RFB947400-01 - HHS IMHI Boiler 3 Replacement - Drawings.pdf
PDF 4 MB Posted
- Solicitation number
- RFB947400-01
- Issued by
- Polk County, Iowa
About this file
This is a set of engineering drawings prepared by KCL Engineering for the HHS Independent Mental Health Institute Boiler 3 Replacement project in Independence, Iowa, under contract RFB-947400-01. The drawings, dated November 14, 2025, include mechanical, structural, and electrical plans for the complete replacement of Boiler 3, encompassing demolition of existing equipment, installation of new boiler systems with associated piping and supports, flue stack modifications, and related mechanical infrastructure. The project involves comprehensive work across basement and first-floor areas of the facility, including removal of existing steam and condensate piping, installation of new hot water and steam systems, structural support frame fabrication for the boiler assembly, and modifications to roof framing to accommodate the new flue stack. The drawings indicate coordination requirements among mechanical, electrical, and structural trades, with detailed specifications for piping standards, insulation requirements, and equipment support details. The document includes general notes requiring field verification of existing conditions, coordination with an asbestos abatement contractor, and compliance with 2018 International Building Code standards and applicable Iowa regulations.
The drawings are marked "Not for Construction" as of the November 14, 2025 date and represent Revision 0. Engineering certification is provided by Ryan E. Kuntz, a licensed Iowa Professional Engineer (Registration No. 19703, with license renewal through December 31, 2025). The structural design incorporates ASTM standards for materials including wide flange beams (ASTM A992), structural steel angles and channels (ASTM A36), and connection bolts (ASTM F3125 Grade A325), with all fabrication and erection to comply with AISC 360 specifications. Mechanical work includes provisions for complete HVAC system coordination, plumbing system installation per code requirements, and detailed specifications for pipe hangers, insulation shields, gas regulator stations, and penetration flashings. Electrical work encompasses new panel specifications, circuit modifications, conduit routing, and installation of control systems with lockable breakers for boiler operation. The drawings establish a comprehensive technical framework for the replacement project while emphasizing contractor responsibility for coordination across trades, field verification of existing conditions, and adherence to all local and state building codes.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revisions Date No.
KCL Engineering 300 4th Street West Des Moines, Iowa 50265 info@kclengineering.com 515.724.7938
Scale:
Sheet:
Sheet Name:
REV. 0
MC
CO
NT
RA
CT
R
FB
- 9
0-0
1 - H
HS
IM
HI
B
OI
LE
R #3
R
EP
LA
CE
ME
NT
11/14/2025 10:06 AM
IO
W
A
AV
E.
IN
DE
PE
ND
EN
CE
- I
OW
A
- 5
KCL Project Number:
Date:
Drawn By:
Checked By: KCL
CJC
25224
11-14-2025
NOT FOR CONSTRUCTION
11-14-2025
CONTRACT RFB - 947400-01 - HHS IMHI BOILER #3 REPLACEMENT
COVER SHEET
I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Iowa.
Ryan E. Kuntz Reg. No. 19703 Date
My license renewal date is December 31, 2025.
Pages or sheets covered by the seal:
11/14/2025
S000
11-14-25 11-14-25
MC THRU M504E000 THRU E100
300 4th Street West Des Moines, Iowa 50265 info@kclengineering.com 515.724.7938
Scale:
Sheet:
Sheet Name:
REV. 0
M000
CO
NT
RA
CT
R
FB
- 9
0-0
1 - H
HS
IM
HI
B
OI
LE
R #3
R
EP
LA
CE
ME
NT
11/14/2025 10:18 AM
IO
W
A
AV
E.
IN
DE
PE
ND
EN
CE
- I
OW
A
- 5
KCL Project Number:
Date:
Drawn By:
Checked By: KCL
CJC
25224
11-14-2025
NOT FOR CONSTRUCTION
11-14-2025
CONTRACT RFB - 947400-01 - HHS IMHI BOILER #3 REPLACEMENT
GENERAL NOTES AND SYMBOLS
POINT OF DISCONNECT OR NEW CONNECTION POINT
EQUIPMENT IDENTIFICATION TAG
SHEET REFERENCE
SECTION CUT REFERENCE TAG, SIM-SIMILAR, TYP-TYPICAL, OPP-OPPOSITE
(E) EXISTING = HALFTONE LINEWORK
NEW = DARK LINEWORK
DEMO = DASHED DARK LINEWORK
KEYNOTE
GENERAL SYMBOLS
SHEET REFERENCE
DETAIL DRAWING REFERENCE TAG, SIM-SIMILAR, TYP-TYPICAL, OPP-OPPOSITE
A101
SIM
INTERIOR ELEVATION DRAWING REFERENCE TAG
BELOW GRADE = LONG DASHED DARK LINEWORK
A101 1
R ef
XXX
X
A101
SIM
ABSOR
ACU
AD
AFF
AFG
AHU
AV
BOT
BTU
BTUH
BV
CA
CB
CENT
CFM
CI
CL
COND
CO
CONC
CONTR
CP
CU
CUH
CWP
DDC
DN
DR
DS
EA
EAT
EC
EDBT
EEW
EF
EJ
EQUIP
ESE
EST
EWBT
EWC
EWT
EX
EXH
EXP
FAI
FCU
FD
FDC
FLEX
FLR
FPM
FPS
FS
FSEC
FT
FTG
GA
GAL
GALV
GC
GW
GPH
GPM
HR
HTG
HB
ISP
JR
LAV
LDBT
LWT
LWBT
MB
MBH
MC
MECH
MH
NTS
OA
OD
PC
PSI
PRV
PRV
PV
PVC
RA
RD
RH
RTU
RV
RVT
SK
SA
SH
SO
ST
TCC
TYP
UH
UR
UV
VA
VTR
WB
WC
WHA
WH
ABSORPTION
AIR CONDITIONING UNIT
ACCESS DOOR OR AREA DRAIN
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AIR HANDLING UNIT
AIR VENT
BOTTOM
BRITISH THERMAL UNIT
BTU PER HOUR
BALL VALVE
COMPRESSED AIR
CATCH BASIN
CENTRIFUGAL
CUBIC FEET PER MINUTE
CAST IRON
CENTER LINE
CONDENSATE
CLEAN OUT
CONCRETE
CONTRACTOR
CONDENSATE PUMP/CIRC. PUMP
COPPER
CABINET UNIT HEATER
CIRCULATING WATER PUMP
DIRECT DIGITAL CONTROLS
DOWN
DRAIN
DOWNSPOUT
EXHAUST AIR
EXHAUST AIR TEMPERATURE
ELECTRICAL CONTRACTOR
ENTERING DRY BULB
TEMPERATURE
EMERGENCY EYE WASH
EXHAUST FAN
EXPANSION JOINT
EQUIPMENT
EMERGENCY SHOWER/EYEWASH
EXTERNAL STATIC PRESSURE
ENTERING WET BULB
TEMPERATURE
ELECTRIC WATER COOLER
ENTERING WATER
TEMPERATURE
EXISTING
EXHAUST
EXPANSION
FRESH AIR INTAKE
FAN COIL UNIT
FLOOR DRAIN
FIRE DEPARTMENT CONNECTION
FLEXIBLE
FLOOR
FEET PER MINUTE
FEET PER SECOND
FLOOR SINK
FOOD SERVICE EQUIPMENT CONSULTANT
FINTUBE
FOOTING
GAGE
GALLON
GALVANIZED
GENERAL CONTRACTOR
GREASE WASTE
GALLONS PER HOUR
GALLONS PER MINUTE
HOUR
HEATING
HOSE BIBB
INTERNAL STATIC PRESSURE
JANITOR RECEPTOR
LAVATORY
LEAVING DRY BULB
TEMPERATURE
LEAVING WATER
TEMPERATURE
LEAVING WET BULB
TEMPERATURE
MOP BASIN
1000 BTUH
MECHANICAL CONTRACTOR
MECHANICAL
MANHOLE
NOT TO SCALE
OUTSIDE AIR
OVERFLOW ROOF DRAIN
PLUMBING CONTRACTOR
POUNDS PER SQUARE INCH
POWER ROOF VENTILATOR
PRESSURE REDUCING VALVE
PRESSURE VENT
POLYVINYL CHLORIDE
RETURN AIR
ROOF DRAIN
RELATIVE HUMIDITY
ROOF TOP UNIT
RELIEF VALVE
ROOF VENT TERMINATION
SINK
SUPPLY AIR
SHOWER
STORM OVERFLOW
STORM
TEMPERATURE CONTROL
CONTRACTOR
TYPICAL
UNIT HEATER
URINAL
UNIT VENTILATOR
VENTILATION AIR
VENT THROUGH ROOF
WALL BOX – CONDENSATE
WATER CLOSET
WATER HAMMER ARRESTOR
WATER HEATER
MECHANICAL ABBREVIATIONS
ACID VENT
ACID WASTE
COMPRESSED AIR
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC SOFT WATER
GREASE WASTE
NATURAL GAS
NON-POTABLE COLD WATER
NON-POTABLE HOT WATER
NON-POTABLE SOFT WATER
OIL / SAND WASTE
PUMPED DISCHARGE
RECIRCULATING HOT WATER
SANITARY
STORM
STORM OVERFLOW
VENT
PROCESSED AIR
TRAP PRIMER
NATURAL GAS VENT
PROPANE
AV
AW
CA
CW
HW
DSW
GW
G
NPCW
NPHW
NPSW
OSW
PD
RHW
SAN
ST
SO
V
PA
P
GV
LP
PIPING LEGEND - PLUMBING
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CONDENSATE DRAIN
HEAT PUMP WATER RETURN
HEAT PUMP WATER SUPPLY
HIGH PRESSURE STEAM
HOT/CHILLED WATER RETURN
HOT/CHILLED WATER SUPPLY
HYDRONIC RETURN
HYDRONIC SUPPLY
LOW PRESSURE STEAM
MEDIUM PRESSURE STEAM
REFRIGERANT GAS
REFRIGERANT LIQUID
PUMPED CONDENSATE
FUEL OIL RETURN
FUEL OIL SUPPLY
FUEL OIL VENT
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
REFRIGERANT HOT GAS
BOILER BLOWDOWN
BOILER FEED
LOW PRESSURE STEAM CONDENSATE
MEDIUM PRESSURE STEAM CONDENSATE
HIGH PRESSURE STEAM CONDENSATE
CWR
CWS
CD
HPWR
HPWS
HPS
HCR
HCS
HWR
HWS
LPS
MPS
RS
RL
PC
FOR
FOS
FOV
CR
CS
RHG
BD
BF
LPC
MPC
HPC
PIPING LEGEND - MECHANICAL
LOOP WATER RETURN
LOOP WATER SUPPLY
LWR
LWS
EXHAUST PIPE - PVCEA
1.
2.
3.
4.
5.
6.
7.
8.
MECHANICAL - GENERAL NOTES
1.
2.
3.
4.
5.
MECHANICAL DEMOLITION DRAWINGS SHOWING EXISTING CONDITIONS HAVE BEEN
PREPARED BASED ON NON-DESTRUCTIVE FIELD OBSERVATION AND AS-BUILT DRAWINGS
PROVIDED BY THE OWNER. FIELD VERIFY EXISTING SYSTEMS BEFORE BEGINNING WORK.
NOTIFY ENGINEER IF EXISTING CONDITIONS ARE MATERIALLY DIFFERENT THAN
THOSE SHOWN ON THE PLANS.
BE FAMILIAR WITH EXISTING MECHANICAL SYSTEMS THAT WILL BE AFFECTED BY THE
DEMOLITION WORK. OBTAIN PERMISSION FROM THE OWNER'S REPRESENTATIVE TO SHUT
OFF SERVICES OR SYSTEMS THAT AFFECT AREAS BEYOND THE LIMITS OF THE IMMEDIATE
DEMOLITION AREA. INFORM THE OWNER ’S REPRESENTATIVE OF THE REASON FOR AND
DURATION OF THE SHUTDOWN. MINIMIZE IMPACT TO OTHER AREAS. PROCEED WITH THE
SHUT-DOWN AFTER PERMISSION FROM THE OWNER IS GRANTED.
REMOVE PIPING, HANGERS, DUCTWORK, GRILLES, REGISTERS, DIFFUSERS, ETC. THAT ARE
INDICATED TO BE REMOVED IN A TIMELY MANNER IN ACCORDANCE WITH THE GENERAL
DEMOLITION SPECIFICATIONS. COORDINATE WITH THE OWNER AND OTHER CONTRACTORS.
UNLESS EQUIPMENT TO BE REMOVED IS NOTED AS OWNER ’S SALVAGE, DISPOSE OF
EQUIPMENT AND/OR MATERIALS INDICATED TO BE REMOVED PROMPTLY.
REMOVE ALL ABANDONED PIPING AND DUCTWORK THAT IS EXPOSED OR ACCESSIBLE
WITHOUT WALL OR CEILING DEMOLITION. REFER TO ENGINEER PLANS FOR CEILINGS TO BE
REMOVED.
MECHANICAL – DEMOLITION NOTES
1.
2.
3.
4.
5.
6.
COORDINATE WORK WITH ALL OTHER TRADES AS DESCRIBED IN MECHANICAL GENERAL
NOTE #1.
PROVIDE A COMPLETE HVAC SYSTEM, INCLUDING SUPPLY, RETURN, EXHAUST, AND
VENTILATION DUCTWORK; MECHANICAL EQUIPMENT, SUPPORTS, HANGERS, DIFFUSERS,
GRILLES, REGISTERS, AND ALL APPURTENANCES. INSTALL ALL EQUIPMENT PER
MANUFACTURER'S RECOMMENDATIONS. INSTALL SYSTEM TO MEET ALL STATE
CODES AND REQUIREMENTS.
DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND
ARRANGEMENT OF DUCT SYSTEM. INDICATED DUCT LOCATIONS, CONFIGURATIONS, AND
ARRANGEMENTS WERE USED TO SIZE DUCTS AND CALCULATE FRICTION LOSS FOR AIR-
HANDLING EQUIPMENT SIZING AND FOR OTHER DESIGN CONSIDERATIONS. INSTALL DUCT
SYSTEMS AS INDICATED UNLESS DEVIATIONS TO LAYOUT ARE APPROVED BY
ENGINEER.
ALL DUCT DIMENSIONS INDICATED ARE INTERIOR FREE AREA DUCT DIMENSIONS AND DO
NOT INCLUDE INSULATION REQUIREMENTS.
SEAL ALL WALL AND FLOOR DUCT PENETRATIONS. PROVIDE FIRE CAULKING ASSEMBLIES
FOR PENETRATIONS OF RATED ASSEMBLIES. REFER TO DRAWINGS FOR
ASSEMBLY RATINGS.
CONTINUE DUCT AND PIPE INSULATION THROUGH WALLS, FLOORS, AND CEILING
PENETRATIONS UNBROKEN, EXCEPT WHERE FIRE OR FIRE/SMOKE DAMPERS ARE INSTALLED
IN DUCTWORK. SEAL AROUND DUCT INSULATION AT WALL PENETRATIONS.
HVAC - NOTES
1.
2.
3.
4.
5.
6.
7.
COORDINATE WORK WITH ALL OTHER TRADES AS DESCRIBED IN MECHANICAL GENERAL
NOTE #1.
PROVIDE A COMPLETE PLUMBING SYSTEM INCLUDING PIPE, INSULATION, HANGERS,
SUPPORTS, EQUIPMENT, WATER HEATERS, FIXTURES, MIXING VALVES, VALVES,
ACCESSORIES AND SPECIALTIES. INSTALL ALL EQUIPMENT PER MANUFACTURER'S
RECOMMENDATIONS. SIZE AND INSTALL PLUMBING SYSTEM PER PLUMBING CODE. COMPLY
WITH ALL STATE CODES AND OWNER'S REQUIREMENTS.
DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND
ARRANGEMENT OF PLUMBING SYSTEM.
EXISTING PLUMBING DISTRIBUTION AND EQUIPMENT SHOWN ARE BASED ON NON-
DESTRUCTIVE SITE OBSERVATION AND AS-BUILT DOCUMENTS PROVIDED BY THE OWNER.
FIELD VERIFY ALL EXISTING CONDITIONS INCLUDING LOCATING UNDER FLOOR PIPING AND
PIPING CONCEALED IN BUILDING ASSEMBLIES WHERE WORK IS REQUIRED.
SEAL ALL WALL PIPE PENETRATIONS. PROVIDE THROUGH-PENETRATION FIRESTOPPING
WHERE REQUIRED. REFER TO ENGINEER DRAWINGS FOR WALL, FLOOR, AND CEILING
ASSEMBLY RATINGS.
CONTINUE PIPE INSULATION THROUGH WALL, FLOOR, AND CEILING PENETRATIONS
UNBROKEN. SEAL AROUND PIPE INSULATION AT PENETRATIONS.
VERIFY WITH ENGINEER FOR ANY FIXTURES NOT TAGGED OR PIPED PRIOR TO ANY WORK.
CONTRACTOR IS RESPONSIBLE FOR ALL PLUMBING FIXTURES SHOWN ON
DRAWINGS; TAGGED OR NOT TAGGED ON PLUMBING / MECHANICAL DRAWINGS UNLESS
SPECIFICALLY NOTED AS EXCLUDED FROM SCOPE.
