21-0806 Replace Substations A and B - ADDENDUM 1 2.pdf
PDF 5 MB Posted
- Attached to
- Y1DA--Replace Substation A&B Federal contract opportunity
- Solicitation number
- 36C25021B0045
About this file
This pre-solicitation notice is for a construction project to Replace Substations A and B at the Cleveland VA Medical Center in Cleveland, Ohio. The project involves demolishing existing structures and furnishing labor and materials to complete the replacement of the two substations. The solicitation will be issued as a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses, with a requirement for the selected contractor to perform a minimum of 15% of the construction work. The estimated project value is between $2-5 million. Interested SDVOSBs should register at SAM.gov to receive the solicitation documents, which will be posted on or around May 24th with proposals due approximately 30 days later. The project duration is 630 calendar days from notice to proceed. Bonds will be required. A site visit will be scheduled.
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: NICK CARROZZA
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
E T
G
DE
I
RET
S
HCRA
I
KACZMAR
STANLEY
NO. 4988
T
E R
S
AT
E
I
T C
J.
O
O
FO
H
1468 WEST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
STRUCTURAL ENGINEERING:
THORSON BAKER + ASSOC.
3030 WEST STREETSBORO RD.
RICHFIELD, OH 44286
P. 330.659.6688
ELECTRICAL ENGINEERING:
HEAPY
1400 WEST DOROTHY LN.
DAYTON, OH 45409
P. 937.224.0861
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
MECHANICAL ENGINEERING:
FFE, INC.
110 BOGGS LN, SUITE 170
SPRINGDALE, OH 45246
P. 513.522.0956
HAZ. MATERIALS ASSESSMENT:
STEPHEN J. SEBESTA & ASSOC.
30628 DETROIT RD. #258
WESTLAKE, OH 44145
P. 216.781.0060
FINAL CDs SUBMISSION
C U s e rs
\d a v e \D o c u m e n ts
\V A
S U
B S
T A
T
IO
N A
B
R d a k a p la n .r v t
/6
/2
:3
:3
A M
GI-1
TITLE SHEET & DRAWING INDEX REPLACE SUBSTATIONS A & B
10701 EAST BLVD. CLEVELAND, OHIO
541-21-105
2.26.21 CJK DAK
DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER - WADE PARK
REPLACE SUBSTATIONS A & B
10701 EAST BLVD. CLEVELAND, OH 44106
PROJECT NO. 541-21-105
Cleveland Veterans Affairs Medical Center
SCOPE OF WORK
AREA
BASEMENT LEVEL
CODE INFORMATION:
I. PROJECT LOCATION: CLEVELAND VETERANS AFFAIRS MEDICAL CENTER
10701 EAST BLVD.
CLEVELAND, OHIO
II. DESCRIPTION & USER GROUP CLASSIFICATION OF BUILDING
A. NATURE OF PROJECT: REPLACEMENT OF EXISTING SUBSTATIONS A & B AND ASSOCIATED ELECTRICAL/MECHANICAL EQUIPMENT
B. DESIGN CODES: 2018 NFPA LIFE SAFETY CODE 101, IBC 2018
2020 PHYSICAL SECURITY AND RESILIENCY DESIGN MANUAL
C. USE GROUP: I-2 HEALTH CARE - NO CHANGE PROPOSED
D. CONSTRUCTION TYPE: TYPE I-332, IB - NON-COMBUSTIBLE, PROTECTED
FIRE RATED CONSTRUCTION (LSC A.8.2.1.1)
EXTERIOR BEARING WALLS 3 HRS
INTERIOR BEARING WALLS 3 HRS
STRUCTURAL COLUMNS 3 HRS (SUPPORTING > 1 FLOOR)
2 HRS (SUPPORTING 1 FLOOR ONLY)
2 HRS (SUPPORTING ROOF ONLY)
BEAMS, GIRDERS, TRUSSES 3 HRS (SUPPORTING > 1 FLOOR, COLS., OR BEARING WALLS)
FLOOR-CEILING ASSEMBLIES 2 HRS
ROOF-CEILING ASSEMBLIES 1-1/2 HRS
INTERIOR NON-BEARING WALLS 0 HRS
EXTERIOR NON-BEARING WALLS 0 HRS
WALL ASSEMBLIES
EXIT ACCESS CORRIDOR WALLS 0 HR SMOKE PARTITIONS
E. PROJECT AREA: BASEMENT LEVEL: 2,383 SF
F. PROJECT AREA OCCUPANT LOAD: 8
G. FIRE PROTECTION: EXISTING BUILDING FULLY SPRINKLED. MODIFICATIONS AS REQUIRED PER NEW IMPROVEMENTS PROPOSED
DRAWING INDEX:
FINAL CD's SUBMISSION
2.26.21
GI-1 TITLE SHEET & DRAWING INDEX
ARCHITECTURAL
LS-100 BASEMENT LEVEL LIFE SAFETY PLAN - PHASE I
AS-X-000 BASEMENT LEVEL SITE LOGISTICS PLAN
AS-X-100 BASEMENT LEVEL EXISTING CONDITIONS PLAN
AS-D-100 BASEMENT LEVEL DEMOLITION PLANS - PHASE I
AS-100 BASEMENT LEVEL IMPROVEMENT AND CEILING PLANS -
PHASE I
AS-600 DOOR AND FINISH SCHEDULES, WALL TYPES, & DETAILS
MECHANICAL/HVAC
M-001 MECHANICAL LEGEND
MD-101 MECHANICAL BASEMENT DEMOLITION PLAN - PHASE I
MH-101 MECHANICAL BASEMENT NEW WORK PLAN - PHASE I
MH-501 MECHANICAL DETAILS
MH-601 MECHANICAL SCHEDULES
MH-602 MECHANICAL CONTROLS
STRUCTURAL
SS-100 SUBSTATION A & B STRUCTURAL SUPPORT PLAN
FIRE PROTECTION
FX-100 FIRE PROTECTION BASEMENT NEW WORK PLAN
EP-100 ELECTRICAL BASEMENT EQUIPMENT ROUTING PLAN
EP-401 ENLARGED BASEMENT POWER AND SYSTEMS PLAN
EP-402 ENLARGED SUB-BASEMENT ELECTRICAL PLAN
EP-501 ELECTRICAL DETAILS
EP-502 EXISTING ELECTRICAL ROOM D21 IMAGES
EP-503 EXISTING SUB-BASEMENT IMAGES
EP-600 MEDIUM VOLTAGE NEW WORK RISER DIAGRAM
EP-601A SUBSTATION A POWER LOW-VOLTAGE NEW WORK RISER DIAGRAM
EP-601B SUBSTATION A LIGHTING LOW-VOLTAGE NEW WORK RISER DIAGRAM
EP-602A SUBSTATION B POWER LOW-VOLTAGE NEW WORK RISER DIAGRAM
EP-602B SUBSTATION B LIGHTING LOW-VOLTAGE NEW WORK RISER DIAGRAM
EP-603 EMERGENCY POWER SYSTEM NEW WORK RISER DIAGRAM
EP-700 DISTRIBUTION SCHEDULES AND ELEVATIONS
ER-10B ELECTRICAL SUB-BASEMENT PLAN
ER-100A BASEMENT LEVEL ELECTRICAL FLOOR PLAN
ER-100B ENLARGED BASEMENT LEVEL ELECTRICAL ROOM PLANS
ER-101A FIRST FLOOR ELECTRICAL ROOM PLANS
ER-101B ENLARGED FIRST FLOOR ELECTRICAL ROOM PLANS
ER-102 SECOND FLOOR ELECTRICAL ROOM PLANS
ER-103 THIRD FLOOR ELECTRICAL ROOM PLANS
ER-104 FOURTH FLOOR ELECTRICAL ROOM PLANS
ER-105 FIFTH FLOOR ELECTRICAL ROOM PLANS
ER-106 SIXTH FLOOR ELECTRICAL ROOM PLANS
ER-107 PENTHOUSE ELECTRICAL ROOM PLANS
NORTH
ELECTRICAL
E-001 ELECTRICAL SCHEDULES AND INDEX OF DRAWINGS
E-002 ELECTRICAL CONSTRUCTION PHASING
ED-401 ENLARGED BASEMENT DEMOLITION PLAN
ED-600 MEDIUM VOLTAGE DEMOLITION RISER DIAGRAM
ED-601A SUBSTATION A POWER LOW-VOLTAGE DEMOLITION RISER DIAGRAM
ED-601B SUBSTATION A LIGHTING LOW-VOLTAGE DEMOLITION RISER DIAGRAM
ED-602A SUBSTATION B POWER LOW-VOLTAGE DEMOLITION RISER DIAGRAM
ED-602B SUBSTATION B LIGHTING LOW-VOLTAGE DEMOLITION RISER DIAGRAM
ED-603 EMERGENCY POWER SYSTEM DEMOLITION RISER DIAGRAM
HAZARDOUS MATERIALS ABATEMENT
HA-001 STANDARD ASBESTOS ABATEMENT DETAILS
HA-101 BASEMENT LEVEL ASBESTOS ABATEMENT PLAN
Revisions: Date:
DESIGN DEVELOPMENT 7.24.20
35% CDs SUBMISSION 9.1.20
65% CDs SUBMISSION 10.8.20
90% CDs SUBMISSION 11.24.20
100% CDs SUBMISSION 2.5.21
FINAL CDs SUBMISSION 2.26.21
ADDENDUM 1 8.6.21
P/B
P /B
P /B
P /B
P /B
P /B
P/B
P /B
P /B
P/B
P /B
P /B
P /B
P /B
P /B
P/B
P /B
P /B
P/B
P /B
P /B
P /B
P /B
P /B
P/B
P /B
P /B
P/B
P /B
P /B
P /B
P /B
P /B
P/B
P /B
P /B
P/B
P /B
P /B
P /B
P /B
P /B
P/B
P /B
P /B
P/B
P /B
P /B
P /B
P /B
P /B
P/B
P /B
P /B
CONSTRUCTION PHASING
PHASE TIME DISCIPLINE
ELECTRICAL
1 180 DAYS CONSTRUCT NEW ELECTRICAL RM
A DEMOLISH LINEN EMERGENCY ROOM LTG/PWR/FA
B CONSTRUCT NEW ELECTRICAL EMERGENCY ROOM LTG/PWR/FA/DOOR
C ROUGH-IN NEW PERMANENT FEEDER FROM GPS1 TO NEW EDSB2
D INSTALL NEW EDSB2
E ROUGH-IN NEW PERMANENT FEEDERS AND/OR SPLICES FROM NEW EDSB2 TO EGKDP, ATS-8, EGDP, SBHDBG1, DPNB1G, EDSB3, ATS-20,ATS-21, ATS-22
F INSTALL NEW EMERGENCY ELECTRICAL EQUIPMENT
G
INSTALL FEEDERS FROM NORMAL AND LOAD SIDE OF TRANSFER SWITCHES TO EXISTING
DISTRIBUTION EQUIPMENT
H
PLACE ALL ATS'S IN MANUAL MODE AND LOCK IN NORMAL SOURCE. DISCONNECT NEW EDSB2 AND MAKE SPLICE TO PERMANENT SOURCE. COMPLETE EMERGENCY SIDE FEEDER TO EACH ATS. START
THE GENERATORS AND ENERGIZE NEW EDSB2. TRANSFER ALL ATS'S TO EMERGENCY SOURCE.
COMPLETE NORMAL SIDE FEEDERS. PLACE ATS'S BACK IN AUTO. ONE ATS AT A TIME, MAKE
CUTOVER OF LOAD SIDE FEEDER IN UNDER 2 HOURS OF TOTAL DOWNTIME EACH.
I ROOM D21 REMOVE ATS 5, 8, 22 , SBHDBG1
J ROOM D21 DISCONNECT EXISTING EDSB2 AND USE FOR TEMPORARY POWER SERVICE TO NEW USSA
& USSB
K RELOCATE TRANSFORMER T-DRD2
L INCLUDE 30 DAY ACTIVATION PERIOD BETWEEN PHASES 1 AND 2
2 150 DAYS REPLACE UNIT SUBSTATION B
2A
A ROUGH-IN ALL CONDUITS AND TEMPORARY FEEDERS FOR THIS PHASE, REMOVE TRANSPORT PATH
DOORS / WALLS
B USSA: OPEN LIGHTING MAIN C/B & CLOSE TIE C/B.
C USSA: DEENERGIZE MV SERVICE TO LIGHTING TRANSFORMER
D DISCONNECT / REMOVE USSA LTG MAIN C/B
E PROVIDE TEMPORARY SERVICE TO EXISTING EDSB2 FROM USSA-LTG TRANSFORMER
F USSA: ENERGIZE MV SERVICE TO LIGHTING TRANSFORMER
G USSB: OPEN C/B FOR DPD2B AND DPD2C
H USBB: CLOSE TIE C/B TO CONNECT DPD2A, DPD2B & DPD2C
I PROVIDE / CUTOVER TEMPORARY SERVICE FROM EDSB2 TO DPD2A/DPD2B/DPD2C IN UNDER 2 HOUR
OUTAGE.
J
PROVIDE / CUTOVER TEMPORARY SERVICE FROM EDSB2 TO ATS-22 IN UNDER 2 HOUR OUTAGE.
K
PROVIDE / CUTOVER TEMPORARY SERVICE FROM EDSB2 TO ATS-26 IN UNDER 2 HOUR OUTAGE.
L
PROVIDE / CUTOVER TEMPORARY SERVICE FROM EDSB2 TO SBME1 IN UNDER 2 HOUR OUTAGE.
M USSB: DEENERGIZE MV SERVICE TO LIGHTING TRANSFORMER
N USSB REMOVE EXISTING MV CABLE TO USSB LIGHTING / MSG
O USSB: OPEN LTG MAIN C/B & OPEN TIE C/B
P
USBB: BREAK DOWN & REMOVE USSB LTG TRANSFORMER AND (3) DISTRIBUTION SECTIONS
Q
USSB: INSTALL BUS BLANKET / INSULATION AND TEMPORARY END CAP SHEET METAL FOR
PROTECTION FOR REMAINING ENERGIZED LIVE PARTS
2B
A
USSB NEW; ASSEMBLE & INSTALL NEW USSB TRANSFORMER (LIGHTING), MAINS AND (2)
DISTRIBUTION SECTIONS (4 SECTIONS TOTAL).
B USSB NEW: INSTALL NEW MV CABLE TO USSB LIGHTING
C
USSB NEW: ROUGH-IN CONDUITS / WIRE FOR BUSWAY TAP FOR PENTHOUSE BUSWAY. PROVIDE
TEMPORARY SERVICE TO MCC IN PENTHOUSE, START GENERATORS, TRANSFER PENTHOUSE ATS TO GENERATOR, INSTALL END TAP BOX AND MAKE CUTOVER TO NEW USSB IN UNDER 6 HOUR OUTAGE.
D USSB NEW:ROUGH-IN CONDUITS / WIRE FOR SBHEB2. MAKE CUTOVER IN UNDER 2 HOUR OUTAGE.
E USSB NEW: ENERGIZE USSB TRANSFORMER LIGHTING
F USSB: DEENERGIZE MV SERVICE TO POWER TRANSFORMER
G USSB REMOVE EXISTING MV CABLE TO USSB POWER
H
USSB: BREAK DOWN & REMOVE USSB POWER TRANSFORMER AND (1) DISTRIBUTION SECTION
2C
A USSB NEW; ASSEMBLE NEW USSB TRANSFORMER (POWER) AND MAINS.
B USSB NEW: INSTALL NEW MV CABLE TO USSB POWER
C USSB NEW: ENERGIZE USSB TRANSFORMER POWER
D USSB NEW; INSTALL FEEDER TO ATS-22 - REMOVE TEMPORARY. MAKE CUTOVER IN UNDER 2 HOUR
OUTAGE.
E USSB NEW; INSTALL FEEDER TO ATS-26 - REMOVE TEMPORARY. MAKE CUTOVER IN UNDER 2 HOUR
OUTAGE.
F USSB NEW; INSTALL FEEDER TO SBME1 - REMOVE TEMPORARY. MAKE CUTOVER IN UNDER 2 HOUR
OUTAGE.
G USSB NEW; INSTALL FEEDER TO DPD2A - REMOVE TEMPORARY. MAKE CUTOVER IN UNDER 2 HOUR
OUTAGE.
H USSB NEW; INSTALL FEEDER TO DPD2B, MAKE CUTOVER IN UNDER 2 HOUR OUTAGE.
I USSB NEW; INSTALL FEEDER TO DPD2C, MAKE CUTOVER IN UNDER 2 HOUR OUTAGE.
J OPEN TIE C/B BETWEEN DPD2A - DPD2B AND DPD2C AND CLOSE C/B FROM USSB NEW.
K INCLUDE 30 DAY ACTIVATION PERIOD BETWEEN PHASES 2 AND 3
3 150 DAYS REPLACE UNIT SUBSTATION A
3A
A PROVIDE TEMPORARY SERVICE FROM EDSB2 TO DPD4. MAKE CUTOVER IN UNDER 2 HOUR OUTAGE.
B PROVIDE TEMPORARY SERVICE FROM EDSB2 TO ATS-5. MAKE CUTOVER IN UNDER 2 HOUR OUTAGE.
C
PROVIDE TEMPORARY SERVICE FROM EDSB2 TO SBHEB1. MAKE CUTOVER IN UNDER 2 HOUR
OUTAGE.
D
PROVIDE TEMPORARY SERVICE FROM EDSB2 TO SBHDB1. MAKE CUTOVER IN UNDER 2 HOUR
OUTAGE.
E PROVIDE TEMPORARY SERVICE FROM EDSB2 TO ATS-8. MAKE CUTOVER IN UNDER 2 HOUR OUTAGE.
F
PROVIDE TEMPORARY SERVICE FROM USSB NEW TO SBMW1. MAKE CUTOVER IN UNDER 2 HOUR
OUTAGE.
G MAINTAIN TEMPORARY SERVICE TO EXISTING EDSB2 FROM USSA-LTG TRANSFORMER
H USSA: LIGHTING MAIN C/B SHOULD STILL BE OPEN AND TIE CLOSED.
I USSA: DEENERGIZE MV SERVICE TO POWER TRANSFORMER
J USSA: REMOVE EXISTING MV CABLE TO USSA POWER
K
USSA: BREAK DOWN & REMOVE USSA POWER TRANSFORMER AND DISTRIBUTION SECTIONS
L
USSA: INSTALL BUS BLANKET / INSULATION AND TEMPORARY END CAP SHEET METAL FOR
PROTECTION OF REMAINING ENERGIZED LIVE PARTS
3B
USSA NEW: ASSEMBLE & INSTALL NEW USSA TRANSFORMER (POWER), MAINS AND DISTRIBUTION
SECTIONS
USSA NEW: INSTALL NEW MV CABLE TO USSA POWER
USSA NEW: OPEN LIGHTING MAIN (DISCONNECTED ANYWAY), CLOSE POWER MAIN C/B AND TIE C/B
USSA NEW: ENERGIZE USSB TRANSFORMER POWER AND DISTRIBUTION
USSA NEW: INSTALL FEEDER TO DPD4 - REMOVE TEMPORARY. MAKE CUTOVER IN LESS THAN 2 HOUR
OUTAGE.
USSA NEW: INSTALL FEEDER TO ATS-5 - REMOVE TEMPORARY. MAKE CUTOVER IN LESS THAN 2
HOUR OUTAGE.
USSA NEW: INSTALL FEEDER TO SBHEB1 - REMOVE TEMPORARY. MAKE CUTOVER IN LESS THAN 2
HOUR OUTAGE.
USSA NEW: INSTALL FEEDER TO SBHDB1 - REMOVE TEMPORARY. MAKE CUTOVER IN LESS THAN 2
HOUR OUTAGE.
USSA NEW: INSTALL FEEDER TO ATS-8 - REMOVE TEMPORARY. MAKE CUTOVER IN LESS THAN 2
HOUR OUTAGE.
USSA NEW: INSTALL FEEDER TO SBMW1 - REMOVE TEMPORARY. MAKE CUTOVER IN LESS THAN 2
HOUR OUTAGE.
3C
USSA: DEENERGIZE MV SERVICE TO LIGHTING TRANSFORMER
USSA: REMOVE EXISTING MV CABLE TO USSA TRANSFORMER (LIGHTING)
USSA: BREAK DOWN & REMOVE USSB LIGHTING TRANSFORMER
EDSB2: BREAK DOWN AND REMOVE
USSA NEW: ASSEMBLE & INSTALL NEW USSA TRANSFORMER (LIGHTING)
COORDINATE SHUT DOWN FOR USSA LTG TO USSA POWER CONNECTIONS. MAKE CUTOVER IN LESS
THAN 2 HOUR OUTAGE.
USSA NEW: INSTALL NEW MV CABLE TO USSA LIGHTING
USSA NEW: OPEN TIE C/B AND CLOSE USSB MAIN C/B'S
USSA NEW: ENERGIZE TRANSFORMER (LIGHTING) AND DISTRIBUTION
A
B
C
D
E
F
G
H
I
J
A
B
C
D
E
H
I
G
F
"USSA" (EXISTING)
3000A, 480/277V-3PH-4W
1600A
800AT
1600A
800AT
1600A
800AT
CLOSE
OPEN AND LOCK OUT REMOVE BUS
CONNECTION AND PROVIDE LUG
CONVERSIONS TO CONNECT
TEMPORARY FEEDER
LIGHTING
POWER
1600A
800AT
1600A
600AT
1600A
800AT
DPD4 ATS5 SBHEB1 SBHDB1 ATS8 SBMW1NEW
TEMP
250/4T
2500AF
2500AT
"EDSB2" (EXISTING TEMP)
400A
SALVAGE EXISTING DISTRIBUTION GEAR AND
USE FOR TEMPORARY POWER.
600A 400A 600A 800A
800AT
1200A
1200AT
800A
800AT
600A 225A 1200A
800AT
"USSB" (EXISTING)
1600A
1200AT
1600A
800AT
3000A
2500AT
HV FEEDER
POWER
1600A
800AT
1600A
800AT
1600A
800AT
1600A
800AT
1600A
800AT
1600A
800AT
PENT
SWG
NEW
USSB
SBHEB2
NEW
USSB
ATS-22-N ATS-26-N SBME1
DPD2A
TIE
CLOSE
DPD2B
TIE
CLOSE
DPD2C
SPARE
EXIST
HV FEEDER
2500A, 480/277V-3PH-4W
80/4T 120/4T 80/4T 80/4T
HV FEEDER
3000A, 480/277V-3PH-4W
MAIN TIE MAIN
MAIN TIE MAIN
LIGHTING
OPENOPEN
NEW
TEMP
EXIST
HV FEEDER
REFER TO DRAWING EP-602A
FOR ADDITIONAL INFORMATION
PROVIDE NEW TRIP
SETTING AS NOTED
(TYP.)
BUSWAY
PERMANENT FEEDERS CONNECTED
TO NEW USSB SECTION ONCE INSTALLED.
2A2B
1 1 1
3200AF
3000AM
2100AT
NEW
TEMP
NEW
TEMP
NEW
TEMP
3200AF
3000AM
2100AT
3200AF
3000AM
2100AT
3200AF
3000AM
2100AT
3200AF
3000AM
2100AT
3200AF
3000AM
2100AT
"USSA" (EXISTING)
3000A, 480/277V-3PH-4W
1600A
800AT
1600A
800AT
1600A
800AT
DISCONNECTED REMOVE AFTER
ALL FEEDERS ARE TRANSFERRED TO
NEW UNIT SUBSTATIONS.
LIGHTING POWER
1600A
800AT
1600A
800AT
1600A
800AT
DPD4 ATS5 SBHEB1 SBHDB1 ATS8 SBMW1
2500AF
2500AT
"EDSB2" (EXISTING TEMP)
400A 600A
600AT
400A 600A 800A
800AT
1200A 800A 600A 225A 1200A
800AT
USSB-NEW
TEMPORARY
FEEDER
80/4T80/4T80/4T80/4T
60/4T
OPEN
HV FEEDER HV FEEDER
MAINTIEMAIN
NEW
TEMP NEW
TEMP
NEW
TEMP
800AT
2500A, 480/277-3PH-4W
MAINTAIN TEMPORARY FEEDERS.
ONCE NEW USSA IS INSTALLED
AND NEW FEEDERS ARE
CONNECTED, DISCONNECT AND
REMOVE EDSB2 AND ASSOCIATED
TEMPORARY CONNECTIONS.
PROVIDE NEW TRIP
SETTING AS NOTED
(TYP.)
3A/3B3C
80/4T
NEW
TEMP
NEW
TEMP
NEW
TEMP
3200AF
3000AM
2100AT
3200AF
3000AM
2100AT
3200AF
3000AM
2100AT
V
DEMARC
ROOM
SUB A POWER
XFMR
SUB A LIGHTING
XFMR
SUB B LIGHTING
XFMR
TRANSPORT NEW PIECES
OF USSB.
DISCONNECT AND REMOVE
EXISTING USSB NOTED.
INSTALL PERMANENT
FEEDERS.
ASSEMBLE AND INSTALL
NEW USSB.
NEW UNIT
PRIMARY TERMINATION
USSB LIGHTING
TRANSFORMER
V
DEMARC
ROOM
SUB A POWER
XFMR
SUB A LIGHTING
XFMR
UNIT
SUB B
SUB B LIGHTING
XFMR
SUB B LIGHTING
XFMR
EDSB2
TEMPORARY FEEDERS
DASHED LINES INDICATE
NEW PIECES OF USSB
FOR RIGGING
AND INSTALLATION.
TEMPORARY FEEDERS
DASHED LINE INDICATES
EXISTING PIECES OF USSB
FOR RIGGING AND REMOVAL.
DISCONNECT AND REMOVAL OF
EXISTING USSB AS NOTED.
EDSB2
V
DEMARC
ROOM
SUB A POWER
XFMR
SUB A LIGHTING
XFMR
CONNECT TEMPORARY
FEEDERS TO USSA
DISTRIBUTION.
DISCONNECT TEMP FEEDERS
FROM USSB DISTRIBUTION.
INSTALL PERMANENT
FEEDERS.
ASSEMBLE AND INSTALL
NEW USSB
NEW UNIT
PRIMARY TERMINATION
USSB LIGHTING
TRANSFORMER
PRIMARY TERMINATION
USSB LIGHTING
TRANSFORMER
V
DEMARC
ROOM
SUB A POWER
XFMR
SUB A LIGHTING
XFMR
DASHED LINES INDICATE
NEW PIECES OF USSA
FOR RIGGING AND
INSTALLATION.
DASHED LINE INDICATES
EXISTING PIECES OF
USSA FOR RIGGING AND
REMOVAL.
DISCONNECT AND REMOVE
EXISTING USSA NOTED.
NEW UNIT
PRIMARY TERMINATION
USSB LIGHTING
TRANSFORMER
PRIMARY TERMINATION
USSB LIGHTING
TRANSFORMER
V
DEMARC
ROOMSUB A LIGHTING
XFMR
DISCONNECT AND REMOVE
EXISTING USSA AND
EXISTING EDSB2 NOTED.
INSTALL PERMANENT
FEEDERS
ASSEMBLE AND INSTALL
NEW USSA.
DISCONNECT TEMP FEEDERS
FROM USSA DISTRIBUTION.
NEW UNIT
PRIMARY TERMINATION
USSB LIGHTING
TRANSFORMER
PRIMARY TERMINATION
USSB LIGHTING
TRANSFORMER
PRIMARY TERMINATION
NEW UNIT
USSA LIGHTING
TRANSFORMER
V
DEMARC
ROOM
ASSEMBLE AND INSTALL
NEW USSA.
N
NEW UNIT
PRIMARY TERMINATION
USSB LIGHTING
TRANSFORMER
PRIMARY TERMINATION
USSB LIGHTING
TRANSFORMER
PRIMARY TERMINATION
PRIMARY TERMINATION
USSA LIGHTING
TRANSFORMER
NEW UNIT
USSA LIGHTING
TRANSFORMER
DEMOLITION
NEW WORK
PHASING PLAN
N
NORTH
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: NICK CARROZZA
VA FORM 08 - 6231
A
Louis Stokes
Cleveland
VA Medical
Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
1468 WEST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
STRUCTURAL ENGINEERING:
THORSON BAKER + ASSOC.
3030 WEST STREETSBORO RD.
RICHFIELD, OH 44286
P. 330.659.6688
ELECTRICAL ENGINEERING:
HEAPY
1400 WEST DOROTHY LN.
DAYTON, OH 45409
P. 937.224.0861
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
MECHANICAL ENGINEERING:
FFE, INC.
110 BOGGS LN, SUITE 170
SPRINGDALE, OH 45246
P. 513.522.0956
HAZ. MATERIALS ASSESSMENT:
STEPHEN J. SEBESTA & ASSOC.
30628 DETROIT RD. #258
WESTLAKE, OH 44145
P. 216.781.0060
FINAL CDs SUBMISSION
C
B
IM
\M o d e l\
-0
-E -C e n tr a l_ m a lo w e .r v t
/9
/2
:4
:0
P
M
E-002
ELECTRICAL CONSTRUCTION PHASING REPLACE SUBSTATION A & B
10701 EAST BLVD. CLEVELAND, OHIO
541-21-105
02.26.2021 MSG JJH/DMB
SCALE: NONE
PHASE 2 SINGLE LINE
SCALE: NONE
PHASE 3 SINGLE LINE
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"
ELECTRICAL ROOM D21 PHASE 2B
SCALE: 1/8" = 1'-0"
ELECTRICAL ROOM D21 PHASE 2A
SCALE: 1/8" = 1'-0"
ELECTRICAL ROOM D21 PHASE 2C
SCALE: 1/8" = 1'-0"
ELECTRICAL ROOM D21 PHASE 3A
SCALE: 1/8" = 1'-0"
ELECTRICAL ROOM D21 PHASE 3B
SCALE: 1/8" = 1'-0"
ELECTRICAL ROOM D21 PHASE 3C
GENERAL NOTES:
PLAN NOTES:
A. SEE FEEDER SCHEDULE ON SHEET EP-700.
B. BASIS OF DESIGN IS EATON ELECTRICAL EQUIPMENT.
ELECTRICAL CONTRACTOR SHALL INCLUDE AS A PART OF EQUIPMENT
SHOP DRAWING SUBMITTAL A SCALED FLOOR PLAN WITH NEW
ELECTRICAL EQUIPMENT AND INDICATING THAT CLEARANCES FOR ALL
PHASES OF CONSTRUCTION INCLUDING RIGGING CAN BE
ACCOMMODATED.
C. EXACT CONSTRUCTION PHASING PROCEDURE AND EQUIPMENT SHALL
BE SUBMITTED TO COR AT THE BEGINNING OF THE PROJECT.
DEVIATIONS FROM THE PROPOSED CONSTRUCTION PHASES WILL BE
REVIEWED. NO ADDITIONAL CONSTRUCTION COSTS ASSOCIATED
WITH DEVIATIONS ARE ACCEPTABLE.
D. IMMEDIATELY AFTER CONSTRUCTION CONTRACT AWARD, CONTRACTOR
SHALL:
1. TAKE DETAILED MEASUREMENTS (OR PROVIDE LASER SCAN) OF
ALL GEAR/CONDUIT AFFECTED BY THIS PROJECT AS WELL AS
ENTIRE RIGGING PATH.
2. OPEN UP ALL GEAR TO BE REPLACED TO LOCATE AND DOCUMENT
CONDUIT ENTRY POINTS, CONDUCTOR SIZES, BUS BAR
ARRANGEMENTS, CONTROL WIRING ETC.
3. PROVIDE 1/4"=1'-0" SCALE COORDINATION DRAWINGS BY PHASE
IN CONJUNCTION WITH UNIT SUBSTATION SHOP DRAWINGS TO
ENSURE THAT EACH PHASE HAS NO IMPEDIMENTS TO
CONSTRUCTION. THESE PHASED COORDINATION DRAWINGS
SHALL SHOW EXISTING GEAR, NEW GEAR AND CONDUIT
EXTENSIONS/SPLICES REQUIRED.
1. SEE SHEET EP-700 FOR PEAK LOADS ON EXISTING EQUIPMENT.
2. SEE SHEET EP-602 FOR NEW BUSWAY END CAP TAP BOX.
3. EXISTING EDSB2 MAIN CIRCUIT BREAKER AND ADJACENT
SECTION ARE MANUFACTURED BY SQUARE D (QED SERIES)
WITH MH36 SERIES CIRCUIT BREAKERS. END SECTION OF
EDSB2 IS MANUFACTURED BY GE (SPECTRA SERIES) WITH
SKLC36 SERIES CIRCUIT BREAKER AND GTP SERIES TRIP
MODULES.
4. PROVIDE PROTECTIVE BARRIER FOR WORK AROUND EXPOSED
LIVE PARTS. COORDINATE FINAL ELECTRICAL SAFETY
PROVISIONS (METHOD OF PROCEDURE) WITH VA POWER
SYSTEM STUDY, AND VA COR FOR APPROVAL. ONLY
AUTHORIZED TRAINED WORKERS WILL BE ALLOWED TO
PERFORM ELECTRICAL WORK. WORKERS SHALL WEAR
APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT (PPE).
5. REFER TO SHEET EP-401 FOR NEW SUBSTATION LAYOUTS.
6. TRANSFORMER SECONDARY FEEDER TAP CONDUCTORS SHALL
BE LESS THAN 25 FEET AND PROTECTED FROM PHYSICAL
DAMAGE BY APPROVED MEANS PER NEC ART 240.21.
5 5 5
4. PROVIDE A HIGHLY DETAILED MOP (METHOD OF PROCEDURE)
OUTLINING THE UNIT SUBSTATION AND EMERGENCY EQUIPMENT
REPLACEMENT IN A STEP BY STEP MANNER WITH ALL REQUIRED
OUTAGES, SAFETY PRECAUTIONS, CUTOVERS, ETC. INDICATED.
THIS MOP SHOULD PROVIDE SUFFICIENT INFORMATION TO SHOW
THAT THE CONTRACTOR HAS PERFORMED THEIR DUE DILIGENCE
TO ENSURE THE REPLACEMENT WILL PROCEED WITHOUT ISSUE.
5. GEAR SHALL NOT BE ORDERED UNTIL MOP IS REVIEWED IN DETAIL
WITH COR AND ENGINEER AND APPROVED.
6. FOR EACH SHUTDOWN REQUIRED, INDICATE ALL PANELS
AFFECTED. VA WILL THEN INVESTIGATE DEPARTMENTS AFFECTED
AND APPROVE THE OUTAGE.
7. THIS FACILITY IS A FULLY FUNCTIONAL 24/7 HEALTHCARE OPERATION
WITH OPERATING ROOMS, ICU'S, INPATIENT/OUT PATIENT,
PHARMACY, LABORATORY, ETC. FUNCTIONS. THE GREATEST OF
CARE MUST BE EXERCISED WHILE PLANNING THIS REPLACEMENT
AT THE BEGINNING OF THE PROJECT.
Revisions: Date:
DESIGN DEVELOPMENT 7.24.20
35% CDs SUBMISSION 09.01.2020
65% CDs SUBMISSION 10.08.2020
90% CDs SUBMISSION 11.24.2020
100% CDs SUBMISSION 02.05.2021
FINAL CDs SUBMISSION 02.26.2021
ADDENDUM 1 08.06.2021
P/B
P /B
P /B
P /B
P /B
P /B
P/B
P /B
P /B
F
CR
CR
FF
CR
EDC
EDC
EDC
S
R
D
F F
R W
JJ
SC
DPD4
ERD6
LD2 DRD-2
ELECTRICAL ROOM
D21
ATS-22
ERD6 SECTION 2
SBHDB1
SUB B
SUB A
NEW ESBD2
ATS-8
ATS-5
AHU-2
T-LDB1EQ
DPLDB1
ATS-26
ATS-30
DPHEBCR1
DPHDB1
T-HGB1EQ
LGB1EQ
HGB1EQ
150KVA
T-DRD2
CLEAN LINEN 2
B-D412
MECHANICAL/ELECTRICAL RM
G09AMECHANICAL RM
D20
B-D424
NEW FLOOR
CORE (TYP.)
NEW FLOOR
CORE (TYP.)
OFFICE/BREAK ROOM
GENERAL NOTES
A. SEE PHASING PLAN SHEET E-002 FOR DEMOLITION/
AND NEW EQUIPMENT INSTALLATION.
B. ALL TEMPORARY FEEDER CABLES SHALL BE
SUPPORTED FROM STRUCTURE ABOVE TO AVOID
NEW AND EXISTING ELECTRICAL EQUIPMENT RIGGING
FOR INSTALLATION AND REMOVAL.
"DPD1"
11KV PB FROM BSW4
B-D410
"DPD1"
"OLD DPD1" USED
AS A PULLBOX
"OLD DPD3" USED
AS A PULLBOX
UNMARKED PANEL
480/277V-3PH-4W
FED FROM LD2
11KV PULLBOX (8'-0" ABOVE FLOOR)
FROM BSW4
UPPER PULL BOX
(4'-0" ABOVE FLOOR)
LOWER PULL BOX
(0'-8" ABOVE FLOOR)
LD3
NEW UNIT
PRIMARY TERMINATION
PRIMARY TERMINATION
PRIMARY TERMINATION
PRIMARY TERMINATION
USSA LIGHTING
TRANSFORMER
RELOCATED TRANSFORMER
DEMARC
ROOM
NEW UNIT
EM1
C1
C1
C1
C1
TEMPORARY
COOLING
UNIT
B-D412A
C1
EXISTING EDSB2 TO
BE USED FOR
TEMPORARY POWER
SERVICE AND
REMOVED AFTER UNIT
SUBSTATION A HAS
BEEN INSTALLED AND
ACTIVATED.
SEE PHASING PLAN
E-002
DOTTED LINE INDICATES
EQUIPMENT WORK
CLEARANCES. TYP.
NEW LUMINARIES WIRED INTO
EXISTING RM. B-D412 LIFE SAFETY
LIGHTING BRANCH CIRCUIT.
EXISTING RELOCATED LUMINAIRE WIRED INTO
EXISTING CORRIDOR B-D410 LIFE SAFETY
LIGHTING BRANCH CIRCUIT.
3 3
PLAN NOTES
1. PROVIDE 4" CONCRETE PAD.
2. TEMPORARY PORTABLE HVAC UNIT 480V-3PH-60HZ-5MCA.
PROVIDE TEMPORARY 480V-3PH-20AMP FEEDER 3-#12
CABLE FROM EXISTING AHU2 SERVICE (RM B502). PROVIDE
NEW 30AMP - 3POLE FUSED SWITCH WITH 20AF IN.
REMOVE WHEN AHU-2 IS PLACED BACK IN SERVICE.
3. MANUFACTURER TO PROVIDE GEAR THAT CAN BE RIGGED
INTO THE SPACE (BROKEN DOWN) AND WILL MEET ALL
REQUIRED WORKING CLEARANCES AS SHOWN AS ROOM
IS EXTREMELY TIGHT. FIELD VERIFY RIGGING, ENTRANCE
PATH, OVERHEAD UTILITIES, CRAWL SPACE CONDUIT
OBSTRUCTIONS, ETC. PRIOR TO ORDERING. SUBMIT
MANUFACTURER'S PROCESS FOR ONSITE ASSEMBLY
AND FIELD CERTIFICATION WITH SHOP DRAWINGS AND
PRIOR TO ORDERING FOR REVIEW. PROVIDE
MANUFACTURER FIELD REPRESENTATIVE ONSITE DURING
INSTALLATION AND FINAL WRITTEN APPROVAL OF FULLY
ASSEMBLED GEAR.
4. NEW CARD READER WITH WALLBOX AND CONDUIT,
PROVIDE NEW DOOR CONTROL WIRING IN CONDUIT BACK
TO ROOM BD422 (APPROX 50' TO THE EAST) AND
TERMINATE IN NEW LENEL DOOR CONTROL EQUIPMENT
PANEL WITH POWER SUPPLY.
5. NEW WIRING DEVICE WIRED TO LOCAL WIRING DEVICE
120V-20AMP BRANCH CIRCUIT. NEW WIRING DEVICE
CIRCUIT SHALL NOT EXCEED 8 DEVICES.
6. PROVIDE NEW BOX AND RE-INSTALL EXISTING CARD
READER. PROVIDE NEW CONTROL WIRING IN CONDUIT
BACK TO EXISTING LENEL PANEL AND NEW POWER
SUPPLY. RE-TERMINATE ON EXISTING DOOR CONTROL
POINT AND NEW POWER SUPPLY.
7. NEW FIRE ALARM DUCT SMOKE DETECTOR, WIRE INTO
EXISTING SALVAGED FIRE ALARM POWER AND SIGNAL
CIRCUIT.
8. REINSTALL EXISTING EXIT SIGN.
9. PROVIDE NEW DUAL DATA DROP FROM EXISTING SIGNALS
CLOSET BD-422. TERMINATE ON EXISTING PORTS IN
EXISTING PATCH PANEL. MATCH EXISTING CABLING
CATEGORY.
10. RE-INSTALL SQUARE D METERS HERE. COORDINATE
EXACT LOCATION WITH COR.
11. LOCATE UNIT SUBSTATION SO ALL REQUIRED WORKING
CLEARANCES ARE MAINTAINED.
12. RECONDITIONED AHU2 (2) 7.52FLA-480V-3PHASE ECM
MOTORS. (UNIT 30A MOCP) RECONNECT TO EXISTING
FEEDER 3" 10G, 3/4" SERVED FROM PDP2 480V-3PHASE-
30AF, PDP2 IS LOCATED IN ROOM 2F501A AND IS SERVED
FROM EXISTING LAB WAREHOUSE SUBSTATION IN RM
2F501A. VERIFY EXACT TERMINATIONS AND LOCATION
WITH AHU2 MFR.
13. PROVIDE NEW FIRE ALARM AV DEVICE. CONNECT TO
EXISTING F.A. CIRCUIT.
14. NEW FIRE ALARM DEVICE. CONNECT TO EXISTING FIRE
ALARM SYSTEM.
15. NEW CORES SHOW FOR REFERENCE ONLY. PROVIDE ALL
REQUIRED FOR NEW CONDUITS. SIZE PER
SPECIFICATIONS. COORDINATE LOCATION WITH GEAR
MANUFACTURER. FIELD LOCATE AND NEW FLOOR
PENETRATIONS SHALL INCLUDE CONDUIT SLEEVE. SEE
DETAIL ON EP-501.
16. NEW VAV BOX. RECONNECT EXISTING VAV BOX SALVAGED
CIRCUIT.
17. REINSTALL CEILING SPEAKER.
REINSTALL EXISTING
PENDANT MTD LUMINAIRE WIRE NEW LUMINAIRE INTO
EXISTING RM LIGHTING BRANCH
CIRCUIT
BD412
BD412a
BD412b
D21
EXISTING CONDENSATE
PUMP TO REMAIN.
USSA LIGHTING
TRANSFORMER
USSB LIGHTING
TRANSFORMER
USSB LIGHTING
TRANSFORMER
6' - 5 3/4"
REINSTALL EXISTING
FIRE ALARM DEVICES
NEW TEMPORARY CONDENSATE PUMP
WITH PLUG AND CORD. WIRE INTO LOCAL
DUPLEX RECEPTACLE
4' - 0"
4' - 0 11/32"
TEMP WORKING
CLEARANCE
REINSTALL EXISTING PENDANT MOUNTED
SALVAGED LUMINARIES AND BRANCH
CIRCUIT. TYPICAL.
TYP.
TYP.
RELOCATED PULL
STATION
3' - 2 11/16"
EP-401
REINSTALL EXISTING
2'X4'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: NICK CARROZZA
VA FORM 08 - 6231
A
Louis Stokes
Cleveland
VA Medical
Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
1468 WEST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
STRUCTURAL ENGINEERING:
THORSON BAKER + ASSOC.
3030 WEST STREETSBORO RD.
RICHFIELD, OH 44286
P. 330.659.6688
ELECTRICAL ENGINEERING:
HEAPY
1400 WEST DOROTHY LN.
DAYTON, OH 45409
P. 937.224.0861
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
MECHANICAL ENGINEERING:
FFE, INC.
110 BOGGS LN, SUITE 170
SPRINGDALE, OH 45246
P. 513.522.0956
HAZ. MATERIALS ASSESSMENT:
STEPHEN J. SEBESTA & ASSOC.
30628 DETROIT RD. #258
WESTLAKE, OH 44145
P. 216.781.0060
FINAL CDs SUBMISSION
C
B
IM
\M o d e l\
-0
-E -C e n tr a l_ m a lo w e .r v t
/9
/2
:4
:0
P
M
EP-401
ENLARGED BASEMENT POWER AND
SYSTEMS PLAN
REPLACE SUBSTATION A & B
10701 EAST BLVD. CLEVELAND, OHIO
541-21-105
02.26.2021 MSG JJH/DMB
SCALE: 1/4" = 1'-0"
ENLARGED BASEMENT POWER AND SYSTEMS PLAN
FULLY SPRINKLERED
EXISTING UNIT SUBSTATION CLEARANCES
SCALE: NTS
N
NORTH
N
Revisions: Date:
DESIGN DEVELOPMENT 7.24.20
35% CDs SUBMISSION 09.01.2020
65% CDs SUBMISSION 10.08.2020
90% CDs SUBMISSION 11.24.2020
100% CDs SUBMISSION 02.05.2021
FINAL CDs SUBMISSION 02.26.2021
ADDENDUM 1 08.06.2021
ENEN
EN
E NE NE NE N
E NE NE N
G
K
KK
E NE NE N
E NE NE NE N
E NE NE N
E NE N
KK
K K K K K K
G G G
E NE N E NE NE NE N
E NE N
E NE NE N
E N
E N
E NE NE N
E NE N
E NE NE N
E N
G
E N
M
800AF
800AT
1600AF
1600AT
4000AF
4000AT
T21 D3.01
(TIE)
GENERATOR PARALLELING/
SYNCHRONIZATION SWITCHGEAR "GPS2"
4000A, 480/277V-3PH-4W
ELECT RM BE602
3000A, 480/277V-3PH-4W
PANEL "DPEG1"
800AF
800AT
3P
ATS-34
800A-4P
EMERGENCY
CRITICAL
800AF
800AT
3P
ATS-33
800A-4P
EMERGENCY
CRITICAL
400AF
400AT
3P
ATS-36
400A-4P
ESSENTIAL
EQUIPMENT
400AF
400AT
3P
ATS-35
400A-4P
LIFE SAFETY
800AF
800AT
3P
800A, 480/277V-3PH-4WGENERATOR
DISTRIBUTION "DPEG2"
800AF
800AT
3P
ATS-47
260A-4P
ESSENTIAL
EQUIPMENT
800AF
800AT
3P
ATS-38
800A-4P
ESSENTIAL
EQUIPMENT
400AF
400AT
3P
ATS-37
1200A-4P
ESSENTIAL
EQUIPMENT
RM 1F192B
RM CARES PH
GENERATOR "G3"
1250KW/1562KVA,
480/277V-3PH-4W
RM 1E500
1250KW/1562KVA,
480/277V-3PH-4W
RM 1E500
G7
2000AF
2000AT
3200AF
3000AT
G6
2000AF
2000AT
1600AF
1600AT
PG1
2000AF
2000AT
800AF
800A-3P
GENERATOR
DISTRIBUTION "DPEG3"
800A, 480/277V-3PH-4W
RM 109
400AF
400AT
3P
400A, 480/277V-3PH-4WGENERATOR
DISTRIBUTION "EPDP1"
225AF
225AT
3P
ATS-40
260A-4P
ESSENTIAL
EQUIPMENT
ATS-39
260A-4P
ESSENTIAL
EQUIPMENT
ATS-48
260A-4P
ESSENTIAL
EQUIPMENT
RM 2F501A
225AF
225AT
3P
225AF
125AT
3P
600AF
600A-3P
GENERATOR DISTRIBUTION
"RAD1PEH1" 1200A, 480/277V-3PH-4W
RM SUB PH
600AF
600AT
3P
ATS-49
600A-4P
ATS-50
260A-4P
ATS-41
300A-4P
400AF
400AT
3P
400AF
400AT
3P
ATS-42
400A-4P
400AF
400AT
3P
600AF
600AT
3P
400AF
400AT
3P
400AF
400AT
3P SPARE
225A
3P SPARE
200A 3P
ELEVATOR
DOCK T-D
2000A, 480/277V-3PH-4WGENERATOR
DISTRIBUTION "EPDP"
800AF
800AT
3P
ATS-44
800A-4P
ESSENTIAL
EQUIPMENT
ATS-45
800A-4P
ESSENTIAL
EQUIPMENT
ATS-46
800A-4P
ESSENTIAL
EQUIPMENT
RM 7C105
800AF
800AT
3P
800AF
800AT
3P
LOAD BANK
2000A, 480/277V-3PH-4WGENERATOR
DISTRIBUTION "EDSB3"
800AF
800AT
3P
ATS-51
800A-4P
ESSENTIAL
EQUIPMENT
ATS-52
800A-4P
ESSENTIAL
EQUIPMENT
RM 100
800AF
800AT
3P
1200AF
PROVISION
1600AF
1000AT
3200AF
2500AT
GENERATOR PARALLELING/
SYNCHRONIZATION SWITCHGEAR "GPS1"
4000A, 480/277V-3PH-4W
ELECT RM BE602
GENERATOR "G1"
1000KW/1200KVA,
480/277V-3PH-4W
RM 1E500
GENERATOR "G2"
G3
1600AF
1600AT
1600AF
1600AT
GFA
G4
1600AF
1600AT
MANUAL
3200AF
3000AT
TGPB
MANUAL
3200AF
3000AT
TGPA
MANUAL
3200AF
3000AT
PG2
MANUAL
4000AF
4000AT
T12
(TIE BREAKER)
MANUAL
3200AF
3000AT
TG3B
MANUAL
3200AF
3200AT
TG3A
3200AF
3000AT
3000A, 480/277V-3PH-4W
RM 100
MANUAL TIE BREAKER
4000A, 480/277V-3PH-4W
RM 100
TIE GPS
GENERATOR "G4"
G4-MCBG4-MCB G2-MCBG1-MCB
1000KW/1200KVA,
480/277V-3PH-4W
RM 1E500
1600A, 480/277V-3PH-4WGENERATOR
DISTRIBUTION "EDSB4"
800AF
800AT
3P
ATS-26
800A-4P
ESSENTIAL
EQUIPMENT
ATS-15
260A-4P
ESSENTIAL
EQUIPMENT
RM 100
400AF
400AT
3P
800AF
PROVISION
1200AF
1200AT
GENERATOR DISTRIBUTION
"EGSB1" 1600A, 480/277V-3PH-4W
RM BA151
800AF
600AT
3P
ATS-4
600A-4P
ESSENTIAL
EQUIPMENT
ATS-3
800A-4P
ATS-2
400A-4P
800AF
800AT
3P
400AF
400AT
3P
ATS-1
400A-4P
400AF
400AT
3P
800AF
400AT
T1-EC
750KVA-3PH
RM 100
TR-EC
750KVA-3PH
RM BA151
ESSENTIAL
EQUIPMENT
EMERGENCY
CRITICALLIFE SAFETY
(NEW) PANEL "EDSB2"
400AF
400AT
400A, 480/277V-3PH-4WGENERATOR
DISTRIBUTION "EGKDP"
150A 3P
ATS-7
150A-4P
LIFE SAFETY
ATS-6
400A-4P
ESSENTIAL
EQUIPMENT
RM BF458
400A 3P
(NEW)
ATS-8
600A-4P
ESSENTIAL
EQUIPMENT
MCC-G11
BOILER RM
600A, 480/277V-3PH-4WGENERATOR
DISTRIBUTION "EGDP"
150A 3P
ATS-13
150A-4P
LIFE SAFETY
ATS-12
400A-4P
ESSENTIAL
EQUIPMENT
RM A105
400A 3P
ATS-11
600A-4P
ESSENTIAL
EQUIPMENT
600A 3P
(NEW)
ATS-5
800A-4P
RM B-D412A
ATS-30
800A-4P
CRITICAL
GENERATOR DISTRIBUTION
"DPNB1G" 1200A, 480/277V-3PH-4W
RM BE261
600A 3P
ATS-19
600A-4P
EMERGENCY
CRITICAL
ATS-18
260A-3P
ATS-17
800A-3P
300AF
3P
800AF
3P
ATS-16
800A-3P
800A 3P
ESSENTIAL
EQUIPMENTLIFE SAFETY
(NEW)
ATS-22
1200A-4P
ATS-21
260A-3P
ESSENTIAL
EQUIPMENT
WEST HVAC-PH
ESSENTIAL
EQUIPMENT
EAST HVAC-PH
ATS-20
600-4P
800A, 480/277V-3PH-4WGENERATOR
DISTRIBUTION "EDSB3"
600AF
600AT
3P
ATS-25
600A-4P
ESSENTIAL
EQUIPMENT
ATS-24
260A-4P
LIFE SAFETY
ATS-23
600A-4P
EMERGENCY
CRITICAL
RM 100
400AF
225AT
3P
600AF
600AT
3P
EMERGENCY
CRITICAL
T-UPS
500KVA-3PH
RM BE261
ATS-65
4000A-4P
ESSENTIAL
EQUIPMENT
3200AF
3000AT
3000A, 480/277V-3PH-4W
2000KW/2500KVA,
480/277V-3PH-4W
RM 102
GENERATOR "G5"
G5-MCB
PORTABLE GENERATOR
CONNECTION TERMINAL BOX "PG2"
3000A FEEDER BUS DUCT
3000A, 480/277V-3PH-4W
RM 112
MANUAL TIE BREAKER
3000A, 480/277V-3PH-4W
RM 112GENERATOR
DISTRIBUTION "GDS3"
400AF
400AT
3P
ATS-43
800A-4P
EMERGENCY
CRITICAL
2500A, 480/277V-3PH-4W
RM B-D412A
SUB-A
(D21)
SUB-B
(D21)
GENERAL NOTES
A. ALL EQUIPMENT AND FEEDERS ARE EXISTING TO
REMAIN UNLESS OTHERWISE NOTED.
B. SEE SHEET E-700 FEEDER SCHEDULE.
C. SEE PHASING PLAN SHEET E-002 FOR DEMOLITION
AND NEW EQUIPMENT INSTALLATION
PLAN NOTES
1. MAKE SPLICE AND PROVIDE SPLICE BOX IN
ELECTRICAL ROOM OR IN CRAWL SPACE BELOW
AS REQUIRED. USE IRREVERSIBLE HYDRAULIC
CRIMP CONNECTORS. FIELD VERIFY
CONDUCTOR SIZES (AND MATCH) PRIOR TO
ORDERING.
2. NEW SQUARE D METER AND CT'S, SQUARE D
ION7400 SERIES OR EQUAL. CONNECT METER TO
EXISTING SCHNEIDER ELECTRIC METERING
SYSTEM. INCLUDE ALL WIRING, HARDWARE,
PROGRAMMING AND TESTING.
3. PROVIDE NEW CONTROL WIRING TO
PARALLELING GEAR. (15) #12 AWG., #12G, 1.5"C.
RUSSELECTRIC TO PROVIDE ALL PROGRAMMING,
TESTING, HMI UPGRADES AND INTEGRATION,
LOAD SHEDDING, ETC. TO INTEGRATE NEW ATS.
PROVIDE WIRING FROM ATS TO PARALLELING
GEAR AND FROM PARALLELING GEAR TO
REMOTE TEST PANEL. REFER TO SHEET EP-700.
DPD1
60/460/4
60/440/4
101/4 80/4 120/4 80/4
80/4 26/4 120/4
120/4 121/4
250/4
EQDLG11
1200A
480/277
3PH -4
SUB-A
(D21)
80/4
80/4
NEW
NEW
NEWNEWNEW
NEWNEWNEWNEW
NEWNEW
NEW
NEW
NEW
RM
E24A
80/4
NEW
RM
2B480
RM
1A1598
225A
SPARE
225A
SPARE
NEWNEW
141/4
101/4
120/4
82/4
121/4
26/4 82/4
SPD
600AF
600AT
800AF
800AT
600AF
600AT
800AF
800AT
1200AF
1200AT
225AF
225AT
600AF
600AT
800AF
800AT
1200AF
1200AT
225AF
SPARE
225AF
SPARE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: NICK CARROZZA
VA FORM 08 - 6231
A
Louis Stokes
Cleveland
VA Medical
Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
1468 WEST 9TH STREET #400
CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
STRUCTURAL ENGINEERING:
THORSON BAKER + ASSOC.
3030 WEST STREETSBORO RD.
RICHFIELD, OH 44286
P. 330.659.6688
ELECTRICAL ENGINEERING:
HEAPY
1400 WEST DOROTHY LN.
DAYTON, OH 45409
P. 937.224.0861
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE.
CLEVELAND, OH 44111
P. 440.667.5120
MECHANICAL ENGINEERING:
FFE, INC.
110 BOGGS LN, SUITE 170
SPRINGDALE, OH 45246
P. 513.522.0956
HAZ. MATERIALS ASSESSMENT:
STEPHEN J. SEBESTA & ASSOC.
30628 DETROIT RD. #258
WESTLAKE, OH 44145
P. 216.781.0060
FINAL CDs SUBMISSION
C
B
IM
\M o d e l\
-0
-E -C e n tr a l_ m a lo w e .r v t
/9
/2
:4
:0
P
M
EP-603
EMERGENCY POWER SYSTEM NEW WORK
RISER DIAGRAM
REPLACE SUBSTATION A & B
10701 EAST BLVD. CLEVELAND, OHIO
541-21-105
02.26.2021 MSG JJH/DMB
SCALE: 12" = 1'-0"
EMERGENCY POWER SYSTEM RISER DIAGRAM
1 1
1 1
FULLY SPRINKLERED
Revisions: Date:
DESIGN DEVELOPMENT 7.24.20
35% CDs SUBMISSION 09.01.2020
65% CDs SUBMISSION 10.08.2020
90% CDs SUBMISSION 11.24.2020
100% CDs SUBMISSION 02.05.2021
FINAL CDs SUBMISSION 02.26.2021
ADDENDUM 1 08.06.2021
07-01-20
Final CDs Submission VAMC WADE PARK
2/26/2021 Replace Substations A & B
Addendum 1 – 8.6.21 Project No. 541-21-105
SAFETY REQUIREMENTS
01 35 26 -1
SECTION 01 35 26
SAFETY REQUIREMENTS
TABLE OF CONTENTS
1.1 APPLICABLE PUBLICATIONS
1.2 DEFINITIONS
1.3 REGULATORY REQUIREMENTS
1.4 ACCIDENT PREVENTION PLAN (APP)
1.5 ACTIVITY HAZARD ANALYSES (AHAs)
1.6 PRECONSTRUCTION CONFERENCE
1.7 “SITE SAFETY AND HEALTH OFFICER” (SSHO) and “COMPETENT PERSON” (CP)
1.8 TRAINING
1.9 INSPECTIONS
1.10 ACCIDENTS, OSHA 300 LOGS, AND MAN-HOURS
1.11 PERSONAL PROTECTIVE EQUIPMENT (PPE)
1.12 INFECTION CONTROL
1.13 TUBERCULOSIS SCREENING
1.14 FIRE SAFETY
1.15 ELECTRICAL
1.16 FALL PROTECTION
1.17 SCAFFOLDS AND OTHER WORK PLATFORMS
1.18 EXCAVATION AND TRENCHES
1.19 CRANES
1.20 CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT)
1.21 CONFINED SPACE ENTRY
1.22 WELDING AND CUTTING
1.23 LADDERS
1.24 FLOOR & WALL OPENINGS
2/26/2021 Replace Substations A & B
Addendum 1 – 8.6.21 Project No. 541-21-105
SAFETY REQUIREMENTS
01 35 26 -2
SECTION 01 35 26
SAFETY REQUIREMENTS
1.1 APPLICABLE PUBLICATIONS:
A. Latest publications listed below form part of this Article to extent referenced. Publications are referenced in text by basic designations only.
B. American Society of Safety Engineers (ASSE):
A10.1-2011...........Pre-Project & Pre-Task Safety and Health
Planning
A10.34-2012..........Protection of the Public on or Adjacent to
Construction Sites
A10.38-2013..........Basic Elements of an Employer’s Program to
Provide a Safe and Healthful Work Environment
American National Standard Construction and
Demolition Operations
C. American Society for Testing and Materials (ASTM):
E84-2013.............Surface Burning Characteristics of Building
Materials
D. The Facilities Guidelines Institute (FGI):
FGI Guidelines-2010Guidelines for Design and Construction of
Healthcare Facilities
E. National Fire Protection Association (NFPA):
10-2018..............Standard for Portable Fire Extinguishers
30-2018..............Flammable and Combustible Liquids Code
51B-2019.............Standard for Fire Prevention During Welding, Cutting and Other Hot Work
70-2020..............National Electrical Code
70B-2019.............Recommended Practice for Electrical Equipment
Maintenance
2/26/2021 Replace Substations A & B
Addendum 1 – 8.6.21 Project No. 541-21-105
SAFETY REQUIREMENTS
01 35 26 -3
70E-2018 ............Standard for Electrical Safety in the Workplace
99-2018..............Health Care Facilities Code
241-2019.............Standard for Safeguarding Construction, Alteration, and Demolition Operations
F. The Joint Commission (TJC)
TJC Manual ..........Comprehensive Accreditation and Certification
Manual
G. U.S. Nuclear Regulatory Commission
10 CFR 20 ...........Standards for Protection Against Radiation
H. U.S. Occupational Safety and Health Administration (OSHA):
29 CFR 1910 .........Safety and Health Regulations for General
Industry
29 CFR 1926 .........Safety and Health Regulations for Construction
Industry
I. VHA Directive 2005-007
1.2 DEFINITIONS:
A. Critical Lift. A lift with the hoisted load exceeding 75% of the crane’s maximum capacity; lifts made out of the view of the operator
(blind picks); lifts involving two or more cranes; personnel being hoisted; and special hazards such as lifts over occupied facilities, loads lifted close to power-lines, and lifts in high winds or where other adverse environmental conditions exist; and any lift which the crane operator believes is critical.
B. OSHA “Competent Person” (CP). One who is capable of identifying existing and predictable hazards in the surroundings and working conditions which are unsanitary, hazardous or dangerous to employees, and who has the authorization to take prompt corrective measures to eliminate them (see 29
CFR 1926.32(f)).
C. "Qualified Person" means one who, by possession of a recognized degree, certificate, or professional standing, or who by extensive knowledge, 2/26/2021 Replace Substations A & B
Addendum 1 – 8.6.21 Project No. 541-21-105
SAFETY REQUIREMENTS
01 35 26 -4 training and experience, has successfully demonstrated his ability to solve or resolve problems relating to the subject matter, the work, or the project.
D. High Visibility Accident. Any mishap which may generate publicity or high visibility.
E. Accident/Incident Criticality Categories:
1. No impact – near miss incidents that should be investigated but are not required to be reported to the VA;
2. Minor incident/impact – incidents that require first aid or result in minor equipment damage (less than $5000). These incidents must be investigated but are not required to be reported to the VA;
3. Moderate incident/impact – Any work-related injury or illness that results in:
a. Days away from work (any time lost after day of injury/illness onset);
b. Restricted work;
c. Transfer to another job;
d. Medical treatment beyond first aid;
e. Loss of consciousness;
4. A significant injury or illness diagnosed by a physician or other licensed health care professional, even if it did not result in (1) through (5) above or,
5. Any incident that leads to major equipment damage (greater than
$5000).
F. These incidents must be investigated and are required to be reported to the VA;
1 Major incident/impact – Any mishap that leads to fatalities, hospitalizations, amputations, and losses of an eye as a result of contractors’ activities. Or any incident which leads to major
2/26/2021 Replace Substations A & B
Addendum 1 – 8.6.21 Project No. 541-21-105
SAFETY REQUIREMENTS
01 35 26 -5 property damage (greater than $20,000) and/or may generate publicity or high visibility. These incidents must be investigated and are required to be reported to the VA as soon as practical, but not later than 2 hours after the incident.
G. Medical Treatment. Treatment administered by a physician or by registered professional personnel under the standing orders of a physician. Medical treatment does not include first aid treatment even through provided by a physician or registered personnel.
1.3 REGULATORY REQUIREMENTS:
A. In addition to the detailed requirements included in the provisions of this contract, comply with 29 CFR 1926, comply with 29 CFR 1910 as incorporated by reference within 29 CFR 1926, comply with ASSE A10.34, and all applicable federal, state, and local laws, ordinances, criteria, rules and regulations. Submit matters of interpretation of standards for resolution before starting work. Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements govern except with specific approval and acceptance by the
Contracting Officer Representative.
1.4 ACCIDENT PREVENTION PLAN (APP):
A. The APP (aka Construction Safety & Health Plan) shall interface with the Contractor's overall safety and health program. Include any portions of the Contractor's overall safety and health program referenced in the APP in the applicable APP element and ensure it is site-specific. The Government considers the Prime Contractor to be the
"controlling authority" for all worksite safety and health of each subcontractor(s). Contractors are responsible for informing their subcontractors of the safety provisions under the terms of the contract and the penalties for noncompliance, coordinating the work to prevent one craft from interfering with or creating hazardous working conditions for other crafts, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.
B. The APP shall be prepared as follows:
2/26/2021 Replace Substations A & B
Addendum 1 – 8.6.21 Project No. 541-21-105
SAFETY REQUIREMENTS
01 35 26 -6
1. Written in English by a qualified person who is employed by the
Prime Contractor articulating the specific work and hazards pertaining to the contract (model language can be found in ASSE
A10.33). Specifically articulating the safety requirements found within these VA contract safety specifications.
2. Address both the Prime Contractors and the subcontractors work operations.
3. State measures to be taken to control hazards associated with materials, services, or equipment provided by suppliers.
4. Address all the elements/sub-elements and in order as follows:
a. SIGNATURE SHEET. Title, signature, and phone number of the following:
1) Plan preparer (Qualified Person such as corporate safety staff person or contracted Certified Safety Professional with construction safety experience);
2) Plan approver (company/corporate officers authorized to obligate the company);
3) Plan concurrence (e.g., Chief of Operations, Corporate Chief of Safety, Corporate Industrial Hygienist, project manager or superintendent, project safety professional). Provide concurrence of other applicable corporate and project personnel (Contractor).
b. BACKGROUND INFORMATION. List the following:
1) Contractor;
2) Contract number;
3) Project name;
4) Brief project description, description of work to be performed, and location; phases of work anticipated (these will require an AHA).
2/26/2021 Replace Substations A & B
Addendum 1 – 8.6.21 Project No. 541-21-105
SAFETY REQUIREMENTS
01 35 26 -7
c. STATEMENT OF SAFETY AND HEALTH POLICY. Provide a copy of current corporate/company Safety and Health Policy Statement, detailing commitment to providing a safe and healthful workplace for all employees. The Contractor’s written safety program goals, objectives, and accident experience goals for this contract should be provided.
d. RESPONSIBILITIES AND LINES OF AUTHORITIES. Provide the following:
1) A statement of the employer’s ultimate responsibility for the implementation of his SOH program;
2) Identification and accountability of personnel responsible for safety at both corporate and project level. Contracts specifically requiring safety or industrial hygiene personnel shall include a copy of their resumes.
3) The names of Competent and/or Qualified Person(s) and proof of competency/qualification to meet specific OSHA
Competent/Qualified Person(s) requirements must be attached.;
4) Requirements that no work shall be performed unless a designated competent person is present on the job site;
5) Requirements for pre-task Activity Hazard Analysis (AHAs);
6) Lines of authority;
7) Policies and procedures regarding noncompliance with safety requirements (to include disciplinary actions for violation of safety requirements) should be identified;
e. SUBCONTRACTORS AND SUPPLIERS. If applicable, provide procedures for coordinating SOH activities with other employers on the job site:
1) Identification of subcontractors and suppliers (if known);
2) Safety responsibilities of subcontractors and suppliers.
f. TRAINING.
2/26/2021 Replace Substations A & B
Addendum 1 – 8.6.21 Project No. 541-21-105
SAFETY REQUIREMENTS
01 35 26 -8
1) Site-specific SOH orientation training at the time of initial hire or assignment to the project for every employee before working on the project site is required.
2) Mandatory training and certifications that are applicable to this project (e.g., explosive actuated tools, crane operator, rigger, crane signal person, fall protection, electrical lockout/NFPA 70E, machine/equipment lockout, confined space, etc…) and any requirements for periodic retraining/recertification are required.
3) Procedures for ongoing safety and health training for supervisors and employees shall be established to address changes in site hazards/conditions.
4) OSHA 10-hour training is required for all workers on site and the OSHA 30-hour training is required for Trade Competent
Persons (CPs)
g. SAFETY AND HEALTH INSPECTIONS.
1) Specific assignment of responsibilities for a minimum daily job site safety and health inspection during periods of work activity: Who will conduct (e.g., “Site Safety and Health
CP”), proof of inspector’s training/qualifications, when inspections will be conducted, procedures for documentation, deficiency tracking system, and follow-up procedures.
2) Any external inspections/certifications that may be required
(e.g., contracted CSP or CSHT)
h. ACCIDENT/INCIDENT INVESTIGATION & REPORTING. The Contractor shall conduct mishap investigations of all Moderate and Major as well as all High Visibility Incidents. The APP shall include accident/incident investigation procedure and identify person(s) responsible to provide the following to the Contracting Officer
Representative:
1) Exposure data (man-hours worked);
2) Accident investigationreports;
2/26/2021 Replace Substations A & B
Addendum 1 – 8.6.21 Project No. 541-21-105
SAFETY REQUIREMENTS
01 35 26 -9
3) Project site injury and illness logs.
i. PLANS (PROGRAMS, PROCEDURES) REQUIRED. Based on a risk assessment of contracted activities and on mandatory OSHA compliance programs, the Contractor shall address all applicable occupational, patient, and public safety risks in site-specific compliance and accident prevention plans. These Plans shall include but are not be limited to procedures for addressing the risks associates with the following:
1) Emergency response;
2) Contingency for severe weather;
3) Fire Prevention;
4) Medical Support;
5) Posting of emergency telephone numbers;
6) Prevention of alcohol and drug abuse;
7) Site sanitation (housekeeping, drinking water, toilets);
8) Night operations and lighting;
9) Hazard communication program;
10) Welding/Cutting “Hot” work;
11) Electrical Safe Work Practices (Electrical LOTO/NFPA 70E);
12) General Electrical Safety;
13) Hazardous energy control (Machine LOTO);
14) Site-Specific Fall Protection & Prevention;
15) Excavation/trenching;
16) Asbestos abatement;
17) Lead abatement;
18) Crane Critical lift;
19) Respiratory protection;
2/26/2021 Replace Substations A & B
Addendum 1 – 8.6.21 Project No. 541-21-105
SAFETY REQUIREMENTS
01 35 26 -10
20) Health hazard control program;
21) Radiation Safety Program;
22) Abrasive blasting;
23) Heat/Cold Stress Monitoring;
24) Crystalline Silica Monitoring (Assessment);
25) Demolition plan (to include engineering survey);
26) Formwork and shoring erection and removal;
27) PreCast Concrete;
28) Public (Mandatory compliance with ANSI/ASSE A10.34-2012).
C. Submit the APP to the Contracting Officer Representative for review for compliance with contract requirements in accordance with Section 01 33
23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 15 calendar days prior to the date of the preconstruction conference for acceptance. Work cannot proceed without an accepted APP.
D. Once accepted by the Contracting Officer Representative, the APP and attachments will be enforced as part of the contract. Disregarding the provisions of this contract or the accepted APP will be cause for stopping of work, at the discretion of the Contracting Officer in accordance with FAR Clause 52.236-13, Accident Prevention, until the matter has been rectified.
E. Once work begins, changes to the accepted APP shall be made with the knowledge and concurrence of the Contracting Officer Representative.
Should any severe hazard exposure, i.e. imminent danger, become evident, stop work in the area, secure the area, and develop a plan to remove the exposure and control the hazard. Notify the Contracting
Officer within 24 hours of discovery. Eliminate/remove the hazard. In the interim, take all necessary action to restore and maintain safe working conditions in order to safeguard onsite personnel, visitors, the public and the environment.
2/26/2021 Replace Substations A & B
Addendum 1 – 8.6.21 Project No. 541-21-105
SAFETY REQUIREMENTS
01 35 26 -11
1.5 ACTIVITY HAZARD ANALYSES (AHAS):
A. AHAs are also known as Job Hazard Analyses, Job Safety Analyses, and
Activity Safety Analyses. Before beginning each work activity involving a type of work presenting hazards not experienced in previous project operations or where a new work crew or sub-contractor is to perform the work, the Contractor(s) performing that work activity shall prepare an AHA (Example electronic AHA forms can be found on the US
Army Corps of Engineers web site)
B. AHAs shall define the activities being performed and identify the work sequences, the specific anticipated hazards, site conditions, equipment, materials, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level of risk.
C. Work shall not begin until the AHA for the work activity has been accepted by the Contracting Officer Representative and discussed with all engaged in the activity, including the Contractor, subcontractor(s), and Government on-site representatives at preparatory and initial control phase meetings.
1. The names of the Competent/Qualified Person(s) required for a particular activity (for example, excavations, scaffolding, fall protection, other activities as specified by OSHA and/or other State and Local agencies) shall be identified and included in the AHA.
Certification of their competency/qualification shall be submitted to the Government Designated Authority (GDA) for acceptance prior to the start of that work activity.
2. The AHA shall be reviewed and modified as necessary to address changing site conditions, operations, or change of competent/qualified person(s).
a. If more than one Competent/Qualified Person is used on the AHA activity, a list of names shall be submitted as an attachment to the AHA. Those listed must be Competent/Qualified for the type of work involved in the AHA and familiar with current site safety issues.
2/26/2021 Replace Substations A & B
Addendum 1 – 8.6.21 Project No. 541-21-105
SAFETY REQUIREMENTS
01 35 26 -12
b. If a new Competent/Qualified Person (not on the original list) is added, the list shall be updated (an administrative action not requiring an updated AHA). The new person shall acknowledge in writing that he or she has reviewed the AHA and is familiar with current site safety issues.
3. Submit AHAs to the Contracting Officer Representative for review for compliance with contract requirements in accordance with Section 01
33 23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES for review at least
15 calendar days prior to the start of each phase.
This is the start of the file's text. The full file is on GovTribe.