This document is a presolicitation notice for replacing substations A and B at the Cleveland VA Medical Center. The Department of Veterans Affairs Network Contracting Office 10 is seeking proposals from service-disabled veteran owned small businesses to completely prepare the site for building operations including demolition and removal of existing structures, and furnish labor and materials to perform the work according to drawings and specifications. The work must be completed within 630 calendar days of receiving a notice to proceed. The solicitation documents will be posted on May 24, 2021 at SAM.gov and proposals will be due approximately 30 days later. This is a 100% set-aside for SDVOSBs who must be registered and verified on various websites. The minimum SDVOSB participation is 15% of the construction work. Bid, payment, and performance bonds will be required. A site visit will be scheduled and any amendments will be posted to SAM.gov.
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: NICK CARROZZA
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
E T
G
DE
I
RET
S
HCRA
I
KACZMAR
STANLEY
NO. 4988
T
E R
S
AT
E
I
T C
J.
O
O
FO
H
1468 WEST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
STRUCTURAL ENGINEERING:
THORSON BAKER + ASSOC.
3030 WEST STREETSBORO RD.
RICHFIELD, OH 44286
P. 330.659.6688
ELECTRICAL ENGINEERING:
HEAPY
1400 WEST DOROTHY LN.
DAYTON, OH 45409
P. 937.224.0861
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
MECHANICAL ENGINEERING:
FFE, INC.
110 BOGGS LN, SUITE 170
SPRINGDALE, OH 45246
P. 513.522.0956
HAZ. MATERIALS ASSESSMENT:
STEPHEN J. SEBESTA & ASSOC.
30628 DETROIT RD. #258
WESTLAKE, OH 44145
P. 216.781.0060
C U s e rs
\d a v e \D o c u m e n ts
\V A
S U
B S
T A
T
IO
N A
B
R d a k a p la n .r v t
/2
/2
:4
:4
A
M
FINAL CDs SUBMISSION
GI-1
TITLE SHEET & DRAWING INDEX REPLACE SUBSTATIONS A & B
10701 EAST BLVD. CLEVELAND, OHIO
541-21-105
2.26.21 CJK DAK
DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER - WADE PARK
REPLACE SUBSTATIONS A & B
10701 EAST BLVD. CLEVELAND, OH 44106
PROJECT NO. 541-21-105
Cleveland Veterans Affairs Medical Center
SCOPE OF WORK
AREA
BASEMENT LEVEL
CODE INFORMATION:
I. PROJECT LOCATION: CLEVELAND VETERANS AFFAIRS MEDICAL CENTER
10701 EAST BLVD.
CLEVELAND, OHIO
II. DESCRIPTION & USER GROUP CLASSIFICATION OF BUILDING
A. NATURE OF PROJECT: REPLACEMENT OF EXISTING SUBSTATIONS A & B AND ASSOCIATED ELECTRICAL/MECHANICAL EQUIPMENT
B. DESIGN CODES: 2018 NFPA LIFE SAFETY CODE 101, IBC 2018
2020 PHYSICAL SECURITY AND RESILIENCY DESIGN MANUAL
C. USE GROUP: I-2 HEALTH CARE - NO CHANGE PROPOSED
D. CONSTRUCTION TYPE: TYPE I-332, IB - NON-COMBUSTIBLE, PROTECTED
FIRE RATED CONSTRUCTION (LSC A.8.2.1.1)
EXTERIOR BEARING WALLS 3 HRS
INTERIOR BEARING WALLS 3 HRS
STRUCTURAL COLUMNS 3 HRS (SUPPORTING > 1 FLOOR)
2 HRS (SUPPORTING 1 FLOOR ONLY)
2 HRS (SUPPORTING ROOF ONLY)
BEAMS, GIRDERS, TRUSSES 3 HRS (SUPPORTING > 1 FLOOR, COLS., OR BEARING WALLS)
FLOOR-CEILING ASSEMBLIES 2 HRS
ROOF-CEILING ASSEMBLIES 1-1/2 HRS
INTERIOR NON-BEARING WALLS 0 HRS
EXTERIOR NON-BEARING WALLS 0 HRS
WALL ASSEMBLIES
EXIT ACCESS CORRIDOR WALLS 0 HR SMOKE PARTITIONS
E. PROJECT AREA: BASEMENT LEVEL: 2,383 SF
F. PROJECT AREA OCCUPANT LOAD: 8
G. FIRE PROTECTION: EXISTING BUILDING FULLY SPRINKLED. MODIFICATIONS AS REQUIRED PER NEW IMPROVEMENTS PROPOSED
DRAWING INDEX:
FINAL CD's SUBMISSION
2.26.21
GI-1 TITLE SHEET & DRAWING INDEX
ARCHITECTURAL
LS-100 BASEMENT LEVEL LIFE SAFETY PLAN - PHASE I
AS-X-000 BASEMENT LEVEL SITE LOGISTICS PLAN
AS-X-100 BASEMENT LEVEL EXISTING CONDITIONS PLAN
AS-D-100 BASEMENT LEVEL DEMOLITION PLANS - PHASE I
AS-100 BASEMENT LEVEL IMPROVEMENT AND CEILING PLANS -
PHASE I
AS-600 DOOR AND FINISH SCHEDULES, WALL TYPES, & DETAILS
MECHANICAL/HVAC
M-001 MECHANICAL LEGEND
MD-101 MECHANICAL BASEMENT DEMOLITION PLAN - PHASE I
MH-101 MECHANICAL BASEMENT NEW WORK PLAN - PHASE I
MH-501 MECHANICAL DETAILS
MH-601 MECHANICAL SCHEDULES
MH-602 MECHANICAL CONTROLS
STRUCTURAL
SS-100 SUBSTATION A & B STRUCTURAL SUPPORT PLAN
FIRE PROTECTION
FX-100 FIRE PROTECTION BASEMENT NEW WORK PLAN
EP-100 ELECTRICAL BASEMENT EQUIPMENT ROUTING PLAN
EP-401 ENLARGED BASEMENT POWER AND SYSTEMS PLAN
EP-402 ENLARGED SUB-BASEMENT ELECTRICAL PLAN
EP-501 ELECTRICAL DETAILS
EP-502 EXISTING ELECTRICAL ROOM D21 IMAGES
EP-503 EXISTING SUB-BASEMENT IMAGES
EP-600 MEDIUM VOLTAGE NEW WORK RISER DIAGRAM
EP-601A SUBSTATION A POWER LOW-VOLTAGE NEW WORK RISER DIAGRAM
EP-601B SUBSTATION A LIGHTING LOW-VOLTAGE NEW WORK RISER DIAGRAM
EP-602A SUBSTATION B POWER LOW-VOLTAGE NEW WORK RISER DIAGRAM
EP-602B SUBSTATION B LIGHTING LOW-VOLTAGE NEW WORK RISER DIAGRAM
EP-603 EMERGENCY POWER SYSTEM NEW WORK RISER DIAGRAM
EP-700 DISTRIBUTION SCHEDULES AND ELEVATIONS
ER-10B ELECTRICAL SUB-BASEMENT PLAN
ER-100A BASEMENT LEVEL ELECTRICAL FLOOR PLAN
ER-100B ENLARGED BASEMENT LEVEL ELECTRICAL ROOM PLANS
ER-101A FIRST FLOOR ELECTRICAL ROOM PLANS
ER-101B ENLARGED FIRST FLOOR ELECTRICAL ROOM PLANS
ER-102 SECOND FLOOR ELECTRICAL ROOM PLANS
ER-103 THIRD FLOOR ELECTRICAL ROOM PLANS
ER-104 FOURTH FLOOR ELECTRICAL ROOM PLANS
ER-105 FIFTH FLOOR ELECTRICAL ROOM PLANS
ER-106 SIXTH FLOOR ELECTRICAL ROOM PLANS
ER-107 PENTHOUSE ELECTRICAL ROOM PLANS
NORTH
ELECTRICAL
E-001 ELECTRICAL SCHEDULES AND INDEX OF DRAWINGS
E-002 ELECTRICAL CONSTRUCTION PHASING
ED-401 ENLARGED BASEMENT DEMOLITION PLAN
ED-600 MEDIUM VOLTAGE DEMOLITION RISER DIAGRAM
ED-601A SUBSTATION A POWER LOW-VOLTAGE DEMOLITION RISER DIAGRAM
ED-601B SUBSTATION A LIGHTING LOW-VOLTAGE DEMOLITION RISER DIAGRAM
ED-602A SUBSTATION B POWER LOW-VOLTAGE DEMOLITION RISER DIAGRAM
ED-602B SUBSTATION B LIGHTING LOW-VOLTAGE DEMOLITION RISER DIAGRAM
ED-603 EMERGENCY POWER SYSTEM DEMOLITION RISER DIAGRAM
HAZARDOUS MATERIALS ABATEMENT
HA-001 STANDARD ASBESTOS ABATEMENT DETAILS
HA-101 BASEMENT LEVEL ASBESTOS ABATEMENT PLAN
Revisions: Date:
DESIGN DEVELOPMENT 7.24.20
35% CDs SUBMISSION 9.1.20
65% CDs SUBMISSION 10.8.20
90% CDs SUBMISSION 11.24.20
100% CDs SUBMISSION 2.5.21
FINAL CDs SUBMISSION 2.26.21
UP
UP
UP
UP
UP
DN
UP
UP
UP
UP
UP
UP UPUP
UP
UP
UP
UP
UP
P/B
P /B
P /B
P /B
P /B
P /B
P/B
P /B
P /B
LIFE SAFETY LEGEND:
EXISTING/NEW 2 HOUR RATED FIRE BARRIER
EXISTING/NEW 1 HOUR RATED FIRE BARRIER
EXISTING/NEW 1 HOUR RATED SMOKE BARRIER
EXISTING/NEW O HOUR RATED SMOKE PARTITION
E EXIT
FE
FIRE EXTINGUISHER
EXIT SIGN LOCATION (DIRECTIONAL ARROWS MAY
OCCUR, SEE PLAN)
LIFE SAFETY GENERAL NOTES:
1. SEE COVER SHEET FOR APPLICABLE CODE INFORMATION
2. PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY. CONTRACTOR WILL COMPLETE ALL WORK REGARDLESS IF IT IS LOCATED OUTSIDE OF PROJECT SCOPE AREA AS INDICATED ON ANY
DRAWINGS
3. CONTRACTOR TO COVER OR ALTER EXIT SIGNS WHICH, DUE TO CONSTRUCTION, TEMPORARILY DO
NOT DEPICT EXIT PATHS (TYP. OF ALL EXIT SIGNS IN OR BEYOND PROJECT AREA)
4. TRAVEL DISTANCES OVER 200' WILL REQUIRE INTERIM LIFE SAFETY MEASURES. COORDINATE WITH VA.
5. EXISTING FLOOR SLABS ARE 2 HR RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW
PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE
COMPROMISED, AND SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL
PATCH CONC. SLAB FULLY WITH NEW CONCRETE TO MATCH EXISTING.
6. PROVIDE FIRESTOPPING AT ALL PENETRATIONS THROUGH NEW AND EXISTING FIRE/SMOKE RATED BARRIER WALLS AND FLOOR SLABS TO COMPLY WITH THE REQUIRED BARRIER RATINGS. PROVIDE
FIRESTOPPING AROUND TEN (10) PENETRATIONS LESS THAN 6 SQUARE INCHES AND FOUR (4)
PENETRATIONS BETWEEN 16 AND 36 SQUARE INCHES TO COMPLY WITH REQUIRED RATING NOT
ASSOCIATED WITH NEW WORK. LARGER OPENINGS SHALL BE BROUGHT TO THE ATTENTION OF THE COR. GC SHALL SUBMIT UL LISTED METHODS FOR PATCHING ALL FIRE BARRIERS THAT MEET THE MINIMUM FIRE RATING REQUIREMENTS OF THE PENETRATING BARRIER AND ARE IN COMPLIANCE WITH
THE OPENING SIZE AS DICTATED BY THE ASSEMBLY.
7. TEMPORARY FIRE ALARMS IN CONSTRUCTION AREAS: GC SHALL PROVIDE TEMPORARY FIRE ALARMS IN ALL CONSTRUCTION AREAS THROUGHOUT THE CONSTRUCTION DURATION UNTIL SUCH TIME THAT
NEW FIRE ALARM SYSTEM DEVICES ARE INSTALLED, TESTED, AND IN FULL OPERATION. HEAT
DETECTION DEVICES SHALL BE UTILIZED AND SHALL BE CONNECTED TO THE BUILDING FIRE ALARM SYSTEM AND COORDINATED THROUGH THE VA ELECTRICAL SHOP. GC SHALL COORDINATE WITH VA SAFETY DEPARTMENT FOR ALL TEMPORARY FIRE ALARM INSTALLATIONS TO ENSURE COMPLIANCE
WITH SAFETY STANDARDS. TEMPORARY FIRE ALARM DEVICES SHALL BE PROGRAMMED INTO THE
SYSTEM BY CERTIFIED NOTIFIER VENDOR. ANY OLD FA DEVICES THAT ARE REMOVED SHALL BE DE-
PROGRAMMED OUT BY THE SAME CERTIFIED VENDOR. ALL COSTS ASSOCIATED WITH THE
PROGRAMMING/DE-PROGRAMMING OF THE TEMPORARY FIRE ALARM SYSTEM SHALL BE INCLUDED IN
THE CONTRACTOR'S SCOPE/BID.
HAZARDOUS ROOM
EXISTING/NEW 3 HOUR RATED FIRE BARRIER
PLASTIC CORRUGATED SHEETING/METAL STUD TEMPORARY PARTITION WALL W/3'-0" X 7'-0" SCWD
DOOR FOR CONTRACTOR ACCESS ONLY. ALSO SHALL BE REQUIRED AT ALL ABOVE-CEILING
MECHANICAL/ELECTRICAL WORK LASTING LONGER THAN 8 HOURS OUTSIDE OF ENCLOSED
CONSTRUCTION AREAS - REFER TO MEP DRAWINGS FOR AFFECTED AREAS. SUCH WORK MUST BE
ISOLATED FROM THE SURROUNDING ENVIRONMENT. WALL AND DOOR TO BE REMOVED UPON
COMPLETION OF WORK U.N.O. PATCH/REPAIR EXISTING CONDITIONS AS REQUIRED UPON REMOVAL
OF ALL TEMPORARY CONSTRUCTION. REFER TO TYPICAL TEMPORARY PARTITION DETAIL ON
SHEET AS-600. SCHEDULE NOTE: CONSTRUCTION OF TEMPORARY BARRIERS SHALL BE
PERFORMED AFTER NORMAL BUSINESS HOURS UNLESS OTHERWISE APPROVED BY THE COR. GC
SHALL COORDINATE ALL ABOVE-CEILING WORK AND TEMPORARY BARRIER CONSTRUCTION WITH VA
AND STAFF
Toilets
B-E423
HVAC Shop
B-E430
Electrical Shop
B-E440
Corridor
CD04
HVAC Shop
D26
Electrical Shop
D25G
Carpenter Shop
D25B
Machine Shop
D25
Alarm System Control
B-E440B
Alarm System Control
B-E440B
Elect.
D25C
Plumbing Shop
D25A
Corridor
D25F
Conference Room
D25E
Lock Smith
D25D
Transformer Room
D21
Storage
D20A
Mechanical Room
D20Office
D25H
Storage
D25I Storage
D25J
Office
D26A
Office
D26B
Corridor
BF402
Switch Gear Room
BE504
Pipe Tunnel
BE503
Air Handler
BE501
Stair
BE505
Storage
BD502
Exit Passage
BF501
Corridor
BF502
Elevator Equipment
Room
BF503
Corridor
BF504
PALMS
Neutralization
Tanks
BF505
Mail Drop
BF509
Warehouse Clerks
BF511
Warehouse Storage
BF510
Corridor
BF520
Electrical Panels
BF521
Mail Sorting
BF522
IRM Telecomm Room
BF515
Engineering Closet
BF516
Corridor
BF526
EMS
BF527
Corridor
BF525
Lounge Lockers
BF530
Female Tlt
BF531
Male Tlt
BF532
TSS Clerks
BF535
Storekeeper Office
BF536
Medical Gas Storage
BF540
Elevator Equipment
Room
BF541
Stair A
BF550
Storage
BF510B
Hazardous Waste
BF469
Bulk Food
BF459
Animal Ward
BF460
Animal Ward
BF461
Animal Ward
BF462
Necropsy
BF463
Animal Reception
BF466
HVAC
BF467
Electrical
BF468
Security
BF468A
Procedure Lab
BF464B
Procedure Lab
BF464C
Procedure Lab
BF464D
Cooler
BF463A
Corridor
BF370
Corridor
BF372
EM Prep Room
BF440
Fluorescent Microscope
BF441
Microscope Room
BF442
Viewing Room
BF422 Corridor
BF403
Autopsy Office
BF426
Autopsy Room
BF427
Shower
BF428
EMS
BF429
Mortuary Refrigerator
BF430
Corridor
BF404
Lab Slide/ Block Storage
BF420B
Toilet
BF423
Stairway
BF-450
Mechanical Room
BE502
F E
F E
E
E
E
S C
O P
E O
F W
O R
K B
O U
N D
A R
Y
EMS Break Room
B-D414
Clean Linen
B-D412
EMS Staff
B-D414A
Uniform Pick-up/Drop-Off
B-D410
Mech.
Equipment
BD424 Primary Switch Room
BD423
Primary Switch Room
BD422
Elect
BD421 Stair 6
E25
Corridor
BD420
Corridor
CE02
New Elec.
Equip. Room
B-D412A
SPECIAL NOTE: EXISTING EAST
WALL OF NEW ELEC. EQUIP.
ROOM B-D412A IS CURRENTLY
RATED FOR 1 HR ONLY. WALL
WILL BE AUGMENTED TO
INCREASE TO A 2 HR RATING.
SEE IMPROVEMENT PLANS
CONTRACTOR
ENTRIES
63'-6" COMMON
PATH OF
TRAVEL
EXISTING EGRESS PATHS IN MAIN
BASEMENT CORRIDORS SHOWN
DASHED. EGRESS FROM NON-
CONSTRUCTION AREAS TO EXITS
WILL REMAIN UNAFFECTED
DURING CONSTRUCTION
E
CLR.
5' - 0"
NOTE: TEMP. CONST. BARRIER
ONLY REQ'D. DURING
DEMOLITION/REPLACEMENT
OF EX. DOOR FRAME
S U
B S
T A
T
IO
N A
S U
B S
T A
T
IO
N B
PHASING NOTE:
REMOVAL AND
REPLACEMENT OF
SUBSTATION B SHALL
OCCUR DURING
PHASE II SCOPE OF
WORK - SEE ELEC.
DWGS.
PHASING NOTE:
REMOVAL AND
REPLACEMENT OF
SUBSTATION A SHALL
OCCUR DURING PHASE
III SCOPE OF WORK -
SEE ELEC. DWGS.
GENERAL PHASING/LIFE SAFETY NOTE: UNLESS NOTED
OTHERWISE, ALL WORK ON THIS SHEET SHALL OCCUR DURING
PHASE I. TEMPORARY PARTITIONS INDICATED SHALL BE
REQUIRED DURING THIS PHASE.
PHASES II & III INCLUDE REMOVAL/REPLACEMENT OF THE EXISTING
SUBSTATIONS A & B, AND WORK AREA IS LIMITED PRIMARILY TO
TRANSFORMER ROOM D21. EXISTING EGRESS PATHS IN ALL
BASEMENT AREAS SURROUNDING ROOM D21 SHALL NOT BE
AFFECTED NOR OBSTRUCTED. CONTRACTOR SHALL ENSURE THAT
PROTECTIVE MEASURES ARE PROVIDED WITHIN ROOM TO
PROTECT ALL EXISTING EQUIPMENT AS REQUIRED FROM
CONSTRUCTION DUST AND DEBRIS.
F E
F E
FE
FE
FE
FE
NOTE: GC SHALL INSTALL TEMP.
BARRIER/DOOR ACROSS OPENING
LEADING TO EXISTING MECHANICAL
ROOM. VA ONLY SHALL HAVE ACCESS
THROUGH THIS DOOR UNLESS APPROVED
BY THE COR. ENSURE THAT DOOR HAS
LOCK AND CYLINDER, FURNISH KEYS TO
THE VA. FREE EGRESS SHALL BE
ALLOWED FROM MECH. ROOM SIDE
5'
THE SCOPE OF WORK DESCRIBED IN THIS DRAWING PACKAGE REPRESENTS A MULTI-PHASED PROJECT THAT MUST BE UNDERTAKEN SIMULTANEOUSLY WITH THE FULL OCCUPANCY AND FUNCTION OF THE EXISTING
HOSPITAL. THE PROPOSED PHASING DURATING PLAN IS AS FOLLOWS:
PRE-CONSTRUCTION: 90 DAYS
PHASE I: 180 DAYS
VA ACTIVATION OF PHASE I: 30 DAYS
PHASE II: 150 DAYS
VA ACTIVATION OF PHASE II: 30 DAYS
PHASE III: 150 DAYS
TOTAL TIMEFRAME: 630 DAYS
PHASE I: IT IS THE INTENT OF PHASE I TO PERFORM ALL CONSTRUCTION NECESSARY TO PREPARE FOR THE
FUTURE REMOVAL OF SUBSTATIONS A & B, INCLUDING BUT NOT LIMITED TO:
• MODIFICATIONS OF EXISTING AIR HANDLER
• REMOVAL AND REPLACEMENT OF EXISTING DOORS/FRAMES
• CONSTRUCTION OF NEW ELECTRICAL EQUIPMENT ROOM IN EXISTING CLEAN LINEN ROOM, INCLUDING
ALL EQUIPMENT INSTALLED AND BROUGHT TO WORKING OPERATION
• RUNNING OF SUB-BASEMENT CONDUITS/FEEDERS TO NEW EQUIPMENT LOCATIONS
• REMOVAL OF EXISTING ASSOCIATED ELECTRICAL EQUIPMENT IN TRANSFORMER ROOM ONCE NEW IS
FULLY ACTIVATED
• ABATEMENT SCOPE OF WORK NOT ASSOCIATED WITH THE REMOVAL/REPLACEMENT OF SUBSTATIONS
PHASE II: IT IS THE INTENT OF PHASE II TO FULLY REMOVE AND REPLACE SUBSTATION B, INCLUDING ASSOCIATED
ABATEMENT.
PHASE III: IT IS THE INTENT OF PHASE III TO FULLY REMOVE AND REPLACE SUBSTATION A, INCLUDING
ASSOCIATED ABATEMENT.
CONTRACTOR SHALL REFER TO MEP DRAWINGS FOR ADDITIONAL PHASING AND SEQUENCING REQUIREMENTS, AND COORDINATE ALL ACTIVITIES WITH VA COR THROUGHOUT THE ENTIRETY OF THE PROJECT CONSTRUCTION.
THE FOLLOWING CONSTRUCTION SCHEDULE TIMEFRAMES SHALL APPLY TO THIS PROJECT:
CONSTRUCTION ACTIVITIES ARE PERMITTED TO OCCUR DURING REGULAR SHIFT HOURS. TEMPORARY CONSTRUCTION BARRIERS MUST BE FULLY IN PLACE AND INTACT DURING CONSTRUCTION. CONTRACTORS, HOWEVER, SHALL NOT BE PERMITTED TO HAVE MATERIALS AND DELIVERIES DELIVERED OR TAKEN AWAY DURING
REGULAR SHIFT HOURS, AND MUST COORDINATE SUCH ACTIVITIES WITH VA COR.
THE TIMEFRAMES IDENTIFIED ABOVE ARE IN REFERENCE TO NORMAL CONSTRUCTION ACTIVITIES AND, UNLESS
APPROVED BY VA COR, SHALL NOT APPLY TO WORK INCLUDING BUT NOT LIMITED TO:
• UTILITY SHUTDOWNS
• EXISTING MEP SYSTEM SHUTDOWNS
• WORK IN PUBLIC CORRIDORS/WAITING AREAS
• CUTTING OF FLOOR OPENINGS IN THE EXISTING BUILDING
• WORK OUTSIDE OF TEMPORARY CONSTRUCTION PARTITIONED AREAS, INCLUDING ACCESS OF CEILING
PLENUM SPACES IN FLOORS ABOVE OR BELOW CONSTRUCTION AREAS, AND REPLACEMENT OF
EXISTING FINISHES
• CONSTRUCTION OF TEMPORARY CONSTRUCTION BARRIERS
WORK IDENTIFIED ABOVE SHALL OCCUR EITHER IN THE EVENING SHIFT, OR IF REQUIRED BY THE VA, ON WEEKENDS. ALL CONSTRUCTION ACTIVITIES AND SCHEDULES MUST BE REVIEWED AND APPROVED BY VA COR.
REFER TO SPEC DIVISION 01 FOR GENERAL PROJECT REQUIREMENTS
PHASING DURATION & CONSTRUCTION TIMEFRAMES:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: NICK CARROZZA
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
E T
G
DE
I
RET
S
HCRA
I
KACZMAR
STANLEY
NO. 4988
T
E R
S
AT
E
I
T C
J.
O
O
FO
H
1468 WEST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
STRUCTURAL ENGINEERING:
THORSON BAKER + ASSOC.
3030 WEST STREETSBORO RD.
RICHFIELD, OH 44286
P. 330.659.6688
ELECTRICAL ENGINEERING:
HEAPY
1400 WEST DOROTHY LN.
DAYTON, OH 45409
P. 937.224.0861
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
MECHANICAL ENGINEERING:
FFE, INC.
110 BOGGS LN, SUITE 170
SPRINGDALE, OH 45246
P. 513.522.0956
HAZ. MATERIALS ASSESSMENT:
STEPHEN J. SEBESTA & ASSOC.
30628 DETROIT RD. #258
WESTLAKE, OH 44145
P. 216.781.0060
C U s e rs
\d a v e \D o c u m e n ts
\V A
S U
B S
T A
T
IO
N A
B
R d a k a p la n .r v t
/2
/2
:0
:2
P
M
FINAL CDs SUBMISSION
LS-100
BASEMENT LEVEL - LIFE SAFETY PLAN -
PHASE I
REPLACE SUBSTATIONS A & B
10701 EAST BLVD. CLEVELAND, OHIO
541-21-105
2.26.21 CJK DAK
SCALE: 3/32" = 1'-0"
BASEMENT LEVEL LIFE SAFETY PLAN - PHASE I
NORTH
Revisions: Date:
DESIGN DEVELOPMENT 7.24.20
35% CDs SUBMISSION 9.1.20
65% CDs SUBMISSION 10.8.20
90% CDs SUBMISSION 11.24.20
DN
GENERAL NOTES:
CONSIDER ALL AREAS OWNER-OCCUPIED UNLESS NOTED OTHERWISE.
ALL WALLS ARE DRAWN AND DIMENSIONED TO A 5" NOMINAL WIDTH TYPICAL UNLESS OTHERWISE NOTED.
ALL DIMENSIONS ARE CLEAR DIMENSIONS FROM FACE OF GYPSUM BOARD TO FACE OF GYPSUM BOARD.
ALL SUB-CONTRACTORS (I.E. FIRE PROTECTION, HVAC, FIRE ALARM, ELECTRICAL, ETC.) TO INSTALL SYSTEM PER OWNER REQUIREMENTS AND IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF ALL APPLICABLE
CODES.
PATCH AND REPAIR ALL EXISTING AREAS TO REMAIN AS REQUIRED TO MATCH EXISTING CONDITIONS.
WHERE NEW UTILITIES ARE TO BE INSTALLED IN EXISTING PARTITIONS, ALL SUB-CONTRACTORS SHALL REMOVE EXISTING DRYWALL AS REQUIRED FOR INSTALLATION OF SAME AND PATCH AND REPAIR WITH NEW
TO MATCH EXISTING CONDITIONS UPON COMPLETION OF UTILITY INSTALLATION.
ALL DAMAGE TO EXISTING AREAS OCCURING AS A RESULT OF CONSTRUCTION SHALL BE REPAIRED AS REQUIRED BY THE CONTRACTOR. CONTRACTOR SHALL PROTECT ALL EXISTING WALL, CEILING, AND FLOOR FINISHES IN EACH AREA. ANY SURFACES DAMAGED BY CONTRACTOR SHALL BE REPLACED BY THE
CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
ALL NEW PENETRATIONS IN FIRE-RATED ASSEMBLIES TO MAINTAIN FIRE RATING OF ASSEMBLY AS
REQUIRED.
NEW AND EXISTING FURNITURE SHOWN FOR REFERENCE ONLY. THE OWNER SHALL REMOVE, PRIOR TO CONSTRUCTION, ALL ITEMS THAT THE OWNER DESIRES TO SALVAGE. ALL REMAINING ITEMS INDICATED TO BE DEMOLISHED SHALL BE REMOVED BY THE CONTRACTOR AND LEGALLY DISPOSED OF IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. ALL ITEMS TO REMAIN IN SPACE SHALL BE PROTECTED THROUGHOUT BY THE CONTRACTOR THROUGHOUT CONSTRUCTION. NEW FURNITURE TO BE FURNISHED AND INSTALLED
BY THE OWNER UNLESS NOTED OTHERWISE.
CONTRACTOR SHALL PROVIDE DUST-REMOVAL WALK-OFF MATS (TACKY MAT) AT ALL CONSTRUCTION ENTRY
POINTS.
CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN NEGATIVE PRESSURE IN WORK AREAS ENSURING NO DUST OR FUMES WILL BE TRANSFERRED TO OCCUPIED AREAS.
PROVIDE VISUAL PRESSURE MONITORING DEVICE AT DUST-PROOF BARRICADE TO CONFIRM PRESSURE.
DUST MONITORING SHALL BE BY OWNER. SEE SPECIFICATION 01 00 00 "GENERAL REQUIREMENTS"
ATTACHMENT AND 01 35 26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS.
ALL DEMOLITION WORK BEING DONE OUTSIDE TEMPORARY PARTITIONS IS TO BE APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS. WORK SHALL BE DONE TO MINIMIZE DISRUPTION TO VISITORS, PATIENTS, AND STAFF. COORDINATE LOCATION OF BARRIERS WITH OWNER.
THE HOSPITAL'S SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION WITHIN THE
PROJECT AREA DURING THE ENTIRE CONSTRUCTION PHASE.
FIELD VERIFY LOCATION OF ALL EXISTING CONDITIONS. NOTIFY COR OF ANY DISCREPANCIES.
WHERE NEW DOORS ARE INDICATED IN EXISTING WALL ASSEMBLIES, CUT OPENINGS IN EXISTING WALL.
REFER TO DOOR SCHEDULE FOR DIMENSIONS. PREPARE OPENINGS FOR NEW DOOR, INCLUSIVE OF THE ADDITION OF JAMB AND HEAD STUD REINFORCEMENT (I.E. DOUBLE STUDS, HEADERS) AND PATCH ADJACENT
WALLS TO MATCH EXISTING.
ALL FLOOR, WALL, CEILING, AND MISC. FIRE-RESISTIVE ASSEMBLIES AND CONSTRUCTION SHALL BE OF THE FIRE RATING CALLED FOR ON THE DRAWINGS AND/OR AS REQUIRED BY CODE. ALL EXISTING FIRE-RESISTIVE ASSEMBLIES SHALL BE MAINTAINED AND THE RATING NOT COMPROMISED. FIRE RATED ASSEMBLIES AND CONSTRUCTION INCLUDING ALL FIRESTOPPING, FIRE RATED DOORS, AND MISC. FIRE RESISTIVE REQUIREMENTS SHALL BE LEFT UNCONCEALED AS REQUIRED FOR INSPECTION BY THE BUILDING OFFICIAL.
DEBRIS REMOVAL SHALL NOT INTERFERE WITH OWNER'S OPERATIONS AND SHALL OCCUR DURING OFF HOURS AS DETERMINED BY THE COR. SEE ALSO SPECIFICATION SECTION 01 35 26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS REGARDING THE HAULING OF DEBRIS FROM THE PROJECT AREA.
ALL NOISE-GENERATING OPERATIONS SHALL BE SCHEDULED SO AS NOT TO IMPEDE OWNER'S OPERATIONS AS DETERMINED BY THE COR. ALL WORK IN PUBLIC CORRIDORS SHALL BE PERFORMED OFF-HOURS UNLESS
OTHERWISE APPROVED BY THE COR.
EXISTING FLOOR SLABS ARE 2 HR FIRE RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE COMPROMISED, AND GC SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL PATCH CONCRETE SLAB FULLY WITH NEW CONCRETE TO MATCH EXISTING OR APPROVED 2 HR RATED INFILL FIRESTOP ASSEMBLY WHEN APPROVED
BY THE COR.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
SYMBOL LEGEND:
INDICATES EXISTING DOOR
INDICATES NEW DOOR
EXISTING WALLS TO REMAIN
NEW WALLS
WALLS TO BE REMOVED FULL HEIGHT U.N.O.
DASHED LINES INDICATE ITEMS TO BE
DEMOLISHED
HATCHED AREA OUTSIDE OF PROJECT SCOPE.
ACCESS INTO CEILING SPACES MAY OCCUR, REFER
TO MEP DWGS.
GENERAL NOTE CONSTRUCTION PARTITION NOTE: WHERE TEMP. CONST. PARTITIONS
CONFLICT W/EX. LIGHTS/DIFFUSER/MEP ITEM LOCATIONS (INDICATED ON CEILING DEMOLITION
PLANS), GC SHALL COORD. W/COR TO EITHER TEMPORARILY REMOVE SUCH ITEMS, OR ADJUST
LOCATION OF CONST. PARTITION ACCORDINGLY TO ALLOW ITEMS TO REMAIN IN PLACE
PLASTIC CORRUGATED SHEETING/METAL STUD TEMPORARY PARTITION WALL W/3'-0" X 7'-0" SCWD
DOOR FOR CONTRACTOR ACCESS ONLY. ALSO REQUIRED AT ALL ABOVE-CEILING
MECHANICAL/ELECTRICAL WORK LASTING LONGER THAN 8 HOURS OUTSIDE OF ENCLOSED
CONSTRUCTION AREAS - REFER TO MEP DRAWINGS FOR AFFECTED AREAS. SUCH WORK MUST BE
ISOLATED FROM THE SURROUNDING ENVIRONMENT. WALL AND DOOR TO BE REMOVED UPON
COMPLETION OF WORK U.N.O. PATCH/REPAIR EXISTING CONDITIONS AS REQUIRED UPON REMOVAL
OF ALL TEMPORARY CONSTRUCTION. REFER TO TYPICAL TEMPORARY PARTITION DETAIL.
SCHEDULE NOTE: CONSTRUCTION OF TEMPORARY BARRIERS SHALL BE PERFORMED AFTER
NORMAL BUSINESS HOURS UNLESS OTHERWISE APPROVED BY THE COR. GC SHALL COORDINATE
ALL ABOVE-CEILING WORK AND TEMPORARY BARRIER CONSTRUCTION WITH VA
Exit Passage
BF501
Corridor
BF502
Transformer Room
D21
Mechanical Room
BE502
Clean Linen
B-D412
New Elec.
Equip. Room
B-D412A
Corridor
BD420
Corridor
BF520
Corridor
BF525
Corridor
BF502
Mechanical Room
D20
Service Lobby
BC404
Corridor
CE03
Elevator Lobby
BC403
7'-8".
8'-0".
9' -6
10' - 6"
13' - 0"
TO MAGNOLIA DRIVE
ROUTE 'A'
ROUTE 'A'
LOADING DOCK
ROUTE 'B'
ROUTE 'B'
8' - 9"
C
LR
7' -0
9' - 4"
8' - 10"
CLG. HT.
TRANSITION LINE
CLG. HT.
TRANSITION
LINES
OPEN TO
EXTERIOR
ABOVE
CLG. HT.
TRANSITION
LINES
CLG. HT.
TRANSITION
LINE
8'
/2
6' -0
7' - 9 1/2"
CENTRAL SERVICE
ELEVATORS
(TO BE REMOVED
AS A PART OF
IMPROVEMENTS)
AS-X-000
A
8'
6'- 0"
C
LR
Corridor
BF502
Mechanical Room
BE502
Transformer Room
D21
18 LOW POINT
LOW POINT
LINE OF OPENING
HEADER ABOVE
1'
/4
AS-D-100
B
THE SCOPE OF WORK DESCRIBED IN THIS DRAWING PACKAGE REPRESENTS A MULTI-PHASED PROJECT THAT MUST BE UNDERTAKEN SIMULTANEOUSLY WITH THE FULL OCCUPANCY AND FUNCTION OF THE EXISTING
HOSPITAL. THE PROPOSED PHASING DURATING PLAN IS AS FOLLOWS:
PRE-CONSTRUCTION: 90 DAYS
PHASE I: 180 DAYS
VA ACTIVATION OF PHASE I: 30 DAYS
PHASE II: 150 DAYS
VA ACTIVATION OF PHASE II: 30 DAYS
PHASE III: 150 DAYS
TOTAL TIMEFRAME: 630 DAYS
PHASE I: IT IS THE INTENT OF PHASE I TO PERFORM ALL CONSTRUCTION NECESSARY TO PREPARE FOR THE
FUTURE REMOVAL OF SUBSTATIONS A & B, INCLUDING BUT NOT LIMITED TO:
• MODIFICATIONS OF EXISTING AIR HANDLER
• REMOVAL AND REPLACEMENT OF EXISTING DOORS/FRAMES
• CONSTRUCTION OF NEW ELECTRICAL EQUIPMENT ROOM IN EXISTING CLEAN LINEN ROOM, INCLUDING
ALL EQUIPMENT INSTALLED AND BROUGHT TO WORKING OPERATION
• RUNNING OF SUB-BASEMENT CONDUITS/FEEDERS TO NEW EQUIPMENT LOCATIONS
• REMOVAL OF EXISTING ASSOCIATED ELECTRICAL EQUIPMENT IN TRANSFORMER ROOM ONCE NEW IS
FULLY ACTIVATED
• ABATEMENT SCOPE OF WORK NOT ASSOCIATED WITH THE REMOVAL/REPLACEMENT OF SUBSTATIONS
PHASE II: IT IS THE INTENT OF PHASE II TO FULLY REMOVE AND REPLACE SUBSTATION B, INCLUDING ASSOCIATED
ABATEMENT.
PHASE III: IT IS THE INTENT OF PHASE III TO FULLY REMOVE AND REPLACE SUBSTATION A, INCLUDING
ASSOCIATED ABATEMENT.
CONTRACTOR SHALL REFER TO MEP DRAWINGS FOR ADDITIONAL PHASING AND SEQUENCING REQUIREMENTS, AND COORDINATE ALL ACTIVITIES WITH VA COR THROUGHOUT THE ENTIRETY OF THE PROJECT CONSTRUCTION.
THE FOLLOWING CONSTRUCTION SCHEDULE TIMEFRAMES SHALL APPLY TO THIS PROJECT:
CONSTRUCTION ACTIVITIES ARE PERMITTED TO OCCUR DURING REGULAR SHIFT HOURS. TEMPORARY CONSTRUCTION BARRIERS MUST BE FULLY IN PLACE AND INTACT DURING CONSTRUCTION. CONTRACTORS, HOWEVER, SHALL NOT BE PERMITTED TO HAVE MATERIALS AND DELIVERIES DELIVERED OR TAKEN AWAY DURING
REGULAR SHIFT HOURS, AND MUST COORDINATE SUCH ACTIVITIES WITH VA COR.
THE TIMEFRAMES IDENTIFIED ABOVE ARE IN REFERENCE TO NORMAL CONSTRUCTION ACTIVITIES AND, UNLESS
APPROVED BY VA COR, SHALL NOT APPLY TO WORK INCLUDING BUT NOT LIMITED TO:
• UTILITY SHUTDOWNS
• EXISTING MEP SYSTEM SHUTDOWNS
• WORK IN PUBLIC CORRIDORS/WAITING AREAS
• CUTTING OF FLOOR OPENINGS IN THE EXISTING BUILDING
• WORK OUTSIDE OF TEMPORARY CONSTRUCTION PARTITIONED AREAS, INCLUDING ACCESS OF CEILING
PLENUM SPACES IN FLOORS ABOVE OR BELOW CONSTRUCTION AREAS, AND REPLACEMENT OF
EXISTING FINISHES
• CONSTRUCTION OF TEMPORARY CONSTRUCTION BARRIERS
WORK IDENTIFIED ABOVE SHALL OCCUR EITHER IN THE EVENING SHIFT, OR IF REQUIRED BY THE VA, ON WEEKENDS. ALL CONSTRUCTION ACTIVITIES AND SCHEDULES MUST BE REVIEWED AND APPROVED BY VA COR.
REFER TO SPEC DIVISION 01 FOR GENERAL PROJECT REQUIREMENTS
PHASING DURATION & CONSTRUCTION TIMEFRAMES:
THE CONTRACTOR SHALL BE RESPONSIBLE FOR IDENTIFYING THE MEANS AND METHODS FOR ALL EQUIPMENT REMOVAL, DELIVERY, AND INSTALLATION ON SITE. THE LIMITATIONS OF THE EXISTING CONDITIONS IDENTIFIED BELOW ARE INTENDED TO REMAIN AS IS, UNLESS DIRECTED OTHERWISE IN THESE DRAWINGS OR DIRECTION IS
GIVEN BY THE VA CO TO MODIFY SAME.
IT IS THE INTENT THAT THE TRANSFORMERS OF THE SUBSTATIONS BE DELIVERED IN PIECES TO THE ROOM TO ACCOMMODATE THE IDENTIFIED SITE RESTRICTIONS. THE PROJECT TEAM HAS VETTED THIS CONCEPT TO THE BEST OF THEIR ABILITIES AS A PART OF THE PROJECT AND HAS BEEN INFORMED THAT THIS CAN BE
ACCOMPLISHED.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES CAUSED TO EXISTING CONDITIONS AS A RESULT OF DELIVERY, REMOVAL, AND INSTALLATION ACTIVITIES, AND SHALL REPAIR ALL DAMAGES TO THE ORIGINAL
CONDITIONS AT NO ADDITIONAL COST TO THE VA.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL TEMPORARY PROTECTION IN ELEVATORS, CORRIDORS, AND OTHER AREAS AS REQUIRED TO PREVENT DAMAGES.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THAT DELIVERY WEIGHTS (INCLUDING SHIPPING
VEHICLES AND PERSONNEL) DO NOT EXCEED THE CAPACITIES OF EXISTING ELEVATORS.
THE CONTRACTOR SHALL COORDINATE SCHEDULING OF REMOVAL AND DELIVERY ACTIVITIES WITH THE VA COR TO ENSURE THAT THE EXISTING SITE CONDITIONS ARE PREPARED TO RECEIVE ALL EQUIPMENT.
SITE LOGISTICS NOTES:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: NICK CARROZZA
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
E T
G
DE
I
RET
S
HCRA
I
KACZMAR
STANLEY
NO. 4988
T
E R
S
AT
E
I
T C
J.
O
O
FO
H
1468 WEST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
STRUCTURAL ENGINEERING:
THORSON BAKER + ASSOC.
3030 WEST STREETSBORO RD.
RICHFIELD, OH 44286
P. 330.659.6688
ELECTRICAL ENGINEERING:
HEAPY
1400 WEST DOROTHY LN.
DAYTON, OH 45409
P. 937.224.0861
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
MECHANICAL ENGINEERING:
FFE, INC.
110 BOGGS LN, SUITE 170
SPRINGDALE, OH 45246
P. 513.522.0956
HAZ. MATERIALS ASSESSMENT:
STEPHEN J. SEBESTA & ASSOC.
30628 DETROIT RD. #258
WESTLAKE, OH 44145
P. 216.781.0060
C U s e rs
\d a v e \D o c u m e n ts
\V A
S U
B S
T A
T
IO
N A
B
R d a k a p la n .r v t
/2
/2
:3
:1
A
M
FINAL CDs SUBMISSION
AS-X-000
BASEMENT LEVEL SITE LOGISTICS PLAN REPLACE SUBSTATIONS A & B
10701 EAST BLVD. CLEVELAND, OHIO
541-21-105
2.26.21 CJK DAK
SCALE: 1/16" = 1'-0"
BASEMENT LEVEL SITE LOGISTICS PLAN
NORTH
SITE LOGISTIC NOTES
Note # Text
1 EXISTING EXTERIOR GRADE GYPSUM BOARD CEILING @ 9'-6" ABOVE FINISHED GRADE
2 PAIR OF 4'-0" X 8'-4" ALUMINUM STOREFRONT DOORS
3 EXISTING SOFFIT @ 8'-6" ABOVE FINISHED GRADE
4 EXISTING GYP. BD. CLG. @ 7'-11" AFF
5 PAIR 4'-0" X 7'-0" HOLLOW METAL DOORS
6 EXISTING TILE CEILING IN ENTIRE CORRIDOR @ 8'-6" AFF
7 PAIR 3'-10" X 7'-0" HOLLOW METAL DOORS
8 EX. CLG.-MTD. SPLIT SYSTEM UNIT, BOTTOM OF UNIT @ APPROX. 7'-11" AFF
9 EX. GYP. BD. CLG. IN ENTIRE CORRIDOR @ 7'-10 1/2" AFF
10 EXISTING ROUND PIPE CLEARANCE BAR SPANNING ACROSS CORRIDOR, BOTTOM @ 6'-10" AFF. GC SHALL TEMPORARILY REMOVE BAR DURING EQUIPMENT DELIVERY AND REINSTALL SAME UPON COMPLETION. BAR SHALL NOT BE REMOVED UNTIL NECESSARY AND SHALL BE IMMEDIATELY REPLACED ONCE EQUIPMENT IS
DELIVERED. BAR SHALL BE REINSTALLED AT THE END OF EACH SHIFT
11 EX. GYP. BD. CLG. @ 7'-8" AFF
12 AREA OF EXISTING ELECTRICAL AND MECHANICAL EQUIPMENT TO BE REMOVED AND REPLACED, SEE
ENLARGED PLAN THIS SHEET
13 PAIR 3'-10" X 7'-0" DOUBLE EGRESS HOLLOW METAL DOORS
14 EX. TILE CLG. IN ENTIRE CORRIDOR @ 8'-1 1/2" AFF
15 DOUBLE HEIGHT CLG. SPACE AREA - HIGH CLEARANCE
16 EXISTING FREIGHT ELEVATOR: 10,000# CAPACITY. ENTRY DOORS W/CLEAR OPENINGS OF 7'-11" L X 8'-0" H
ON FRONT AND REAR SIDES. ELEVATOR CAB: 8'-0" W X 13'-2" L X 8'-0" H
17 EXISTING INSULATED CONDENSATE LINE RUNNING OVERHEAD, LOW POINT @ 6'-7" AFF. PORTION OF LINE EXTENDING WEST FROM CIRCLE (ELBOW) ANGLES UP TOWARDS ENTRY DOORS AND RUNS ABOVE THE CEILING IN CORRIDOR BF502. EXISTING INSULATION TO BE PARTIALLY MODIFIED TO INCREASE DELIVERY
CLEARANCE - SEE MECH. DWGS.
18 EXISTING INSULATED STEAM LINE RUNNING OVERHEAD, LOW POINT @ 7'-6" AFF. PORTION OF LINE EXTENDING WEST FROM CIRCLE (ELBOW) ANGLES UP TOWARDS ENTRY DOORS AND RUNS ABOVE THE CEILING IN CORRIDOR BF502. STEAM LINE SHALL REMAIN AND MUST NOT BE DAMAGED. PROTECT AS
REQ'D. THROUGHOUT CONSTRUCTION
19 EXISTING OVERHEAD DUCTWORK FROM AHU-2 TO BE REMOVED PRIOR TO REMOVAL AND REPLACEMENT OF NEW ELECTRICAL EQUIPMENT. SEE HVAC DRAWINGS FOR TEMPORARY COOLING & PHASING OF DUCT
REMOVAL REQUIREMENTS
20 EXISTING STRUCTURAL HEADER ABOVE @ 8'-10 1/2" AFF. HEADER SHALL REMAIN. DOOR FRAME BELOW TO
BE REMOVED/REPLACED, AND OPENING HEIGHT INCREASED TO 8'-2". SEE IMPROVEMENT PLAN
21 EXISTING STRUCTURAL BEAM ABOVE @ 11'-1" AFF. BEAM SHALL REMAIN. DOOR FRAME BELOW TO BE
REMOVED/REPLACED, AND OPENING HEIGHT INCREASED TO 8'-2". SEE IMPROVEMENT PLAN
22 EXISTING PADDED CONTAINMENT CURB AROUND DOORWAY TO REMAIN. PROTECT AS REQ'D.
THROUGHOUT CONSTRUCTION
23 PAIR 4'-0" X 7'-0" DOORS. DOORS TO BE REMOVED AND REPLACED/INCREASED IN HEIGHT AS A PART OF
SCOPE OF WORK
24 EX. 4'-0" X 7'-0" HOLLOW METAL DOOR
25 EX. TILE CLG. IN ENTIRE CORRIDOR @ 7'-7" AFF
26 EX. TILE CLG. IN ENTIRE CLEAN LINEN ROOM @ 7'-8 1/2" AFF
SCALE: 3/16" = 1'-0"AS-X-000
A ENLARGED TRANSFORMER ROOM ENTRY PLAN
NORTH
Revisions: Date:
DESIGN DEVELOPMENT 7.24.20
35% CDs SUBMISSION 9.1.20
65% CDs SUBMISSION 10.8.20
90% CDs SUBMISSION 11.24.20
P/B
P /B
P /B
P /B
P /B
P /B
P/B
P /B
P /B
UP
UP
UP
UP
UP
UP
UP
UP
UP UPUP
GENERAL NOTES:
CONSIDER ALL AREAS OWNER-OCCUPIED UNLESS NOTED OTHERWISE.
ALL WALLS ARE DRAWN AND DIMENSIONED TO A 5" NOMINAL WIDTH TYPICAL UNLESS OTHERWISE NOTED.
ALL DIMENSIONS ARE CLEAR DIMENSIONS FROM FACE OF GYPSUM BOARD TO FACE OF GYPSUM BOARD.
ALL SUB-CONTRACTORS (I.E. FIRE PROTECTION, HVAC, FIRE ALARM, ELECTRICAL, ETC.) TO INSTALL SYSTEM PER OWNER REQUIREMENTS AND IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF ALL APPLICABLE
CODES.
PATCH AND REPAIR ALL EXISTING AREAS TO REMAIN AS REQUIRED TO MATCH EXISTING CONDITIONS.
WHERE NEW UTILITIES ARE TO BE INSTALLED IN EXISTING PARTITIONS, ALL SUB-CONTRACTORS SHALL REMOVE EXISTING DRYWALL AS REQUIRED FOR INSTALLATION OF SAME AND PATCH AND REPAIR WITH NEW
TO MATCH EXISTING CONDITIONS UPON COMPLETION OF UTILITY INSTALLATION.
ALL DAMAGE TO EXISTING AREAS OCCURING AS A RESULT OF CONSTRUCTION SHALL BE REPAIRED AS REQUIRED BY THE CONTRACTOR. CONTRACTOR SHALL PROTECT ALL EXISTING WALL, CEILING, AND FLOOR FINISHES IN EACH AREA. ANY SURFACES DAMAGED BY CONTRACTOR SHALL BE REPLACED BY THE
CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
ALL NEW PENETRATIONS IN FIRE-RATED ASSEMBLIES TO MAINTAIN FIRE RATING OF ASSEMBLY AS
REQUIRED.
NEW AND EXISTING FURNITURE SHOWN FOR REFERENCE ONLY. THE OWNER SHALL REMOVE, PRIOR TO CONSTRUCTION, ALL ITEMS THAT THE OWNER DESIRES TO SALVAGE. ALL REMAINING ITEMS INDICATED TO BE DEMOLISHED SHALL BE REMOVED BY THE CONTRACTOR AND LEGALLY DISPOSED OF IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. ALL ITEMS TO REMAIN IN SPACE SHALL BE PROTECTED THROUGHOUT BY THE CONTRACTOR THROUGHOUT CONSTRUCTION. NEW FURNITURE TO BE FURNISHED AND INSTALLED
BY THE OWNER UNLESS NOTED OTHERWISE.
CONTRACTOR SHALL PROVIDE DUST-REMOVAL WALK-OFF MATS (TACKY MAT) AT ALL CONSTRUCTION ENTRY
POINTS.
CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN NEGATIVE PRESSURE IN WORK AREAS ENSURING NO DUST OR FUMES WILL BE TRANSFERRED TO OCCUPIED AREAS.
PROVIDE VISUAL PRESSURE MONITORING DEVICE AT DUST-PROOF BARRICADE TO CONFIRM PRESSURE.
DUST MONITORING SHALL BE BY OWNER. SEE SPECIFICATION 01 00 00 "GENERAL REQUIREMENTS"
ATTACHMENT AND 01 35 26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS.
ALL DEMOLITION WORK BEING DONE OUTSIDE TEMPORARY PARTITIONS IS TO BE APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS. WORK SHALL BE DONE TO MINIMIZE DISRUPTION TO VISITORS, PATIENTS, AND STAFF. COORDINATE LOCATION OF BARRIERS WITH OWNER.
THE HOSPITAL'S SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION WITHIN THE
PROJECT AREA DURING THE ENTIRE CONSTRUCTION PHASE.
FIELD VERIFY LOCATION OF ALL EXISTING CONDITIONS. NOTIFY COR OF ANY DISCREPANCIES.
WHERE NEW DOORS ARE INDICATED IN EXISTING WALL ASSEMBLIES, CUT OPENINGS IN EXISTING WALL.
REFER TO DOOR SCHEDULE FOR DIMENSIONS. PREPARE OPENINGS FOR NEW DOOR, INCLUSIVE OF THE ADDITION OF JAMB AND HEAD STUD REINFORCEMENT (I.E. DOUBLE STUDS, HEADERS) AND PATCH ADJACENT
WALLS TO MATCH EXISTING.
ALL FLOOR, WALL, CEILING, AND MISC. FIRE-RESISTIVE ASSEMBLIES AND CONSTRUCTION SHALL BE OF THE FIRE RATING CALLED FOR ON THE DRAWINGS AND/OR AS REQUIRED BY CODE. ALL EXISTING FIRE-RESISTIVE ASSEMBLIES SHALL BE MAINTAINED AND THE RATING NOT COMPROMISED. FIRE RATED ASSEMBLIES AND CONSTRUCTION INCLUDING ALL FIRESTOPPING, FIRE RATED DOORS, AND MISC. FIRE RESISTIVE REQUIREMENTS SHALL BE LEFT UNCONCEALED AS REQUIRED FOR INSPECTION BY THE BUILDING OFFICIAL.
DEBRIS REMOVAL SHALL NOT INTERFERE WITH OWNER'S OPERATIONS AND SHALL OCCUR DURING OFF HOURS AS DETERMINED BY THE COR. SEE ALSO SPECIFICATION SECTION 01 35 26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS REGARDING THE HAULING OF DEBRIS FROM THE PROJECT AREA.
ALL NOISE-GENERATING OPERATIONS SHALL BE SCHEDULED SO AS NOT TO IMPEDE OWNER'S OPERATIONS AS DETERMINED BY THE COR. ALL WORK IN PUBLIC CORRIDORS SHALL BE PERFORMED OFF-HOURS UNLESS
OTHERWISE APPROVED BY THE COR.
EXISTING FLOOR SLABS ARE 2 HR FIRE RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE COMPROMISED, AND GC SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL PATCH CONCRETE SLAB FULLY WITH NEW CONCRETE TO MATCH EXISTING OR APPROVED 2 HR RATED INFILL FIRESTOP ASSEMBLY WHEN APPROVED
BY THE COR.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
SYMBOL LEGEND:
INDICATES EXISTING DOOR
INDICATES NEW DOOR
EXISTING WALLS TO REMAIN
NEW WALLS
WALLS TO BE REMOVED FULL HEIGHT U.N.O.
DASHED LINES INDICATE ITEMS TO BE
DEMOLISHED
HATCHED AREA OUTSIDE OF PROJECT SCOPE.
ACCESS INTO CEILING SPACES MAY OCCUR, REFER
TO MEP DWGS.
GENERAL NOTE CONSTRUCTION PARTITION NOTE: WHERE TEMP. CONST. PARTITIONS
CONFLICT W/EX. LIGHTS/DIFFUSER/MEP ITEM LOCATIONS (INDICATED ON CEILING DEMOLITION
PLANS), GC SHALL COORD. W/COR TO EITHER TEMPORARILY REMOVE SUCH ITEMS, OR ADJUST
LOCATION OF CONST. PARTITION ACCORDINGLY TO ALLOW ITEMS TO REMAIN IN PLACE
PLASTIC CORRUGATED SHEETING/METAL STUD TEMPORARY PARTITION WALL W/3'-0" X 7'-0" SCWD
DOOR FOR CONTRACTOR ACCESS ONLY. ALSO REQUIRED AT ALL ABOVE-CEILING
MECHANICAL/ELECTRICAL WORK LASTING LONGER THAN 8 HOURS OUTSIDE OF ENCLOSED
CONSTRUCTION AREAS - REFER TO MEP DRAWINGS FOR AFFECTED AREAS. SUCH WORK MUST BE
ISOLATED FROM THE SURROUNDING ENVIRONMENT. WALL AND DOOR TO BE REMOVED UPON
COMPLETION OF WORK U.N.O. PATCH/REPAIR EXISTING CONDITIONS AS REQUIRED UPON REMOVAL
OF ALL TEMPORARY CONSTRUCTION. REFER TO TYPICAL TEMPORARY PARTITION DETAIL.
SCHEDULE NOTE: CONSTRUCTION OF TEMPORARY BARRIERS SHALL BE PERFORMED AFTER
NORMAL BUSINESS HOURS UNLESS OTHERWISE APPROVED BY THE COR. GC SHALL COORDINATE
ALL ABOVE-CEILING WORK AND TEMPORARY BARRIER CONSTRUCTION WITH VA
6 7 8 9 12
14a 15b 16b
17c 18d 19
Q
R
T
V
W
Y
Z
AA
BB
S
U
15 16 17 18
V1
Z1
Y1
X
W1
AA2
V2
Micro Office
D08A
Pipe Plumb.
Supervisor
B-E392A
Stair 3
D09 Prog. Clerk
B-E380
Elect.
CD02A
Lab 5
B-D360
Lab 5B
B-D358
Lab 6
B-D356
Lab 7
B-D354
Conference
B-D352
Corridor
CE02
Uniform Pick-up/Drop-Off
B-D410
Toilets
B-E423
Female Lockers
B-E425
Electrical Shop Supervisor
B-E440A
Corridor
CD02
Corridor
CD04
HVAC Shop Supervisor
B-E430A
HVAC Shop
D26
Electrical Shop
D25G
Carpenter Shop
D25B
Machine Shop
D25
Alarm System Control
BE440C
Super. Office
BE460
Elect.
D25C
Plumbing Shop
D25A
Corridor
D25F
Conference Room
D25E
Lock Smith
D25D
Transformer Room
D21
Telecomm
D20A
Mechanical Room
D20
Corridor
BD420
Mech.
Equipment
BD424
Primary Switch Room
BD423
Primary Switch Room
BD422
Elect
BD421
Storage Room
G09B
E.C.
G08A
Paint Shop
G08
Stair 6
E25
Corridor
CG01
Corridor
CE03
Office
D25H Storage
D25J
Office
D26A
Office
D26B
Corridor
BF402
Pipe Tunnel
BE503
Air Handler
BE501
Fuel Tank Room
BD501
Storage
BD502
Corridor
BF502
Elevator Equipment
Room
BF503
Corridor
BF504
Female Toilet
BF401A
Clean Supply
BF405
Office
BF406
Ancillary Testing
BF407
Office
BF408
Mechanical Room
BE502
F E
S C
O P
E O
F W
O R
K B
O U
N D
A R
Y
EMS Break Room
B-D414
Clean Linen
B-D412
EMS Staff
B-D414A
S U
B S
T A
T
IO
N A
S U
B S
T A
T
IO
N B
HEAVY DASHED BOX
INDICATES
SUSPENDED AIR
HANDLER UNIT ABOVE
WIRE MESH
PARTITIONS AROUND
AIR HANDLER
MOBILE SLIDING STAINLESS
STEEL WIRE LINEN RACK
SYSTEM
EXISTING PADDED
CONTAINMENT
CURB AROUND
DOORWAY
EXISTING
BOLLARDS TO
REMAIN
Z33 Z34 Z35
Z37
Z39
Z41
Warehouse Clerks
BF511
HVAC Shop
B-E430
Electrical Shop
B-E440
AS-D-100
B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: NICK CARROZZA
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
E T
G
DE
I
RET
S
HCRA
I
KACZMAR
STANLEY
NO. 4988
T
E R
S
AT
E
I
T C
J.
O
O
FO
H
1468 WEST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
STRUCTURAL ENGINEERING:
THORSON BAKER + ASSOC.
3030 WEST STREETSBORO RD.
RICHFIELD, OH 44286
P. 330.659.6688
ELECTRICAL ENGINEERING:
HEAPY
1400 WEST DOROTHY LN.
DAYTON, OH 45409
P. 937.224.0861
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
MECHANICAL ENGINEERING:
FFE, INC.
110 BOGGS LN, SUITE 170
SPRINGDALE, OH 45246
P. 513.522.0956
HAZ. MATERIALS ASSESSMENT:
STEPHEN J. SEBESTA & ASSOC.
30628 DETROIT RD. #258
WESTLAKE, OH 44145
P. 216.781.0060
C U s e rs
\d a v e \D o c u m e n ts
\V A
S U
B S
T A
T
IO
N A
B
R d a k a p la n .r v t
/2
/2
:2
:2
P
M
FINAL CDs SUBMISSION
AS-X-100
BASEMENT LEVEL EXISTING CONDITIONS
PLAN
REPLACE SUBSTATIONS A & B
10701 EAST BLVD. CLEVELAND, OHIO
541-21-105
2.26.21 CJK DAK
SCALE: 1/8" = 1'-0"
BASEMENT LEVEL EXISTING CONDITIONS PLAN
NORTH
Revisions: Date:
DESIGN DEVELOPMENT 7.24.20
35% CDs SUBMISSION 9.1.20
65% CDs SUBMISSION 10.8.20
90% CDs SUBMISSION 11.24.20
P/B
P /B
P /B
P /B
P /B
P /B
P/B
P /B
P /B
UP
UP
UP
UP
UP
UP
UP UPUP
S
S
S
GENERAL NOTES:
CONSIDER ALL AREAS OWNER-OCCUPIED UNLESS NOTED OTHERWISE.
ALL WALLS ARE DRAWN AND DIMENSIONED TO A 5" NOMINAL WIDTH TYPICAL UNLESS OTHERWISE NOTED.
ALL DIMENSIONS ARE CLEAR DIMENSIONS FROM FACE OF GYPSUM BOARD TO FACE OF GYPSUM BOARD.
ALL SUB-CONTRACTORS (I.E. FIRE PROTECTION, HVAC, FIRE ALARM, ELECTRICAL, ETC.) TO INSTALL SYSTEM PER OWNER REQUIREMENTS AND IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF ALL APPLICABLE
CODES.
PATCH AND REPAIR ALL EXISTING AREAS TO REMAIN AS REQUIRED TO MATCH EXISTING CONDITIONS.
WHERE NEW UTILITIES ARE TO BE INSTALLED IN EXISTING PARTITIONS, ALL SUB-CONTRACTORS SHALL REMOVE EXISTING DRYWALL AS REQUIRED FOR INSTALLATION OF SAME AND PATCH AND REPAIR WITH NEW
TO MATCH EXISTING CONDITIONS UPON COMPLETION OF UTILITY INSTALLATION.
ALL DAMAGE TO EXISTING AREAS OCCURING AS A RESULT OF CONSTRUCTION SHALL BE REPAIRED AS REQUIRED BY THE CONTRACTOR. CONTRACTOR SHALL PROTECT ALL EXISTING WALL, CEILING, AND FLOOR FINISHES IN EACH AREA. ANY SURFACES DAMAGED BY CONTRACTOR SHALL BE REPLACED BY THE
CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
ALL NEW PENETRATIONS IN FIRE-RATED ASSEMBLIES TO MAINTAIN FIRE RATING OF ASSEMBLY AS
REQUIRED.
NEW AND EXISTING FURNITURE SHOWN FOR REFERENCE ONLY. THE OWNER SHALL REMOVE, PRIOR TO CONSTRUCTION, ALL ITEMS THAT THE OWNER DESIRES TO SALVAGE. ALL REMAINING ITEMS INDICATED TO BE DEMOLISHED SHALL BE REMOVED BY THE CONTRACTOR AND LEGALLY DISPOSED OF IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. ALL ITEMS TO REMAIN IN SPACE SHALL BE PROTECTED THROUGHOUT BY THE CONTRACTOR THROUGHOUT CONSTRUCTION. NEW FURNITURE TO BE FURNISHED AND INSTALLED
BY THE OWNER UNLESS NOTED OTHERWISE.
CONTRACTOR SHALL PROVIDE DUST-REMOVAL WALK-OFF MATS (TACKY MAT) AT ALL CONSTRUCTION ENTRY
POINTS.
CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN NEGATIVE PRESSURE IN WORK AREAS ENSURING NO DUST OR FUMES WILL BE TRANSFERRED TO OCCUPIED AREAS.
PROVIDE VISUAL PRESSURE MONITORING DEVICE AT DUST-PROOF BARRICADE TO CONFIRM PRESSURE.
DUST MONITORING SHALL BE BY OWNER. SEE SPECIFICATION 01 00 00 "GENERAL REQUIREMENTS"
ATTACHMENT AND 01 35 26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS.
ALL DEMOLITION WORK BEING DONE OUTSIDE TEMPORARY PARTITIONS IS TO BE APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS. WORK SHALL BE DONE TO MINIMIZE DISRUPTION TO VISITORS, PATIENTS, AND STAFF. COORDINATE LOCATION OF BARRIERS WITH OWNER.
THE HOSPITAL'S SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION WITHIN THE
PROJECT AREA DURING THE ENTIRE CONSTRUCTION PHASE.
FIELD VERIFY LOCATION OF ALL EXISTING CONDITIONS. NOTIFY COR OF ANY DISCREPANCIES.
WHERE NEW DOORS ARE INDICATED IN EXISTING WALL ASSEMBLIES, CUT OPENINGS IN EXISTING WALL.
REFER TO DOOR SCHEDULE FOR DIMENSIONS. PREPARE OPENINGS FOR NEW DOOR, INCLUSIVE OF THE ADDITION OF JAMB AND HEAD STUD REINFORCEMENT (I.E. DOUBLE STUDS, HEADERS) AND PATCH ADJACENT
WALLS TO MATCH EXISTING.
ALL FLOOR, WALL, CEILING, AND MISC. FIRE-RESISTIVE ASSEMBLIES AND CONSTRUCTION SHALL BE OF THE FIRE RATING CALLED FOR ON THE DRAWINGS AND/OR AS REQUIRED BY CODE. ALL EXISTING FIRE-RESISTIVE ASSEMBLIES SHALL BE MAINTAINED AND THE RATING NOT COMPROMISED. FIRE RATED ASSEMBLIES AND CONSTRUCTION INCLUDING ALL FIRESTOPPING, FIRE RATED DOORS, AND MISC. FIRE RESISTIVE REQUIREMENTS SHALL BE LEFT UNCONCEALED AS REQUIRED FOR INSPECTION BY THE BUILDING OFFICIAL.
DEBRIS REMOVAL SHALL NOT INTERFERE WITH OWNER'S OPERATIONS AND SHALL OCCUR DURING OFF HOURS AS DETERMINED BY THE COR. SEE ALSO SPECIFICATION SECTION 01 35 26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS REGARDING THE HAULING OF DEBRIS FROM THE PROJECT AREA.
ALL NOISE-GENERATING OPERATIONS SHALL BE SCHEDULED SO AS NOT TO IMPEDE OWNER'S OPERATIONS AS DETERMINED BY THE COR. ALL WORK IN PUBLIC CORRIDORS SHALL BE PERFORMED OFF-HOURS UNLESS
OTHERWISE APPROVED BY THE COR.
EXISTING FLOOR SLABS ARE 2 HR FIRE RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE COMPROMISED, AND GC SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL PATCH CONCRETE SLAB FULLY WITH NEW CONCRETE TO MATCH EXISTING OR APPROVED 2 HR RATED INFILL FIRESTOP ASSEMBLY WHEN APPROVED
BY THE COR.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
SYMBOL LEGEND:
INDICATES EXISTING DOOR
INDICATES NEW DOOR
EXISTING WALLS TO REMAIN
NEW WALLS
WALLS TO BE REMOVED FULL HEIGHT U.N.O.
DASHED LINES INDICATE ITEMS TO BE
DEMOLISHED
HATCHED AREA OUTSIDE OF PROJECT SCOPE.
ACCESS INTO CEILING SPACES MAY OCCUR, REFER
TO MEP DWGS.
GENERAL NOTE CONSTRUCTION PARTITION NOTE: WHERE TEMP. CONST. PARTITIONS
CONFLICT W/EX. LIGHTS/DIFFUSER/MEP ITEM LOCATIONS (INDICATED ON CEILING DEMOLITION
PLANS), GC SHALL COORD. W/COR TO EITHER TEMPORARILY REMOVE SUCH ITEMS, OR ADJUST
LOCATION OF CONST. PARTITION ACCORDINGLY TO ALLOW ITEMS TO REMAIN IN PLACE
PLASTIC CORRUGATED SHEETING/METAL STUD TEMPORARY PARTITION WALL W/3'-0" X 7'-0" SCWD
DOOR FOR CONTRACTOR ACCESS ONLY. ALSO REQUIRED AT ALL ABOVE-CEILING
MECHANICAL/ELECTRICAL WORK LASTING LONGER THAN 8 HOURS OUTSIDE OF ENCLOSED
CONSTRUCTION AREAS - REFER TO MEP DRAWINGS FOR AFFECTED AREAS. SUCH WORK MUST BE
ISOLATED FROM THE SURROUNDING ENVIRONMENT. WALL AND DOOR TO BE REMOVED UPON
COMPLETION OF WORK U.N.O. PATCH/REPAIR EXISTING CONDITIONS AS REQUIRED UPON REMOVAL
OF ALL TEMPORARY CONSTRUCTION. REFER TO TYPICAL TEMPORARY PARTITION DETAIL.
SCHEDULE NOTE: CONSTRUCTION OF TEMPORARY BARRIERS SHALL BE PERFORMED AFTER
NORMAL BUSINESS HOURS UNLESS OTHERWISE APPROVED BY THE COR. GC SHALL COORDINATE
ALL ABOVE-CEILING WORK AND TEMPORARY BARRIER CONSTRUCTION WITH VA
6 7 8 9 12
14a 15b 16b
Q
R
T
V
W
Y
Z
S
U
15 16 1710
Z1
Y1
X
Pipe Tunnel
BE503
Air Handler
BE501
Storage
BD502
Corridor
BF502
Elevator Equipment
Room
BF503
Corridor
BF504
Female Toilet
BF401A
Clean Supply
BF405
Office
BF406
Ancillary Testing
BF407
Office
BF408
Mechanical Room
BE502
Pipe Plumb.
Supervisor
B-E392A
Elect.
CD02A
Corridor
CE02
Uniform Pick-up/Drop-Off
B-D410
Toilets
B-E423
Female Lockers
B-E425
HVAC Shop
B-E430
Male Lockers
B-E424
Electrical Shop Supervisor
B-E440A
Electrical Shop
B-E440
Corridor
CD02
Corridor
CD04
HVAC Shop Supervisor
B-E430A
Carpenter Shop
D25B
Machine Shop
D25
Alarm System Control
B-E440B
Alarm System Control
B-E440B
Elect.
D25C
Plumbing Shop
D25A
Corridor
D25F
Conference Room
D25E
Lock Smith
D25D
Transformer Room
D21
Storage
D20A
Mechanical Room
D20
Mechanical & Electrical Room
G09A
Corridor
BD420
Mech.
Equipment
BD424
Primary Switch
Room
BD423
Storage Room
G09
Office
D25H Storage
D25J
Office
D26A
Office
D26B
PHASING NOTE: EXISTING SUSPENDED AIR
HANDLER TO BE MODIFIED IN PHASE I
SCOPE OF WORK - REFER TO MECH.
DWGS. FOR PHASING/SEQUENCING
REQUIREMENTS
REFER TO ELEC. DWGS.
FOR DEMO SCOPE OF
WORK & PHASING FOR
ELEC. EQUIP. REMOVAL
8'
EXISTING ROUGH OPENING
TO BE INCREASED IN
HEIGHT TO PERMIT
INSTALLATION OF NEW,
TALLER DOORS/FRAME. GC
SHALL DEMO EX. MASONRY
HEADER AND RAISE SAME
TO 8'-2" AFF. INSTALL
LINTELS ACROSS OPENING
8'-4".
EXISTING ROUGH OPENING IS
INFILLED WITH A DOOR/TRANSOM
FRAME ASSEMBLY AND DUCTWORK,
DAMPER, AND CONDUIT. REFER TO
PLAN\INTERIOR ELEVATIONS A & B/AS-
D-100, A/AS-100, AND MECH. DWGS.
FOR TEMPORARY AND PERMANENT
INFILL MODIFICATIONS. NEW LINTELS
ACROSS TOP OF EX. ROUGH OPENING
ARE TO BE INCLUDED IN BID, SEE
STRUCT. DWGS.
S U
B S
T A
T
IO
N A
S U
B S
T A
T
IO
N B
EMS Break Room
B-D414
Clean Linen
B-D412
EMS Staff
B-D414A
16' - 3"
ALIGN
5'
CONTRACTOR
ENTRY
STAFF ACCESS TO LINEN ROOM
SHALL BE AT EXISTING SOUTH
DOOR
13' - 5"
ANTEROOM
NOTE: ALL CONSTRUCTION
WORKERS SHALL BE
REQUIRED TO VACUUM/CLEAN
ALL DUST AND DEBRIS FROM
CLOTHING/WORK CARTS IN
ANTEROOM
CONSTRUCTION WORKERS SHALL
NOT HAVE ACCESS TO EXISTING
CLEAN LINEN ROOM AREAS
OUTSIDE OF CONSTRUCTION
BARRIER WITHOUT APPROVAL
FROM VA COR
5' - 0"
EX. POURED EPOXY CORRIDOR
FLOORING EAST OF CMU WALL
TO REMAIN, PROTECT AS REQ'D.
PHASING NOTE:
REMOVAL AND
REPLACEMENT OF
SUBSTATION B SHALL
OCCUR DURING PHASE
II SCOPE OF WORK - SEE
ELEC. DWGS.
PHASING NOTE:
REMOVAL AND
REPLACEMENT OF
SUBSTATION A SHALL
OCCUR DURING PHASE
III SCOPE OF WORK -
SEE ELEC. DWGS.
CLR.
5' - 0"
CONTRACTOR
ENTRY
NOTE: GC SHALL INSTALL TEMP.
BARRIER/DOOR ACROSS OPENING
LEADING TO EXISTING MECHANICAL
ROOM. VA ONLY SHALL HAVE ACCESS
THROUGH THIS DOOR UNLESS APPROVED
BY THE COR. ENSURE THAT DOOR HAS
LOCK AND CYLINDER, FURNISH KEYS TO
THE VA
TEMP. CONST.
BARRIER ONLY REQ'D.
DURING DEMOLITION
OF EX. DOOR FRAME
VIF
EXISTING FLOOR IS
POURED EPOXY AND IS
INTENDED TO REMAIN.
PROTECT SAME AS REQ'D.
EX. WALL BASE ON
NORTH WALL SHALL
REMAIN
EXISTING WALL
BASE ON EAST
WALL SHALL BE
REMOVED
EX. CHAIN-HUNG LIGHT
FIXTURE TO BE
TEMPORARILY REMOVED.
REINSTALL UPON CONST.
COMPLETION
Z33 Z34 Z35
Z37
Z39
Z41
AS-D-100
A
AS-D-100
B
GC SHALL PROVIDE TEMPORARY
PROTECTION OF ALL EXISTING
RACKS, CARTS, ETC. IN LINEN
ROOM DURING ABOVE-CEILING
WORK, TYP.
4'-1" +/-
REMOVE EXISTING MESH PANEL
FROM EAST SIDE OF AIR HANDLER
TO EX. NORTHEAST ENCLOSURE
FRAMING MEMBER (WHICH SHALL
REMAIN)
Uniform Pick-up/Drop-Off
B-D410
Clean Linen
B-D412
EMS Break Room
B-D414
Toilets
B-E423
Female Lockers
B-E425
Mech.
Equipment
BD424
SEE HVAC DWGS. FOR
DEMO OF DIFFUSERS,
VAVs, AND ASSOCIATED
DUCTWORK. GC SHALL
PROVIDE TEMPORARY
PROTECTION OVER
EXISTING CLEAN LINEN
ITEMS (RACKS, CARTS,
DESK) IN SPACE TO
PROTECT SAME FROM
DUST AND DEBRIS.
PROVIDE A NEW, FULL
CEILING TILE @ REMOVED
DIFFUSER LOCATION
NOTE: GC SHALL TEMPORARILY REMOVE ALL EXISTING
LIGHTS, SPEAKER, DIFFUSER, AND CEILING TILES/GRID TO
ACCOMMODATE TEMPORARY PARTITION CONSTRUCTION.
REINSTALL ALL ITEMS UPON COMPLETION OF
CONSTRUCTION. LIGHTING AND SPEAKER SHALL BE
TEMPORARILY DISCONNECTED BY THE EC, AND EC SHALL
COORDINATE WITH THE GC ACCORDINGLY
CEILING DEMOLITION SYMBOL LEGEND:
EXISTING CEILING
TILE AREAS TO
REMAIN
EXISTING TILE
AREAS TO BE
DEMOLISHED
GYPSUM BOARD
CEILING/SOFFIT -
PAINTED FINISH
2 X 4 LIGHT
FIXTURE
2 X 2 LIGHT FIXTURE
RECESSED CAN
LIGHT FIXTURE
RETURN AIR
DIFFUSERSSUPPLY AIR DIFFUSERS
SECURITY CAMERA S RECESSED SPEAKER
W WIRELESS ACCESS POINT SD SMOKE DETECTOR
AREAS IDENTIFIED TO BE DEMOLISHED ARE LIMITED TO THOSE SHOWN TO ACCOMMODATE NEW
CONSTRUCTION - REFER TO REFLECTED CEILING PLANS FOR ALL IMPROVEMENTS. ADDITIONAL TILE MAY NEED TO BE REMOVED TO ACCOMMODATE CONSTRUCTION OF TEMPORARY CONSTRUCTION PARTITIONS.
VERIFY FULL REMOVAL SCOPE IN FIELD
TEMP.
COOLING
UNIT
7'-0" TALL +/-
4'-1" +/-
REMOVE EAST LEAF OF…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .