21-0806 Replace Substations A and B - ADDENDUM 1 2.pdf

PDF 5 MB Posted

Attached to
Y1DA--Replace Substation A&B Federal contract opportunity
Solicitation number
36C25021B0045
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This pre-solicitation notice is for a construction project to Replace Substations A and B at the Cleveland VA Medical Center in Cleveland, Ohio. The project involves demolishing existing structures and furnishing labor and materials to complete the replacement of the two substations. The solicitation will be issued as a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses, with a requirement for the selected contractor to perform a minimum of 15% of the construction work. The estimated project value is between $2-5 million. Interested SDVOSBs should register at SAM.gov to receive the solicitation documents, which will be posted on or around May 24th with proposals due approximately 30 days later. The project duration is 630 calendar days from notice to proceed. Bonds will be required. A site visit will be scheduled.

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Louis Stokes Cleveland

VA Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

E T

G

DE

I

RET

S

HCRA

I

KACZMAR

STANLEY

NO. 4988

T

E R

S

AT

E

I

T C

J.

O

O

FO

H

1468 WEST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

STRUCTURAL ENGINEERING:

THORSON BAKER + ASSOC.

3030 WEST STREETSBORO RD.

RICHFIELD, OH 44286

P. 330.659.6688

ELECTRICAL ENGINEERING:

HEAPY

1400 WEST DOROTHY LN.

DAYTON, OH 45409

P. 937.224.0861

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

MECHANICAL ENGINEERING:

FFE, INC.

110 BOGGS LN, SUITE 170

SPRINGDALE, OH 45246

P. 513.522.0956

HAZ. MATERIALS ASSESSMENT:

STEPHEN J. SEBESTA & ASSOC.

30628 DETROIT RD. #258

WESTLAKE, OH 44145

P. 216.781.0060

FINAL CDs SUBMISSION

C U s e rs

\d a v e \D o c u m e n ts

\V A

S U

B S

T A

T

IO

N A

B

R d a k a p la n .r v t

/6

/2

:3

:3

A M

GI-1

TITLE SHEET & DRAWING INDEX REPLACE SUBSTATIONS A & B

10701 EAST BLVD. CLEVELAND, OHIO

541-21-105

2.26.21 CJK DAK

DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER - WADE PARK

REPLACE SUBSTATIONS A & B

10701 EAST BLVD. CLEVELAND, OH 44106

PROJECT NO. 541-21-105

Cleveland Veterans Affairs Medical Center

SCOPE OF WORK

AREA

BASEMENT LEVEL

CODE INFORMATION:

I. PROJECT LOCATION: CLEVELAND VETERANS AFFAIRS MEDICAL CENTER

10701 EAST BLVD.

CLEVELAND, OHIO

II. DESCRIPTION & USER GROUP CLASSIFICATION OF BUILDING

A. NATURE OF PROJECT: REPLACEMENT OF EXISTING SUBSTATIONS A & B AND ASSOCIATED ELECTRICAL/MECHANICAL EQUIPMENT

B. DESIGN CODES: 2018 NFPA LIFE SAFETY CODE 101, IBC 2018

2020 PHYSICAL SECURITY AND RESILIENCY DESIGN MANUAL

C. USE GROUP: I-2 HEALTH CARE - NO CHANGE PROPOSED

D. CONSTRUCTION TYPE: TYPE I-332, IB - NON-COMBUSTIBLE, PROTECTED

FIRE RATED CONSTRUCTION (LSC A.8.2.1.1)

EXTERIOR BEARING WALLS 3 HRS

INTERIOR BEARING WALLS 3 HRS

STRUCTURAL COLUMNS 3 HRS (SUPPORTING > 1 FLOOR)

2 HRS (SUPPORTING 1 FLOOR ONLY)

2 HRS (SUPPORTING ROOF ONLY)

BEAMS, GIRDERS, TRUSSES 3 HRS (SUPPORTING > 1 FLOOR, COLS., OR BEARING WALLS)

FLOOR-CEILING ASSEMBLIES 2 HRS

ROOF-CEILING ASSEMBLIES 1-1/2 HRS

INTERIOR NON-BEARING WALLS 0 HRS

EXTERIOR NON-BEARING WALLS 0 HRS

WALL ASSEMBLIES

EXIT ACCESS CORRIDOR WALLS 0 HR SMOKE PARTITIONS

E. PROJECT AREA: BASEMENT LEVEL: 2,383 SF

F. PROJECT AREA OCCUPANT LOAD: 8

G. FIRE PROTECTION: EXISTING BUILDING FULLY SPRINKLED. MODIFICATIONS AS REQUIRED PER NEW IMPROVEMENTS PROPOSED

DRAWING INDEX:

FINAL CD's SUBMISSION

2.26.21

GI-1 TITLE SHEET & DRAWING INDEX

ARCHITECTURAL

LS-100 BASEMENT LEVEL LIFE SAFETY PLAN - PHASE I

AS-X-000 BASEMENT LEVEL SITE LOGISTICS PLAN

AS-X-100 BASEMENT LEVEL EXISTING CONDITIONS PLAN

AS-D-100 BASEMENT LEVEL DEMOLITION PLANS - PHASE I

AS-100 BASEMENT LEVEL IMPROVEMENT AND CEILING PLANS -

PHASE I

AS-600 DOOR AND FINISH SCHEDULES, WALL TYPES, & DETAILS

MECHANICAL/HVAC

M-001 MECHANICAL LEGEND

MD-101 MECHANICAL BASEMENT DEMOLITION PLAN - PHASE I

MH-101 MECHANICAL BASEMENT NEW WORK PLAN - PHASE I

MH-501 MECHANICAL DETAILS

MH-601 MECHANICAL SCHEDULES

MH-602 MECHANICAL CONTROLS

STRUCTURAL

SS-100 SUBSTATION A & B STRUCTURAL SUPPORT PLAN

FIRE PROTECTION

FX-100 FIRE PROTECTION BASEMENT NEW WORK PLAN

EP-100 ELECTRICAL BASEMENT EQUIPMENT ROUTING PLAN

EP-401 ENLARGED BASEMENT POWER AND SYSTEMS PLAN

EP-402 ENLARGED SUB-BASEMENT ELECTRICAL PLAN

EP-501 ELECTRICAL DETAILS

EP-502 EXISTING ELECTRICAL ROOM D21 IMAGES

EP-503 EXISTING SUB-BASEMENT IMAGES

EP-600 MEDIUM VOLTAGE NEW WORK RISER DIAGRAM

EP-601A SUBSTATION A POWER LOW-VOLTAGE NEW WORK RISER DIAGRAM

EP-601B SUBSTATION A LIGHTING LOW-VOLTAGE NEW WORK RISER DIAGRAM

EP-602A SUBSTATION B POWER LOW-VOLTAGE NEW WORK RISER DIAGRAM

EP-602B SUBSTATION B LIGHTING LOW-VOLTAGE NEW WORK RISER DIAGRAM

EP-603 EMERGENCY POWER SYSTEM NEW WORK RISER DIAGRAM

EP-700 DISTRIBUTION SCHEDULES AND ELEVATIONS

ER-10B ELECTRICAL SUB-BASEMENT PLAN

ER-100A BASEMENT LEVEL ELECTRICAL FLOOR PLAN

ER-100B ENLARGED BASEMENT LEVEL ELECTRICAL ROOM PLANS

ER-101A FIRST FLOOR ELECTRICAL ROOM PLANS

ER-101B ENLARGED FIRST FLOOR ELECTRICAL ROOM PLANS

ER-102 SECOND FLOOR ELECTRICAL ROOM PLANS

ER-103 THIRD FLOOR ELECTRICAL ROOM PLANS

ER-104 FOURTH FLOOR ELECTRICAL ROOM PLANS

ER-105 FIFTH FLOOR ELECTRICAL ROOM PLANS

ER-106 SIXTH FLOOR ELECTRICAL ROOM PLANS

ER-107 PENTHOUSE ELECTRICAL ROOM PLANS

NORTH

ELECTRICAL

E-001 ELECTRICAL SCHEDULES AND INDEX OF DRAWINGS

E-002 ELECTRICAL CONSTRUCTION PHASING

ED-401 ENLARGED BASEMENT DEMOLITION PLAN

ED-600 MEDIUM VOLTAGE DEMOLITION RISER DIAGRAM

ED-601A SUBSTATION A POWER LOW-VOLTAGE DEMOLITION RISER DIAGRAM

ED-601B SUBSTATION A LIGHTING LOW-VOLTAGE DEMOLITION RISER DIAGRAM

ED-602A SUBSTATION B POWER LOW-VOLTAGE DEMOLITION RISER DIAGRAM

ED-602B SUBSTATION B LIGHTING LOW-VOLTAGE DEMOLITION RISER DIAGRAM

ED-603 EMERGENCY POWER SYSTEM DEMOLITION RISER DIAGRAM

HAZARDOUS MATERIALS ABATEMENT

HA-001 STANDARD ASBESTOS ABATEMENT DETAILS

HA-101 BASEMENT LEVEL ASBESTOS ABATEMENT PLAN

Revisions: Date:

DESIGN DEVELOPMENT 7.24.20

35% CDs SUBMISSION 9.1.20

65% CDs SUBMISSION 10.8.20

90% CDs SUBMISSION 11.24.20

100% CDs SUBMISSION 2.5.21

FINAL CDs SUBMISSION 2.26.21

ADDENDUM 1 8.6.21

P/B

P /B

P /B

P /B

P /B

P /B

P/B

P /B

P /B

P/B

P /B

P /B

P /B

P /B

P /B

P/B

P /B

P /B

P/B

P /B

P /B

P /B

P /B

P /B

P/B

P /B

P /B

P/B

P /B

P /B

P /B

P /B

P /B

P/B

P /B

P /B

P/B

P /B

P /B

P /B

P /B

P /B

P/B

P /B

P /B

P/B

P /B

P /B

P /B

P /B

P /B

P/B

P /B

P /B

CONSTRUCTION PHASING

PHASE TIME DISCIPLINE

ELECTRICAL

1 180 DAYS CONSTRUCT NEW ELECTRICAL RM

A DEMOLISH LINEN EMERGENCY ROOM LTG/PWR/FA

B CONSTRUCT NEW ELECTRICAL EMERGENCY ROOM LTG/PWR/FA/DOOR

C ROUGH-IN NEW PERMANENT FEEDER FROM GPS1 TO NEW EDSB2

D INSTALL NEW EDSB2

E ROUGH-IN NEW PERMANENT FEEDERS AND/OR SPLICES FROM NEW EDSB2 TO EGKDP, ATS-8, EGDP, SBHDBG1, DPNB1G, EDSB3, ATS-20,ATS-21, ATS-22

F INSTALL NEW EMERGENCY ELECTRICAL EQUIPMENT

G

INSTALL FEEDERS FROM NORMAL AND LOAD SIDE OF TRANSFER SWITCHES TO EXISTING

DISTRIBUTION EQUIPMENT

H

PLACE ALL ATS'S IN MANUAL MODE AND LOCK IN NORMAL SOURCE. DISCONNECT NEW EDSB2 AND MAKE SPLICE TO PERMANENT SOURCE. COMPLETE EMERGENCY SIDE FEEDER TO EACH ATS. START

THE GENERATORS AND ENERGIZE NEW EDSB2. TRANSFER ALL ATS'S TO EMERGENCY SOURCE.

COMPLETE NORMAL SIDE FEEDERS. PLACE ATS'S BACK IN AUTO. ONE ATS AT A TIME, MAKE

CUTOVER OF LOAD SIDE FEEDER IN UNDER 2 HOURS OF TOTAL DOWNTIME EACH.

I ROOM D21 REMOVE ATS 5, 8, 22 , SBHDBG1

J ROOM D21 DISCONNECT EXISTING EDSB2 AND USE FOR TEMPORARY POWER SERVICE TO NEW USSA

& USSB

K RELOCATE TRANSFORMER T-DRD2

L INCLUDE 30 DAY ACTIVATION PERIOD BETWEEN PHASES 1 AND 2

2 150 DAYS REPLACE UNIT SUBSTATION B

2A

A ROUGH-IN ALL CONDUITS AND TEMPORARY FEEDERS FOR THIS PHASE, REMOVE TRANSPORT PATH

DOORS / WALLS

B USSA: OPEN LIGHTING MAIN C/B & CLOSE TIE C/B.

C USSA: DEENERGIZE MV SERVICE TO LIGHTING TRANSFORMER

D DISCONNECT / REMOVE USSA LTG MAIN C/B

E PROVIDE TEMPORARY SERVICE TO EXISTING EDSB2 FROM USSA-LTG TRANSFORMER

F USSA: ENERGIZE MV SERVICE TO LIGHTING TRANSFORMER

G USSB: OPEN C/B FOR DPD2B AND DPD2C

H USBB: CLOSE TIE C/B TO CONNECT DPD2A, DPD2B & DPD2C

I PROVIDE / CUTOVER TEMPORARY SERVICE FROM EDSB2 TO DPD2A/DPD2B/DPD2C IN UNDER 2 HOUR

OUTAGE.

J

PROVIDE / CUTOVER TEMPORARY SERVICE FROM EDSB2 TO ATS-22 IN UNDER 2 HOUR OUTAGE.

K

PROVIDE / CUTOVER TEMPORARY SERVICE FROM EDSB2 TO ATS-26 IN UNDER 2 HOUR OUTAGE.

L

PROVIDE / CUTOVER TEMPORARY SERVICE FROM EDSB2 TO SBME1 IN UNDER 2 HOUR OUTAGE.

M USSB: DEENERGIZE MV SERVICE TO LIGHTING TRANSFORMER

N USSB REMOVE EXISTING MV CABLE TO USSB LIGHTING / MSG

O USSB: OPEN LTG MAIN C/B & OPEN TIE C/B

P

USBB: BREAK DOWN & REMOVE USSB LTG TRANSFORMER AND (3) DISTRIBUTION SECTIONS

Q

USSB: INSTALL BUS BLANKET / INSULATION AND TEMPORARY END CAP SHEET METAL FOR

PROTECTION FOR REMAINING ENERGIZED LIVE PARTS

2B

A

USSB NEW; ASSEMBLE & INSTALL NEW USSB TRANSFORMER (LIGHTING), MAINS AND (2)

DISTRIBUTION SECTIONS (4 SECTIONS TOTAL).

B USSB NEW: INSTALL NEW MV CABLE TO USSB LIGHTING

C

USSB NEW: ROUGH-IN CONDUITS / WIRE FOR BUSWAY TAP FOR PENTHOUSE BUSWAY. PROVIDE

TEMPORARY SERVICE TO MCC IN PENTHOUSE, START GENERATORS, TRANSFER PENTHOUSE ATS TO GENERATOR, INSTALL END TAP BOX AND MAKE CUTOVER TO NEW USSB IN UNDER 6 HOUR OUTAGE.

D USSB NEW:ROUGH-IN CONDUITS / WIRE FOR SBHEB2. MAKE CUTOVER IN UNDER 2 HOUR OUTAGE.

E USSB NEW: ENERGIZE USSB TRANSFORMER LIGHTING

F USSB: DEENERGIZE MV SERVICE TO POWER TRANSFORMER

G USSB REMOVE EXISTING MV CABLE TO USSB POWER

H

USSB: BREAK DOWN & REMOVE USSB POWER TRANSFORMER AND (1) DISTRIBUTION SECTION

2C

A USSB NEW; ASSEMBLE NEW USSB TRANSFORMER (POWER) AND MAINS.

B USSB NEW: INSTALL NEW MV CABLE TO USSB POWER

C USSB NEW: ENERGIZE USSB TRANSFORMER POWER

D USSB NEW; INSTALL FEEDER TO ATS-22 - REMOVE TEMPORARY. MAKE CUTOVER IN UNDER 2 HOUR

OUTAGE.

E USSB NEW; INSTALL FEEDER TO ATS-26 - REMOVE TEMPORARY. MAKE CUTOVER IN UNDER 2 HOUR

OUTAGE.

F USSB NEW; INSTALL FEEDER TO SBME1 - REMOVE TEMPORARY. MAKE CUTOVER IN UNDER 2 HOUR

OUTAGE.

G USSB NEW; INSTALL FEEDER TO DPD2A - REMOVE TEMPORARY. MAKE CUTOVER IN UNDER 2 HOUR

OUTAGE.

H USSB NEW; INSTALL FEEDER TO DPD2B, MAKE CUTOVER IN UNDER 2 HOUR OUTAGE.

I USSB NEW; INSTALL FEEDER TO DPD2C, MAKE CUTOVER IN UNDER 2 HOUR OUTAGE.

J OPEN TIE C/B BETWEEN DPD2A - DPD2B AND DPD2C AND CLOSE C/B FROM USSB NEW.

K INCLUDE 30 DAY ACTIVATION PERIOD BETWEEN PHASES 2 AND 3

3 150 DAYS REPLACE UNIT SUBSTATION A

3A

A PROVIDE TEMPORARY SERVICE FROM EDSB2 TO DPD4. MAKE CUTOVER IN UNDER 2 HOUR OUTAGE.

B PROVIDE TEMPORARY SERVICE FROM EDSB2 TO ATS-5. MAKE CUTOVER IN UNDER 2 HOUR OUTAGE.

C

PROVIDE TEMPORARY SERVICE FROM EDSB2 TO SBHEB1. MAKE CUTOVER IN UNDER 2 HOUR

OUTAGE.

D

PROVIDE TEMPORARY SERVICE FROM EDSB2 TO SBHDB1. MAKE CUTOVER IN UNDER 2 HOUR

OUTAGE.

E PROVIDE TEMPORARY SERVICE FROM EDSB2 TO ATS-8. MAKE CUTOVER IN UNDER 2 HOUR OUTAGE.

F

PROVIDE TEMPORARY SERVICE FROM USSB NEW TO SBMW1. MAKE CUTOVER IN UNDER 2 HOUR

OUTAGE.

G MAINTAIN TEMPORARY SERVICE TO EXISTING EDSB2 FROM USSA-LTG TRANSFORMER

H USSA: LIGHTING MAIN C/B SHOULD STILL BE OPEN AND TIE CLOSED.

I USSA: DEENERGIZE MV SERVICE TO POWER TRANSFORMER

J USSA: REMOVE EXISTING MV CABLE TO USSA POWER

K

USSA: BREAK DOWN & REMOVE USSA POWER TRANSFORMER AND DISTRIBUTION SECTIONS

L

USSA: INSTALL BUS BLANKET / INSULATION AND TEMPORARY END CAP SHEET METAL FOR

PROTECTION OF REMAINING ENERGIZED LIVE PARTS

3B

USSA NEW: ASSEMBLE & INSTALL NEW USSA TRANSFORMER (POWER), MAINS AND DISTRIBUTION

SECTIONS

USSA NEW: INSTALL NEW MV CABLE TO USSA POWER

USSA NEW: OPEN LIGHTING MAIN (DISCONNECTED ANYWAY), CLOSE POWER MAIN C/B AND TIE C/B

USSA NEW: ENERGIZE USSB TRANSFORMER POWER AND DISTRIBUTION

USSA NEW: INSTALL FEEDER TO DPD4 - REMOVE TEMPORARY. MAKE CUTOVER IN LESS THAN 2 HOUR

OUTAGE.

USSA NEW: INSTALL FEEDER TO ATS-5 - REMOVE TEMPORARY. MAKE CUTOVER IN LESS THAN 2

HOUR OUTAGE.

USSA NEW: INSTALL FEEDER TO SBHEB1 - REMOVE TEMPORARY. MAKE CUTOVER IN LESS THAN 2

HOUR OUTAGE.

USSA NEW: INSTALL FEEDER TO SBHDB1 - REMOVE TEMPORARY. MAKE CUTOVER IN LESS THAN 2

HOUR OUTAGE.

USSA NEW: INSTALL FEEDER TO ATS-8 - REMOVE TEMPORARY. MAKE CUTOVER IN LESS THAN 2

HOUR OUTAGE.

USSA NEW: INSTALL FEEDER TO SBMW1 - REMOVE TEMPORARY. MAKE CUTOVER IN LESS THAN 2

HOUR OUTAGE.

3C

USSA: DEENERGIZE MV SERVICE TO LIGHTING TRANSFORMER

USSA: REMOVE EXISTING MV CABLE TO USSA TRANSFORMER (LIGHTING)

USSA: BREAK DOWN & REMOVE USSB LIGHTING TRANSFORMER

EDSB2: BREAK DOWN AND REMOVE

USSA NEW: ASSEMBLE & INSTALL NEW USSA TRANSFORMER (LIGHTING)

COORDINATE SHUT DOWN FOR USSA LTG TO USSA POWER CONNECTIONS. MAKE CUTOVER IN LESS

THAN 2 HOUR OUTAGE.

USSA NEW: INSTALL NEW MV CABLE TO USSA LIGHTING

USSA NEW: OPEN TIE C/B AND CLOSE USSB MAIN C/B'S

USSA NEW: ENERGIZE TRANSFORMER (LIGHTING) AND DISTRIBUTION

A

B

C

D

E

F

G

H

I

J

A

B

C

D

E

H

I

G

F

"USSA" (EXISTING)

3000A, 480/277V-3PH-4W

1600A

800AT

1600A

800AT

1600A

800AT

CLOSE

OPEN AND LOCK OUT REMOVE BUS

CONNECTION AND PROVIDE LUG

CONVERSIONS TO CONNECT

TEMPORARY FEEDER

LIGHTING

POWER

1600A

800AT

1600A

600AT

1600A

800AT

DPD4 ATS5 SBHEB1 SBHDB1 ATS8 SBMW1NEW

TEMP

250/4T

2500AF

2500AT

"EDSB2" (EXISTING TEMP)

400A

SALVAGE EXISTING DISTRIBUTION GEAR AND

USE FOR TEMPORARY POWER.

600A 400A 600A 800A

800AT

1200A

1200AT

800A

800AT

600A 225A 1200A

800AT

"USSB" (EXISTING)

1600A

1200AT

1600A

800AT

3000A

2500AT

HV FEEDER

POWER

1600A

800AT

1600A

800AT

1600A

800AT

1600A

800AT

1600A

800AT

1600A

800AT

PENT

SWG

NEW

USSB

SBHEB2

NEW

USSB

ATS-22-N ATS-26-N SBME1

DPD2A

TIE

CLOSE

DPD2B

TIE

CLOSE

DPD2C

SPARE

EXIST

HV FEEDER

2500A, 480/277V-3PH-4W

80/4T 120/4T 80/4T 80/4T

HV FEEDER

3000A, 480/277V-3PH-4W

MAIN TIE MAIN

MAIN TIE MAIN

LIGHTING

OPENOPEN

NEW

TEMP

EXIST

HV FEEDER

REFER TO DRAWING EP-602A

FOR ADDITIONAL INFORMATION

PROVIDE NEW TRIP

SETTING AS NOTED

(TYP.)

BUSWAY

PERMANENT FEEDERS CONNECTED

TO NEW USSB SECTION ONCE INSTALLED.

2A2B

1 1 1

3200AF

3000AM

2100AT

NEW

TEMP

NEW

TEMP

NEW

TEMP

3200AF

3000AM

2100AT

3200AF

3000AM

2100AT

3200AF

3000AM

2100AT

3200AF

3000AM

2100AT

3200AF

3000AM

2100AT

"USSA" (EXISTING)

3000A, 480/277V-3PH-4W

1600A

800AT

1600A

800AT

1600A

800AT

DISCONNECTED REMOVE AFTER

ALL FEEDERS ARE TRANSFERRED TO

NEW UNIT SUBSTATIONS.

LIGHTING POWER

1600A

800AT

1600A

800AT

1600A

800AT

DPD4 ATS5 SBHEB1 SBHDB1 ATS8 SBMW1

2500AF

2500AT

"EDSB2" (EXISTING TEMP)

400A 600A

600AT

400A 600A 800A

800AT

1200A 800A 600A 225A 1200A

800AT

USSB-NEW

TEMPORARY

FEEDER

80/4T80/4T80/4T80/4T

60/4T

OPEN

HV FEEDER HV FEEDER

MAINTIEMAIN

NEW

TEMP NEW

TEMP

NEW

TEMP

800AT

2500A, 480/277-3PH-4W

MAINTAIN TEMPORARY FEEDERS.

ONCE NEW USSA IS INSTALLED

AND NEW FEEDERS ARE

CONNECTED, DISCONNECT AND

REMOVE EDSB2 AND ASSOCIATED

TEMPORARY CONNECTIONS.

PROVIDE NEW TRIP

SETTING AS NOTED

(TYP.)

3A/3B3C

80/4T

NEW

TEMP

NEW

TEMP

NEW

TEMP

3200AF

3000AM

2100AT

3200AF

3000AM

2100AT

3200AF

3000AM

2100AT

V

DEMARC

ROOM

SUB A POWER

XFMR

SUB A LIGHTING

XFMR

SUB B LIGHTING

XFMR

TRANSPORT NEW PIECES

OF USSB.

DISCONNECT AND REMOVE

EXISTING USSB NOTED.

INSTALL PERMANENT

FEEDERS.

ASSEMBLE AND INSTALL

NEW USSB.

NEW UNIT

PRIMARY TERMINATION

USSB LIGHTING

TRANSFORMER

V

DEMARC

ROOM

SUB A POWER

XFMR

SUB A LIGHTING

XFMR

UNIT

SUB B

SUB B LIGHTING

XFMR

SUB B LIGHTING

XFMR

EDSB2

TEMPORARY FEEDERS

DASHED LINES INDICATE

NEW PIECES OF USSB

FOR RIGGING

AND INSTALLATION.

TEMPORARY FEEDERS

DASHED LINE INDICATES

EXISTING PIECES OF USSB

FOR RIGGING AND REMOVAL.

DISCONNECT AND REMOVAL OF

EXISTING USSB AS NOTED.

EDSB2

V

DEMARC

ROOM

SUB A POWER

XFMR

SUB A LIGHTING

XFMR

CONNECT TEMPORARY

FEEDERS TO USSA

DISTRIBUTION.

DISCONNECT TEMP FEEDERS

FROM USSB DISTRIBUTION.

INSTALL PERMANENT

FEEDERS.

ASSEMBLE AND INSTALL

NEW USSB

NEW UNIT

PRIMARY TERMINATION

USSB LIGHTING

TRANSFORMER

PRIMARY TERMINATION

USSB LIGHTING

TRANSFORMER

V

DEMARC

ROOM

SUB A POWER

XFMR

SUB A LIGHTING

XFMR

DASHED LINES INDICATE

NEW PIECES OF USSA

FOR RIGGING AND

INSTALLATION.

DASHED LINE INDICATES

EXISTING PIECES OF

USSA FOR RIGGING AND

REMOVAL.

DISCONNECT AND REMOVE

EXISTING USSA NOTED.

NEW UNIT

PRIMARY TERMINATION

USSB LIGHTING

TRANSFORMER

PRIMARY TERMINATION

USSB LIGHTING

TRANSFORMER

V

DEMARC

ROOMSUB A LIGHTING

XFMR

DISCONNECT AND REMOVE

EXISTING USSA AND

EXISTING EDSB2 NOTED.

INSTALL PERMANENT

FEEDERS

ASSEMBLE AND INSTALL

NEW USSA.

DISCONNECT TEMP FEEDERS

FROM USSA DISTRIBUTION.

NEW UNIT

PRIMARY TERMINATION

USSB LIGHTING

TRANSFORMER

PRIMARY TERMINATION

USSB LIGHTING

TRANSFORMER

PRIMARY TERMINATION

NEW UNIT

USSA LIGHTING

TRANSFORMER

V

DEMARC

ROOM

ASSEMBLE AND INSTALL

NEW USSA.

N

NEW UNIT

PRIMARY TERMINATION

USSB LIGHTING

TRANSFORMER

PRIMARY TERMINATION

USSB LIGHTING

TRANSFORMER

PRIMARY TERMINATION

PRIMARY TERMINATION

USSA LIGHTING

TRANSFORMER

NEW UNIT

USSA LIGHTING

TRANSFORMER

DEMOLITION

NEW WORK

PHASING PLAN

N

NORTH

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

Louis Stokes

Cleveland

VA Medical

Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1468 WEST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

STRUCTURAL ENGINEERING:

THORSON BAKER + ASSOC.

3030 WEST STREETSBORO RD.

RICHFIELD, OH 44286

P. 330.659.6688

ELECTRICAL ENGINEERING:

HEAPY

1400 WEST DOROTHY LN.

DAYTON, OH 45409

P. 937.224.0861

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

MECHANICAL ENGINEERING:

FFE, INC.

110 BOGGS LN, SUITE 170

SPRINGDALE, OH 45246

P. 513.522.0956

HAZ. MATERIALS ASSESSMENT:

STEPHEN J. SEBESTA & ASSOC.

30628 DETROIT RD. #258

WESTLAKE, OH 44145

P. 216.781.0060

FINAL CDs SUBMISSION

C

B

IM

\M o d e l\

-0

-E -C e n tr a l_ m a lo w e .r v t

/9

/2

:4

:0

P

M

E-002

ELECTRICAL CONSTRUCTION PHASING REPLACE SUBSTATION A & B

10701 EAST BLVD. CLEVELAND, OHIO

541-21-105

02.26.2021 MSG JJH/DMB

SCALE: NONE

PHASE 2 SINGLE LINE

SCALE: NONE

PHASE 3 SINGLE LINE

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"

ELECTRICAL ROOM D21 PHASE 2B

SCALE: 1/8" = 1'-0"

ELECTRICAL ROOM D21 PHASE 2A

SCALE: 1/8" = 1'-0"

ELECTRICAL ROOM D21 PHASE 2C

SCALE: 1/8" = 1'-0"

ELECTRICAL ROOM D21 PHASE 3A

SCALE: 1/8" = 1'-0"

ELECTRICAL ROOM D21 PHASE 3B

SCALE: 1/8" = 1'-0"

ELECTRICAL ROOM D21 PHASE 3C

GENERAL NOTES:

PLAN NOTES:

A. SEE FEEDER SCHEDULE ON SHEET EP-700.

B. BASIS OF DESIGN IS EATON ELECTRICAL EQUIPMENT.

ELECTRICAL CONTRACTOR SHALL INCLUDE AS A PART OF EQUIPMENT

SHOP DRAWING SUBMITTAL A SCALED FLOOR PLAN WITH NEW

ELECTRICAL EQUIPMENT AND INDICATING THAT CLEARANCES FOR ALL

PHASES OF CONSTRUCTION INCLUDING RIGGING CAN BE

ACCOMMODATED.

C. EXACT CONSTRUCTION PHASING PROCEDURE AND EQUIPMENT SHALL

BE SUBMITTED TO COR AT THE BEGINNING OF THE PROJECT.

DEVIATIONS FROM THE PROPOSED CONSTRUCTION PHASES WILL BE

REVIEWED. NO ADDITIONAL CONSTRUCTION COSTS ASSOCIATED

WITH DEVIATIONS ARE ACCEPTABLE.

D. IMMEDIATELY AFTER CONSTRUCTION CONTRACT AWARD, CONTRACTOR

SHALL:

1. TAKE DETAILED MEASUREMENTS (OR PROVIDE LASER SCAN) OF

ALL GEAR/CONDUIT AFFECTED BY THIS PROJECT AS WELL AS

ENTIRE RIGGING PATH.

2. OPEN UP ALL GEAR TO BE REPLACED TO LOCATE AND DOCUMENT

CONDUIT ENTRY POINTS, CONDUCTOR SIZES, BUS BAR

ARRANGEMENTS, CONTROL WIRING ETC.

3. PROVIDE 1/4"=1'-0" SCALE COORDINATION DRAWINGS BY PHASE

IN CONJUNCTION WITH UNIT SUBSTATION SHOP DRAWINGS TO

ENSURE THAT EACH PHASE HAS NO IMPEDIMENTS TO

CONSTRUCTION. THESE PHASED COORDINATION DRAWINGS

SHALL SHOW EXISTING GEAR, NEW GEAR AND CONDUIT

EXTENSIONS/SPLICES REQUIRED.

1. SEE SHEET EP-700 FOR PEAK LOADS ON EXISTING EQUIPMENT.

2. SEE SHEET EP-602 FOR NEW BUSWAY END CAP TAP BOX.

3. EXISTING EDSB2 MAIN CIRCUIT BREAKER AND ADJACENT

SECTION ARE MANUFACTURED BY SQUARE D (QED SERIES)

WITH MH36 SERIES CIRCUIT BREAKERS. END SECTION OF

EDSB2 IS MANUFACTURED BY GE (SPECTRA SERIES) WITH

SKLC36 SERIES CIRCUIT BREAKER AND GTP SERIES TRIP

MODULES.

4. PROVIDE PROTECTIVE BARRIER FOR WORK AROUND EXPOSED

LIVE PARTS. COORDINATE FINAL ELECTRICAL SAFETY

PROVISIONS (METHOD OF PROCEDURE) WITH VA POWER

SYSTEM STUDY, AND VA COR FOR APPROVAL. ONLY

AUTHORIZED TRAINED WORKERS WILL BE ALLOWED TO

PERFORM ELECTRICAL WORK. WORKERS SHALL WEAR

APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT (PPE).

5. REFER TO SHEET EP-401 FOR NEW SUBSTATION LAYOUTS.

6. TRANSFORMER SECONDARY FEEDER TAP CONDUCTORS SHALL

BE LESS THAN 25 FEET AND PROTECTED FROM PHYSICAL

DAMAGE BY APPROVED MEANS PER NEC ART 240.21.

5 5 5

4. PROVIDE A HIGHLY DETAILED MOP (METHOD OF PROCEDURE)

OUTLINING THE UNIT SUBSTATION AND EMERGENCY EQUIPMENT

REPLACEMENT IN A STEP BY STEP MANNER WITH ALL REQUIRED

OUTAGES, SAFETY PRECAUTIONS, CUTOVERS, ETC. INDICATED.

THIS MOP SHOULD PROVIDE SUFFICIENT INFORMATION TO SHOW

THAT THE CONTRACTOR HAS PERFORMED THEIR DUE DILIGENCE

TO ENSURE THE REPLACEMENT WILL PROCEED WITHOUT ISSUE.

5. GEAR SHALL NOT BE ORDERED UNTIL MOP IS REVIEWED IN DETAIL

WITH COR AND ENGINEER AND APPROVED.

6. FOR EACH SHUTDOWN REQUIRED, INDICATE ALL PANELS

AFFECTED. VA WILL THEN INVESTIGATE DEPARTMENTS AFFECTED

AND APPROVE THE OUTAGE.

7. THIS FACILITY IS A FULLY FUNCTIONAL 24/7 HEALTHCARE OPERATION

WITH OPERATING ROOMS, ICU'S, INPATIENT/OUT PATIENT,

PHARMACY, LABORATORY, ETC. FUNCTIONS. THE GREATEST OF

CARE MUST BE EXERCISED WHILE PLANNING THIS REPLACEMENT

AT THE BEGINNING OF THE PROJECT.

Revisions: Date:

DESIGN DEVELOPMENT 7.24.20

35% CDs SUBMISSION 09.01.2020

65% CDs SUBMISSION 10.08.2020

90% CDs SUBMISSION 11.24.2020

100% CDs SUBMISSION 02.05.2021

FINAL CDs SUBMISSION 02.26.2021

ADDENDUM 1 08.06.2021

P/B

P /B

P /B

P /B

P /B

P /B

P/B

P /B

P /B

F

CR

CR

FF

CR

EDC

EDC

EDC

S

R

D

F F

R W

JJ

SC

DPD4

ERD6

LD2 DRD-2

ELECTRICAL ROOM

D21

ATS-22

ERD6 SECTION 2

SBHDB1

SUB B

SUB A

NEW ESBD2

ATS-8

ATS-5

AHU-2

T-LDB1EQ

DPLDB1

ATS-26

ATS-30

DPHEBCR1

DPHDB1

T-HGB1EQ

LGB1EQ

HGB1EQ

150KVA

T-DRD2

CLEAN LINEN 2

B-D412

MECHANICAL/ELECTRICAL RM

G09AMECHANICAL RM

D20

B-D424

NEW FLOOR

CORE (TYP.)

NEW FLOOR

CORE (TYP.)

OFFICE/BREAK ROOM

GENERAL NOTES

A. SEE PHASING PLAN SHEET E-002 FOR DEMOLITION/

AND NEW EQUIPMENT INSTALLATION.

B. ALL TEMPORARY FEEDER CABLES SHALL BE

SUPPORTED FROM STRUCTURE ABOVE TO AVOID

NEW AND EXISTING ELECTRICAL EQUIPMENT RIGGING

FOR INSTALLATION AND REMOVAL.

"DPD1"

11KV PB FROM BSW4

B-D410

"DPD1"

"OLD DPD1" USED

AS A PULLBOX

"OLD DPD3" USED

AS A PULLBOX

UNMARKED PANEL

480/277V-3PH-4W

FED FROM LD2

11KV PULLBOX (8'-0" ABOVE FLOOR)

FROM BSW4

UPPER PULL BOX

(4'-0" ABOVE FLOOR)

LOWER PULL BOX

(0'-8" ABOVE FLOOR)

LD3

NEW UNIT

PRIMARY TERMINATION

PRIMARY TERMINATION

PRIMARY TERMINATION

PRIMARY TERMINATION

USSA LIGHTING

TRANSFORMER

RELOCATED TRANSFORMER

DEMARC

ROOM

NEW UNIT

EM1

C1

C1

C1

C1

TEMPORARY

COOLING

UNIT

B-D412A

C1

EXISTING EDSB2 TO

BE USED FOR

TEMPORARY POWER

SERVICE AND

REMOVED AFTER UNIT

SUBSTATION A HAS

BEEN INSTALLED AND

ACTIVATED.

SEE PHASING PLAN

E-002

DOTTED LINE INDICATES

EQUIPMENT WORK

CLEARANCES. TYP.

NEW LUMINARIES WIRED INTO

EXISTING RM. B-D412 LIFE SAFETY

LIGHTING BRANCH CIRCUIT.

EXISTING RELOCATED LUMINAIRE WIRED INTO

EXISTING CORRIDOR B-D410 LIFE SAFETY

LIGHTING BRANCH CIRCUIT.

3 3

PLAN NOTES

1. PROVIDE 4" CONCRETE PAD.

2. TEMPORARY PORTABLE HVAC UNIT 480V-3PH-60HZ-5MCA.

PROVIDE TEMPORARY 480V-3PH-20AMP FEEDER 3-#12

CABLE FROM EXISTING AHU2 SERVICE (RM B502). PROVIDE

NEW 30AMP - 3POLE FUSED SWITCH WITH 20AF IN.

REMOVE WHEN AHU-2 IS PLACED BACK IN SERVICE.

3. MANUFACTURER TO PROVIDE GEAR THAT CAN BE RIGGED

INTO THE SPACE (BROKEN DOWN) AND WILL MEET ALL

REQUIRED WORKING CLEARANCES AS SHOWN AS ROOM

IS EXTREMELY TIGHT. FIELD VERIFY RIGGING, ENTRANCE

PATH, OVERHEAD UTILITIES, CRAWL SPACE CONDUIT

OBSTRUCTIONS, ETC. PRIOR TO ORDERING. SUBMIT

MANUFACTURER'S PROCESS FOR ONSITE ASSEMBLY

AND FIELD CERTIFICATION WITH SHOP DRAWINGS AND

PRIOR TO ORDERING FOR REVIEW. PROVIDE

MANUFACTURER FIELD REPRESENTATIVE ONSITE DURING

INSTALLATION AND FINAL WRITTEN APPROVAL OF FULLY

ASSEMBLED GEAR.

4. NEW CARD READER WITH WALLBOX AND CONDUIT,

PROVIDE NEW DOOR CONTROL WIRING IN CONDUIT BACK

TO ROOM BD422 (APPROX 50' TO THE EAST) AND

TERMINATE IN NEW LENEL DOOR CONTROL EQUIPMENT

PANEL WITH POWER SUPPLY.

5. NEW WIRING DEVICE WIRED TO LOCAL WIRING DEVICE

120V-20AMP BRANCH CIRCUIT. NEW WIRING DEVICE

CIRCUIT SHALL NOT EXCEED 8 DEVICES.

6. PROVIDE NEW BOX AND RE-INSTALL EXISTING CARD

READER. PROVIDE NEW CONTROL WIRING IN CONDUIT

BACK TO EXISTING LENEL PANEL AND NEW POWER

SUPPLY. RE-TERMINATE ON EXISTING DOOR CONTROL

POINT AND NEW POWER SUPPLY.

7. NEW FIRE ALARM DUCT SMOKE DETECTOR, WIRE INTO

EXISTING SALVAGED FIRE ALARM POWER AND SIGNAL

CIRCUIT.

8. REINSTALL EXISTING EXIT SIGN.

9. PROVIDE NEW DUAL DATA DROP FROM EXISTING SIGNALS

CLOSET BD-422. TERMINATE ON EXISTING PORTS IN

EXISTING PATCH PANEL. MATCH EXISTING CABLING

CATEGORY.

10. RE-INSTALL SQUARE D METERS HERE. COORDINATE

EXACT LOCATION WITH COR.

11. LOCATE UNIT SUBSTATION SO ALL REQUIRED WORKING

CLEARANCES ARE MAINTAINED.

12. RECONDITIONED AHU2 (2) 7.52FLA-480V-3PHASE ECM

MOTORS. (UNIT 30A MOCP) RECONNECT TO EXISTING

FEEDER 3" 10G, 3/4" SERVED FROM PDP2 480V-3PHASE-

30AF, PDP2 IS LOCATED IN ROOM 2F501A AND IS SERVED

FROM EXISTING LAB WAREHOUSE SUBSTATION IN RM

2F501A. VERIFY EXACT TERMINATIONS AND LOCATION

WITH AHU2 MFR.

13. PROVIDE NEW FIRE ALARM AV DEVICE. CONNECT TO

EXISTING F.A. CIRCUIT.

14. NEW FIRE ALARM DEVICE. CONNECT TO EXISTING FIRE

ALARM SYSTEM.

15. NEW CORES SHOW FOR REFERENCE ONLY. PROVIDE ALL

REQUIRED FOR NEW CONDUITS. SIZE PER

SPECIFICATIONS. COORDINATE LOCATION WITH GEAR

MANUFACTURER. FIELD LOCATE AND NEW FLOOR

PENETRATIONS SHALL INCLUDE CONDUIT SLEEVE. SEE

DETAIL ON EP-501.

16. NEW VAV BOX. RECONNECT EXISTING VAV BOX SALVAGED

CIRCUIT.

17. REINSTALL CEILING SPEAKER.

REINSTALL EXISTING

PENDANT MTD LUMINAIRE WIRE NEW LUMINAIRE INTO

EXISTING RM LIGHTING BRANCH

CIRCUIT

BD412

BD412a

BD412b

D21

EXISTING CONDENSATE

PUMP TO REMAIN.

USSA LIGHTING

TRANSFORMER

USSB LIGHTING

TRANSFORMER

USSB LIGHTING

TRANSFORMER

6' - 5 3/4"

REINSTALL EXISTING

FIRE ALARM DEVICES

NEW TEMPORARY CONDENSATE PUMP

WITH PLUG AND CORD. WIRE INTO LOCAL

DUPLEX RECEPTACLE

4' - 0"

4' - 0 11/32"

TEMP WORKING

CLEARANCE

REINSTALL EXISTING PENDANT MOUNTED

SALVAGED LUMINARIES AND BRANCH

CIRCUIT. TYPICAL.

TYP.

TYP.

RELOCATED PULL

STATION

3' - 2 11/16"

EP-401

REINSTALL EXISTING

2'X4'

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

Louis Stokes

Cleveland

VA Medical

Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1468 WEST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

STRUCTURAL ENGINEERING:

THORSON BAKER + ASSOC.

3030 WEST STREETSBORO RD.

RICHFIELD, OH 44286

P. 330.659.6688

ELECTRICAL ENGINEERING:

HEAPY

1400 WEST DOROTHY LN.

DAYTON, OH 45409

P. 937.224.0861

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

MECHANICAL ENGINEERING:

FFE, INC.

110 BOGGS LN, SUITE 170

SPRINGDALE, OH 45246

P. 513.522.0956

HAZ. MATERIALS ASSESSMENT:

STEPHEN J. SEBESTA & ASSOC.

30628 DETROIT RD. #258

WESTLAKE, OH 44145

P. 216.781.0060

FINAL CDs SUBMISSION

C

B

IM

\M o d e l\

-0

-E -C e n tr a l_ m a lo w e .r v t

/9

/2

:4

:0

P

M

EP-401

ENLARGED BASEMENT POWER AND

SYSTEMS PLAN

REPLACE SUBSTATION A & B

10701 EAST BLVD. CLEVELAND, OHIO

541-21-105

02.26.2021 MSG JJH/DMB

SCALE: 1/4" = 1'-0"

ENLARGED BASEMENT POWER AND SYSTEMS PLAN

FULLY SPRINKLERED

EXISTING UNIT SUBSTATION CLEARANCES

SCALE: NTS

N

NORTH

N

Revisions: Date:

DESIGN DEVELOPMENT 7.24.20

35% CDs SUBMISSION 09.01.2020

65% CDs SUBMISSION 10.08.2020

90% CDs SUBMISSION 11.24.2020

100% CDs SUBMISSION 02.05.2021

FINAL CDs SUBMISSION 02.26.2021

ADDENDUM 1 08.06.2021

ENEN

EN

E NE NE NE N

E NE NE N

G

K

KK

E NE NE N

E NE NE NE N

E NE NE N

E NE N

KK

K K K K K K

G G G

E NE N E NE NE NE N

E NE N

E NE NE N

E N

E N

E NE NE N

E NE N

E NE NE N

E N

G

E N

M

800AF

800AT

1600AF

1600AT

4000AF

4000AT

T21 D3.01

(TIE)

GENERATOR PARALLELING/

SYNCHRONIZATION SWITCHGEAR "GPS2"

4000A, 480/277V-3PH-4W

ELECT RM BE602

3000A, 480/277V-3PH-4W

PANEL "DPEG1"

800AF

800AT

3P

ATS-34

800A-4P

EMERGENCY

CRITICAL

800AF

800AT

3P

ATS-33

800A-4P

EMERGENCY

CRITICAL

400AF

400AT

3P

ATS-36

400A-4P

ESSENTIAL

EQUIPMENT

400AF

400AT

3P

ATS-35

400A-4P

LIFE SAFETY

800AF

800AT

3P

800A, 480/277V-3PH-4WGENERATOR

DISTRIBUTION "DPEG2"

800AF

800AT

3P

ATS-47

260A-4P

ESSENTIAL

EQUIPMENT

800AF

800AT

3P

ATS-38

800A-4P

ESSENTIAL

EQUIPMENT

400AF

400AT

3P

ATS-37

1200A-4P

ESSENTIAL

EQUIPMENT

RM 1F192B

RM CARES PH

GENERATOR "G3"

1250KW/1562KVA,

480/277V-3PH-4W

RM 1E500

1250KW/1562KVA,

480/277V-3PH-4W

RM 1E500

G7

2000AF

2000AT

3200AF

3000AT

G6

2000AF

2000AT

1600AF

1600AT

PG1

2000AF

2000AT

800AF

800A-3P

GENERATOR

DISTRIBUTION "DPEG3"

800A, 480/277V-3PH-4W

RM 109

400AF

400AT

3P

400A, 480/277V-3PH-4WGENERATOR

DISTRIBUTION "EPDP1"

225AF

225AT

3P

ATS-40

260A-4P

ESSENTIAL

EQUIPMENT

ATS-39

260A-4P

ESSENTIAL

EQUIPMENT

ATS-48

260A-4P

ESSENTIAL

EQUIPMENT

RM 2F501A

225AF

225AT

3P

225AF

125AT

3P

600AF

600A-3P

GENERATOR DISTRIBUTION

"RAD1PEH1" 1200A, 480/277V-3PH-4W

RM SUB PH

600AF

600AT

3P

ATS-49

600A-4P

ATS-50

260A-4P

ATS-41

300A-4P

400AF

400AT

3P

400AF

400AT

3P

ATS-42

400A-4P

400AF

400AT

3P

600AF

600AT

3P

400AF

400AT

3P

400AF

400AT

3P SPARE

225A

3P SPARE

200A 3P

ELEVATOR

DOCK T-D

2000A, 480/277V-3PH-4WGENERATOR

DISTRIBUTION "EPDP"

800AF

800AT

3P

ATS-44

800A-4P

ESSENTIAL

EQUIPMENT

ATS-45

800A-4P

ESSENTIAL

EQUIPMENT

ATS-46

800A-4P

ESSENTIAL

EQUIPMENT

RM 7C105

800AF

800AT

3P

800AF

800AT

3P

LOAD BANK

2000A, 480/277V-3PH-4WGENERATOR

DISTRIBUTION "EDSB3"

800AF

800AT

3P

ATS-51

800A-4P

ESSENTIAL

EQUIPMENT

ATS-52

800A-4P

ESSENTIAL

EQUIPMENT

RM 100

800AF

800AT

3P

1200AF

PROVISION

1600AF

1000AT

3200AF

2500AT

GENERATOR PARALLELING/

SYNCHRONIZATION SWITCHGEAR "GPS1"

4000A, 480/277V-3PH-4W

ELECT RM BE602

GENERATOR "G1"

1000KW/1200KVA,

480/277V-3PH-4W

RM 1E500

GENERATOR "G2"

G3

1600AF

1600AT

1600AF

1600AT

GFA

G4

1600AF

1600AT

MANUAL

3200AF

3000AT

TGPB

MANUAL

3200AF

3000AT

TGPA

MANUAL

3200AF

3000AT

PG2

MANUAL

4000AF

4000AT

T12

(TIE BREAKER)

MANUAL

3200AF

3000AT

TG3B

MANUAL

3200AF

3200AT

TG3A

3200AF

3000AT

3000A, 480/277V-3PH-4W

RM 100

MANUAL TIE BREAKER

4000A, 480/277V-3PH-4W

RM 100

TIE GPS

GENERATOR "G4"

G4-MCBG4-MCB G2-MCBG1-MCB

1000KW/1200KVA,

480/277V-3PH-4W

RM 1E500

1600A, 480/277V-3PH-4WGENERATOR

DISTRIBUTION "EDSB4"

800AF

800AT

3P

ATS-26

800A-4P

ESSENTIAL

EQUIPMENT

ATS-15

260A-4P

ESSENTIAL

EQUIPMENT

RM 100

400AF

400AT

3P

800AF

PROVISION

1200AF

1200AT

GENERATOR DISTRIBUTION

"EGSB1" 1600A, 480/277V-3PH-4W

RM BA151

800AF

600AT

3P

ATS-4

600A-4P

ESSENTIAL

EQUIPMENT

ATS-3

800A-4P

ATS-2

400A-4P

800AF

800AT

3P

400AF

400AT

3P

ATS-1

400A-4P

400AF

400AT

3P

800AF

400AT

T1-EC

750KVA-3PH

RM 100

TR-EC

750KVA-3PH

RM BA151

ESSENTIAL

EQUIPMENT

EMERGENCY

CRITICALLIFE SAFETY

(NEW) PANEL "EDSB2"

400AF

400AT

400A, 480/277V-3PH-4WGENERATOR

DISTRIBUTION "EGKDP"

150A 3P

ATS-7

150A-4P

LIFE SAFETY

ATS-6

400A-4P

ESSENTIAL

EQUIPMENT

RM BF458

400A 3P

(NEW)

ATS-8

600A-4P

ESSENTIAL

EQUIPMENT

MCC-G11

BOILER RM

600A, 480/277V-3PH-4WGENERATOR

DISTRIBUTION "EGDP"

150A 3P

ATS-13

150A-4P

LIFE SAFETY

ATS-12

400A-4P

ESSENTIAL

EQUIPMENT

RM A105

400A 3P

ATS-11

600A-4P

ESSENTIAL

EQUIPMENT

600A 3P

(NEW)

ATS-5

800A-4P

RM B-D412A

ATS-30

800A-4P

CRITICAL

GENERATOR DISTRIBUTION

"DPNB1G" 1200A, 480/277V-3PH-4W

RM BE261

600A 3P

ATS-19

600A-4P

EMERGENCY

CRITICAL

ATS-18

260A-3P

ATS-17

800A-3P

300AF

3P

800AF

3P

ATS-16

800A-3P

800A 3P

ESSENTIAL

EQUIPMENTLIFE SAFETY

(NEW)

ATS-22

1200A-4P

ATS-21

260A-3P

ESSENTIAL

EQUIPMENT

WEST HVAC-PH

ESSENTIAL

EQUIPMENT

EAST HVAC-PH

ATS-20

600-4P

800A, 480/277V-3PH-4WGENERATOR

DISTRIBUTION "EDSB3"

600AF

600AT

3P

ATS-25

600A-4P

ESSENTIAL

EQUIPMENT

ATS-24

260A-4P

LIFE SAFETY

ATS-23

600A-4P

EMERGENCY

CRITICAL

RM 100

400AF

225AT

3P

600AF

600AT

3P

EMERGENCY

CRITICAL

T-UPS

500KVA-3PH

RM BE261

ATS-65

4000A-4P

ESSENTIAL

EQUIPMENT

3200AF

3000AT

3000A, 480/277V-3PH-4W

2000KW/2500KVA,

480/277V-3PH-4W

RM 102

GENERATOR "G5"

G5-MCB

PORTABLE GENERATOR

CONNECTION TERMINAL BOX "PG2"

3000A FEEDER BUS DUCT

3000A, 480/277V-3PH-4W

RM 112

MANUAL TIE BREAKER

3000A, 480/277V-3PH-4W

RM 112GENERATOR

DISTRIBUTION "GDS3"

400AF

400AT

3P

ATS-43

800A-4P

EMERGENCY

CRITICAL

2500A, 480/277V-3PH-4W

RM B-D412A

SUB-A

(D21)

SUB-B

(D21)

GENERAL NOTES

A. ALL EQUIPMENT AND FEEDERS ARE EXISTING TO

REMAIN UNLESS OTHERWISE NOTED.

B. SEE SHEET E-700 FEEDER SCHEDULE.

C. SEE PHASING PLAN SHEET E-002 FOR DEMOLITION

AND NEW EQUIPMENT INSTALLATION

PLAN NOTES

1. MAKE SPLICE AND PROVIDE SPLICE BOX IN

ELECTRICAL ROOM OR IN CRAWL SPACE BELOW

AS REQUIRED. USE IRREVERSIBLE HYDRAULIC

CRIMP CONNECTORS. FIELD VERIFY

CONDUCTOR SIZES (AND MATCH) PRIOR TO

ORDERING.

2. NEW SQUARE D METER AND CT'S, SQUARE D

ION7400 SERIES OR EQUAL. CONNECT METER TO

EXISTING SCHNEIDER ELECTRIC METERING

SYSTEM. INCLUDE ALL WIRING, HARDWARE,

PROGRAMMING AND TESTING.

3. PROVIDE NEW CONTROL WIRING TO

PARALLELING GEAR. (15) #12 AWG., #12G, 1.5"C.

RUSSELECTRIC TO PROVIDE ALL PROGRAMMING,

TESTING, HMI UPGRADES AND INTEGRATION,

LOAD SHEDDING, ETC. TO INTEGRATE NEW ATS.

PROVIDE WIRING FROM ATS TO PARALLELING

GEAR AND FROM PARALLELING GEAR TO

REMOTE TEST PANEL. REFER TO SHEET EP-700.

DPD1

60/460/4

60/440/4

101/4 80/4 120/4 80/4

80/4 26/4 120/4

120/4 121/4

250/4

EQDLG11

1200A

480/277

3PH -4

SUB-A

(D21)

80/4

80/4

NEW

NEW

NEWNEWNEW

NEWNEWNEWNEW

NEWNEW

NEW

NEW

NEW

RM

E24A

80/4

NEW

RM

2B480

RM

1A1598

225A

SPARE

225A

SPARE

NEWNEW

141/4

101/4

120/4

82/4

121/4

26/4 82/4

SPD

600AF

600AT

800AF

800AT

600AF

600AT

800AF

800AT

1200AF

1200AT

225AF

225AT

600AF

600AT

800AF

800AT

1200AF

1200AT

225AF

SPARE

225AF

SPARE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: NICK CARROZZA

VA FORM 08 - 6231

A

Louis Stokes

Cleveland

VA Medical

Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1468 WEST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

STRUCTURAL ENGINEERING:

THORSON BAKER + ASSOC.

3030 WEST STREETSBORO RD.

RICHFIELD, OH 44286

P. 330.659.6688

ELECTRICAL ENGINEERING:

HEAPY

1400 WEST DOROTHY LN.

DAYTON, OH 45409

P. 937.224.0861

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE.

CLEVELAND, OH 44111

P. 440.667.5120

MECHANICAL ENGINEERING:

FFE, INC.

110 BOGGS LN, SUITE 170

SPRINGDALE, OH 45246

P. 513.522.0956

HAZ. MATERIALS ASSESSMENT:

STEPHEN J. SEBESTA & ASSOC.

30628 DETROIT RD. #258

WESTLAKE, OH 44145

P. 216.781.0060

FINAL CDs SUBMISSION

C

B

IM

\M o d e l\

-0

-E -C e n tr a l_ m a lo w e .r v t

/9

/2

:4

:0

P

M

EP-603

EMERGENCY POWER SYSTEM NEW WORK

RISER DIAGRAM

REPLACE SUBSTATION A & B

10701 EAST BLVD. CLEVELAND, OHIO

541-21-105

02.26.2021 MSG JJH/DMB

SCALE: 12" = 1'-0"

EMERGENCY POWER SYSTEM RISER DIAGRAM

1 1

1 1

FULLY SPRINKLERED

Revisions: Date:

DESIGN DEVELOPMENT 7.24.20

35% CDs SUBMISSION 09.01.2020

65% CDs SUBMISSION 10.08.2020

90% CDs SUBMISSION 11.24.2020

100% CDs SUBMISSION 02.05.2021

FINAL CDs SUBMISSION 02.26.2021

ADDENDUM 1 08.06.2021

07-01-20

Final CDs Submission VAMC WADE PARK

2/26/2021 Replace Substations A & B

Addendum 1 – 8.6.21 Project No. 541-21-105

SAFETY REQUIREMENTS

01 35 26 -1

SECTION 01 35 26

SAFETY REQUIREMENTS

TABLE OF CONTENTS

1.1 APPLICABLE PUBLICATIONS

1.2 DEFINITIONS

1.3 REGULATORY REQUIREMENTS

1.4 ACCIDENT PREVENTION PLAN (APP)

1.5 ACTIVITY HAZARD ANALYSES (AHAs)

1.6 PRECONSTRUCTION CONFERENCE

1.7 “SITE SAFETY AND HEALTH OFFICER” (SSHO) and “COMPETENT PERSON” (CP)

1.8 TRAINING

1.9 INSPECTIONS

1.10 ACCIDENTS, OSHA 300 LOGS, AND MAN-HOURS

1.11 PERSONAL PROTECTIVE EQUIPMENT (PPE)

1.12 INFECTION CONTROL

1.13 TUBERCULOSIS SCREENING

1.14 FIRE SAFETY

1.15 ELECTRICAL

1.16 FALL PROTECTION

1.17 SCAFFOLDS AND OTHER WORK PLATFORMS

1.18 EXCAVATION AND TRENCHES

1.19 CRANES

1.20 CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT)

1.21 CONFINED SPACE ENTRY

1.22 WELDING AND CUTTING

1.23 LADDERS

1.24 FLOOR & WALL OPENINGS

2/26/2021 Replace Substations A & B

Addendum 1 – 8.6.21 Project No. 541-21-105

SAFETY REQUIREMENTS

01 35 26 -2

SECTION 01 35 26

SAFETY REQUIREMENTS

1.1 APPLICABLE PUBLICATIONS:

A. Latest publications listed below form part of this Article to extent referenced. Publications are referenced in text by basic designations only.

B. American Society of Safety Engineers (ASSE):

A10.1-2011...........Pre-Project & Pre-Task Safety and Health

Planning

A10.34-2012..........Protection of the Public on or Adjacent to

Construction Sites

A10.38-2013..........Basic Elements of an Employer’s Program to

Provide a Safe and Healthful Work Environment

American National Standard Construction and

Demolition Operations

C. American Society for Testing and Materials (ASTM):

E84-2013.............Surface Burning Characteristics of Building

Materials

D. The Facilities Guidelines Institute (FGI):

FGI Guidelines-2010Guidelines for Design and Construction of

Healthcare Facilities

E. National Fire Protection Association (NFPA):

10-2018..............Standard for Portable Fire Extinguishers

30-2018..............Flammable and Combustible Liquids Code

51B-2019.............Standard for Fire Prevention During Welding, Cutting and Other Hot Work

70-2020..............National Electrical Code

70B-2019.............Recommended Practice for Electrical Equipment

Maintenance

2/26/2021 Replace Substations A & B

Addendum 1 – 8.6.21 Project No. 541-21-105

SAFETY REQUIREMENTS

01 35 26 -3

70E-2018 ............Standard for Electrical Safety in the Workplace

99-2018..............Health Care Facilities Code

241-2019.............Standard for Safeguarding Construction, Alteration, and Demolition Operations

F. The Joint Commission (TJC)

TJC Manual ..........Comprehensive Accreditation and Certification

Manual

G. U.S. Nuclear Regulatory Commission

10 CFR 20 ...........Standards for Protection Against Radiation

H. U.S. Occupational Safety and Health Administration (OSHA):

29 CFR 1910 .........Safety and Health Regulations for General

Industry

29 CFR 1926 .........Safety and Health Regulations for Construction

Industry

I. VHA Directive 2005-007

1.2 DEFINITIONS:

A. Critical Lift. A lift with the hoisted load exceeding 75% of the crane’s maximum capacity; lifts made out of the view of the operator

(blind picks); lifts involving two or more cranes; personnel being hoisted; and special hazards such as lifts over occupied facilities, loads lifted close to power-lines, and lifts in high winds or where other adverse environmental conditions exist; and any lift which the crane operator believes is critical.

B. OSHA “Competent Person” (CP). One who is capable of identifying existing and predictable hazards in the surroundings and working conditions which are unsanitary, hazardous or dangerous to employees, and who has the authorization to take prompt corrective measures to eliminate them (see 29

CFR 1926.32(f)).

C. "Qualified Person" means one who, by possession of a recognized degree, certificate, or professional standing, or who by extensive knowledge, 2/26/2021 Replace Substations A & B

Addendum 1 – 8.6.21 Project No. 541-21-105

SAFETY REQUIREMENTS

01 35 26 -4 training and experience, has successfully demonstrated his ability to solve or resolve problems relating to the subject matter, the work, or the project.

D. High Visibility Accident. Any mishap which may generate publicity or high visibility.

E. Accident/Incident Criticality Categories:

1. No impact – near miss incidents that should be investigated but are not required to be reported to the VA;

2. Minor incident/impact – incidents that require first aid or result in minor equipment damage (less than $5000). These incidents must be investigated but are not required to be reported to the VA;

3. Moderate incident/impact – Any work-related injury or illness that results in:

a. Days away from work (any time lost after day of injury/illness onset);

b. Restricted work;

c. Transfer to another job;

d. Medical treatment beyond first aid;

e. Loss of consciousness;

4. A significant injury or illness diagnosed by a physician or other licensed health care professional, even if it did not result in (1) through (5) above or,

5. Any incident that leads to major equipment damage (greater than

$5000).

F. These incidents must be investigated and are required to be reported to the VA;

1 Major incident/impact – Any mishap that leads to fatalities, hospitalizations, amputations, and losses of an eye as a result of contractors’ activities. Or any incident which leads to major

2/26/2021 Replace Substations A & B

Addendum 1 – 8.6.21 Project No. 541-21-105

SAFETY REQUIREMENTS

01 35 26 -5 property damage (greater than $20,000) and/or may generate publicity or high visibility. These incidents must be investigated and are required to be reported to the VA as soon as practical, but not later than 2 hours after the incident.

G. Medical Treatment. Treatment administered by a physician or by registered professional personnel under the standing orders of a physician. Medical treatment does not include first aid treatment even through provided by a physician or registered personnel.

1.3 REGULATORY REQUIREMENTS:

A. In addition to the detailed requirements included in the provisions of this contract, comply with 29 CFR 1926, comply with 29 CFR 1910 as incorporated by reference within 29 CFR 1926, comply with ASSE A10.34, and all applicable federal, state, and local laws, ordinances, criteria, rules and regulations. Submit matters of interpretation of standards for resolution before starting work. Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements govern except with specific approval and acceptance by the

Contracting Officer Representative.

1.4 ACCIDENT PREVENTION PLAN (APP):

A. The APP (aka Construction Safety & Health Plan) shall interface with the Contractor's overall safety and health program. Include any portions of the Contractor's overall safety and health program referenced in the APP in the applicable APP element and ensure it is site-specific. The Government considers the Prime Contractor to be the

"controlling authority" for all worksite safety and health of each subcontractor(s). Contractors are responsible for informing their subcontractors of the safety provisions under the terms of the contract and the penalties for noncompliance, coordinating the work to prevent one craft from interfering with or creating hazardous working conditions for other crafts, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.

B. The APP shall be prepared as follows:

2/26/2021 Replace Substations A & B

Addendum 1 – 8.6.21 Project No. 541-21-105

SAFETY REQUIREMENTS

01 35 26 -6

1. Written in English by a qualified person who is employed by the

Prime Contractor articulating the specific work and hazards pertaining to the contract (model language can be found in ASSE

A10.33). Specifically articulating the safety requirements found within these VA contract safety specifications.

2. Address both the Prime Contractors and the subcontractors work operations.

3. State measures to be taken to control hazards associated with materials, services, or equipment provided by suppliers.

4. Address all the elements/sub-elements and in order as follows:

a. SIGNATURE SHEET. Title, signature, and phone number of the following:

1) Plan preparer (Qualified Person such as corporate safety staff person or contracted Certified Safety Professional with construction safety experience);

2) Plan approver (company/corporate officers authorized to obligate the company);

3) Plan concurrence (e.g., Chief of Operations, Corporate Chief of Safety, Corporate Industrial Hygienist, project manager or superintendent, project safety professional). Provide concurrence of other applicable corporate and project personnel (Contractor).

b. BACKGROUND INFORMATION. List the following:

1) Contractor;

2) Contract number;

3) Project name;

4) Brief project description, description of work to be performed, and location; phases of work anticipated (these will require an AHA).

2/26/2021 Replace Substations A & B

Addendum 1 – 8.6.21 Project No. 541-21-105

SAFETY REQUIREMENTS

01 35 26 -7

c. STATEMENT OF SAFETY AND HEALTH POLICY. Provide a copy of current corporate/company Safety and Health Policy Statement, detailing commitment to providing a safe and healthful workplace for all employees. The Contractor’s written safety program goals, objectives, and accident experience goals for this contract should be provided.

d. RESPONSIBILITIES AND LINES OF AUTHORITIES. Provide the following:

1) A statement of the employer’s ultimate responsibility for the implementation of his SOH program;

2) Identification and accountability of personnel responsible for safety at both corporate and project level. Contracts specifically requiring safety or industrial hygiene personnel shall include a copy of their resumes.

3) The names of Competent and/or Qualified Person(s) and proof of competency/qualification to meet specific OSHA

Competent/Qualified Person(s) requirements must be attached.;

4) Requirements that no work shall be performed unless a designated competent person is present on the job site;

5) Requirements for pre-task Activity Hazard Analysis (AHAs);

6) Lines of authority;

7) Policies and procedures regarding noncompliance with safety requirements (to include disciplinary actions for violation of safety requirements) should be identified;

e. SUBCONTRACTORS AND SUPPLIERS. If applicable, provide procedures for coordinating SOH activities with other employers on the job site:

1) Identification of subcontractors and suppliers (if known);

2) Safety responsibilities of subcontractors and suppliers.

f. TRAINING.

2/26/2021 Replace Substations A & B

Addendum 1 – 8.6.21 Project No. 541-21-105

SAFETY REQUIREMENTS

01 35 26 -8

1) Site-specific SOH orientation training at the time of initial hire or assignment to the project for every employee before working on the project site is required.

2) Mandatory training and certifications that are applicable to this project (e.g., explosive actuated tools, crane operator, rigger, crane signal person, fall protection, electrical lockout/NFPA 70E, machine/equipment lockout, confined space, etc…) and any requirements for periodic retraining/recertification are required.

3) Procedures for ongoing safety and health training for supervisors and employees shall be established to address changes in site hazards/conditions.

4) OSHA 10-hour training is required for all workers on site and the OSHA 30-hour training is required for Trade Competent

Persons (CPs)

g. SAFETY AND HEALTH INSPECTIONS.

1) Specific assignment of responsibilities for a minimum daily job site safety and health inspection during periods of work activity: Who will conduct (e.g., “Site Safety and Health

CP”), proof of inspector’s training/qualifications, when inspections will be conducted, procedures for documentation, deficiency tracking system, and follow-up procedures.

2) Any external inspections/certifications that may be required

(e.g., contracted CSP or CSHT)

h. ACCIDENT/INCIDENT INVESTIGATION & REPORTING. The Contractor shall conduct mishap investigations of all Moderate and Major as well as all High Visibility Incidents. The APP shall include accident/incident investigation procedure and identify person(s) responsible to provide the following to the Contracting Officer

Representative:

1) Exposure data (man-hours worked);

2) Accident investigationreports;

2/26/2021 Replace Substations A & B

Addendum 1 – 8.6.21 Project No. 541-21-105

SAFETY REQUIREMENTS

01 35 26 -9

3) Project site injury and illness logs.

i. PLANS (PROGRAMS, PROCEDURES) REQUIRED. Based on a risk assessment of contracted activities and on mandatory OSHA compliance programs, the Contractor shall address all applicable occupational, patient, and public safety risks in site-specific compliance and accident prevention plans. These Plans shall include but are not be limited to procedures for addressing the risks associates with the following:

1) Emergency response;

2) Contingency for severe weather;

3) Fire Prevention;

4) Medical Support;

5) Posting of emergency telephone numbers;

6) Prevention of alcohol and drug abuse;

7) Site sanitation (housekeeping, drinking water, toilets);

8) Night operations and lighting;

9) Hazard communication program;

10) Welding/Cutting “Hot” work;

11) Electrical Safe Work Practices (Electrical LOTO/NFPA 70E);

12) General Electrical Safety;

13) Hazardous energy control (Machine LOTO);

14) Site-Specific Fall Protection & Prevention;

15) Excavation/trenching;

16) Asbestos abatement;

17) Lead abatement;

18) Crane Critical lift;

19) Respiratory protection;

2/26/2021 Replace Substations A & B

Addendum 1 – 8.6.21 Project No. 541-21-105

SAFETY REQUIREMENTS

01 35 26 -10

20) Health hazard control program;

21) Radiation Safety Program;

22) Abrasive blasting;

23) Heat/Cold Stress Monitoring;

24) Crystalline Silica Monitoring (Assessment);

25) Demolition plan (to include engineering survey);

26) Formwork and shoring erection and removal;

27) PreCast Concrete;

28) Public (Mandatory compliance with ANSI/ASSE A10.34-2012).

C. Submit the APP to the Contracting Officer Representative for review for compliance with contract requirements in accordance with Section 01 33

23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 15 calendar days prior to the date of the preconstruction conference for acceptance. Work cannot proceed without an accepted APP.

D. Once accepted by the Contracting Officer Representative, the APP and attachments will be enforced as part of the contract. Disregarding the provisions of this contract or the accepted APP will be cause for stopping of work, at the discretion of the Contracting Officer in accordance with FAR Clause 52.236-13, Accident Prevention, until the matter has been rectified.

E. Once work begins, changes to the accepted APP shall be made with the knowledge and concurrence of the Contracting Officer Representative.

Should any severe hazard exposure, i.e. imminent danger, become evident, stop work in the area, secure the area, and develop a plan to remove the exposure and control the hazard. Notify the Contracting

Officer within 24 hours of discovery. Eliminate/remove the hazard. In the interim, take all necessary action to restore and maintain safe working conditions in order to safeguard onsite personnel, visitors, the public and the environment.

2/26/2021 Replace Substations A & B

Addendum 1 – 8.6.21 Project No. 541-21-105

SAFETY REQUIREMENTS

01 35 26 -11

1.5 ACTIVITY HAZARD ANALYSES (AHAS):

A. AHAs are also known as Job Hazard Analyses, Job Safety Analyses, and

Activity Safety Analyses. Before beginning each work activity involving a type of work presenting hazards not experienced in previous project operations or where a new work crew or sub-contractor is to perform the work, the Contractor(s) performing that work activity shall prepare an AHA (Example electronic AHA forms can be found on the US

Army Corps of Engineers web site)

B. AHAs shall define the activities being performed and identify the work sequences, the specific anticipated hazards, site conditions, equipment, materials, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level of risk.

C. Work shall not begin until the AHA for the work activity has been accepted by the Contracting Officer Representative and discussed with all engaged in the activity, including the Contractor, subcontractor(s), and Government on-site representatives at preparatory and initial control phase meetings.

1. The names of the Competent/Qualified Person(s) required for a particular activity (for example, excavations, scaffolding, fall protection, other activities as specified by OSHA and/or other State and Local agencies) shall be identified and included in the AHA.

Certification of their competency/qualification shall be submitted to the Government Designated Authority (GDA) for acceptance prior to the start of that work activity.

2. The AHA shall be reviewed and modified as necessary to address changing site conditions, operations, or change of competent/qualified person(s).

a. If more than one Competent/Qualified Person is used on the AHA activity, a list of names shall be submitted as an attachment to the AHA. Those listed must be Competent/Qualified for the type of work involved in the AHA and familiar with current site safety issues.

2/26/2021 Replace Substations A & B

Addendum 1 – 8.6.21 Project No. 541-21-105

SAFETY REQUIREMENTS

01 35 26 -12

b. If a new Competent/Qualified Person (not on the original list) is added, the list shall be updated (an administrative action not requiring an updated AHA). The new person shall acknowledge in writing that he or she has reviewed the AHA and is familiar with current site safety issues.

3. Submit AHAs to the Contracting Officer Representative for review for compliance with contract requirements in accordance with Section 01

33 23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES for review at least

15 calendar days prior to the start of each phase.

This is the start of the file's text. The full file is on GovTribe.