PLUMBING - NOTES
WARNING - CALL 48 HOURS BEFORE YOU DIG: LAW REQUIRES ANYONE DOING ANY
EXCAVATION, FENCING, PLANTING OR DRILLING TO CALL 48 HOURS IN ADVANCE. HAND DIG
WITHIN 18 INCHES OF ANY LOCATE MARK OR FLAG. ONE CALL 811. THE CONTRACTOR
SHALL VERIFY THE LOCATION AND DEPTH OF ALL EXISTING UTILITIES PRIOR TO
COMMENCING WORK.
INCORPORATE MECHANICAL SPECIFICATIONS, DRAWINGS AND STATE CODES.
COORDINATE MECHANICAL AND ELECTRICAL WORK WITH ALL OTHER TRADES. BEGIN
INSTALLATION AND ROUGH-IN AFTER COORDINATION WITH ALL TRADES ASSOCIATED WITH
THE INSTALLATION IS COMPLETE. COORDINATE BUILDING STRUCTURE, ARCHITECTURAL
ASSEMBLIES, SHEET METAL, ALL PIPING SYSTEMS, LIGHT FIXTURES, CONDUITS, CABLE
TRAYS, ETC. REFER TO ALL GENERAL, MECHANICAL, AND ELECTRICAL DRAWINGS AND
SPECIFICATIONS FOR THIS PROJECT. CONTRACTOR IS RESPONSIBLE FOR REWORK
ASSOCIATED WITH FAILURE TO COORDINATE.
EACH TRADE IS RESPONSIBLE FOR MAKING PENETRATIONS WHERE REQUIRED IN EXISTING
WALLS, FLOORS, CEILINGS, AND ROOFS. MAKE PENETRATIONS NEAT. PATCH, CONCEAL, OR
CAULK OVERCUT.
COVER EXPOSED WALL PENETRATIONS WITH ESCUTCHEONS OR SHEET METAL AS
APPROPRIATE.
CAULK ALL CONCEALED AND EXPOSED PIPING AND DUCT WALL PENETRATIONS TO PREVENT
NOISE TRANSFER BETWEEN SPACES.
CREATE OPENINGS IN THE BUILDING THAT ARE REQUIRED TO REMOVE EXISTING ITEMS AND
TO BRING IN NEW EQUIPMENT. PATCH ALL OPENINGS CREATED AND FINISHED WITH
MATERIALS TO MATCH EXISTING CONDITIONS. INCLUDE THIS WORK IN BID.
ON COMPLETION OF THE INSTALLATION, COOPERATE WITH THE OWNER TO PROVIDE
TESTING, ADJUSTING, AND BALANCING TO OBTAIN PROPER OPERATION OF ALL EQUIPMENT
AND SYSTEMS. PROVIDE ALL FACILITIES AND EQUIPMENT AND COMPLETE ALL TESTS
REQUIRED FOR ADJUSTMENTS AND BALANCING TO ESTABLISH THE PROPER PERFORMANCE
OF EQUIPMENT.
300 4th Street West Des Moines, Iowa 50265 info@kclengineering.com 515.724.7938
Scale:
Sheet:
Sheet Name:
REV. 0
MD100
CO
NT
RA
CT
R
FB
- 9
0-0
1 - H
HS
IM
HI
B
OI
LE
R #3
R
EP
LA
CE
ME
NT
11/14/2025 10:06 AM
1/4" = 1'-0"
IO
W
A
AV
E.
IN
DE
PE
ND
EN
CE
- I
OW
A
- 5
KCL Project Number:
Date:
Drawn By:
Checked By: KCL
CJC
25224
11-14-2025
NOT FOR CONSTRUCTION
11-14-2025
CONTRACT RFB - 947400-01 - HHS IMHI BOILER #3 REPLACEMENT
MECHANICAL DEMO
ENLARGED BASEMENT PLAN
A.
B.
C.
D.
E.
F.
G.
REFER TO M000 FOR GENERAL NOTES & SYMBOLS.
PATCH WALLS, ROOFS, AND/OR FLOOR WHERE DUCTS, GRILLES, PIPES, OR
EQUIPMENT ARE REMOVED. PAINT OR FINISH TO MATCH ORIGINAL
CONSTRUCTION.
COORDINATE WITH OWNER AND ASBESTOS ABATEMENT CONTRACTOR FOR
WORK IN AREAS CONTAINING ASBESTOS.
WHERE DUCTWORK IS REMOVED, REMOVE ALL ASSOCIATED SUPPORTS.
WHERE EQUIPMENT IS REMOVED, REMOVE ALL ASSOCIATED SUPPORTS,
DUCTWORK, PIPING, AND CONTROLS.
WHERE CONTROLS ARE REMOVED, REMOVE ALL ASSOCIATED WIRING AND/OR
PNEUMATIC TUBING. PATCH WALL OPENINGS AND PAINT OR FINISH TO MATCH
ORIGINAL CONSTRUCTION. IN WALLS THAT CANNOT BE PATCHED, INSTALL
STAINLESS STEEL COVER PLATE. ABANDON PNEUMATIC TUBING IN WALLS.
REMOVE ALL EXPOSED ABANDONED STEAM AND CONDENSATE PIPING. PATCH
WALL AND FLOOR OPENINGS TO MATCH ORIGINAL CONSTRUCTION.
GENERAL NOTES:
300 4th Street West Des Moines, Iowa 50265 info@kclengineering.com 515.724.7938
Scale:
Sheet:
Sheet Name:
REV. 0
MD101
CO
NT
RA
CT
R
FB
- 9
0-0
1 - H
HS
IM
HI
B
OI
LE
R #3
R
EP
LA
CE
ME
NT
11/14/2025 10:06 AM
1/4" = 1'-0"
IO
W
A
AV
E.
IN
DE
PE
ND
EN
CE
- I
OW
A
- 5
KCL Project Number:
Date:
Drawn By:
Checked By: KCL
CJC
25224
11-14-2025
NOT FOR CONSTRUCTION
11-14-2025
CONTRACT RFB - 947400-01 - HHS IMHI BOILER #3 REPLACEMENT
MECHANICAL DEMO
ENLARGED FIRST FLOOR PLAN
A.
B.
C.
D.
E.
F.
G.
REFER TO M000 FOR GENERAL NOTES & SYMBOLS.
PATCH WALLS, ROOFS, AND/OR FLOOR WHERE DUCTS, GRILLES, PIPES, OR
EQUIPMENT ARE REMOVED. PAINT OR FINISH TO MATCH ORIGINAL
CONSTRUCTION.
COORDINATE WITH OWNER AND ASBESTOS ABATEMENT CONTRACTOR FOR
WORK IN AREAS CONTAINING ASBESTOS.
WHERE DUCTWORK IS REMOVED, REMOVE ALL ASSOCIATED SUPPORTS.
WHERE EQUIPMENT IS REMOVED, REMOVE ALL ASSOCIATED SUPPORTS,
DUCTWORK, PIPING, AND CONTROLS.
WHERE CONTROLS ARE REMOVED, REMOVE ALL ASSOCIATED WIRING AND/OR
PNEUMATIC TUBING. PATCH WALL OPENINGS AND PAINT OR FINISH TO MATCH
ORIGINAL CONSTRUCTION. IN WALLS THAT CANNOT BE PATCHED, INSTALL
STAINLESS STEEL COVER PLATE. ABANDON PNEUMATIC TUBING IN WALLS.
REMOVE ALL EXPOSED ABANDONED STEAM AND CONDENSATE PIPING. PATCH
WALL AND FLOOR OPENINGS TO MATCH ORIGINAL CONSTRUCTION.
300 4th Street West Des Moines, Iowa 50265 info@kclengineering.com 515.724.7938
Scale:
Sheet:
Sheet Name:
REV. 0
M100
CO
NT
RA
CT
R
FB
- 9
0-0
1 - H
HS
IM
HI
B
OI
LE
R #3
R
EP
LA
CE
ME
NT
11/14/2025 10:06 AM
1/4" = 1'-0"
IO
W
A
AV
E.
IN
DE
PE
ND
EN
CE
- I
OW
A
- 5
KCL Project Number:
Date:
Drawn By:
Checked By: KCL
CJC
25224
11-14-2025
NOT FOR CONSTRUCTION
11-14-2025
CONTRACT RFB - 947400-01 - HHS IMHI BOILER #3 REPLACEMENT
MECHANICAL
ENLARGED BASEMENT PLAN
A.
B.
C.
D.
E.
REFER TO M000 FOR GENERAL NOTES & SYMBOLS.
REFER TO M300 & M500 FOR MECHANICAL DETAILS.
REFER TO M501 - M504 FOR MECHANICAL SCHEDULES.
BRANCH DUCT SIZES TO AIR TERMINALS SHALL MATCH NECK SIZE OF GRILLE,
REGISTER, OR DIFFUSER UNLESS NOTED OTHERWISE.
MAXIMUM FLEXIBLE DUCT LENGTH TO DIFFUSERS SHALL BE 60 ”, WITH MAXIMUM
OF ONE 90 DEGREE ELBOW.
300 4th Street West Des Moines, Iowa 50265 info@kclengineering.com 515.724.7938
Scale:
Sheet:
Sheet Name:
REV. 0
M101
CO
NT
RA
CT
R
FB
- 9
0-0
1 - H
HS
IM
HI
B
OI
LE
R #3
R
EP
LA
CE
ME
NT
11/14/2025 10:06 AM
1/4" = 1'-0"
IO
W
A
AV
E.
IN
DE
PE
ND
EN
CE
- I
OW
A
- 5
KCL Project Number:
Date:
Drawn By:
Checked By: KCL
CJC
25224
11-14-2025
NOT FOR CONSTRUCTION
11-14-2025
CONTRACT RFB - 947400-01 - HHS IMHI BOILER #3 REPLACEMENT
MECHANICAL
ENLARGED FIRST FLOOR PLAN
A.
B.
C.
D.
E.
REFER TO M000 FOR GENERAL NOTES & SYMBOLS.
REFER TO M300 & M500 FOR MECHANICAL DETAILS.
REFER TO M501 - M504 FOR MECHANICAL SCHEDULES.
BRANCH DUCT SIZES TO AIR TERMINALS SHALL MATCH NECK SIZE OF GRILLE,
REGISTER, OR DIFFUSER UNLESS NOTED OTHERWISE.
MAXIMUM FLEXIBLE DUCT LENGTH TO DIFFUSERS SHALL BE 60 ”, WITH MAXIMUM
OF ONE 90 DEGREE ELBOW.
GROUND FLOOR GROUND FLOOR
ROOF ROOF
Revisions Date No.
KCL Engineering 300 4th Street West Des Moines, Iowa 50265 info@kclengineering.com 515.724.7938
Scale:
Sheet:
Sheet Name:
REV. 0
M300
CO
NT
RA
CT
R
FB
- 9
0-0
1 - H
HS
IM
HI
B
OI
LE
R #3
R
EP
LA
CE
ME
NT
11/14/2025 10:06 AM
N.T.S.
IO
W
A
AV
E.
IN
DE
PE
ND
EN
CE
- I
OW
A
- 5
KCL Project Number:
Date:
Drawn By:
Checked By: KCL
CJC
25224
11-14-2025
NOT FOR CONSTRUCTION
11-14-2025
CONTRACT RFB - 947400-01 - HHS IMHI BOILER #3 REPLACEMENT
MECHANICAL PIPING
FLOW DIAGRAM
1 BOILER SCHEMATIC PIPING PLAN
2 BOILER ISO FLUE STACK ROUTING
300 4th Street West Des Moines, Iowa 50265 info@kclengineering.com 515.724.7938
Scale:
Sheet:
Sheet Name:
REV. 0
M500
CO
NT
RA
CT
R
FB
- 9
0-0
1 - H
HS
IM
HI
B
OI
LE
R #3
R
EP
LA
CE
ME
NT
11/14/2025 10:06 AM
N.T.S.
IO
W
A
AV
E.
IN
DE
PE
ND
EN
CE
- I
OW
A
- 5
KCL Project Number:
Date:
Drawn By:
Checked By: KCL
CJC
25224
11-14-2025
NOT FOR CONSTRUCTION
11-14-2025
CONTRACT RFB - 947400-01 - HHS IMHI BOILER #3 REPLACEMENT
MECHANICAL DETAILS
AND SCHEDULES
1 BOILER DETAIL
PIPE SIZE (MIN. 9") ROD
SIZE PER SPECIFICATION
ROD SIZE PER
SPECIFICATION
CLEVIS HANGER
(TYP OF 1)
INSULATION
(TYP.)
INSULATION
SHIELD
3"x2"x1/4" (LLH)
INSULATION
PIPE
3 PIPE HANGER DETAIL
4 REMOTE PRESSURE DETAIL
5 TEMPERATURE & PRESSURE GAUGE DETAIL
6 PIPE THROUGH FLOOR DETAIL 7 GAS REGULATOR STATION DETAIL
LAP UPSLOPE ROOFING
OVER TOP OF FLASHING
LAP DOWNSLOPE FLASHING
OVER ROOFING
STORM COLLAR WITH
ADJUSTABLE DRAW BAND
AT PIPE PENETRATION
NOTES:
PENETRATION MUST BE
ANCHORED TO ENSURE
STABILITY.
APPLY LAP SEALANT AROUND
ENTIRE PERIMETER OF
FLASHING.
CONTINUOUS BEAD OF
LAP SEALANT
FLASHING
STACK
2 PENETRATION FLASHING DETAIL
3-PLY SBS ROOFING
SCH 40 PIPE SLEEVE, 1 PIPE SIZE
LARGER THEN STACK
300 4th Street West Des Moines, Iowa 50265 info@kclengineering.com 515.724.7938
Scale:
Sheet:
Sheet Name:
REV. 0
M501
CO
NT
RA
CT
R
FB
- 9
0-0
1 - H
HS
IM
HI
B
OI
LE
R #3
R
EP
LA
CE
ME
NT
11/14/2025 10:06 AM
N.T.S.
IO
W
A
AV
E.
IN
DE
PE
ND
EN
CE
- I
OW
A
- 5
KCL Project Number:
Date:
Drawn By:
Checked By: KCL
CJC
25224
11-14-2025
NOT FOR CONSTRUCTION
11-14-2025
CONTRACT RFB - 947400-01 - HHS IMHI BOILER #3 REPLACEMENT
MECHANICAL PIPING AND
INSULATION STANDARDS
300 4th Street West Des Moines, Iowa 50265 info@kclengineering.com 515.724.7938
Scale:
Sheet:
Sheet Name:
REV. 0
M502
CO
NT
RA
CT
R
FB
- 9
0-0
1 - H
HS
IM
HI
B
OI
LE
R #3
R
EP
LA
CE
ME
NT
11/14/2025 10:06 AM
N.T.S.
IO
W
A
AV
E.
IN
DE
PE
ND
EN
CE
- I
OW
A
- 5
KCL Project Number:
Date:
Drawn By:
Checked By: KCL
CJC
25224
11-14-2025
NOT FOR CONSTRUCTION
11-14-2025
CONTRACT RFB - 947400-01 - HHS IMHI BOILER #3 REPLACEMENT
MECHANICAL PIPING
AND INSULATION
STANDARDS
300 4th Street West Des Moines, Iowa 50265 info@kclengineering.com 515.724.7938
Scale:
Sheet:
Sheet Name:
REV. 0
M503
CO
NT
RA
CT
R
FB
- 9
0-0
1 - H
HS
IM
HI
B
OI
LE
R #3
R
EP
LA
CE
ME
NT
11/14/2025 10:06 AM
N.T.S.
IO
W
A
AV
E.
IN
DE
PE
ND
EN
CE
- I
OW
A
- 5
KCL Project Number:
Date:
Drawn By:
Checked By: KCL
CJC
25224
11-14-2025
NOT FOR CONSTRUCTION
11-14-2025
CONTRACT RFB - 947400-01 - HHS IMHI BOILER #3 REPLACEMENT
300 4th Street West Des Moines, Iowa 50265 info@kclengineering.com 515.724.7938
Scale:
Sheet:
Sheet Name:
REV. 0
M504
CO
NT
RA
CT
R
FB
- 9
0-0
1 - H
HS
IM
HI
B
OI
LE
R #3
R
EP
LA
CE
ME
NT
11/14/2025 10:06 AM
N.T.S.
IO
W
A
AV
E.
IN
DE
PE
ND
EN
CE
- I
OW
A
- 5
KCL Project Number:
Date:
Drawn By:
Checked By: KCL
CJC
25224
11-14-2025
NOT FOR CONSTRUCTION
11-14-2025
CONTRACT RFB - 947400-01 - HHS IMHI BOILER #3 REPLACEMENT
3' - 1 1/2" 3' - 1 1/2"
CL BOILER
W
X
W
X
6"
4'
6"
BEARING PLATE
(TYP 4 LOCATIONS),
SEE DETAIL
S000
(SIM)
/3 S000
6'
9" 2'
4"
4'
6"
1'
8" 1'
8"
13' - 0"
3' - 5"
C L S
TA
C
K
EXISTING WALL
11" 2' - 5"
S000 (TYP 4 SIDES)
FIELD VERIFY LOCATION OF
FRAME BASE ON DUCTWORK
T/STEEL EL = 1' - 6 3/4" ABOVE T/CONCRETE SLAB
BEARING PLATE TO SIT DIRECTLY
ON TOP OF EXISTING CONCRETE
PAD AT THIS LOCATION
EXISTING
CONCRETE PAD
S000
EXISTING
CONCRETE SLAB
W14X43
4' - 6" 21' - 0" 6" 4' - 6" 2' - 4"±
(2) 3/4"Ø BOLTS; DRILL AND
EPOXY SET INTO SLAB WITH
4" MINIMUM EMBEDMENT (TYP)
3/8" STIFFENER ON EACH
SIDE OF BEAM WEB (TYP
AT BEARING PLATE)
3 SIDES TYP
GROUT AS REQUIRED (TYP)
BEARING PLATE (TYP);
SEE DETAIL /3 S000
EXISTING WALL
1'
3/
4"
1' - 2"
2" 3"
3" 2"
1 1/2" 11" 1 1/2"
W-BEAM, SEE
PLAN FOR SIZE
PL3/4"
(2) 1 1/16"Ø HOLESC L
B
E A
R
IN
G P
LA
TE
CL STACK
C L S
TA
C
K
BOILER FLUE,
SEE MECHANICAL
DRAWINGS
W6X15
13' - 0"
7' - 9" 5' - 3"
7'
1" 2'
0"
C L S
TA
C
K
EXISTING TRUSS
B/TRUSS EL = 30' - 0"
EXISTING TRUSS
B/TRUSS EL = 30' - 0"
3' - 1" 2' - 7"
3'
7" 2'
1/ 2"
1/
2"
1'
5" 1'
5"
EXISTING PIPE
EXISTING
DUCTWORK
EXISTING WALL
C
(E
S000
(TYP 2)
T/STEEL EL = 31' - 3" UNO
C5 (E)
1' - 5" 1' - 5"
C 5X
6.
C5X6.7
C5X6.7
C 5X
6.
7 C12 (E) EL -0' - 3"
C
(E
C5 (E)
EL -1' - 3"
CONTRACTOR TO FIELD MODIFY
ROOF FRAMING AS REQUIRED
FOR NEW STACK
OVERSIZE COLLAR ON
DUCTWORK, SEE
MECHANICAL DRAWINGS
CODES, STANDARDS, AND SPECIFICATIONS
1. DESIGN AND CONSTRUCTION OF THIS PROJECT SHALL CONFORM TO THE REQUIREMENTS OF THE 2018 EDITION OF THE INTERNATIONAL BUILDING CODE (IBC) AND ANY APPLICABLE AMENDMENTS, AS
ADOPTED BY THE AUTHORITY HAVING JURISDICTION
2. DESIGN REQUIREMENTS FOR THE MATERIALS OF CONSTRUCTION BASED ON THE REFERENCED
STANDARDS IN CHAPTER 35 OF THE IBC
3. OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) 29 CFR 1910 - STANDARDS FOR GENERAL
INDUSTRY AND CFR 1926 - SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION HAVE BEEN
REFERENCED FOR REQUIREMENTS RELATED TO WORKPLACE SAFETY
GENERAL NOTES:
STRUCTURAL STEEL
1. MATERIALS:
WIDE FLANGE (W AND WT) - ASTM A992
ANGLES (L), CHANNELS (C AND MC), BEAMS (S AND M) - ASTM A36
PLATES (PL) AND BARS - ASTM A36
HP SHAPES (HP) - ASTM A572 GR. 50
SQUARE/RECTANGULAR HSS - ASTM A500 GR. C
ROUND HOLLOW STRUCTURAL SECTIONS - ASTM A500 GR. C
STANDARD STEEL PIPE - ASTM A53 GR. B
RAISED-PATTERN FLOOR PLATE - ASTM A786 COMMERCIAL GRADE
STEEL CONNECTION BOLTS - ASTM F3125 GR. A325 (TYP) OR GR. A490
WELD MATERIAL - AWS A5.1 E70XX
ANCHOR BOLTS - ASTM F1554 GR. 36
STAINLESS STEEL SHAPES - ASTM A276 TYPE 304 Fy = 30 KSI
HEADED WELDED STEEL STUDS - ASTM A108, TYPE B
HEAVY HEX NUTS - ASTM A563
WASHERS - ASTM F436
GROUT - ASTM C827
2. FABRICATION AND ERECTION TO BE IN ACCORDANCE WITH AISC 360 SPECIFICATIONS
3. BEAM CONNECTIONS ARE TO BE EQUAL TO OR GREATER THAN ONE HALF THE UNIFORM LOAD CAPACITY OF THE BEAM. THE LENGTH OF CONNECTION ANGLES SHALL NOT BE LESS THAN HALF THE "T" DISTANCE OF THE BEAM WEB. ALL MAJOR BOLTED CONNECTIONS ARE TO BE BEARING TYPE CONNECTIONS USING
DOUBLE CLIP ANGLES AND 3/4"Ø A325N BOLTS AND NUTS UNLESS NOTED OTHERWISE.
4. FIELD CUTTING OR OTHER FIELD MODIFICATIONS TO STRUCTURAL STEEL SHALL NOT BE MADE WITHOUT
SPECIFIC PRIOR WRITTEN APPROVAL OF THE ENGINEER
5. ALL STRUCTURAL STEEL PLAN DIMENSIONS ARE TO CENTER LINE OF BEAMS AND COLUMNS AND TO THE BACK OF CHANNELS AND ANGLES, UNO. FOR HSS HORIZONTAL BRACING, ELEVATIONS ARE GIVEN TO CENTERLINE OF THE STRUCTURAL MEMBER, UNO. FOR ALL OTHER MEMBERS, ELEVATIONS ARE GIVEN TO
TOP OF STRUCTURAL MEMBER, UNO
6. THE CENTER OF GRAVITY OF BRACES AND SUPPORT MEMBERS ARE TO INTERSECT IN A MANNER TO AVOID ECCENTRICITY WHERE PRACTICAL; OTHERWISE FASTENERS AND SUPPORT MEMBERS ARE TO ACCOMMODATE STRESS DUE TO ECCENTRICITY, INCLUDING PRYING ACTION IN FRAMING ANGLES OR
FLANGED GUSSETS
7. CAPACITY OF CONNECTIONS FOR BRACING MEMBERS TO BE CAPABLE OF DEVELOPING THE NET SECTION
STRENGTH OF THE MEMBERS IN COMPRESSION, UNO
8. ALL WELDING AND TESTING OF WELDS SHALL BE IN ACCORDANCE WITH THE LATEST AWS CODES AND
RECOMMENDATIONS AND SHALL BE COMPLETED BY AWS QUALIFIED WELDERS WITH CURRENT AWS
CERTIFICATION
9. WELDING ELECTRODES SHALL BE IN ACCORDANCE WITH AWS D1.1 AWS A5.1 OR A5.5; E70XX ARE GENERALLY REQUIRED FOR SHIELDED-METAL ARC WELDING; AWS A5.17 OR AWS A5.23, F7X-EXXX FOR SUBMERGED ARC WELDING; AWS A5.18, ER70S-X FOR GAS METAL ARC WELDING; AND AWS A5.0 E7XT.X FOR
FLUX-CORED ARC WELDING
10. FABRICATION AND ERECTION WELDING TECHNIQUES SHALL CONFORM TO AWS D1.1; WELDERS SHALL BE QUALIFIED AND CERTIFIED TO PERFORM THE WORK REQUIRED IN ACCORDANCE WITH AWS D1.1 OR
SIMILAR REQUIREMENTS
11. UNLESS NOTED OTHERWISE, ALL WELDS SHALL BE CONTINUOUS 3/16" FILLET WELDS
12. ALL BASE PLATES SUPPORTING STEEL COLUMNS SHALL BE GROUTED SOLID WITH HIGH STRENGTH (8,000 PSI MIN), NON-SHRINK GROUT IMMEDIATELY AFTER STRUCTURAL STEEL IS IN PLACE AND PLUMB AND PRIOR TO PLACING ANY CONCRETE FOR THE ELEVATED FLOORS SUPPORTED BY THE RESPECTIVE
COLUMNS
13. UPON COMPLETION OF INSTALLATION OF ALL ITEMS TO BE FIELD PAINTED, ALL PAINTED SURFACES DAMAGED DURING CONSTRUCTION AND ALL FIELD WELDED AREAS SHALL BE PREPPED IN ACCORDANCE WITH PAINT MANUFACTURER'S RECOMMENDATIONS. FIELD APPLY THE SPECIFIED PAINT SYSTEM IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS TO PROVIDE A CLEAN UNIFORM APPEARANCE
14. DAMAGE TO ANY GALVANIZED MATERIAL SHALL BE TOUCHED UP AS REQUIRED WITH A ZINC RICH PAINT
15. GRATING SHALL BE 1 1/4" X 3/16" 19-W-4 OR EQUAL, ATTACHED WITH CLIPS PER MANUFACTURER'S REQUIREMENTS, UNO. INTERIOR GRATING SHALL BE PRIMED AND PAINTED PER OWNER SPECIFICATIONS, EXTERIOR GRATING SHALL BE SERRATED AND GALVANIZED. GRATING SHALL BE FABRICATED SO THAT CROSS BARS OF ADJACENT PANELS ARE ALIGNED WHEN INSTALLED. EACH HOLE OR OPENING GREATER THAN 8" SHALL BE BANDED WITH 1 1/4" X 3/16" BAND WELDED TO CUT PORTIONS OF GRATING
16. ALL STRUCTURAL STEEL SURFACES TO BE PREPARED TO SSPC-SP6 STANDARDS PRIOR TO APPLYING
THE FOLLOWING COATINGS:
A. STEEL SHALL BE SHOP PRIMED WITH SHERWIN WILLIAMS PRO-CRYL UNIVERSAL ACRYLIC PRIMER
WITH MINIMUM DFT OF 2.0 MIL
B. STEEL SHALL BE SHOP PAINTED WITH SHERWIN WILLIAMS WATERBORNE ACRYLIC DRY FALL WITH
MINIMUM DFT OF 3.0 MIL
GENERAL STRUCTURAL NOTES
1. ALL WORK SHALL CONFORM TO ALL APPLICABLE BUILDING CODES, ORDINANCES, AND REGULATIONS AS
ADOPTED BY LOCAL AUTHORITIES HAVING JURISDICTIONS
2. ENGINEER SHALL NOT HAVE CONTROL OR CHARGE OF, AND SHALL NOT BE RESPONSIBLE FOR:
CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, OR PROCEDURES, FOR SAFETY
PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK, FOR THE ACTS OR OMISSION OF THE CONTRACTOR, SUBCONTRACTOR, OR ANY OTHER PERSONS PERFORMING ANY OF THE WORK, OR FOR THE FAILURE OF ANY OF THEM TO CARRY OUT THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS
3. THE CONTRACTOR SHALL VERIFY ALL CONDITIONS, DIMENSIONS, AND ELEVATIONS AT THE SITE. IF ACTUAL CONDITIONS DIFFER FROM THOSE SHOWN ON CONTRACT DOCUMENTS, CONSTRUCTION OF ANY
AFFECTED ELEMENTS SHALL NOT COMMENCE WITHOUT APPROVAL OF DESIGN ENGINEER
4. THE LOCATION OF ANY EXISTING UTILITIES SHOWN ON THE DRAWINGS ARE TAKEN FROM EXISTING RECORDS. ADDITIONAL UTILITIES MAY BE ENCOUNTERED DURING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UTILITIES WHICH COME IN CONFLICT WITH THE PROPOSED
CONSTRUCTION
5. THE CONTRACTOR SHALL SUBMIT A WRITTEN REQUEST TO THE DESIGN ENGINEER FOR APPROVAL BEFORE PROCEEDING WITH ANY CHANGES, MODIFICATIONS OR SUBSTITUTIONS DIFFERING FROM
CONTRACT DOCUMENTS
6. THE CONTRACTOR SHALL PROVIDE ADEQUATE TEMPORARY SHORING AND BRACING FOR ALL
STRUCTURAL ELEMENTS UNTIL THE ENTIRE STRUCTURAL SYSTEM IS PLUMB AND SECURED
7. THE CONTRACTOR SHALL VERIFY THE POSITION, ELEVATION, AND ORIENTATION OF PROCESS EQUIPMENT PRIOR TO FABRICATION. THIS INCLUDES ANCHOR BOLT SIZES AND LOCATIONS, FLOOR PENETRATIONS, AND REQUIRED CLEARANCES TO ADJACENT WALLS, FRAMING, AND OTHER OBSTRUCTIONS
8. WHERE NEW CONSTRUCTION INTERFACES WITH EXISTING, FIELD VERIFY EXISTING DIMENSIONS, MEMBER
SIZES, AND ELEVATIONS SHOWN ON THE DRAWINGS PRIOR TO STARTING CONSTRUCTION. ALL
DISCREPANCIES SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER.
9. DO NOT SCALE DIMENSIONS FROM DRAWINGS. INTERPRETATION OF PLANS, DETAILS, DIMENSIONS, OR OTHER ITEMS PROVIDED IN THE CONTRACT DOCUMENTS ARE TO BE COMPLETED BY THE DESIGN ENGINEER
10. DETAILED SHOP DRAWINGS SHALL BE SUBMITTED FOR APPROVAL, BY THE OWNER AND DESIGN ENGINEER, PRIOR TO FABRICATION FOR ALL STRUCTURAL ITEMS INCLUDING: CONCRETE AND MASONRY REINFORCEMENT, EMBEDDED STEEL ITEMS, STRUCTURAL STEEL, STEEL STACKS, STEEL JOISTS, STEEL
DECKING, METAL GRATING, GUARDRAILS AND STAIRS
11. ALL OPEN EXCAVATIONS SHALL CONFORM TO OSHA STANDARDS FOR THE CONSTRUCTION INDUSTRY
12. WHERE APPLICATION IS MADE TO THE BUILDING OFFICIAL FOR CONSTRUCTION, THE OWNER SHALL EMPLOY A SPECIAL INSPECTOR TO PROVIDE INSPECTIONS AND TESTS PER THE REQUIREMENTS OF
CHAPTER 17 OF THE IBC UNLESS WAIVED BY THE BUILDING OFFICIAL
13. PERIODIC SITE OBSERVATION BY THE ENGINEER IS SOLELY FOR THE PURPOSE OF DETERMINING IF WORK IS PROCEEDING IN ACCORDANCE WITH STRUCTURAL CONTRACT DOCUMENTS. THIS LIMITED SITE OBSERVATION SHOULD NOT BE CONSTRUED AS EXHAUSTIVE OR CONTINUOUS TO CHECK THE QUALITY OF WORK, BUT RATHER AS PERIODIC IN AN EFFORT TO REVIEW THE PROGRESS OF THE CONTRACTOR
GROUND FLOOR
EL 0"
W6X15
H S
S 4X
4X 1/
H S
S 4X
4X 1/
H
SS
3X 3X
1/
HSS3X3X1/4
8'
0" 8'
0"
EXISTING CONCRETE SLAB
BASE PLATE (TYP), SEE
DETAIL /5 S000
NOTE: ENTIRE FRAME TO BE SHOP WELDED TOGETHER
(2) 3/4"Ø BOLTS, DRILL AND
EPOXY SET INTO SLAB WITH 4"
MINIMUM EMBEDMENT (TYP)
10"
1 1/2" 3 1/2" 3 1/2" 1 1/2"
1/
2"
1/ 2"
1/
2"
1/ 2"
PL 1/2"
HSS4X4X1/4
(2) 1 1/16"Ø HOLES
BOLTS TO BE OUTSIDE OF
SHOP WELDED FRAME (TYP)
EXISTING ROOF TRUSS
WT4X12 (TYPICAL)
(4) 3/4"Ø A325 BOLTS @
3.5" GAUGE WITH ANCO
SELF-LOCKING NUTS
0'-6 1/2" A36 ROD (TYPICAL),
DIAMETER TO BE THICKNESS OF
CLAMPED MATERIAL PLUS 1/4" MIN
WT END TO BE SNUG TO EXISTING
TRUSS BOTTOM CHORD MEMBER
FILLET (TYPICAL)
TYP
EL (SEE PLAN)
B/EXISTING TRUSS
W-BEAM, SEE
PLAN FOR SIZE
2" 5" MAX
*CLAMP TO BE LOCATED 1'-0" MAX
FROM TRUSS PANEL POINT
9"
Sheet:
C O P Y R
IG
H T
P R O T E C T
IO
N
U N D E R
F E D E R A L
L A W
(T
IT
L E
U .S C O D E
A b o v e la w li m it s th e u s e o f th is d o c u m e n t (d ra w in g d a ta to th is s p e c if ic p ro je c t o n ly a n d d u p li c a ti o n w h o le o r in p a rt fo r u s e o n o th e r th a n th is p ro je c t is p ro h ib it e d
Shoemaker
Haaland www.shoemaker-haaland.com
Scale:
Sheet Name:
KCL Engineering
ENGINEERING
300 4th Street West Des Moines, Iowa 50265 info@kclengineering.com 515.724.7938
KCL
FOR CONSTRUCTION
KCL Project Number:
Date:
Drawn By:
Checked By:
SHPE JOB NO.
/1 /2
:1
:2
P
M R
P ro je c ts
\2
\2
K C
L E n g in e e ri n g
I M
H I B o ile r R e p la c e m e n t
In d e p e n d e n c e
IA
M o d e ls
\2
.r v t
As indicated
S000
STRUCTURAL PLANS & DETAILS
25224
11/14/25
DWR
EMH
IO
W
A A
V E
IN
D
E P
E N
D E
N C
E , I
A
C O
N
TR
A C
T R
FB
-0
-H
H S
IM
H
I B O
IL
E
R
R
E P
LA
C
E M
E N
T
25245
1/4" = 1'-0"1
BOILER SUPPORT FRAMING PLAN
1/4" = 1'-0"2
TYPICAL SECTION AT BOILER SUPPORT BEAM
3/4" = 1'-0"3
BEARING PLATE DETAIL
1/4" = 1'-0"6
STACK LATERAL SUPPORT FRAMING PLAN
N
1/4" = 1'-0"4
BOILER FLUE SUPPORT FRAME SECTION
1 1/2" = 1'-0"5
HSS COLUMN SQUARE BASE
PLATE DETAIL
1 1/2" = 1'-0"7
BEAM CLAMP DETAIL
Revisions Date No.
ISSUED FOR BID 11/14/25 0
NOTE: DIMENSIONS TO BE VERIFIED WITH FINAL EQUIPMENT
ELECTRICAL ABBREVIATIONS
A DEVICE MOUNTED +8" ABOVE
COUNTER TOP (VERIFY LOCATION)
AFF ABOVE FINISHED FLOOR
ATS AUTOMATIC TRANSFER SWITCH
C CEILING
CB CIRCUIT BREAKER
CT CURRENT TRANSFORMER
E EXISTING ITEM TO REMAIN
EC ELECTRICAL CONTRACTOR
EM EMERGENCY LIGHT FIXTURE
ER NEW LOCATION OF EXISTING ITEM
F ROUGH IN FOR FUTURE DEVICE
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FSD FIRE SMOKE DAMPER
G GROUND FAULT CIRCUIT INTERRUPTER
GND GROUND
KVA KILO-VOLT-AMPERES
KW KILOWATTS
MC MECHANICAL CONTRACTOR
MCB MAIN CIRCUIT BREAKER
MDP MAIN DISTRIBUTION PANEL
MLO MAIN LUGS ONLY
N NEW ITEM
NIC NOT IN CONTRACT
NM NONMETALLIC
NTS NOT TO SCALE
OC ON CENTER
OFCI OWNER FURNISHED
CONTRACTOR INSTALLED
OFOI OWNER FURNISHED,
OWNER INSTALLED
R EXISTING ITEM TO BE REMOVED
RR EXISTING ITEM TO BE REMOVED AND
RELOCATED
RN EXISTING ITEM TO BE REMOVED AND
REPLACED WITH NEW
SCCR SHORT CIRCUIT CURRENT RATING
T TAMPER PROOF DEVICE
TCC TEMPERATURE CONTROL CONTRACTOR
TV TELEVISION
TYP TYPICAL
UPS UNINTERRUPTIBLE POWER SUPPLY
V VOLTS
VA VOLT-AMPERES
WG WIREGUARD COVER
WP WEATHERPROOF DEVICE
WR WEATHER RESISTANT DEVICE
+24" INDICATES MOUNTING HEIGHT CENTER
LINE OF DEVICE TO FINISHED FLOOR
1.
2.
3.
4.
PROVIDE ELECTRICAL INSTALLATION IN ACCORDANCE WITH ALL LOCAL, STATE, AND
NATIONAL CODES.
THE CURRENT ADOPTED EDITION OF THE ELECTRICAL CODE IS THE STANDARD FOR THE
ELECTRICAL INSTALLATION. VERIFY WITH LOCAL OFFICIALS WHEN PERMITS ARE OBTAINED.
NOTIFY DESIGN TEAM OF ANY DISCREPANCIES BETWEEN THE PROJECT MANUAL OR
DRAWINGS AND THE GOVERNING CODE.
REFER TO PROJECT MANUAL AND PROJECT CODE REVIEW SHEET FOR LIST OF APPLICABLE
CODES.
PER NEC EVERY CIRCUIT AND CIRCUIT MODIFICATION SHALL BE LEGIBLY IDENTIFIED AS TO
ITS CLEAR, EVIDENT AND SPECIFIC PURPOSE OR USE. CONTRACTOR TO PROVIDE FINAL
CIRCUIT IDENTIFICATION FOR ALL NEW AND MODIFIED CIRCUITS AT PROJECT COMPLETION.
CODE NOTES - ELECTRICAL
1.
2.
3.
4.
5.
PROVIDE NORMAL WIRING DEVICES AS GRAY UNLESS OTHERWISE NOTED.
PROVIDE DEVICES COVER PLATES AS STAINLESS STEEL. MATCH WIRING DEVICES COLOR.
PROVIDE GFCI TYPE RECEPTACLES AT ALL LOCATIONS REQUIRED BY THE NEC.
INSTALL WALL MOUNTED RECEPTACLES AT +18" ABOVE FINISHED FLOOR UNLESS OTHERWISE
NOTED.
INSTALL WALL MOUNTED LIGHT SWITCHES AT +46 ” ABOVE FINISHED FLOOR UNLESS
OTHERWISE NOTED. EXCEPTION; INSTALL DEVICES ABOVE AN OBSTRUCTED HIGH FORWARD
REACH OBSTACLE GREATER THEN 20 INCHES IN DEPTH AT +42 ”.
DEVICE INSTALLATION AND MATERIALS - ELECTRICAL
1.
2.
3.
COORDINATE LOCATION/INSTALLATION OF MECHANICAL AND ELECTRICAL WORK WITH ALL
OTHER TRADES. BEGIN INSTALLATION AND ROUGH-IN ONLY AFTER PROPER AND TIMELY
COORDINATION WITH ALL TRADES ASSOCIATED WITH THE INSTALLATION IS COMPLETE.
COORDINATE WITH BUILDING STRUCTURE, ARCHITECTURE, MECHANICAL SHEET METAL, ALL
PIPING SYSTEMS, LIGHT FIXTURES, CONDUITS, CABLE TRAYS, EQUIPMENT
ACCESS/CLEARANCE, ETC. REFER TO ALL GENERAL, MECHANICAL, AND ELECTRICAL
DRAWINGS AND SPECIFICATIONS FOR THIS PROJECT. CONTRACTOR IS RESPONSIBLE FOR
REWORK OF INSTALLED EQUIPMENT RESULTING FROM INSUFFICIENT COORDINATION.
ELECTRICAL DRAWINGS ARE ONLY A PORTION OF THE COMPLETE SET OF PLANS AND
CONTRACT DOCUMENTS. THE ELECTRICAL SCOPE OF WORK IS DEFINED BY THE COMPLETE
SET OF CONTRACT DOCUMENTS. THIS INCLUDES BUT IS NOT LIMITED TO REFERENCING;
ARCHITECTURAL PLANS FOR DIMENSIONS AND DETAILS; EQUIPMENT PLANS FOR ROUGH-IN
REQUIREMENTS, MECHANICAL PLANS FOR EQUIPMENT SIZES AND LOCATIONS.
ELECTRICAL WORK TO BE COMPLETED BY INDIVIDUALS LICENSED BY THE STATE OF IOWA.
GENERAL NOTES - ELECTRICAL
1.
2.
3.
4.
5.
6.
7.
8.
INCREASE CONDUCTOR SIZES ON 20A 120V-1 PHASE CIRCUITS EXCEEDING 100 FEET TO
CENTER OF LOAD TO ACCOUNT FOR VOLTAGE DROP.
RACEWAYS AND BOXES ARE SHOWN DIAGRAMMATICALLY ONLY AND INDICATE GENERAL
AND APPROXIMATE LOCATIONS. LAYOUTS DO NOT ALWAYS SHOW THE TOTAL NUMBER
OF RACEWAYS OR BOXES FOR THE CIRCUITS REQUIRED, NOR ARE THE LOCATIONS OF
INDICATED RUNS INTENDED TO SHOW THE ACTUAL ROUTING OF THE RACEWAYS.
LIGHT FIXTURES, SWITCHES, DEVICES, ETC. ARE SHOWN IN PREFERRED LOCATION.
MODIFY CONDUIT, HANGERS, CIRCUITING, ETC. TO PROVIDE A COMPLETE AND
OPERATIONAL SYSTEM.
PROVIDE A DEDICATED GREEN INSULATED GROUND CONDUCTOR TO ALL DEVICES. DO
NOT USE CONDUIT SYSTEM AS THE ONLY EQUIPMENT GROUNDING METHOD.
DO NOT INSTALL BOXES BACK-TO-BACK ON OPPOSITE SIDES OF THE SAME WALL.
