RFB922300-01 - DOC CCF Kitchen & Laundry Addition - Addendum #2.pdf
PDF 12 MB Posted
- Attached to
- DOC CCF Kitchen & Laundry Addition
- Solicitation number
- RFB922300-01
- Issued by
- Polk County, Iowa
About this file
Addendum Number 2 for the Clarinda Correctional Facility Kitchen & Laundry Addition project is issued by the State of Iowa Department of Corrections, with Farnsworth Group serving as the design firm. The addendum, dated January 13, 2023, modifies the original bid documents for RFB Number 922300-01, which covers a kitchen and laundry facility renovation. The project involves multiple bid packages including General Construction, Precast, Roofing/Gutters/Downspouts, Food Service, Fire Suppression, Plumbing and HVAC, Electrical, and Civil work. Bids are due on January 19, 2023, at 2:00 PM through the State's IMPACS Electronic Procurement System, with a tentative Notice of Intent to Award expected on January 20, 2023. The construction timeline spans from April 2023 to May 2024, with project closeout anticipated in June 2024.
The addendum introduces several key modifications, including revisions to utility plans, structural details, architectural elements, and foodservice equipment specifications. Notable changes include adjustments to mechanical housekeeping pad dimensions, addition of temporary construction openings, modifications to electrical connections for sliding gates and security checkpoints, and updates to equipment scheduling. The bid includes unit pricing options for excavation and backfill, as well as alternate bid items for laundry and bakery equipment. The project requires a 5% bid security and mandates that contractors be registered with the Iowa Labor Commissioner. Bidders must comply with federal and state affirmative action/equal employment opportunity requirements, and the State reserves the right to reject any and all bids.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum
14225 University Avenue, Suite 110 | Waukee, IA 50263 | p 515.225.3469 | www.f-w.com
ENGINEERS | ARCHITECTS | SURVEYORS | SCIENTISTS
Addendum Number: 2
Addendum Issue Date: January 13, 2023 Owner: State of Iowa Department of Corrections – Clarinda
Correctional Facility
Project Name: Clarinda Correctional Facility – Kitchen & Laundry
RFB Number: 922300-01
Containing: 9 Pages; 13 Drawings; 3 Specification Sections
This addendum amends the drawings and specifications of the above reference project and is hereby incorporated into the contract documents as part thereof. Bidders must acknowledge receipt of this Addendum in the space provided on the Bid Form. FAILURE TO DO SO MAY SUBJECT BIDDER TO DISQUALIFICATION.
General/Additional Information:
- Johnson Controls Contact Information: Trevor Johnson, trevor.johnson@jci.com, 402-677-3625
- Questions:
o Due to the unstable climate, price volatility, availability of raw materials, and long contract completion dates, Culinex would like to add an escalator clause to this contract. If a particular item cannot be purchased because of hold to dimensions, storage issues, product availability from the factory, or approvals, Culinex has the right to ask for a change order if these prices change between the time the contract was signed to the time the installation of that item is installed. First, the change order would need to be justified and proven to show that the item has increased in price. Second, the owner/CM/General Contractor must approve the change order. Third, a similar product may be suggested to replace the original product specified if the owner/CM/General Contractor approves the substitution to keep all costs down.
Answer: All bids are final for the scope of the bid package bid on.
Drawings:
Civil:
Item No. 1. C4.1 – UTILITY PLAN
1. REVISE Grinder Pump Structure to reference both Details 14 & 16 on Sheet C6.1
Item No. 2. C6.1 – UTILITY PLAN
Reference View 16 – SANITARY SEWER GRINDER MANHOLE (30004T-1206)
1. ADD notes to Detail 14 for an approved equivalent product for the sanitary sewer grinder pump.
Structural:
Item No. 3. S1.4 – LOW ROOF & SECOND FLOOR FRAMING PLAN – AREA ‘B’
1. REVISE dimensions for mechanical housekeeping pad
2. ADD text notes and section cut C4/S5.5 for temporary construction opening in precast wall
Item No. 4. S5.4 – STRUCTURAL DETAILS
1. REVISE detail C4/S5.4 as shown in attached updated sheet
Farnsworth Group, Inc.
Addendum 2
Item No. 5. S5.5 – STRUCTURAL DETAILS
1. ADD detail C4/S5.5
Architectural:
Item No. 6. A1.2 – LEVEL 1 FLOOR PLAN – AREA ‘B’
1. ADD view 2 – INT. PIPE PROTECTION COVER – TYP as shown on sheet
Reference view 1 – FIRST FLOOR PLAN – AREA ‘B’
2. ADD callout 2/A1.2 for stainless steel vent pipe cover detail as shown
Item No. 7. A2.1 – ROOF PLAN – AREA ‘A’
Reference view 7 – PARAPET DETAIL @ CONNECTOR - TYP
1. REVISE detail as shown for the razor wire support steel and connection
Item No. 8. A3.1 – EXTERIOR ELEVATIONS
Reference view 4 – SOUTH ELEVATION
1. REVISE elevation to include a precast infill panel measuring 12’ tall by 12’ wide located 3’-9” west of grid A2.
Foodservice Equipment:
Item No. 9. FS103 – FOODSERVICE EQUIPMENT PLAN AND SCHEDULE – AREA 3
Reference FOODSERVICE EQUIPMENT SCHEDULE – AREA C
1. REVISE Item #114 – SLICER remarks to read “EXISTING/OWNER TO RELOCATE”
Reference View 1 – FOODSERVICE EQUIPMENT PLAN - AREA 3
2. ADD equipment item bubble annotation for Item #153 as shown on updated drawing sheet
3. ADD equipment item bubble annotation for Item #155 as shown on updated drawing sheet
Item No. 10. FSE100 – FOODSERVICE EQUIPMENT ELECTRICAL SCHEDULE & DETAILS
Reference FOODSERVICE EQUIPMENT ELECTRICAL SCHEDULE - Item #7A – WALK-IN
REFRIGERATOR/FREEZER COMPLEX
1. REVISE remarks to read “DFA / NOTE W / SEE DETAIL SD-191”
Fire Protection: NA
Plumbing:
Item No. 11. P3.1 - ENLARGED PLAN - PLUMBING
Reference view 1 – LEVEL 01 PLAN – AREA B – PLUMBING – MAIN KITCHEN AREAS
1. REPLACE with attached updated sheet.
2. ADD CF-1 in Mech 1241.
3. REVISE T-2 location in Mech 1241.
Item No. 12. P5.1 - PLUMBING DIAGRAMS
Reference view 2 – DOMESTIC WATER FLOW DIAGRAM
1. REPLACE with attached updated sheet.
2. ADD CF-1 next to reverse osmosis unit as shown on updated sheet.
Item No. 13. P6.1 - PLUMBING SCHEDULES
1. ADD CF-1 to the Plumbing Material List with the following information.
a. TAG NAME: “CF-1”
b. DESCRIPTION:
“CARBON FILTER - SIMPLEX HIGH EFFICIENCY CARBON FILTER SYSTEM, SUITABLE FOR FOOD
AND BEVERAGE INDUSTRY, REMOVES CHLORINE, PROGRAMMABLE CONTROLLER WITH
REGENERATION BY TIME CLOCK, FLOW METER OR DIFFERENTIAL PRESSURE SWITCH,
FIBERGLASS REINFORCED POLYESTR TANK.
CONTINUOUS FLOW RATE OF 5 GPM AT 1 PSI PRESSURE DROP
MAXIMUM FLOW RATE OF 11 GPM AT 2 PSI PRESSURE DROP
DESIGN FLOW RATE OF 5.6 GPM AT 1 PSI PRESSURE DROP
BACKWASH OF 10 GPM
3 CUBIC FEET OF MEDIA
FILTER TANKS SIZE: 14”X47”
ELECTRICAL REQUIREMENTS - PROVIDE 120V-1 PHASE RECEPTACLE. THIS EQUIPMENT
REQUIRES EMERGENCY POWER.”
c. MANUFACTURER AND MODEL:
“CULLIGAN HE CF 12, MARLO ACE-12G-1”
2. ADD Mixing Valve MV-3 to Plumbing Material List with the following information:
a. TAG NAME: “MV-3”
b. DESCRIPTION:
“MIXING VALVE - POINT-OF-USE ANTI-SCALD THERMOSTATIC MIXING VALVE
ARRANGEMENT FOR TEMPERED WATER CONTROL, ALL BRONZE/BRASS CONSTRUCTION,
ROUGH FINISH, UNION/THREADED INLETS WITH STRAINERS, COMBINATION CHECK STOPS
OR SEPARATE SUPPLY CHECK VALVES AND SHUT OFF VALVES.
