R-7291 Preliminary Pricing Entrance Channel.pdf
PDF 251 KB Posted
- Solicitation number
- PW-26-744
- Issued by
- Los Angeles County, California
About this file
This is a preliminary pricing document for R-7291 Alamitos Bay Entrance Channel Dredging REBID project prepared by LB Buys for Long Beach, California. The project encompasses maintenance dredging to -20 feet MLLW plus 1 foot of payable overdredge, with transport and discharge at the Beach Nourishment Area, along with grading and earthwork. The scope of work includes seven primary line items: mobilization/demobilization, environmental controls, survey services for both dredging and beach nourishment, maintenance dredging of 415,000 cubic yards, debris removal from the channel and beach nourishment area, and fuel costs. Six vendors submitted preliminary pricing quotes for the project: Manson Construction Co. (VEN0000397), Curtin Maritime Corp (VEN0002492), New Dynasty Construction Co. (VEN0004651), Endemic Environmental Services Inc. (VEN0005668), The Dutra Group (VEN0008100), and Dixon Marine Services, Inc. (VEN0011931).
Pricing for this rebid project varies significantly among the six bidders, with total bids ranging from $22,000.00 to $12,369,000.00. The primary cost driver is the maintenance dredging line item at 415,000 cubic yards, with unit costs ranging from $0.00 to $24.50 per cubic yard among the bidders. New Dynasty Construction Co. submitted significantly lower pricing ($22,000.00 total), suggesting either incomplete or placeholder bids, while The Dutra Group submitted the highest bid at $12,369,000.00. Curtin Maritime Corp provided the most competitive bid at $10,103,886.71, followed by Manson Construction Co. at $8,063,283.00. All six quotes are presented with both unit pricing and extended pricing columns for transparent cost evaluation. The document references project designation PW-26-744 and includes quotes numbered #00004405, #00004399, #00004236, #00004404, #00004401, and #00004393.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VEN0000397 -
Manson
Construction Co.
Unit Pricing
VEN0000397 -
Manson
Construction Co.
Extended Pricing
VEN0002492 -
Curtin Maritime
Corp Unit Pricing
VEN0002492 -
Curtin Maritime
Corp Extended Pricing
VEN0004651 - New Dynasty
Construction Co.
Unit Pricing
VEN0004651 - New Dynasty
Construction Co.
Extended Pricing
VEN0005668 -
Endemic
Environmental Services Inc.
Unit Pricing
VEN0005668 -
Endemic
Environmental Services Inc.
Extended Pricing
VEN0008100 - The Dutra Group Unit Pricing
VEN0008100 - The Dutra Group
Extended Pricing
VEN0011931 -
Dixon Marine Services, Inc.
Unit Pricing
VEN0011931 -
Dixon Marine Services, Inc.
Extended Pricing
Item Number Description Unit of
Measure Quantity Measures
1.00 Mobilization/demobilization
LS 1.00 Unit Cost 725,000.00 725,000.00 429,088.76 429,088.76 0.00 0.00 0.00 0.00 1,100,000.00 1,100,000.00 942,500.00 942,500.00
2.00 Environmental controls
LS 1.00 Unit Cost 250,000.00 250,000.00 115,000.00 115,000.00 22,000.00 22,000.00 102,800.00 102,800.00 75,000.00 75,000.00 86,000.00 86,000.00
3.00 Survey - dredging LS 1.00 Unit Cost 300,000.00 300,000.00 75,000.00 75,000.00 0.00 0.00 0.00 0.00 200,000.00 200,000.00 221,700.00 221,700.00
4.00 Survey - beach nourishment LS 1.00 Unit Cost 300,000.00 300,000.00 161,276.86 161,276.86 0.00 0.00 0.00 0.00 326,500.00 326,500.00 104,500.00 104,500.00
5.00
Maintenance dredging to -20 feet MLLW plus 1 foot of payable overdredge, transport, discharge at Beach Nourishment
Area, and grading and earthwork at Beach
Nourishment Area
CY 415,000.00 Unit Cost 13.90 5,768,500.00 21.06 8,739,900.00 0.00 0.00 0.00 0.00 24.50 10,167,500.00 12.63 5,241,450.00
6.00
Debris removal (from Channel and Beach Nourishment Area), handling, and disposal. This is an allowance. Enter $250,000 for this line item.
ALL 1.00 Unit Cost 250,000.00 250,000.00 250,000.00 250,000.00 0.00 0.00 0.00 0.00 250,000.00 250,000.00 250,000.00 250,000.00
7.00 Fuel Costs LS 1.00 Unit Cost 469,783.00 469,783.00 333,621.09 333,621.09 0.00 0.00 0.00 0.00 250,000.00 250,000.00 602,000.00 602,000.00
TOTAL: 8,063,283.00 10,103,886.71 22,000.00 102,800.00 12,369,000.00 7,448,150.00
Quote #00004393Quote #00004405 Quote #00004399 Quote #00004236 Quote #00004404 Quote #00004401
R-7291 Alamitos Bay Entrance Channel Dredging REBID
Preliminary Pricing from LB Buys: R-7291 / PW-26-744
File details come from the government source that posted it. Updated .