Questions and Answers~10.docx
DOCX document 23 KB Posted
- Attached to
- Re-Bid NEW BOILER AT CHICAGO WEST
- Solicitation number
- 26-350SOS-SOS35-B-52358
- Issued by
- Cook County, Illinois
About this file
This is a Questions and Answers document for the Illinois Secretary of State's re-bid for installation of a new boiler at the Chicago West facility located at 5301 W. Lexington Street, Chicago, Illinois. The document addresses clarifications regarding mechanical and controls work required for the project. Key technical requirements include removal of existing pneumatic controls piping and replacement with new control devices, specifically differential pressure sensors around all new pumps and boilers, temperature sensors on inlet and outlet of new boilers, and temperature sensors around common piping for mixing and supply water temperatures. The new controls contractor shall integrate into the existing BACNET Eclypse system managed by Automatic Building Controls. Additionally, the project requires installation of a new 4-inch expansion tank on a concrete housekeeping pad with location and schedule details referenced in Addendum 1 (drawings M2.01L and M6.01), and a new 4-inch air separator specified as B&G model R-4F or equal per drawing M2.01L.
The document clarifies that the mechanical contractor shall serve as the prime contractor responsible for subcontracting electrical work, which represents a minor portion of the overall scope. All new controls work shall be performed by ABC (Automatic Building Controls), with specifications and integration requirements outlined in drawing M5.03, note 5 of Addendum 1. The questions and answers were addressed by MCA on April 21, 2026, providing contractors with necessary technical guidance for bid preparation and project execution.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Vendor Disclosure v 24.1 Formerly Forms A~17.docx | DOCX document | |
| Chicago West Boiler Re-bid IFB 26PS759001~1.pdf | ||
| M2.01L-MECHANICAL HYDRONIC PIPING LOWER PLAN N.pdf | ||
| IPG Active Registered Vendor Disclosure formerly Forms B v.23.1~40.docx | DOCX document | |
| Mechanical Drawings.pdf | ||
| Questions and Answers Set 1~10.docx | DOCX document | |
| Electrical Drawings.pdf | ||
| Addendum 1.pdf | ||
| Questions and Answers Set 2~1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions & Answers
1. Drawing M0.04 Note HHH states that we are to remove pneumatic controls piping, fittings, hangers, and appurtenances replaced with new controls system. Can you please provide a detailed list of control items to be replaced.
MCA 4/21/2026: Refer to control diagram M5.03 note 5 of addendum 1. At a minimum, contractor shall provide Differential pressure sensors around all new pumps, differential pressure sensors around all new boilers, temperature sensors on inlet and outlet of all new boilers, and temperatures around the common pipe for mixing and supply water temperatures. All other control devices are existing to remain.
2. Can you please provide the name and contact for the facilities control contractor? Is there a specified control contractor for the new work?
MCA 4/21/2026: Refer to general note AO on M0.04 of addendum 1. Existing controls contractor is Automatic Building Controls. All new controls shall integrate into the existing BACNET Eclypse system and the new controls contractor shall be ABC.
3. Details #8 on M7.01 show an expansion tank on a concrete pad. Will a new expansion tank be required? Can you please provide a schedule and location on the drawings if an expansion tank is required?
Provide 4” concrete housekeeping pad. Refer to Addendum 1 for location of new tank (M2.01L) and schedule data (M6.01).
4. The drawings are calling for a new air separator. There is no schedule provided for a separator. Can you please provide a schedule for the new air separator?
Refer to note on M2.01L of addendum 1. Provide new 4” air separator, B&G model R-4F or equal.
5. Clarification: “The electrical is a minor portion of the work and unless SOS requires otherwise, I suggest the mechanical contractor hold the responsibility of sub-contracting the electrical work under them. In other words, the Mechanical should act as the prime for all scope of work.”