Belmont Plaza Pool Pre-Bid Meeting Document Summary
This document is a pre-bid meeting presentation for the City of Long Beach's Belmont Plaza Pool construction project (R-7274/B-4835). The project involves the design and construction of a new aquatic facility located at Belmont Plaza in Long Beach, California, featuring a 50-meter pool with movable bulkhead and spring board diving capabilities, a combined instructional and recreational pool, and associated support buildings including a main facility building and pool equipment building. The facility will include 940,640 gallons of filtration capacity with regenerative Neptune Benson Defender filtration, sodium hypochlorite disinfection, and high efficiency gas-fired heating. The project is a restricted bid limited to five pre-qualified general contractors: Balfour Beatty Construction LLC, Bernards Bros. Inc., Milender White Construction Co., S.J. Amoroso Construction Co. LLC, and W.E. O'Neil Construction. The pre-bid meeting was held on September 15, 2025, with Bid Deadline #1 scheduled for October 13, 2025 at 2:00 PM (online submission via LB Buys) and Bid Deadline #2 on October 15, 2025 at 2:00 PM (hard copy to City Clerk). City Council consideration of the bid award is anticipated for December 23, 2025, with construction and commissioning scheduled from April 2026 through November 2027. The bid guarantee period is 90 calendar days.
The opinion of probable construction cost for the project is $57.0 million, which includes the base bid, one additive bid alternate for spectator bleachers and canopy with expanded pool equipment building, and pre-set bid allowances for dewatering ($2,500,000) and market volatility ($500,000). The cost excludes Owner-furnished, Contractor-installed Myrtha pool equipment and Owner-furnished, Owner-installed low voltage systems. The project is subject to prevailing wage requirements with wage determination based on the quote date, apprenticeship requirements, and is governed by the City's Project Labor Agreement (Contract #35891) with a 40 percent local hire goal for Tideland Funds (Tier 3 only) and 10 percent transitional/veteran worker hire goal. Specialty subcontractors in geo-piers/vibro stone columns, deep CIDH pile foundations, dewatering, and Myrtha pool installation must be pre-approved or submitted for approval 14 calendar days prior to Bid Deadline #1. Key project features include site stabilization and dewatering with deferred vendor design-build submittals, approximately 2,500 cubic yards of excavated material from the 50-meter pool available for beach fill, hazardous materials removal and disposal at existing facilities, and environmental monitoring including tree, bird, archeological, paleontological, and Native American oversight. Requests for questions, requests for information, and specialty subcontractor requests must be submitted by 2:00 PM on September 29, 2025.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Belmont Plaza Pool – Pre-Bid Meeting 2 PM, September 15, 2025
Pre-Bid Meeting Agenda
1. Introductions / Opening Comments [LB Public Works / Consultant PM]
**IMPORTANT**: Please sign in on the Zoom Chat. Include Name, Title & Firm
2. Restricted Bid – Prequalified Bidders Only
3. Key Changes from Prior Bid Documents
4. Labor Compliance & Project Labor Agreement (PLA)
5. Project Overview
6. Project Design Review
7. Key Project / Contract Detail Highlights
8. Key Specialty Areas - Minimum Qualifications
9. Schedule 10.Questions and/or Requests for Information
Introductions / Opening Comments
▪ Public Works Project Management Officer
▪ Other City Representatives
▪ Consultant Project Manager
▪ Design Team Representatives
▪ Construction Management Team Representatives
▪ Myrtha Pool Representatives
▪ Prequalified Bidder Representatives
List of Firm participants will be shared after conclusion of meeting 3
Restricted Bid- Prequalified Bidders Only
Key Changes from Prior Bid Documents:
Two-Step Bid Submittal Items due at Bid Deadline #1 (Submitted online via LB Buys)
▪ Reference Division C.1 Simplified LB Buys entry and upload requirements, Lump Sum Bid Form and supporting documents, (including scanned copy of bid bond)
▪ Bid Form
▪ Bidder Information & Signature Form
▪ C01-List of Subcontractors
▪ C02-Non-collusion Declaration
▪ C03-Workers Compensation Certification
▪ C04-Certification of Site Examination
▪ C05-Information to Comply with Labor Code Section 2810
▪ C06-Debarment, Suspension, Ineligibility Certification
▪ C07-Certification of Compliance with The Equal Benefits
Ordinance
Items due at Bid Deadline #2 (hard copy submittal to City Clerk 48 hours after Bid Deadline #1)
▪ Reference Division C.2
▪ C11-Preliminary Schedule of Values
▪ C12-Bidders Bond Form (Wet Signed and
Notarized Original)
Items due at Bid Deadline #1 (continued)
▪ C08-Equal Benefits Ordinance Disclosure Form
▪ C09-Iran Contracting Act of 2010 Compliance Affidavit
▪ C10-Bidders Bond Form (Digital / scanned copy)
▪ Bid Guarantee Period: 90 Calendar Days
▪ Bid Allowances:
▪ Dewatering Allowance, to be administered via substantiated time and materials documentation
▪ Market Volatility Allowance, to be administered via substantiated supporting backup of incurred costs compared to Escrow Bid Documents (reference Division D)
▪ Procurement Phase duration reduced, ability to start field work earlier if mutually agreeable to all parties
Key Changes from Prior Bid Documents
▪ Only one Bid Alternate, for Bleachers/Shade Structure/Support Building Expansion
▪ Climb walls and rope swings from prior bid have been removed
▪ Specialty Subcontractors:
▪ List of pre-approved specialty subcontractors added
(reference DIV J/131100 for pool subcontractors and Appendix A for all others)
▪ Requests to add other specialty subcontractors due 14 days prior to bid (reference form in Division E). City Determination to be issued via addendum no later than 5 days prior to Bid Deadline#1
▪ Pre-approval for hazardous materials subcontractor no longer required
▪ Decorative Concrete Scope
▪ Reduction in area
▪ “or equal” products included in the specifications, in addition to the basis of design
Site Stabilization & Dewatering
▪ Deferred Submittals (Vendor Design-Build)
▪ Geo-Pier (Vibro Stone Columns, VSC) and
Dewatering subcontractors must be pre-approved or submitted for approval 14 calendar days prior to Bid Deadline #1 Reference Plan sheets S-200, C-1.32, Geotechnical Reports, and Groundwater Test Results
▪ Groundwater test results included in Appendix H
▪ Permit processing for Contractor Selected Dewatering System and Discharge Point(s)
Key Project / Contract Detail Highlights
Labor Compliance Requirements
▪ Prevailing Wage (see pages 22-24 of Prequalification RFP): Wage Determination will be based on quote date (date the city asks for quote from the vendor)
▪ Apprentices Required (see RFP page 24)
▪ Prime and all subs performing prevailing wage work need to be registered with DIR
(California Department of Industrial Relations):
https://www.dir.ca.gov/public-works/contractor-registration.html
▪ Certified Payroll Submission via LCPtracker
▪ Since this is a Project Labor Agreement (PLA) covered contract, CPRs are not required to be submitted to the DIR, but we still need them uploaded via LCPtracker
▪ A Labor Compliance consultant will be assigned to this project and there will be a pre-construction meeting prior to job start to cover all requirements.
▪ The City will assign a Labor Compliance Consultant to monitor project and assist vendor with labor compliance questions.
▪ Questions? please email: Laborcompliance@longbeach.gov https://www.dir.ca.gov/public-works/contractor-registration.html https://www.dir.ca.gov/public-works/contractor-registration.html https://www.dir.ca.gov/public-works/contractor-registration.html https://www.dir.ca.gov/public-works/contractor-registration.html https://www.dir.ca.gov/public-works/contractor-registration.html mailto:Laborcompliance@longbeach.gov
City Project Labor Agreement (PLA)
▪ Citywide PLA Agreement Contract #35891
• Nicholle Moore Nicholle.Moore@longbeach.gov
• Union vs. Non-Union Contractors
• Letter of Assent
• Local Hire Goal – 40% (Tideland Funds - Tier 3 only)
• Transitional / Veteran Worker Hire Goal – 10%
• Apprentices
• Jobs Coordinator
• Pre-Con / Pre-Job Conference mailto:Eric.Galeana@longbeach.gov
Project Overview
▪ Previous facility closed in 2013 due to seismic concerns
▪ Constructed existing pool in 2014
▪ Previous facility demolished in 2014
▪ Draft EIR certified in 2016
▪ Original project submitted to CCC in 2018. Revised (prior designed) project conditionally approved by CCC in 2021; Now pending CDP Amendment Approval, hearing scheduled for October 2025
▪ Due to State Legislation in 2022 that eliminated City’s bond fund strategy, Project re-designed 2023-2025
▪ Prior bid period (Feb-May 2025): The City exercised its right to reject all bids
Project Overview – History
Project Overview / Location
Project Overview / Aerial View of Site
Project Overview Plan
Project Overview – Aerial Rendering Looking South
Project Overview – Aerial Rendering Looking North
Project Design Review – Buildings Main Building
Project Design Review – Buildings Pool Equipment Building
• Back of house features:
• Pool mechanical and electrical equipment
• Various chemical storage tanks and rooms
(Chlorine, CO2, Acid) and safety devices
• Pool equipment storage
• Timing/guard office
• Switchgear and equipment yard
• Solar panel system
• Beach restrooms (required by CCC)
• Pool user restrooms and shade structures
(Bid Alternate)
• Features (1) 50M pool with movable bulkhead, spring board diving
• Features combined instructional and recreational pool
Project Design Review – Pools
Aquatics
Filtration / Disinfection / Heating
▪ 940,640 gallons
▪ Remote chemical storage / UG feed
▪ Regenerative / Neptune Benson Defender
▪ Sodium Hypochlorite disinfection
▪ High efficiency gas fired heater
Project Design Review
Project Design Review – Site
Grading, Beach Fill
▪ Approx 2500 Cu. Yd. excavated from 50M pool (from 3’ to 10’ depth) to be made available for beach fill
▪ Reference Plan sheets C-1.32, Soils Report, Specifications Appendix D (Sampling and Analysis Plan, SAPR)
Haz Removal & Disposal, Monitoring & Treatment
▪ Reference Specifications Appendices B, F & I
▪ Haz removal / disposal at existing at-grade pools & appurtenant facilities (SE corner of site)
▪ Tree, Bird, Archeological / Paleontological and Native
American Monitoring
Key Project / Contract Detail Highlights
Bid Alternates
▪ Bid Alternate:
▪ (A-1) Add Spectator Bleachers and Canopy and expand Pool Equipment Room for added restrooms (Reference Plans Designated with “Alternate”)
Key Project / Contract Detail Highlights
▪ Base Bid does NOT Include:
▪ Spectator Bleachers and Canopy
▪ Expanded Pool Equipment Building with Spectator Restrooms
Project Opinion of Probable Construction Cost
▪ Opinion of Probable Cost Excludes:
▪ Supply of Myrtha Pool Equipment (Designated as
Owner Furnish, Contractor Install - OFCI)
▪ Low Voltage Systems (Designated as Owner Furnish, Owner Install - OFOI)
Key Project / Contract Detail Highlights
$57.0 Million
▪ Opinion of Probable Cost Includes:
▪ Base Bid
▪ Bid Alternate
▪ Pre-set Bid Allowances
Key Specialty Areas - Minimum Qualifications
▪ Geo-Piers (Vibro Stone Columns, VSC)
▪ Deep (CIDH) Pile Foundations
▪ Dewatering
▪ Myrtha Pool and related systems installer(s)
Reference:
Appendix A: Preapproved Specialty Subcontractors Division J, 131100-1.03.A.4 (pre-approved pool subcontractors only) Division E, E07-Local: Specialty Subcontractor Qualifications Form
Schedule
Milestone Date / Anticipated Timeframe
Bid Release Date Tuesday, September 9, 2025
Pre-Bid Meeting Monday, September 15, 2025 (2PM)
Last Day for Questions / RFIs / Specialty Sub Requests Monday, September 29, 2025 (2PM)
Bid Deadline #1 Monday, October 13, 2025 (2PM) Do not wait until last minute to upload!
Bid Deadline #2 Wednesday, October 15, 2025 (2PM)
City Council Consideration of Bid Award December 23, 2025
Administrative NTP / Procurement Phase January 2026 to March 2026
Construction and Commissioning April 2026 to November 2027
Questions and/or Requests for Clarification
▪ Email all questions to: ddemilia@ardurra.com and TidelandsCIP@longbeach.gov, include “R-7274 / B-4835 Belmont Plaza Pool Bid RFI” in the subject line (Reference Specifications Division B – Instructions to Bidders)
▪ All questions, substitution requests, and specialty subcontractor requests due to the City of Long Beach by 2:00 PM, Monday, September 29, 2025
Confirmation of Attendance at Mandatory PreBid Meeting
**IMPORTANT**: Sign in on Zoom Chat. Include Name, Title, Firm mailto:ddemilia@ardurra.com mailto:TidelandsCIP@longbeach.gov
| Belmont Plaza Pool – Pre-Bid Meeting |
| Pre-Bid Meeting Agenda |
| Introductions / Opening Comments |
| Restricted Bid- Prequalified Bidders Only |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Site Stabilization & Dewatering |
| Labor Compliance Requirements |
| City Project Labor Agreement (PLA) |
| Project Overview |
| Slide Number 13 |
| Project Overview / Location |
| Project Overview / Aerial View of Site |
| Project Overview Plan |
| Project Overview – Aerial Rendering Looking South |
| Project Overview – Aerial Rendering Looking North |
| Project Design Review – Buildings |
| Project Design Review – Buildings |
| Project Design Review – Pools |
| Aquatics |
| Slide Number 23 |
| Grading, Beach Fill |
| Bid Alternates |
| Project Opinion of Probable Construction Cost |
| Key Specialty Areas - Minimum Qualifications |
| Schedule |
| Questions and/or Requests for Clarification |
| Slide Number 30 |