Revised Attachment D - Cost Form.xlsx

XLSX spreadsheet 77 KB Posted

Attached to
Tax System Modernization
Solicitation number
Doc1288967193
Issued by
North Carolina

About this file

The document is a Cost Form (Attachment D) for RFP 45-RQ161211 issued by the North Carolina Department of Revenue (NCDOR) for a Tax System Modernization project. The RFP seeks a comprehensive Commercial-Off-the-Shelf (COTS) integrated tax system (ITS) and implementation services to replace the legacy Integrated Tax Administration System (ITAS). The project involves a phased implementation across five releases, targeting multiple tax types including individual income, sales and use, corporate, motor carrier, alcohol, tobacco, and severance taxes. The implementation is planned to process over 12.5 million annual tax returns, with minimal customization and full compliance with IRS Publication 1075 requirements. The contract term spans up to 6 years, with three additional 5-year renewal options, and vendor responses are due by May 16, 2025, with contract award planned for October 2025.

The cost proposal requires detailed financial breakdowns across implementation, software, hosting, and production support for a 21-year period, with NCDOR providing the Azure cloud environment and charging back hosting costs to the vendor. The vendor must provide seven full-time equivalent (FTE) staff for Application Support Services and include hourly rate cards for additional services. Payments will be tied to deliverable acceptance and subject to 20% retainage per phase until production implementation. The system must integrate with 38 existing interfaces across enterprise, external third-party, federal, and inter-agency systems. While no incumbent vendor is mentioned, the current system has been operational since 1994, necessitating a comprehensive migration strategy to the new integrated tax system. The total project cost is expected to be substantial, with the cost form requiring granular pricing across multiple implementation phases and support years.

View the file

Other files

File Type Posted
Attachment J - Technical Specifications.xlsx XLSX spreadsheet
Attachment M - Tax Schedule Matrix.xlsx XLSX spreadsheet
Attachment N - Forms Inventory.xlsx XLSX spreadsheet
RFP 45-RQ161211 NCDOR Tax System Modernization.pdf PDF
Revised Attachment i - Functional Specifications.xlsx XLSX spreadsheet
Attachment I - Functional Specifications.xlsx XLSX spreadsheet
Attachment L - Staffing Plan.xlsx XLSX spreadsheet
Attachment P - Interface Inventory.xlsx XLSX spreadsheet
Attachment O - Systems Inventory.xlsx XLSX spreadsheet
Attachment D - Cost Form.xlsx XLSX spreadsheet
Attachment Q - Implementation Roles & Responsibilities.xlsx XLSX spreadsheet
Attachment V - Statutory References.xlsx XLSX spreadsheet
Addendum 1 RFP 45-RQ161211-State Response to Vendor Questions.pdf PDF
Revised Attachment H.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Instructions RFP 45-RQ161211 North Carolina DOR Tax System Modernization Attachment D - Cost Form

Response Instructions
Company Name:<Vendor Company Name Here>
This template provides a structured approach for proposing the costs associated with delivering the Tax System and Implementation requirements. Vendor must fill out all applicable worksheets and cells as described by the template and individual worksheet instructions. This template is the formal Cost Form for Vendor's proposal. Vendor warrants that all costs associated with the services as requested in this RFP are included in this workbook. Failure to adequately represent all costs as requested in this RFP may be grounds for proposal disqualification at the sole discretion of the North Carolina DOR.

The Vendor must complete the Cost Proposal with the expected cost rate based on the anticipated contract start date as stated in the RFP. However, should the contract start date shift for any reason, North Carolina DOR expects Vendor to honor the costs as stated in their Cost Proposal. The total bid cost is a firm fixed price proposal, and the determination of the contract start date will not affect the total bid price. Vendors should prepare cost proposal to reflect best available pricing to meet requested scope of services.

This workbook contains cost information required for submission of a proposal for the services in this RFP. The worksheets within this response template are listed below.

All worksheets must be completed. Any proposals that do not provide complete cost information may be excluded from the competitive field.

- Cells requiring Vendor data entry are highlighted in light-grey to clearly indicate which cells are available for data entry

- Cells that contain titles and formulas are marked in dark gray

- Cells that are not applicable are marked in black highlight

- Do NOT add, edit, or adjust cells unless specifically requested to do so

- It is the Vendor's responsibility to validate the integrity of the Cost Workbook formulas and links

Key Assumptions:

- Vendor must abide by the deadlines detailed in the RFP

- All figures should be in USD and whole dollars

- Implementation is expected to occur up to year 6, with support and maintenance costs occurring after each implementation phase

- Proposals to include costs for a total of 11 years

- Proposed costs should be inclusive of any labor, travel and expenses necessary to deliver on the scope of services

DO NOTHING ON THIS SHEET.

Table of Contents
ID #WorksheetDescriptions
1InstructionsInstructions and Table of Contents
2Total Cost SummarySummarizes Vendor's total proposed costs
3ImplementationWorksheet for Vendor to itemize the integration services project costs
4SoftwareWorksheet for Vendor to itemize all one-time and ongoing packaged software costs
5HostingWorksheet for Vendor to itemize all one-time and ongoing costs for the components and services that deliver the system as a service
6Production SupportWorksheet for Vendor to itemize application maintenance and operations costs
7Other One Time CostsWorksheet for Vendor to itemize other one-time costs
8Cost AssumptionsWorksheet for Vendor to itemize all assumptions upon which its pricing is dependent
9Value-Added ServicesWorksheet for Vendor to provide costs associated with any value-added services or solution capabilities beyond the features/requirements detailed in this RFP. This section will not be scored as part of the Cost Form
10Payment ScheduleWorksheet for Vendor to provide their preferred payment schedule throughout the term of the contract
11Rate CardWorksheet for Vendor to provide hourly rates, by role, to deliver any services not contemplated in the Cost Form

Attachment P / Cost Proposal

RFP# 2024-KB-002 - IRMS Replacement Project Page &P of &N

2. Total Cost Summary

Total Cost Summary

The costs recorded on this Total Cost Summary worksheet are automatically calculated using the information entered into worksheets 3. Implementation, 4. Software, 5. Hosting, 6. Production Support, 7. Other One Time Costs. It is Vendor's responsibility to ensure that the costs reflect the full proposal cost for the services outlined in this RFP. Components such as data warehouse, document management, etc. should be included in the Cost Form.

Instructions: do NOT edit this sheet. Prior to submission, confirm all costs reflect the proposal cost total.

Total Cost Summary

DescriptionYear 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 10Year 11Total
Implementation$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Software$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Hosting$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Production Support$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Other One Time Cost$ - 0
Total Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Attachment P / Cost Proposal

RFP# 2024-KB-002 - IRMS Replacement Project Page &P of &N

3. Implementation Implementation Costs

All tasks associated with the implementation services and deliverables described in response to RFP Section 3.4.5 - Implementation Services & Approach and proposed by the Vendor shall be included per year (12-month period) for that service, based on the Vendor's phased implementation plan described in response to RFP Section 3.4.5 Implementation Services & Approach.

Note: the information displayed in the cells of this worksheet may be altered. It is the responsibility of the Vendor to ensure the spreadsheet calculations are correct. All costs must be fully inclusive.

Instructions: enter costs for existing services in the light-grey cells. If a service will be provided by a third party, notate that as such in the Cost Assumptions tab and cost out that service as its own separate line item. Adjust labels in the white cells as needed. Insert additional rows as necessary where noted to record additional services. Ensure the calculations in the Total column (gray cells) carry through to the Total column for rows added. You may not delete rows once added. Proposed costs should be inclusive of any labor, travel and expenses necessary to deliver on the scope of services.

The worksheet allows for five (5) phases, Vendor needs to only enter costs for the number of phases anticipated in their implementation plan. Add sections for additional phases as needed. All figures should be in USD and whole dollars.

Solution Implementation

PhaseImplementation ServicesYear 1Year 2Year 3Year 4Year 5Year 6Total
OneProject Management$ - 0
OneOrganizational Change Management$ - 0
OneTraining and Knowledge Transfer$ - 0
OneDesign / Business Process Analysis$ - 0
OneConfiguration and Customization$ - 0
OneIntegrations / Interfaces$ - 0
OneData Warehouse, Reporting, and Analytics$ - 0
OneTesting$ - 0
OneData Conversion and Migration$ - 0
OneProduction Cut-Over$ - 0
Add additional rows/deliverables as required$ - 0
Total Implementation Costs Phase I$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Solution Implementation

PhaseImplementation ServicesYear 1Year 2Year 3Year 4Year 5Year 6Total
TwoProject Management$ - 0
TwoOrganizational Change Management$ - 0
TwoTraining and Knowledge Transfer$ - 0
TwoDesign / Business Process Analysis$ - 0
TwoConfiguration and Customization$ - 0
TwoIntegrations / Interfaces$ - 0
TwoData Warehouse, Reporting, and Analytics$ - 0
TwoTesting$ - 0
TwoData Conversion and Migration$ - 0
TwoProduction Cut-Over$ - 0
Add additional rows/deliverables as required$ - 0
Total Implementation Costs Phase II$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Solution Implementation

PhaseImplementation ServicesYear 1Year 2Year 3Year 4Year 5Year 6Total
ThreeProject Management$ - 0
ThreeOrganizational Change Management$ - 0
ThreeTraining and Knowledge Transfer$ - 0
ThreeDesign / Business Process Analysis$ - 0
ThreeConfiguration and Customization$ - 0
ThreeIntegrations / Interfaces$ - 0
ThreeData Warehouse, Reporting, and Analytics$ - 0
ThreeTesting$ - 0
ThreeData Conversion and Migration$ - 0
ThreeProduction Cut-Over$ - 0
Add additional rows/deliverables as required$ - 0
Total Implementation Costs Phase III$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Solution Implementation

PhaseImplementation ServicesYear 1Year 2Year 3Year 4Year 5Year 6Total
FourProject Management$ - 0
FourOrganizational Change Management$ - 0
FourTraining and Knowledge Transfer$ - 0
FourDesign / Business Process Analysis$ - 0
FourConfiguration and Customization$ - 0
FourIntegrations / Interfaces$ - 0
FourData Warehouse, Reporting, and Analytics$ - 0
FourTesting$ - 0
FourData Conversion and Migration$ - 0
FourProduction Cut-Over$ - 0
Add additional rows/deliverables as required$ - 0
Total Implementation Costs Phase IV$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Solution Implementation

PhaseImplementation ServicesYear 1Year 2Year 3Year 4Year 5Year 6Total
FiveProject Management$ - 0
FiveOrganizational Change Management$ - 0
FiveTraining and Knowledge Transfer$ - 0
FiveDesign / Business Process Analysis$ - 0
FiveConfiguration and Customization$ - 0
FiveIntegrations / Interfaces$ - 0
FiveData Warehouse, Reporting, and Analytics$ - 0
FiveTesting$ - 0
FiveData Conversion and Migration$ - 0
FiveProduction Cut-Over$ - 0
Add additional rows/deliverables as required$ - 0
Total Implementation Costs Phase V$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Attachment P / Cost Proposal

RFP# 2024-KB-002 - IRMS Replacement Project Page &P of &N

4. Software

Software Costs

Vendor will provide any and all costs for software which Vendor's solution will leverage to meet the requirements of this RFP, including third-party software. Costs shall include any licensing necessary to cover all environments (e.g., development, test, training, production, sandbox, prototype etc.). All costs associated with the purchase, delivery, installation, inspection, licenses, and production of the Software components shall be loaded into the Software Cost.

In the Software Specification table below, Vendor shall list the proposed software manufacturer, brand name, module name, and version number for the items being proposed.

It is the responsibility of Vendor to ensure spreadsheet calculations are correct.

Instructions: enter all one-time and ongoing software costs for each fiscal year by item. Insert additional rows as necessary where noted. Ensure the calculations in the Total column (gray cells) carry through to the Total column for rows added. You may not delete rows once added. All figures should be in USD and whole dollars.

Software Costs

Item #Software ItemPer Unit CostYear 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 10Year 11Total Item Cost
1Item 1$ - 0
2Item 2$ - 0
3Item 3$ - 0
4Item 4$ - 0
Add additional rows/deliverables as required$ - 0
Total Software Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Software Specifications

Item #Software ItemEnvironment (e.g. Development, Test, Training, Production)ManufacturerLicense Type (e.g. enterprise, per user, per server)Brand NameModule NameVersion NumberSoftware TypeDetailed Description (e.g. functionality, purpose)Operating SystemEarliest Proposed Purchase Date
1Item 1
2Item 2
3Item 3
4Item 4
Add additional rows/deliverables as required
Software Add On Costs
Cost either per unit or annual
Item #Software ItemPer UnitPer Year
1Optional Item/Module# 1 (pls describe)
2Optional Item/Module#2 (pls describe)
3Optional Item/Moduel#3 (pls describe)
Add additional rows/deliverables as required
Total Software Add On Cost$ - 0$ - 0

Attachment P / Cost Proposal

RFP# 2024-KB-002 - IRMS Replacement Project Page &P of &N

5. Hosting

Solution Hosting Costs

These services will include all components (e.g., operating system, servers, data center site, network, storage, uninterrupted power supply [UPS], etc.) and the services (e.g., backup, disaster recovery, etc.) required to provide the solution infrastructure as a service.

The hosting costs must be all-inclusive of the setup and support services for the required environment(s), including but not limited to the purchase of hardware, installation services, inspection, licenses (e.g., operating system), HVAC, facility fees, and physical/site security of the environments shall be included in the annual Cost.

Instructions: in the sections below, describe the environment size then select the environment size in the environment description for each year. Enter the total costs proposed for each year. In developing the hosting cost, the Vendor should reference the MS Azure pricing calculator: https://azure.microsoft.com/en-us/pricing/calculator/

NOTE: Vendor chargeback

- Small (for example: 2 CPUs, 32 GB memory and 500 GB of storage)

- Medium (for example: 4 CPUs, 64 GB memory and 1 TB of storage)

- Large (for example: 10 CPUs, 160 GB memory and 5 TB of storage)

All figures should be in USD and whole dollars.

Hosting Costs

Year 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 10Year 11Total
Phase 1$ - 0
Phase 2$ - 0
Phase 3$ - 0
Phase 4$ - 0
Phase 5$ - 0
Production Support$ - 0
Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Hosting Services Specifications

Environment SizeNumber of EnvironmentsDetailed Specifications
Small
Medium
Large

HOSTING COST NOTE:

NCDOR will provide the Azure environment (subscription) for the ITS. NCDOR will provide all security components including, but not limited to, firewalls, logging, end point protection and vulnerability patching. The vendor will be given administrative access to the subscription and will be responsible for implementing all systems and services in that subscription to provide the ITS. The vendor will work with NCDOR to determine exactly what controls, as prescribed by IRS publication 1075, are the responsibility of the vendor, the controls that are the responsibility of NCDOR and what controls, if any, are a shared responsibility.

Any costs associated with the azure subscription to host the ITS and related security tools will be charged back to the vendor. The vendor should ensure that the contract cost will be sufficient to cover the costs of the Azure ITS subscription.

The intent of this billing arrangement is to allow the vendor complete flexibility to host the ITS while insulating NCDOR from unpredicted or variable costs. The vendor can then control both performance and hosting costs for the ITS.

Example:

•NCDOR pays the vendor for the ITS contract
•The vendor implements the ITS in the provided Azure subscription. NCDOR will apply all security tools that are required.
•Microsoft will bill the Agency for the cost of the subscription. This cost will be charged back to the vendor.

Attachment P / Cost Proposal

RFP# 2024-KB-002 - IRMS Replacement Project Page &P of &N

6. Production Support

Production Support Costs

Vendor will provide costs for all post-implementation and production services inclusive of all tasks and deliverables required for maintenance and operation of the new applications as described in RFP Section 3.4.7 Production Support Services.

For the purposes of this pricing worksheet, Vendors should assume the provision seven (7) FTEs to provide Application Support Services.

Note: the information displayed in the cells of this worksheet may be altered. It is the responsibility of the Vendor to ensure the spreadsheet calculations are correct. All costs must be fully inclusive.

Instructions: Enter annual costs for all support services in the light-grey cells. Insert additional rows as necessary where noted if the Vendor's implementation plan includes more than five phases or roles. Ensure the calculations in the Total column (gray cells) carry through to the Total column for rows added. You may not delete rows once added. All figures should be in USD and whole dollars.

Post Implementation and Production Support Services

Support ServicesSupport LevelYear 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 10Year 11Total
Phase I - Support Costs$ - 0
Phase I-II - Support Costs$ - 0
Phase I-III - Support Costs$ - 0
Phase I-IV - Support Costs (if applicable)$ - 0
Phase I-V - Support Costs (if applicable)$ - 0
Ongoing Production Support$ - 0
Add additional rows/deliverables as required$ - 0
Production Support Services Costs Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

* Support Level should correspond to the description provided in response to RFP Section 3.4.7 Production Support Services.

Attachment P / Cost Proposal

RFP# 2024-KB-002 - IRMS Replacement Project Page &P of &N

7. Other One Time Costs

Other One Time Costs

Vendor should detail propose other one time costs that may be deemed beneficial to the ongoing improvement of North Carolina DOR's tax and revenue administration efforts, both near-term and long-term. These costs are over and above the other summary categories. Vendor will provide costs for any proposed other one time costs services and/or features.

It is the responsibility of Vendor to ensure spreadsheet calculations are correct. All costs must be fully inclusive.

Instructions: Enter annual costs for all other one time service and/or feature proposed. Insert additional rows as necessary where noted if the Vendor suggests more than five services and/or features. Ensure the calculations in the Total column (gray cells) carry through to the Total column for rows added. All figures should be in USD and whole dollars.

Other One Time Costs

Total Cost
Transition Services
Termination Services
One time Service or Feature #2 [Please describe]
One time Service or Feature #3 [Please describe]
One time Service or Feature #4 [Please describe]
One time Service or Feature #5 [Please describe]
Add additional rows/deliverables as required
One time Services and Features Total Cost$ - 0

Attachment P / Cost Proposal

RFP# 2024-KB-002 - IRMS Replacement Project Page &P of &N

8. Cost Assumptions

Cost Assumptions

Vendor must state all assumptions upon which its pricing is determined. Assumptions shall not conflict with the Terms and Conditions or mandatory requirements of this RFP, and shall not change the requested scope of the RFP as described in the proposal. North Carolina DOR may disqualify the proposal if, in North Carolina DOR's sole discretion, determines that assumptions stated cause the proposal to inaccurately represent the costs for scope described in Vendor's proposal, or meets the needs as described in this RFP. Vendor must provide a clear understanding to North Carolina DOR of the cost impact to North Carolina DOR if any assumption is determined to be invalid; North Carolina DOR may use these values in consideration of the Cost Form.

Instructions: Complete the table below using as many rows as needed. Vendor shall provide a list of all business, economic, legal, programmatic, or practical assumptions that underlie Vendor's response to this RFP along with associated rationale. Clearly describe the location of the references to the RFP and/or proposal, description of the assumption, rationale for the need of the assumption, and the cost impact to North Carolina DOR should the assumption be invalid. Insert additional rows as needed.

Cost Assumptions

Item #Proposal Section, Page, ParagraphDescriptionRationaleCost Impact if the Assumption is Invalid
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Attachment P / Cost Proposal

RFP# 2024-KB-002 - IRMS Replacement Project Page &P of &N

9. Value-Added Services

Value-Added Services and Features

Vendor is invited to propose value-added services and/or features that may be deemed beneficial to the ongoing improvement of North Carolina DOR's tax and revenue administration efforts, both near-term and long-term. Vendor will provide costs for any proposed value-added services and/or features, but these costs will not be included in the Total Cost Summary. Costs for value-added services and/or features will not be scored, but are informational for Department.

It is the responsibility of the Vendor to ensure spreadsheet calculations are correct. All costs must be fully inclusive.

Instructions: Enter annual costs for all value-added services and/or features proposed. Insert additional rows as necessary where noted if the Vendor suggests more than five services and/or features. Ensure the calculations in the Total column (gray cells) carry through to the Total column for rows added. You may not delete rows once added. All figures should be in USD and whole dollars.

Value-Added Services and Features

Year 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 10Year 11Total
Value-added Services or Feature #1$ - 0
Value-added Services or Feature #2$ - 0
Value-added Services or Feature #3$ - 0
Value-added Services or Feature #4$ - 0
Value-added Services or Feature #5$ - 0
Add additional rows/deliverables as required$ - 0
Value-Added Services and Features Total Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Attachment P / Cost Proposal

RFP# 2024-KB-002 - IRMS Replacement Project Page &P of &N

10. Payment Schedule

Preferred Payment Schedule

Vendor may propose their preferred payment schedule to North Carolina DOR. Here, you'll find columns labeled for 'Frequency,' 'Contract Year,' and 'Payment Amount'. Review your entries for accuracy and completeness. If needed, include any additional details in designated columns. The preferred payment Schedule will not be scored, but are informational for North Carolina DOR. It is the responsibility of the Vendor to ensure spreadsheet calculations are correct.

Instructions: The Vendor is invited to customize the rows and columns below to convey their preferred payment schedule. All figures should be in USD and whole dollars. The total fees should reconcile with the total cost summary tab 2.

Preferred Payment Schedule: Sample

Payment #PhaseContract YearMilestone / Deliverable NameDescription & List of Key DeliverablesPayment Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Attachment P / Cost Proposal

RFP# 2024-KB-002 - IRMS Replacement Project Page &P of &N

11. Rate Card

General Rate Card

Vendor will provide the personnel hourly rate relating to change orders or other services or support not otherwise contemplated in this Cost Form. The rates provided are to be valid for the base term of the contract. North Carolina DOR expects the rates to increase by no more than the cost of living adjustment as determined by the United States Social Security Administration.

It is the responsibility of Vendor to ensure spreadsheet calculations are correct. All costs must be fully inclusive.

Instructions: Enter rates for other personnel hourly rates for services or support. Insert additional rows as necessary where noted. You may not delete rows once added. All figures should be in USD and whole dollars.

Personnel Hourly Rate

RoleSeniority LevelHourly Rate
Project Director
Project Manager
Functional Lead
Technical Lead
Application/Solution Architect
Security Lead
Data Conversion Lead
Testing Lead
Training Lead
Production Batch Operator
Add additional roles as required (Subcontractors Included)
Average Hourly RateERROR:#DIV/0!

Attachment P / Cost Proposal

RFP# 2024-KB-002 - IRMS Replacement Project Page &P of &N

Sheet1

Level 1 - Junior (0-2 yrs. experience)
Level 2 - Advanced Junior (3-5 yrs. experience)
Level 3 - Intermediate (6-10 yrs. experience)
Level 4 - Senior (11-15 yrs. experience)
Level 5 - Experienced (15 yrs. experience)

Data Validation

Hosting Environment Size
Small
Medium
Large

File details come from the government source that posted it. Updated .