SPILL PREVENTION CONTROL
AND
COUNTERMEASURE PLAN
United States Department of the Interior Bureau of Safety and Environmental Enforcement
The Ohmsett Facility
March 8, 2021
Prepared for
Applied Research Associates, Inc. (ARA) Rocky Mountain Division
PO Box 150 Leonardo, New Jersey 07737
1805 Atlantic Avenue Manasquan, New Jersey 08736 Tel: (732) 223-2225 Fax: (732) 223-3666 www.brinkenv.com
PROJECT NO. 03BR119/ REF 21021
SPCC Plan Page ii March 8, 2021 United States Department of the Interior Brinkerhoff Project No. 03BR119
The Ohmsett Facility, Leonardo New Jersey
SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN
TABLE OF CONTENTS
1.0 Overview
1.1 Discharge Reporting
1.2 USEPA 60-Day Release Report
1.3 SPCC Plan Amendments and Renewal
1.4 Table of SPCC Plan Revisions
1.5 SPCC Cross Reference Table
2.0 CERTIFICATIONS
2.1 Ohmsett Management Approval
2.2 Professional Engineer Certification
2.3 Certification of the Applicability of Substantial Harm Criteria
3.0 Facility Information – 40 CFR 112.4
4.0 Spill Containment – 40 CFR 112.7
4.1 Site Conformance – 40 CFR 112.7(a)(1)
4.2 Requirement Compliance – 40 CFR 112.7(a)(2)
4.3 Physical Site Layout – 40 CFR 112.7(a)(3)
4.3.1 Site Storage Capacity – 40 CFR 112.7(a)(3)(i)
4.3.2 Discharge Prevention Measures – 40 CFR 112.7(a)(3)(ii) .. 17
4.3.3 Discharge or Drainage Controls – 40 CFR 112.7(a)(3)(iii) . 17
4.3.4 Discharge Countermeasures – 40 CFR 112.7(a)(3)(iv)
4.3.4.1 Mechanical Containment Recovery (MCR)
4.3.5 Discharge Response Procedures
4.3.6 Disposal Methods – 40 CFR 112.7(a)(3)(v)
4.3.7 Contact Information – 40 CFR 112.7(a)(3)(vi)
5.0 Potential Equipment Failures – 40 CFR 112.7(b)
6.0 Containment and Diversionary Structures – Onshore Facilities -
4 0CFR 112.7(c)
6.1 Dikes, Berms or Retaining Walls – 40 CFR 112.7(c)(1)(i)
6.2 Curbing – 40 CFR 112.7(c)(1)(ii)
6.3 Culverting, Gutters, or Other Drainage Systems –
40 FR 112.7(c)(1)(iii)
6.4 Weirs, Booms or Other Barriers – 40 CFR 112.7(c)(1)(iv)
6.5 Spill Diversion Ponds – 40 CFR 112.7(c)(1)(v)
SPCC Plan Page iii March 8, 2021
TABLE OF CONTENTS (continued)
6.6 Retention Ponds – 40 CFR 112.7(c)(1)(vi)
6.7 Sorbent Materials – 40 CFR 112.7(c)(1)(vii)
6.8 Offshore Facility – 40 CFR 112.7(c)(2)
7.0 Inspections, Tests and Records – 40 CFR 112.7(e)
7.1 Inspections
7.1.1 Daily Inspections
7.1.2 Monthly Inspections
7.1.3 Annual Inspection
7.2 Integrity Testing
7.3 Record Keeping
8.0 Personnel, Training, and Discharge Prevention Procedures – 40 CFR 112.7(f)
8.1 Contingency Training – 40 CFR 112.7(f)(1)
8.2 Designated Individual – 40 CFR 112.7(f)(2)
8.3 Spill Prevention Briefings – 40 CFR 112.7(f)(3)
9.0 Facility Security – 40 CFR 112.7(g)
9.1 Fencing – 40 CFR 112.7(g)(1)
9.2 Valves – 40 CFR 112.7(g)(2)
9.3 Pumps – 40 CFR 112.7(g)(3)
9.4 Blank Flanges and Caps – 40 CFR 112.7(g)(4)
9.5 Lighting – 40 CFR 112.7(g)(5)(i)(ii)
10.0 Facility Tank Car and Tank Truck Loading/Unloading Rack –
40 CFR 112.7(h)
10.1 Loading/Unloading Area – 40 CFR 112.7(h)(1)(2)(3)
10.2 Alteration Repair – 40 CFR 112.7(i)
10.3 Conformance – 40 CFR 112.7(j)
11.0 Facility Drainage – 40 CFR 112.8(b)
12.0 Bulk Storage Containers – 40 CFR 112.8(c)
12.1 Bulk Storage Practices – 40 CFR 112.8(c)(1)
12.2 Bulk Storage Containment – 40 CFR 112.8(c)(2)
12.2.1 Tank Farm Secondary Containment
12.2.2 Lake Zelman
SPCC Plan Page iv March 8, 2021
TABLE OF CONTENTS (continued)
12.2.3 Building R-25A
12.2.4 Temporary Containment Area
12.2.5 Diesel Fuel Tank Containment
12.3 Rainwater Drainage Measures – 40 CFR 112.8(c)(3)
12.4 Buried and Partially-Buried Metallic Storage
Tanks – 40 CFR 112.8(c)(4 and 5)
12.5 Integrity Testing – 40 CFR 112.8(c)(6)
12.6 Internal Heating Coil – 40 CFR 112.8(c)(7)
12.7 Good Engineering Practices – 40 CFR 112.8(c)(8)
12.8 Effluent Treatment Facilities – 40 CFR 112.8(c)(9)
12.9 Oil Accumulations in Diked Areas – 40 CFR 112.8(c)(10)
12.10 Mobile Oil Storage Containers – 40 CFR 112.8(c)(11)
13.0 Facility Transfer Operations, Pumping and Facility Process –
40 CFR 112.8(d)
13.1 Buried Piping – 40 CFR 112.8(d)(1)
13.2 Standby Service Pipelines – 40 CFR 112.8(d)(2)
13.3 Pipe Supports – 40 CFR 112.8(d)(3)
13.4 Inspections – 40 CFR 112.8(d)(4)
13.5 Traffic Warnings – 40 CFR 112.8(d)(5)
FIGURES
Figure 1 – Site Location Map Figure 2 – Road Map Figure 3 – Site Plan Figure 4 – Tank Farm & Lake Zelman Secondary Containment Map Figure 5 – Ohmsett Facility Drainage Map
APPENDICES
Appendix I – U.S. Environmental Protection Agency SPCC Field Inspection and Plan
Review Checklist Appendix II – Emergency Contact Information Appendix III – Monthly Ohmsett Inspection Logs Appendix IV – Annual Inspection Checklist Appendix V – Ohmsett Operating Manual for Liquid Transfer
SPCC Plan Page 1 March 8, 2021
1.0 OVERVIEW
Brinkerhoff Environmental Services, Inc. (Brinkerhoff) prepared this Spill Prevention Control and Countermeasure (SPCC) Plan for the subject site identified as the Ohmsett Research, Testing and Training Facility (hereinafter referred to as Ohmsett), operated by the United States Department of the Interior Bureau of Safety and Environmental Enforcement. Ohmsett is located within Naval Weapons Station Earle (hereinafter referred to as NWS Earle) Waterfront, Route 36, in Leonardo, Monmouth County, New Jersey. The SPCC Plan has been prepared in accordance with the United States Environmental Protection Agency (USEPA) Title 40 of the Code of Federal Regulations (CFR), Part 112 (Oil Pollution Prevention), July 17, 2002 through November 5, 2009 revisions.
The subject site is situated to the south of Sandy Hook Bay, which flows into the Lower Bay to the north. The Lower Bay flows through False Hook Channel before discharging into the Atlantic Ocean to the east. The location of the site is shown on the United States Geological Survey Site Location Map provided as Figure 1. A road map indicating the location of the subject site is provided as Figure 2. The subject site supports a permanent test oil storage capacity of approximately 78,850-gallons with additional flexible storage in Building R-24, and R-41. Ohmsett is situated on a navigable waterway and is, therefore, subject to the spill prevention and countermeasures as required in 40 CFR 112.1.
The purpose of this SPCC Plan is to document the systems and practices in place at the facility to prevent, control and contain oil spills from reaching navigable waters and adjoining shorelines.
Additionally, the SPCC Plan establishes inspection, record keeping, training, notification, and reporting requirements.
A copy of the SPCC Plan is maintained at the subject site in accordance with (40 CFR Part 112.3).
The USEPA does not require a copy of the SPCC Plan; however, the SPCC Plan is available to the USEPA for on-site review and inspection during normal working hours. The USEPA SPCC Field Inspection and Plan Review Checklist is included as Appendix I.
SPCC Plan Page 2 March 8, 2021
Bureau of Safety and Environmental Enforcement
1.1 DISCHARGE REPORTING – 40 CFR 110
In accordance with 40 CFR 110, Discharge of Oil Regulation, any discharge of oil in “harmful quantity” to navigable waters, adjoining shorelines or the contiguous zone must be reported to the following agency:
• National Response Center (NRC) Notification is made immediately upon discovery. The NRC has a dedicated hotline for discharge notification. The hotline number is 1-800-424-8802
The term “harmful quantity” is the quantity which
• violates state water quality standards;
• causes a sheen on the water’s surface; or
• leaves a sludge or emulsion beneath the surface.
For the purpose of this SPCC Plan, a leak or spill of any quantity of oil into its containment structure or other impermeable surface is not a discharge, provided that the spill is fully contained and can be completely cleaned up before it migrates to the environment.
1.2 USEPA 60-DAY RELEASE REPORT – 40 CFR 112.4
Pursuant to 40 CFR 112.(4), if oil is discharged to waters or adjacent shorelines in a quantity
(1) greater than 1,000 gallons in a single discharge; or
(2) greater than 42 gallons in two (2) discharges occurring within a 12-month period, Ohmsett will submit a written report to the USEPA Regional Administrator within 60 days. The USEPA may require Ohmsett to amend this Plan as a result of submitting the 60-day written report.
This 60-Day Release Report must contain the following information:
1. Name of facility;
2. Name of the owner or operator;
3. Location of the facility;
4. Maximum storage or handing capacity of the facility;
5. Corrective actions and/or countermeasures taken, including a description of general equipment repaired or replaced;
6. An adequate description of the facility, including maps, flow diagrams, and topographical maps, as deemed necessary;
7. The cause of the discharge, including a failure analysis of the system or subsystem;
8. Additional preventive measures taken or contemplated to minimize the possibility of recurrence; and
9. Other information as deemed necessary by the Regional Administrator.
SPCC Plan Page 3 March 8, 2021
Bureau of Safety and Environmental Enforcement The Ohmsett Facility, Leonardo New Jersey
The EPA 60-Day Release Report shall be submitted to USEPA and NJDEP at the following addresses:
USEPA
Regional Administrator – Region II United States Environmental Protection Agency 290 Broadway New York, New York, 1007-1866 Attn: SPCC Coordinator
NJDEP
NJDEP – Bureau of Release Prevention 401 East State Street PO Box 420, Mail Code 22-03D Trenton, New Jersey 08625-0420 Attn: Discharge Confirmation Report
1.3 SPCC PLAN AMENDMENTS AND RENEWAL
In accordance with 40 CFR 112.5 (a) this SPCC Plan shall be amended within six (6) months following a change in in the facility design, construction, operation or maintenance that materially affects the potential for a spill event. Examples of changes that may require an amendment include, but are not limited to the following:
• Commissioning or decommissioning storage containers;
• Replacement, construction or relocation of storage containers;
• Construction or demolition that might alter secondary containment;
• Changes of product or service; or
• Revision of Standard Operating Procedures or Maintenance Procedures.
A review and evaluation of this SPCC Plan is conducted at least once every five (5) years in accordance with 40 CFR 112.5 (b). The review shall include a determination as to whether or not the SPCC Plan continues to address the present conditions at the site and an evaluation as to whether or not more effective prevention and control technologies have been developed, and if such technologies would work for the facility.
Following the review and evaluation of the Plan and pursuant to 40 CFR 112.5(c), a Licensed Professional Engineer shall certify technical amendments to this SPCC Plan.
SPCC Plan Page 4 March 8, 2021
Bureau of Safety and Environmental Enforcement
1.4 TABLE OF SPCC PLAN REVISIONS
TABLE 1. SPCC PLAN REVISION SUMMARY
Date Amendment Description Section(s) changed
October 17, 2003 -- Prepare Plan June 12, 2008 Scheduled Review No Change
December 10, 2008 500-gallon AST addition
Alteration to the facility design adding one (1) 550-gallon diesel single-walled steel AST.
April 26, 2011 Facility layout revision
Alteration to the facility design changing the use of the former secondary containment pad for the Tank Farm loading/unloading area and the eastern pad used for general storage by the Ohmsett Facility.
June 28, 2011 Wendy Schmidt Oil Cleanup
Plan provided for temporary alteration associated with the Wendy Schmidt Oil Cleanup X Challenge (X Challenge) to be performed at the site.
December 7, 2011 USEPA Inspection Plan updated to include current rule changes and per USEPA Inspection comments.
January 22, 2015 Facility Drainage Update
Plan updated to include facility drainage and structure changes.
July 29, 2016 New Storage Building R-41
Plan updated to include flexible storage associated with newly constructed Building R-41 and modification of permanent test oil storage configuration.
March 8, 2021
Contact Update/Change in Building
Use/Equipment Out-of- Service/Plan Renewal
Facility contact; owner/operator updated; Building R-25A removed as oil storage area; Centrifuge Oil Processing System and Oil Reservoir Out of Service (OOS) and removed from site.
SPCC Plan Page 5 March 8, 2021
Bureau of Safety and Environmental Enforcement The Ohmsett Facility, Leonardo New Jersey
1.5 SPCC CROSS REFERENCE TABLE
The following table provides a cross-reference of the regulatory citation for SPCC under 40 CFR 112 and the application sections of this Plan.
TABLE 2. SPCC CROSS REFERENCE TABLE
40 CFR 112
Citation Content of Regulatory Citation Applicable Section
112.3(a) and (b) Requirement to prepare SPCC Plan 1.0 112.3(c) RESERVED N/A 112.3(d) Professional Engineer’s Certification 2.2 112.3(e) Plan Availability 1.0
112.3 (f) Extension of Time N/A 112.3(g) Qualified Facilities N/A
112.4 Amendment of SPCC Plan by Regional Administrator (Spill Reporting of Oil Discharge Events)
1.2
112.5(a) Amendment of SPCC Plan by Owner/Operator (Change in Facility) 1.3
112.5(b) Five-year review and certification 1.3
112.5(c) Amendments by Certified Professional Engineer 1.3
112.6 Qualified Facility Requirements – Self
Certification N/A
112.7 (a) and 112.8 (a)
Management Approval and Cross Reference the SPCC Regulations 1.5, Table 2 and 2.1
112.7(a)(1) Discussion of Conformance with SPCC Requirements 1.0 and 4.1
112.7(a)(2) Deviations from Plan Requirements 4.2, Plan does not deviate from requirements
112.7(a)(3) Facility Description & Diagram 4.3 112.7(a)(3)(i) Storage Container Descriptions 4.3.1 112.7(a)(3)(ii) Oil Handling Procedures 4.3.2 112.7(a)(3)(iii) Discharge and Drainage Controls 4.3.3
112.7(a)(3)(iv) Discharge Discovery, Response and Cleanup 4.3.4
112.7(a)(3)(v) Disposal of Recovered Materials 4.3.6 112.7(a)(3)(vi) Emergency Contact List 4.3.7, Appendix II 112.7(a)(4) Procedure for Reporting Discharges 1.1 and Appendix II 112.7(a)(5) Procedure for Spill Response 4.3.4
112.7(b) Potential Spill Predictions, Directions, Flow Rates, and Volumes 5.0
112.7(c)(1) Containment and/or diversionary structures onshore facilities 6.0
SPCC Plan Page 6 March 8, 2021
Bureau of Safety and Environmental Enforcement The Ohmsett Facility, Leonardo New Jersey
TABLE 2. SPCC CROSS REFERENCE TABLE
112.7(c)(2) Offshore facilities N/A
112.7(d) Determination of impracticability of containment/diversionary structures and alternate procedures
N/A
112.7(e) Inspection, Tests, and Records 7.0
112.7(f) Personnel, training and spill prevention procedures: 8.0
112.7(g) Security: 9.0 112.7(h)
Tank car and tank truck loading/unloading rack 10.1
112.7(i) Evaluation of field-constructed containers undergoing repair, alteration, etc for risk of failure
10.2
112.7(j) Discussion of compliance with SPCC Regulations and applicable State Regulations and Guidelines
10.3
112.7(k) Qualified Oil-filled Operational Equipment N/A
112.8(b)
Facility drainage including valves for diked areas; manual valve operation;
plant drainage from undiked area;
diversion system; lift pump installation
11.0
112.8(c)(1) Bulk storage containers material and construction compatibility with contents 12.1
112.8(c)(2) Secondary Containment 12.2
112.8(c)(3) Control of Accumulated Precipitation 12.3
112.8(c)(4) UST Corrosion Protection N/A
112.8(c)(5) Corrosion Protection of Partially Buried Tanks N/A
112.8(c)(6) Testing of Above-ground containers 12.5
112.8(c)(7) Monitoring of Internal Tank Heating Coils 12.6
112.8(c)(8) Engineering Controls to Prevent Discharges 12.7
112.8(c)(9) Observation of effluent Treatment Facilities 12.8
112.8(c)(10) Prompt Repair of Visible Discharges from Equipment 12.9
SPCC Plan Page 7 March 8, 2021
Bureau of Safety and Environmental Enforcement The Ohmsett Facility, Leonardo New Jersey
TABLE 2. SPCC CROSS REFERENCE TABLE
112.8(c)(11) Positioning/location of mobile containers to prevent discharges 12.10
112.8(d)(1) Corrosion protection of buried pipelines. 13.1
112.8(d)(2) Pipeline terminal connections are capped or blank flanged. 13.2
112.8(d)(3) Properly Designed Pipe Supports. 13.3
112.8(d)(4) Aboveground pipeline inspections.
Integrity and leak testing requirements of buried piping
13.4
112.8(d)(5) Warning procedures to prevent vehicular damage to aboveground piping 13.5
112.9 Oil Production Facilities N/A
112.10 Oil Drilling (onshore) N/A
112.11 Oil Drilling (offshore) N/A
112.20 Certification of the Applicability of the
Substantial Harm Criteria 2.3
2.0 CERTIFICATIONS
This SPCC Plan includes the following approval/certification:(]) Ohmsett management approval and (2) certification by a Licensed Professional Engineer. Ohmsett acknowledges that certification of this Plan by a Licensed Professional Engineer shall not relieve the company or facility from the duty to prepare and fully implement this Plan.
2.1 OHMSETT MANAGEMENT APPROVAL
In accordance with 40 CFR Part 112.7, I certify that this Plan is fully approved by the management of the Ohmsett facility, and the necessary resources are committed to implement the Plan as described.
SPCC Plan United States Department of the Interior Bureau of Safety and Environmental Enforcement The Ohmsett Facility, Leonardo New Jersey
Date
Brinkerhoff Project No. 03BR 119
SPCC Plan Page 10 March 8, 2021
Bureau of Safety and Environmental Enforcement The Ohmsett Facility, Leonardo New Jersey
2.3 CERTIFICATION OF THE APPLICABILITY OF SUBSTANTIAL HARM
CRITERIA
Ohmsett has prepared the following certification pursuant to 40 CFR 112.20 to determine applicability for developing an Oil Pollution Act (OPA-90) Facility Response Plan.
Facility Name: The Ohmsett Facility, National Oil Spill Response and Renewable Energy Test Facility
Facility Address: 801 Route 36 Leonardo, Monmouth County, New Jersey 07737
1. Does the facility transfer oil over water to or from vessels and does the facility have a total oil storage capacity greater than or equal to 42,000 gallons?
YES NO X
2. Does the facility have a total oil storage capacity greater than or equal to 1 million gallons and does the facility lack secondary containment that is sufficiently large to contain the capacity of the largest aboveground oil storage tank plus sufficient freeboard to allow for precipitation within any aboveground storage tank area?
YES NO X
3. Does the facility have a total oil storage capacity greater than or equal to 1 million gallons and is the facility located at a distance such that a discharge from the facility could cause injury to fish and wildlife and sensitive environments?
YES NO X
4. Does the facility have a total oil storage capacity greater than or equal to 1 million gallons and is the facility located at a distance such that a discharge from the facility would shut down a public drinking water intake?
YES NO X
5. Does the facility have a total oil storage capacity greater than or equal to 1 million gallons and has the facility experienced a reportable oil spill in an amount greater than or equal to 10,000 gallons within the last 5 years?
YES NO X
CERTIFICATION: APPLICABILITY OF SUBSTANTIAL HARM CRITERIA
T certify under penalty oflaw that I have personally examined and am familiar with the information submitted in this document, and that based on my inquiry of those individuals responsible for obtaining this information, I believe that the submitted information is true, accurate, and complete.
Alan Guarino
Senior Test ngineer, QA/QC
SPCC Plan Page 11 United States Department of the Interior Bureau of Safety and Environmental Enforcement The Ohmsett Facility, Leonardo New Jersey
Brinkerhoff Project No. 03BR 119
SPCC Plan Page 12 March 8, 2021
Bureau of Safety and Environmental Enforcement The Ohmsett Facility, Leonardo New Jersey
3.0 FACILITY INFORMATION
Name: The Ohmsett Facility The National Oil Spill Response and Renewable Energy Test Facility
Physical Naval Weapons Station (NWS) Earle Waterfront Location: Building R-26
801 Route 36 Leonardo, Monmouth County, New Jersey Latitude: 40.438997 Longitude: -74.059863
Mailing Address/ PO Box 150 Street Address: Leonardo, Monmouth County, New Jersey 07737
Owner: Naval Weapons Station Earle Route 34 Colts Neck, New Jersey 07722
Operator: Bureau of Safety and Environmental Enforcement 45600 Woodland Road, MS VAE-OSPD Sterling, Virginia 20166
Operator Contact: Paul Meyer Phone: (703) 787-1573
On-Site Facility Alan Guarino, Sr. Test Engineer, QA/QC Contact: (732) 866-7283 office
(732) 233-2467 cell
Facility Description: The United States Department of Interior, Bureau of Safety and Environmental Enforcement operates the Ohmsett Facility, located at NWS Earle Waterfront Area, Leonardo, Monmouth County, New Jersey.
The facility operates an outdoor saltwater wave/tow tank and conducts research of full-scale oil spill response equipment, marine renewable energy systems and training in an environmentally-controlled marine environment.
NJPDES General Stormwater Permit No.: NJ0005762
Standard Industrial Classification (SCIC) Code: 9711
Facility Storage: Permanent Storage 78,850-gallons; Portable Storage Building R-24 (1,210-gallons); and Building R-41 (58,000-gallons); Refer to detailed inventory in Table 3.
SPCC Plan Page 13 March 8, 2021
Bureau of Safety and Environmental Enforcement VHB 21021
Table 3 – Oil Storage and Process Tank Inventory
Tank Location1 Ohmsett ID Navy ID
Tank Description Vertical (V)
Horizontal (H) Portable (P)
Product Type Product Quantity (Gallons)
Tank Farm
3 73 Vertical Test Oil Tanks (V) Test Oil 10,000
4 74 Vertical Test Oil Tanks (V) Test Oil 10,000
5 75 Vertical Test Oil Tanks (V) Test Oil 10,000
6 76 Vertical Test Oil Tanks (V) Test Oil 10,000
1A/1B 69/70 Test Oil Tank (H) Test Oil 10,000
2A/2B 71/72 Test Oil Tank (H) Test Oil 10,000
7 117 Mixing Tank (V) (Process tank) 2,000
N/A 80 Diesel Storage Tank Diesel fuel 550
Lake Zelman
N/A 82 Centrifuge process hopper OOS 500
N/A 83 Centrifuge oil reservoir OOS 200
N/A N/A Totes, 55-gallon drums, pails (P) Test oil Totes – 330-gallons Drums – 55-gallons
Pails – 5-gallons
Test Basin #1 #2 N/A
Two (2) Equalization Pits, Decant tank. Reinforced concrete, lined with epoxy resin (Process tanks) Test oil Two (2) - each 5,000 gallons
Main and Aux. Bridges N/A N/A Test Oil Storage Tank Test oil 1,500
N/A N/A Recovered Test Oil Storage Tanks Test Oil Two (2) – each 2,400 gallons
Building R-242 N/A N/A Two (2) – 330-gallon totes (P) Ten (10) – 30- or 55- gallon drums (P) Test oil, lubricants Two (2) – 330-gallon Plastic totes
Ten (10) – 30- or 55- gallon drums
Building R-412 N/A N/A
(90) – 330-gallon totes (P)
(68) – 350-gallon totes (P)
(75) – 55-gallon drums (P)
(75) – 5-gallon pails
Test oil, lubricants
(90) – 330-gallon totes
(68) – 350-gallon totes
(75) – 55-gallon drums
(75) – 5-gallon pails
1 Oil storage in Building R-25A was discontinued in January 2021.
2 Types and quantity of containers listed is typical; total quantities may be different during actual product testing.
SPCC Plan Page 14 March 8, 2021
4.0 SPILL CONTAINMENT – 40 CFR 112.7
The USEPA SPCC regulations require that facilities with over 1,320 gallons of total aboveground storage capacity have specific pollution prevention devices placed on the ASTs and loading/unloading areas. The subject site contains the following storage: four (4) 10,000-gallon vertical test oil ASTs; two (2) 10,000-gallon horizontal test oil ASTs; one (1) 2,000-gallon mixing tank; two (2) 5,000-gallon concrete equalization pits; one (1) 550-gallon diesel AST; one
(1) 1,500-gallon test oil storage; two (2) 2,400-gallon recovered test oil tanks. In addition to the above is a 500-gallon centrifuge process hopper. The locations of the tank storage are shown on the Site Plan presented as Figure 3 as required per 40 CFR 112.7(a)(3).
4.1 SITE CONFORMANCE – 40 CFR 112.7(a)(1)
Ohmsett is situated south of Sandy Hook Bay, which flows into the Lower Bay to the north. The Lower Bay flows through False Hook Channel before discharging into the Atlantic Ocean to the east. The subject site contains 11 ASTs with a maximum storage capacity of 74,550 gallons of product. Since Ohmsett is situated on a navigable waterway and has oil storage in excess of the minimum limit of 1,320 gallons, the Site is subject to the provisions of 40 CFR 112. The subject property implements the requirements set forth in the rule and specifically in 40 CFR 112.7.
Ohmsett has not had oil spills into navigable waters adjacent to the facility boundaries. The systems at Ohmsett are nontransportation and include storage tanks, pipelines and flexible hoses, oil refurbishment systems, and truck-loading capabilities. There are no underground storage tanks (USTs) at Ohmsett.
4.2 REQUIREMENT COMPLIANCE – 40 CFR 112.7(a)(2)
Ohmsett does not deviate from the requirements in Paragraph (g), (h)(2), or (3). Accordingly, alternate methods for conformance are not incorporated into this SPCC Plan.
4.3 PHYSICAL SITE LAYOUT – 40 CFR 112.7(a)(3)
The Ohmsett Facility is located within the NWS Earle facility. Entrance to the facility is at 801 Route 36, via the NWS Earle Security Gate. Refer to Figure 3. The facility is bordered to the north, east and south by freshwater wetlands, with Compton Creek located to the east and the Sandy Hook Bay to the north.
The main feature of the facility is an elevated test tank, approximately 665-foot-long x 65 ft wide x 11.5 ft deep with a programmable wave generator. An outdoor Tank Farm is located to the east of the test tank. A tank storage area with concrete secondary containment is identified as Lake Zelman and is adjacent to the test tank.
The Ohmsett facility has four (4) buildings. Building R-24 provides office, laboratory and testing space and is located R-26 is located within the central portion of the facility. The newly
SPCC Plan Page 15 March 8, 2021
Bureau of Safety and Environmental Enforcement The Ohmsett Facility, Leonardo New Jersey constructed Building R-41 is located to the southwest of the Test Basin which is situated to the south of Building R-26. The Tank Farm is located to the north of the Test Basin.
The chemical laboratory is located within Building R-24 and is located adjacent to the west of the Test Basin. Flexible storage is estimated to include two (2) 330-gallon totes and ten 30- or 55-gallon drums in the garage bay of Building R-24 during a test simulation for an estimated duration of two weeks. North of Building R-24 is the flammable storage closets that typically contain motor oil, hydraulic oil, paints, and general laboratory solvents. Immediately north of the flammable storage closets is the hazardous waste accumulation area which materials are stored for a maximum of 90-days.
Building R-41 is designated as an oil storage structure with concrete floors and separate storage areas for long-term and temporary or mixing storage. The flexible storage in Building R-41 is estimated to include 90 330-gallon totes, 68 350-gallon totes, 75 55-gallon drums, 75 5-gallon pails of test oil/lubricants for a total of approximately 58,000-gallons.
Building R-25 is used for non-oil storage.
4.3.1 SITE STORAGE CAPACITY – 40 CFR 112.7(a)(3)(i)
The following describes the facility storage capacity per secondary containment area with associated piping as it relates to distribution:
Tank Farm
Four (4) 10,000-gallon Vertical Test Oil ASTs Four (4) 10,000-gallon vertical test oil ASTs are located in the Tank Farm north of Building R-
26. Ohmsett personnel refer to these tanks as #3 through #6 with Naval Tank Inventory #73 through #76, respectively. The test oil ASTs are single-walled steel and located on an impervious concrete floor. These ASTs are located within a concrete diked area that provides secondary containment (See Section 5.1). Piping from these ASTs is routed to the test oil storage tank located on the main bridge over the Test Basin. The piping is single-walled steel and is visible from the ground surface. A hose connection is employed from the pipe end to the tank when product transfers are made.
Two (2) 10,000-gallon Test Oil ASTs Two (2) 10,000-gallon horizontal test oil ASTs are located within the Tank Farm to the east of the four 10,000-gallon vertical test oil ASTs referenced above. Ohmsett personnel refer to these tanks as #1A/1B and #2A/2B with Naval Tank Inventory #69 through #72, respectively. The horizontal ASTs are single-walled steel and located on impervious concrete flooring. These ASTs are located within a concrete diked area that provides secondary containment (See Section 5.1). Each horizontal AST is internally divided into two 5,000-gallon chambers. Product piping from these ASTs is connected to the test oil storage tank located on the main bridge over the Test Basin. The piping is single-walled and is visible from the ground surface.
SPCC Plan Page 16 March 8, 2021
Bureau of Safety and Environmental Enforcement The Ohmsett Facility, Leonardo New Jersey
One (1) 2,000-gallon Mixing Tank One (1) 2,000-gallon mixing tank is located at the western edge of the Tank Farm secondary containment area. Ohmsett personnel refer to this tank as #7 with Naval Tank Inventory #117.
The vertical tank is single-walled steel located on an impervious concrete base. Product piping from this AST is routed to the test oil storage tank located on the main bridge over the Test Basin. The piping is single-walled and is visible from the ground surface.
One (1) 550-gallon Diesel AST One (1) 550-gallon diesel single-walled steel AST is located in the northern corner of the Tank Farm secondary containment area. This AST is designated as Naval Tank Inventory #80; there is no Ohmsett number designation. Product piping is not associated with this AST. The AST can be visually inspected for leaks into the containment area.
Lake Zelman
Lake Zelman is a secondary containment concrete feature at Ohmsett located adjacent to the oil processing area.
Totes, Drums and Pails Varying containers of drums and totes are stored in eastern corner of Lake Zelman for off-site disposal. These vessels contain the recovered oil from the test basin. This area is also used for temporary storage of test oil on an as needed basis.
One (1) 500-gallon Centrifuge Process Hopper (Out of Service) One (1) 500-gallon steel centrifuge process hopper is located within Lake Zelman. Naval Tank Inventory #83 is used to designate these vessels. These centrifuge systems are out of service (OOS) though still at the site.
Two (2) 5,000-gallon Oil Processing ASTS Two (2) 5,000-gallon oil processing, equalization skim, decant tanks are located within Lake Zelman. The tanks are constructed of reinforced concrete and internally lined with epoxy resin.
Product piping from these ASTs is connected to the Tank Farm. The piping is single-walled and is visible from the ground surface.
Main Bridge and Auxiliary Bridge
One (1) 1,500-gallon and Two (2) 2,400-gallon Test Oil Storage ASTs The 1,500-gallon and two (2) 2,400-gallon compartmented, single-walled steel test oil storage ASTs are located over the Test Basin on the main bridge and auxiliary bridges, respectively.
These ASTs are used to store test oil when equipment is tested. Product piping from the ASTs located within the Tank Farm and is routed to a location adjacent to the main bridge; a hose connection is made for product transfers. The piping is single-walled and is visible from the ground surface.
SPCC Plan Page 17 March 8, 2021
Bureau of Safety and Environmental Enforcement The Ohmsett Facility, Leonardo New Jersey
Building R-41
Building R-41 is an oil storage structure with concrete floor, containing two (2) separate areas of storage capacity. Oil is stored in portable tanks, totes/drums and pails. The northern storage area contains approximately 18,000-gallons of test oil, whereas the southern area supports 40,000-gallon gallons of test oil storage. The concrete surface grades towards trench and floor drains situated at doorway openings and entrances. Totes are stacked three (3) high in linear rows with access on either side for visual inspections. Pallets are centrally stored with 55-gallon drums and 5-gallon pails.
4.3.2 DISCHARGE PREVENTION MEASURES – 40 CFR 112.7(a)(3)(ii)
The systems at Ohmsett are nontransportation-oriented and include storage tanks, totes, drums, pails, heat exchangers, pipelines and flexible hoses, oil refurbishment systems, and truck loading capabilities. Routine handling of materials at the property requires detailed knowledge of the facility and the potential effects of test oil spills.
Discharge prevention measures established at Ohmsett as part of the Standard Operating Procedures (SOPs) for routine handling of products to prevent test oil spills are as follows:
1. Transfers of test oils/fuel are performed by trained Ohmsett personnel.
2. Filling operations are attended by Ohmsett personnel.
3. During truck loading/unloading operations, a direct line of sight between the Ohmsett personal and truck driver is maintained.
4. Conduct regular inspections for signs for corrosion, breaks or cracks in tanks, hoses, or product piping, discharged product, or other evidence of existing or potential spills.
5. Totes, drums, and pails are stored in areas clear of debris on shelving or pallets and arranged for ease of inspection.
6. Spills or leaks are promptly cleaned up. The facility ahs an adequate supply of absorbent materials on-hand to contain and cleanup small spills or leaks.
4.3.3 DISCHARGE OR DRAINAGE CONTROLS – 40 CFR 112.7(a)(3)(iii)
Discharge or drainage controls includes secondary containment around containers and other structures and procedures for the control of the discharge and is implemented at Ohmsett. The following section presents the discharge and drainage controls at the subject facility.
Storm Water Drainage Valves The secondary containment of the Tank Farm, Tank Farm transfer pad and material storage north of Building R-24 have manual valves that are normally closed and locked. If the water level impedes operations, then following a visual inspection for a sheen on the water’s surface, the drain valve is unlocked and manually opened to remove accumulated rainwater. In the event a sheen is observed, it is manually removed before draining.
SPCC Plan Page 18 March 8, 2021
Bureau of Safety and Environmental Enforcement The Ohmsett Facility, Leonardo New Jersey
Storm Water Drainage Sump Pumps Lake Zelman has a sump pump for handling accumulated storm water. Storm water is pumped through an oil/water coalescer/separator to the Middletown Sewerage Authority under NJPDES General Stormwater Permit No. NJ0005762.
The sump pump in the Tank Farm is also automatically actuated by a level control. Storm water is pumped to the Test Basin where it is contained and treated with the main body of water. Both sump pumps may be manually overridden.
Building R-41 Floor Drain and Pump The flooring in Building R-41 is pitched towards the trench and floor drains which are connected to below grade piping which exits at the northeastern corner of the structure toward a pump prior to connecting with the Test Basin. The subgrade piping is single-walled. If product is detected in the drain, a switch release is triggered which activates the pump.
4.3.4 DISCHARGE COUNTERMEASURES – 40 CFR 112.7(a)(3)(iv)
Potential releases of oil within the facility can be controlled by on-site trained personnel.
Operating personnel training coupled with professional knowledge of oil spill response equipment and methods will ensure that response procedures are implemented in the event of the spill.
4.3.4.1 MECHANICAL CONTAINMENT RECOVERY (MCR)
Mechanical Containment Recovery (MCR) is the primary line of defense against product spills and is the most effective means of containment at the site. MCR involves the placement of adsorbent booms at the point of discharge to the waterway to contain the spill and keep the spill from migrating. An oil skimmer, pump and recovery hose are located onsite in an easily assessable location.
Spill response equipment is located in the Emergency Response Storage Sheds and is kept in readily-accessible and secure locations. Each Emergency Response Storage Shed contains the following or its equivalent:
• Two (2) sorbent booms;
• 11 - bags of Sorbent C;
• One (1) - Long handle shovel;
• Two (2) - pairs of pull over boots;
• 50-feet of 3/8-inch propylene rope; and
• Two (2) - pairs of rubber gloves.
The location of the Emergency Response Storage Shed is such that the equipment can be quickly retrieved should a spill occur. The spill response equipment, including fire extinguishers, are checked regularly to assure proper working order and that an adequate supply of equipment is maintained. Refer to Figure 3 for locations of Emergency Response Storage Sheds at Ohmsett.
SPCC Plan Page 19 March 8, 2021
Bureau of Safety and Environmental Enforcement The Ohmsett Facility, Leonardo New Jersey
4.3.5 DISCHARGE RESPONSE PROCEDURES
In the event of an oil spill not involving a fire or potential fire, these response actions will be taken by trained personnel to stop or contain the discharge:
1. Assess the extent of the leak, spill or discharge. Do not endanger personnel health or safety.
2. Stop all transfer operations.
3. Stop pump(s).
4. Check and close valves, including secondary containment vales.
5. Obtain help per contact information outlined in Section 3.3.7.
6. Go to the nearest Emergency Response Storage Shed for protective gear and sorbent materials.
7. Apply appropriate sorbent materials.
8. Recover free product into open top drums.
9. Empty leaking containers.
10. Initiate notification procedures as outlined in Section 1.1 and 1.2 and the Emergency
Contact List.
If a spill is likely to reach surface drainage features, sorbent booms must be deployed as follows:
• On the ground in the path of the spreading oil.
• In the drainage canal likely to receive the oil and downstream from the expected point of entry.
If the oil is spilled on the west side of the Test Basin, and is spreading toward the southwest drainage ditch, close the catch basin gate. Deploy the oil skimmer, recovery pump and transfer hose just upstream of the sorbent boom deployed in the drainage canal likely to receive the oil and just downstream of the point of entry.
Using a wheel loader or Bobcat, excavate contaminated soil, gravel and debris. Spill debris is to be piled on a polyethylene plastic liner within the spill zone and covered with a secured polyethylene plastic liner and bermed to avoid run-off. Sorbent materials are to be accumulated in 55-gallons drums and stored in the same area. Arrange for off-site disposal of spill debris and repair/correct the condition that caused the spill.
Ohmsett will coordinate with NWS-Earle Environmental Division to prepare written confirmation report to be filed with the NJDEP and the 60-day Release Report to USEPA. The Clean Water Act, Section 311(b)(5) and 40 CFR 110 requires a facility verbally notify the National Response Center to report harmful quantity spills from a facility into waterways or adjacent shorelines within 200 feet of a body of water.
Should the spill at the subject site be of significant quantity (i.e., above and beyond the capacity of the facility), the NWS Earle Fire Department is contacted immediately. The On-Site Facility Contact for spill response identified in Section 2.0 of this SPCC Plan is authorized to commit the
SPCC Plan Page 20 March 8, 2021
Bureau of Safety and Environmental Enforcement The Ohmsett Facility, Leonardo New Jersey manpower and resources necessary to prevent spills and to expeditiously control and remove harmful quantities of oil released from the primary containment or from the Test Basin.
4.3.6 DISPOSAL METHODS – 40 CFR 112.7(a)(3)(v)
Personnel will manage free product, used sorbent pads, booms, etc. and contaminated soil and water in accordance with applicable federal, state and local regulations. Spent booms are placed in an impervious container (i.e., 55-gallon steel or plastic drum) and properly labeled so as not to be improperly handled. The spent booms and/or pads are properly disposed of by a third-party contractor through NWS Earle Environmental Department.
4.3.7 EMERGENCY CONTACT INFORMATION – 40 CFR 112.7(a)(3)(vi)
The Emergency Contact List is provided in Appendix II.
SPCC Plan Page 21 March 8, 2021
Bureau of Safety and Environmental Enforcement The Ohmsett Facility, Leonardo New Jersey
5.0 POTENTIAL EQUIPMENT FAILURES – 40 CFR 112.7(b)
Ohmsett has implemented various measures to prevent and control the release of oil to the environment. A summary of the flow direction, rate of flow and volume of discharge from a potential equipment failure is provided in the table below. General flow directions are shown by arrow on Figure 5.
Flow rates can vary from a small quantity per minute to an instantaneous release of the tank contents.
TABLE 4. POTENTIAL EUQIPMENT FAILURES
POTENTIAL
FAILURE SPILL DIRECTION
MAXIMUM
POTENTIAL
VOLUME
RELEASED
FLOW RATE
Loading or Unloading Equipment
Northeast of the Tank Farm Area to Sandy
Hook Bay 2,000 Gallons Gradual to
Instantaneous
Complete Failure of the
ASTs on the Subject Property
Northeast of the Tank Farm Area to Sandy
Hook Bay 60,550 Gallons Instantaneous
Tank Overfill Northeast of the
Tank Farm Area to Sandy Hook Bay
2,000 Gallons Gradual to Instantaneous
Pipe Failure Northeast of the
Tank Farm Area to Sandy Hook Bay
2,000 Gallons Gradual to Instantaneous
Leaking Pipe or Valve Packing
Northeast of the Tank Farm Area to Sandy
Hook Bay Several Gallons Gradual
Tank Truck Leak or Failure
Northeast of the Tank Farm Area to Sandy
Hook Bay
Maximum of 4,000 Gallons
Gradual to Instantaneous
Hose Leak during Transfer
Northeast of the Tank Farm Area to Sandy
Hook Bay
Maximum of 4,000 Gallons Gradual
Rupture of Totes, Drums or Pails
Contained within Building R-41 or Lake Zelman 330 Gallons Gradual
SPCC Plan Page 22 March 8, 2021
Bureau of Safety and Environmental Enforcement The Ohmsett Facility, Leonardo New Jersey
6.0 CONTAINMENT AND DIVERSIONARY STRUCTURES -
ONSHORE FACILITIES – 40 CFR 112.7(c)
In accordance with 40 CFR 112.7(c)(1), appropriate containment and diversionary structures to prevent a discharge are provided at Ohmsett. Secondary containment structures are designed to prevent oil from reaching navigable waters in the event the primary system fails. The secondary containment features at the Tank Farm and Lake Zelman are depicted on Figure 4 and Figure 5.
6.1 DIKES, BERMS OR RETAINING WALLS – 40 CFR 112.7(c)(1)(i)
The eight (8) ASTs and associated piping that comprise the Tank Farm (Naval Tank Inventory #69 through 76, 80, and 117) are located within the concrete dike that acts as secondary containment. The floor and walls of the containment area are coated with epoxy resin paint. The largest single tank in the dike is 10,000-gallons. The combined contiguous volume of the dike, with a six (6)-inch allowance for storm water, is approximately 17,000-gallons. An automatic sump pump that is actuated by a level-control pumps water that may accumulate in the dike to the Test Basin. Additionally, the dike is equipped with manually operated drain valves that are kept closed and locked. In the event that manual drainage is necessary, the storm water will be visually inspected for no sheen prior to discharge.
The former location of the 550-gallon diesel tank (Naval Tank Inventory #80) is another concrete dike coated with epoxy resin paint. The spill capacity of the dike, with a two (2)-inch storm water allowance, is approximately 860-gallons. When in use, accumulated stormwater is drained manually through valves in the dike, following a visual inspection for sheen or evidence of leaks.
When not in use, these valves are kept closed and locked.
Lake Zelman is a concrete containment area located adjacent to and east of the oil processing facilities. This area provides secondary containment for potential spills from oil processing, overflow from the 10,000-gallon concrete equalization tank (two (2) chambers), or handling of oil drums. The total capacity of Lake Zelman is approximately 67,700-gallons. Storm water from Lake Zelman is pumped via sump pump through an oil water coalescer/separator to the Middletown Sewerage Authority. The pump can be manually overridden. Storm water can also be manually removed through the use of portable pumping systems maintained at the facility.
6.2 CURBING – 40 CFR 112.7(c)(1)(ii)
The decks surrounding the Ohmsett Test Basin are curbed with the exception of the southwest corner that serves as a vehicle access ramp. The east deck measures approximately 686-feet by 7-feet within a 0.83-foot curb. The west deck measures approximately 686-feet by 14 feet with a 0.83-foot curb. The equipment wash pad at the north end of the tank measures approximately 86-feet by 24-feet with a 0.83-foot curb. The deck space drains through scuppers to the Main Test Tank, which in turn acts as approximately 970,000-gallons of secondary containment.
Spills from the two (2) equalization tanks and three (3) test oil ASTs are contained in the Test Tank and would be recovered by mechanical means and sent through oil processing systems once recovered.
SPCC Plan Page 23 March 8, 2021
Bureau of Safety and Environmental Enforcement The Ohmsett Facility, Leonardo New Jersey
6.3 CULVERTING, GUTTERS, OR OTHER DRAINAGE SYSTEMS -
40 CFR 112.7(c)(1)(iii)
Drainage systems at Ohmsett include the wash pad, vehicle and personnel decks, the Tank Farm and Lake Zelman. The concrete wash pad is used for decontaminating test devices and as a decontamination area. It is a section of the Test Basin deck located between the north end of the tank and the control tower. The dimensions of the concrete wash pad are 23 feet by 65 feet, with a 0.83-foot curb. The flooring of this area is graded so spent wash water flows to a catch basin and then into the equalization tank or the Test Basin. This area is also used when testing spill response equipment where smaller oil and water spills are expected.
Vehicle and personnel decks drain into the Test Basin through 10-inch wide three (3)-inch deep scuppers that pass beneath the carriage rails and tow cables. Fluids that are released on the decks flow to the Test Basin where they are skimmed and manually recovered.
Lake Zelman is a concrete secondary containment structure for the oil recovery system located to the east of Building R-26. It has an approximate containment capacity of 67,000 gallons. A sump is located at the base of the filter pad wall. An automatic sump pump lifts stormwater up to discharge to the oil/water separator after inspection.
The flooring in Building R-41 is pitched towards the centrally located floor and/or trench drains.
The subgrade piping that exits the northeastern wall of Building R-41 connects to a pump prior to the Test Basin. If product is detected in the drains R-41, a switch release is triggered which activates the pump to transfer the oil into the Test Basin.
6.4 WEIRS, BOOMS OR OTHER BARRIERS – 40 CFR 112.7(c)(1)(iv)
Two (2) weirs are located at Ohmsett and the locations and purposes of each are as follows:
1. The first weir is located in the scum pipe located at the northeastern corner of the Test Basin. This weir recovers test fluids that are spilled onto the Test Basin water surface for recovery into the equalization pit.
2. The second weir is a portable unit intended for surface drainage ditches in conjunction with a recovery pump.
6.5 SPILL DIVERSION PONDS – 40 CFR 112.7(c)(1)(v)
As stated above the Test Basin is used as a spill diversion pond at Ohmsett. The capacity of the Test Basin is approximately 3.5-million gallons operated with 2.6-million gallons of saltwater.
In the event of a spill, the Test Basin can support in excess of 970,000-gallons of oil and can process the contaminated water at a rate of 2,000 gallons per minute (gpm).
SPCC Plan Page 24 March 8, 2021
Bureau of Safety and Environmental Enforcement The Ohmsett Facility, Leonardo New Jersey
6.6 RETENTION PONDS – 40 CFR 112.7(c)(1)(vi)
The Test Basin can also be used as the retention pond at Ohmsett.
6.7 SORBENT MATERIALS – 40 CFR 112.7(c)(1)(vii)
Ohmsett stores clay sorbent “Speedi-Dri”, chopped fiber sorbent “Sorbent-C”, sorbent pads, and sorbent booms. The clay and chopped fibers are to be used on small spills that occur within the work area. Sorbent pads are used as preventative measures and sorbent booms are used in a spill response. A boom is either placed around the source of a spill or across drainage ditches at the facility.
6.8 OFFSHORE FACILITY – 40 CFR 112.7(c)(2)
Ohmsett does not have an offshore facility.
SPCC Plan Page 25 March 8, 2021
Bureau of Safety and Environmental Enforcement The Ohmsett Facility, Leonardo New Jersey
7.0 INSPECTIONS, TESTS AND RECORDS – 40 CFR 112.7(e)
Inspections and tests are required as per 40 CFR 112.7(e) in accordance with written procedures.
7.1 INSPECTIONS
Frequent visual inspections of the exteriors of the volume containers, ASTs and piping are required by the facility. The following outlines the inspections performed at Ohmsett.
7.1.1 DAILY INSPECTIONS
A daily complete walk-through of the facility is performed involving the inspecting for container/piping damage or leakage, stained or discolored soils, or excessive accumulation of water in diked and bermed areas and verifying that the dike drain valves are securely closed.
Note a record of daily inspections are not required.
Areas inspected during daily inspections include the following:
I. Check tanks for leaks, specifically looking for:
A. Drip marks;
B. Discoloration of tanks;
C. Puddles containing spilled or leaked material;
D. Corrosion;
E. Cracks; and F. Localized dead vegetation.
II. Check foundation for:
A. Cracks;
B. Discoloration;
C. Puddles containing spilled or leaked material;
D. Settling;
E. Gaps between tank and foundation; and F. Damage caused by vegetation roots.
III. Check piping for:
A. Droplets of stored material;
B. Discoloration;
C. Corrosion;
D. Bowing of pipe between supports;
E. Evidence of stored material seepage from valves or seals; and F. Localized dead vegetation.
7.1.2 MONTHLY INSPECTIONS
The checklist provided in Appendix III is used for monthly inspections. The monthly inspections cover the following key elements:
SPCC Plan Page 26 March 8, 2021
Bureau of Safety and Environmental Enforcement The Ohmsett Facility, Leonardo New Jersey
Observing the exterior of aboveground storage tanks, pipes, and other…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .