landing 4
Pipe End Sealant (White - CP-11) Ceiling Area by AHU 5
Sealant at Metal Support Pad (Black)
Ceiling Area Under Duct / Above Support 6
Black Tar Pipe Wrap Top of AHU (Not Accessible) Assumed
Table 1B: Suspect Building Materials (House B)
Material Location Sample Number
Exterior Stucco Finish Building Exterior by AC Units 1
Plaster Wall Stair Landing– East Wall 2
Black Tar on Pipe Stair Landing - Ceiling Area by AHU (Not
Accessible) Assumed
12” x 12” Floor Tile Tan w/ Dark Streaks
Stair Landing 3
Brown Mastic (Under 12”x12” Tile) Stair Landing 4
Tables 2A and 2B below list the asbestos containing materials identified:
4.0 LEAD PAINT TESTING
Atlas collected paint chip samples from representative surface coatings that may be impacted by AHU replacement activities.
Surface coatings that were collected were considered to be representative of materials in a homogeneous area if:
1. They exhibited similar physical characteristics (suspect materials alike in appearance, substrate, color, and time of application were tested as homogenous areas)
2. The application of the tested surface could be associated to an application of an unsampled surface.
Atlas collected and submitted a total of four paint chip samples from representative surface coatings. The samples were submitted to EMSL of Cinnaminson, New Jersey, under proper chain of custody for analysis by Lead in Paint Chips by Flame AAS (SW 846 3050B/7000B). EMSL is accredited under the American Industrial Hygiene Association-Laboratory Accreditation Program (AIHA-LAP, LLC) (AIHA-LAP; lab code 100194).
A copy of the analytical results and chain of custody can be found in Appendix B.
The USEPA has defined LBP as “paint or other surface coatings that contain lead in excess of 0.5 percent by weight (>0.5%)”. Results less than 0.5% by weight indicate that lead is not present at or above the USEPA regulatory level; however, lead was present in lower concentrations above
Table 2A: Asbestos-Containing Materials (Building A)
Sample Number Material Location
Approx.
Quantity
Asbestos Content
3 Brown Mastic North Stair Landing 50 SF 2%
Chrysotile
NA Black Tar Pipe Wrap North Stair Landing – Ceiling
Area by AHU 8 LF Assumed
SF = Square Feet, LF = Linear Feet
Table 2B: Asbestos-Containing Materials (Building B)
Sample Number Material Location
Approx.
Quantity
Asbestos Content
NA Black Tar Pipe Wrap Stair Landing – Ceiling Area by AHU 8 LF Assumed
SF = Square Feet, LF = Linear Feet the laboratory detection limit in other surfaces tested and these are classified as lead-containing paint (LCP). Negative results do not mean that lead is not present.
4.1 Regulation Review
The disturbance and disposal of materials with surface coatings that contain lead paint are regulated by the USEPA, OSHA and the State of Iowa. The Resource Conservation and Recovery Act (RCRA) provides the USEPA with the authority to regulate the waste status of demolition or renovation debris, including lead-containing materials. Specific notification and testing requirements must be addressed prior to transporting, treating, storing, or disposing of hazardous wastes.
Construction work covered by 29 CFR 1926.62 includes any repair, renovation or other activities that disturb in-place, lead-containing materials, but does not include routine cleaning and repainting where there is insignificant damage, wear or corrosion of existing lead-containing coatings or substrates. Unless adequately protected, employee exposures to lead must not exceed airborne concentrations >50 micrograms per cubic meter (g/m3) averaged over an 8-hour period.
Occupational exposure to lead occurring in the course of construction work, including maintenance activities, painting, alteration and repairs is subject to the OSHA Lead standard (29 CFR 1926.62). The lead standard applies to any detectable concentration of lead in paint, as even small concentrations of lead can result in unacceptable employee exposures depending upon the method of removal and other workplace conditions.
