Replace Substation AB Drawings.pdf

PDF 35 MB Posted

Attached to
Y1DA--Replace Substation A&B Federal contract opportunity
Solicitation number
36C25021B0045
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This document is a presolicitation notice for replacing substations A and B at the Cleveland VA Medical Center. The Department of Veterans Affairs Network Contracting Office 10 is seeking proposals from service-disabled veteran owned small businesses to completely prepare the site for building operations including demolition and removal of existing structures, and furnish labor and materials to perform the work according to drawings and specifications. The work must be completed within 630 calendar days of receiving a notice to proceed. The solicitation documents will be posted on May 24, 2021 at SAM.gov and proposals will be due approximately 30 days later. This is a 100% set-aside for SDVOSBs who must be registered and verified on various websites. The minimum SDVOSB participation is 15% of the construction work. Bid, payment, and performance bonds will be required. A site visit will be scheduled and any amendments will be posted to SAM.gov.

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Louis Stokes Cleveland

VA Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

E T

G

DE

I

RET

S

HCRA

I

KACZMAR

STANLEY

NO. 4988

T

E R

S

AT

E

I

T C

J.

O

O

FO

H

1468 WEST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

STRUCTURAL ENGINEERING:

THORSON BAKER + ASSOC.

3030 WEST STREETSBORO RD.

RICHFIELD, OH 44286

P. 330.659.6688

ELECTRICAL ENGINEERING:

HEAPY

1400 WEST DOROTHY LN.

DAYTON, OH 45409

P. 937.224.0861

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

MECHANICAL ENGINEERING:

FFE, INC.

110 BOGGS LN, SUITE 170

SPRINGDALE, OH 45246

P. 513.522.0956

HAZ. MATERIALS ASSESSMENT:

STEPHEN J. SEBESTA & ASSOC.

30628 DETROIT RD. #258

WESTLAKE, OH 44145

P. 216.781.0060

C U s e rs

\d a v e \D o c u m e n ts

\V A

S U

B S

T A

T

IO

N A

B

R d a k a p la n .r v t

/2

/2

:4

:4

A

M

FINAL CDs SUBMISSION

GI-1

TITLE SHEET & DRAWING INDEX REPLACE SUBSTATIONS A & B

10701 EAST BLVD. CLEVELAND, OHIO

541-21-105

2.26.21 CJK DAK

DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER - WADE PARK

REPLACE SUBSTATIONS A & B

10701 EAST BLVD. CLEVELAND, OH 44106

PROJECT NO. 541-21-105

Cleveland Veterans Affairs Medical Center

SCOPE OF WORK

AREA

BASEMENT LEVEL

CODE INFORMATION:

I. PROJECT LOCATION: CLEVELAND VETERANS AFFAIRS MEDICAL CENTER

10701 EAST BLVD.

CLEVELAND, OHIO

II. DESCRIPTION & USER GROUP CLASSIFICATION OF BUILDING

A. NATURE OF PROJECT: REPLACEMENT OF EXISTING SUBSTATIONS A & B AND ASSOCIATED ELECTRICAL/MECHANICAL EQUIPMENT

B. DESIGN CODES: 2018 NFPA LIFE SAFETY CODE 101, IBC 2018

2020 PHYSICAL SECURITY AND RESILIENCY DESIGN MANUAL

C. USE GROUP: I-2 HEALTH CARE - NO CHANGE PROPOSED

D. CONSTRUCTION TYPE: TYPE I-332, IB - NON-COMBUSTIBLE, PROTECTED

FIRE RATED CONSTRUCTION (LSC A.8.2.1.1)

EXTERIOR BEARING WALLS 3 HRS

INTERIOR BEARING WALLS 3 HRS

STRUCTURAL COLUMNS 3 HRS (SUPPORTING > 1 FLOOR)

2 HRS (SUPPORTING 1 FLOOR ONLY)

2 HRS (SUPPORTING ROOF ONLY)

BEAMS, GIRDERS, TRUSSES 3 HRS (SUPPORTING > 1 FLOOR, COLS., OR BEARING WALLS)

FLOOR-CEILING ASSEMBLIES 2 HRS

ROOF-CEILING ASSEMBLIES 1-1/2 HRS

INTERIOR NON-BEARING WALLS 0 HRS

EXTERIOR NON-BEARING WALLS 0 HRS

WALL ASSEMBLIES

EXIT ACCESS CORRIDOR WALLS 0 HR SMOKE PARTITIONS

E. PROJECT AREA: BASEMENT LEVEL: 2,383 SF

F. PROJECT AREA OCCUPANT LOAD: 8

G. FIRE PROTECTION: EXISTING BUILDING FULLY SPRINKLED. MODIFICATIONS AS REQUIRED PER NEW IMPROVEMENTS PROPOSED

DRAWING INDEX:

FINAL CD's SUBMISSION

2.26.21

GI-1 TITLE SHEET & DRAWING INDEX

ARCHITECTURAL

LS-100 BASEMENT LEVEL LIFE SAFETY PLAN - PHASE I

AS-X-000 BASEMENT LEVEL SITE LOGISTICS PLAN

AS-X-100 BASEMENT LEVEL EXISTING CONDITIONS PLAN

AS-D-100 BASEMENT LEVEL DEMOLITION PLANS - PHASE I

AS-100 BASEMENT LEVEL IMPROVEMENT AND CEILING PLANS -

PHASE I

AS-600 DOOR AND FINISH SCHEDULES, WALL TYPES, & DETAILS

MECHANICAL/HVAC

M-001 MECHANICAL LEGEND

MD-101 MECHANICAL BASEMENT DEMOLITION PLAN - PHASE I

MH-101 MECHANICAL BASEMENT NEW WORK PLAN - PHASE I

MH-501 MECHANICAL DETAILS

MH-601 MECHANICAL SCHEDULES

MH-602 MECHANICAL CONTROLS

STRUCTURAL

SS-100 SUBSTATION A & B STRUCTURAL SUPPORT PLAN

FIRE PROTECTION

FX-100 FIRE PROTECTION BASEMENT NEW WORK PLAN

EP-100 ELECTRICAL BASEMENT EQUIPMENT ROUTING PLAN

EP-401 ENLARGED BASEMENT POWER AND SYSTEMS PLAN

EP-402 ENLARGED SUB-BASEMENT ELECTRICAL PLAN

EP-501 ELECTRICAL DETAILS

EP-502 EXISTING ELECTRICAL ROOM D21 IMAGES

EP-503 EXISTING SUB-BASEMENT IMAGES

EP-600 MEDIUM VOLTAGE NEW WORK RISER DIAGRAM

EP-601A SUBSTATION A POWER LOW-VOLTAGE NEW WORK RISER DIAGRAM

EP-601B SUBSTATION A LIGHTING LOW-VOLTAGE NEW WORK RISER DIAGRAM

EP-602A SUBSTATION B POWER LOW-VOLTAGE NEW WORK RISER DIAGRAM

EP-602B SUBSTATION B LIGHTING LOW-VOLTAGE NEW WORK RISER DIAGRAM

EP-603 EMERGENCY POWER SYSTEM NEW WORK RISER DIAGRAM

EP-700 DISTRIBUTION SCHEDULES AND ELEVATIONS

ER-10B ELECTRICAL SUB-BASEMENT PLAN

ER-100A BASEMENT LEVEL ELECTRICAL FLOOR PLAN

ER-100B ENLARGED BASEMENT LEVEL ELECTRICAL ROOM PLANS

ER-101A FIRST FLOOR ELECTRICAL ROOM PLANS

ER-101B ENLARGED FIRST FLOOR ELECTRICAL ROOM PLANS

ER-102 SECOND FLOOR ELECTRICAL ROOM PLANS

ER-103 THIRD FLOOR ELECTRICAL ROOM PLANS

ER-104 FOURTH FLOOR ELECTRICAL ROOM PLANS

ER-105 FIFTH FLOOR ELECTRICAL ROOM PLANS

ER-106 SIXTH FLOOR ELECTRICAL ROOM PLANS

ER-107 PENTHOUSE ELECTRICAL ROOM PLANS

NORTH

ELECTRICAL

E-001 ELECTRICAL SCHEDULES AND INDEX OF DRAWINGS

E-002 ELECTRICAL CONSTRUCTION PHASING

ED-401 ENLARGED BASEMENT DEMOLITION PLAN

ED-600 MEDIUM VOLTAGE DEMOLITION RISER DIAGRAM

ED-601A SUBSTATION A POWER LOW-VOLTAGE DEMOLITION RISER DIAGRAM

ED-601B SUBSTATION A LIGHTING LOW-VOLTAGE DEMOLITION RISER DIAGRAM

ED-602A SUBSTATION B POWER LOW-VOLTAGE DEMOLITION RISER DIAGRAM

ED-602B SUBSTATION B LIGHTING LOW-VOLTAGE DEMOLITION RISER DIAGRAM

ED-603 EMERGENCY POWER SYSTEM DEMOLITION RISER DIAGRAM

HAZARDOUS MATERIALS ABATEMENT

HA-001 STANDARD ASBESTOS ABATEMENT DETAILS

HA-101 BASEMENT LEVEL ASBESTOS ABATEMENT PLAN

Revisions: Date:

DESIGN DEVELOPMENT 7.24.20

35% CDs SUBMISSION 9.1.20

65% CDs SUBMISSION 10.8.20

90% CDs SUBMISSION 11.24.20

100% CDs SUBMISSION 2.5.21

FINAL CDs SUBMISSION 2.26.21

UP

UP

UP

UP

UP

DN

UP

UP

UP

UP

UP

UP UPUP

UP

UP

UP

UP

UP

P/B

P /B

P /B

P /B

P /B

P /B

P/B

P /B

P /B

LIFE SAFETY LEGEND:

EXISTING/NEW 2 HOUR RATED FIRE BARRIER

EXISTING/NEW 1 HOUR RATED FIRE BARRIER

EXISTING/NEW 1 HOUR RATED SMOKE BARRIER

EXISTING/NEW O HOUR RATED SMOKE PARTITION

E EXIT

FE

FIRE EXTINGUISHER

EXIT SIGN LOCATION (DIRECTIONAL ARROWS MAY

OCCUR, SEE PLAN)

LIFE SAFETY GENERAL NOTES:

1. SEE COVER SHEET FOR APPLICABLE CODE INFORMATION

2. PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY. CONTRACTOR WILL COMPLETE ALL WORK REGARDLESS IF IT IS LOCATED OUTSIDE OF PROJECT SCOPE AREA AS INDICATED ON ANY

DRAWINGS

3. CONTRACTOR TO COVER OR ALTER EXIT SIGNS WHICH, DUE TO CONSTRUCTION, TEMPORARILY DO

NOT DEPICT EXIT PATHS (TYP. OF ALL EXIT SIGNS IN OR BEYOND PROJECT AREA)

4. TRAVEL DISTANCES OVER 200' WILL REQUIRE INTERIM LIFE SAFETY MEASURES. COORDINATE WITH VA.

5. EXISTING FLOOR SLABS ARE 2 HR RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW

PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE

COMPROMISED, AND SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL

PATCH CONC. SLAB FULLY WITH NEW CONCRETE TO MATCH EXISTING.

6. PROVIDE FIRESTOPPING AT ALL PENETRATIONS THROUGH NEW AND EXISTING FIRE/SMOKE RATED BARRIER WALLS AND FLOOR SLABS TO COMPLY WITH THE REQUIRED BARRIER RATINGS. PROVIDE

FIRESTOPPING AROUND TEN (10) PENETRATIONS LESS THAN 6 SQUARE INCHES AND FOUR (4)

PENETRATIONS BETWEEN 16 AND 36 SQUARE INCHES TO COMPLY WITH REQUIRED RATING NOT

ASSOCIATED WITH NEW WORK. LARGER OPENINGS SHALL BE BROUGHT TO THE ATTENTION OF THE COR. GC SHALL SUBMIT UL LISTED METHODS FOR PATCHING ALL FIRE BARRIERS THAT MEET THE MINIMUM FIRE RATING REQUIREMENTS OF THE PENETRATING BARRIER AND ARE IN COMPLIANCE WITH

THE OPENING SIZE AS DICTATED BY THE ASSEMBLY.

7. TEMPORARY FIRE ALARMS IN CONSTRUCTION AREAS: GC SHALL PROVIDE TEMPORARY FIRE ALARMS IN ALL CONSTRUCTION AREAS THROUGHOUT THE CONSTRUCTION DURATION UNTIL SUCH TIME THAT

NEW FIRE ALARM SYSTEM DEVICES ARE INSTALLED, TESTED, AND IN FULL OPERATION. HEAT

DETECTION DEVICES SHALL BE UTILIZED AND SHALL BE CONNECTED TO THE BUILDING FIRE ALARM SYSTEM AND COORDINATED THROUGH THE VA ELECTRICAL SHOP. GC SHALL COORDINATE WITH VA SAFETY DEPARTMENT FOR ALL TEMPORARY FIRE ALARM INSTALLATIONS TO ENSURE COMPLIANCE

WITH SAFETY STANDARDS. TEMPORARY FIRE ALARM DEVICES SHALL BE PROGRAMMED INTO THE

SYSTEM BY CERTIFIED NOTIFIER VENDOR. ANY OLD FA DEVICES THAT ARE REMOVED SHALL BE DE-

PROGRAMMED OUT BY THE SAME CERTIFIED VENDOR. ALL COSTS ASSOCIATED WITH THE

PROGRAMMING/DE-PROGRAMMING OF THE TEMPORARY FIRE ALARM SYSTEM SHALL BE INCLUDED IN

THE CONTRACTOR'S SCOPE/BID.

HAZARDOUS ROOM

EXISTING/NEW 3 HOUR RATED FIRE BARRIER

PLASTIC CORRUGATED SHEETING/METAL STUD TEMPORARY PARTITION WALL W/3'-0" X 7'-0" SCWD

DOOR FOR CONTRACTOR ACCESS ONLY. ALSO SHALL BE REQUIRED AT ALL ABOVE-CEILING

MECHANICAL/ELECTRICAL WORK LASTING LONGER THAN 8 HOURS OUTSIDE OF ENCLOSED

CONSTRUCTION AREAS - REFER TO MEP DRAWINGS FOR AFFECTED AREAS. SUCH WORK MUST BE

ISOLATED FROM THE SURROUNDING ENVIRONMENT. WALL AND DOOR TO BE REMOVED UPON

COMPLETION OF WORK U.N.O. PATCH/REPAIR EXISTING CONDITIONS AS REQUIRED UPON REMOVAL

OF ALL TEMPORARY CONSTRUCTION. REFER TO TYPICAL TEMPORARY PARTITION DETAIL ON

SHEET AS-600. SCHEDULE NOTE: CONSTRUCTION OF TEMPORARY BARRIERS SHALL BE

PERFORMED AFTER NORMAL BUSINESS HOURS UNLESS OTHERWISE APPROVED BY THE COR. GC

SHALL COORDINATE ALL ABOVE-CEILING WORK AND TEMPORARY BARRIER CONSTRUCTION WITH VA

AND STAFF

Toilets

B-E423

HVAC Shop

B-E430

Electrical Shop

B-E440

Corridor

CD04

HVAC Shop

D26

Electrical Shop

D25G

Carpenter Shop

D25B

Machine Shop

D25

Alarm System Control

B-E440B

Alarm System Control

B-E440B

Elect.

D25C

Plumbing Shop

D25A

Corridor

D25F

Conference Room

D25E

Lock Smith

D25D

Transformer Room

D21

Storage

D20A

Mechanical Room

D20Office

D25H

Storage

D25I Storage

D25J

Office

D26A

Office

D26B

Corridor

BF402

Switch Gear Room

BE504

Pipe Tunnel

BE503

Air Handler

BE501

Stair

BE505

Storage

BD502

Exit Passage

BF501

Corridor

BF502

Elevator Equipment

Room

BF503

Corridor

BF504

PALMS

Neutralization

Tanks

BF505

Mail Drop

BF509

Warehouse Clerks

BF511

Warehouse Storage

BF510

Corridor

BF520

Electrical Panels

BF521

Mail Sorting

BF522

IRM Telecomm Room

BF515

Engineering Closet

BF516

Corridor

BF526

EMS

BF527

Corridor

BF525

Lounge Lockers

BF530

Female Tlt

BF531

Male Tlt

BF532

TSS Clerks

BF535

Storekeeper Office

BF536

Medical Gas Storage

BF540

Elevator Equipment

Room

BF541

Stair A

BF550

Storage

BF510B

Hazardous Waste

BF469

Bulk Food

BF459

Animal Ward

BF460

Animal Ward

BF461

Animal Ward

BF462

Necropsy

BF463

Animal Reception

BF466

HVAC

BF467

Electrical

BF468

Security

BF468A

Procedure Lab

BF464B

Procedure Lab

BF464C

Procedure Lab

BF464D

Cooler

BF463A

Corridor

BF370

Corridor

BF372

EM Prep Room

BF440

Fluorescent Microscope

BF441

Microscope Room

BF442

Viewing Room

BF422 Corridor

BF403

Autopsy Office

BF426

Autopsy Room

BF427

Shower

BF428

EMS

BF429

Mortuary Refrigerator

BF430

Corridor

BF404

Lab Slide/ Block Storage

BF420B

Toilet

BF423

Stairway

BF-450

Mechanical Room

BE502

F E

F E

E

E

E

S C

O P

E O

F W

O R

K B

O U

N D

A R

Y

EMS Break Room

B-D414

Clean Linen

B-D412

EMS Staff

B-D414A

Uniform Pick-up/Drop-Off

B-D410

Mech.

Equipment

BD424 Primary Switch Room

BD423

Primary Switch Room

BD422

Elect

BD421 Stair 6

E25

Corridor

BD420

Corridor

CE02

New Elec.

Equip. Room

B-D412A

SPECIAL NOTE: EXISTING EAST

WALL OF NEW ELEC. EQUIP.

ROOM B-D412A IS CURRENTLY

RATED FOR 1 HR ONLY. WALL

WILL BE AUGMENTED TO

INCREASE TO A 2 HR RATING.

SEE IMPROVEMENT PLANS

CONTRACTOR

ENTRIES

63'-6" COMMON

PATH OF

TRAVEL

EXISTING EGRESS PATHS IN MAIN

BASEMENT CORRIDORS SHOWN

DASHED. EGRESS FROM NON-

CONSTRUCTION AREAS TO EXITS

WILL REMAIN UNAFFECTED

DURING CONSTRUCTION

E

CLR.

5' - 0"

NOTE: TEMP. CONST. BARRIER

ONLY REQ'D. DURING

DEMOLITION/REPLACEMENT

OF EX. DOOR FRAME

S U

B S

T A

T

IO

N A

S U

B S

T A

T

IO

N B

PHASING NOTE:

REMOVAL AND

REPLACEMENT OF

SUBSTATION B SHALL

OCCUR DURING

PHASE II SCOPE OF

WORK - SEE ELEC.

DWGS.

PHASING NOTE:

REMOVAL AND

REPLACEMENT OF

SUBSTATION A SHALL

OCCUR DURING PHASE

III SCOPE OF WORK -

SEE ELEC. DWGS.

GENERAL PHASING/LIFE SAFETY NOTE: UNLESS NOTED

OTHERWISE, ALL WORK ON THIS SHEET SHALL OCCUR DURING

PHASE I. TEMPORARY PARTITIONS INDICATED SHALL BE

REQUIRED DURING THIS PHASE.

PHASES II & III INCLUDE REMOVAL/REPLACEMENT OF THE EXISTING

SUBSTATIONS A & B, AND WORK AREA IS LIMITED PRIMARILY TO

TRANSFORMER ROOM D21. EXISTING EGRESS PATHS IN ALL

BASEMENT AREAS SURROUNDING ROOM D21 SHALL NOT BE

AFFECTED NOR OBSTRUCTED. CONTRACTOR SHALL ENSURE THAT

PROTECTIVE MEASURES ARE PROVIDED WITHIN ROOM TO

PROTECT ALL EXISTING EQUIPMENT AS REQUIRED FROM

CONSTRUCTION DUST AND DEBRIS.

F E

F E

FE

FE

FE

FE

NOTE: GC SHALL INSTALL TEMP.

BARRIER/DOOR ACROSS OPENING

LEADING TO EXISTING MECHANICAL

ROOM. VA ONLY SHALL HAVE ACCESS

THROUGH THIS DOOR UNLESS APPROVED

BY THE COR. ENSURE THAT DOOR HAS

LOCK AND CYLINDER, FURNISH KEYS TO

THE VA. FREE EGRESS SHALL BE

ALLOWED FROM MECH. ROOM SIDE

5'

THE SCOPE OF WORK DESCRIBED IN THIS DRAWING PACKAGE REPRESENTS A MULTI-PHASED PROJECT THAT MUST BE UNDERTAKEN SIMULTANEOUSLY WITH THE FULL OCCUPANCY AND FUNCTION OF THE EXISTING

HOSPITAL. THE PROPOSED PHASING DURATING PLAN IS AS FOLLOWS:

PRE-CONSTRUCTION: 90 DAYS

PHASE I: 180 DAYS

VA ACTIVATION OF PHASE I: 30 DAYS

PHASE II: 150 DAYS

VA ACTIVATION OF PHASE II: 30 DAYS

PHASE III: 150 DAYS

TOTAL TIMEFRAME: 630 DAYS

PHASE I: IT IS THE INTENT OF PHASE I TO PERFORM ALL CONSTRUCTION NECESSARY TO PREPARE FOR THE

FUTURE REMOVAL OF SUBSTATIONS A & B, INCLUDING BUT NOT LIMITED TO:

• MODIFICATIONS OF EXISTING AIR HANDLER

• REMOVAL AND REPLACEMENT OF EXISTING DOORS/FRAMES

• CONSTRUCTION OF NEW ELECTRICAL EQUIPMENT ROOM IN EXISTING CLEAN LINEN ROOM, INCLUDING

ALL EQUIPMENT INSTALLED AND BROUGHT TO WORKING OPERATION

• RUNNING OF SUB-BASEMENT CONDUITS/FEEDERS TO NEW EQUIPMENT LOCATIONS

• REMOVAL OF EXISTING ASSOCIATED ELECTRICAL EQUIPMENT IN TRANSFORMER ROOM ONCE NEW IS

FULLY ACTIVATED

• ABATEMENT SCOPE OF WORK NOT ASSOCIATED WITH THE REMOVAL/REPLACEMENT OF SUBSTATIONS

PHASE II: IT IS THE INTENT OF PHASE II TO FULLY REMOVE AND REPLACE SUBSTATION B, INCLUDING ASSOCIATED

ABATEMENT.

PHASE III: IT IS THE INTENT OF PHASE III TO FULLY REMOVE AND REPLACE SUBSTATION A, INCLUDING

ASSOCIATED ABATEMENT.

CONTRACTOR SHALL REFER TO MEP DRAWINGS FOR ADDITIONAL PHASING AND SEQUENCING REQUIREMENTS, AND COORDINATE ALL ACTIVITIES WITH VA COR THROUGHOUT THE ENTIRETY OF THE PROJECT CONSTRUCTION.

THE FOLLOWING CONSTRUCTION SCHEDULE TIMEFRAMES SHALL APPLY TO THIS PROJECT:

CONSTRUCTION ACTIVITIES ARE PERMITTED TO OCCUR DURING REGULAR SHIFT HOURS. TEMPORARY CONSTRUCTION BARRIERS MUST BE FULLY IN PLACE AND INTACT DURING CONSTRUCTION. CONTRACTORS, HOWEVER, SHALL NOT BE PERMITTED TO HAVE MATERIALS AND DELIVERIES DELIVERED OR TAKEN AWAY DURING

REGULAR SHIFT HOURS, AND MUST COORDINATE SUCH ACTIVITIES WITH VA COR.

THE TIMEFRAMES IDENTIFIED ABOVE ARE IN REFERENCE TO NORMAL CONSTRUCTION ACTIVITIES AND, UNLESS

APPROVED BY VA COR, SHALL NOT APPLY TO WORK INCLUDING BUT NOT LIMITED TO:

• UTILITY SHUTDOWNS

• EXISTING MEP SYSTEM SHUTDOWNS

• WORK IN PUBLIC CORRIDORS/WAITING AREAS

• CUTTING OF FLOOR OPENINGS IN THE EXISTING BUILDING

• WORK OUTSIDE OF TEMPORARY CONSTRUCTION PARTITIONED AREAS, INCLUDING ACCESS OF CEILING

PLENUM SPACES IN FLOORS ABOVE OR BELOW CONSTRUCTION AREAS, AND REPLACEMENT OF

EXISTING FINISHES

• CONSTRUCTION OF TEMPORARY CONSTRUCTION BARRIERS

WORK IDENTIFIED ABOVE SHALL OCCUR EITHER IN THE EVENING SHIFT, OR IF REQUIRED BY THE VA, ON WEEKENDS. ALL CONSTRUCTION ACTIVITIES AND SCHEDULES MUST BE REVIEWED AND APPROVED BY VA COR.

REFER TO SPEC DIVISION 01 FOR GENERAL PROJECT REQUIREMENTS

PHASING DURATION & CONSTRUCTION TIMEFRAMES:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Louis Stokes Cleveland

VA Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

E T

G

DE

I

RET

S

HCRA

I

KACZMAR

STANLEY

NO. 4988

T

E R

S

AT

E

I

T C

J.

O

O

FO

H

1468 WEST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

STRUCTURAL ENGINEERING:

THORSON BAKER + ASSOC.

3030 WEST STREETSBORO RD.

RICHFIELD, OH 44286

P. 330.659.6688

ELECTRICAL ENGINEERING:

HEAPY

1400 WEST DOROTHY LN.

DAYTON, OH 45409

P. 937.224.0861

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

MECHANICAL ENGINEERING:

FFE, INC.

110 BOGGS LN, SUITE 170

SPRINGDALE, OH 45246

P. 513.522.0956

HAZ. MATERIALS ASSESSMENT:

STEPHEN J. SEBESTA & ASSOC.

30628 DETROIT RD. #258

WESTLAKE, OH 44145

P. 216.781.0060

C U s e rs

\d a v e \D o c u m e n ts

\V A

S U

B S

T A

T

IO

N A

B

R d a k a p la n .r v t

/2

/2

:0

:2

P

M

FINAL CDs SUBMISSION

LS-100

BASEMENT LEVEL - LIFE SAFETY PLAN -

PHASE I

REPLACE SUBSTATIONS A & B

10701 EAST BLVD. CLEVELAND, OHIO

541-21-105

2.26.21 CJK DAK

SCALE: 3/32" = 1'-0"

BASEMENT LEVEL LIFE SAFETY PLAN - PHASE I

NORTH

Revisions: Date:

DESIGN DEVELOPMENT 7.24.20

35% CDs SUBMISSION 9.1.20

65% CDs SUBMISSION 10.8.20

90% CDs SUBMISSION 11.24.20

DN

GENERAL NOTES:

CONSIDER ALL AREAS OWNER-OCCUPIED UNLESS NOTED OTHERWISE.

ALL WALLS ARE DRAWN AND DIMENSIONED TO A 5" NOMINAL WIDTH TYPICAL UNLESS OTHERWISE NOTED.

ALL DIMENSIONS ARE CLEAR DIMENSIONS FROM FACE OF GYPSUM BOARD TO FACE OF GYPSUM BOARD.

ALL SUB-CONTRACTORS (I.E. FIRE PROTECTION, HVAC, FIRE ALARM, ELECTRICAL, ETC.) TO INSTALL SYSTEM PER OWNER REQUIREMENTS AND IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF ALL APPLICABLE

CODES.

PATCH AND REPAIR ALL EXISTING AREAS TO REMAIN AS REQUIRED TO MATCH EXISTING CONDITIONS.

WHERE NEW UTILITIES ARE TO BE INSTALLED IN EXISTING PARTITIONS, ALL SUB-CONTRACTORS SHALL REMOVE EXISTING DRYWALL AS REQUIRED FOR INSTALLATION OF SAME AND PATCH AND REPAIR WITH NEW

TO MATCH EXISTING CONDITIONS UPON COMPLETION OF UTILITY INSTALLATION.

ALL DAMAGE TO EXISTING AREAS OCCURING AS A RESULT OF CONSTRUCTION SHALL BE REPAIRED AS REQUIRED BY THE CONTRACTOR. CONTRACTOR SHALL PROTECT ALL EXISTING WALL, CEILING, AND FLOOR FINISHES IN EACH AREA. ANY SURFACES DAMAGED BY CONTRACTOR SHALL BE REPLACED BY THE

CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.

ALL NEW PENETRATIONS IN FIRE-RATED ASSEMBLIES TO MAINTAIN FIRE RATING OF ASSEMBLY AS

REQUIRED.

NEW AND EXISTING FURNITURE SHOWN FOR REFERENCE ONLY. THE OWNER SHALL REMOVE, PRIOR TO CONSTRUCTION, ALL ITEMS THAT THE OWNER DESIRES TO SALVAGE. ALL REMAINING ITEMS INDICATED TO BE DEMOLISHED SHALL BE REMOVED BY THE CONTRACTOR AND LEGALLY DISPOSED OF IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. ALL ITEMS TO REMAIN IN SPACE SHALL BE PROTECTED THROUGHOUT BY THE CONTRACTOR THROUGHOUT CONSTRUCTION. NEW FURNITURE TO BE FURNISHED AND INSTALLED

BY THE OWNER UNLESS NOTED OTHERWISE.

CONTRACTOR SHALL PROVIDE DUST-REMOVAL WALK-OFF MATS (TACKY MAT) AT ALL CONSTRUCTION ENTRY

POINTS.

CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN NEGATIVE PRESSURE IN WORK AREAS ENSURING NO DUST OR FUMES WILL BE TRANSFERRED TO OCCUPIED AREAS.

PROVIDE VISUAL PRESSURE MONITORING DEVICE AT DUST-PROOF BARRICADE TO CONFIRM PRESSURE.

DUST MONITORING SHALL BE BY OWNER. SEE SPECIFICATION 01 00 00 "GENERAL REQUIREMENTS"

ATTACHMENT AND 01 35 26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS.

ALL DEMOLITION WORK BEING DONE OUTSIDE TEMPORARY PARTITIONS IS TO BE APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS. WORK SHALL BE DONE TO MINIMIZE DISRUPTION TO VISITORS, PATIENTS, AND STAFF. COORDINATE LOCATION OF BARRIERS WITH OWNER.

THE HOSPITAL'S SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION WITHIN THE

PROJECT AREA DURING THE ENTIRE CONSTRUCTION PHASE.

FIELD VERIFY LOCATION OF ALL EXISTING CONDITIONS. NOTIFY COR OF ANY DISCREPANCIES.

WHERE NEW DOORS ARE INDICATED IN EXISTING WALL ASSEMBLIES, CUT OPENINGS IN EXISTING WALL.

REFER TO DOOR SCHEDULE FOR DIMENSIONS. PREPARE OPENINGS FOR NEW DOOR, INCLUSIVE OF THE ADDITION OF JAMB AND HEAD STUD REINFORCEMENT (I.E. DOUBLE STUDS, HEADERS) AND PATCH ADJACENT

WALLS TO MATCH EXISTING.

ALL FLOOR, WALL, CEILING, AND MISC. FIRE-RESISTIVE ASSEMBLIES AND CONSTRUCTION SHALL BE OF THE FIRE RATING CALLED FOR ON THE DRAWINGS AND/OR AS REQUIRED BY CODE. ALL EXISTING FIRE-RESISTIVE ASSEMBLIES SHALL BE MAINTAINED AND THE RATING NOT COMPROMISED. FIRE RATED ASSEMBLIES AND CONSTRUCTION INCLUDING ALL FIRESTOPPING, FIRE RATED DOORS, AND MISC. FIRE RESISTIVE REQUIREMENTS SHALL BE LEFT UNCONCEALED AS REQUIRED FOR INSPECTION BY THE BUILDING OFFICIAL.

DEBRIS REMOVAL SHALL NOT INTERFERE WITH OWNER'S OPERATIONS AND SHALL OCCUR DURING OFF HOURS AS DETERMINED BY THE COR. SEE ALSO SPECIFICATION SECTION 01 35 26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS REGARDING THE HAULING OF DEBRIS FROM THE PROJECT AREA.

ALL NOISE-GENERATING OPERATIONS SHALL BE SCHEDULED SO AS NOT TO IMPEDE OWNER'S OPERATIONS AS DETERMINED BY THE COR. ALL WORK IN PUBLIC CORRIDORS SHALL BE PERFORMED OFF-HOURS UNLESS

OTHERWISE APPROVED BY THE COR.

EXISTING FLOOR SLABS ARE 2 HR FIRE RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE COMPROMISED, AND GC SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL PATCH CONCRETE SLAB FULLY WITH NEW CONCRETE TO MATCH EXISTING OR APPROVED 2 HR RATED INFILL FIRESTOP ASSEMBLY WHEN APPROVED

BY THE COR.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

SYMBOL LEGEND:

INDICATES EXISTING DOOR

INDICATES NEW DOOR

EXISTING WALLS TO REMAIN

NEW WALLS

WALLS TO BE REMOVED FULL HEIGHT U.N.O.

DASHED LINES INDICATE ITEMS TO BE

DEMOLISHED

HATCHED AREA OUTSIDE OF PROJECT SCOPE.

ACCESS INTO CEILING SPACES MAY OCCUR, REFER

TO MEP DWGS.

GENERAL NOTE CONSTRUCTION PARTITION NOTE: WHERE TEMP. CONST. PARTITIONS

CONFLICT W/EX. LIGHTS/DIFFUSER/MEP ITEM LOCATIONS (INDICATED ON CEILING DEMOLITION

PLANS), GC SHALL COORD. W/COR TO EITHER TEMPORARILY REMOVE SUCH ITEMS, OR ADJUST

LOCATION OF CONST. PARTITION ACCORDINGLY TO ALLOW ITEMS TO REMAIN IN PLACE

PLASTIC CORRUGATED SHEETING/METAL STUD TEMPORARY PARTITION WALL W/3'-0" X 7'-0" SCWD

DOOR FOR CONTRACTOR ACCESS ONLY. ALSO REQUIRED AT ALL ABOVE-CEILING

MECHANICAL/ELECTRICAL WORK LASTING LONGER THAN 8 HOURS OUTSIDE OF ENCLOSED

CONSTRUCTION AREAS - REFER TO MEP DRAWINGS FOR AFFECTED AREAS. SUCH WORK MUST BE

ISOLATED FROM THE SURROUNDING ENVIRONMENT. WALL AND DOOR TO BE REMOVED UPON

COMPLETION OF WORK U.N.O. PATCH/REPAIR EXISTING CONDITIONS AS REQUIRED UPON REMOVAL

OF ALL TEMPORARY CONSTRUCTION. REFER TO TYPICAL TEMPORARY PARTITION DETAIL.

SCHEDULE NOTE: CONSTRUCTION OF TEMPORARY BARRIERS SHALL BE PERFORMED AFTER

NORMAL BUSINESS HOURS UNLESS OTHERWISE APPROVED BY THE COR. GC SHALL COORDINATE

ALL ABOVE-CEILING WORK AND TEMPORARY BARRIER CONSTRUCTION WITH VA

Exit Passage

BF501

Corridor

BF502

Transformer Room

D21

Mechanical Room

BE502

Clean Linen

B-D412

New Elec.

Equip. Room

B-D412A

Corridor

BD420

Corridor

BF520

Corridor

BF525

Corridor

BF502

Mechanical Room

D20

Service Lobby

BC404

Corridor

CE03

Elevator Lobby

BC403

7'-8".

8'-0".

9' -6

10' - 6"

13' - 0"

TO MAGNOLIA DRIVE

ROUTE 'A'

ROUTE 'A'

LOADING DOCK

ROUTE 'B'

ROUTE 'B'

8' - 9"

C

LR

7' -0

9' - 4"

8' - 10"

CLG. HT.

TRANSITION LINE

CLG. HT.

TRANSITION

LINES

OPEN TO

EXTERIOR

ABOVE

CLG. HT.

TRANSITION

LINES

CLG. HT.

TRANSITION

LINE

8'

/2

6' -0

7' - 9 1/2"

CENTRAL SERVICE

ELEVATORS

(TO BE REMOVED

AS A PART OF

IMPROVEMENTS)

AS-X-000

A

8'

6'- 0"

C

LR

Corridor

BF502

Mechanical Room

BE502

Transformer Room

D21

18 LOW POINT

LOW POINT

LINE OF OPENING

HEADER ABOVE

1'

/4

AS-D-100

B

THE SCOPE OF WORK DESCRIBED IN THIS DRAWING PACKAGE REPRESENTS A MULTI-PHASED PROJECT THAT MUST BE UNDERTAKEN SIMULTANEOUSLY WITH THE FULL OCCUPANCY AND FUNCTION OF THE EXISTING

HOSPITAL. THE PROPOSED PHASING DURATING PLAN IS AS FOLLOWS:

PRE-CONSTRUCTION: 90 DAYS

PHASE I: 180 DAYS

VA ACTIVATION OF PHASE I: 30 DAYS

PHASE II: 150 DAYS

VA ACTIVATION OF PHASE II: 30 DAYS

PHASE III: 150 DAYS

TOTAL TIMEFRAME: 630 DAYS

PHASE I: IT IS THE INTENT OF PHASE I TO PERFORM ALL CONSTRUCTION NECESSARY TO PREPARE FOR THE

FUTURE REMOVAL OF SUBSTATIONS A & B, INCLUDING BUT NOT LIMITED TO:

• MODIFICATIONS OF EXISTING AIR HANDLER

• REMOVAL AND REPLACEMENT OF EXISTING DOORS/FRAMES

• CONSTRUCTION OF NEW ELECTRICAL EQUIPMENT ROOM IN EXISTING CLEAN LINEN ROOM, INCLUDING

ALL EQUIPMENT INSTALLED AND BROUGHT TO WORKING OPERATION

• RUNNING OF SUB-BASEMENT CONDUITS/FEEDERS TO NEW EQUIPMENT LOCATIONS

• REMOVAL OF EXISTING ASSOCIATED ELECTRICAL EQUIPMENT IN TRANSFORMER ROOM ONCE NEW IS

FULLY ACTIVATED

• ABATEMENT SCOPE OF WORK NOT ASSOCIATED WITH THE REMOVAL/REPLACEMENT OF SUBSTATIONS

PHASE II: IT IS THE INTENT OF PHASE II TO FULLY REMOVE AND REPLACE SUBSTATION B, INCLUDING ASSOCIATED

ABATEMENT.

PHASE III: IT IS THE INTENT OF PHASE III TO FULLY REMOVE AND REPLACE SUBSTATION A, INCLUDING

ASSOCIATED ABATEMENT.

CONTRACTOR SHALL REFER TO MEP DRAWINGS FOR ADDITIONAL PHASING AND SEQUENCING REQUIREMENTS, AND COORDINATE ALL ACTIVITIES WITH VA COR THROUGHOUT THE ENTIRETY OF THE PROJECT CONSTRUCTION.

THE FOLLOWING CONSTRUCTION SCHEDULE TIMEFRAMES SHALL APPLY TO THIS PROJECT:

CONSTRUCTION ACTIVITIES ARE PERMITTED TO OCCUR DURING REGULAR SHIFT HOURS. TEMPORARY CONSTRUCTION BARRIERS MUST BE FULLY IN PLACE AND INTACT DURING CONSTRUCTION. CONTRACTORS, HOWEVER, SHALL NOT BE PERMITTED TO HAVE MATERIALS AND DELIVERIES DELIVERED OR TAKEN AWAY DURING

REGULAR SHIFT HOURS, AND MUST COORDINATE SUCH ACTIVITIES WITH VA COR.

THE TIMEFRAMES IDENTIFIED ABOVE ARE IN REFERENCE TO NORMAL CONSTRUCTION ACTIVITIES AND, UNLESS

APPROVED BY VA COR, SHALL NOT APPLY TO WORK INCLUDING BUT NOT LIMITED TO:

• UTILITY SHUTDOWNS

• EXISTING MEP SYSTEM SHUTDOWNS

• WORK IN PUBLIC CORRIDORS/WAITING AREAS

• CUTTING OF FLOOR OPENINGS IN THE EXISTING BUILDING

• WORK OUTSIDE OF TEMPORARY CONSTRUCTION PARTITIONED AREAS, INCLUDING ACCESS OF CEILING

PLENUM SPACES IN FLOORS ABOVE OR BELOW CONSTRUCTION AREAS, AND REPLACEMENT OF

EXISTING FINISHES

• CONSTRUCTION OF TEMPORARY CONSTRUCTION BARRIERS

WORK IDENTIFIED ABOVE SHALL OCCUR EITHER IN THE EVENING SHIFT, OR IF REQUIRED BY THE VA, ON WEEKENDS. ALL CONSTRUCTION ACTIVITIES AND SCHEDULES MUST BE REVIEWED AND APPROVED BY VA COR.

REFER TO SPEC DIVISION 01 FOR GENERAL PROJECT REQUIREMENTS

PHASING DURATION & CONSTRUCTION TIMEFRAMES:

THE CONTRACTOR SHALL BE RESPONSIBLE FOR IDENTIFYING THE MEANS AND METHODS FOR ALL EQUIPMENT REMOVAL, DELIVERY, AND INSTALLATION ON SITE. THE LIMITATIONS OF THE EXISTING CONDITIONS IDENTIFIED BELOW ARE INTENDED TO REMAIN AS IS, UNLESS DIRECTED OTHERWISE IN THESE DRAWINGS OR DIRECTION IS

GIVEN BY THE VA CO TO MODIFY SAME.

IT IS THE INTENT THAT THE TRANSFORMERS OF THE SUBSTATIONS BE DELIVERED IN PIECES TO THE ROOM TO ACCOMMODATE THE IDENTIFIED SITE RESTRICTIONS. THE PROJECT TEAM HAS VETTED THIS CONCEPT TO THE BEST OF THEIR ABILITIES AS A PART OF THE PROJECT AND HAS BEEN INFORMED THAT THIS CAN BE

ACCOMPLISHED.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES CAUSED TO EXISTING CONDITIONS AS A RESULT OF DELIVERY, REMOVAL, AND INSTALLATION ACTIVITIES, AND SHALL REPAIR ALL DAMAGES TO THE ORIGINAL

CONDITIONS AT NO ADDITIONAL COST TO THE VA.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL TEMPORARY PROTECTION IN ELEVATORS, CORRIDORS, AND OTHER AREAS AS REQUIRED TO PREVENT DAMAGES.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THAT DELIVERY WEIGHTS (INCLUDING SHIPPING

VEHICLES AND PERSONNEL) DO NOT EXCEED THE CAPACITIES OF EXISTING ELEVATORS.

THE CONTRACTOR SHALL COORDINATE SCHEDULING OF REMOVAL AND DELIVERY ACTIVITIES WITH THE VA COR TO ENSURE THAT THE EXISTING SITE CONDITIONS ARE PREPARED TO RECEIVE ALL EQUIPMENT.

SITE LOGISTICS NOTES:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Louis Stokes Cleveland

VA Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

E T

G

DE

I

RET

S

HCRA

I

KACZMAR

STANLEY

NO. 4988

T

E R

S

AT

E

I

T C

J.

O

O

FO

H

1468 WEST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

STRUCTURAL ENGINEERING:

THORSON BAKER + ASSOC.

3030 WEST STREETSBORO RD.

RICHFIELD, OH 44286

P. 330.659.6688

ELECTRICAL ENGINEERING:

HEAPY

1400 WEST DOROTHY LN.

DAYTON, OH 45409

P. 937.224.0861

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

MECHANICAL ENGINEERING:

FFE, INC.

110 BOGGS LN, SUITE 170

SPRINGDALE, OH 45246

P. 513.522.0956

HAZ. MATERIALS ASSESSMENT:

STEPHEN J. SEBESTA & ASSOC.

30628 DETROIT RD. #258

WESTLAKE, OH 44145

P. 216.781.0060

C U s e rs

\d a v e \D o c u m e n ts

\V A

S U

B S

T A

T

IO

N A

B

R d a k a p la n .r v t

/2

/2

:3

:1

A

M

FINAL CDs SUBMISSION

AS-X-000

BASEMENT LEVEL SITE LOGISTICS PLAN REPLACE SUBSTATIONS A & B

10701 EAST BLVD. CLEVELAND, OHIO

541-21-105

2.26.21 CJK DAK

SCALE: 1/16" = 1'-0"

BASEMENT LEVEL SITE LOGISTICS PLAN

NORTH

SITE LOGISTIC NOTES

Note # Text

1 EXISTING EXTERIOR GRADE GYPSUM BOARD CEILING @ 9'-6" ABOVE FINISHED GRADE

2 PAIR OF 4'-0" X 8'-4" ALUMINUM STOREFRONT DOORS

3 EXISTING SOFFIT @ 8'-6" ABOVE FINISHED GRADE

4 EXISTING GYP. BD. CLG. @ 7'-11" AFF

5 PAIR 4'-0" X 7'-0" HOLLOW METAL DOORS

6 EXISTING TILE CEILING IN ENTIRE CORRIDOR @ 8'-6" AFF

7 PAIR 3'-10" X 7'-0" HOLLOW METAL DOORS

8 EX. CLG.-MTD. SPLIT SYSTEM UNIT, BOTTOM OF UNIT @ APPROX. 7'-11" AFF

9 EX. GYP. BD. CLG. IN ENTIRE CORRIDOR @ 7'-10 1/2" AFF

10 EXISTING ROUND PIPE CLEARANCE BAR SPANNING ACROSS CORRIDOR, BOTTOM @ 6'-10" AFF. GC SHALL TEMPORARILY REMOVE BAR DURING EQUIPMENT DELIVERY AND REINSTALL SAME UPON COMPLETION. BAR SHALL NOT BE REMOVED UNTIL NECESSARY AND SHALL BE IMMEDIATELY REPLACED ONCE EQUIPMENT IS

DELIVERED. BAR SHALL BE REINSTALLED AT THE END OF EACH SHIFT

11 EX. GYP. BD. CLG. @ 7'-8" AFF

12 AREA OF EXISTING ELECTRICAL AND MECHANICAL EQUIPMENT TO BE REMOVED AND REPLACED, SEE

ENLARGED PLAN THIS SHEET

13 PAIR 3'-10" X 7'-0" DOUBLE EGRESS HOLLOW METAL DOORS

14 EX. TILE CLG. IN ENTIRE CORRIDOR @ 8'-1 1/2" AFF

15 DOUBLE HEIGHT CLG. SPACE AREA - HIGH CLEARANCE

16 EXISTING FREIGHT ELEVATOR: 10,000# CAPACITY. ENTRY DOORS W/CLEAR OPENINGS OF 7'-11" L X 8'-0" H

ON FRONT AND REAR SIDES. ELEVATOR CAB: 8'-0" W X 13'-2" L X 8'-0" H

17 EXISTING INSULATED CONDENSATE LINE RUNNING OVERHEAD, LOW POINT @ 6'-7" AFF. PORTION OF LINE EXTENDING WEST FROM CIRCLE (ELBOW) ANGLES UP TOWARDS ENTRY DOORS AND RUNS ABOVE THE CEILING IN CORRIDOR BF502. EXISTING INSULATION TO BE PARTIALLY MODIFIED TO INCREASE DELIVERY

CLEARANCE - SEE MECH. DWGS.

18 EXISTING INSULATED STEAM LINE RUNNING OVERHEAD, LOW POINT @ 7'-6" AFF. PORTION OF LINE EXTENDING WEST FROM CIRCLE (ELBOW) ANGLES UP TOWARDS ENTRY DOORS AND RUNS ABOVE THE CEILING IN CORRIDOR BF502. STEAM LINE SHALL REMAIN AND MUST NOT BE DAMAGED. PROTECT AS

REQ'D. THROUGHOUT CONSTRUCTION

19 EXISTING OVERHEAD DUCTWORK FROM AHU-2 TO BE REMOVED PRIOR TO REMOVAL AND REPLACEMENT OF NEW ELECTRICAL EQUIPMENT. SEE HVAC DRAWINGS FOR TEMPORARY COOLING & PHASING OF DUCT

REMOVAL REQUIREMENTS

20 EXISTING STRUCTURAL HEADER ABOVE @ 8'-10 1/2" AFF. HEADER SHALL REMAIN. DOOR FRAME BELOW TO

BE REMOVED/REPLACED, AND OPENING HEIGHT INCREASED TO 8'-2". SEE IMPROVEMENT PLAN

21 EXISTING STRUCTURAL BEAM ABOVE @ 11'-1" AFF. BEAM SHALL REMAIN. DOOR FRAME BELOW TO BE

REMOVED/REPLACED, AND OPENING HEIGHT INCREASED TO 8'-2". SEE IMPROVEMENT PLAN

22 EXISTING PADDED CONTAINMENT CURB AROUND DOORWAY TO REMAIN. PROTECT AS REQ'D.

THROUGHOUT CONSTRUCTION

23 PAIR 4'-0" X 7'-0" DOORS. DOORS TO BE REMOVED AND REPLACED/INCREASED IN HEIGHT AS A PART OF

SCOPE OF WORK

24 EX. 4'-0" X 7'-0" HOLLOW METAL DOOR

25 EX. TILE CLG. IN ENTIRE CORRIDOR @ 7'-7" AFF

26 EX. TILE CLG. IN ENTIRE CLEAN LINEN ROOM @ 7'-8 1/2" AFF

SCALE: 3/16" = 1'-0"AS-X-000

A ENLARGED TRANSFORMER ROOM ENTRY PLAN

NORTH

Revisions: Date:

DESIGN DEVELOPMENT 7.24.20

35% CDs SUBMISSION 9.1.20

65% CDs SUBMISSION 10.8.20

90% CDs SUBMISSION 11.24.20

P/B

P /B

P /B

P /B

P /B

P /B

P/B

P /B

P /B

UP

UP

UP

UP

UP

UP

UP

UP

UP UPUP

GENERAL NOTES:

CONSIDER ALL AREAS OWNER-OCCUPIED UNLESS NOTED OTHERWISE.

ALL WALLS ARE DRAWN AND DIMENSIONED TO A 5" NOMINAL WIDTH TYPICAL UNLESS OTHERWISE NOTED.

ALL DIMENSIONS ARE CLEAR DIMENSIONS FROM FACE OF GYPSUM BOARD TO FACE OF GYPSUM BOARD.

ALL SUB-CONTRACTORS (I.E. FIRE PROTECTION, HVAC, FIRE ALARM, ELECTRICAL, ETC.) TO INSTALL SYSTEM PER OWNER REQUIREMENTS AND IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF ALL APPLICABLE

CODES.

PATCH AND REPAIR ALL EXISTING AREAS TO REMAIN AS REQUIRED TO MATCH EXISTING CONDITIONS.

WHERE NEW UTILITIES ARE TO BE INSTALLED IN EXISTING PARTITIONS, ALL SUB-CONTRACTORS SHALL REMOVE EXISTING DRYWALL AS REQUIRED FOR INSTALLATION OF SAME AND PATCH AND REPAIR WITH NEW

TO MATCH EXISTING CONDITIONS UPON COMPLETION OF UTILITY INSTALLATION.

ALL DAMAGE TO EXISTING AREAS OCCURING AS A RESULT OF CONSTRUCTION SHALL BE REPAIRED AS REQUIRED BY THE CONTRACTOR. CONTRACTOR SHALL PROTECT ALL EXISTING WALL, CEILING, AND FLOOR FINISHES IN EACH AREA. ANY SURFACES DAMAGED BY CONTRACTOR SHALL BE REPLACED BY THE

CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.

ALL NEW PENETRATIONS IN FIRE-RATED ASSEMBLIES TO MAINTAIN FIRE RATING OF ASSEMBLY AS

REQUIRED.

NEW AND EXISTING FURNITURE SHOWN FOR REFERENCE ONLY. THE OWNER SHALL REMOVE, PRIOR TO CONSTRUCTION, ALL ITEMS THAT THE OWNER DESIRES TO SALVAGE. ALL REMAINING ITEMS INDICATED TO BE DEMOLISHED SHALL BE REMOVED BY THE CONTRACTOR AND LEGALLY DISPOSED OF IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. ALL ITEMS TO REMAIN IN SPACE SHALL BE PROTECTED THROUGHOUT BY THE CONTRACTOR THROUGHOUT CONSTRUCTION. NEW FURNITURE TO BE FURNISHED AND INSTALLED

BY THE OWNER UNLESS NOTED OTHERWISE.

CONTRACTOR SHALL PROVIDE DUST-REMOVAL WALK-OFF MATS (TACKY MAT) AT ALL CONSTRUCTION ENTRY

POINTS.

CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN NEGATIVE PRESSURE IN WORK AREAS ENSURING NO DUST OR FUMES WILL BE TRANSFERRED TO OCCUPIED AREAS.

PROVIDE VISUAL PRESSURE MONITORING DEVICE AT DUST-PROOF BARRICADE TO CONFIRM PRESSURE.

DUST MONITORING SHALL BE BY OWNER. SEE SPECIFICATION 01 00 00 "GENERAL REQUIREMENTS"

ATTACHMENT AND 01 35 26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS.

ALL DEMOLITION WORK BEING DONE OUTSIDE TEMPORARY PARTITIONS IS TO BE APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS. WORK SHALL BE DONE TO MINIMIZE DISRUPTION TO VISITORS, PATIENTS, AND STAFF. COORDINATE LOCATION OF BARRIERS WITH OWNER.

THE HOSPITAL'S SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION WITHIN THE

PROJECT AREA DURING THE ENTIRE CONSTRUCTION PHASE.

FIELD VERIFY LOCATION OF ALL EXISTING CONDITIONS. NOTIFY COR OF ANY DISCREPANCIES.

WHERE NEW DOORS ARE INDICATED IN EXISTING WALL ASSEMBLIES, CUT OPENINGS IN EXISTING WALL.

REFER TO DOOR SCHEDULE FOR DIMENSIONS. PREPARE OPENINGS FOR NEW DOOR, INCLUSIVE OF THE ADDITION OF JAMB AND HEAD STUD REINFORCEMENT (I.E. DOUBLE STUDS, HEADERS) AND PATCH ADJACENT

WALLS TO MATCH EXISTING.

ALL FLOOR, WALL, CEILING, AND MISC. FIRE-RESISTIVE ASSEMBLIES AND CONSTRUCTION SHALL BE OF THE FIRE RATING CALLED FOR ON THE DRAWINGS AND/OR AS REQUIRED BY CODE. ALL EXISTING FIRE-RESISTIVE ASSEMBLIES SHALL BE MAINTAINED AND THE RATING NOT COMPROMISED. FIRE RATED ASSEMBLIES AND CONSTRUCTION INCLUDING ALL FIRESTOPPING, FIRE RATED DOORS, AND MISC. FIRE RESISTIVE REQUIREMENTS SHALL BE LEFT UNCONCEALED AS REQUIRED FOR INSPECTION BY THE BUILDING OFFICIAL.

DEBRIS REMOVAL SHALL NOT INTERFERE WITH OWNER'S OPERATIONS AND SHALL OCCUR DURING OFF HOURS AS DETERMINED BY THE COR. SEE ALSO SPECIFICATION SECTION 01 35 26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS REGARDING THE HAULING OF DEBRIS FROM THE PROJECT AREA.

ALL NOISE-GENERATING OPERATIONS SHALL BE SCHEDULED SO AS NOT TO IMPEDE OWNER'S OPERATIONS AS DETERMINED BY THE COR. ALL WORK IN PUBLIC CORRIDORS SHALL BE PERFORMED OFF-HOURS UNLESS

OTHERWISE APPROVED BY THE COR.

EXISTING FLOOR SLABS ARE 2 HR FIRE RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE COMPROMISED, AND GC SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL PATCH CONCRETE SLAB FULLY WITH NEW CONCRETE TO MATCH EXISTING OR APPROVED 2 HR RATED INFILL FIRESTOP ASSEMBLY WHEN APPROVED

BY THE COR.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

SYMBOL LEGEND:

INDICATES EXISTING DOOR

INDICATES NEW DOOR

EXISTING WALLS TO REMAIN

NEW WALLS

WALLS TO BE REMOVED FULL HEIGHT U.N.O.

DASHED LINES INDICATE ITEMS TO BE

DEMOLISHED

HATCHED AREA OUTSIDE OF PROJECT SCOPE.

ACCESS INTO CEILING SPACES MAY OCCUR, REFER

TO MEP DWGS.

GENERAL NOTE CONSTRUCTION PARTITION NOTE: WHERE TEMP. CONST. PARTITIONS

CONFLICT W/EX. LIGHTS/DIFFUSER/MEP ITEM LOCATIONS (INDICATED ON CEILING DEMOLITION

PLANS), GC SHALL COORD. W/COR TO EITHER TEMPORARILY REMOVE SUCH ITEMS, OR ADJUST

LOCATION OF CONST. PARTITION ACCORDINGLY TO ALLOW ITEMS TO REMAIN IN PLACE

PLASTIC CORRUGATED SHEETING/METAL STUD TEMPORARY PARTITION WALL W/3'-0" X 7'-0" SCWD

DOOR FOR CONTRACTOR ACCESS ONLY. ALSO REQUIRED AT ALL ABOVE-CEILING

MECHANICAL/ELECTRICAL WORK LASTING LONGER THAN 8 HOURS OUTSIDE OF ENCLOSED

CONSTRUCTION AREAS - REFER TO MEP DRAWINGS FOR AFFECTED AREAS. SUCH WORK MUST BE

ISOLATED FROM THE SURROUNDING ENVIRONMENT. WALL AND DOOR TO BE REMOVED UPON

COMPLETION OF WORK U.N.O. PATCH/REPAIR EXISTING CONDITIONS AS REQUIRED UPON REMOVAL

OF ALL TEMPORARY CONSTRUCTION. REFER TO TYPICAL TEMPORARY PARTITION DETAIL.

SCHEDULE NOTE: CONSTRUCTION OF TEMPORARY BARRIERS SHALL BE PERFORMED AFTER

NORMAL BUSINESS HOURS UNLESS OTHERWISE APPROVED BY THE COR. GC SHALL COORDINATE

ALL ABOVE-CEILING WORK AND TEMPORARY BARRIER CONSTRUCTION WITH VA

6 7 8 9 12

14a 15b 16b

17c 18d 19

Q

R

T

V

W

Y

Z

AA

BB

S

U

15 16 17 18

V1

Z1

Y1

X

W1

AA2

V2

Micro Office

D08A

Pipe Plumb.

Supervisor

B-E392A

Stair 3

D09 Prog. Clerk

B-E380

Elect.

CD02A

Lab 5

B-D360

Lab 5B

B-D358

Lab 6

B-D356

Lab 7

B-D354

Conference

B-D352

Corridor

CE02

Uniform Pick-up/Drop-Off

B-D410

Toilets

B-E423

Female Lockers

B-E425

Electrical Shop Supervisor

B-E440A

Corridor

CD02

Corridor

CD04

HVAC Shop Supervisor

B-E430A

HVAC Shop

D26

Electrical Shop

D25G

Carpenter Shop

D25B

Machine Shop

D25

Alarm System Control

BE440C

Super. Office

BE460

Elect.

D25C

Plumbing Shop

D25A

Corridor

D25F

Conference Room

D25E

Lock Smith

D25D

Transformer Room

D21

Telecomm

D20A

Mechanical Room

D20

Corridor

BD420

Mech.

Equipment

BD424

Primary Switch Room

BD423

Primary Switch Room

BD422

Elect

BD421

Storage Room

G09B

E.C.

G08A

Paint Shop

G08

Stair 6

E25

Corridor

CG01

Corridor

CE03

Office

D25H Storage

D25J

Office

D26A

Office

D26B

Corridor

BF402

Pipe Tunnel

BE503

Air Handler

BE501

Fuel Tank Room

BD501

Storage

BD502

Corridor

BF502

Elevator Equipment

Room

BF503

Corridor

BF504

Female Toilet

BF401A

Clean Supply

BF405

Office

BF406

Ancillary Testing

BF407

Office

BF408

Mechanical Room

BE502

F E

S C

O P

E O

F W

O R

K B

O U

N D

A R

Y

EMS Break Room

B-D414

Clean Linen

B-D412

EMS Staff

B-D414A

S U

B S

T A

T

IO

N A

S U

B S

T A

T

IO

N B

HEAVY DASHED BOX

INDICATES

SUSPENDED AIR

HANDLER UNIT ABOVE

WIRE MESH

PARTITIONS AROUND

AIR HANDLER

MOBILE SLIDING STAINLESS

STEEL WIRE LINEN RACK

SYSTEM

EXISTING PADDED

CONTAINMENT

CURB AROUND

DOORWAY

EXISTING

BOLLARDS TO

REMAIN

Z33 Z34 Z35

Z37

Z39

Z41

Warehouse Clerks

BF511

HVAC Shop

B-E430

Electrical Shop

B-E440

AS-D-100

B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Louis Stokes Cleveland

VA Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

E T

G

DE

I

RET

S

HCRA

I

KACZMAR

STANLEY

NO. 4988

T

E R

S

AT

E

I

T C

J.

O

O

FO

H

1468 WEST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

STRUCTURAL ENGINEERING:

THORSON BAKER + ASSOC.

3030 WEST STREETSBORO RD.

RICHFIELD, OH 44286

P. 330.659.6688

ELECTRICAL ENGINEERING:

HEAPY

1400 WEST DOROTHY LN.

DAYTON, OH 45409

P. 937.224.0861

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

MECHANICAL ENGINEERING:

FFE, INC.

110 BOGGS LN, SUITE 170

SPRINGDALE, OH 45246

P. 513.522.0956

HAZ. MATERIALS ASSESSMENT:

STEPHEN J. SEBESTA & ASSOC.

30628 DETROIT RD. #258

WESTLAKE, OH 44145

P. 216.781.0060

C U s e rs

\d a v e \D o c u m e n ts

\V A

S U

B S

T A

T

IO

N A

B

R d a k a p la n .r v t

/2

/2

:2

:2

P

M

FINAL CDs SUBMISSION

AS-X-100

BASEMENT LEVEL EXISTING CONDITIONS

PLAN

REPLACE SUBSTATIONS A & B

10701 EAST BLVD. CLEVELAND, OHIO

541-21-105

2.26.21 CJK DAK

SCALE: 1/8" = 1'-0"

BASEMENT LEVEL EXISTING CONDITIONS PLAN

NORTH

Revisions: Date:

DESIGN DEVELOPMENT 7.24.20

35% CDs SUBMISSION 9.1.20

65% CDs SUBMISSION 10.8.20

90% CDs SUBMISSION 11.24.20

P/B

P /B

P /B

P /B

P /B

P /B

P/B

P /B

P /B

UP

UP

UP

UP

UP

UP

UP UPUP

S

S

S

GENERAL NOTES:

CONSIDER ALL AREAS OWNER-OCCUPIED UNLESS NOTED OTHERWISE.

ALL WALLS ARE DRAWN AND DIMENSIONED TO A 5" NOMINAL WIDTH TYPICAL UNLESS OTHERWISE NOTED.

ALL DIMENSIONS ARE CLEAR DIMENSIONS FROM FACE OF GYPSUM BOARD TO FACE OF GYPSUM BOARD.

ALL SUB-CONTRACTORS (I.E. FIRE PROTECTION, HVAC, FIRE ALARM, ELECTRICAL, ETC.) TO INSTALL SYSTEM PER OWNER REQUIREMENTS AND IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF ALL APPLICABLE

CODES.

PATCH AND REPAIR ALL EXISTING AREAS TO REMAIN AS REQUIRED TO MATCH EXISTING CONDITIONS.

WHERE NEW UTILITIES ARE TO BE INSTALLED IN EXISTING PARTITIONS, ALL SUB-CONTRACTORS SHALL REMOVE EXISTING DRYWALL AS REQUIRED FOR INSTALLATION OF SAME AND PATCH AND REPAIR WITH NEW

TO MATCH EXISTING CONDITIONS UPON COMPLETION OF UTILITY INSTALLATION.

ALL DAMAGE TO EXISTING AREAS OCCURING AS A RESULT OF CONSTRUCTION SHALL BE REPAIRED AS REQUIRED BY THE CONTRACTOR. CONTRACTOR SHALL PROTECT ALL EXISTING WALL, CEILING, AND FLOOR FINISHES IN EACH AREA. ANY SURFACES DAMAGED BY CONTRACTOR SHALL BE REPLACED BY THE

CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.

ALL NEW PENETRATIONS IN FIRE-RATED ASSEMBLIES TO MAINTAIN FIRE RATING OF ASSEMBLY AS

REQUIRED.

NEW AND EXISTING FURNITURE SHOWN FOR REFERENCE ONLY. THE OWNER SHALL REMOVE, PRIOR TO CONSTRUCTION, ALL ITEMS THAT THE OWNER DESIRES TO SALVAGE. ALL REMAINING ITEMS INDICATED TO BE DEMOLISHED SHALL BE REMOVED BY THE CONTRACTOR AND LEGALLY DISPOSED OF IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. ALL ITEMS TO REMAIN IN SPACE SHALL BE PROTECTED THROUGHOUT BY THE CONTRACTOR THROUGHOUT CONSTRUCTION. NEW FURNITURE TO BE FURNISHED AND INSTALLED

BY THE OWNER UNLESS NOTED OTHERWISE.

CONTRACTOR SHALL PROVIDE DUST-REMOVAL WALK-OFF MATS (TACKY MAT) AT ALL CONSTRUCTION ENTRY

POINTS.

CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN NEGATIVE PRESSURE IN WORK AREAS ENSURING NO DUST OR FUMES WILL BE TRANSFERRED TO OCCUPIED AREAS.

PROVIDE VISUAL PRESSURE MONITORING DEVICE AT DUST-PROOF BARRICADE TO CONFIRM PRESSURE.

DUST MONITORING SHALL BE BY OWNER. SEE SPECIFICATION 01 00 00 "GENERAL REQUIREMENTS"

ATTACHMENT AND 01 35 26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS.

ALL DEMOLITION WORK BEING DONE OUTSIDE TEMPORARY PARTITIONS IS TO BE APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS. WORK SHALL BE DONE TO MINIMIZE DISRUPTION TO VISITORS, PATIENTS, AND STAFF. COORDINATE LOCATION OF BARRIERS WITH OWNER.

THE HOSPITAL'S SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION WITHIN THE

PROJECT AREA DURING THE ENTIRE CONSTRUCTION PHASE.

FIELD VERIFY LOCATION OF ALL EXISTING CONDITIONS. NOTIFY COR OF ANY DISCREPANCIES.

WHERE NEW DOORS ARE INDICATED IN EXISTING WALL ASSEMBLIES, CUT OPENINGS IN EXISTING WALL.

REFER TO DOOR SCHEDULE FOR DIMENSIONS. PREPARE OPENINGS FOR NEW DOOR, INCLUSIVE OF THE ADDITION OF JAMB AND HEAD STUD REINFORCEMENT (I.E. DOUBLE STUDS, HEADERS) AND PATCH ADJACENT

WALLS TO MATCH EXISTING.

ALL FLOOR, WALL, CEILING, AND MISC. FIRE-RESISTIVE ASSEMBLIES AND CONSTRUCTION SHALL BE OF THE FIRE RATING CALLED FOR ON THE DRAWINGS AND/OR AS REQUIRED BY CODE. ALL EXISTING FIRE-RESISTIVE ASSEMBLIES SHALL BE MAINTAINED AND THE RATING NOT COMPROMISED. FIRE RATED ASSEMBLIES AND CONSTRUCTION INCLUDING ALL FIRESTOPPING, FIRE RATED DOORS, AND MISC. FIRE RESISTIVE REQUIREMENTS SHALL BE LEFT UNCONCEALED AS REQUIRED FOR INSPECTION BY THE BUILDING OFFICIAL.

DEBRIS REMOVAL SHALL NOT INTERFERE WITH OWNER'S OPERATIONS AND SHALL OCCUR DURING OFF HOURS AS DETERMINED BY THE COR. SEE ALSO SPECIFICATION SECTION 01 35 26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS REGARDING THE HAULING OF DEBRIS FROM THE PROJECT AREA.

ALL NOISE-GENERATING OPERATIONS SHALL BE SCHEDULED SO AS NOT TO IMPEDE OWNER'S OPERATIONS AS DETERMINED BY THE COR. ALL WORK IN PUBLIC CORRIDORS SHALL BE PERFORMED OFF-HOURS UNLESS

OTHERWISE APPROVED BY THE COR.

EXISTING FLOOR SLABS ARE 2 HR FIRE RATED. FOR ALL NEW CORE DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE COMPROMISED, AND GC SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL PATCH CONCRETE SLAB FULLY WITH NEW CONCRETE TO MATCH EXISTING OR APPROVED 2 HR RATED INFILL FIRESTOP ASSEMBLY WHEN APPROVED

BY THE COR.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

SYMBOL LEGEND:

INDICATES EXISTING DOOR

INDICATES NEW DOOR

EXISTING WALLS TO REMAIN

NEW WALLS

WALLS TO BE REMOVED FULL HEIGHT U.N.O.

DASHED LINES INDICATE ITEMS TO BE

DEMOLISHED

HATCHED AREA OUTSIDE OF PROJECT SCOPE.

ACCESS INTO CEILING SPACES MAY OCCUR, REFER

TO MEP DWGS.

GENERAL NOTE CONSTRUCTION PARTITION NOTE: WHERE TEMP. CONST. PARTITIONS

CONFLICT W/EX. LIGHTS/DIFFUSER/MEP ITEM LOCATIONS (INDICATED ON CEILING DEMOLITION

PLANS), GC SHALL COORD. W/COR TO EITHER TEMPORARILY REMOVE SUCH ITEMS, OR ADJUST

LOCATION OF CONST. PARTITION ACCORDINGLY TO ALLOW ITEMS TO REMAIN IN PLACE

PLASTIC CORRUGATED SHEETING/METAL STUD TEMPORARY PARTITION WALL W/3'-0" X 7'-0" SCWD

DOOR FOR CONTRACTOR ACCESS ONLY. ALSO REQUIRED AT ALL ABOVE-CEILING

MECHANICAL/ELECTRICAL WORK LASTING LONGER THAN 8 HOURS OUTSIDE OF ENCLOSED

CONSTRUCTION AREAS - REFER TO MEP DRAWINGS FOR AFFECTED AREAS. SUCH WORK MUST BE

ISOLATED FROM THE SURROUNDING ENVIRONMENT. WALL AND DOOR TO BE REMOVED UPON

COMPLETION OF WORK U.N.O. PATCH/REPAIR EXISTING CONDITIONS AS REQUIRED UPON REMOVAL

OF ALL TEMPORARY CONSTRUCTION. REFER TO TYPICAL TEMPORARY PARTITION DETAIL.

SCHEDULE NOTE: CONSTRUCTION OF TEMPORARY BARRIERS SHALL BE PERFORMED AFTER

NORMAL BUSINESS HOURS UNLESS OTHERWISE APPROVED BY THE COR. GC SHALL COORDINATE

ALL ABOVE-CEILING WORK AND TEMPORARY BARRIER CONSTRUCTION WITH VA

6 7 8 9 12

14a 15b 16b

Q

R

T

V

W

Y

Z

S

U

15 16 1710

Z1

Y1

X

Pipe Tunnel

BE503

Air Handler

BE501

Storage

BD502

Corridor

BF502

Elevator Equipment

Room

BF503

Corridor

BF504

Female Toilet

BF401A

Clean Supply

BF405

Office

BF406

Ancillary Testing

BF407

Office

BF408

Mechanical Room

BE502

Pipe Plumb.

Supervisor

B-E392A

Elect.

CD02A

Corridor

CE02

Uniform Pick-up/Drop-Off

B-D410

Toilets

B-E423

Female Lockers

B-E425

HVAC Shop

B-E430

Male Lockers

B-E424

Electrical Shop Supervisor

B-E440A

Electrical Shop

B-E440

Corridor

CD02

Corridor

CD04

HVAC Shop Supervisor

B-E430A

Carpenter Shop

D25B

Machine Shop

D25

Alarm System Control

B-E440B

Alarm System Control

B-E440B

Elect.

D25C

Plumbing Shop

D25A

Corridor

D25F

Conference Room

D25E

Lock Smith

D25D

Transformer Room

D21

Storage

D20A

Mechanical Room

D20

Mechanical & Electrical Room

G09A

Corridor

BD420

Mech.

Equipment

BD424

Primary Switch

Room

BD423

Storage Room

G09

Office

D25H Storage

D25J

Office

D26A

Office

D26B

PHASING NOTE: EXISTING SUSPENDED AIR

HANDLER TO BE MODIFIED IN PHASE I

SCOPE OF WORK - REFER TO MECH.

DWGS. FOR PHASING/SEQUENCING

REQUIREMENTS

REFER TO ELEC. DWGS.

FOR DEMO SCOPE OF

WORK & PHASING FOR

ELEC. EQUIP. REMOVAL

8'

EXISTING ROUGH OPENING

TO BE INCREASED IN

HEIGHT TO PERMIT

INSTALLATION OF NEW,

TALLER DOORS/FRAME. GC

SHALL DEMO EX. MASONRY

HEADER AND RAISE SAME

TO 8'-2" AFF. INSTALL

LINTELS ACROSS OPENING

8'-4".

EXISTING ROUGH OPENING IS

INFILLED WITH A DOOR/TRANSOM

FRAME ASSEMBLY AND DUCTWORK,

DAMPER, AND CONDUIT. REFER TO

PLAN\INTERIOR ELEVATIONS A & B/AS-

D-100, A/AS-100, AND MECH. DWGS.

FOR TEMPORARY AND PERMANENT

INFILL MODIFICATIONS. NEW LINTELS

ACROSS TOP OF EX. ROUGH OPENING

ARE TO BE INCLUDED IN BID, SEE

STRUCT. DWGS.

S U

B S

T A

T

IO

N A

S U

B S

T A

T

IO

N B

EMS Break Room

B-D414

Clean Linen

B-D412

EMS Staff

B-D414A

16' - 3"

ALIGN

5'

CONTRACTOR

ENTRY

STAFF ACCESS TO LINEN ROOM

SHALL BE AT EXISTING SOUTH

DOOR

13' - 5"

ANTEROOM

NOTE: ALL CONSTRUCTION

WORKERS SHALL BE

REQUIRED TO VACUUM/CLEAN

ALL DUST AND DEBRIS FROM

CLOTHING/WORK CARTS IN

ANTEROOM

CONSTRUCTION WORKERS SHALL

NOT HAVE ACCESS TO EXISTING

CLEAN LINEN ROOM AREAS

OUTSIDE OF CONSTRUCTION

BARRIER WITHOUT APPROVAL

FROM VA COR

5' - 0"

EX. POURED EPOXY CORRIDOR

FLOORING EAST OF CMU WALL

TO REMAIN, PROTECT AS REQ'D.

PHASING NOTE:

REMOVAL AND

REPLACEMENT OF

SUBSTATION B SHALL

OCCUR DURING PHASE

II SCOPE OF WORK - SEE

ELEC. DWGS.

PHASING NOTE:

REMOVAL AND

REPLACEMENT OF

SUBSTATION A SHALL

OCCUR DURING PHASE

III SCOPE OF WORK -

SEE ELEC. DWGS.

CLR.

5' - 0"

CONTRACTOR

ENTRY

NOTE: GC SHALL INSTALL TEMP.

BARRIER/DOOR ACROSS OPENING

LEADING TO EXISTING MECHANICAL

ROOM. VA ONLY SHALL HAVE ACCESS

THROUGH THIS DOOR UNLESS APPROVED

BY THE COR. ENSURE THAT DOOR HAS

LOCK AND CYLINDER, FURNISH KEYS TO

THE VA

TEMP. CONST.

BARRIER ONLY REQ'D.

DURING DEMOLITION

OF EX. DOOR FRAME

VIF

EXISTING FLOOR IS

POURED EPOXY AND IS

INTENDED TO REMAIN.

PROTECT SAME AS REQ'D.

EX. WALL BASE ON

NORTH WALL SHALL

REMAIN

EXISTING WALL

BASE ON EAST

WALL SHALL BE

REMOVED

EX. CHAIN-HUNG LIGHT

FIXTURE TO BE

TEMPORARILY REMOVED.

REINSTALL UPON CONST.

COMPLETION

Z33 Z34 Z35

Z37

Z39

Z41

AS-D-100

A

AS-D-100

B

GC SHALL PROVIDE TEMPORARY

PROTECTION OF ALL EXISTING

RACKS, CARTS, ETC. IN LINEN

ROOM DURING ABOVE-CEILING

WORK, TYP.

4'-1" +/-

REMOVE EXISTING MESH PANEL

FROM EAST SIDE OF AIR HANDLER

TO EX. NORTHEAST ENCLOSURE

FRAMING MEMBER (WHICH SHALL

REMAIN)

Uniform Pick-up/Drop-Off

B-D410

Clean Linen

B-D412

EMS Break Room

B-D414

Toilets

B-E423

Female Lockers

B-E425

Mech.

Equipment

BD424

SEE HVAC DWGS. FOR

DEMO OF DIFFUSERS,

VAVs, AND ASSOCIATED

DUCTWORK. GC SHALL

PROVIDE TEMPORARY

PROTECTION OVER

EXISTING CLEAN LINEN

ITEMS (RACKS, CARTS,

DESK) IN SPACE TO

PROTECT SAME FROM

DUST AND DEBRIS.

PROVIDE A NEW, FULL

CEILING TILE @ REMOVED

DIFFUSER LOCATION

NOTE: GC SHALL TEMPORARILY REMOVE ALL EXISTING

LIGHTS, SPEAKER, DIFFUSER, AND CEILING TILES/GRID TO

ACCOMMODATE TEMPORARY PARTITION CONSTRUCTION.

REINSTALL ALL ITEMS UPON COMPLETION OF

CONSTRUCTION. LIGHTING AND SPEAKER SHALL BE

TEMPORARILY DISCONNECTED BY THE EC, AND EC SHALL

COORDINATE WITH THE GC ACCORDINGLY

CEILING DEMOLITION SYMBOL LEGEND:

EXISTING CEILING

TILE AREAS TO

REMAIN

EXISTING TILE

AREAS TO BE

DEMOLISHED

GYPSUM BOARD

CEILING/SOFFIT -

PAINTED FINISH

2 X 4 LIGHT

FIXTURE

2 X 2 LIGHT FIXTURE

RECESSED CAN

LIGHT FIXTURE

RETURN AIR

DIFFUSERSSUPPLY AIR DIFFUSERS

SECURITY CAMERA S RECESSED SPEAKER

W WIRELESS ACCESS POINT SD SMOKE DETECTOR

AREAS IDENTIFIED TO BE DEMOLISHED ARE LIMITED TO THOSE SHOWN TO ACCOMMODATE NEW

CONSTRUCTION - REFER TO REFLECTED CEILING PLANS FOR ALL IMPROVEMENTS. ADDITIONAL TILE MAY NEED TO BE REMOVED TO ACCOMMODATE CONSTRUCTION OF TEMPORARY CONSTRUCTION PARTITIONS.

VERIFY FULL REMOVAL SCOPE IN FIELD

TEMP.

COOLING

UNIT

7'-0" TALL +/-

4'-1" +/-

REMOVE EAST LEAF OF…

This is the start of the file's text. The full file is on GovTribe.