About this file

This file contains mechanical, plumbing, and fire protection drawings for the Clarinda Correctional Facility Kitchen & Laundry Addition project for the State of Iowa Department of Corrections, located at 2000 N 16th St, Clarinda, IA 51632. The project involves a comprehensive renovation and expansion of the facility's mechanical systems, including installation of new air handling units (AHU-1, DOAS-1), exhaust fans, terminal air boxes, refrigeration systems, water heaters, and associated ductwork and piping. The drawings are part of a bid set dated 11/18/2022, prepared by IMEG Corp., and cover mechanical, plumbing, and fire protection system designs for both Level 01 and Level 02 of the facility.

The project includes detailed specifications for mechanical equipment such as a pressure booster system, water softener, air compressor, and multiple condensing units. The mechanical systems are designed with energy efficiency and comprehensive monitoring in mind, with the facility management system (FMCS) capable of tracking detailed performance metrics for equipment like air handlers, refrigeration systems, and water heaters. The drawings specify emergency power considerations, with provisions for generator-powered operation of critical systems, and include extensive control sequences for different mechanical components. The project appears to be fully funded and is part of a state-level infrastructure improvement initiative for the Department of Corrections.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROBERT RIPPE & ASSOCIATES, INC. © 2011 ROBERT RIPPE

QUICK DISCONNECT

OFFSET

WALL

UTILITY OUT OF WALLUTILITY INLET

UTILITY INLET

FOODSERVICE

EQUIPMENT

FINISHED FLOOR

ELBOW BY MECHANICAL TRADES

FACE OF BUILDING WALL

FOODSERVICE EQUIPMENT

PLAN

SECTION

EXCEED 3 1/2"

NOT TO

SHUT-OFF VALVE BY

MECHANICAL TRADES

QUICK DISCONNECT HOSE

AND FITTING BY FSEC

WALL REINFORCING NOT BY FSEC

RESTRAINING CABLE BY FSEC

NOTE:

IF UTILITY INLET IS NOT AT HEIGHT SHOWN, MECHANICAL TRADES TO PROVIDE PIPING

WITH ELBOWS TO RAISE INLET.

A .F

.F V

F Y

A .F

.F V

F Y

CODE APPROVED,

BACKFLOW PREVENTER

BY PLUMBING TRADES

IN-WALL PIPING

SHUT-OFF VALVE

RECESSED CONTROL CABINET

PER SPEC. (REQUIRES MIN. 5"

RECESS DEPTH)

CHROME-PLATED

ESCHUTEON

HOSE REEL PER SPEC.

FLEXIBLE WATER

CONNECTOR

VERIFY NOZZLE TYPE

WITH SPEC.

DOOR SHOWN IN

OPEN POSITION

HOT & COLD

SUPPLY PIPING

NOTE:

DASHED PIPING AND BACKFLOW PREVENTER PROVIDED AND INSTALLED BY MECHANICAL

TRADES. ALL OTHER COMPONENTS SUPPLIED BY FOODSERVICE EQUIPMENT CONTRACTOR AND

INSTALLED BY PLUMBING TRADES.

MIXING

VALVES

CHECK VALVES

WATER HAMMER ARRESTOR

ROBERT RIPPE & ASSOCIATES, INC. © 2011 ROBERT RIPPE

HOSE REEL

ROBERT RIPPE & ASSOCIATES, INC. © 2011 ROBERT RIPPE

DISPOSER

PRE-RINSE*

VACUUM

BREAKER WITH

ANGLE FLANGES*

FLOW

CONTROL

VALVE*

SOLENOID

VALVE*

WASTE LINE

MIXING VALVE*

W/INTEGRAL

CHECK VALVES

SHUT-OFF

VALVES

DOUBLE WATER

INLET USED ONLY ON

18" BOWL SINKS

BOWL SINK*

WATER

INLET

ELBOW

BODY WATER

INLET* AT SINK

APPLICATIONS

DISPOSER*

RECOMMENDED INSTALLATION - MECHANICAL

NOTE:

ALL PIPE 1/2" MINIMUM

*THESE COMPONENTS FURNISHED BY FSEC. ALL OTHER

COMPONENTS AND INSTALLATION PROVIDED BY PLUMBING TRADES.

P E

R E

L E

V A

T

IO

N

P E

R E

L E

V A

T

IO

N

NOTE:

1. ELECTRICAL COMPONENTS AND INTERWIRING BY ELECTRICAL TRADES UNLESS NOTED OTHERWISE.

2. CONDUIT CONCEALED IN WALL WHEREVER POSSIBLE. EXPOSED CONDUIT TO BE CHROME-PLATED.

ROBERT RIPPE & ASSOCIATES, INC. © 2011 ROBERT RIPPE

WIRING DIAGRAM - ELECTRIC GAS VALVE

WET CHEMICAL FIRE PROTECTION SYSTEM

A .F

.F

A .F

.F

ELECTRICAL PANEL

WITH POWER SHUT-

OFF DEVICE(S) FOR

ELECTRIC COOKING

EQUIPMENT

MANUAL RESET

FURNISHED BY FSEC

FIRE PROTECTION

SYSTEM ENCLOSURE

BY FSEC, MOUNT

FLUSH WITH CEILING

CONDUIT BELOW

CEILING AND

OCTAGONAL

JUNCTION BOX

BY ELECTRICAL

TRADES

REMOTE MANUAL

PULL (VERIFY

LOCATION)

CEILING

LOCATE

GAS VALVE

PER LOCAL

CODE

JUNCTION

BOX

EMPTY

CONDUIT

ABOVE CEILING

BY FSEC

WIRING TO

SUPPLY FAN

WIRING TO POWER

SHUT-OFF DEVICE(S)

ELECTRICAL GAS

VALVE FURNISHED BY

FSEC INSTALLED BY

MECHANICAL TRADES

WIRING TO BUILDING

FIRE ALARM

POWER TO COOKING

EQUIPMENT

POWER

SUPPLY

DATE:

DRAWN:

REVIEWED:

SHEET TITLE:

SHEET NUMBER:

PROJECT NO.:

PROJECT:

ISSUE:

# DATE: DESCRIPTION:

DESIGNED:

/3

/2

:0 :3

A

M FSM101

FOODSERVICE

EQUIPMENT

MECHANICAL

DETAILS

MM

EG/RB

0211435.00

CLARINDA

CORRECTIONAL

FACILITY - KITCHEN &

LAUNDRY ADDITION

STATE OF IOWA - DEPARTMENT

OF CORRECTIONS

2000 N 16TH ST, CLARINDA, IA

51632

11/18/2022

EG/TP

BID SET

AH

AG

AF

AE

A2 A3 A4 A5

8B

B

8B

B

8C

C

8C

C

8D

D

8F

F

8G

G

CHEMICAL STORAGE AND LAUNDRYSUPERVISOR'S OFFICE

BAKERY REF.

BAKERY FRZ COLD FOOD

ISSUANCE

WALK-IN PRODUCE REFRIGERATOR

MEAT AND DAIRY WALK-IN REFRIGERATOR

COOK'S REF.

ISSUANCE

COOK'S FRZ.

ISSUANCE

WALK-IN TEMPERING

INGREDIENT AND DRY GOODS ISSUANCE

INGREDIENT ASSEMBLY

DRY STORAGE

DRY

BAKERY

STORAGE

TOOL CONTROL

ROOM

WALK-IN FREEZER

8E

E

8E

E

FD W/FUNNEL

FD W/FUNNEL

FD W/FUNNEL

FD W/FUNNEL

FD W/FUNNEL

CWR

GASG

MECHANICAL LEGEND

FLOOR SINK w/HALF GRATE

FLOOR SINK

FLOOR DRAIN

INDIRECT WASTE

AIR GAP WASTE

DIRECT WASTE

HOT WATER

COLD WATER

FSH

FS

FD

IW

AGW

W

HW

CW

S STEAM

CR CONDENSATE RETURN

COOLING TOWER /

CHILLED WATER SUPPLY/RETURN

EXHAUST

SUPPLY

TTFD TELL-TALE FLOOR DRAIN

AFF

CLG

DFA

FSEC

OOW

MT

PLBG

WC

ABOVE FINISHED FLOOR

CEILING

DOWN FROM ABOVE

FOODSERVICE EQUIPMENT CONTRACTOR

OUT OF WALL

MECHANICAL TRADES

PLUMBING

WATER COLUMN

A COMPRESSED AIR

CO2

AH

AG

A2 A3

CONDENSING UNITS ARE LOCATED

OUTSIDE ON THE ROOF. VERIFY EXACT

LOCATION WITH ARCHITECT/ENGINEER.

ROOF CURBS, AND ALL PENETRATIONS

FOR REFRIGERATION LINES AND UTILITIES

ARE NOT BY SECT. 114000 CONTRACTOR.

8A

A

WALK-IN WALLS BELOW

WALK-IN WALLS BELOW

B

DATE:

DRAWN:

REVIEWED:

SHEET TITLE:

SHEET NUMBER:

PROJECT NO.:

PROJECT:

ISSUE:

# DATE: DESCRIPTION:

DESIGNED:

/3

/2

:0 :4

A

M FSM102

FOODSERVICE

EQUIPMENT

MECHANICAL PLAN -

AREA 1

MM

EG/RB

0211435.00

CLARINDA

CORRECTIONAL

FACILITY - KITCHEN &

LAUNDRY ADDITION

STATE OF IOWA - DEPARTMENT

OF CORRECTIONS

2000 N 16TH ST, CLARINDA, IA

51632

11/18/2022

EG/TP

BID SET

1/4" = 1'-0"

1 FOODSERVICE MECHANICAL PLAN - AREA 1

1/4" = 1'-0"

2 FOODSERVICE MECHANICAL PLAN - ROOF

A1

AH

AG

A2

BAKERY

BAKERY REF.

BAKERY FRZ

DRY

BAKERY

STORAGE

OFFENDER BREAK AREA

RACK PARKING

TOOL CONTROL

ROOM

FSH

FD

FD

A

A

FSH

A

FD

CWR

GASG

MECHANICAL LEGEND

FLOOR SINK w/HALF GRATE

FLOOR SINK

FLOOR DRAIN

INDIRECT WASTE

AIR GAP WASTE

DIRECT WASTE

HOT WATER

COLD WATER

FSH

FS

FD

IW

AGW

W

HW

CW

S STEAM

CR CONDENSATE RETURN

COOLING TOWER /

CHILLED WATER SUPPLY/RETURN

EXHAUST

SUPPLY

TTFD TELL-TALE FLOOR DRAIN

AFF

CLG

DFA

FSEC

OOW

MT

PLBG

WC

ABOVE FINISHED FLOOR

CEILING

DOWN FROM ABOVE

FOODSERVICE EQUIPMENT CONTRACTOR

OUT OF WALL

MECHANICAL TRADES

PLUMBING

WATER COLUMN

A COMPRESSED AIR

CO2

DATE:

DRAWN:

REVIEWED:

SHEET TITLE:

SHEET NUMBER:

PROJECT NO.:

PROJECT:

ISSUE:

# DATE: DESCRIPTION:

DESIGNED:

/3

/2

:0 :4

A

M FSM103

FOODSERVICE

EQUIPMENT

MECHANICAL PLAN -

AREA 2

MM

EG/RB

0211435.00

CLARINDA

CORRECTIONAL

FACILITY - KITCHEN &

LAUNDRY ADDITION

STATE OF IOWA - DEPARTMENT

OF CORRECTIONS

2000 N 16TH ST, CLARINDA, IA

51632

11/18/2022

EG/TP

BID SET

1 FOODSERVICE MECHANICAL PLAN - AREA 2

B B

F

FF FF2 DR

R E

F

B B

F

FF FF2 DR

R E

F

A1

AF

AE

AD

AC

AB

PD

PE

A2 A3

A4

A

A

A

HOT FOOD PRODUCTION

COLD FOOD

PREPARATION

AND ASSEMBLY

POT AND PAN

WASHING

CHEMICAL STORAGE AND LAUNDRYSUPERVISOR'S OFFICE

DISHROOM

STAFF BREAK ROOM DIRECTOR'S OFFICE

TRAY CART ASSEMBLY

A

A

A

B

A

A

B

A

A

A

A

B

145 145

A

TRAY CART

PARKING

DURING

ASSEMBLY

TRAY

CART

PARKING

DURING

ASSEMBLY

FSH FSH

FSH FSH

FSH

FSH

187187

DRAIN TO STAND

PIPE IN WALL, VFY.

A

FD

104104

TTFD

A

B

A

A

FSH

FSH

155155

FSH

FSH

A

R1

A

L1

B

R1

B

L1

C

R1

C

L1

163163

163163

A

A

A

MOP SINK NOT

PROVIDED BY

SECTION 114000

FD

A

A

FSH

FSH

FSH FSH

CHASE FOR

VERTICAL VENTING

MAIN UTILITY CONNECTIONS IN

RISER, MECH. TRADES TO MAKE

FINAL CONNECTIONS FROM UDS

TO FOODSERVICE EQUIPMENT

B

150150150150

146146 146146

CWR

GASG

MECHANICAL LEGEND

FLOOR SINK w/HALF GRATE

FLOOR SINK

FLOOR DRAIN

INDIRECT WASTE

AIR GAP WASTE

DIRECT WASTE

HOT WATER

COLD WATER

FSH

FS

FD

IW

AGW

W

HW

CW

S STEAM

CR CONDENSATE RETURN

COOLING TOWER /

CHILLED WATER SUPPLY/RETURN

EXHAUST

SUPPLY

TTFD TELL-TALE FLOOR DRAIN

AFF

CLG

DFA

FSEC

OOW

MT

PLBG

WC

ABOVE FINISHED FLOOR

CEILING

DOWN FROM ABOVE

FOODSERVICE EQUIPMENT CONTRACTOR

OUT OF WALL

MECHANICAL TRADES

PLUMBING

WATER COLUMN

A COMPRESSED AIR

CO2

DATE:

DRAWN:

REVIEWED:

SHEET TITLE:

SHEET NUMBER:

PROJECT NO.:

PROJECT:

ISSUE:

# DATE: DESCRIPTION:

DESIGNED:

/3

/2

:0 :5

A

M FSM104

FOODSERVICE

EQUIPMENT

MECHANICAL PLAN -

AREA 3

MM

EG/RB

0211435.00

CLARINDA

CORRECTIONAL

FACILITY - KITCHEN &

LAUNDRY ADDITION

STATE OF IOWA - DEPARTMENT

OF CORRECTIONS

2000 N 16TH ST, CLARINDA, IA

51632

11/18/2022

EG/TP

BID SET

1 FOODSERVICE MECHANICAL PLAN - AREA 3

FIRE PROTECTION SYMBOL LIST

SYMBOL: DESCRIPTION:

FIRE PROTECTIONFP

ANGLE VALVE

BUTTERFLY VALVE WITH MONITOR SWITCH

NO HATCH LIGHT HAZARD

ORDINARY GROUP 1

SPRINKLER - WALL MOUNTED

SPRINKLER

SPRINKLER - CONCEALED

INSPECTOR TEST AND DRAIN VALVE

MONITOR SWITCH

PIPE CAP

PIPE DOWN

PIPE UP OR UP/DOWN

SHUTOFF VALVE NORMALLY OPEN

DRAINDFP

NOT ALL SYMBOLS MAY APPLY.

AUTOMATIC DRAIN VALVE

UNION/FLANGE

DIRECTION OF FLOW IN PIPE

PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P

CHECK VALVE

FLOW SWITCH

F

ROUTE TO DRAIN

AREA BOUNDARY

FIRE PROTECTION ABBREVIATION KEY

N.C. NORMALLY CLOSED

NOT IN CONTRACTNIC

NORMALLY OPENN.O.

ABBR: DESCRIPTION:

TYPICALTYP

UNLESS OTHERWISE NOTESUON

PLAN OR DETAIL NUMBER

PLAN OR DETAIL NAME

PLAN OR DETAIL SCALE

DETAIL REFERRED TO BY SECTION CUT

SHEET DETAIL IS LOCATED ON

NAME

VIEW NAME

1/8" = 1'-0"

M101

SIMSIM

INDICATES SIMILAR DETAIL REFERENCED

IN MULTIPLE LOCATIONS

LEVEL NAME

10'-0" HEIGHT ABOVE

PROJECT 0'-0"

1 INDICATES NOTE USED TO DESCRIBE

ADDITIONAL INFORMATION ABOUT

WORK REQUIRED, SPECIFIC TO THE

SHEET AND/OR DETAIL

N

O R HT

INDICATES DIRECTION OF TRUE NORTH

VIEW KEY

LINE TYPE AND TAG KEY:

NEW WORK BY THIS CONTRACTOR (WIDE LINE)

NEW

EXISTING TO BE REMOVED (SHORT DASHED PATTERN)

NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)

EXISTING

EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)

EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

HALFTONING DOES NOT MODIFY SCOPE.

'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING

TAG UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL

INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST

INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL

INDICATES A PLUMBING CONNECTION TO A FOOD SERVICE EQUIPMENT.

REFERENCE FOOD SERVICE DRAWINGS FOR ADDITIONAL INFORMATION IN

REGARDS TO TYPE OF EQUIPMENT, ROUGH-IN SIZES, AND ADDITIONAL

COMMENTS.

T101

BUILDING CODE: IBC 2015 EDITION

FIRE CODE: IFC 2015 EDITION

PLUMBING CODE: UPC 2021 EDITION

MECHANICAL CODE: IMC 2021 EDITION

ELECTRICAL CODE: NFPA 70 (NEC) 2020 EDITION

LIFE SAFETY CODE: NFPA 101 2012 EDITION

ENERGY CONSERVATION CODE: IECC 2012

HEALTH DEPARTMENT CODE: CURRENT EDITION

LOCAL BUILDING CODE: CURRENT EDITION

APPLICABLE CODES

CONTRACTOR SHALL COMPLY WITH APPLICABLE CODES AND LOCAL AMENDMENTS.

CONTACT PERSONS:

PROJECT MANAGER

MECHANICAL

ELECTRICAL

TECHNOLOGY

MIKE MCCARTY

MIKE MCCARTY

KRISTEN SPINA

DAMON DEEN

DESCRIPTION: PERSON:

TEMPERATURE CONTROLS CONTRACTORT.C.C.

SECURITY CONTRACTORS.C.

CIVIL CONTRACTORC.C.

FIRE PROTECTION CONTRACTORF.P.C.

PLUMBING CONTRACTORP.C.

MECHANICAL CONTRACTORM.C.

ELECTRICAL CONTRACTORE.C.

CONTRACTOR ABBREVIATION KEY

ABBR: DESCRIPTION:

TECHNOLOGY CONTRACTORT.C.

CONSTRUCTION MANAGERC.M.

FOOD SERVICE EQUIPMENT CONTRACTORFSEC

MECHANICAL GENERAL NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.

1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE

DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.

DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,

AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE

INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING

CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.

2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM

ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR

PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.

3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE

CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO

VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO

VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES

OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING

WITH FABRICATION OR EQUIPMENT ORDERS.

4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE

REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER

ACCESS.

5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO

COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR

EXPENSE TO OTHERS.

6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL

CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF

DESIGN.

7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY

AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING

MOUNTED DEVICES, OTHER THAN SPRINKLERS.

8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,

FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS

RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND

FINISH.

9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE

DRY WALL CONTRACTOR FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS,

ETC. COORDINATE PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE DRY WALL

CONTRACTOR OF THE REQUIRED ACCESS PANELS PRIOR TO BIDDING.

10. SEAL ALL FLOOR, WALL, AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING,

AND DUCTS PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE

SEALED AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER

FOR OUTDOOR USE.

11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,

PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE

TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS

WITHIN ROOMS.

12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED

OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL

RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.

13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT

MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND

REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,

PIPING, DUCTWORK, ETC.

14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.

15. MAINTAIN A MINIMUM WORKING CLEARANCE OF 3’-6” IN FRONT OF ALL ELECTRICAL

EQUIPMENT REQUIRING MAINTENANCE, INSPECTION, AND TESTING INCLUDING BUT NOT

LIMITED TO PANELS, DISTRIBUTION PANELS, SWITCHBOARDS, MOTOR CONTROL CENTERS,

TRANSFORMERS, EQUIPMENT DISCONNECTS AND STARTERS.

16. MAINTAIN THE DEDICATED ELECTRICAL EQUIPMENT SPACE DEFINED BY THE WIDTH / DEPTH

OF ELECTRICAL EQUIPMENT MEASURED FROM THE FLOOR TO A HEIGHT 6’-0” ABOVE THE

EQUIPMENT OR THE STRUCTURAL CEILING, WHICHEVER IS LOWER. SYSTEMS FOREIGN TO

THE ELECTRICAL DISTRIBUTION SYSTEM ARE NOT ALLOWED IN THE DEDICATED

ELECTRICAL SPACE INCLUDING; DUCTWORK, PIPING, ETC.

17. PROVIDE CONCRETE EQUIPMENT PAD FOR ALL FLOOR MOUNTED EQUIPMENT. PAD SHALL

EXTEND MINIMUM 6” BEYOND ALL SIDES OF EQUIPMENT.

18. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER

NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE

CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.

MECHANICAL RENOVATION NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.

1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD

SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND

REPORT ANY CONFLICTS BEFORE PROCEEDING.

2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS

BEFORE STARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK.

3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE

FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD

CONDITIONS.

4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF THEIR WORK AND

SHALL NOTIFY THE ARCHITECT/ENGINEER PRIOR TO BIDDING IF OTHER UTILITIES ARE

REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO THEIR AREA OF WORK.

5. EACH CONTRACTOR SHALL CUT AND PATCH ROOFS, WALLS, AND FLOORS ASSOCIATED

WITH THEIR WORK.

6. THIS CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILINGS,

CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK REQUIRED BY

THEIR WORK.

7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH

NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL

EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT

DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL

SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.

8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING

CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT

REMAIN ACTIVE.

9. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY

REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW

SYSTEMS ARE INSTALLED.

10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR

TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND

CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY

DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.

11. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT

THAT HAS BEEN REMOVED.

1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE

CONTRACTOR. CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS

REQUIRED FOR FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT.

2. CATALOG NUMBERS SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVEN AS AN AID

TO THE CONTRACTOR AND TO INDICATE THE QUALITY REQUIRED. CONTRACTOR IS

RESPONSIBLE FOR COMPLETE DESCRIPTION OF MATERIAL ON THESE DRAWINGS AND

IN THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE MATERIAL

TAKES PRECEDENCE OVER THE CATALOG NUMBER. THE FIRST MANUFACTURER IS THE

BASIS OF DESIGN.

3. CENTER SPRINKLERS IN CEILING TILES IN BOTH DIRECTIONS IN ALL AREAS. IN AREAS

WITH 2’X4’ CEILING TILES CENTERING USING A 2’X2’ CEILING PATTERN IS ACCEPTABLE.

SPRINKLER HEADS SHALL BE ALIGNED WITH OTHER SPRINKLER HEADS, LIGHTING,

DIFFUSERS, AND ANY OTHER FEATURES IN THE CEILING.

4. NEW SPRINKLERS SHALL BE QUICK RESPONSE TYPE, UNLESS OTHERWISE NOTED.

CONTRACTOR SHALL NOT MIX STANDARD RESPONSE SPRINKLERS WITH QUICK

RESPONSE SPRINKLERS IN UNPARTITIONED SPACES.

5. PROVIDE COVERAGE ABOVE AND BELOW ALL DUCTWORK GREATER THAN 48" WIDE.

6. FIRE PROTECTION PIPE ROUTING IS SHOWN FOR GENERAL LAYOUT. DETERMINE EXACT

NUMBER OF SPRINKLERS, PIPE SIZING, AND PIPE ROUTING.

7. ALL BUILDING AREAS SHALL BE FULLY SPRINKLERED INCLUDING CANOPIES, WALKWAYS,

OVERHANGS, SOFFITS, AND BUILDING PROJECTIONS. ALL ACCESSIBLE COMBUSTIBLE

CONCEALED SPACES SHALL BE FULLY PROTECTED BY THE SPRINKLER SYSTEM.

8. EACH RISER ASSEMBLY SHALL INCLUDE CHECK VALVE BUTTERFLY CONTROL VALVE

INDICATING "OPEN" OR "CLOSED" POSITION, TEST INSPECTION VALVE, FLOW SWITCH

AND PRESSURE GAUGES.

9. PROVIDE RISER ROOM IDENTIFICATION SIGNAGE OUTSIDE THE FIRE RISER ROOM.

COORDINATE EXACT SIGN LANGUAGE WITH AHJ.

10. WHERE FEASIBLE INSTALL PIPES HIGH AS POSSIBLE TO AVOID CONFLICT WITH OTHER

DISCIPLINES.

11. INSTALL SYSTEM DRAINS AT LOW POCKET AREAS CONTAINING FIVE GALLONS OF

WATER OR MORE, PROVIDE WITH ISOLATION VALVE AND THREADED HOSE

CONNECTION.

12. FOLLOW STRUCTURAL DETAILS WHEN PENETRATING OR PASSING THROUGH

STRUCTURAL ELEMENTS. ALTERNATE DESIGNS WILL NEED TO BE APPROVED THROUGH

THE STRUCTURAL ENGINEER.

13. PROVIDE INTERMEDIATE TEMPERATURE SPRINKLER HEADS WHERE REQUIRED BY NFPA

13 UNLESS OTHERWISE NOTED.

14. FINAL HEAD LOCATION, TYPE AND FINISH SHALL BE REVIEWED AND APPROVED BY THE

ARCHITECT.

15. THE OWNER MUST BE NOTIFIED PRIOR TO EACH AND EVERY DRAINING OR RECHARGING

OF THE SPRINKLER SYSTEM.

16. THE CONTRACTOR SHALL PREPARE A COORDINATED SET OF SHOP DRAWINGS AND

SHALL OBTAIN APPROVAL FROM THE AUTHORITIES HAVING JURISDICTION AND THE

LOCAL FIRE DEPARTMENT PRIOR TO ANY INSTALLATION.

17. DRAWING SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE

DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.

DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT,

ETC. AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE

INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING

CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.

18. VERIFY ALL DIMENSIONS AND CLEARANCES FROM ARCHITECTURAL, STRUCTURAL,

SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR PHYSICALLY AT SITE. REVIEW

ALL DRAWINGS. INCLUDING THOSE OF OTHER TRADES.

FIRE PROTECTION GENERAL NOTES:

FIRE PROTECTION SHEET INDEX

F0.0 FIRE PROTECTION COVERSHEET

F1.1 LEVEL 01 PLAN - AREA A - FIRE PROTECTION

F1.2 LEVEL 01 PLAN - AREA B - FIRE PROTECTION

F1.3 LEVEL 02 PLAN - AREA A - FIRE PROTECTION

F1.4 LEVEL 02 PLAN - AREA B - FIRE PROTECTION

F4.1 FIRE PROTECTION DETAILS & SCHEDULES

GRAND TOTAL: 6

DATE:

DRAWN:

REVIEWED:

SHEET TITLE:

SHEET NUMBER:

PROJECT NO.:

PROJECT:

ISSUE:

# DATE: DESCRIPTION:

DESIGNED:

/3

/2

:4 :3

A

M F0.0

FIRE PROTECTION

COVERSHEET

MIKMCC

DELLLE

0211435.00

CLARINDA

CORRECTIONAL

FACILITY - KITCHEN &

LAUNDRY ADDITION

STATE OF IOWA - DEPARTMENT

OF CORRECTIONS

2000 N 16TH ST, CLARINDA, IA

51632

11/18/2022

MIKMCC

BID SET

2882 106TH STREET

DES MOINES, IA 50322

P: 515.334.9906 F: 515.334.9908 www.imegcorp.com

IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,

TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING

AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND

SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT

WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

IMEG CORP. ©2022 IMEG CORP.

REF. SCALE IN INCHES

0 1 2 3

PROJECT #21007688.00

D

E

F

1 2 3 4 5 6 7 8 9

PA

PB

PC

P5 P4 P3

AA

AB

A1 A2 A3

HALL

DISHROOM

CHEMICAL

STORAGE

ELEC.

LAUNDRY

CORRIDOR

FOLDING

OFFENDER

RR

PASSAGE

VISITOR

ENTRANCE

RECEPTION

TOILET

TOILET

OFFICER

HALL

PERSONNEL

ENTRANCE

ADMINISTRATION

TOILET

OFFICE

TOILET

TOILET

MUSTER

ANTEROOM

SEGREGATION

A/C

1046RELEASE

SHAKEDOWN

PEDESTRIAN

SALLYPORT

FAMILY

WAITING

SEARCH

SEARCH

CONTACT

VISIT

VISITOR

TOILET

INMATE

TOILET

INMATE

SEARCH

PHONE

CONTACT

PHONE

CONTACT

PHONE

CONTACT

PHONE

CONTACT

PHONE

CONTACT

NON-CONTACT

VISIT

TOILET

EVIDENCE

CAPTAIN'S

OFFICE

OFFICE

OFFICE

HALL

CORRIDOR

DRYER

CHASE

OPEN

BREAKROOM/

STORAGE

1062A

OFFICE

1062B

FP UP. REFER TO 1/F1.3

FOR CONTINUATION

F P

ZONE

1K

REFER TO 2/F4.1 FOR RATED FIRE

BARRIER PENETRATION DETAIL (TYP.).

AREA WILL BE UNHEATED WITH

INSULATED CEILING ABOVE

DRYERS. PROVIDE SIDE WALL DRY

TYPE SPRINKLERS (SPR-4).

FP

FP

WALL BOX/RECESSED BOX

IT-1

1"FP

AREA 'A'

AREA 'B'

HALL

DISHROOM

CHEMICAL

STORAGE

ELEC.

LAUNDRY

CORRIDOR

FOLDING

OFFENDER

RR

PASSAGE

VISITOR

ENTRANCE

RECEPTION

TOILET

TOILET

OFFICER

HALL

PERSONNEL

ENTRANCE

ADMINISTRATION

TOILET

OFFICE

TOILET

TOILET

MUSTER

ANTEROOM

SEGREGATION

A/C

1046RELEASE

SHAKEDOWN

PEDESTRIAN

SALLYPORT

FAMILY

WAITING

SEARCH

SEARCH

CONTACT

VISIT

VISITOR

TOILET

INMATE

TOILET

INMATE

SEARCH

PHONE

CONTACT

PHONE

CONTACT

PHONE

CONTACT

PHONE

CONTACT

PHONE

CONTACT

NON-CONTACT

VISIT

TOILET

EVIDENCE

CAPTAIN'S

OFFICE

OFFICE

OFFICE

HALL

CORRIDOR

DRYER

CHASE

OPEN

BREAKROOM/

STORAGE

1062A

OFFICE

1062B

DATE:

DRAWN:

REVIEWED:

SHEET TITLE:

SHEET NUMBER:

PROJECT NO.:

PROJECT:

ISSUE:

# DATE: DESCRIPTION:

DESIGNED:

/3

/2

:4 :4

A

M F1.1

LEVEL 01 PLAN -

AREA A - FIRE

PROTECTION

MIKMCC

DELLLE

0211435.00

CLARINDA

CORRECTIONAL

FACILITY - KITCHEN &

LAUNDRY ADDITION

STATE OF IOWA - DEPARTMENT

OF CORRECTIONS

2000 N 16TH ST, CLARINDA, IA

51632

11/18/2022

MIKMCC

BID SET

N O R

HT

1/8" = 1'-0"

LEVEL 01 PLAN - AREA A - FIRE PROTECTION

2882 106TH STREET

DES MOINES, IA 50322

P: 515.334.9906 F: 515.334.9908 www.imegcorp.com

IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,

TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING

AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND

SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT

WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

IMEG CORP. ©2022 IMEG CORP.

REF. SCALE IN INCHES

0 1 2 3

PROJECT #21007688.00

GENERAL NOTES:

1. REFER TO F4.1 FOR SPRINKLER USAGE

SCHEDULE AND FIRE PROTECTION MATERIAL LIST.

2. REFER TO DETAILS 1/F4.1, 2/F4.2 AND 3/F4.3 FOR

SPRINKLER MOUNTING DETAILS AND PIPING

THROUGH FIRE RATED WALL DETAIL.

3. REFER TO F0.0 FOR GENERAL FIRE PROTECTION

NOTES.

KEYNOTES:

1. CORE DRILL THROUGH EXISTING PRECAST

EXTERIOR WALL. CORES SHALL BE

COORIDNATED WITH EXISTING VERTICAL CABLING

IN WALL. REFER TO EXISTING WALL SCANNING

DATA FOUND ON STRUCTURAL PLANS.

COORDINATE NEW WALL OPENING WITH PRECAST

SUPPLIER SO CORE DRILLING IS NOT REQUIRED.

ALL OPENINGS SHALL BE COORDINATED PRIOR

TO ORDERING PRECAST AND COORDINATED TO

ALIGN WITH NEW CORES IN EXISTING PRECAST

WALL.

2. PIPING ROUTED TO EXISTING SPRINKLERS FOR

FIRST FLOOR WEST SPRINKLER ZONE.

3. REMOVE EXISTING EXPOSED FIRE PROTECTION

PIPE WITH INSPECTOR TEST SHUTOFF VALVE

LOCATED APPROXIMATELY 4 FT AFF. EXTEND

PIPING ABOVE CEILING TO EVIDENCE ROOM.

REMOVE EXISTING PIPING DOWNSTREAM OF

INSPECTOR TEST TO EXTERIOR DRAIN AND PATCH

EXTERIOR WALL OPENING.

4. ROUTE FIRE PROTECTION DRAIN PIPE ABOVE

CEILING AND DISCHARGE OUT EXTERIOR WALL.

COORDINATE NEW WALL OPENING WITH PRECAST

SUPPLIER SO CORE DRILLING IS NOT REQUIRED.

5. INSTALL NEW INSPECTOR TEST IN EVIDENCE

ROOM AT AN ACCESSIBLE LOCATION

ACCEPTABLE TO THE AHJ. INSTALL A 3/4" MANUAL

DRAIN VALVE AND PIPE ROUTED TO A LOCKABLE

RECESSED STAINLESS STEEL BOX LOCATED IN

TOILET 1061. PROVIDE A 3/4" HOSE BIBB

CONNECTION WITHIN THE RECESSED BOX TO

ALLOW FOR CONNECTION OF HOSE AND ROUTING

TO EXISTING FLOOR DRAIN FOR DRAINING

TRAPPED WATER IN PIPING AFTER OPERATION OF

THE INSPECTOR TEST. DURING FLOW OF

INSPECTOR TEST, WATER SHALL DISCHARGE

OUTSIDE.

PD

PE

P5

P4 P3

AB

AC

AD

AE

AF

AG

AH

A1 A2 A4 A5A3

HOT PRO &

ASSEMBLY

DISHROOM

P O

T

P A

N W

A S

H

POT & PAN

STOR

LNDRY &

CHEM

STOR

STAFF BREAK

RM

DIRECTOR

OFF

STAFF

RR

CART

WASH

1221A

OFFENDER

BREAK

SUPERVISOR

OFF.

OFFENDER

RR

C A

R T

P A

R K

IN

G

BAKERY

FREEZER

TEMPERING

MEAT & DAIRY

REF.

PRODUCE

REF

INGR & DRY

GOOD ISSUE

DRY STORAGE

RECEIVING

BAKERY

FRZR

BAKERY

REF

INGREDIENT

ASSEMBLY

CORRIDOR

MECH

COLD PRO &

ASSEMBLY

PASSAGE

PRODUCE

ISSUE

MEAT &

DAIRY

ISSUE

FRZR

ISSUE

STOR

JAN

TOOL

CONTROL

F P

F P

FP UP. REFER TO F1.4 FOR

CONTINUAITON

AREA 'A'

AREA 'B'

HOT PRO &

ASSEMBLY

DISHROOM

P O

T

P A

N W

A S

H

POT & PAN

STOR

LNDRY &

CHEM

STOR

STAFF BREAK

RM

DIRECTOR

OFF

STAFF

RR

CART

WASH

1221A

OFFENDER

BREAK

SUPERVISOR

OFF.

OFFENDER

RR

C A

R T

P A

R K

IN

G

BAKERY

FREEZER

TEMPERING

MEAT & DAIRY

REF.

PRODUCE

REF

INGR & DRY

GOOD ISSUE

DRY STORAGE

RECEIVING

BAKERY

FRZR

BAKERY

REF

INGREDIENT

ASSEMBLY

CORRIDOR

MECH

COLD PRO &

ASSEMBLY

PASSAGE

PRODUCE

ISSUE

MEAT &

DAIRY

ISSUE

FRZR

ISSUE

STOR

JAN

TOOL

CONTROL

DATE:

DRAWN:

REVIEWED:

SHEET TITLE:

SHEET NUMBER:

PROJECT NO.:

PROJECT:

ISSUE:

# DATE: DESCRIPTION:

DESIGNED:

/3

/2

:4 :5

A

M F1.2

LEVEL 01 PLAN -

AREA B - FIRE

PROTECTION

MIKMCC

DELLLE

0211435.00

CLARINDA

CORRECTIONAL

FACILITY - KITCHEN &

LAUNDRY ADDITION

STATE OF IOWA - DEPARTMENT

OF CORRECTIONS

2000 N 16TH ST, CLARINDA, IA

51632

11/18/2022

MIKMCC

BID SET

N O R

HT

1/8" = 1'-0"

LEVEL 01 PLAN - AREA B - FIRE PROTECTION

2882 106TH STREET

DES MOINES, IA 50322

P: 515.334.9906 F: 515.334.9908 www.imegcorp.com

IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,

TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING

AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND

SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT

WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

IMEG CORP. ©2022 IMEG CORP.

REF. SCALE IN INCHES

0 1 2 3

PROJECT #21007688.00

KEYNOTES:

1. PROVIDE DRY TYPE SPRINKLER (SPR-4) IN

COOLER OR FREEZER. F.S.C. SHALL PROVIDE

PENETRATION, TRIM RING AND SEAL AROUND

SPRINKLER. F.P.C. SHALL COORDINATE WITH

F.S.C. ON LOCATIONS WHERE PENETRATIONS ARE

REQUIRED.

2. ADD SUPPLEMENTAL DRAIN VALVE TO ALLOW

DRANING TO FLOOR SINK IN ROOM 1241.

ZONE

1K

GENERAL NOTES:

1. REFER TO F4.1 FOR SPRINKLER USAGE

SCHEDULE AND FIRE PROTECTION MATERIAL LIST.

2. REFER TO DETAILS 1/F4.1, 2/F4.2 AND 3/F4.3 FOR

SPRINKLER MOUNTING DETAILS AND PIPING

THROUGH FIRE RATED WALL DETAIL.

3. REFER TO F0.0 FOR GENERAL FIRE PROTECTION

NOTES.

A

A.5

B

C

D

E

F

1 2 3 4 5 6 7 8 9

PA

PB

PC

P5 P4 P3

A.8

AA

AB

A1 A2 A3

MECHANICAL

FUTURE

EXPANSION

VESTIBULE

MECHANICAL

OFFICE

EXISTING FIRE PUMP

AND JOCKEY PUMP

TIE-IN NEW FIRE PROTECTION PIPE

AND ADD ZONE VALVE INTO

EXISTING 6" MAIN. COORDINATE

SHUTDOWN AND TIE-IN OF FIRE

PROTECTION SYSTEM WITH

OWNER.

F P

BF-1

CK-1

FS-1

CONNECT TO EXISTING GALVANIZED STEEL VERTICAL DRAIN

PIPE LOCATED NEAR DOUBLE DOORS.

COORDINATE ROUTING WITH EXISTING

PIPING DUCTWORK, CONDUITS, ETC.

OFFSETS MAY BE REQUIRED.

EXISTING FIRE PUMP

CONTROLLER

DFP

ROOF - NO FP SCOPE.

FP FP

F P

IT-1

F P

F P

FP

MECHANICAL

FUTURE

EXPANSION

VESTIBULE

MECHANICAL

OFFICE

DATE:

DRAWN:

REVIEWED:

SHEET TITLE:

SHEET NUMBER:

PROJECT NO.:

PROJECT:

ISSUE:

# DATE: DESCRIPTION:

DESIGNED:

/3

/2

:4 :0

A

M F1.3

LEVEL 02 PLAN -

AREA A - FIRE

PROTECTION

MIKMCC

DELLLE

0211435.00

CLARINDA

CORRECTIONAL

FACILITY - KITCHEN &

LAUNDRY ADDITION

STATE OF IOWA - DEPARTMENT

OF CORRECTIONS

2000 N 16TH ST, CLARINDA, IA

51632

11/18/2022

MIKMCC

BID SET

2882 106TH STREET

DES MOINES, IA 50322

P: 515.334.9906 F: 515.334.9908 www.imegcorp.com

IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,

TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING

AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND

SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT

WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

IMEG CORP. ©2022 IMEG CORP.

REF. SCALE IN INCHES

0 1 2 3

PROJECT #21007688.00

N O R

HT

3/32" = 1'-0"

LEVEL 02 PLAN - AREA A - FIRE PROTECTION

GENERAL NOTES:

1. REFER TO F4.1 FOR SPRINKLER USAGE

SCHEDULE AND FIRE PROTECTION MATERIAL LIST.

2. REFER TO F0.0 FOR GENERAL FIRE PROTECTION

P5

P4 P3

AB

AC

AD

AE

AF

AG

AH

A1 A2 A4 A5A3

MECH

F P

MECH

DATE:

DRAWN:

REVIEWED:

SHEET TITLE:

SHEET NUMBER:

PROJECT NO.:

PROJECT:

ISSUE:

# DATE: DESCRIPTION:

DESIGNED:

/3

/2

:4 :0

A

M F1.4

LEVEL 02 PLAN -

AREA B - FIRE

PROTECTION

MIKMCC

DELLLE

0211435.00

CLARINDA

CORRECTIONAL

FACILITY - KITCHEN &

LAUNDRY ADDITION

STATE OF IOWA - DEPARTMENT

OF CORRECTIONS

2000 N 16TH ST, CLARINDA, IA

51632

11/18/2022

MIKMCC

BID SET

N O R

HT

3/32" = 1'-0"

LEVEL 02 PLAN - AREA B - FIRE PROTECTION

2882 106TH STREET

DES MOINES, IA 50322

P: 515.334.9906 F: 515.334.9908 www.imegcorp.com

IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,

TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING

AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND

SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT

WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

IMEG CORP. ©2022 IMEG CORP.

REF. SCALE IN INCHES

0 1 2 3

PROJECT #21007688.00

GENERAL NOTES:

1. REFER TO F4.1 FOR SPRINKLER USAGE

SCHEDULE AND FIRE PROTECTION MATERIAL LIST.

2. REFER TO F0.0 FOR GENERAL FIRE PROTECTION

FIRE SEALANT

FIRE SEALANT

NOTE 2

NOTE 3

PENETRATING ITEM

NOTE 4

NOTE 3

NOTE 4

PENETRATING ITEM

NOTE 2

NOTE 3

RATED WALL

(CONSTRUCTION

VARIES)

RATED FLOOR

(CONSTRUCTION

VARIES)

NOTES:

1. THIS GENERAL DETAIL APPLIES TO ALL ITEMS PENETRATING FIRE RATED WALLS OR

FLOORS. THE INTENT IS TO MAINTAIN THE FIRE RATING AND TO ALLOW LONGITUDINAL

MOVEMENT. REFER TO SPECIFICATION SECTION 07 84 00 FOR SELECTION OF THROUGH

PENETRATION FIRE STOPPING.

2. SCHEDULE 5 PIPE SLEEVE EMBEDDED IN WALL OR FLOOR, OR SMOOTH CORE DRILL.

EACH CONTRACTOR FURNISHES SLEEVE TO DIVISION 3 OCNTRACTOR, COORDINATES

SLEEVE LOCATIONS AND DEBURS SLEEVE. DIVISION 3 CONTRACTOR 3 BUILDS SLEEVE

INTO WALL OR FLOOR ALLOWING NO GAP AROUND SLEEVE. IF SLEEVE IS NOT

PROVIDED WHEN WALL OR FLOOR IS BUILT, CONTRACTOR SHALL INSTALL SLEEVE.

SLEEVE SIZE SHALL ALLOW ANNULAR SPACE REQUIRED BY THE SELECTED FIRE STOP

SYSTEM.

3. INSTALL BACKING MATERIAL, SUCH AS MINERAL WOOL SAFING, AS REQUIRED FOR FIRE

STOP SYSTEM. INSTALL IN ACCORDANCE WITH FIRE STOP SYSTEM APPLICATION

LISTING. SECURE TO WALL OR FLOOR TO ALLOW LONGITUDINAL MOVEMENT OF

PENETRATING ITEM WITHOUT MOVEMENT OF FIRE BARRIER.

4. WATERTIGHT WELDED 1"x1" 20 GAUGE MINIMUM GALVANIZED SHEET METAL ANGLE

FRAME, BY CONTRACTOR IN EQUIPMENT ROOMS FOR WATER STOP. PLACE A BEAD OF

WATERPROOF SEALANT BETWEEN FLOOR AND BOTTOM OF ANGLE FRAME. SECURE TO

FLOOR WITH MASONRY ANCHORS IN CORNERS AND ON 12" MAXIMUM CENTERS.

MULTIPLE PENETRATING ITEMS MAY BE ENCLOSED IN ONE FRAME.

RETAINING FLANGE TO

PREVENT SPRINKLER

MOVEMENT

1" NIPPLE

1" x 1/2"

REDUCER

2-1/4" DIA OPENING IN CEILING

1/4" ADJUSTMENT

3/16"

SPRINKLER MAIN

PROVIDE TWO ELL'S FOR

ADJUSTING HEAD TO

CENTER OF CEILING TILE

PIPE SIZES SHALL MATCH -

GRAPHIC ENLARGED TO SHOW

DETAIL AT SPRINKLER/CEILING

INTERFACE.

SIMILAR INSTALLATION APPLIES

TO SIDEWALL APPLICATION

SPRINKLER

MAIN

PROVIDE TWO ELL'S FOR

ADJUSTING HEAD TO

CENTER OF CEILING TILE

LAY IN CEILING

CEILING PLATE

AUTOMATIC SPRINKLER HEAD.

REFER TO SPRINKLER HEAD

SCHEDULE FOR HEAD TYPE.

DATE:

DRAWN:

REVIEWED:

SHEET TITLE:

SHEET NUMBER:

PROJECT NO.:

PROJECT:

ISSUE:

# DATE: DESCRIPTION:

DESIGNED:

/3

/2

:4 :1

A

M F4.1

FIRE PROTECTION

DETAILS &

SCHEDULES

MIKMCC

DELLLE

0211435.00

CLARINDA

CORRECTIONAL

FACILITY - KITCHEN &

LAUNDRY ADDITION

STATE OF IOWA - DEPARTMENT

OF CORRECTIONS

2000 N 16TH ST, CLARINDA, IA

51632

11/18/2022

MIKMCC

BID SET

2882 106TH STREET

DES MOINES, IA 50322

P: 515.334.9906 F: 515.334.9908 www.imegcorp.com

IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,

TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING

AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND

SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT

WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

IMEG CORP. ©2022 IMEG CORP.

REF. SCALE IN INCHES

0 1 2 3

PROJECT #21007688.00

NO SCALE

FLOOR/WALL PENETRATION - RATED FIRE BARRIER

2NO SCALE

INSTITUTIONAL QUICK RESPONSE STANDARD

COVERAGE FLUSH PENDENT SPRINKLER DETAIL

1 NO SCALE

DRY SPRINKLER HEAD MOUNTING DETAIL

FIRE PROTECTION MATERIAL LIST

TAG NAME DESCRIPTION MANUFACTURER AND MODEL

BF-1 INDICATING BUTTERFLY VALVE, NORMALLY OPEN, 175 PSI WWP, GROOVED TYPE,

DUCTILE IRON BODY WITH PROTECTIVE COATING, ELECTROLESS NICKEL OR

EPDM COATED DUCTILE IRON DISC, STAINLESS STEEL STEM AND SCREWS,

CAST OR DUCTILE IRON HANDWHEEL, EPDM SEAT, INDICATOR FLAG, FACTORY

MOUNTED INTEGRAL MONITOR SWITCHES, UL/FM.

LUGGED OR WAFER VALVES ARE ACCEPTABLE PROVIDED THEY HAVE THE

FEATURES LISTED ABOVE.

NIBCO GD-4765-8N, VICTAULIC

SERIES 705, TYCO BFV-300,

KENNEDY G300, GLOBE

GLR300G, REL-BFG-300

CK-1 SWING CHECK VALVE, 300 PSI WWP, GROOVED/FLANGED TYPE, DUCTILE IRON

BODY, STAINLESS STEEL HINGE ASSOCIATED WITH RUBBER FACED CLAPPER,

BRASS SEAT RING, ACCESS COVER, 1/2" OR 3/4" TAPPED BOSSES, VALVE LISTED

FOR HORIZONTAL OR VERTICAL INSTALLATION, UL/FM.

FLANGED TYPE IS ACCEPTABLE PROVIDED VALVE HAS THE FEATURES LISTED

ABOVE.

VIKING G-1, TYCO CV-1F

FS-1 FLOW SWITCH - VANE TYPE, 450 PSI, FLOW SENSITIVITY OF 4-10 GPM, TWO

SINGLE POLE DOUBLE THROW SWITCHES, PNEUMATIC RETARD ADJUSTABLE

FROM 0-90 SECONDS WITH AUTOMATIC RESET, NEMA 4 INDOOR/OUTDOOR

RATED METAL HOUSING, UL/FM.

POTTER VSR, SYSTEM

SENSOR WFD

IT-1 COMBINATION INSPECTOR'S TEST AND DRAIN VALVE, 300 PSI, INTEGRAL SIGHT

GLASS, BALL VALVE PLATE INDICATING OFF-TEST-DRAIN POSITIONS,

FURNISHED WITH TEST ORIFICE GIVING FLOW EQUIVALENT TO ONE SPRINKLER

OF A TYPE HAVING THE SMALLEST ORIFICE INSTALLED ON THE SYSTEM,

PRESSURE RELIEF VALVE, UL/FM.

AGF M1011A, RELIABLE

MODEL TD, VICTAULIC

TESTMASTER, GLOBE UTD W/

MODEL ARV PRV

NOTES:

1. SEE FLOOR PLANS FOR ZONING REQUIREMENTS.

2. SPRINKLER SHALL HAVE COLOR CODED BULB THERMAL ELEMENT.

3. ALL SPRINKLERS SHALL BE UL LISTED.

4. CONTRACTOR TO VERIFY SPRINKLER REQUIREMENTS BASED ON ACTUAL INSTALLATION, USAGE, ARCHITECTURAL CEILING PLAN AND NFPA 13

REQUIREMENTS.

5. TAG NAME IS PRIMARILY FOR IDENTIFIYING SPRINKLERS IN SUBMITTALS. IT MAY OR MAY NOT BE FOUND ELSEWHERE ON THE DRAWINGS.

CONTRACTOR TO SUBMIT ALL SPRINKLER TYPES TO BE USED.

6. AREAS ARE GENERAL IN NATURE. CONTRACTOR TO MATCH UNSCHEDULED AREAS TO SIMILAR SPACES.

7. SPRINKLERS SHALL HAVE A 3mm QUICK RESPONSE BULB.

8. SPRINKLERS SPECIFIED WITHIN FIRE SPRINKLER USAGE SCHEDULE ARE STANDARD COVERAGE TYPE. EXTENDED COVERAGE

SPRINKLERS ARE PERMITTED PROVIDED SPRINKLERS MEET THE REQUIREMENTS OF UL.

FIRE SPRINKLER USAGE SCHEDULE

AREA TYPE

(NOTE 1 & 6)

AREA

HAZARD

SPRINKLER

TEMPERATURE

RATING

MANUFACTURER &

MODEL NOTES

TAG NAME

(NOTE 4 & 5) SPRINKLER TYPE

RESPONSE

CATEGORY FINISH

AREAS WITHOUT CEILING

UNLESS NOTED

OTHERWISE

SEE PLANS SPR-1 UPRIGHT QUICK ROUGH

BRASS

PER NFPA VIKING VK, RELIABLE

F1FR, TYCO TY-FRB,

VICTAULIC V2704

NOTE 2, 3, 7, 8

AREAS WITH CEILINGS

UNLESS NOTED

OTHERWISE

SEE PLANS SPR-2 INSTITUTIONAL PENDENT QUICK WHITE PER NFPA TYCO RAVEN, VIKING

VK426

NOTE 2, 3, 7, 8

SIDEWALL APPLICATIONS SEE PLANS SPR-3 INSTITUTIONAL SIDEWALL QUICK WHITE PER NFPA TYCO RAVEN, VIKING

VK427

NOTE 2, 3, 7, 8

COOLER AND FREEZER

AREAS, DRYER CHASE

SEE PLANS SPR-4 DRY CONCEALED W/

WHITE FLAT COVERPLATE

QUICK WHITE PER NFPA VIKING VK, RELIABLE

F3QR, VICTAULIC V3618

NOTE 2, 3, 7, 8

DRYER CHASE SEE PLANS SPR-5 DRY SIDEWALL QUICK ROUGH

BRASS

PER NFPA VIKING VK, RELIABLE

F3QR, TYCO DS,

VICTAULIC V3610

NOTE 2, 3, 7, 8

PLUMBING SYMBOL LIST

SYMBOL: DESCRIPTION:

PIPE SERVING FIXTURE ON FLOOR ABOVE

(EXAMPLE: FD = FLOOR DRAIN)FD

PITCH PIPE IN DIRECTION

RD-1

6"(1000)

ROOF DRAIN PROPERTIES SYMBOL

SIZE (ROOF SQ. FT.)

DIELECTRIC CONNECTION

UNION/FLANGE

BALANCING VALVE (NUMBER INDICATES GPM)

GPM

CHECK VALVE

REDUCER - REFERENCE SPECIFICATION

FOR CONCENTRIC/ECCENTRIC AND FOT/FOB

METERM

ALIGNMENT GUIDE

PIPE ANCHOR

PIPE CAP

PIPE DOWN

PIPE UP OR UP/DOWN

DIRECTION OF FLOW IN PIPE

SHUTOFF VALVE NORMALLY OPEN

SHUTOFF VALVE NORMALLY CLOSED

ACID VENTAV

ACID WASTEAW

COLD WATER - POTABLECW

DT DRAIN TILE

SANITARY DRAINAGE (GREASE SANITARY DRAINAGE)GSAN

HOT WATER - POTABLEHW

HOT WATER CIRCULATING - POTABLEHWC

HOT WATER - POTABLE NUMBER INDICATES TEMPHW140

HOT WATER CIRC. - POTABLE NUMBER INDICATES TEMPHWC140

NON-POTABLE COLD WATERNCW

NON-POTABLE HOT WATERNHW

PUMPED DISCHARGEPD

SANITARY DRAINAGESAN

SOFT COLD WATERSCW

SOFT HOT WATERSHW

STORM DRAINAGE (ROOF SQUARE FOOTAGE)ST(1,000)

STS STORM DRAINAGE (SECONDARY)

VENTV

WASTE ANETHESIA GAS DISPOSALWAGD

GREASE VENTGV

COMPRESSED AIRCA

DEIONIZED WATERDI

PROPANE GASP

REVERSE OSMOSIS WATERRO

STW SOFT TEMPERED WATER

TW TEMPERED WATER

DRAIND

G NATURAL GAS

NOT ALL SYMBOLS MAY APPLY.

PRESSURE REDUCING VALVE (LIQUID/GAS)

FUEL OIL RETURNFOR

FUEL OIL SUPPLYFOS

LAB VACUUMVAC

SOLENOID VALVE

SAFETY/RELIEF VALVE

VACUUM BREAKER

PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P

TEMPERATURE SENSOR WITH WELL

T

THERMOMETER WITH WELL (DIAL TYPE)T

THERMOMETER WITH WELL (FILLED TYPE)

PUMP

GRV GAS REGULATOR VENT

INSTRUMENT AIRIA

MEDICAL AIRMA

MEDICAL VACUUMMV

NITROGENN

NITROUS OXIDENO

OXYGENO

PURE WATERPW

SERVICE WATER - POTABLEW

PIPE CONTINUATION

PRESSURE SENSOR (FURNISHED WITH BALL VALVE)P

ROUTE TO DRAIN

BACKFLOW PREVENTER

MEDIUM PRESSURE GASMPG

EXPANSION JOINT

#.#" IS THE EXPANSION TRAVEL INCHESEJ-#

AIR ADMITTANCE VALVE

PLUMBING ABBREVIATION KEY

BATHTUBBT

CO CLEANOUT

CLINICAL SINKCS

DRINKING FOUNTAINDF

EMERGENCY EYEWASHEE

FLOOR CLEANOUTFCO

FLOOR DRAINFD

FLOOR SINKFS

GARBAGE DISPOSERGD

GREASE INTERCEPTORGI

HOSE BIBBHB

I.E. INVERT ELEVATION (FOR REFERENCE ONLY)

LAVATORYLAV

MOP BASINMB

MH MANHOLE

MIXING VALVEMV

NEUTRALIZATION TANKNT

OIL SEPARATOROS

ROOF DRAINRD

SHOWERSH

SINKSK

SERVICE SINKSS

TRENCH DRAINTD

TRAP PRIMERTP

URINALUR

WATER CLOSETWC

WALL CLEANOUTWCO

WASH FOUNTAINWF

WATER HEATERWH

WASHING MACHINE FIXTUREWMF

YARD CLEANOUTYCO

EMERGENCY SHOWERES

EMERGENCY SHOWER/EYEWASHESE

ELECTRIC WATER COOLEREWC

VENT THROUGH ROOFVTR

AD ACCESS DOOR

ABOVE FINISHED FLOORAFF

BFP BACKFLOW PREVENTER

NOT IN CONTRACTNIC

ABBR: DESCRIPTION:

TYPICALTYP

UNLESS OTHERWISE NOTESUON

EXISTINGE

FLOW METERFM

WATER SOFTENERWS

WATER METERWM

DIALYSIS BOXDB

CATCH BASINCB

CAST IRONCI

DUCTILE IRONDI

UTILITY BOXUB

SHORT CIRCUIT CURRENT RATINGSCCR

FOOD SERVICE PLANSFSP

IW INDIRECT WASTE

PLAN OR DETAIL NUMBER

PLAN OR DETAIL NAME

PLAN OR DETAIL SCALE

DETAIL REFERRED TO BY SECTION CUT

SHEET DETAIL IS LOCATED ON

NAME

VIEW NAME

1/8" = 1'-0"

M101

SIMSIM

INDICATES SIMILAR DETAIL REFERENCED

IN MULTIPLE LOCATIONS

LEVEL NAME

10'-0" HEIGHT ABOVE

PROJECT 0'-0"

1 INDICATES NOTE USED TO DESCRIBE

ADDITIONAL INFORMATION ABOUT

WORK REQUIRED, SPECIFIC TO THE

SHEET AND/OR DETAIL

N

O R HT

INDICATES DIRECTION OF TRUE NORTH

VIEW KEY

LINE TYPE AND TAG KEY:

NEW WORK BY THIS CONTRACTOR (WIDE LINE)

NEW

EXISTING TO BE REMOVED (SHORT DASHED PATTERN)

NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)

EXISTING

EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)

EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

HALFTONING DOES NOT MODIFY SCOPE.

'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING

TAG UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL

INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST

INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL

INDICATES A PLUMBING CONNECTION TO A FOOD SERVICE EQUIPMENT.

REFERENCE FOOD SERVICE DRAWINGS FOR ADDITIONAL INFORMATION IN

REGARDS TO TYPE OF EQUIPMENT, ROUGH-IN SIZES, AND ADDITIONAL

COMMENTS.

T101

TEMPERATURE CONTROLS CONTRACTORT.C.C.

SECURITY CONTRACTORS.C.

CIVIL CONTRACTORC.C.

FIRE PROTECTION CONTRACTORF.P.C.

PLUMBING CONTRACTORP.C.

MECHANICAL CONTRACTORM.C.

ELECTRICAL CONTRACTORE.C.

CONTRACTOR ABBREVIATION KEY

ABBR: DESCRIPTION:

TECHNOLOGY CONTRACTORT.C.

CONSTRUCTION MANAGERC.M.

FOOD SERVICE EQUIPMENT CONTRACTORFSEC

CONTACT PERSONS:

PROJECT MANAGER

MECHANICAL

ELECTRICAL

TECHNOLOGY

MIKE MCCARTY

MIKE MCCARTY

KRISTEN SPINA

DAMON DEEN

DESCRIPTION: PERSON:

MECHANICAL GENERAL NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.

1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE

DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.

DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,

AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE

INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING

CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.

2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM

ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR

PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.

3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE

CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO

VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO

VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES

OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING

WITH FABRICATION OR EQUIPMENT ORDERS.

4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE

REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER

ACCESS.

5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO

COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR

EXPENSE TO OTHERS.

6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL

CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF

DESIGN.

7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY

AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING

MOUNTED DEVICES, OTHER THAN SPRINKLERS.

8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,

FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS

RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND

FINISH.

9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE

DRY WALL CONTRACTOR FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS,

ETC. COORDINATE PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE DRY WALL

CONTRACTOR OF THE REQUIRED ACCESS PANELS PRIOR TO BIDDING.

10. SEAL ALL FLOOR, WALL, AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING,

AND DUCTS PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE

SEALED AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER

FOR OUTDOOR USE.

11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,

PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE

TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS

WITHIN ROOMS.

12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED

OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL

RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.

13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT

MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND

REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,

PIPING, DUCTWORK, ETC.

14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.

15. MAINTAIN A MINIMUM WORKING CLEARANCE OF 3’-6” IN FRONT OF ALL ELECTRICAL

EQUIPMENT REQUIRING MAINTENANCE, INSPECTION, AND TESTING INCLUDING BUT NOT

LIMITED TO PANELS, DISTRIBUTION PANELS, SWITCHBOARDS, MOTOR CONTROL CENTERS,

TRANSFORMERS, EQUIPMENT DISCONNECTS AND STARTERS.

16. MAINTAIN THE DEDICATED ELECTRICAL EQUIPMENT SPACE DEFINED BY THE WIDTH / DEPTH

OF ELECTRICAL EQUIPMENT MEASURED FROM THE FLOOR TO A HEIGHT 6’-0” ABOVE THE

EQUIPMENT OR THE STRUCTURAL CEILING, WHICHEVER IS LOWER. SYSTEMS FOREIGN TO

THE ELECTRICAL DISTRIBUTION SYSTEM ARE NOT ALLOWED IN THE DEDICATED

ELECTRICAL SPACE INCLUDING; DUCTWORK, PIPING, ETC.

17. PROVIDE CONCRETE EQUIPMENT PAD FOR ALL FLOOR MOUNTED EQUIPMENT. PAD SHALL

EXTEND MINIMUM 6” BEYOND ALL SIDES OF EQUIPMENT.

18. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER

NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE

CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.

MECHANICAL RENOVATION NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.

1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD

SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND

REPORT ANY CONFLICTS BEFORE PROCEEDING.

2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS

BEFORE STARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK.

3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE

FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD

CONDITIONS.

4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF THEIR WORK AND

SHALL NOTIFY THE ARCHITECT/ENGINEER PRIOR TO BIDDING IF OTHER UTILITIES ARE

REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO THEIR AREA OF WORK.

5. EACH CONTRACTOR SHALL CUT AND PATCH ROOFS, WALLS, AND FLOORS ASSOCIATED

WITH THEIR WORK.

6. THIS CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILINGS,

CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK REQUIRED BY

THEIR WORK.

7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH

NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL

EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT

DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL

SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.

8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING

CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT

REMAIN ACTIVE.

9. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY

REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW

SYSTEMS ARE INSTALLED.

10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR

TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND

CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY

DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.

11. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT

THAT HAS BEEN REMOVED.

1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE CONTRACTOR.

CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS REQUIRED FOR

FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT.

2. CATALOG NUMBERS SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVEN AS AN AID TO

THE CONTRACTOR AND TO INDICATE THE QUALITY REQUIRED. CONTRACTOR IS

RESPONSIBLE FOR A COMPLETE DESCRIPTION OF MATERIAL ON THESE DRAWINGS AND IN

THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE MATERIAL TAKES

PRECEDENCE OVER THE CATALOG NUMBER. THE FIRST MANUFACTURER LISTED IS THE

BASIS OF DESIGN.

3. CONTRACTOR SHALL VERIFY THAT FIXTURES SUPPLIED ARE APPROVED PER ALL

APPLICABLE STATE, LOCAL AND GOVERNING AUTHORITIES.

4. ALL FIXTURES SHALL CONFORM TO FEDERAL ACT S.3874

5. INVERT ELEVATIONS ARE FROM EXISTING DRAWINGS AND MAY NOT BE ACCURATE. VERIFY

ALL ELEVATIONS BEFORE BEGINNING WORK.

6. VERIFY UNDERGROUND PIPE SIZES, INVERT ELEVATIONS, AND LOCATIONS PRIOR TO

BEGINNING ANY WORK.

7. REFER TO THE PLUMBING ROUGH-IN SCHEDULE FOR THE SIZES OF BRANCH PIPES TO

PLUMBING FIXTURES.

8. EXISTING CONDITIONS ON DEMOLITION PLANS ARE PROVIDED TO INDICATE THE GENERAL

SCOPE OF ITEMS TO BE REMOVED. REFER TO SPECIFICATION SECTION 22 05 05 FOR

ADDITIONAL DEMOLITION INFORMATION.

9. P.C. SHALL CUT AND PATCH EXISTING AS REQUIRED FOR NEW OR DEMOLITION WORK

UNLESS NOTED OTHERWISE. REFER TO SPECIFICATION SECTION 22 05 05 FOR ADDITIONAL

INFORMATION.

10. P.C. SHALL REFERENCE ALL PLANS WITHIN DRAWING SET FOR SCOPE OF WORK. P.C.

SHALL REVIEW FOOD SERVICE DRAWINGS FOR COORDINATION OF WORK BETWEEN P.C.

AND FSEC.

11. P.C. SHALL PROVIDE ALL NECESSARY SHUT-OFF VALVES, PRESSURE REGULATORS,

INDIVIDUAL EQUIPMENT SUPPLY STOPS, ETC. REQUIRED UPSTREAM OF FINAL SUPPLY

CONNECTION(S) TO FOOD SERVICE EQUIPMENT UNLESS NOTED OTHERWISE.

12. ALL INDIRECT WASTES FOR FOODSERVICE EQUIPMENT WILL BE EXTENDED TO FLOOR

DRAINS BY MECHANICAL TRADES, EXCEPT FOR THE WALK-IN REFRIGERATOR/FREEZER

BLOWER COIL DRAINLINES AND DRAINLINES WITHIN THE CUSTOM FABRICATED COUNTERS

WHICH WILL BE EXTENDED TO FLOOR DRAINS BY THE FSEC.

13. THE FSEC IS RESPONSIBLE FOR SETTING FOOD SERVICE EQUIPMENT IN PLACE. FINAL

CONNECTIONS AND INTERCONNECTIONS FOR THIS EQUIPMENT ARE THE RESPONSIBILITY

OF THE P.C.

14. SINK FAUCETS FURNISHED LOOSE BY FSEC FOR INSTALLATION BY P.C. SINK ROTARY DRAIN

& OVERFLOW FURNISHED AND INSTALLED BY FSEC; TAILPIECE, P-TRAP, ESCUTCHEON

PLATES AND DRAIN CONNECTION FURNISHED AND INSTALLED BY P.C. EXCEPT FOR

TAILPIECE AND P-TRAP FOR WALL MOUNTED HANDSINKS WHICH ARE PROVIDED BY FSEC

AND INSTALLED BY P.C.

15. HEALTH CODES REQUIRE THAT ALL PLUMBING BE ENCLOSED IN WALLS OR FLOOR AND

THAT EXPOSED PIPING RUNS BE AS SHORT AS POSSIBLE. GAS PIPING TO BE SLEEVED AND

VENTED PER CODE SO IT IS CONCEALED WITHIN THE WALL. EXPOSED HORIZONTAL PIPING

MUST BE 6” ABOVE THE FLOOR AND AT LEAST 1” OFF THE WALL. ANY EXPOSED HAND SINK

PIPING (BOTH DRAIN AND SUPPLY LINES) ARE TO BE CHROME PLATED.

16. RECOMMENDED HOT WATER TEMPERATURES FOR SINKS SHOULD BE AS FOLLOWS: POT &

PAN SINKS SET AT 120° F MAXIMUM, HAND SINKS SET AT 110° F MAXIMUM AND ALL OTHER

SINKS SET AT 110-120° F MAXIMUM. HOT WATER TEMPERATURES MUST CONFORM TO CODE

REQUIREMENTS.

17. FLOOR TROUGHS NOTED ON FOOD SERVICE PLANS SHALL BE PROVIDED BY FSEC,

INSTALLED BY P.C. REFER TO 6/FS300 FOR FLOOR TROUGH DETAIL.

PLUMBING GENERAL NOTES:

PLUMBING SLOPE REQUIREMENTS:

INTERIOR:

SANITARY WASTE: 1/4” PER FOOT

GREASE WASTE: 1/4” PER FOOT

CONDENSATE AND INDIRECT DRAINAGE: 1/8” PER FOOT

SANITARY AND GREASE VENT: NO SPECIFIC PITCH, PITCH TO FIXTURES

DOMESTIC WATER: NO SPECIFIC PITCH, PITCH TO FIXTURES

BASED ON PLUMBING CODE: UPC-2021

BUILDING CODE: IBC 2015 EDITION

FIRE CODE: IFC 2015 EDITION

PLUMBING CODE: UPC 2021 EDITION

MECHANICAL CODE: IMC 2021 EDITION

ELECTRICAL CODE: NFPA 70 (NEC) 2020 EDITION

LIFE SAFETY CODE: NFPA 101 2012 EDITION

ENERGY CONSERVATION CODE: IECC 2012

HEALTH DEPARTMENT CODE: CURRENT EDITION

LOCAL BUILDING CODE: CURRENT EDITION

APPLICABLE CODES

CONTRACTOR SHALL COMPLY WITH APPLICABLE CODES AND LOCAL AMENDMENTS.

WATER HEATER SIZING:

1. KITCHEN WATER HEATER DEMAND

A. 3000 MEALS PER DAY SERVED

B. ASHRAE APPLICATIONS, CHAPTER 51 FOR SERVICE WATER HEATING, FIG. 20 - FOOD

SERVICE INDICATES 1.5 GPH RECOVERY CAPACITY PER MAXIMUM MEALS PER HOUR

C. ESTIMATE 500 MEALS PER HOUR

D. 500*1.5 = 750 GPH RECOVERY CAPACITY REQUIRED FOR KITCHEN

2. LAUNDRY WATER HEATER DEMAND

A. AO SMITH ONLINE SIZING

B. COMMERCIAL LAUNDRY

C. (6) 100 LB WASHERS

D. PEAK DEMAND = 1,680 GPH

3. MAXIMUM SYSTEM DEMAND:

A. KITCHEN = 750 GPH

B. LAUNDRY = 1680 GPH

C. TOTAL…