The disposal of lead containing waste is regulated by the USEPA and State of Iowa. Wastes generated by industrial businesses, commercial businesses, and government institutions are subject to regulation. Commercial business owners and removal contractors are required to determine if paint waste generated from nonresidential structures (such as public and commercial buildings, warehouses, bridges, water towers, and transmission towers) contains heavy metals that would cause the debris to be considered a hazardous waste. Disposal options and applicable management requirements for collected debris will be based upon whether the waste stream is considered a hazardous waste and the amount of debris generated. Removal contractors and building owners need to include these factors when preparing and responding to bid specifications. Specific notification and testing requirements must be addressed prior to transporting, treating, storing, or disposing of hazardous wastes. Lead-containing wastes are considered hazardous waste under RCRA if Toxicity Characteristic Leachate Procedure (TCLP) results exceed 5 milligrams per liter (mg/L). The USEPA has made exceptions for the handling and disposal of lead wastes generated from residential housing.
Specific notification and testing requirements must be addressed prior to transporting, treating, storing, or disposing of hazardous wastes. Lead-containing wastes are considered hazardous waste under RCRA if Toxicity Characteristic Leachate Procedure (TCLP) results exceed 5 milligrams per liter (mg/L). The USEPA has made exceptions for the handling and disposal of lead wastes generated from residential housing.
The above overview is not intended to be inclusive of all potentially pertinent regulatory information. The relevant USEPA, OSHA and State of Iowa regulations should be consulted prior to undertaking activities involving the demolition, renovation or maintenance of surface coatings that contain lead.
4.2 Lead Paint Testing
The following surface coatings were collected as part of the lead paint testing:
bold = lead-based paint
This evaluation report can help the Owner develop a plan for renovating the building by having concentrations of lead in the paint identified. It is our understanding that the information in this report will be provided to the contractors so that appropriate precautions can be made to minimize worker exposure to lead. If surface coatings with lead containing paint are handled improperly, exposure could occur to workers and future occupants of the facility.
5.0 CONCLUSIONS AND RECOMMENDATIONS
Asbestos was identified in the following materials:
• Brown Mastic under Floor Tile in Stair Landing of House A.
• Black Tar Pipe Wrap at AHUs above Stair Landings in Houses A & B
Lead-based paint (>0.5% by weight) was identified in the painted plaster ceiling above the stair landing in House A.
6.0 LIMITATIONS
The results, findings, conclusions, and recommendations expressed in this report are based solely on conditions noted during the March 31, 2026, Atlas inspection of the areas / surfaces to be disturbed in the stair landings of Houses A & B as part of the NCCF AHU Replacement Project.
Although Atlas performed limited destructive sampling to access suspect ACM, additional suspect but unsampled materials could be located under existing building materials, in isolated areas or in other concealed areas. Therefore, if suspect materials are encountered during renovation/demolition activities that do not appear to have been characterized as non-ACM, samples should be collected and analyzed prior to disturbing these materials or the materials can be assumed to be ACM and abated accordingly. Atlas’s selection of sample locations and frequency of sampling was based on the inspector’s assumption that like materials in the same
T A B L E 3 : L E A D P A I N T S U M M A R Y
Sample Number
Sample Location
Representative Material Paint Color
Lead Concentration (% by weight)
PC-1 House B - East Side Exterior Stucco White <0.0064
PC-2 House B – Stair Landing Plaster East Wall Tan <0.0064
PC-3
House A – Stair Landing
Plaster Ceiling White 14
PC-4 Painted Metal AHU White <0.0064 area are homogeneous in content.
The report is designed to aid the building owner, architect, construction manager, general contractor, and potential asbestos abatement contractor in locating ACM. Under no circumstances is the report to be utilized as a bidding document or as a project specification document since it does not have all the components required to serve as an Asbestos Project Design document or an Abatement Work plan.
Our professional services have been performed, our findings obtained, and our conclusions and recommendations prepared in accordance with customary principles and practices in the fields of environmental science and engineering. This statement is in lieu of other statements either expressed or implied. This report does not warrant against future operations or conditions, nor does it warrant against operations or conditions present of a type or at a location not investigated.
This report is intended for the sole use of the IDAS. The scope of services performed in execution of this evaluation may not be appropriate to satisfy the needs of other users and use or re-use of this document or the findings, conclusions, or recommendations is at the risk of said user.
APPENDIX A
Asbestos Analytical Report and Chain of Custody
EMSL Analytical, Inc.
200 Route 130 North Cinnaminson, NJ 08077
Tel/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com / cinnasblab@EMSL.com
042606423EMSL Order:
Customer ID: ATC55
Customer PO:
Project ID:
Attention: Phone:Steve Hudson (402) 697-9747
Fax:Atlas Technical (402) 597-8532
Received Date:11117 Mockingbird Drive 04/03/2026 9:30 AM
Analysis Date:Omaha, NE 68137 04/07/2026
Collected Date: 03/31/2026
Project: 204BS09994 / IOWA DAS / NCCF AHU Window Replacement Project / House A
Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E
Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
1-Insulation
042606423-0001
None DetectedNon-fibrous (Other)20%Cellulose
Glass
65%
15%
Brown/White/Silver
Fibrous
Homogeneous
1/2 Floor North
Staircase - NE Corner
- Pipe Insulation
Under Metal
1-Mastic
042606423-0001A
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
1/2 Floor North
Staircase - NE Corner
- Mastic Under Metal
042606423-0002
None DetectedNon-fibrous (Other)100%Gray/White
Non-Fibrous
Homogeneous
1/2 Floor North
Staircase - 12"x12"
Floor Tile White x/
Dark Streaks
042606423-0003
2% ChrysotileNon-fibrous (Other)91%Cellulose7%Brown/Gray/Black
Fibrous
Heterogeneous
1/2 Floor North
Staircase - Brown
Mastic
Result includes a small amount of inseparable attached material
4-Plaster
042606423-0004
None DetectedQuartz
Non-fibrous (Other)
40%
53%
Cellulose
Hair
2%
5%
Gray/White
Fibrous
Homogeneous
1/2 Floor North
Staircase - Plaster
Wall
4-Skim Coat
042606423-0004A
None DetectedQuartz
Ca Carbonate
Non-fibrous (Other)
10%
30%
60%
White
Non-Fibrous
Homogeneous
1/2 Floor North
Staircase - Plaster
Wall
4-Texture
042606423-0004B
None DetectedCa Carbonate
Non-fibrous (Other)
15%
85%
Tan/Blue
Non-Fibrous
Homogeneous
1/2 Floor North
Staircase - Plaster
Wall
042606423-0005
None DetectedNon-fibrous (Other)92%Glass8%Gray/White/Yellow
Fibrous
Homogeneous
1/2 Floor North
Staircase - Pipe
Sealant (CP-11)
042606423-0006
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Under Duct / Above
Support - Black Metal
Pad Sealant
Analyst(s)
Juliet Mulcahy (9) Samantha Sweeney, Laboratory Manager or Other Approved Signatory
EMSL maintains liability limited to cost of analysis . Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations . The report reflects the samples as received.
Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 600/M4-82-020 “Interim Method”) but augmented with procedures outlined in the 1993 (”final”) version of the method. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non- friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis . Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Estimation of uncertainty is available on request.
Samples analyzed by EMSL Analytical, Inc. Cinnaminson, NJ NVLAP Lab Code 101048-0, AIHA LAP, LLC-IHLAP Lab 100194, PA ID# 68-00367, LA #04127
Initial report from: 04/07/2026 15:27:53
Page 1 of 1ASB_PLM_0008_0002 - 2.31 Printed: 4/7/2026 3:27 PM
OrderID: 042606423
OrderID: 042606423
EMSL Analytical, Inc.
200 Route 130 North Cinnaminson, NJ 08077
Tel/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com / cinnasblab@EMSL.com
042606380EMSL Order:
Customer ID: ATC55
Customer PO:
Project ID:
Attention: Phone:Steve Hudson (402) 697-9747
Fax:Atlas Technical (402) 597-8532
Received Date:11117 Mockingbird Drive 04/03/2026 9:30 AM
Analysis Date:Omaha, NE 68137 04/06/2026
Collected Date: 03/31/2026
Project: 204BS09994 / IOWA DAS / NCCF AHU Replacement Project / House B
Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E
Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
042606380-0001
None DetectedQuartz
Non-fibrous (Other)
20%
80%
Gray
Non-Fibrous
Homogeneous
Floor EXT - House B -
Exterior Stucco
042606380-0002
None DetectedCa Carbonate
Gypsum
Non-fibrous (Other)
20%
30%
50%
Gray/White
Non-Fibrous
Homogeneous
Stairwell - East Wall -
House B - Plaster
042606380-0003
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
Stairwell - East Wall -
House B - 12x12 F.T.
Tan w/ Dark Streaks
042606380-0004
None DetectedNon-fibrous (Other)100%Tan/Black
Non-Fibrous
Heterogeneous
Stairwell - East Wall -
House B - Brown
Mastic
Result includes a small amount of inseparable attached material
Analyst(s)
Brett Teixeira (4) Samantha Sweeney, Laboratory Manager or Other Approved Signatory
EMSL maintains liability limited to cost of analysis . Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations . The report reflects the samples as received.
Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 600/M4-82-020 “Interim Method”) but augmented with procedures outlined in the 1993 (”final”) version of the method. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non- friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis . Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Estimation of uncertainty is available on request.
Samples analyzed by EMSL Analytical, Inc. Cinnaminson, NJ NVLAP Lab Code 101048-0, AIHA LAP, LLC-IHLAP Lab 100194, PA ID# 68-00367, LA #04127
Initial report from: 04/06/2026 15:27:00
Page 1 of 1ASB_PLM_0008_0002 - 2.31 Printed: 4/6/2026 3:27 PM
OrderID: 042606380
OrderID: 042606380
APPENDIX B
Lead Analytical Report and Chain of Custody
Project Name:
Customer PO:
EMSL Sales Rep:
Reported:
EMSL Analytical, Inc.
200 Route 130, Cinnaminson, NJ, 08077
Telephone: 856-858-4800 Fax:cs@emsl.com www.emsl.com
Attention:
Received: 04/03/2026 09:30
04/07/2026 13:01
Anthony DeRosa
EMSL Order ID: 012615297
LIMS Reference ID: AE15297
EMSL Customer ID: ATC55
204BS09994-NCCF / NCCF AHU Replacement
Project/ Houses A & B Steve Hudson, MS, CIH, CIEC
Atlas Technical [ATC55]
11117 Mockingbird Drive
Omaha, NE 68137
(402) 697-9747 steve.hudson@oneatlas.com
Analytical Results
Analyte Results RL Q DF Analysis Date
& AnalystWeight
Prep Date
& Tech
Analytical
MethodPrep Method
Client Sample ID: PC-1/White - Stucco -Exterior Stucco - House B - East Side Date Sampled: 03/31/26
Matrix: Chips LIMS Reference ID: AE15297-01
1Lead 04/06/26 D.W. 04/06/26 LP<0.0064 % wt 0.0064 % wt SW846-7000B0.2703 g SW-846 3050B
Client Sample ID: PC-2/Tan - Plaster - East Wall - House B - 1/2 Stairwell Date Sampled: 03/31/26
Matrix: Chips LIMS Reference ID: AE15297-02
1Lead 04/06/26 D.W. 04/06/26 LP<0.0064 % wt 0.0064 % wt SW846-7000B0.2574 g SW-846 3050B
Client Sample ID: PC-3/White- Plaster - Ceiling - House A - 1/2 Stairwell Date Sampled: 03/31/26
Matrix: Chips LIMS Reference ID: AE15297-03
200Lead D04/06/26 D.W. 04/06/26 LP14 % wt 1.3 % wt SW846-7000B0.2464 g SW-846 3050B
Client Sample ID: PC-4/White- Metal- AHU- House A - 1/2 Stairwell Date Sampled: 03/31/26
Matrix: Chips LIMS Reference ID: AE15297-04
1Lead 04/06/26 D.W. 04/06/26 LP<0.0064 % wt 0.0064 % wt SW846-7000B0.2538 g SW-846 3050B
[TOC_1]Sample Results[TOC]
Page 1 of 4Page 1 of 5
EMSL Sales Rep:
Reported:
EMSL Analytical, Inc.
200 Route 130, Cinnaminson, NJ, 08077
Telephone: 856-858-4800 Fax:cs@emsl.com www.emsl.com
Attention:
Received: 04/03/2026 09:30
04/07/2026 13:01
Anthony DeRosa
EMSL Order ID: 012615297
LIMS Reference ID: AE15297
EMSL Customer ID: ATC55
204BS09994-NCCF / NCCF AHU Replacement
Project/ Houses A & B Steve Hudson, MS, CIH, CIEC
Atlas Technical [ATC55]
11117 Mockingbird Drive
Omaha, NE 68137
(402) 697-9747 steve.hudson@oneatlas.com
CertificationsAnalyte
Certified Analyses included in this Report
SW846-7000B in Chips
AIHA LAPLead
[TOC_1]Certified
Analyses[TOC]
List of Certifications
Code Description Number Expires
NJDEP 03036New Jersey Department of Environmental Protection 06/30/2026
AIHA LAP 100194American Industrial Hygiene Association (AIHA LAP, LLC) 04/01/2027
NYSDOH 10872New York State Department of Health ELAP 04/01/2026
California ELAP 1877California Water Boards 06/30/2026
A2LA 2845.01A2LA Environmental Certificate 07/31/2026
21-A2LA 2845.15A2LA Food Chem/Mat Sci 07/31/2026
PADEP 68-00367Pennsylvania Department of Environmental Protection 11/30/2026
MADEP M-NJ337Massachusetts Department of Environmental Protection 06/30/2026
CTDPH PH-0270Connecticut Department of Public Health 06/30/2026
Please see the specific Field of Testing (FOT) on www.emsl.com <http://www.emsl.com> for a complete listing of parameters for which EMSL is certified.
[TOC_1]Certifications[TOC]
Notes and Definitions
Item Definition
C Result > 4x Spike
D Analyte was reported from a dilution run.
(Dig) For metals analysis, sample was digested.
[2C] Reported from the second channel in dual column analysis.
DA Direct Analysis
DF Dilution Factor
MDL Method Detection Limit.
ND Analyte was NOT DETECTED at or above the reporting limit, or the mdl if provided.
NR Spike/Surrogate showed no recovery.
Q Qualifier
RCS Respirable Crystalline Silica
RL Reporting Limit
For paint chips, the RL is 0.0064% by wt. (equiv. to 64 mg/kg, or ppm) based upon a minimum sample weight of 0.25 grams.
For soils, the RL is 32 mg/kg (ppm) based upon a minimum sample weight of 0.5 grams.
For dust wipes, the RL is 8 µg/wipe; reporting units of µg/sq. ft. are not validated by the lab based upon data provided by non-lab personnel.
Wet Sample is not dry weight corrected.
[TOC_1]Qualifiers, Definitions and Disclaimer[TOC]
Page 2 of 4Page 2 of 5
EMSL Sales Rep:
Reported:
EMSL Analytical, Inc.
200 Route 130, Cinnaminson, NJ, 08077
Telephone: 856-858-4800 Fax:cs@emsl.com www.emsl.com
Attention:
Received: 04/03/2026 09:30
04/07/2026 13:01
Anthony DeRosa
EMSL Order ID: 012615297
LIMS Reference ID: AE15297
EMSL Customer ID: ATC55
204BS09994-NCCF / NCCF AHU Replacement
Project/ Houses A & B Steve Hudson, MS, CIH, CIEC
Atlas Technical [ATC55]
11117 Mockingbird Drive
Omaha, NE 68137
(402) 697-9747 steve.hudson@oneatlas.com
Measurement of uncertainty and any applicable definitions of method modifications are available upon request. Per EPA NLLAP policy, sample results are not blank corrected.
Owen McKenna Laboratory Manager or other approved signatory
Analysis following EMSL SOP for the Determination of Environmental Lead by FLAA. The laboratory has a reporting limit of 0.0064% by wt., based upon a minimum sample weight of
0.25g submitted to the lab, and is not responsible for any result or reporting limit provided in mg/cm2 since it is dependent upon an area value provided by non-lab personnel. A "<" (less than) result signifies that the analyte was not detected at or above the reporting limit. Measurement of uncertainty and definitions of modifications are available upon request. Results in this report are not blank corrected unless specified.
EMSL maintains liability limited to cost of analysis. Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. The report reflects the samples as received. Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody.
QC sample results are within quality control criteria and met method specifications unless otherwise noted. All results for soil samples are reported on a dry weight basis, unless otherwise noted.
[TOC_1]Chain of Custody
Images[TOC]
Page 3 of 4Page 3 of 5
APPENDIX C
Photo Log
Photo Log NCCF AHU Replacement Project – Houses A & B Date Taken: March 31, 2026 Atlas Project No. 204BS09994
Photo #1 Sample #1 – Pipe Insulation under
Metal Jacket – House A Stair Landing Photo #2 Samples #2&3 – 12”x12” Floor Tile &
Brown Mastic – House A Stair Landing
Photo #3 Sample #5 – White Pipe End Sealant
– House A Stair Landing Photo #4 Sample #6 – Black Selant at Metal
Pad of AHU – House A Stair Landing
Photo #5 Assumed asbestos containing Black
Tar Pipe Wrap – at AHU in Stair Landings of House A & B
Photo #6 Paint Sample PC-1 – White Paint on Exterior Stucco.
APPENDIX D
Staff Certifications
D R
A F T
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
IMEG #26001283.00 TOC - 1
IDAS NCCF AHU Replacement Table of Contents
TABLE OF CONTENTS
DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING(HVAC)
SECTION 23 05 00 - BASIC HVAC REQUIREMENTS
SECTION 23 05 05 - HVAC DEMOLITION FOR REMODELING
SECTION 23 05 29 - HVAC SUPPORTS AND ANCHORS
SECTION 23 05 93 - TESTING, ADJUSTING, AND BALANCING
SECTION 23 07 13 - DUCTWORK INSULATION
SECTION 23 31 00 - DUCTWORK
SECTION 23 33 00 - DUCTWORK ACCESSORIES
SECTION 23 62 13 - AIR COOLED CONDENSING UNITS
SECTION 23 81 26 - SPLIT SYSTEM AIR CONDITIONING UNITS
DIVISION 26 - ELECTRICAL
SECTION 26 05 00 - BASIC ELECTRICAL REQUIREMENTS
SECTION 26 05 03 - THROUGH PENETRATION FIRESTOPPING
SECTION 26 05 05 - ELECTRICAL DEMOLITION FOR REMODELING
SECTION 26 05 13 - WIRE AND CABLE
SECTION 26 05 26 - GROUNDING AND BONDING
SECTION 26 05 27 - SUPPORTING DEVICES
SECTION 26 05 33 - CONDUIT AND BOXES
SECTION 26 05 53 - ELECTRICAL IDENTIFICATION
SECTION 26 27 26 - WIRING DEVICES
SECTION 26 28 16 - DISCONNECT SWITCHES
END TABLE OF CONTENTS
IMEG #26001283.00 23 05 00 - 1
IDAS NCCF AHU Replacement BASIC HVAC REQUIREMENTS
SECTION 23 05 00 - BASIC HVAC REQUIREMENTS
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. Requirements applicable to all Division 23 Sections.
B. All materials and installation methods shall conform to the applicable standards, guidelines and codes referenced herein and within each specification section.
1.2 SCOPE OF WORK
A. This Specification and the associated drawings govern the furnishing, installing, testing and placing into satisfactory operation the Mechanical Systems.
B. Each Contractor shall provide all new materials indicated on the drawings and/or in these specifications, and all items required to make the portion of the Mechanical Work a finished and working system.
C. Scope of Work:
1. Air Conditioning and Ventilating Work shall include, but is not necessarily limited to:
a. Furnish and install package indoor air handling units complete with dampers, filters, coils, fans, refrigerant piping, condensate piping, and motors.
b. Furnish and install air-cooled condensing units.
2. Testing, Adjusting, and Balancing Work shall include, but is not necessarily limited to:
a. Furnish complete testing, adjusting, and balancing as specified in Section 23 05 93, including, but not limited to, air systems.
1.3 WORK SEQUENCE
A. All work that will produce excessive noise or interference with normal building operations, as determined by the Owner, shall be scheduled with the Owner. It may be necessary to schedule such work during unoccupied hours. The Owner reserves the right to determine when restricted construction hours will be required.
1.4 DIVISION OF WORK BETWEEN MECHANICAL, ELECTRICAL & CONTROL
CONTRACTORS
A. Definitions:
1. "Mechanical Contractors" refers to the following:
a. Air Conditioning and Ventilating Contractor.
b. Testing, Adjusting, and Balancing Contractor.
IMEG #26001283.00 23 05 00 - 2
2. Motor Control Wiring: The wiring associated with the remote operation of the magnetic coils of magnetic motor starters or relays, or the wiring that permits direct cycling of motors by means of devices in series with the motor power wiring. In the latter case the devices are usually single phase and are usually connected to the motor power wiring through a manual motor starter having "Manual-Off-Auto" provisions.
3. Control devices such as start-stop push buttons, thermostats, pressure switches, flow switches, relays, etc., generally represent the types of equipment associated with motor control wiring.
4. Motor control wiring is single phase and usually 120 volts. In some instances, the voltage will be the same as the motor power wiring. Generally, where the motor power wiring exceeds 120 volts, a control transformer is used to give a control voltage of 120 volts.
5. Temperature Control Wiring: The wiring associated with the operation of a motorized damper, solenoid valve or motorized valve, etc., either modulating or two-position, as opposed to wiring which directly powers or controls a motor used to drive equipment such as fans, pumps, etc.
a. This wiring will be from a 120 volt source and may continue as 120 volt, or be reduced in voltage (24 volt) in which case a control transformer shall be furnished as part of the temperature control wiring.
6. Control Motor: An electric device used to operate dampers, valves, etc. It may be two-position or modulating. Conventional characteristics of such a motor are 24 volts, 60 cycles, 1 phase, although other voltages may be encountered.
7. Voltage is generally specified and scheduled as distribution voltage. Motor submittals may be based on utilization voltage if it corresponds to the correct distribution voltage.
Distribution/Nominal Voltage Utilization Voltage
120 115 208 200 240 230 277 265 480 460
B. General:
1. The purpose of these Specifications is to outline the Electrical and Mechanical Contractor's responsibilities related to electrical work required The exact wiring requirements for much of the equipment cannot be determined until the systems have been selected and submittals reviewed. Therefore, the electrical drawings show only known wiring related to such items. All wiring not shown on the electrical drawings, but required for mechanical systems, is the responsibility of the Mechanical Contractor.
2. Where the drawings require the Electrical Contractor to wire between equipment furnished by the Mechanical Contractor, such wiring shall terminate at terminals provided in the equipment. The Mechanical Contractor shall provide complete electrical power/controls wiring diagrams and supervision to the Electrical Contractor and designate the terminal numbers for correct wiring.
3. All electrical work shall conform to the National Electrical Code. All provisions of the Electrical Specifications concerning wiring, protection, etc., apply to wiring provided by the Mechanical Contractor unless noted otherwise.
IMEG #26001283.00 23 05 00 - 3
C. Mechanical Contractor's Responsibility:
1. Assumes responsibility for internal wiring of all equipment provided by the Mechanical Contractor, for example:
a. Condensing Units.
b. Package Air Handling Units.
2. Assumes all responsibility for the Temperature Control wiring, when the Temperature Control Contractor is a Subcontractor to the Mechanical Contractor.
3. Shall verify all existing equipment sizes and capacities where units are to be modified, moved or replaced. Contractor shall notify Architect/Engineer of any discrepancies prior to ordering new units or replacement parts, including replacements of equipment motors.
4. Temperature Control Contractor's Responsibility:
a. Wiring of all devices needed to make the Temperature Control System functional.
b. Verifying any control wiring on the electrical drawings as being by the Electrical
Contractor. All wiring required for the Control System, but not shown on the electrical drawings, is the responsibility of the Temperature Control Contractor.
c. Coordinating equipment locations (such as relays, transformers, etc.) with the Electrical Contractor, where wiring of the equipment is by the Electrical Contractor.
5. This Contractor is responsible for coordination of utilities with all other Contractors. If any field coordination conflicts are found, the Contractor shall coordinate with other Contractors to determine a viable layout.
D. Electrical Contractor's Responsibility:
1. Provides all combination starters, manual starters and disconnect devices shown on the Electrical Drawings or indicated to be by the Electrical Contractor on the Mechanical Drawings or Specifications.
2. Installs and wires all remote control devices furnished by the Mechanical Contractor or Temperature Control Contractor when so noted on the Electrical Drawings.
3. Provides motor control and temperature control wiring, where so noted on the drawings.
4. Coordinate with the Mechanical Contractor for size of motors and/or other electrical devices involved with repair or replacement of existing equipment.
5. This Contractor is responsible for coordination of utilities with all other Contractors. If any field coordination conflicts are found, the Contractor shall coordinate with other Contractors to determine a viable layout.
1.5 QUALITY ASSURANCE
A. Contractor's Responsibility Prior to Submitting Pricing Data:
1. The Contractor is responsible for constructing complete and operating systems. The Contractor acknowledges and understands that the Contract Documents are a two-dimensional representation of a three-dimensional object, subject to human interpretation. This representation may include imperfect data, interpreted codes, utility guidelines, three-dimensional conflicts, and required field coordination items. Such deficiencies can be corrected when identified prior to ordering material and starting
IMEG #26001283.00 23 05 00 - 4
installation. The Contractor agrees to carefully study and compare the individual Contract Documents and report at once in writing to the Design Team any deficiencies the Contractor may discover. The Contractor further agrees to require each subcontractor to likewise study the documents and report at once any deficiencies discovered.
2. The Contractor shall resolve all reported deficiencies with the Architect/Engineer prior to awarding any subcontracts, ordering material, or starting any work with the Contractor's own employees. Any work performed prior to receipt of instructions from the Design Team will be done at the Contractor's risk.
B. Qualifications:
1. Only products of reputable manufacturers are acceptable.
2. All Contractors and subcontractors shall employ only workers skilled in their trades.
C. Compliance with Codes, Laws, Ordinances:
1. Conform to all requirements of the State of Iowa's Codes, Laws, Ordinances and other regulations having jurisdiction.
2. If there is a discrepancy between the codes and regulations and these specifications, the Architect/Engineer shall determine the method or equipment used.
3. If the Contractor notes, at the time of bidding, that any parts of the drawings or specifications do not comply with the codes or regulations, Contractor shall inform the Architect/Engineer in writing, requesting a clarification. If there is insufficient time for this procedure, Contractor shall submit with the proposal a separate price to make the system comply with the codes and regulations.
4. All changes to the system made after letting of the contract, to comply with codes or requirements of Inspectors, shall be made by the Contractor without cost to the Owner.
5. If there is a discrepancy between manufacturer's recommendations and these specifications, the manufacturer's recommendations shall govern.
6. All rotating shafts and/or equipment shall be completely guarded from all contact. Partial guards and/or guards that do not meet all applicable OSHA standards are not acceptable.
Contractor is responsible for providing this guarding if it is not provided with the equipment supplied.
D. Permits,…