CABINET - SEMI-RECESSED 18 GAUGE STAINLESS STEEL CABINET WITH 16 GAUGE LOCKING
DOOR TO ENCLOSE VALVE, INLET STOPS, OUTLET THERMOMETER, AND OUTLET VALVES.
RATED FOR 2.2 GPM OUTPUT MAXIMUM AT 5 PSI DIFFERENTIAL AND 0.5 GPM OUTPUT
MINIMUM. UNIT TO MIX 140 DEGREE F HOT WATER SUPPLY AND 40 DEGREE F COLD WATER
SUPPLY FOR 110 DEGREE F OUTLET. CONFIRM OUTLET TEMPERATURE SETPOINT WITH
FOOD SERVICE PLANS.
UNIT SHALL BE ASSE 1070 LISTED AND APPROVED. VALVE SHALL COMPLY WITH FEDERAL
ACT S.3874.”
c. MANUFACTURER AND MODEL:
“LEONARD (170-LF/270-LF/370-LF), ACORN CONTROLS (ST7069), APOLLO (34BLF), BRADLEY
(S59 SERIES), LAWLER (310/570), POWERS (SERIES LFLM495), SYMMONS (8210CK MAXLINE
SERIES), WATTS (LFMMV), WILKINS (ZW1070XL)”
Mechanical: NA
Electrical:
Item No. 14. E0.2 - SITE PLAN - ELECTRICAL
Reference view 1 – SITE PLAN - ELECTRICAL
1. REPLACE with attached updated sheet.
2. ADD electrical connection for sliding gate, connect to panel KH1 with 4#12 & 1#12GND on a 20A, 1P breaker.
3. ADD disconnect switch for sliding gate.
4. ADD note Electrical Connections and note for Trailers to read:
a. “E.C. TO PROVIDE POWER FROM EXISTING ELECTRICAL POLE TO PROPOSED TRAILER
LOCATIONS.”
5. ADD electrical connection and note for Temporary Security Checkpoint to read:
a. “GATE PROVIDED BY OTHERS. E.C. TO COORDINATE POWER TO TEMPORARY SECURITY
CHECKPOINT.”
Item No. 15. E1.6 - LEVEL 01 PLAN - AREA B - POWER
Reference view 1 – LEVEL 01 PLAN – AREA B - POWER
1. ADD GFI receptacle for CF-1 on north wall of Mech 1241, circuit to Panel KL1 with 2#12 & 1#12 GND on a 20A, 1P breaker.
Item No. 16. E6.2 - ELECTRICAL SCHEDULES
1. ADD DS-SLIDING GATE to the Disconnect and Starter Schedule with the following information.
a. TYPE: “NF”
b. RATING: “30A”
c. VOLTAGE: “480V”
d. POLES: “3”
e. ENCLOSURE: “NEMA 3R”
f. APPROVED MANUFACTURERS:
“SQUARE D 3110 HU361RB
EATON TYPE DH
GENERAL ELECTRIC TYPE TH
SIEMENS TYPE HNF”
Item No. 17. E7.1 - ELECTRICAL PANEL SCHEDULES
1. ADD circuit breaker for sliding gate onto Panel KH1 Schedule, circuits #28, #30, and #32.
2. ADD circuit breaker for CF-1 onto Panel KL1 Schedule, circuit #33.
Technology:
Item No. 18. T0.0 - TECHNOLOGY COVERSHEET
1. REVISE Technology Symbol Notes #3 on the Technology Symbol List to read:
a. “SYMBOL INDICATES LOCATION OF OWNER PROVIDED AND INSTALLED CAMERA. PROVIDE
DATA CABLING ONLY, REFER TO FIBER AND COPPER RISER FOR ADDITIONAL INFORMATION.”
2. REVISE the reference to “27 05 03 and 28 05 03” in note 6 under Technology Installation Notes to read:
a. “DIVISION 7”
Item No. 19. T1.1 - LEVEL 01 PLAN - AREA A - TECHNOLOGY
Reference view 1 – LEVEL 01 PLAN – AREA A - TECHNOLOGY
1. REMOVE [CSS] symbol from Door 1199E.
Reference view 3 – ELEVATION – TELECOM ROOM TR-1
2. ADD note pointing to VS-NVR-1 and both VS-SWI-1(s) indicating “OWNER PROVIDED AND
INSTALLED”.
3. ADD SC-GND-2 to rack elevation.
Item No. 20. T1.2 - LEVEL 01 PLAN - AREA B - TECHNOLOGY
Reference view 1 - LEVEL 01 PLAN - AREA B - TECHNOLOGY
1. ADD [CSS] symbol on far east side of driveway east of Receiving 1240.
2. ADD note pointing to CSS system on far east side of driveway to read:
a. “CSS SHALL BE INSTALLED NEXT TO DS-SLIDING GATE. REFER TO E0.2 SITE PLAN FOR EXACT
LOCATION OF DS-SLIDING GATE.”
Item No. 21. T4.1 - TECHNOLOGY DETAILS
Reference view 3 – CONTROLLED SECURITY SCHEME DOOR ROUGH-IN DETAIL
1. REVISE Controlled Security Scheme Door Rough-in Detail note #4 to read:
a. “REFER TO SECTION 28 13 00 FOR CABLING REQUIREMENTS AND THE CONTROLLED
SECURITY SCHEME SCHEDULE ON T6.1 FOR ADDITIONAL INFORMATION.”
Item No. 22. T5.1 - TECHNOLOGY DIAGRAMS
Reference view 3 – FIBER AND COPPER RISER DIAGRAM
1. REVISE in MC-1 keynote 4 to be keynote 2 and keynote 5 to be keynote 3.
2. REVISE in TR-1 keynote 7 to be keynote 4.
3. REVISE keynote 7 to read:
a. “Not used.”
Item No. 23. T6.1 - TECHNOLOGY SCHEDULES
1. REMOVE Door 1199E from Control Security Scheme (CSS) Type Schedule.
2. ADD East Gate to Control Security Scheme (CSS) Type Schedule.
a. ADD bullet point under the Remote Unlock Via Detention Control column.
b. ADD to the Notes column: “OWNER FURNISHED AND INSTALLED GATE. CONNECT TO
OPEN/CLOSE CONTACT SWITCHES ON GATE.”
3. ADD the following language to the description of PA-H1-W on the Technology Equipment Schedule:
a. “PROVIDE NEW PAGING CABLING FROM PAGING HORN TO NEAREST EXISTING PAGING
CHANNEL. REFER TO SECTION 27 51 13 FOR ADDITIONAL INFORMATION. ROUGH-IN A
SINGLE GANG BACKBOX WITH (1) 3/4" CONDUIT TO NEAREST CABLING PATHWAY.”
4. ADD the following to the beginning portion of the descriptions for items VS-CM-1, VS-CM-2, and
VS-CM-3 on the Technology Equipment Schedule to be:
a. “VIDEO SURVEILLANCE CAMERA PROVIDED AND INSTALLED BY OWNER. PROVIDE DATA
CABLING FOR CAMERA. PROVIDE 15' SLACK COIL AND TERMINATED ON RJ-45 PLUG. RJ-45 PLUG
SHALL BE HUBBELL SP6 OR PREAPPROVED EQUAL. REFER TO FIBER AND COPPER RISER
DIAGRAM AND SECTION 27 15 00 FOR ADDITIONAL INFORMATION. ROUGH-IN A 4" SQUARE
BACKBOX WITH A SINGLE GANG PLASTER RING. INSTALL A 1" EMT CONDUIT TO NEAREST CABLE
PATHWAY. ADDITIONAL INFORMATION IN DESCRIPTION FOR REFERNCE ONLY. ADDITIONAL
INFORMATION IN MANUFACTURER AND MODEL NUMBER FOR REFERNCE ONLY.”
5. ADD the following to the beginning portion of the descriptions for items VS-NVR-1 and VS-SWI-1 from the Technology Equipment Schedule:
a. “VIDEO SURVEILLANCE EQUIPMENT PROVIDED AND INSTALLED BY OWNER. ADDITIONAL
INFORMATION IN DESCRIPTION AND THE MANUFACTURER AND MODEL NUMBER FOR
REFERNCE ONLY. ”
6. ADD SC-GND-2 item to Technology Equipment Schedule with the following description:
A. “RACK MOUNT GROUND BAR. REFER TO SECTION 27 0526 FOR RACK MOUNT GROUND BAR
REQUIREMENTS”.
Specifications:
Item No. 24. Section 00 0110 Table of Contents
1. ADD the following verbiage “Volume 1” and “Volume 2”and revise section 00 3100 to “00 3101” and section 01 2000 to “01 1200”. Revised pages attached.
Reference 2.08 – Division 08 -- Openings
2. DELETE item E. 08 9100 – Louvers
Item No. 25. Section 00 3113 – PRELIMINARY SCHEDULE
1. REPLACE section attachment schedule page with the updated schedule attached per Addendum 2.
Item No. 26. Section 00 4116 Bid Information
1. REPLACE Section 00 4116 Bid Information (In its entirety) with the attached revised bid information.
Submit Bid Information Section 00 4116 as an attachment through the State’s IMPAC’S Electronic
Procurement System.
Item No. 27. Section 01 1200 – Contract Summary
1. REVISE Bid Package #01, Division 08 – Openings, Delete section 08 9100 Louvers in its entirety.
2. ADD Bid Package #02 – Precast, Additional Clarifications Bid Package #02, add item “P. Coordinate installation of 12’ x 12’ precast knock out panel area at south wall elevation with the construction manager. The tentative date of the precast knock out panel installation is March 2024.”
3. REVISE Bid Package #07 – Electrical, Division 28 – Electronic Safety and Security, section 28 2300
Video Surveillance to “28 2300 Video Surveillance (VIDEO SURVEILLANCE EQUIPMENT PROVIDED
AND INSTALLED BY OWNER. SPECIFICATION PROVIDED AS REFERENCE ONLY.”
4. ADD Bid Package #08 – Civil, Additional Clarifications Bid Package #08, add item “N. Includes providing and installing Sewage Grinder Pump. Detail 14/C6.1”
Item No. 28. Section 03 4500 – PRECAST ARCHITECTURAL CONCRETE
Reference Article 1.07 MOCK-UP
1. REVISE item A. to read as follows: “Provide full size or 4’x4’ panel mock-up, with lifting device, and attachment points, and finish in accordance with approved sample.”
Reference Article 2.02 PRECAST UNITS, GENERAL
2. REVISE item D.1.b to read as follows: “Provide formliner to match existing precast concrete profile, approximately 2” wide flutes with 1” deep x ¼” wide reveals, as closely as possible and as approved by Architect.”
Reference Article 2.05 FORM LINERS
4. REVISE item A.1 to read as follows: “Basis of Design: Fitzgerald Formliners: Fractured Rib;
www.formliners.com/#sle”
5. ADD item 5. to read as follows: “Reckli; www.reckli.com/#sle”
6. ADD item C.a. to read as follows: “Formliner selection shall be from manufacturer’s full line. A custom formliner is not required.”
Reference Article 2.06 SUPPORT DEVICES
7. ADD item E. to read as follows: “Contractor’s Option: Wythe Connectors: epoxy-coated carbon-fiber grid manufactured to connect wythes of precast concrete panels.”
Reference Article 3.03 ERECTION
8. REVISE item G. to read as follows: “Exposed Joint Dimension: ¾ inch. Adjust units so that dimensions are within tolerances.
Item No. 29. Section 08 7100 – DOOR HARDWARE
Reference Hardware Sets – Set 13.0
1. ADD hardware as follows:
“1 Armor Plate K1050 34” x 1” LDW CSK TORX screws BEV US32D RO”
2. ADD note as follows: “Armor Plate shall be included at door 1237E only”
Reference Hardware Sets
3. ADD Hardware Set 16.0 to read as follows:
“SET 16.0
Doors: 1200B, 1201, 1208, 1240
4 Armor Plate K1050 34” x 1” LDW CSK TORX screws BEV US32D RO”
Item No. 30. Section 08 9100 - LOUVERS
1. DELETE section in its entirety
Item No. 31. Section 11 1900 - DETENTION SECURITY EQUIPMENT
Reference Detention Hardware Sets
1. DELETE Kick Plate hardware line item in its entirety from the following sets: DE-01, DE-02, & DE-03
Item No. 32. Section 11 4000 – FOODSERVICE EQUIPMENT
Reference – Item #64 – WATER METER
1. Revise manufacturers to say, “Doyon Inc. Model WM35 or equal by CMC America, Gemini or Empire Bakery Equipment *R103”
Reference – Item #101B – PAN STORAGE SHELVING
2. Clarify, quantity of 6
Item No. 33. Section 27 1500 - Horizontal Cabling Requirements
1. ADD the below table after Part 2 - Horizontal Cable, Article 2.01, paragraph A.6.
Electrical Value (1 - 250 MHz)
Minimum Margin
Insertion Loss: 5% NEXT: 3.0 dB PS NEXT: 5.0 dB ACR-F (ELFEXT): 4.0 dB PS ACR-F (PS ELFEXT): 5.0 dB Return Loss: 2.0 dB
Item No. 34. Section 28 0500 - Basic Electronic Safety and Security System Requirements
1. DELETE from Article 1.02, Scope of Work, paragraph D.2.
2. ADD new paragraph B to Article 1.03, Owner Furnished Products:
“B. Video surveillance cameras and recording equipment provided by Owner's security contractor. Scope of work is rough-in and data cabling only.”
3. DELETE from Article 1.08, paragraph A.1, Submittals list, reference to section 28 23 00 Video
Surveillance.
Item No. 35. Section 28 2300 - Video Surveillance
1. ADD “VIDEO SURVEILLANCE EQUIPMENT PROVIDED AND INSTALLED BY OWNER. SPECIFICATION
PROVIDED AS REFERENCE ONLY” directly after the specification section name on page 28 2300-1.
Product Approvals:
The following manufacturers are approved as substitute products of the named Base Bid manufacturer(s). Approval is contingent upon manufacturers fulfilling all specification requirements, tangible and intangible, equally as well as specified product.
References/Item Manufacturer/Supplier
11 1900 – Detention Security Equipment – Detention Equipment Supplier JTA Builders LLC dba WDSI
22 3000 – Plumbing Equipment - Reverse Osmosis System Marlo Inc.
23 3700 – Air Inlets and Outlets - Louvers Anemostat, Arrow
23 8200 – Terminal Heat Transfer Unit – Electric Wall Heaters Brasch
23 82 00 - Terminal Heat Transfer Units - Electric Unit Heaters Brasch
26 51 19 - LED Lighting - Type F3 Metalux SLSTP series
26 51 19 - LED Lighting - Type F3A Metalux SLSTP series
26 51 19 - LED Lighting - Type W1 Lithonia ARC1 series
26 51 19 - LED Lighting - Type EM1 ISOLITE BUG series
Bids are Due: January 19, 2023 / 2:00 PM local time to IMPACS Electronic Procurement System.
END OF ADDENDUM
Issued By:
FARNSWORTH GROUP, INC.
Kelsey Vetter, AIA
Project Architect
Attachments:
Specifications: 00 0110 Table of Contents (6 pages), 00 3113 Preliminary Schedule (1 page), 00 4116 Bid Information
(8 pages)
Other: Pre-bid Meeting Agenda (4 pages), Pre-bid Sign-In Sheet (1 page)
Drawings: C4.1, C6.01, S1.4, S5.4, S5.5, A1.2, A2.1, A3.1, FS103, FSE100, P3.1, P5.1, E0.2
DOC CCF Kitchen & Laundry Addition Clarinda, Iowa
DAS#9223.00
RFB922300-01
PROJECT 9223.00 TABLE OF CONTENTS 01 0110 - 1
11-18-2022
00 0110
TABLE OF CONTENTS
VOLUME 1
PROCUREMENT AND CONTRACTING REQUIREMENTS
1.01 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS
A. 00 0101 – Project Title Page
B. 00 0107 - Seals Page
C. 00 0110 - Table of Contents
D. 00 0115 - List of Drawing Sheets
E. 00 0116 - Bid Submittal Checklist
F. 00 1113 - Notice to Bidders (Advertisement for Bids)
G. 00 2113 - Instructions to Bidders/Sample COI
H. 00 2113.01 - IMPACS Electronic Procurement System Instructions
I. 00 3101 – Geotechnical Soils Investigation Report
J. 00 3113 - Preliminary Schedule/Proposed Schedule
K. 00 3143 - Permit Application
L. 00 4116 - Bid Information
M. 00 4116.01 - Non-Discrimination Clause Information
N. 00 4116.02 - Targeted Small Business Information
O. 00 4313 - Bid Security Forms
P. 00 5200 - Agreement Form/Sample
Q. 00 6000 - Payment bond and Performance Bond Forms
SPECIFICATIONS
2.01 DIVISION 01 -- GENERAL REQUIREMENTS
A. 01 1200 - Contract Summary
B. 01 2500 - Substitution Procedures
C. 01 2600 - Contract Modification Procedures
D. 01 2900 - Payment Procedures
E. 01 3100 - Project Management and Coordination
F. 01 3100.01 - Web Based Construction Management
G. 01 3200 - Construction Progress Documentation
H. 01 3300 - Submittal Procedures
I. 01 4000 - Quality Requirements
J. 01 4500 - Special Inspections and Tests
K. 01 5000 - Temporary Facilities and Controls
L. 01 6000 - Product Requirements
M. 01 7300 - Execution
PROJECT 9223.00 TABLE OF CONTENTS 01 0110 - 2
N. 01 7700 - Closeout Procedures
O. 01 9113 - General Commissioning Requirements
2.02 DIVISION 02 -- EXISTING CONDITIONS
A. 02 4100 - Demolition
2.03 DIVISION 03 -- CONCRETE
A. 03 3000 - Cast-in-Place Concrete
B. 03 3511 - Concrete Floor Finishes
C. 03 4500 - Precast Architectural Concrete
2.04 DIVISION 04 -- MASONRY
A. 04 2000 - Unit Masonry
2.05 DIVISION 05 -- METALS
A. 05 1200 - Structural Steel Framing
B. 05 2100 - Steel Joist Framing
C. 05 3100 - Steel Decking
D. 05 4000 - Cold-Formed Metal Framing
E. 05 5000 - Metal Fabrications
F. 05 5100 - Metal Stairs
2.06 DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES
A. 06 1000 - Rough Carpentry
B. 06 4100 - Architectural Wood Casework
2.07 DIVISION 07 -- THERMAL AND MOISTURE PROTECTION
A. 07 2100 - Thermal Insulation
B. 07 2500 - Weather Barriers
C. 07 4213.19 - Insulated Metal Wall Panels
D. 07 5300 - Elastomeric Membrane Roofing
E. 07 6200 - Sheet Metal Flashing and Trim
F. 07 7100 - Roof Specialties
G. 07 7123 - Manufactured Gutters and Downspouts
H. 07 7200 - Roof Accessories
I. 07 7260 - Roof Fall Protection
J. 07 8400 - Firestopping
K. 07 9200 - Joint Sealants
2.08 DIVISION 08 -- OPENINGS
A. 08 1113 - Hollow Metal Doors and Frames
B. 08 3323 - Overhead Coiling Doors
C. 08 7100 - Door Hardware
D. 08 8000 - Glazing
E. 08 9100 – Louvers
2.09 DIVISION 09 -- FINISHES
A. 09 2116 - Gypsum Board Assemblies
PROJECT 9223.00 TABLE OF CONTENTS 01 0110 - 3
B. 09 2216 - Non-Structural Metal Framing
C. 09 3000 - Tiling
D. 09 5100 - Acoustical Ceilings
E. 09 9123 - Interior Painting
F. 09 9600 - High-Performance Coatings
2.10 DIVISION 10 -- SPECIALTIES
A. 10 1401 – Code-Required Signage
B. 10 2600 - Wall and Door Protection
C. 10 2800 - Toilet, Bath, and Laundry Accessories
D. 10 4400 - Fire Protection Specialties
2.11 DIVISION 11 -- EQUIPMENT
A. 11 1900 - Detention Security Equipment
B. 11 1910 - Detention Hollow Metal
C. 11 1940 – Security and Screen Walls and Doors
D. 11 4000 - Foodservice Equipment
2.12 DIVISION 12 -- FURNISHINGS
A. 12 3600 – Countertops
VOLUME 2
2.13 DIVISION 21 – FIRE SUPPRESSION
A. 21 0500 – Basic Fire Suppression Requirements
B. 21 0505 – Fire Suppression Demolition For Remodeling
C. 21 0529 – Fire Suppression Supports And Anchors
D. 21 1300 – Fire Protection Systems
2.14 DIVISION 22 – PLUMBING
A. 22 0500 – Basic Plumbing Requirements
B. 22 0505 – Plumbing Demolition for Remodeling
C. 22 0513 – Motors
D. 22 0516 - Plumbing Expansion Compensation
E. 22 0529 - Plumbing Supports And Anchors
F. 22 0548 – Plumbing Vibration Isolation Vibration Isolation Submittal Form
G. 22 0553 - Plumbing Identification
H. 22 0716 - Plumbing Equipment Insulation
I. 22 0719 - Plumbing Piping Insulation
J. 22 0900 – Instrumentation
K. 22 1000 - Plumbing Piping
L. 22 1023 - Natural Gas Piping
M. 22 1030 - Plumbing Specialties
N. 22 1200 - Tanks – Plumbing
PROJECT 9223.00 TABLE OF CONTENTS 01 0110 - 4
O. 22 1519 - Compressed Air Systems
P. 22 3000 - Plumbing Equipment
Q. 22 4000 - Plumbing Fixtures
2.15 DIVISION 23 -- HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
A. 23 0500 - Basic HVAC Requirements
B. 23 0505 - HVAC Demolition for Remodeling
C. 23 0513 - Motors
D. 23 0529 - HVAC Supports And Anchors
E. 23 0530 - Roof Support And Wind Bracing
F. 23 0548 - HVAC Vibration Isolation/ Vibration Isolation Submittal Form
G. 23 0553 - HVAC Identification
H. 23 0593 - Testing, Adjusting, And Balancing
I. 23 0713 - Ductwork Insulation
J. 23 0719 - HVAC Piping Insulation
K. 23 0800 - HVAC Commissioning Requirements
L. 23 0900 - Controls
M. 23 0913 - Instrumentation
N. 23 2300 - Refrigeration Piping And Specialties
O. 23 3100 - Ductwork
P. 23 3300 - Ductwork Accessories
Q. 23 3423 - Power Ventilators
R. 23 3600 - Air Terminal Units
S. 23 3700 - Air Inlets And Outlets
T. 23 4000 - Air Cleaning
U. 23 6213 - Air Cooled Condensing Units
V. 23 7313 - Indoor Modular Air Handling Units
W. 23 8200 - Terminal Heat Transfer Units
2.16 DIVISION 26 -- ELECTRICAL
A. 26 0500 - Basic Electrical Requirements
B. 26 0505 - Electrical Demolition For Remodeling
C. 26 0513 - Wire And Cable
D. 26 0526 - Grounding And Bonding
E. 26 0527 - Supporting Devices
F. 26 0533 - Conduit And Boxes
G. 26 0553 - Electrical Identification
H. 26 0573 - Power System Study
I. 26 0800 – Electrical Commissioning Requirements
J. 26 0913 - Power Monitoring and Control System
K. 26 0933 - Lighting Control Systems
L. 26 2200 - Dry Type Transformers
PROJECT 9223.00 TABLE OF CONTENTS 01 0110 - 5
M. 26 2416 - Panelboards
N. 26 2419 - Motor Control
O. 26 2726 - Wiring Devices
P. 26 2813 - Fuses
Q. 26 2816 - Disconnect Switches
R. 26 2923 - Variable Frequency Drives
S. 26 3213 - Packaged Engine Generator Systems
T. 26 3600 - Transfer Switch
U. 26 4100 - Lightning Protection Systems
V. 26 4300 - Surge Protection Devices
W. 26 5119 - LED Lighting
2.17 DIVISION 27 -- COMMUNICATIONS
A. 27 0500 - Basic Communications Systems Requirements
B. 27 0505 - Technology Demolition For Remodeling
C. 27 0526 - Communications Bonding
D. 27 0528 - Interior Communication Pathways
E. 27 0553 - Identification And Administration
F. 27 1100 - Communication Equipment Rooms (CER)
G. 27 1500 - Horizontal Cabling Requirements
H. 27 1710 - Testing
I. 27 1720 - Structured Cabling System Warranty
J. 27 5113 - Paging Systems
2.18 DIVISION 28 -- ELECTRONIC SAFETY AND SECURITY
A. 28 0500 - Basic Electronic Safety and Security Systems Requirements
B. 28 1300 – Electronic Access Control
C. 28 2300 - Video Surveillance
D. 28 3100 - Fire Alarm and Detection Systems
2.19 DIVISION 31 -- EARTHWORK
A. 31 1000 - Site Clearing
B. 31 2000 – Earthwork
C. 31 2005 - Earth Moving for Building
D. 31 2333 - Trenching and Backfilling
E. 31 3500 - Erosion Control
2.20 DIVISION 32 – EXTERIOR IMPROVEMENTS
A. 32 1123 – Aggregate Base Courses
B. 32 1313 – Concrete Paving
C. 32 1373 – Pavement Joint Sealants
D. 32 1723 – Pavement Markings
E. 32 9119 – Landscape Grading
F. 32 9219 - Seeding
PROJECT 9223.00 TABLE OF CONTENTS 01 0110 - 6
2.21 DIVISION 33 -- UTILITIES
A. 33 3100 - Sanitary Sewerage Piping
B. 33 3101 - Sanitary Sewer Manholes
C. 33 4000 - Storm Sewer and Drainage
D. 33 4900 - Storm Drainage Structures
END OF SECTION
A ct ivi ty
ID
A ct ivi ty
D U
R P la nn ed S ta rt
P la nn ed
F in is h
P re de ce ss or s
P ro je ct
-C C
F 1B
D -1
D O
C C
C F
K it ch en
L au n d ry
P ro je ct
-C
C F
1B D
-1 D
O C
C C
F K it ch en
L au n d ry
N ov .0
1.
Ju n.
.2
W
B S
: 7
2- C
C F1
B D
-1 .1
D E
S
IG
N /B
ID
D
IN
G
W B
S : 7
2-
C C
F1 B
D -1
.1 D
E S
IG
N
/B
ID
D
IN
G
N ov .0
1.
Ja n.
.2
W
B S
: 7
2- C
C F1
B D
-1 .2
C O
N S
T R
U C
T
IO
N W
B S
: 7
2- C
C F1
B D
-1 .2
C O
N S
T R
U C
T
IO
N
D ec .0
6.
Ju n.
.2
W
B S
-C
C F
1B D
-1 .2
.1 A d m in st ra tio n W
B S
-C
C F
1B D
-1 .2
.1 A d m in st ra tio n
D ec .0
6.
Ju n.
.2
C
A A
C on tra ct or B id di ng
D ec
.0 6.
Ja n.
.2
D B
P C
C
A A
C on tra ct or 's
C on tra ct s
Ja n.
.2
Fe b.
.2
D B
P C
C
A A
S ub m itta ls
Ja n.
.2
A ug
.0 9.
C
A A
C
A A
P re
C on st ru ct io n M ee tin gs
Ja n.
.2
Ja n.
.2
C A
A
C
A A
P R
E C
A S
T P
R O
C U
R E
M E
N T
Ja n.
.2
Ju n.
.2
C A
A
C
A A
S
TR
U C
TU
R
A L
S
TE
E L P
R O
C U
R E
M E
N T
Ja n.
.2
Ju n.
.2
C A
A
C
A A
R oo fin g
M at er ia ls P ro cu re m en t
Ja n.
.2
A ug .0
9.
C A
A
C
A A
S ub st an tia l C om pl et io n
M ar
.2 7.
C
A C
C
A C
C
A A
C lo se -O ut s/
C om m is si on in g
A pr .1
0.
Ju n.
.2
C
A A
C
A C
C
A A
Fi na l C om pl et io n
Ju n.
.2
C A
A
W
B S
-C
C F
1B D
-1 .2
.2 C o ns tr uc tio n
W B
S
-C C
F 1B
D -1
.2 .2
C o ns tr uc tio n
M ar .3
1.
M ay
.2 1.
C
A C
S ite
S ec ur ity
P re p
M ar
.3 1.
A pr .2
4.
C A
A
C A
C
C A
C
Li fe s af et y s id ew al k
M ar
.3 1.
A pr .2
4.
C A
A
C
A C
LI
FE
S A
FE
TY
F
IR
E D
O O
R
M ar
.3 1.
A pr .1
7.
C A
C
C
A C
B ui ld in g P ad P re p
A pr .2
4.
M ay
.3 0.
C
A C
C
A C
C
A C
B ui ld in g Fo ot in gs /F ou nd at io ns
M ay
.3 0.
Ju l.0 5.
C
A C
C
A C
M E
P U nd er gr ou nd
Ju n.
.2
Ju n.
.2
C A
C
C A
C
C A
C
B ui ld in g
S tru ct ur e P re C as t
Ju n.
.2
Ju l.1
9.
C A
A
C A
C
C A
C
S tru ct ur al
S te el /J oi st s/ D ec ki ng
Ju l.1
9.
A ug
.2 3.
C
A C
C
A A
C
A C
M E
P R ou gh
-In s
A ug .0
9.
O ct
.1 2.
C
A C
C
A C
R oo f M em br an e In ta lls
A ug .2
3.
S ep
.2 1.
C
A C
C
A A
C
A C
S la b-on
-G ra de
S ep
.2 1.
O ct .1
2.
C A
C
C
A C
In te rio r N on -W ei gh t B ea rin g
W al ls
O ct
.1 2.
N ov .0
9.
C A
C
C
A C
In te rio r W al l F in is he s
O ct .2
6.
D ec
.1 8.
C
A C
C
A C
C ei lin g
In st al ls
N ov .0
9.
Ja n.
.2
C
A C
C
A C
Fl oo rin g
In st al ls
N ov .1
6.
Fe b.
.2
C
A C
C
A C
E qu ip m en t In st al ls
Ja n.
.2
M ar .2
0.
C A
C
C
A C
M E
P T rim -O ut
Fe b.
.2
M ar .2
7.
C A
C
C
A C
R E
M O
V E
T E
M P
P A
N E
L &
IN
S
TA
LL
P
R E
C A
S T
K N
O C
K O
U T
PA
N
E L
M ar .1
5.
M ar
.2 0.
C
A C
C
A C
Fi na l P un ch -L is t
M ar .2
7.
A pr
.1 8.
C
A C
, A
A
, A
C A
C
W
E
AT
H E
R D
A
YS
A pr .1
8.
M ay
.2 1.
C
A C
W
B S
: 7
2- C
C F1
B D
-1 .2
.2 .1
S ite
C iv il W or k W
B S
: 7
2- C
C F1
B D
-1 .2
.2 .1
S ite
C iv il W or k
A pr .2
4.
M ar
.2 7.
A
U tili tie s
U nd er gr ou nd
A pr .2
4.
M ay
.0 8.
C
A C
A
E as t S id ew al k w
/ S lo tte d
D ra in
Ju n.
.2
Ju l.1 0.
C
A C
C
A C
A
P ar ki ng
L ot
D em o
Ju n.
.2
Ju l.1 0.
C
A C
A
G en er at or P ad
Ju l.1
0.
Ju l.1
7.
A
A
Fi ne
G ra di ng
G en ae ra l S ite
A re a
O ct
.1 2.
O ct .1
9.
C A
C
C A
C
A
S ee di ng G en ae ra l S ite A re a
O ct .1
9.
O ct
.2 4.
A
A
TE
M
P R
O A
D R
E M
O
VA
L/
FI
N A
L G
R A
D
IN
G /S
E E
D
IN
G
IN
A R
E A
M ar .2
0.
M ar
.2 7.
C
A C
N ov em be r 2
D ec em be r 2
Ja nu ar y 2
Fe br ua ry
M ar ch
A pr il 2
M ay
Ju ne
Ju ly
A ug us t 2
S ep te m be r 2
O ct ob er
N ov em be r 2
D ec em be r 2
Ja nu ar y 2
Fe br ua ry
M ar ch
A pr il 2
M ay
Ju ne
Ju ly
P ro je ct
: 7
2- C
C F1
B D
-1 D
O C
C C
F K itc he n
L au nd ry
W B
S : 7
2-
C C
F1 B
D -1
.1 D
E S
IG
N
/B
ID
D
IN
G
W B
S : 7
2-
C C
F1 B
D -1
.2 C
O N
S
TR
U C
TI
O
N
W B
S : 7
2-
C C
F1 B
D -1
.2 .1
A dm in st ra tio n
C on tra ct or B id di ng
C on tra ct or 's
C on tra ct s
S ub m itta ls
P re
C on st ru ct io n M ee tin gs
P R
E C
A S
T P
R O
C U
R E
M E
N T
S
TR
U C
TU
R
A L
S
TE
E L P
R O
C U
R E
M E
N T
R oo fin g
M at er ia ls P ro cu re m en t
M ar
.2 7.
, S ub st an tia l C om pl et io n
C lo se -O ut s/
C om m is si on in g
Ju n.
.2
4, F in al
C om pl et io n
W B
S : 7
2-
C C
F1 B
D -1
.2 .2
C on st ru ct io n
S ite
S ec ur ity
P re p
Li fe s af et y s id ew al k
LI
FE
S A
FE
TY
F
IR
E D
O O
R
B ui ld in g P ad P re p
B ui ld in g Fo ot in gs /F ou nd at io ns
M E
P U nd er gr ou nd B ui ld in g S tru ct ur e
P re
C as t
S tru ct ur al S te el
/J oi st s/
D ec ki ng
M E
P R ou gh
-In s
R oo f M em br an e In ta lls
S la b-on
-G ra de
In te rio r N on -W ei gh t B ea rin g
W al ls
In te rio r W al l F in is he s
C ei lin g
In st al ls
Fl oo rin g
In st al ls
E qu ip m en t In st al ls
M E
P T rim -O ut
R E
M O
V E
T E
M P
P A
N E
L &
IN
S
TA
LL
P
R E
C A
S T
K N
O C
K O
U T
PA
N
E L
Fi na l P un ch -L is t
W E
AT
H
E R
D A
YS
W B
S : 7
2-
C C
F1 B
D -1
.2 .2
.1 S ite C ivi l W or k
U tili tie s
U nd er gr ou nd
E as t S id ew al k w
/ S lo tte d
D ra in
P ar ki ng
L ot
D em o
G en er at or P ad
Fi ne
G ra di ng
G en ae ra l S ite
A re a
S ee di ng
G en ae ra l S ite
A re a
TE
M
P R
O A
D R
E M
O
VA
L/
FI
N A
L G
R A
D
IN
G /S
E E
D
IN
G
IN
A R
E
D O C
CC
F
Ki tc he n
La un dr y
P rim ar y
B as el in e
A ct ua l W or k
R em ai ni ng W or k
C rit ic al
R em ai ni ng W or k
S ta rt C on st ra in t
Fi ni sh C on st ra in t
T A
S K f ilt er : A ll A ct iv iti es
O ra cl e C or po ra tio n
PROJECT 9223.00 BID INFORMATION 00 4116 - 1
SECTION 00 4116
BID INFORMATION
(To be uploaded with bid submission)
Complete this bid information section and submit as an attachment through the State’s IMPACS Electronic Procurement System.
RFB #922300-01
BID INFORMATION for CONSTRUCTION CONTRACT for
Clarinda Correctional Facility (CCF) 2000 N. 16th St., Clarinda, Iowa 51632
Project 9223.00
Iowa Department of Administrative Services Hoover State Office Building, Level 3 1305 East Walnut Street Des Moines, Iowa 50319-0105
The following information is to be completed and submitted with your bid.
1. Bid Information (to be uploaded with bid submission)
2. Non-Discrimination Clause Information
3. Contractor Targeted Small Business Enterprise Pre-Bid Contract Information
4. Bid Security – 5% of total Bid amount (to be uploaded with bid submission)
Authorized Representative:
The undersigned Bidder, in response to your Request for Bid for construction of the above project, having examined the Drawings, Specifications, and other Bidding Documents dated December 18, 2022, and Addenda issued and acknowledged below as received and being familiar with all the conditions surrounding the construction of the proposed project including the availability of materials and labor, hereby proposes to furnish all labor, materials, equipment and supplies to perform all work to construct the project in strict accordance with the proposed Contract Documents, within the time and at the prices stated below. Prices are to cover all expenses incurred in performing the work required under the proposed Contract Documents, of which this bid is a part.
Bidder acknowledges receipt of the following Addenda which are a part of the Bidding Documents and for which any effect on cost of the Work is included in the bid amounts indicated:
Number ________ ________ ________ ________ ________
Dated ________ ________ ________ ________ ________
Note that the State of Iowa is exempt from State and Local sales and use taxes (including local option and school option) for this project. Taxes on construction materials shall NOT be included in the bid amounts.
PROJECT 9223.00 BID INFORMATION 00 4116 - 2
Amounts shall be indicated in both words and figures. In case of discrepancy, the amount indicated in words shall govern.
BID PACKAGES:
Bid Package BP 01
Description: General Construction
Bidder proposes and agrees to perform all work as described in the Construction Documents for the sum of:
Dollars
BP 01 Unit Price 01A
Description: Over Excavation and Backfill with Engineered Fill (1 Cubic Yard)
BP 01 Unit Price 01B
Description: Over Excavation and Backfill with Lean Concrete (1 Cubic Yard)
BP 01 Alternate NO. 1
Description: Laundry Equipment Opening Surrounds
Bidder proposes and agrees to perform all work as described in the Construction Documents for the sum
PROJECT 9223.00 BID INFORMATION 00 4116 - 3
Bid Package BP 02
Description: Precast
Bidder proposes and agrees to perform all work as described in the Construction Documents for the sum
Bid Package BP 03
Description: EPDM Roofing/Gutters/Downspouts
Bidder proposes and agrees to perform all work as described in the Construction Documents for the sum
Bid Package BP 04
Description: Food Service
Bidder proposes and agrees to perform all work as described in the Construction Documents for the sum
BP 04 Alternate NO. 2
Description: Alternate Bakery Equipment Supply and Installation
Bidder proposes and agrees to perform all work as described in the Construction Documents for the sum
PROJECT 9223.00 BID INFORMATION 00 4116 - 4
Bid Package BP 05
Description: Fire Suppression
Bidder proposes and agrees to perform all work as described in the Construction Documents for the sum
Bid Package BP 06
Description: Plumbing and HVAC
Bidder proposes and agrees to perform all work as described in the Construction Documents for the sum
BP 06 Alternate NO. 1
Description: Laundry Equipment Mechanical and Plumbing
Bidder proposes and agrees to perform all work as described in the Construction Documents for the sum
BP 06 Alternate NO. 2
Description: Alternate Bakery Mechanical and Plumbing
Bidder proposes and agrees to perform all work as described in the Construction Documents for the sum
PROJECT 9223.00 BID INFORMATION 00 4116 - 5
Bid Package BP 07
Description: Electrical
Bidder proposes and agrees to perform all work as described in the Construction Documents for the sum
BP 07 Alternate 01
Description: Laundry Equipment Electrical
Bidder proposes and agrees to perform all work as described in the Construction Documents for the sum
BP 07 Alternate 02
Description: Alternate Bakery Equipment Electrical
Bidder proposes and agrees to perform all work as described in the Construction Documents for the sum
Bid Package BP 08
Description: Civil
Bidder proposes and agrees to perform all work as described in the Construction Documents for the sum
BP 08 Unit Price 08A
Description: Over Excavation and Backfill with Engineered Fill (1 Cubic Yard)
PROJECT 9223.00 BID INFORMATION 00 4116 - 6
Combined Bid Package Option
Description: Combined Bid Package
Combined Bid Package Includes Indicate Bid Packages that are part of combined bid:
Yes or No
Bid Package #01 – General Construction
Bid Package #02 – Precast
Bid Package #03 – Roofing/Gutters/Downspouts
Bid Package #04 – Food Service
Bid Package #05 – Fire Suppression
Bid Package #06 – Plumbing and HVAC
Bid Package #07 – Electrical
Bid Package #08 – Civil
Bidder proposes and agrees to perform all work as described in the Construction Documents for the sum
Bidder hereby certifies that:
1. This bid is genuine and is not made in the interest of or on behalf of any undisclosed person, firm or corporation.
2. Bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid; Bidder has not solicited or induced any person, firm or corporation to refrain from bidding;
and Bidder has not sought by collusion to obtain any advantage over any other bidder or over the Owner.
3. Bidder hereby certifies that the Bidder is registered with the Iowa Labor Commissioner as a Contractor as required by Chapter 91C, Code of Iowa.
4. Bidder agrees to comply with all Federal and State Affirmative Action/Equal Employment Opportunity requirements concerning fair employment and will not discriminate between or among them by reason of race, color, religion, sex, national origin or physical handicap.