MAINTAIN MINIMUM OF 8 ” DISTANCE BETWEEN BOXES WHEREVER APPLICABLE.
BALANCE PANEL LOADS DURING INSTALLATION. CIRCUIT NUMBERING SHOWN ON PLANS
MAY BE ADJUSTED TO ACCOMMODATE.
PROVIDE TYPED PANEL DIRECTORY AT PROJECT COMPLETION FOR NEW PANELS AND
EXISTING PANELS WITH CIRCUITS MODIFIED DURING PROJECT. USE OWNER ’S CURRENT
ROOM NUMBERS AND EQUIPMENT NAMES. PROVIDE UNIQUE CIRCUIT IDENTIFICATION
PER NEC 408.4(A)
CONTRACTOR IS RESPONSIBLE FOR OPENINGS IN WALLS, FLOORS, CEILINGS, AND
ROOFS THAT ARE REQUIRED TO COMPLETE THEIR SCOPE OF WORK. SEAL
PENETRATIONS IN ACCORDANCE WITH THE RATING OF THE AFFECTED ASSEMBLY.
REFER TO ARCHITECTURAL CODE PLAN FOR RATED WALLS, FLOORS, AND CEILINGS.
INSTALLATION NOTES - ELECTRICAL
CONDUIT UP, REFER TO TAG ON DRAWING FOR SIZE
CONDUIT DOWN, REFER TO TAG ON DRAWING FOR SIZE
EQUIPMENT IDENTIFICATION TAG. REFER TO EQUIPMENT CONNECTION SCHEDULE
DETAIL DRAWING REFERENCE TAG, SIM-SIMILAR, TYP-TYPICAL, OPP-OPPOSITE
INTERIOR ELEVATION DRAWING REFERENCE TAG
GENERAL SYMBOLS
A101
SIM
A101 1
R ef
KEYNOTE#
XXX
X
SHEET REFERENCE
SECTION CUT REFERENCE TAG, SIM-SIMILAR, TYP-TYPICAL, OPP-OPPOSITE
SHEET REFERENCE
JUNCTION BOX, WALL MOUNTED, ELEVATION AS NOTED.J
A101
SIM
CONDUCTOR AND CONDUIT RUN, CONCEALED UNDER THE FLOOR
CONDUCTOR AND CONDUIT RUN
CABLE SCHEDULE
TAG AMPS PHASE/NEUTRAL GROUND CONDUIT
A 130 (3) - #1 #6 1 1/2"
B 25 (2) - #12 #12 3/4"
C 65 (3) - #6 #8 3/4"
NOTES:
1. CONDUCTORS SHALL BE THWN COPPER, UNLESS DESIGNATED "AL" FOR ALUMINUM
2. TAGS WITH "(UG)" INDICATE UNDERGROUND FEEDS IN RIGID CONDUIT. ALL OTHER FEEDS ASSUMED TO BE ABOVE-GROUND IN RIGID CONDUIT.
3. CABLE TERMINATIONS/LUGS SHALL BE VERIFIED TO BE RATED FOR 75°C
ELECTRICAL PANEL SPECIFICATIONS - PANEL PP-8 DAS Independence Boiler
LOAD DESCRIPTION LOAD TY BRKR CKT PHASE CKT BRKR TY LOAD LOAD DESCRIPTION
(VA) AMP P NO A B C NO AMP P (VA)
(E) 1-A OIL PUMP
15 3 1 2 20 1 (E) HEATER IN WEST CORNER
3 4 20 1 (E) LIGHS ON WEST WALL
5 6 20 1 (E) LIGHTS ON SOUTH WALL
(E) 2-A OIL PUMP
15 3 7 8 30 1 (E) BATHROOM IN DRIVERS
9 10 30 1 (E) OUTLET WORK BENCH
11 12 15 1 SPARE
(E) 1-B OIL PUMP
20 3 13 14 20 1 (E) OUTLETS ON SOUTH WALL
15 16 20 1 (E) OUTLETS ON SOUTH WALL
17 18 20 1 (E) OUTLETS ON WES WALL
(E) 2-B OIL PUMP
20 3 19 20 20 1 (N) Boiler Estop
21 22 SPACE
23 24 SPACE
(E) SMALL OIL PUMP
30 3 25 26 SPACE
27 28 SPACE
29 30 SPACE
(E) #2 BOILER
60 3 31 32 15 3
GRINDER33 34
35 36
(E) #1 BOILER
60 3 37 38 50 3
WELDER39 40
41 42
ELECTRICAL PANEL SPECIFICATIONS - PANEL MDP-PP DAS Independence Boiler
LOAD DESCRIPTION LOAD TY BRKR CKT PHASE CKT BRKR TY LOAD LOAD DESCRIPTION
(VA) AMP P NO A B C NO AMP P (VA)
EMPTY
3 1 2 3
EMPTY3 4
5 6
EMPTY
3 7 8 3
EMPTY9 10
11 12
EMPTY
3 13 14 3
EMPTY15 16
17 18
(E) ELEVATOR TRANSFORMER (DON'T USE)
110 3 19 20 100 3
(E) BOILER ROOM MAIN, SE CORNER21 22
23 24
(N) XFMR BOILER BLR-1*
33620 125 3 25 11207 26 125 3
(E) PANEL PP227 11207 28
29 11207 30
(E) PANEL XPDE
200 3 31 32 200 3
(E) BOILER FEED PUMP, NE CORNER33 34
35 36
(E) NO1, NO2 BOILER
200 3 37 38 200 3
(E) GROUNDING SHOP39 40
41 42
(E) ACTIVITY CENTER
200 3 43 44 225 3
(E) PANEL PP145 46
47 48
* Breaker for the Boiler BLR-1 must be lockable and labeled XFMR Boiler BLR-1
Revisions Date No.
KCL Engineering 300 4th Street West Des Moines, Iowa 50265 info@kclengineering.com 515.724.7938
Scale:
Sheet:
Sheet Name:
REV. 0
E000
CO
NT
RA
CT
R
FB
- 9
0-0
1 - H
HS
IM
HI
B
OI
LE
R #3
R
EP
LA
CE
ME
NT
11/14/2025 10:06 AM
1/8" = 1'-0"
IO
W
A
AV
E.
IN
DE
PE
ND
EN
CE
- I
OW
A
- 5
KCL Project Number:
Date:
Drawn By:
Checked By: KCL
CJC
25224
11-14-2025
NOT FOR CONSTRUCTION
11-14-2025
CONTRACT RFB - 947400-01 - HHS IMHI BOILER #3 REPLACEMENT
ELECTRICAL GENERAL NOTES
AND SYMBOLS
J
KCL Engineering 300 4th Street West Des Moines, Iowa 50265 info@kclengineering.com 515.724.7938
Scale:
Sheet:
Sheet Name:
REV. 0
E100
CO
NT
RA
CT
R
FB
- 9
0-0
1 - H
HS
IM
HI
B
OI
LE
R #3
R
EP
LA
CE
ME
NT
11/14/2025 10:06 AM
1/8" = 1'-0"
IO
W
A
AV
E.
IN
DE
PE
ND
EN
CE
- I
OW
A
- 5
KCL Project Number:
Date:
Drawn By:
Checked By: KCL
CJC
25224
11-14-2025
NOT FOR CONSTRUCTION
11-14-2025
CONTRACT RFB - 947400-01 - HHS IMHI BOILER #3 REPLACEMENT
CONDUIT ROUTING PLAN
| Sheets and Views |
| IMHI_MEPT_KCL BOILER REPLACEMENT-MC |
| IMHI_MEPT_KCL BOILER REPLACEMENT-M000 |
| IMHI_MEPT_KCL BOILER REPLACEMENT-MD100 |
| IMHI_MEPT_KCL BOILER REPLACEMENT-MD101 |
| IMHI_MEPT_KCL BOILER REPLACEMENT-M100 |
| IMHI_MEPT_KCL BOILER REPLACEMENT-M101 |
| IMHI_MEPT_KCL BOILER REPLACEMENT-M300 |
| IMHI_MEPT_KCL BOILER REPLACEMENT-M500 |
| IMHI_MEPT_KCL BOILER REPLACEMENT-M501 |
| IMHI_MEPT_KCL BOILER REPLACEMENT-M502 |
| IMHI_MEPT_KCL BOILER REPLACEMENT-M503 |
| IMHI_MEPT_KCL BOILER REPLACEMENT-M504 |
| IMHI_MEPT_KCL BOILER REPLACEMENT-S000 DNU - See PDF |
| IMHI_MEPT_KCL BOILER REPLACEMENT-E000 |
| IMHI_MEPT_KCL BOILER REPLACEMENT-E100 |
File details come from the government source that posted it. Updated .