REVISED_ZONE_P_Price_Sheet.pdf

PDF 117 KB Posted

Attached to
Septic to Sewer Zones O & P
Solicitation number
B-7-25-57
Issued by
Brevard County, Florida

About this file

This document is a bid form for Brevard County's Sewer Improvement and Rehabilitation Project (Bid #B-7-25-57 SOIRL) for Zone P, detailing a comprehensive gravity sewer infrastructure project. The bid includes multiple line items for sewer infrastructure work, including 2 manholes each at 0'-6', 8'-10', and 10'-12' depths, 1 drop manhole at 8'-10', 1 doghouse manhole at 12'-14', and approximately 1,477 linear feet of 8" PVC sewer at varying depths. The project also encompasses associated tasks such as preconstruction video recording, survey layout, erosion and sediment control, maintenance of traffic, concrete support cradles, service point installations, and extensive site restoration including asphalt removal and replacement, milling, overlay, and sod installation.

The bid form allows for lump sum pricing and includes provisions for ACH payments and potential prompt payment discounts, in accordance with the Local Government Prompt Payment Act. While specific unit prices are not filled in, the document provides a comprehensive breakdown of quantities for each project component, with units measured in linear feet (LF), square yards (SY), and lump sum (LS). The bid covers restoration of various surface types including asphalt pavement, brick paver walkways, concrete driveways and sidewalks, and Miami curbing. Contractors are required to acknowledge receipt of any addenda and provide company details, with space for signatures, contact information, and total bid price calculation.

View the file

Other files

File Type Posted
B-7-25-57_Notice_of_Award.pdf PDF
Bid_Tabulation_-_Intent_to_Award.pdf PDF
REVISED_Section_1025_Measurement_and_Payment.pdf PDF
Addendum_4.pdf PDF
Addendum_3.pdf PDF
Addendum_2.pdf PDF
Addendum_1.pdf PDF
PRINTING_INSTRUCTIONS.pdf PDF
Plan_set_-_Zone_P.PDF PDF
Attachment_C_-_Specifications_Zone_P.pdf PDF
Attachment_B_-_Specifications_Zone_O.pdf PDF
B-7-25-57_Inv_&_Specs.pdf PDF
Attachment_A_-_Draft_Contract.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ZONE P

No. Item Qty. Unit(s) Unit $ Extended $

1 Mobilization/demobilization 1 LS

2 Insurance and bonds 1 LS

3 Preconstruction video recording 1 LS

4 Survey layout, project docs & as-builts 1 LS

5 Erosion and Sediment Control 1 LS

6 Maintenance of Traffic 1 LS

7 Gravity Sewer

8 Sewer Manholes 0’-6’ 2 EA

9 Sewer Manholes 8’-10’ 2 EA

10 Sewer Manholes 10’-12’ 2 EA

11 Drop Manholes 8’-10’ 1 EA

12 Doghouse Manholes 12’-14’ 1 EA

13 8” PVC Sewer 0’-6’ 380 LF

14 8” PVC Sewer 6’-8’ 177 LF

15 8” PVC Sewer 8’-10’ 327 LF

16 8” PVC Sewer 10’-12’ 593 LF

17 Concrete Support Cradles 6 EA

18 Testing (Including TV of Mains) 1 LS

No. Item Qty. Unit(s) Unit $ Extended $

19 Short Service Points, Single 6 EA

20 Long Service Points 6 EA

21 Clean-up/Site Restoration

22 Site Clean-up 1 LS

23 Remove and Replace (Open Cut)- Pavement Asphalt 2” Thick Type SP 12.5

SY

24 Remove and Replace (Open Cut)-24” Thick Min. Non-Excavatable Flowable Fill

25 Mill Existing Asphalt (1” Min.) 2840 SY

26 Asphalt Overlay Type SP 12.5-1.5” Min.

Thick

27 Remove and Replace (Open Cut)-Brick Paver Walkway

28 Remove and Replace (Open Cut) Concrete Driveway 6” Thick

29 Remove and Replace (Open Cut) Concrete Sidewalk

30 Remove and Replace (Open Cut)- Mod.

Miami Curb

LF

31 Bahia Sod 1800 SY

Total Lump Sum Bid Price: $ __________________ (In Words) _________________________

TOTAL LUMP SUM BID PRICE FOR ZONE O&P: Add Totals from Zone O and P from tables above $

_______________________ TOTAL LUMP SUM IN WORDS: ___________________

ACH PAYMENTS

Does your company accept ACH Payment Method? _____Yes / _____ No

PROMPT PAYMENT DISCOUNT

Brevard County shall remit payment in accordance with the Local Government Prompt Payment Act, Section 218.70, Florida Statutes et seq. Contractors may offer cash discounts for prompt payment but they will not be considered in determination of award. If a Contractor offers a discount, it is understood that the discount time will be from the date of satisfactory delivery, at the place of acceptance, and receipt of correct invoice, at the office specified, whichever occurs last.

* If Prompt Payment Discount is offered, please state discount and terms:

ADDENDUM ACKNOWLEDGMENT

Contractor acknowledges receipt of Addenda by indicating addendum number and date of issue.

Add. No.________ Dated_______________ // Add. No.________ Dated_______________

Add. No.________ Dated_______________ // Add. No.________ Dated_______________

I hereby acknowledge that I have read, understand, and agree to all terms, conditions, insurance, scope of work, specifications, and pricing for Bid # B-7-25-57 SOIRL ZONES O&P

COMPANY NAME_____________________________________________________________

ADDRESS___________________________________________________________________

AUTHORIZED SIGNATURE_____________________________________________________

PRINTED SIGNATURE______________________________DATE______________________

TELEPHONE ______________FAX ________________EMAIL___________________

File details come from the government source that posted it. Updated .