5. All construction under this Contract shall conform to the requirements of the Iowa State Building Code.
6. Bidder agrees that this bid shall remain valid and shall not be withdrawn for a period of thirty (30) calendar days after the date for receipt of bids.
7. Bidder agrees that if written notice of acceptance of this bid is mailed, emailed, or delivered to the undersigned within thirty (30) days after the date in which bids are due, or at any time thereafter before it is withdrawn, the undersigned will sign and return the Contract Agreement, prepared in accord with the Bidding Documents and this bid as accepted; and will also provide proof of insurance coverage and required surety bonds.
8. Bidder understands that the Owner reserves the right to reject any and all bids, and to waive irregularities or informalities and enter into a contract for the work, as the Owner deems to be in the best interest of the State.
PROJECT 9223.00 BID INFORMATION 00 4116 - 7
9. Bidder understands that the Owner reserves the right to accept any, or no, Alternate Bid, if requested, and that the Alternate Bids may be considered in any order or combination, and the low Bidder shall be determined on the basis of the sum of the base bid and any Alternate(s) accepted.
Subcontractors:
The Trade Contractor must identify all Subcontractors and Suppliers within 48 hours of the published date and time for which bids must be submitted, in accordance with Iowa Code Section 8A311, as amended by House File 646 in 2011. Subcontractors and suppliers may not be changed without the approval of the Owner. Requests for changing a Subcontractor or supplier must identify the reason for the proposed change, the name of the new Subcontractor or supplier, and the change in the subcontractor or supplier price as a result of the change. Any reduction in subcontractor or supplier price as a result of the change, if the change is approved by the Owner, shall be deducted from the Trade Contract Price via a deductive Change Order. Any such changes, if approved by the Owner, which result in an increase in the Trade Contract Price shall be borne by the Trade Contractor.
Enforcement of Reciprocal Resident Bidder Preference, per Iowa Code 73A.21.
All bidders shall either check the box next to “Resident Bidder” or check the box next to “Nonresident Bidder” and by doing so and signing thereafter certifies and attests to the same. All information requested must be provided. Seek out the advice of an attorney if you have questions.
“Resident Bidder” means a person or entity authorized to transact business in of the State of Iowa and having a place of business for transacting business within the State of Iowa at which it is conducting and has conducted business for at least three years prior to the date of the first advertisement for the public improvement. Note, however, that if a nonresident bidder’s state or foreign country has a more stringent definition of a resident bidder, the more stringent definition is applicable as to bidders from that state or foreign country.
Resident Bidder
Name of Resident Bidder: ___________________________
By: _____________________________________ Authorized Agent and Signatory of Resident Bidder
OR:
Nonresident Bidder
Name of Nonresident Bidder: ___________________________
Name of State or Foreign Country of Nonresident Bidder: ___________________________
Particularly identify and describe any preference, labor preference, or any other type of preferential treatment, in effect in the nonresident bidder’s state or foreign country at the time of this bid:
NOTICE: Nonresident Bidders domiciled in a state or country with a resident labor force preference shall make and keep, for a period of not less than three years, accurate records of all workers employed on the
PROJECT 9223.00 BID INFORMATION 00 4116 - 8
public improvement. The records shall include each worker’s name, address, telephone number when available, social security number, trade classification, and the starting ending time of employment.
By: ________________________________________ Authorized Agent and Signatory of Nonresident Bidder
Bid Form shall be signed by an officer of the company with authority to bind in a contract.
Notice of acceptance of this bid, or request for additional information by the Department of Administrative Services, may be addressed to the undersigned at the address set forth below:
Legal Name of Firm: ____________________________________________________________
Date: _________________________________________________
Signature of Bidder: ____________________________________________________
Title: ______________________________________________________
Typed Name of Signatory: _____________________________________________________
Email: _______________________________________
Business Address:
Telephone Number: ____________________ Fax Number: ____________________
Federal Tax Identification Number: ____________________
Iowa Contractor Registration Number: _________________________
Bidder Safety Manager Name:_______________________________
For an out-of-state Bidder, Bidder certifies that the Resident Preference given by the State or
Foreign Country of Bidder’s residence, _________________________, is _______ %.
END OF SECTION
State of Iowa - Department of Administrative Services 109 SE 13th St.
Des Moines, Iowa 50319 P: (515) 281-7260
Project: 9223.00 DOC CCF Kitchen & Laundry Addition
2000 North 16th Street Clarinda, Iowa 51632
RFB922300-01 Pre-Bid 12-13-2022 Agenda: Meeting #1
Meeting Date Dec 13, 2022 Meeting Time 10:00 AM - Central Time (US & Canada)
Meeting Location
Overview Meeting to allow prospective bidders to visit the site, when possible, and learn more about the project.
Microsoft Teams meeting Join on your computer, mobile app or room device Click here to join the meeting Or call in (audio only) +1 515-598-7333,,354763166#
Attachments
Scheduled Attendees
Name Company Phone Number Email
Christopher Falk Clarinda Correctional Facility P: (712) 542-6106 christopher.falk@iowa.gov
Kelsey Vetter Farnsworth Group P: (515) 297-8590 kvetter@f-w.com
Jerry Dehnke Samuels Group, Inc. P: (515) 288-0467 jdehnke@samuelsgroup.net
Josh Herman State of Iowa - Department of Administrative Services
P: (515) 725-1293 josh.herman@iowa.gov
Introduction
No. Mtg Origin Title Assignment Due Date Priority Status
1.1 1 Introductions Open
Description Attendees
Project Overview
2.1 1 Project Description Open
Description
• Project description
• Base bids
Bid Package #01 – General Construction Bid Package #02 – Precast Bid Package #03 – Roofing/Gutters/Downspouts Bid Package #04 – Food Service Bid Package #05 – Fire Suppression Bid Package #06 – Plumbing and HVAC Bid Package #07 – Electrical Bid Package #08 – Civil
State of Iowa - Department of Administrative Services Page 1 of 4 Printed On: Jan 11, 2023 07:19 AM CST
• Alternates
Alternate #1 – Laundry Equipment Alternate #2 – Alternate Bakery Equipment
• Unit prices
Unit Price – Over Ex/Backfill with Engineered Fill (1 Cubic yard) Unit Price – Over Ex/Backfill with Lean Concrete (1 Cubic yard)
• View Specification 01 1200 - Contract Summary for more information.
2.2 1 Project Schedule Open
Description
• Anticipated Notice of Intent to Award (NOI): January 21, 2023
• Contract(s) Issued: February 3, 2023
• Submittals: Submittal process to start immediately
• Construction: April 2023 to May 2024
• Closeout: June 2024
A pull-plan session will be held with the successful bid package contractors to finalize the construction schedule.
State Holidays: New Year's Day, Martin Luther King Day, Memorial Day, 4th of July, Labor Day, Veterans Day, Thanksgiving and day after Thanksgiving, Christmas Day
2.3 1 Site Rules Open
Description
• Onsite supervision by Prime Contractor is required at all times when work by that contractor or their subcontractors/suppliers is taking place.
• Contractors shall provide daily logs for each day they are on site.
• Construction progress meeting will be established once construction starts.
• It is of the utmost importance to show respect and courtesy to all staff at all times.
• Clean all debris, materials, and bring all finishes back to existing conditions in the area they were working in prior to moving to the next area.
• No smoking, vaping or smokeless tobacco use onsite.
• Daily clean up shall be required.
• All ladders shall be taken down and secured (Locked up) at end of work day.
• Temporary facilities
• Demolished equipment
• Tool control
• Cell phones
• Background checks - Required for all contractor personnel
• Work hours
Zone A (Construction Zone) Zone B (Restricted Construction Zone With Tool Control)
• View Specification 01 1200 - Contract Summary for more information.
Meeting #1 - RFB922300-01 Pre-Bid 12-13-2022 Project: 9223.00 DOC CCF Kitchen & Laundry Addition
State of Iowa - Department of Administrative Services Page 2 of 4 Printed On: Jan 11, 2023 07:19 AM CST
RFB Overview
3.1 1 Bid Submission Open
Description
• Bids are due by: 2:00 pm, Thursday, January 19, 2023.
• The Bid shall be submitted to the Issuing Officer through the IMPACS Electronic Procurement System.
o Link and information is in the project manual o Contractors will need to register prior to bidding o Bidders will need to register regardless of whether it has already done business with the State of Iowa.
o Bidders should complete the registration process and ensure the ability to log in as soon as possible to ensure Bids can be submitted on the due date.
o Please make sure the electronic documents submitted contain any required signatures. Digital signatures will be accepted.
• Bid Opening will be held via conference call on January 19, 2023 at 3:00 pm via google meets or call in.
• Contractor shall reference section 00 0116 for the bid submittal checklist o Bid Proposal Information o Non Discrimination Clause Information o Contractor Targeted Small Business Enterprise Pre-Bid Contract Information o Bid Security – 5% of total Bid amount
3.2 1 Bid Schedule Open
Description
• Questions/Substitutions shall be submitted in Writing to Construction.Procurement@iowa.gov
• Final Questions/Substitutions Due in Writing to Construction.Procurement@iowa.gov , no later than January 11, 2023 by 2:00 pm
• Final Addendum Issued: January 13, 2023
• Bids Due: January 19, 2023
• Tentative NOI Issued: January 20, 2023
3.3 1 Administrative Details Open
Description
• Contractors will sign a modified ConsensusDocs 802. Example in the project manual.
• Project-specific Certificate of Insurance must be provided prior to contract execution. Follow example in the project manual and limits in the 802.
• Project-specific P&P bonds must be provided prior to contract execution.
• Successful contractor must turn in their list of subcontractors and suppliers within 48 hours of the bid.
• DAS will provide tax exempt certificates upon request.
• Procore will be used for all project management, at no cost to the trade contractor.
o Submittals, Invoicing, RFIs, ASIs, PRs, RFQs o Contracts, Change Orders and Certificates of Substantial and Final Completion will also use Docusign
• Contractor Schedule of Values shall be broken out as specified in the project manual.
o SOV must contain a closeout line item for at least 1% of the total contract value.
o This line item can only be invoiced once the certificate of final completion has been signed by all parties.
State of Iowa - Department of Administrative Services Page 3 of 4 Printed On: Jan 11, 2023 07:19 AM CST
3.4 1 Pre-Bid Site Visits Open
• Contact Construction.Procurement@iowa.gov attention Jeff Just to request additional site visit information.
Questions
4.1 1 Questions Open
• Submit all questions in writing to construction.procurement@iowa.gov
State of Iowa - Department of Administrative Services Page 4 of 4 Printed On: Jan 11, 2023 07:19 AM CST
XX
X X
X X
X X
X X
X
EX INTAKE
RIM=1045.30
FL(NE)= 1043.85
FL(SE)= 1043.30
EX INTAKE
RIM=1045.25
FL(SE)= 1044.15
Y A DR
Y A DR
Y A DR
EX RCP24" FES
FL=1040.58
H Y D
WV
WVEP
GV
FO
EP
S
EX SAN MH
RIM=1044.32
INV(N)= 1035.67
*RIM=1042.50
*INV(N)=1034.00
*BOTTOM=1029.50
*INV(OUT)=1038.00
*PER REF. CCF C2.1 UTILITY PLAN
EP
CO
EP
X X
X X
X X
X X
X
X
X X X X
EX. BUILDING
(MEDIUM SECURITY PRISON)
FF=1049.24
EX 12" CPP
W/ HEADWALL
AND GRATE
FL=1039.20
EX 12" CPP
FL=1039.62
EX RCP24" FES
FL=1039.59
EX INTAKE
RIM=1039.64
EX " CPP
FL=1037.57
EX INTAKE
RIM=1043.78
FL= 1041.89EX " CPP
FL=1041.89
EP
EP EP
EP
X X
X
X X X
SAN 8" SAN 8" SAN 8" SAN
SA
N
SA
N
SA
N
SA
N
X
APPROX. LOCATION PER
ALLIANT ENERGY MAP
32.
0'
129.0'
32.0'
9.0
32.
0'
57.8'
.3'
141.2'
1.8
XXX
XXX
X X
X
X X
X X
ST 24" ST 24"
W8" W8" W8" W8"
W6" W6"G 6" G 6" G 6" G 6"
CATVCATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W8" W8" W8" W8" W8" W8" W8"
W 8"
W 8"
W 8"
G 6"
G 6"
G 6"
G 6"
G 6"
G 6"
G 6"
G 6"
G 6" G 6" G 6" G 6" G 6" G 6" G 6"
G 6"
G 6"
G 6"
TE
LE
TE
LE
TELE
TE
LE
TE
LE
TE
LE
TE
LE
TE
LE
TE
LE
TE
LE
TE
LE
TELE
U/ E
U/ E
U/E
U/ E
U/ E
U/ E
U/ E
U/ E
U/ E
U/ E
U/ E
U/E U/E
APPROX. LOCATION
PER LEO A DALY
UTILITY PLAN SHEET
APPROX. LOCATION
PER LEO A DALY
UTILITY PLAN SHEET
U/E U/E
U/E U/E
U/E
U/E
U/E U/E
U/E U/E
APPROX. LOCATION
PER LEO A DALY
UTILITY PLAN SHEET
SAN
SA
N
SA
N
SAN SAN
SAN
SA
N
SA
N
ST
12"
SAN
4"
SAN
4"
SAN
4"
GM
ST
STSTST
ST
ST
ST
ST
ST
ST
X X X X X
X X
X X X X X
S
S
S S
SANITARY SEWER GRINDER MANHOLE
RIM=1045.60
INV=1036.40
BOTTOM=1035.90
(REF. CCF C2.1 UTILITY PLAN)
SANITARY SEWER MANHOLE
RIM=1045.40± (PAV.)
INV(W)=1038.50
INV=1036.70
(REF. CCF C2.1 UTILITY PLAN)
SANITARY SEWER MANHOLE
RIM=1046.20
INV(IN)=1037.25
(REF. CCF C2.1 UTILITY PLAN)
SANITARY SEWER MANHOLE
RIM=1046.50
INV(IN)=1042.00
INV(OUT)=1040.65
(REF. CCF C2.1 UTILITY PLAN)
SAN
SAN
SAN
APPROX. LOCATION PER CCF
SEWER MAIN EXTENSION PLAN
1-26-2000
N 16TH STREET
PRIVATE ACCESS DRIVE
ST 30" ST 30"
ST
ST
ST 24" ST 24"
ST 30"
ST 30"
PROPOSED BUILDING
TOTAL BLDG. AREA = 22,250 SF
BLDG . HEIGHT = 28'-6"
FF=1049.24'
SAN 6" SAN 6" SAN 6"
ST
ST 24" ST 24"
CO
ST
ST
S
D D
D
D
149 LF- 30" N-12
@ S=0.35%
STRUCT #4A
30" FES W/ FOOTING &
APRON GUARD
FL=1040.80
124 LF- 30" N-12
@ S=0.35%
8 L
F-
" N -1
S =0
.35
3 L
F-
" N -1
S =0
.35
STRUCT #4
30" NYLOPLAST W/ BOLTED FLAT
GRATE
RIM=1044.87
FL(W/E)=1041.31
(REF. DETAIL 16, C6.1 FOR
SECURE LATCH SYSTEM)
STRUCT #3
30" NYLOPLAST W/ BOLTED FLAT GRATE
RIM=1045.18
FL(N/E)=1041.75
(REF. DETAIL 16, C6.1 FOR SECURE
LATCH SYSTEM)
STRUCT #2
24" NYLOPLAST W/
BOLTED FLAT GRATE
RIM=1045.25
FL(N/S)=1042.23
(REF. DETAIL 16, C6.1
FOR SECURE LATCH
SYSTEM)
STRUCT #1
18" NYLOPLAST W/ BOLTED FLAT
GRATE
RIM=1046.30
FL(S)=1042.66
(REF. DETAIL 16, C6.1 FOR
SECURE LATCH SYSTEM)
STRUCT #5A
24" NYLOPLAST W/ BOLTED SOLID LID
RIM=1049.11
FL(W)=1045.25
FL(E)=1044.75
(REF. DETAIL 16, C6.1 FOR SECURE
LATCH SYSTEM)
STRUCT #5
24" NYLOPLAST W/ BOLTED
SOLID LID
RIM=1049.11
FL(W)=1046.01
(REF. DETAIL 16, C6.1 FOR
SECURE LATCH SYSTEM)
PROP. GREASE
INTERCEPTOR
CONNECTION
INV= 1043.36
(REF. TO MEP PLAN
FOR CONTINUATION)
149 LF 6" SANI. SWR
@ 1.0% SLOPE
SANI MH W/
BOLTED LID &
MUF…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .