Summary: R-7274 Addendum No. 2 – Belmont Plaza Pool
This addendum document is issued by the City of Long Beach, Department of Public Works, and supplements the original plans and specifications for the Belmont Plaza Pool rebid project (Specification No. R-7274). The project involves construction of a new 4.1-acre aquatic facility at Belmont Shore Beach Park, comprising a 12,926-square-foot Olympic-sized 50-meter by 25-yard pool with diving facilities, a 4,246-square-foot combined instructional and recreational pool, an 11,247-square-foot east entry building, and a 4,424-square-foot west support building with associated amenities. The facility is designed to LEED Silver certification standards and will serve as a recreational and competitive venue for the community and region. Bid Deadline #1 (all Division C.1 documents) is October 21, 2025, at 2:00 p.m. via the City's online portal, and Bid Deadline #2 (Division C.2 documents) is October 23, 2025, at 2:00 p.m. for hard copy delivery to the City Clerk's Office. A mandatory pre-bid conference was held on September 15, 2025, via Zoom. Only prequalified contractors possessing a valid California Class A or B General Engineering Contractor license are eligible to bid. The project is subject to a Citywide Project Labor Agreement (PLA) with the Los Angeles/Orange Counties Building and Construction Trades Council and signatory unions.
The base bid includes a $2,500,000 allowance for dewatering, shoring, related work, testing, and permitting, and a $500,000 allowance for market volatility. Bid alternate A-1 provides optional spectator bleachers, a shade structure, and expansion of the west support building. Bidders must submit bid security equivalent to 10 percent of their bid amount with Bid Deadline #1 and an original certified check or bond with Bid Deadline #2. The awarded contractor must execute performance and labor/materials bonds of 100 percent of the contract price within 15 calendar days of receiving the Notice of Award. Prevailing wage requirements apply pursuant to California Labor Code provisions, with rates available on the Department of Industrial Relations website. The project is subject to compliance with the California Coastal Commission Local Coastal Development Permit, including construction management requirements, biologist presence during sensitive habitat work, stormwater pollution controls, and nesting bird surveys during January through September. Addendum No. 2 addresses 76 Requests for Information (RFIs), including clarifications on pile design, irrigation specifications, specialty glazed windscreen scope, pool fill water responsibility, PLA job coordinator requirements, and various technical specifications, with responses provided or deferred to forthcoming Addendum #3.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Long Beach
Department of Public Works Project Management Bureau 411 W Ocean Blvd. 5th floor, Long Beach, California 90802
October 9, 2025
NOTICE TO BIDDERS
ADDENDUM NO. 2
SPECIFICATIONS NO. R-7274
BELMONT PLAZA POOL
This addendum changes and supersedes the language in the original plans and specifications.
Please acknowledge receipt of this addendum by signing and submitting with your bids. Any bidder who fails to submit this addendum may be disqualified.
Bidders are directed to the revised Division A and revised Division C.1 Bid Form included in this Addendum for adjusted Bid Deadline dates.
Clarification of Project R-Number: The City confirms that the R-Number for the current (rebid) Specifications is R-7274. The City acknowledges that the R-Number is incorrect in various locations of the plans and specifications, including the title block of the plans and Division J of the Specifications. This discrepancy will be corrected in the final conformed “For Construction” set that will be provided to the Awarded Contractor.
Please note the following clarifications, additions, or changes:
PLANS
A list of revised plans are provided below:
• L4.00 – IRRIGATION LEGENDS
• L4.11 – IRRIGATION DETAILS
• ES101 – ELECTRICAL SITE PLAN
• E-611 – LIGHTING CONTROLS AND FIXTURE SCHEDULE
• GR-107 – EXTERIOR SIGNS
SPECIFICATIONS
A summary of specification revisions and edits is provided below:
• Table of Contents
• Division A: Notice Inviting Bids – revised to reflect an update to Bid Deadline #1 and #2
Addendum No. 2 – Specification No. R-7274
• Division C.1: Bid Documents Bid Form – revised to reflect an update to Bid Deadline #1
• Division H: General Requirements Section 7-2 Lump Sum Work Section 7-3.9 Bid Item Descriptions
• Division J: Project Manual – CSI Technical Specifications 00 01 10 Table of Contents 03 41 00 Precast Structural Concrete 13 11 00 Swimming Pools 27 51 23 Intercommunications and Program Systems
• Appendix C – revised cover sheet and addition of Geotechnical Recommendations for Demolition and backfilling Existing Pools (Shallow Play Pool and Warm-up Pool), AESCO, March 10, 2025
RESPONSES TO REQUESTS FOR INFORMATION (RFI)
Bidders shall submit pricing per the clarifications and responses below:
Question #2.001: Specification section 033063 Decorative Cast-in-Place Concrete has been omitted from the Belmont Aquatics pool rebid project specifications, but on the drawings Shaw & Son’s for Conc-1 is still sole source. Ref drawings: A-141, A-141A, A-141B, & A-611.
Response: Response to this RFI will be included in forthcoming Addendum #3.
Question #2.002: Please confirm if the Owner or General Contractor will be responsible for the cost for filling up the pool with water before owner takes over occupancy?
Response: Refer to revised Specification 131100 paragraph 1.13, included in this Addendum, for fill water quality requirements, including responsibility of costs. Since the prefabricated pools will be tested with the finishes already applied, a second fill may not be required if the watertightness test is passed on the first attempt.
Question #2.003: Please confirm if the Owner or General Contractor will be responsible for the PLA Job coordinator for the PLA program.
Response: The General Contractor will be responsible for the PLA Jobs Coordinator per Division B - Instructions to Bidders: "Furthermore, the general contractor will be required to hire a "Jobs Coordinator" to provide additional outreach efforts connecting Long Beach residents to job opportunities. The term Jobs Coordinator means an independent third-party individual, entity, or employee with whom the prime contractor enters into a contract or employs to facilitate implementation of the targeted hiring requirements of the PLA."
Question #2.004: Please confirm that a Biologist for bird nesting shall be present on site during the months of January through September will not be required.
Response: The City has engaged a qualified biologist to perform Bird Surveys during construction to comply with Special Condition #4 of the Coastal Development Permit Notice of Intent to Issue Permit (reference Division F). The Project, including the Contractor, is obligated to adhere to the findings/recommendations of the biologist during construction.
Question #2.005: Table of Contents section 03 35 40 Polished Concrete Finishing: On the previous Belmont Pool bid this section was omitted. Please confirm that this section will be omitted and will not be part of the scope of work.
Response: Confirmed.
Question #2.006: Please confirm that if the Water Treatment System is included in the Bid Item No. 2 Allowances.
Response: Confirmed.
Question #2.007: Spec Section 07 18 00 Traffic Coatings, Pedestrian Traffic was added to the contract documents. Please provide locations where spec section 07 18 00 should be applied?
Response: Section 07 18 00 of Division J is hereby removed from the Contract Documents.
Question #2.008: For the previous bid there was a Specification section 275123 Intercommunications and Program Systems that was issued with Addendum #2, it appears that this section was not included in the rebid specifications. Please confirm that this Specification section will not be included in the scope of work.
Response: Specification Section 27 51 23 Intercommunications and Program Systems, attached to this Addendum, is hereby added to Division J of the Specifications.
Question #2.009: Please confirm if the Owner’s team will require Temporary trailers, toilets etc.
for the duration of the project.
Response: Confirmed. Refer to Specifications Division H, Subdivision 8-2.1, and related provisions of the Standard Specifications.
Question #2.010: For the construction temporary fence: Please confirm if a sound barrier fabric be required, if so, provide the STC rating for the fabric.
Response: Sound barrier fabric is not required for the temporary construction fence.
Question #2.011: Please confirm that drawing AD101 DEMOLITION SITE PLAN has been omitted from the scope of work “drawings”
Response: Confirmed. Please refer to Civil plan sheet C1.20 DEMOLITION PLAN.
Question #2.012: Please confirm that Specification section 275123 Intercommunications and Program Systems has been omitted from the scope of work.
Response: Please refer to the response to Question 2.008.
Question #2.013: Please confirm if alternative designs to accommodate settlement and uplift at pool can be achieved through a combination of conventional structural and ground improvement methods?
Response: No, alternative methods have been reviewed by the design team and the structure conveyed on the documents was deemed to be the best solution for long-term performance of the structures.
Question #2.014: Please provide bearing capacity and settlement criteria as it relates to the loads imposed by the pool.
Response: The pool is supported by CIDH piles based on allowable values from project Geotechnical Report. Settlement criteria is 1" total and 1/2" differential.
Question #2.015: Sheet AQ-104 indicates that piles are to be designed for a compression load of 234 kips and a tension load of 115 kips. Please provide the Dead, Live, and Seismic Load components of these loads, or please provide the appropriate LRFD loads for structural design of these piles. Can the bid date please be extended to further evaluate the impacts of these responses. (Keller N.A.)
Response: Pile loads vary based on location. Maximum LRFD load for piles is 327 kips compression and 161 kips tension. Please refer to the Response to Question 2.020 regarding bid date extension request.
Question #2.016: Do the provided compression and tension loads correspond to the static load case? (Keller N.A.)
Response: Pile design capacities in Detail 01/AQ-104 are maximum based on multiple load cases.
Question #2.017: The geotechnical report indicates that the post-liquefaction condition will govern design. However, the compression load, tension load, and pile length in Sheet AQ-104 correspond to the static condition prior to liquefaction. Please provide appropriate loads for the post-liquefaction case to ensure that piles are designed for the critical case. (Keller N.A.)
Response: Response to this RFI will be included in forthcoming Addendum #3.
Question #2.018: Per the previous award period, it was clarified that piles could be installed via a continuous flight auger method (CFA) rather than a CIDH. There was a test pile program that was included previously and is now not required for the pool foundation piles. Please clarify if a test program is required if utilizing the CFA method or if the design values provided are sufficient to account for either CIDH or CFA installation methodology without requiring a pre-production test program. If a test program is required, please specify. (Keller N.A.)
Response: Response to this RFI will be included in forthcoming Addendum #3.
Question #2.019: Can the bid date please be extended to further evaluate the impacts of these responses. (Keller N.A.)
Response: Please refer to the revised Division A and revised Division C.1 Bid Form included in this Addendum for adjusted Bid Deadline dates.
Question #2.020: Please clarify the location in the specifications that identifies the allowable mark-up for Bid Item No. 2 and Bid Item No. 3 Allowances
Response: Markups shall be per Section 7-4.3 of Division H.
Question #2.021: Bid Documents, Deadline #1 describes Bid Item 2 as “Allowance – Dewatering, Shoring and Related Work, Testing and Permitting.” Please clarify the following:
a. Will the owner be responsible for coordinating and procuring the shoring and dewatering scope?
b. When will the subcontractors be selected for the dewatering scope? Will it be after bid award?
c. If the subcontractor will be selected after bid award, what will the process be to select the subcontractors?
d. Does the allowance include water treatment for the effluent?
Response:
a. The Contractor is responsible for the Dewatering, Shoring and Related Work, Testing and
Permitting scope as outlined in Section 7-3.9 of Division H.
b. The General Contractor is responsible for engaging subcontractor(s) as applicable to complete the dewatering scope. Identification of subcontractors is required at Bid Deadline #1 per Division C.1.
c. See answer to b. above.
d. Yes.
Question #2.022: Bid Documents, Deadline #1 describes Bid Item 3 as “Allowance – Market Volatility.” Please clarify the following:
a. Does the allowance cover escalation costs beyond 90 calendar days of bid deadline #2? If not, what is the intent of the allowance?
Response: The City will consider payments against this allowance as described in Section 7-3.9 of Division H for the duration of the Contract.
Question #2.023: Plan drawing AQ-104 Typical CIDH Pile Detail 01 shows 4 EA #7 dowels.
Please advise if it is acceptable to extend the CIDH Pile #7 vertical bars above top of pile and use HRC 555 terminator heads lieu of installing the dowels.
Response: The proposed construction is acceptable.
Question #2.024: Plan drawing AQ-104 Typical CIDH Pile Detail 01 shows 4 EA #7 dowels.
Please advise if it is acceptable to extend the CIDH Pile #7 vertical bars above top of pile and field bend them to an equivalent lap length lieu of installing the dowels.
Response: The proposed construction is not acceptable.
Question #2.025: Plan drawing AQ-104 Typical CIDH Pile Detail 01 shows 4 EA #7 dowels.
Please advise if it is acceptable to field bend the dowel 90 degree bends.
Response: The proposed construction is not acceptable.
Question #2.026: Please advise if it is acceptable to install the 24” CIDH piles using the Augercast drill method.
Response: Response to this RFI will be included in forthcoming Addendum #3.
Question #2.027: If the augercast drill method is acceptable, please clarify if a compression or tension load test will be required to prove the capacity of a proposed augercast pile alternate.
Response: Response to this RFI will be included in forthcoming Addendum #3.
Question #2.028: Specification Section 131102 Cast-In-Drilled-Hole (CIDH) Piling (Drilled Piers) Subsection 3.02C2 states, “Remove water from excavated shafts before concreting.” CIDH piles at pools will require slurry/drilling fluid and casing to stabilize the excavation. At no point will the contractor be able to remove the water to the bottom of shaft without risking heave from the bottom of excavation. Please confirm Specification section 131102 Subsection 3.02C does not apply to CIDH piles within the pool and recreational pool footprint.
Response: The Contractor is not required to remove water from the bottom of the shaft. Water will be displaced from the hole by the slurry/drilling fluid.
Question #2.029: Are the 24” CIDH piles at the pool considered “end-bearing drilled piers”?
Response: CIDH pile capacity is derived from side friction and end bearing.
Question #2.030: Please provide the digital “raw” data files for the Cone Penetration Tests (CPT).
Response: Please use the link below to access/download the Cone Penetration Test data in Excel format: https://andpen.egnyte.com/fl/PpMWTBRCQhjx https://andpen.egnyte.com/fl/PpMWTBRCQhjx
Question #2.031: Regarding Specification section 034100 PRECAST STRUCTURAL CONCRETE: Please clarify Paragraph 1.03 A - ALLOWANCES
Response: Please refer to revised Division J Specification 034100 included in this Addendum.
Question #2.032: As required in Specification section 133424 1.5 C 1a, Specialty Glazed Windscreen, please confirm that ISO Certification is to be submitted with the bid.
Response: Required certifications and qualifications stipulated in the specifications shall be submitted by the awarded contractor prior to transmittal of the related product information, deferred / delegated design.
Question #2.033: For the finish painting of the AESS Steel supporting structure for the Specialty Glazed Windscreen, please confirm that factory pre-finishing is okay if utilizing the specified coatings in lieu of field painting
Response: No exceptions taken. Touch up paint to match and be compatible with field condition.
Question #2.034: Please confirm that the scope of work for the Specialty Glazed Windscreen shall include the engineering, fabrication, supply and installation of the steel supporting structure, embeds, glazing, fittings, glazing channels, Art Glass as required for a complete installation.
Embeds to be provided for placement by others.
Response: Specification 133424 delegates the design of the entire specialty glazed windscreen to the windscreen manufacturer as defined in the specification. The work includes but is not limited to the engineering, fabrication, supply and installation of the steel supporting structure, embeds, glazing, fittings and glazing channels. See Question 2.040 Response for art glass only.
Installation of the embeds is included in the Contract and shall be coordinated by the General Contractor.
Question #2.035: Please confirm that the Specialty Glazed Windscreen provider shall determine the required glass thickness and final steel requirements for the Specialty Glazed Windscreen.
Response: Glass thicknesses and steel requirements shall be engineered by the specialty glazed windscreen provider, and shall conform to the basis of design for glass types (laminated, insulated, etc), Solar Heat Gain Coefficient, and aesthetic requirements as indicated on the A-200 series sheets and the GR series sheets for the art glass.
Question #2.036: Glass Type GL02A on drawing A-201 calls for Guardian Bird1st Etch on the #2 glass surface as there is an anti-graffiti film specified for the #1 surface. Guardian advises that the etch would be replaced by a ceramic frit if it is required to be against the laminate interlayer. Is a ceramic frit on #2 surface acceptable in lieu of Guardian Bird 1st Etch on #2?
Response: Acceptable. Ceramic frit pattern shall match Bird1st Etch pattern.
Question #2.037: Please confirm that the Specialty Glazed Windscreen subcontractor is to supply the embeds for the Windscreens vertical steel members and glazing channels as indicated on sheets A603 and A604. Installation by others.
Response: Specification 133424 requires one entity to engineer, fabricate, assemble and install the entire specialty glazed windscreen, which includes but is not limited to the vertical steel members and glazing channels. Installation is included in the Contract and shall be coordinated by the General Contractor.
Question #2.038: Please confirm that the written Qualification Statement as required in Specification Section 133424 1.4 B 2. is to be submitted with the bid.
Response: Required certifications and qualifications stipulated in the specifications shall be submitted by the awarded contractor prior to transmittal of the related product information, deferred / delegated design.
Question #2.039: The glazing channels at the base of the Specialty Glazed Windscreen are indicated to be flush with the floor finish. Please confirm if weep holes are required in the embedded glazing channels to provide drainage. Please provide spacing.
Response: Specification 133424 delegates the design of the entire specialty glazed windscreen to the windscreen manufacturer as defined in the specification. This work includes the glazing channel and any required drainage and weep holes or other means of drainage to achieve the specified performance.
Question #2.040: Please confirm that the engineering to determine the Art Glass laminated glass thickness is to be by the Specialty Glazed Windscreen subcontractor.
Response: Confirmed, Specification 133424 requires one entity to engineer, fabricate, assemble and install the entire specialty glazed windscreen with the only exception for Judson Studio to fabricate, deliver and install the art glass only per Plan Sheet GR-115.
Question #2.041: Section 034100 – 2.03.B.1.a: Please confirm if we can use local aggregate in lieu of the specified crushed buff marble.
Response: Provide the crushed buff marble per Specification 034100.
Question #2.042: Section 034100 – 2.05: Please confirm if epoxy-coated reinforcement (rebar) is required, or if standard rebar is acceptable.
Response: Response to this RFI will be included in forthcoming Addendum #3.
Question #2.043: Section 034100 – 2.10: Please confirm if it is necessary to include flyash and slag in the concrete mix. For exposed architectural finishes, these materials may result in non-uniform coloration, which could affect the intended appearance.
Response: Response to this RFI will be included in forthcoming Addendum #3.
Question #2.044: Please confirm listing City and State is acceptable on C-8 List of Subcontractors.
Response: Confirmed.
Question #2.045: Please confirm that all the RFI clarification in addendum #2, #3, and #4 of previous bid shall be applied for this re-bid.
Response: While the City and its consultants have endeavored to address all RFIs and Addenda from the prior bid period, Bidders shall base pricing for the current rebid period on the documents posted on LB Buys, Bid Solicitation PW-25-657, only.
Question #2.046: In irrigation schedule on sheet L4.00, part of controller model CS3-24-WM states it has a wall-mount enclosure, but the detail 2/ L4.10 is show pedestal controller. Please clarify.
Response: The controller itself is a wall mounted controller unit that is installed inside of the Strongbox pedestal enclosure as stated in the legend.
Question #2.047: Refer to irrigation schedule on sheet L4.00, model for dripline shall be Netafim TLHCVXR3-1205 with 0.53 GPH flow but in manufacturer website, the 0.53 GPH flow rate shall be model TLHCVXR5-1205. Please clarify.
Response: The tubing model should be TLHCVXR5-1205. Please refer to the revised Plan Sheet L4.00, included with this Addendum.
Question #2.048: In irrigation schedule on sheet L4.00, the details specified for the dripline Netafim TLHCVXR3-1205 are on sheet L4.11. However, those details are for techline EZ. Please clarify.
Response: Please refer to the revised Plan Sheet L4.11, included with this Addendum.
Question #2.049: In detail 4/ C5.00, please provide the size and type of 12" thick gravel layer at bioretention planter.
Response: Gravel layer at base of LID planter shall be 3/4" crushed rock.
Question #2.050: In the Electrical Plan, Sheet ES101(Please see attached), the Perimeter Walkway shows its a lighted Rail. Please see attached snip below.
Could you please confirm if the line highlighted in yellow are Guardrails? (Please see attached marked drawing) If so, do you have an available section details/drawings of the perimeter walkway guardrails?
Response: See Architectural Sheet A-542 for rail details and A-421, A-422 for elevations. The railing at ramps and stairs are standard handrail height. All other perimater walkway railing is detection rail height 8.5 inches.
Question #2.051: Could you please confirm if the guardrail at the perimeter walkway area are free-standing railings like the railings at Ramps and Stairs?
Response: No, the perimeter walkway is a cane detection type rail of 8.5 inch height
Question #2.052: Would you accept a Viva Standard iRAIL Linear for the lighted handrail scope?
Please see attached snip of our iRAIL Linear.
Response: The proposed alternate rail is acceptable if it meets the fixture schedule parameters:
"STANDARD HEIGHT FOR ALL RAMPS, OTHERWISE 8.5" HEIGHT AFG, HEAVY DUTY
STAINLESS STEEL 316 LED INTEGRATED CANE RAIL, MIN 100 LUMENS/FT, WILDLIFE
AMBER CCT, EXTERIOR RATED, B0-U0-G0. 277 VOLT DRIVER SHALL BE INTEGRATED
INTO VERTICAL POST SUPPORTS"
Question #2.053: Section 5-4.2.6 Builder’s Risk Insurance does not specifically outline any requirements for sub limits for “other perils” such as earthquake and flood, please confirm these sub limits are not required.
Response: Confirmed. The City does not require limits for “other perils” on Builder’s Risk Insurance coverage.
Question #2.054: If earthquake and flood sub limits are required can the Contractor determine sub limits for earthquake and flood insurance coverage based on probable maximum loss (PML) with a 475-year return period, covering all potential loss or damage until the project is completed and accepted by the client
Response: See response to Question #2.053 above.
Question #2.055: Sheet L0.01, Tree Protection Plan, shows (6) Miscellaneous Tree to be Transplanted (Existing Tree Inventory #19-23) and then reference the Planting Plans for final location. IFB Sheet L5.03, Planting Enlargement, seem to have removed these (6) Miscellaneous Trees. Are these (6) Miscellaneous Tree still to be relocated or are they to be removed. If they are to be relocated, where is there final planting location?
Response: Sheet L0.01 in the 9/2/25 Issue For Bid set shows (4) palm trees to be relocated (Existing Tree Inventory #15-18). The miscellaneous trees in question are in fact large shrubs, not trees, that are to be removed per C1.20 and not relocated.
Question #2.056: For bid submissions on the Long Beach Buys site, do GCs need to add any subs to the subcontractors tab or is the "list of subcontractors" bid form sufficient
Response: Bidders do not need to add subcontractors to the Subcontractors tab on LB Buys at bid time. A completed List of Subcontractors is to be submitted with the bid at Bid Deadline #1 per the form in Division C.1.
Question #2.057: Domestic water notes W1 call out as" installed by LBUD under separate project", is this installed by other and not under this project?
Response: Response to this RFI will be included in forthcoming Addendum #3.
Question #2.058: Domestic water notes W6 call out as "installed by LBUD ", therefore, this is by other too?
If above are the case, all domestic water and its related work are by others? Otherwise, may I know all pipes are PVC C900?
Question #2.059: Fire water notes F1 and F3, call out as" installed by contractor under separate design approved by LBUD under separate project", is this installed by other and not under this project?
Response: Response to this RFI will be included in forthcoming Addendum #3.
Question #2.060: Fire water notes F4, call out as "installed by LBUD under separate design and project" , is this installed by other and not under this project?
Response: Response to this RFI will be included in forthcoming Addendum #3.
Question #2.061: Fire water notes F6 call out " under separate permit", is this still under this project?
If above are the case, all fire water and its related work are by others? Otherwise, may I know all pipes are PVC C900?
Response: Response to this RFI will be included in forthcoming Addendum #3.
Question #2.062: May I know depth of proposed fire and domestic water depth?
Response: Response to this RFI will be included in forthcoming Addendum #3.
Question #2.063: Storm drain note SD4, may I know depth, size of rock and detail information for planting media?
Response: Response to this RFI will be included in forthcoming Addendum #3.
Question #2.064: Per Sheet G-000 & Division F, General Contractor is to submit separate permit application for various scopes. Please confirm if permit fees will be reimbursable to General Contractor or if owner will be responsible to pay permit fees?
Response: Permit fees will be paid as outlined in Section 2-2 of Division H.
Question #2.065: Please confirm that all RFIs and addendum from the initial round of bidding have been incorporated into the re-issued set of drawings and specification for the re-bid?
Response: While the City and its consultants have endeavored to address all RFIs and Addenda from the prior bid period, Bidders shall base pricing for the current rebid period on the documents posted on LB Buys, Bid Solicitation PW-25-657, only.
Question #2.066: If the previous RFIs and addendums from the first round of bidding were not incorporated into the re-issued set of plans and specifications please consider re-issuing all RFIs and Addendums from the previous round to ensure complete GC bids.
Response: Please see response to Question 2.065 above.
Question #2.067: Please provide complete and current Groundwater lab analysis for NPDES discharge permit. Current report is not adequate to provide cost.
Response: Lab analysis provided in Appendix H has been confirmed satisfactory for NPDES and Sanitary Sewer discharge. Any additional testing required will be covered by Bid Item #2 (allowance).
Question #2.068: Does the contact allowance of 2.5 million include dewatering, treatment, and shoring. If the combination of dewatering, treatment and shoring exceed the allowance amount
2.5 million, who will cover this cost.
Response: Refer to Division H, Section 7-3.9, which clearly indicates that the allowance covers dewatering, treatment and shoring, among other details. The Adjustment Clause in this section describes the City’s intent to adjust the allowance if deemed meritorious based upon the Contractor’s justifying documentation.
Question #2.069: In review of the revised Specifications 019100, Section 1.6 SYSTEMS TO BE COMMISSIONED has been reduced from the earlier RFP. The revised Specification is focused on the LEED requirements i.e., HVAC, Domestic Hot Water system, Lighting Control, and Irrigation. It does include systems outside of the LEED requirements: Pool Chemical Treatment system, Pool Equipment: Pumps and Water Temperature Control. Also 3rd Party electrical testing documentation – we assume this means to review the secondary injection of the 480V breakers to ensure the trip settings meet the short circuit study. All other system commissioning will be by others. Is our understanding of the Commissioning Scope of Work, please confirm.
Response: Per LEED requirements, pool equipment & pumps are part of the plumbing/water systems that are included for commissioning activities and should be part of commissioned systems and relevant activities, such as providing startup documentation, completion of pre-functional checklists and functional testing. It is confirmed that third party electrical testing includes verifying breakers and trip settings meet the short circuit study and associated reporting provided.
Question #2.070: The Specification refers to GLUMAC to coordinate related compliance forms.
Will they be the LEED Administrator and we provide our Commissioning Documents to them?
Response: Glumac will be acting as the Commissioning Authority, and Contractor documentation shall be submitted to Glumac for review and acceptance before submission into the LEED portal.
Question #2.071: Can we provide a VE alternative to the 7' spacing and/or 21' depth for the stone columns?
Response: This is a delegated design item, with the basis of design provided in the design documents. The final engineered solution is expected to achieve at-minimum equivalent performance to the specified system.
Question #2.072: SS-2 Mango 8268 - Avonite Solid Surface has been discontinued for some time. There is not stock available and no options similar in color. Please reselect this material.
Response: Provide Avonite Ivory 8106 only if Mango 8268 has been discontinued, as Mango 8268 appears on Avonite website as color option:
https://aristechsurfaces.com/market/architectural/avonite/colors https://aristechsurfaces.com/market/architectural/avonite/colors
Question #2.073: The current structural plans show only slab-on-grade (SOG) with no indication of topping slabs at CONC-01 locations. Please confirm if slab depressions are required for CONC- 01 and provide a slab plan showing all required depression locations.
Question #2.074: Please provide a detail showing the topping slab assembly for CONC-01, including reinforcement requirements.
Question #2.075: Sheet A-574 indicates a 2" topping slab for the radiant flooring. Typical minimum for radiant applications is 3". Please confirm if 2" is acceptable.
Question #2.076: Sheet C1.20 Demo Keynote 1 references the "Geotechnical Recommendations for Demolition and Backfilling Existing Pools (Shallow Play Pool and Warm-Up Pool" Dated March 10, 2025 Prepared by Aesco. The Geotech provided in Appendix C is dated January 17, 2025. If available, please provide March 10th Geotechnical Report.
Response: "Geotechnical Recommendations for Demolition and Backfilling Existing Pools (Shallow Play Pool and Warm-Up Pool", AESCO, March 10, 2025, is included with this Addendum and hereby added to Appendix C of the Specifications.
CONTACT: Before the Bid opening, prospective Bidders shall direct any communications regarding this Work to:
City of Long Beach, Department of Public Works Project Management Bureau 5th Floor, City Hall 411 W. Ocean Boulevard Long Beach, CA 90802 Attention: Dino D’Emilia / TidelandsCIP E-mail: ddemilia@ardurra.com / TidelandsCIP@longbeach.gov
Communications may be written or oral, but the City is not bound by any oral interpretation of the Contract Documents made by any City employee, nor does the City guarantee the accurate transcription of oral questions.
PREPARED BY: Dino D’Emilia, Consultant Project Manager
ACKNOWLEDGED BY: __________________________________________________
Company Name
Print Name Title
Signature Date mailto:ddemilia@ardurra.com mailto:TidelandsCIP@longbeach.gov
IRRIGATION NOTES
IRRIGATION EQUIPMENT SCHEDULE
LOW VOLUME IRRIGATION EQUIPMENT SCHEDULE
A
B
E
E
IRRIGATION ROTOR HEAD SCHEDULE
MODEL WATER EFFICIENT LANDSCAPE ORDINANCE COMPLIANCE
IRRIGATION MULTI-STREAM ROTARY HEAD SCHEDULE
LATERAL LINE SIZING CHART
REMOTE CONTROL VALVE KEY
SITE GRADING NOTE:
SITE IRRIGATION NOTES:
I R
R I G
A T
I O
N
L
E G
E N
D S
L4.00
550 South Hope Street
Suite 2500
Los Angeles, California
90071 USA
(213) 542-4500
WWW.HED.DESIGN
111 SW Oak Street, SUITE 200
PORTLAND, OR. 97204
503-228-3122
2464 West Port Plaza Drive, Suite 200 St. Louis, MO 63146 314.863.5717 hastingschivetta.com
600 Moulton Ave Suite 405, LA, CA, 90031
323.226.1112 | www.rotoark.com
D E S I G N E D
B Y
S F
D R A W N
B Y
S F
D E S I G N
C H E C K
B Y
S F
D R A F T I N G
C H E C K
B Y
S F
G R A P H I C
S C A L E
DRAWING NO.
SHEET
SPECS R-7274
SHEET REF.
DRAWINGS B-4835
T-2
OF
ISSUANCES
B E
L M
O N
T
B
E A
C H
A
Q U
A T
I C
S
C
E N
T E
R
B
E L
M O
N T
P
O O
L
NQ. DATE DESCRIPTION
0��02�2025 ISSUE FOR BID
Associates PLLC
10�0��2025 AFFGPFWO �2
E
E
550 South Hope Street
Suite 2500
Los Angeles, California
90071 USA
(213) 542-4500
WWW.HED.DESIGN
111 SW Oak Street, SUITE 200
PORTLAND, OR. 97204
503-228-3122
2464 West Port Plaza Drive, Suite 200 St. Louis, MO 63146 314.863.5717 hastingschivetta.com
600 Moulton Ave Suite 405, LA, CA, 90031
323.226.1112 | www.rotoark.com
D E S I G N E D
B Y
S F
D R A W N
B Y
S F
D E S I G N
C H E C K
B Y
S F
D R A F T I N G
C H E C K
B Y
S F
G R A P H I C
S C A L E
DRAWING NO.
SHEET
SPECS R-7274
SHEET REF.
DRAWINGS B-4835
T-2
OF
ISSUANCES
B E
L M
O N
T
B
E A
C H
A
Q U
A T
I C
S
C
E N
T E
R
B
E L
M O
N T
P
O O
L
NQ. DATE DESCRIPTION
0��02�2025 ISSUE FOR BID
Associates PLLC
10�0��2025 AFFGPFWO �2
I R
R I G
A T
I O
N
D
E T
A I L
S
L4.11
Techline® HCVXR END FEED LAYOUT
REMOTE CONTROL VALVE WITH
DISC FILTER AND PRV
TECHLINE® START CONNECTION
AREA PERIMETER
SEE SPECIFICATIONS
FOR ROW SPACING
PERIMETER LATERALS
2" TO 4" FROM EDGE
TECHLINE® HCVXR DRIPLINE
MANUAL FLUSH VALVE
PLUMBED TO PVC OR POLY
PVC OR POLY EXHAUST HEADER
PVC OR POLY SUPPLY HEADER
NOTE:
1. RECOMMENDED MINIMUM FILTRATION:
120 MESH
2. PRESSURE AT FLUSH VALVE SHALL BE
MIN 21.8 PSI
3. HIGH CHECK VALVE (MAX 8.5' OF
WATER (ELEVATION CHANGE))
4. REFER TO MAXIMUM LENGTH OF A
SINGLE LATERAL CHART
Techline® HCVXR CENTER FEED LAYOUT
REMOTE CONTROL VALVE WITH
DISC FILTER AND PRV
AREA PERIMETER
PERIMETER LATERALS 2"
TO 4" FROM EDGE
Techline® HCVXR DRIPLINE
SEE SPECIFICATIONS FOR ROW
SPACING
PVC OR POLY EXHAUST HEADER
PVC OR POLY SUPPLY HEADER
MANUAL FLUSH VALVE
PLUMBED TO PVC OR POLY (TYP)
Techline® START CONNECTION
PVC OR POLY EXHAUST HEADER
NOTE:
1. RECOMMENDED MINIMUM FILTRATION:
120 MESH
2. PRESSURE AT FLUSH VALVE SHALL BE
MIN 21.8 PSI
3. HIGH CHECK VALVE (MAX 8.5' OF
WATER (ELEVATION CHANGE))
4. REFER TO MAXIMUM LENGTH OF A
SINGLE LATERAL CHART
Techline® HCVXR ISLAND LAYOUT
REMOTE CONTROL VALVE WITH
DISC FILTER AND PRV
ISLAND PERIMETER
Techline® HCVXR DRIPLINE
MANUAL FLUSH VALVE
PLUMBED TO PVC OR POLY
PVC OR POLY EXHAUST HEADER
Techline® START CONNECTION
SEE SPECIFICATIONS
FOR ROW SPACING
PERIMETER LATERALS
2" TO 4" FROM EDGE
PVC OR POLY SUPPLY HEADER
NOTE:
1. RECOMMENDED MINIMUM FILTRATION:
120 MESH
2. PRESSURE AT FLUSH VALVE SHALL BE
MIN 21.8 PSI
3. HIGH CHECK VALVE (MAX 8.5' OF
WATER (ELEVATION CHANGE))
4. REFER TO MAXIMUM LENGTH OF A
SINGLE LATERAL CHART
Techline® HCVXR IRREGULAR AREAS: Triangular
MANUAL FLUSH VALVE
PLUMBED TO PVC OR POLY
Techline® START CONNECTION
AREA PERIMETER
Techline® HCVXR DRIPLINE
REMOTE CONTROL VALVE
WITH DISC FILTER AND PRV
PVC OR POLY SUPPLY HEADER
Techline® TEE
EXHAUST HEADER PVC OR POLY
PERIMETER LATERALS 2"
TO 4" FROM EDGE
SEE SPECIFICATIONS
FOR ROW SPACING
NOTE:
1. RECOMMENDED MINIMUM FILTRATION:
120 MESH
2. PRESSURE AT FLUSH VALVE SHALL BE
MIN 21.8 PSI
3. HIGH CHECK VALVE (MAX 8.5' OF
WATER (ELEVATION CHANGE))
4. REFER TO MAXIMUM LENGTH OF A
SINGLE LATERAL CHART
Techline® HCVXR LAYOUT, 1 VALVE- TOP OF SLOPE
AIR/VACUUM RELIEF VALVE (PLUMBED
TO PVC)
Techline® START CONNECTION
AREA PERIMETER
Techline® HCVXR DRIPLINE
PVC OR POLY SUPPLY HEADER
IN-LINE SPRING CHECK
VALVE
REMOTE CONTROL VALVE
WITH DISC FILTER AND PRV
PERIMETER LATERALS
2" TO 4" FROM EDGE
PVC OR POLY EXHAUST HEADER
MANUAL FLUSH VALVE
PLUMBED TO PVC OR POLY (TYP)
SLOPE
SEE SPECIFICATIONS FOR ROW SPACING
INCREASE LOW ROW SPACING BY 25% MAX
DEPENDING ON SOIL TYPE
8'-6"
MAX
8'-6"
MAX
8'-6"
MAX
TOP OF SLOPE
TOE OF SLOPE
NOTE:
1. RECOMMENDED MINIMUM FILTRATION:
120 MESH
2. PRESSURE AT FLUSH VALVE SHALL BE
MIN 21.8 PSI
3. HIGH CHECK VALVE (MAX 8.5' OF
WATER (ELEVATION CHANGE))
4. REFER TO MAXIMUM LENGTH OF A
SINGLE LATERAL CHART
5. CHECK VALVE TYPE AND SIZE SHALL
BE SPECIFIED BY ORIENTATION &
FLOW REQUIREMENTS NOT LINE SIZE.
Techline® HCVXR SUBGRADE INSTALLATION
1. 2"-3" MULCH LAYER PER PLAN WHERE OCCURS
2. FINISHED GRADE.
3. AMENDED SOIL REMOVED, STOCKPILED & REPLACED POST
TUBING INSTALL. 2"-3" FOR DG & 4"-6" FOR MULCH.
4. NETAFIM TECHLINE HCVXR DRIP TUBING
5. RIPPED/TILLED & AMENDED SUB-GRADE PER AGRONOMIC SOILS
REPORT TO A DEPTH OF 10"-12"
6. 3"-4" DECOMPOSED GRANITE PER PLAN WHERE OCCURS
4"-6"
2"-3"
* REFER TO PLANS FOR TUBING SPACING
LEGEND
1. RECOMMENDED MINIMUM
FILTRATION: 120 MESH
2. PRESSURE AT FLUSH VALVE SHALL
BE MIN 21.8 PSI
3. HIGH CHECK VALVE (MAX 8.5' OF
WATER (ELEVATION CHANGE))
4. REFER TO MAXIMUM LENGTH OF A
SINGLE LATERAL CHART
NOTE:
NOT TO SCALE DETAIL - H114
SEE "Techline® HCVXR PARKING
ISLAND LAYOUT", DETAIL
H103 FOR PLAN VIEW
OF THIS APPLICATION
Techline® HCVXR SUB-HEADER INSTALLATION
Techline® START
CONNECTION (TYP) REFER
TOCONNECTION DETAIL - XXX
Techline® HCVXR DRIPLINE
FINISH GRADE
NOTE:
1. SEE PLANS AND LEGEND FOR ALL DIMENSIONS AND Techline® HCVXR DRIPLINE SPACING.
2. RATIO OF Techline® HCVXR DRIPLINES TO START CONNECTIONS IS SHOWN AT 2:1, BUT MAY VARY
PER HYDRAULIC DEMAND ON START CONNECTIONS. SEE PLANS AND LEGEND.
COMPACTED SUBGRADE
PVC HEADER
Techline® TEE (TYP)
1. RECOMMENDED MINIMUM
FILTRATION: 120 MESH
2. PRESSURE AT FLUSH VALVE SHALL
BE MIN 21.8 PSI
3. HIGH CHECK VALVE (MAX 8.5' OF
WATER (ELEVATION CHANGE))
4. REFER TO MAXIMUM LENGTH OF A
SINGLE LATERAL CHART
NOTE:
UPUP
D W
(E) SCE SERVICE
MANHOLE
(1) - 5"C
SEE SINGLE LINE
DIAGRAM.
8' x 10' UTILITY TRANFORMER SLAB
BOX PER SCE REQUIREMENTS AND
STANDARDS. REFER TO SHEETS
A-101A and AA101A FOR FURTHER
LAYOUT DETAIL
50M POOL
(EXTERIOR)
INSTRUCT
POOL
REC POOL
SUPPORT BUILDING
MAIN
ELEC
SPORTS LIGHTING
POLE P1
EXISTING LANDSCAPE
OLYMPIC PLAZA BLVD
S T
E R
M
IN
O A
V E
EP101A
SPORTS LIGHTING
POLE P6
SPORTS LIGHTING
POLE P5
SPORTS LIGHTING
POLE P4
SPORTS LIGHTING
POLE P3
SPORTS LIGHTING
POLE P2
SEE MUSCO FIXTURE
SCHEDULE
50'-0" AFF (TYP)
MAIN SERVICE AND
METER SWITCHBOARD
'MS'
(2) - 4"C
(2) - 3"C
SEE DETAIL
2/E-502 (TYP)
PULLBOX #1
SEE SINGLE
LINE
ENTRY BUILDING
(1) - 3"C
SEE DETAIL
1/E-502
EMBEDDED LIGHT FIXTURE 'S1' IN CANE
DETECTION RAIL AS IDENTIFIED ON SHEET
A-101. TYPICAL FOR PERIMETER WALKWAY.
SEE SHEETS A-542 FOR RAIL DETAILS AND
A-421, A-422 FOR ELEVATIONS
LINEAR RAIL
EMBEDDED LIGHT
FIXTURE (TYP)
LINEAR RAIL
EMBEDDED LIGHT
FIXTURE (TYP)
(TYP)S1
S1
S1
S1
S1
S1
S2
S1
(TYP)
(E) LIGHT POLE
SEE CIVIL DRAWINGS
(TYP)
S5
S5A
S5
S5
S5
S5
S5 30' AFG
30' AFG
S5
S5 30' AFG
25' AFG
(TYP)
EXISTING
EAST POOL
NOT IN
SCOPE
X1
7'-8" AFF
(TYP)
X1
X1X1
X1
S6
40' AFG
S6
40' AFG
(E) LIGHT
POLE
(E) LIGHT
POLE
(E) LIGHT
POLE
(E)
RELOCATED
LIGHT POLE
(E) LIGHT
POLE
(E) LIGHT
POLE
(E) LIGHT
POLE
X1
X1
X1
L3
SEE EP101C FOR
IRRIGATION
CONTROLLER POWER
S1
S1
S1
L1 - 11
L1 - 11
L1 - 3
INV-1 - 2 L1 - 6 L1 - 6
L1 - 7
L1 - 7
L1 - 7
L1 - 10
L1 - 5
L1 - 5
L1 - 4
L1 - 5
L1 - 4
L1 - 4
L1 - 1
L1 - 1
L1 - 1
L1 - 1
INV-1 - 1
INV-1 - 1
INV-1 - 1
INV-1 - 1
L1 - 3
L1 - 3
L1 - 3
INV-1 - 3
INV-1 - 3
L1 - 2
L1 - 2 L1 - 2
L1 - 10
L3 - 5
L3 - 5
L3 - 5
L3 - 5
L3 - 5
L3 - 5 L1 - 10
S5A
J
J
J
J
J
J
J J
JJ
J
JJJ
J
J J
J
J
J
J
J
J
JJ
JJJJJJJJJJJJJJJJJJJJ
J
J
J
J
J J
(TYP)
S5
J
L3 - 6J
J
L3
L3 - 7 L3 - 7 L3 - 7 L3 - 7 L3 - 7 L3 - 7 L3 - 7 L3 - 7 L3 - 7 L3 - 7
L3 - 6
L3 - 7
L3 - 7
L3 - 7
L3 - 7L3 - 7L3 - 7L3 - 7L3 - 7L3 - 7L3 - 7L3 - 7L3 - 7L3 - 7
L3 - 7
L3 - 7
L3 - 7
L3 - 5
L3 - 5
L3 - 6
L3 - 6 L3 - 6 L3 - 6L3 - 6
L3 - 6
L1 - 10
L1 - 10 L1 - 10
L1 - 13
L1 - 13
L1 - 13
L1 - 13
L3
L3 - 5L3 - 5L3 - 5L1 - 10
L1 - 10
S5A
S5A
S5A
S5A
30'
AFG
25' AFG
(TYP)
L3 - 1 L1 - 10
L1 - 13
L1 - 10 L3 - 6
L3 - 1
L3 - 1
PULLBOX #2
SEE SINGLE
LINE
ES101
(EXTERIOR)
S2 S2 S2
EMBEDDED LIGHT FIXTURE 'S1' IN STANDARD
HEIGHT HANDRAIL AS IDENTIFIED ON SHEET
A-101. TYPICAL FOR STAIRS AND RAMPS. SEE
SHEETS A-542 FOR RAIL DETAILS AND A-421,
A-422 FOR ELEVATIONS
E
E
ELEC YARD
MECH YARD
SUPPORT BUILDING
(T Y
P
(T Y
P
2464 West Port Plaza Drive, Suite 200
St. Louis, MO 63146
314.863.5717 hastingschivetta.com
600 Moulton Ave Suite 405, LA, CA, 90031
323.226.1112 | www.rotoark.com
D E S
IG
N E D
B Y
D R A W N
B Y
D E S
IG
N
C H E C K
B Y
D R A F T
IN
G
C H E C K
B Y
G R A P H
IC
S C A L E
DRAWING NO.
SHEET
SPECS R-7274
SHEET REF.
DRAWINGS B-4835
T-2
OF
ISSUANCES
:2 :3
P M
A u to d e s k
D o c s C O B e lm o n t B e a c h
A q u a ti c
C tr
R e d e s ig n
C O E le c H E D .r v t
S B a n i
S B a n i
G .P a lo d y
G .P a lo d y
E le c tr ic a l S it e P la n
B E
L M
O N
T B
E A
C H
A Q
U A
T
IC
S C
E N
T E
R
B E
L M
O N
T P
O O
L
ES101
N
1" = 20'-0"
ELECTRICAL SITE PLAN
550 South Hope Street Suite 2500 Los Angeles, California
90071 USA
(213) 542-4500
WWW.HED.DESIGN
KEYED NOTES
BUILDING SURFACE LINEAR EXTERIOR DOWN LIGHTING.
SEE ARCHITECTURAL MOUNTING DETAIL. (TYP)
BUILDING LINEAR LED PTFE UPLIGHTING. MOUNTED ON LEDGE
ABOVE CMU. SEE ARCHITECTURAL MOUNTING DETAILS ON
SHEET A-532. (TYP)
PROVIDE (2) 3" CONDUITS FROM BLEACHER CANOPY
STRUCTURE CAPPED AT MAIN SWITCHBOARD IN ELECTRICAL
YARD.
RELOCATE ADJACENT EXISTING JUNCTION BOX AS NECESSARY
TO MAINTAIN CONTINUITY FOR EXISTING LIGHT POLES ON THE
SAME CIRCUIT.
JUNCTION BOX REFERS TO CONNECTION TO POWER SUPPLY.
EXTEND CIRCUIT AND PROVIDE CONNECTION TO RAIL POST-
MOUNTED POWER SUPPLY FOR ILLUMINATED RAIL. MAXIMUM
DISTANCE FOR POWER SUPPLY IS APPROX 20'. REFER TO
MANUFACTURER RECOMMENDATIONS.
PROVIDE CIRCUIT FOR SIGN LIGHTING PER SIGNAGE SHEETS
GR-107 AND GR-108. PROVIDE SEPARATE LIGHT SWITCH FOR
SIGNAGE IN THE CONTROL OFFICE.
SEE ARCHITECTURAL DOOR SCHEDULE. THE DOOR(S) SHALL
OPEN IN THE DIRECTION OF EGRESS AND BE EQUIPPED WITH
LISTED PANIC HARDWARE PER (110.26(C)(3))
1/8" = 1'-0"
ENLARGED PLAN - MAIN ELECTRICAL
SERVICE YARD
No. DATE DESCRIPTION
09/02/2025 ISSUE FOR BID
E 10/09/2025 ADDENDUM #2
BREAK ROOM, STORAGE, MULTIPURPOSE
CEILING OCCUPANCY SENSOR
LIGHTING CONTROL WIRING DIAGRAM
TYPICAL MALE & FEMALE RESTROOM
LIGHTING CONTROL WIRING DIAGRAM
RPD
277V FEED
(EMERGENCY)
277V FEED
(NORMAL)
WALL WASH
FIXTURE (TYP.)
SEE LIGHTING FIXTURE
SCHEDULE
LIGHTING FIXTURE
DESCRIPTION PRODUCT #SYMBOL
SEE LIGHTING FIXTURE
SCHEDULE
WALL WASH FIXTURE
RPD
M
RPD
277V FEED
(NORMAL)
BRG
CAT6
(TYP.)
EPDBRG
BRG NETWORK BRIDGE NLIGHT NBRG 8 KIT OR EQUIV
NORMAL CIRCUIT ROOM CONTROLLER
WITH 0-10V DIMMING
NLIGHT NPP16D
OR EQUIV
ELECTRICAL /MDF ROOM
LIGHTING CONTROL WIRING DIAGRAM
ON/OFF RAISE LOWER
SINGLE ZONE WALL
SWITCH
ON/OFF
EMERGENCY CIRCUIT ROOM CONTROLLER NLIGHT EPP16 OR EQUIVEPD
TO
NETWORK
BRIDGE
TO
NETWORK
BRIDGE
277V FEED
(EMERGENCY)
BRG
CAT6
(TYP.)
TO
NETWORK
BRIDGE
EPD
OFFICES, OPEN OFFICE, STAFF ROOM,
LIGHTING CONTROL WIRING DIAGRAM
o s
RPD
277V FEED
(NORMAL)
BRG
TO
NETWORK
BRIDGE
ON/OFF RAISE LOWER
2-ZONE WALL SWITCH
ZONE 1
ZONE 2
ON/OFF
OS
ON/OFF WALL SWITCH
OCCUPANCY SENSOR
LOCKERS AND LARGE RESTROOMS
LIGHTING CONTROL WIRING DIAGRAM
RPD
277V FEED
(NORMAL)
BRG
TO
NETWORK
BRIDGE
o s
$os ON/OFF WALL SWITCH OCCUPANCY SENSOR o s
ON/OFF & RAISE/LOWER WALL SWITCH NLIGHT NPODMA DX OR
EQUIVALENT
OCCUPANCY SENSOR NLIGHT NCM PDT 9 OR EQUIVM
BUILDING
NETWORK
NETWORK
SEGMENT
MANAGER
(ELEC ROOM)
TO HANDRAIL
LIGHTING
LIGHTING
CONTROL PANEL
(ELEC ROOM)
AREA
CONTROLLER
TO INDOOR
LIGHTING
FIXTURES
TO SITE POLE
MOUNT LIGHTING
(NOT SPORTS)
TO EXTERIOR
BUILDING LIGHTING
NETWORK SEGMENT MANAGER WITH
ASTRONOMICAL TIME CLOCK /
SCHEDULING CAPABILITY.
DEMAND RESPONSE CAPABILITY
DESCRIPTION
LIGHTING CONTROL PANEL RELAY SCHEDULE
RELAY
RAIL LIGHTING ENTRANCE1
RAIL LIGHTING SOUTH - WEST
SITE POLE LIGHTING - NORTH, DECK
RAIL LIGHTING NORTH - EAST
ENTRY BUILDING EXTERIOR AND SIGNAGE7
SITE POLE LIGHTING - EAST
SITE POLE LIGHTING - SOUTH - WEST
SPARE
SPARE
SPARE
SPARE
SPARE
PHOTOCELL
/ DAYLIGHT
SENSORS
2464 West Port Plaza Drive, Suite 200
St. Louis, MO 63146
314.863.5717 hastingschivetta.com
600 Moulton Ave Suite 405, LA, CA, 90031
323.226.1112 | www.rotoark.com
D E S
IG
N E D
B Y
D R A W N
B Y
D E S
IG
N
C H E C K
B Y
D R A F T
IN
G
C H E C K
B Y
G R A P H
IC
S C A L E
DRAWING NO.
SHEET
SPECS R-7274
SHEET REF.
DRAWINGS B-4835
T-2
OF
ISSUANCES
:2 :3
P M
A u to d e s k
D o c s C O B e lm o n t B e a c h
A q u a ti c
C tr
R e d e s ig n
C O E le c H E D .r v t
S B a n i
S B a n i
G .P a lo d y
G .P a lo d y
L ig h ti n g C o n tr o ls a n d F ix tu re S c h e d u le
B E
L M
O N
T B
E A
C H
A Q
U A
T
IC
S C
E N
T E
R
B E
L M
O N
T P
O O
L
E-611
550 South Hope Street Suite 2500 Los Angeles, California
90071 USA
(213) 542-4500
WWW.HED.DESIGN
NOT TO SCALE1
AREA LIGHTING CONTROL
DIAGRAMS
INTERIOR -LIGHTING FIXTURE SCHEDULE
Type Mark Description
CONSTRUCTION
LIGHT
SOURCE
Color
Temperature
(CCT)
ELECTRICAL PRODUCT
DESCRIPTION MOUNTING CRI VOLT WATTS W/ft MFR Model
A1 4FT LINEAR SURFACE LIGHT -
UTILITY AREAS
LINEAR PENDANT SURFACE 90 3500 K 277 V 30 W 7.5 LITHONIA ZL1N L48 5000LM FST
MVOLT 35K 80 CRI
A3 4FT LINEAR DIRECT INDIRECT
FIXTURE
LINEAR PENDANT SUSPENDE
D
90 3500 K 277 V 30 W 7.5 FINELITE HP-4-ID-4FT-H-B-935-TG-F-96
LG-277-SC-FC10
R1 RECESSED LIGHT WET LISTED
SHOWERS
4" DOWNLIGHT RECESSED 90 3500 K 277 V 12 W PRESCOLITE LTR-4RD-H-SL10L-DM1-LTR4
D-T-SH-SL-35K-9
W2 2FT LINEAR WALL SURFACE
MOUNT
LINEAR WALL MOUNT, WITH INTEGRAL OCCUPANCY/ DAYLIGHT
SENSORS FOR FIXTURES NOTED ON PLANS
SURFACE
WALL
HORIZONTA
L
80 3500 K 277 V 15 W SELUX L60-1C45-935-BW-W-02-BL-U-
DIM-S3
W3 LINEAR TAPE LED, SURFACE
MOUNT CHANNEL FOR ENTRY LID
LIGHTING
CORE
ARCHITECTURAL
LSMW50HF OR EQUIVALENT
X1 EXIT EXIT SIGN, EDGE-LIT, RED LETTERING, 1-SIDED WALL 0 0 K 277 V 5 W LITHONIA EDG 1 R EL WM
SPORTS LIGHTING FIXTURE SCHEDULE (MUSCO)
LIGHTING FIXTURE SCHEDULE - ADD ALTERNATE BLEACHER AND RESTROOMS ON EL101A
Type Mark Description
CONSTRUCTION
LIGHT
SOURCE
Color
Temperature
(CCT)
ELECTRICAL PRODUCT
DESCRIPTION MOUNTING CRI VOLT WATTS W/ft MFR Model
A1 4FT LINEAR SURFACE LIGHT -
UTILITY AREAS
LINEAR PENDANT SURFACE 90 3500 K 277 V 30 W 7.5 LITHONIA ZL1N L48 5000LM FST
MVOLT 35K 80 CRI
S5A POLE AREA LIGHT RECTANGULAR AREA LED, POLE MOUNTED, TYPE IV
DISTRIBUTION, ON/OFF DIMMING, MINIMUM 10,000 LUMNES
ALUMINIMUM, DARK BRONZE FINISH.
FOR FIXTURES NOT MOUNTED ON SPORTS LIGHTING POLES,
PROVIDE 25' POLE, 4.5-INCH SQUARE, STRAIGHT, ALUMINUM
WITH UV-RESISTANT POWDER COATING, WITH BASE FOR
MOUNTING TO CONCRETE FOUNDATION. DARK BRONZE
FINISH. LIGMAN ADP160140 OR EQUIVALENT
SQUARE
POLE
80 3000 K 277 V 105 W LIGMAN LIGHTING DE-20003-T4-W30
W2 2FT LINEAR WALL SURFACE
MOUNT
LINEAR WALL MOUNT, WITH INTEGRAL OCCUPANCY/
DAYLIGHT SENSORS FOR FIXTURES NOTED ON PLANS
SURFACE
WALL
HORIZONTAL
80 3500 K 277 V 15 W SELUX L60-1C45-935-BW-W-02-BL-U-
DIM-S3
NOTES:
1. SEE PERFORMANCE-BASED SPECIFICATION DIVISION 26 5668 FOR
SPORTS LIGHTING 'S3'.
EXTERIOR- LIGHTING FIXTURE SCHEDULE
Type Mark Description
CONSTRUCTION
LIGHT
SOURCE
Color
Temperature
(CCT)
ELECTRICAL PRODUCT
DESCRIPTION MOUNTING CRI VOLT WATTS W/ft MFR Model
S1 INTEGRATED RAIL LED STANDARD HEIGHT FOR ALL STAIRS AND RAMPS, OTHERWISE
8.5" HEIGHT AFG, HEAVY DUTY STAINLESS STEEL 316 LED
INTEGRATED CANE RAIL, MIN 100 LUMENS/FT, WILDLIFE AMBER
CCT, ASYMMETRIC DISTRIBUTION, EXTERIOR RATED, B0-U0-G0.
277 VOLT DRIVER SHALL BE INTEGRATED INTO VERTICAL POST
SUPORTS
-- 90 2700 K 277 V <varies> 1.5 ORGANIC RAIL HR2-LENGTH PER
PLANS-P-A-ND-A-CU-LA-E-ID
S2 LINEAR SURFACE MOUNT,
EXTERIOR WET RATED, FOR
ENTRY CANOPY AREA
LINEAR SURFACE MOUNT -- 90 3000 K 277 V 36 W 9 SELUX W60-1C35-935-NB-F-XX-WH-
DIM-EC
S3 SPORTS LIGHTING LED, SEE NOTE
1, MOUNTED 50'-0" AFG, 500W AND
900W FIXTURES, MINIMUM 67K
LUMEN, S
MUSCO TLC SERIES 500 AND 900
S5 POLE AREA LIGHT RECTANGULAR AREA LED, POLE MOUNTED, TYPE II
DISTRIBUTION, ON/OFF DIMMING, MINIMUM 10,000 LUMNES
ALUMINIMUM, DARK BRONZE FINISH.
FOR FIXTURES NOT MOUNTED ON SPORTS LIGHTING POLES,
PROVIDE 25' POLE, 4.5-INCH SQUARE, STRAIGHT, ALUMINUM
WITH UV-RESISTANT POWDER COATING, WITH BASE FOR
MOUNTING TO CONCRETE FOUNDATION. DARK BRONZE
FINISH. LIGMAN ADP160140 OR EQUIVALENT
SQUARE
POLE
80 3000 K 277 V 105 W LIGMAN LIGHTING DE-20003-T2-W30
S5A POLE AREA LIGHT RECTANGULAR AREA LED, POLE MOUNTED, TYPE IV
DISTRIBUTION, ON/OFF DIMMING, MINIMUM 10,000 LUMNES
ALUMINIMUM, DARK BRONZE FINISH.
FOR FIXTURES NOT MOUNTED ON SPORTS LIGHTING POLES,
PROVIDE 25' POLE, 4.5-INCH SQUARE, STRAIGHT, ALUMINUM
WITH UV-RESISTANT POWDER COATING, WITH BASE FOR
MOUNTING TO CONCRETE FOUNDATION. DARK BRONZE
FINISH. LIGMAN ADP160140 OR EQUIVALENT
SQUARE
POLE
80 3000 K 277 V 105 W LIGMAN LIGHTING DE-20003-T4-W30
S6 POLE AREA LIGHT RECTANGULAR AREA LED, POLE MOUNTED, TYPE ME
DISTRIBUTION, ON/OFF DIMMING, MINIMUM 10,000 LUMNES
ALUMINIMUM, DARK BRONZE FINISH.
FOR FIXTURES NOT MOUNTED ON SPORTS LIGHTING POLES,
PROVIDE 25' POLE, 4.5-INCH SQUARE, STRAIGHT, ALUMINUM
WITH UV-RESISTANT POWDER COATING, WITH BASE FOR
MOUNTING TO CONCRETE FOUNDATION. DARK BRONZE
FINISH. LIGMAN ADP160140 OR EQUIVALENT
SQUARE
POLE
80 3000 K 277 V 105 W LIGMAN LIGHTING DE-20003-ME-W30
NOT TO SCALE2
OVERALL LIGHTING CONTROL
DIAGRAMS
No. DATE DESCRIPTION
09/02/2025 ISSUE FOR BID
E 10/09/2025 ADDENDUM #2
X
TE
R
IO
R
S
IG
N S
GR-107
M ad e In
S pa ce
M ad e In
S pa ce
M ad e In
S pa ce
M ad e In
S pa ce
ADDRESS SIGN
LOCATION
II
III III
III III
III III
III III
III III
ENTRY BUILDING NORTH
1/8”=1’-0”
A
B
SIGNAGE DETAIL
1/2”=1’-0”
B
A
SIGN TYPE BN041
36’-7”
EQ. EQ. EQ. EQ.
2’-0”1’-3”
ADDRESS SIGN BN04
SEE DRAWING 1 BELOW
ADDRESS SIGN DETAIL
1/2”=1’-0”B
ADDRESS SIGN LOCATION
BUILDING ID SIGN BN03
SEE DRAWING 2 ABOVE
1’-2”
9” 10.5”
SIGN TYPE BN032
belmont plaza po ol belmo nt plaza p ool
PLINTH AREA B PLAN
1/16”=1’-0”CENTRY BUILDING NORTH
1/8”=1’-0”A
B
A
SIGN TYPE BN03
QUANTITY: 1
4” DEEP PAINTED ALUMINUM SIGN
CABINET WITH ATTACHED 3.5” DEEP
REVERSE CHANNEL HALO LIT
ALUMINUM LETTERFORMS. PIN
MOUNT LETTERS 1.5“ FROM
CABINET FACE. PAINT AND CLEAR
COAT ALL SURFACES.
ELECTRICAL TO BE 277V.
SECURE CABINET TO CANOPY
STRUCTURE. CABINET TO BE 1/8”
ALUMINUM OR AS REQD TO AVOID
OIL CANNING. NOTE 3 SEAMS ON
SIGN FACE, 10’ ALUMINUM SHEET
REQD.
NOTE:
ALL NON-REGULATORY SIGNS TO BE
SUBMITTED BY SIGN FABRICATOR UNDER
SEPERATE PERMIT.
NOTE:
ALL NON-REGULATORY SIGNS TO BE
SUBMITTED BY SIGN FABRICATOR UNDER
SEPERATE PERMIT.
P2
P1
A
SIGN TYPE BN03
QUANTITY: 1
3.5” DEEP PAINTED W/ CLEAR COAT
ALUMINUM REVERSE CHANNEL
HALO LIT ALUMINUM LETTERS.
PIN MOUNTED 1.5” FROM BUILDING
FACADE. ELECTRICAL TO BE 277V.
P2
MATTHEWS PAINT BLUE
TO MATCH PANTONE 2728C
A
SIGN CABINET
P8 CLEAR COAT
LETTERFORMS
P8 CLEAR COAT
belmont plaza poolbe l mo nt pla za p o o l
E
E
BELMONT PLAZA POOL Addendum #2
Belmont Plaza Pool Page i R-7274 / B-4835 City of Long Beach Table of Contents
CONTRACT DOCUMENTS
TABLE OF CONTENTS
DIVISION A – NOTICE INVITING BIDS
Notice Inviting Bids ...................................................................................................... A-1
DIVISION B – INSTRUCTION TO BIDDERS
Instruction to Bidders ................................................................................................... B-1
DIVISION C.1 – BID DOCUMENTS, BID DEADLINE #1
Bid Form ...................................................................................................................... C-2 Bidder Information / Signature Form ............................................................................ C-4 C01-List of Subcontractors .......................................................................................... C-7 C02-Non-collusion Declaration .................................................................................... C-9 C03-Workers Compensation Certification ..............................
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .